Muyni
← Back to Arlington Heights

Plat and Subdivision Committee

Regular Meeting

Arlington Heights, IL · February 8, 2017

Agenda

Agenda

Village of Arlington Heights Plat and Subdivision Committee Community Room, 3rd Floor Arlington Heights Village Hall 33 S. Arlington Heights Road Arlington Heights, IL 60005 February 8, 2017 7:00 PM I. CALL TO ORDER II. ROLL CALL III. APPROVAL OF MINUTES IV. REPORTS V. OLD BUSINESS VI. NEW BUSINESS A. Hearts Place Apartments - 120-122 E. Boeger Dr. - T1582 Rezoning, PUD for Assisted Housing VII. OTHER BUSINESS VIII.ADJOURNMENT Persons with disabilities requiring auxiliary aids or services, such as an American Sign Language interpreter or written materials in accessible formats, should contact David Robb, Disability Services Coordinator, at 33 S. Arlington Heights Road, Arlington Heights, Illinois 60005, (847)368-5793 (Voice), (847)368-5980 (Fax) or drobb@vah.com. Item: Hearts Place Apartments - 120-122 E. Boeger Dr. - T1582 Department: Planning & Community Development Requested Action 1. A rezoning from B-1, Limited Retail Business District and B-2, General Business District to I, Institutional. 2. A preliminary Planned Unit Development (PUD) to allow the construction of a two story, 16 unit supportive housing development. 3. An amendment to the Village’s Comprehensive Plan to change the underlying land use designation from Commercial to Institutional 4. Preliminary Plat of Resubdivision to consolidate the two lots into one lot. Variations Required 1. A variation from Chapter 28, Section 5.1-8.3, Minimum Area for Zoning District, to allow a reduction to the minimum district standard size from 2.0 to 0.93 acres. 2. A variation from Chapter 28, Section 5.1-8.1.a., Location, to waive the requirement that property up to four acres and zoned Institutional shall have frontage on a street classified at least as a Collector on the Arlington Heights Thoroughfare Plan. 3. Chapter 28, Section 5.1-8.14, Minimum Distance from Building Wall to Paved Area, to allow a reduction to the minimum distance from 25 to approximately 16 feet. 4. Other Variations may be necessary as identified when detailed plans are received. Recommendation Although the Staff Development Committee continues to promote and support affordable housing in the Village, further details from the petitioner are needed before a formal recommendation can be rendered. The petitioner should address the following items in their formal application to the Plan Commission. 1. Provide a written justification to support the change in zoning and land use as well as demonstrate that said use is appropriate and suitable for the site and provides the type of housing as identified in the 2015-2019 Consolidated Plan. 2. The applicant should provide further details on the target population of “individuals living with disabilities” to ensure that the proposed development conforms to the specific populations as identified within the Consolidated Plan. 3. Provide a written justification for each variation based on the following hardship criteria outlined in the Zoning Ordinance: The property in question cannot yield a reasonable return if permitted to be used only under the conditions allowed by the regulations in that zone. The plight of the owner is due to unique circumstances. The variation, if granted, will not alter the essential character of the locality. 4. Prior to a public hearing of the Plan Commission, a neighborhood meeting shall be held to obtain early input from adjacent property owners and residents both within Arlington Heights and Buffalo Grove. 5 . The development shall be deed restricted so that it remains in perpetuity as an affordable supportive housing development for those with disabilities. Market rate units shall not be allowed. 6. Engineering plans, details and storm water detention calculations shall be required as part of the formal review process. 7. A market assessment shall be required to demonstrate a need for this type and size development at this location. In addition, a response to the Village’s Affordable Multi- Family Housing Policy shall be required and shall include an assessment on; i) the affordability of the proposed development, ii) information concerning the inclusion of affordable units, and/or iii) other information related to the development’s responsiveness to the Village’s Affordable Multi-Family Housing Policy. 8. Provide a detailed description on the security measures that will be provided within the proposed facility. 9. A code compliant tree preservation and landscape plan shall be required. 10. Design Commission review shall be required prior to a formal hearing of the Plan Commission. 11. A detailed traffic and parking study from a Certified Traffic engineer that assesses access (location, design, and Level of Service), on-site circulation, trip generation and distribution, parking, and impacts to public streets shall be required. 12. School, Park, and Library contributions shall be required per Village Code prior to the issuance of a building permit. 13. These are just preliminary comments only and should not be relied upon as identification of the only major issues. The Staff Development Committee reserves the right to change its position on issues upon submittal of a formal application and detailed review. ATTACHMENTS: Description Type Staff Report Board or Commission Report VB Minutes 3/7/16 Minutes Aerial Exhibits Plat of Survey Exhibits Project Narrative Correspondence Conceptual Building Elevations Exhibits Rendering Exhibits Site & Floor Plans Exhibits Preliminary Engineering Exhibits VILLAGE OF ARLINGTON HEIGHTS Temp File Number: T1582 Project Title: Hearts Place Address: 120-122 E. Boeger Dr. PIN: 03-08-100-053, 03-08-100-054 To: Plat and Subdivision Committee Prepared By: Sam Hubbard Meeting Date: February 8, 2017 Date prepared: February 3, 2017 Petitioner: Jessica Berzak UP Development, LLC Address: 900 W. Jackson Blvd. #2W Chicago, IL 60607 Existing Zoning: B-1: Limited Retail Business District, and B-2: General Business District SURROUNDING LAND USES Direction Existing Zoning Existing Use Comprehensive Plan North B-2 Popeye’s Restaurant with Drive-thru Commercial South M-1 Multi-story light industrial/office R&D, Mfg., Warehousing building East Village of Buffalo Grove – Vacant land at south end of property, animal hospital on north end of property West B-1 La Joie Day Care Commercial Requested Action: 1. A rezoning from B-1, Limited Retail Business District and B-2, General Business District to I, Institutional 2. A preliminary Planned Unit Development (PUD) to allow the construction of a two story, 16 unit supportive housing development. 3. An amendment to the Village’s Comprehensive Plan to change the underlying land use designation from Commercial to Institutional 4. Preliminary Plat of Resubdivision to consolidate the two lots into one lot. Variations Required: 1. A variation from Chapter 28, Section 5.1-8.3, Minimum Area for Zoning District, to allow a reduction to the minimum district standard size from 2.0 to 0.93 acres. 2. A variation from Chapter 28, Section 5.1-8.1.a., Location, to waive the requirement that property up to four acres and zoned Institutional shall have frontage on a street classified at least as a Collector on the Arlington Heights Thoroughfare Plan. 3. Chapter 28, Section 5.1-8.14, Minimum Distance from Building Wall to Paved Area, to allow a reduction to the minimum distance from 25 to approximately 16 feet. 4. Other Variations may be necessary as identified when detailed plans are received. Page 1 of 5 Project Background: The subject property consists of lots of record comprising a total of 40,435 square feet (0.93 acres). The east lot, which is currently vacant, is zoned B-2, General Business District, while the west lot, which has an existing one-story utility building, is zoned B-1, Limited Retail Business District. The proposed action, if approved, would allow UP Development (the petitioner) to construct a 16-unit multi-family development that would provide a home for families living with disabilities that are in need supportive services. All units within the building would be 2- bedroom. The first floor would contain 7 units, as well as laundry and storage space, a community room, and two offices that can be used to provide the supportive services to the residents. These services would be provided through a network of community-based organizations under the coordination of the Housing Opportunity Development Corporation (HODC). The HODC would partner with local agencies such a Thresholds, WINGS, Catholic Charities, etc. to ensure that the residents have access to the programs and supportive services that they need to remain independent. Proposed market rents are contemplated at $1298 per month for each apartment at Heart’s Place. This figure is contingent on the development receiving an allocation of funds from the state, as well as project based subsidies from other sources. Rental subsidies would ensure the tenants do not pay more than 30% of their income towards the rent. The maximum tenant contribution for a 2BR unit is $1,026, however this figure is subject to change as the financing mix changes. Permanent Supportive Housing (PSH) is a housing model that promotes and integrates independent affordable living with on-site supportive services for individuals and single parent families with children. Each dwelling unit would be furnished by the developer and would be fully equipped with bathroom, kitchen, living, and sleeping areas. The support services offered to residents would be in areas such as case management, life & parenting skills, and employment support to assist residents in becoming self-sustaining and contributing members of the community. Prior History In 2010, the petitioner, who was associated with Daveri Development Group at that time, applied for approval of PSH project on the subject property, albeit at a different size and density (project was proposed as a 3-story building with 30 units). Multiple Variations were required for this project, including the following: 1. A variation from Chapter 28, Section 5.1-8.3, Minimum Area for Zoning District, to allow a reduction to the minimum district standard size from 2.0 to 0.93 acres. 2. A variation from Chapter 28, Section 5.1-8.1.a., Location, to waive the requirement that property up to four acres and zoned Institutional shall have frontage on a street classified at least as a Collector on the Arlington Heights Thoroughfare Plan. 3. A variation from Chapter 28, Section 5.1-8.4, Minimum Lot Size to allow a reduction to the minimum lot size from 73,800 to 40,451 square feet (or an increase in the number of dwelling units from 16 to 30 units) 4. A variation from Chapter 28, Section 5.1-8.10c. to allow a 10% reduction to the minimum unit size from 550 to 495 square feet for the Efficiency units, and from 650 to 585 square feet for the 1-Bedroom units. 5. A variation from Chapter 28, Section 5.1-8.14, Minimum Distance from Building Wall to Paved Area, to allow a reduction to the minimum distance from 30 to 3 feet 6. A variation from Chapter 28, Section 11.4, Schedule of Required Parking, to allow a reduction to the minimum number of parking stalls from 62 to 24 spaces (15-spaces + 9 landbanked spaces) The Village Board did not approve the application from 2010, primarily due to concerns over the number and significance of the requested Variations. Variations #1 and #2 as identified above are still required for the present application, however, the need for Variations #3 and #4 have been eliminated. The Variation as identified in #5 is still required, although to a lesser degree than previously proposed. At this point it is not certain if a parking Variation is required (see Parking section below). Early Review On March 17, 2016, the petitioner appeared before the Village Board for an Early Review. Minutes from this meeting are attached. Village of Arlington Heights Consolidated Plan The Village of Arlington Heights Consolidated Plan is a comprehensive five year planning document that identifies the overall housing and community development needs of the Village, outlines available programs and resources, and establishes a strategy Page 2 of 5 for prioritizing and addressing housing needs and economic opportunities for low and moderate income people within the community. The Consolidated Plan and Annual Action Plan constitutes the Village of Arlington Heights’ application for Federal Community Development Block Grant (CDBG) funding for housing and community development programs through the US Department of Housing and Urban Development (HUD). The 2015-2019 Consolidated Plan identified as a high priority a need for special housing options for persons that are non- homeless, including housing for individuals with mental disabilities, physical disabilities, developmental disabilities, and victims of domestic violence (among others). Specifically, the plans states that the Village “seeks to provide transitional and permanent housing with supportive services, or supportive services alone, to enable persons with special needs who are not currently homeless but require housing assistance to live healthily and as independently as possible in the community”. As previously mentioned, Hearts Place is a PSH development for individuals living with disabilities. The Village’s Consolidated Plan however focuses special housing for those with mental disabilities, physical disabilities, developmental disabilities, and victims of domestic violence (among others). As part of the formal Plan Commission application, the applicant should provide further details on the target population of “individuals living with disabilities” to ensure that the proposed development conforms to the specific populations as identified within the Consolidated Plan. Zoning and Comprehensive Plan Based on the information provided, Staff has determined that the land use is most consistent with a Care Facility, Intermediate, which according to Chapter 28, Section 3.2-41 of the Village of Arlington Heights Municipal Code is defined as: “A facility which provides, on a regular basis, health-related care and services to individuals who do not require the degree of care and treatment which a hospital or skilled nursing facility is designated to provide, but who, because of their mental or physical condition, require care and services which can be made available to them only through institutional facilities such as these”. According to the Permitted Use Table outlined in the Village’s Zoning Ordinance, a Care Facility, Intermediate is a permitted use in the I, Institutional District. To proceed forward, the Plan Commission must review and the Village Board must approve three primary zoning actions. The first action is a rezoning from B-1 and B-2 to I, Institutional. The second action is an amendment to the Village’s Comprehensive Plan to change the underlying land use designation from Commercial to Institutional. The last action is a Planned Unit Development, which is required for any development in the I, Institutional District. Several variations from the zoning code have also been identified and will be discussed throughout this report. For each variation, UP Development must provide a written justification based on the following hardship criteria:  The property in question cannot yield a reasonable return if per mitted to be used only under the conditions allowed by the regulations in that zone.  The plight of the owner is due to unique circumstances.  The variation, if granted, will not alter the essential character of the locality. Site Plan Staff has performed a preliminary review of the conceptual site plan provided by the applicant. The proposed development appears to conform to most bulk and setback requirements, however, a final evaluation can only be performed when detailed plans are submitted. There was one site related Variation is identified below, as well as additional landscape and utility issues. Setbacks The proposed building conforms to the required setbacks within the I District. However, the I, Institutional district requires a minimum separation of 25 feet between the proposed building and any paved surface. Pursuant to the site plan, the building at its closest point is approximately 16 feet from the new parking lot that is located to the east of the building. As a result, the following variation has been identified:  A variation from Chapter 28, Section 5.1-8.14, Minimum Distance from Building Wall to Paved Area, to allow a reduction to the minimum distance from 25 to 16 feet As with the other variations that have been identified in this report, the Petitioner will need to provide a written justification prior to Staff rendering a final recommendation. Page 3 of 5 Landscape & Tree Preservation Issues Staff notes that there are a number of trees around the perimeter of the site. As such the petitioner will need to provide a tree preservation plan that identifies all of the existing trees that have a trunk caliper size that is three inches or greater. This plan must identify each tree by common and botanical name, size, condition (good, fair, poor), disposition (preserve, relocate, remove), and replacement value. In addition, a landscape plan will be required and needs to focus on perimeter landscaping and transitional screening in order to enhance and screen the development from the surrounding properties. Furthermore, the outdoor common/recreational areas need to incorporate a mixture of different plant material in order to create visual interest. Utilities and On-Site Detention The Public Works Department has identified a need to loop the existing water main on Boeger Drive to the east to Old Arlington Heights Road. This loop would allow for the existing main to provide adequate fire protection for the proposed development. Additionally, during the previous proposal, staff identified an existing 8-inch private sanitary sewer that services the adjacent property to the north (Popeye’s Restaurant) and bi-sects the subject site. The previous development was asked to relocate the aforementioned sewer elsewhere on site and situate it within a private utility easement, and staff expects the current proposal will also need to relocate this sanitary sewer. In addition, on-site detention shall be required. The exact size and location will need to be further evaluated once detailed engineering plans and detention calculations are provided as part of the formal review process. Building Related Issues Design Commission review and approval shall be required prior to a formal hearing of the Plan Commission. In addition, the proposed structure must incorporate the principals outlined in the Village’s Design Guidelines, which include: the use of durable quality materials such as face brick, the limited use of dryvit or light gauge materials, and the use of architectural details to provide a visual interest. The building must be fully sprinklered and constructed of non-combustible materials. Lastly, as part of the building permit review process; the Petitioner will need to pay all applicable school, park, and library contributions. Traffic and Parking According to Chapter 28, Section 6.12, Traffic Engineering Approval, any PUD that requires Plan Commission review is required to provide a traffic and parking study from a Certified Traffic Engineer. This study needs to assess access (location, design, and Level of Service), on-site circulation, trip generation and distribution, parking, and impacts to public streets. The proposed development is indicating that a total of 33 parking spaces will be provided (25 parking spaces + 8 land-banked parking spaces). With respect to parking, Village Code requires two parking stalls for each dwelling unit, regardless of the number of bedrooms. As a result, the proposed 16 unit development would require a total of 32 parking stalls for residents, guests and employees. Additionally, the two office spaces within the development will require parking at 1 space per 300 square feet of floor area. The exact size of the office units has not been provided, therefore, if the total size of the office units are 450 square feet or less, only one parking space will be required (for a total of 33 on-site parking spaces required). If the office units are greater than 450 square feet in total floor area, two parking spaces would be required, which would bring the total amount of on-site parking to 34 spaces, and the development would then require a one-space parking Variation or an additional on-site parking space can be added. Staff notes that multi-family dwellings are required to provide one loading berth at 10’ x 35’ in size if the overall square footage of the development is greater than 10,000 square feet. One of the documents submitted by the applicant indicates that the size of the building will be 10,218 sq. ft., which would require the provision of a loading berth. The proposed site plan does not show a loading berth and further clarification on the building size is needed. If the loading berth is required and not provided, then a Variation must be requested. RECOMMENDATION Although the Staff Development Committee continues to promote and support affordable housing in the Village, further details from the petitioner are needed before a formal recommendation can be rendered. The petitioner should address the following items in their formal application to the Plan Commission. 1. Provide a written justification to support the change in zoning and land use as well as demonstrate that said use is appropriate and suitable for the site and provides the type of housing as identified in the 2015-2019 Consolidated Plan. 2. The applicant should provide further details on the target population of “individuals living with disabilities” to ensure that the proposed development conforms to the specific populations as identified within the Consolidated Plan. 3. Provide a written justification for each variation based on the following hardship criteria outlined in the Zoning Ordinance: Page 4 of 5  The property in question cannot yield a reasonable return if per mitted to be used only under the conditions allowed by the regulations in that zone.  The plight of the owner is due to unique circumstances.  The variation, if granted, will not alter the essential character of the locality. 4. Prior to a public hearing of the Plan Commission, a neighborhood meeting shall be held to obtain early input from adjacent property owners and residents both within Arlington Heights and Buffalo Grove. 5. The e development shall be deed restricted so that it remains in perpetuity as an affordable supportive housing development for those with disabilities. Market rate units shall not be allowed. 6. Engineering plans, details and storm water detention calculations shall be required as part of the formal review process. 7. A market assessment shall be required to demonstrate a need for this type and size development at this location. In addition, a response to the Village’s Affordable Multi-Family Housing Policy shall be required and shall include an assessment on; i) the affordability of the proposed development, ii) information concerning the inclusion of affordable units, and/or iii) other information related to the development’s responsiveness to the Village’s Affordable Multi-Family Housing Policy 8. Provide a detailed description on the security measures that will be provided within the proposed facility. 9. A code compliant tree preservation and landscape plan shall be required 10. Design Commission review shall be required prior to a formal hearing of the Plan Commission. 11. A detailed traffic and parking study from a Certified Traffic engineer that assesses access (location, design, and Level of Service), on-site circulation, trip generation and distribution, parking, and impacts to public streets shall be required. 12. School, Park, and Library contributions shall be required per Village Code prior to the issuance of a building permit. 13. These are just preliminary comments only and should not be relied upon as identification of the only major issues. The Staff Development Committee reserves the right to change its position on issues upon submittal of a formal application and detailed review. ________________________________________ February 3, 2017 Bill Enright, Deputy Director of Planning and Community Development Cc: Randy Recklaus, Village Manager All Department Heads Temp File 1582 Page 5 of 5 XVI. REPORT OF THE VILLAGE MANAGER A. Heart' s Place - 120- 122 E. Boeger Dr. – Early Review Mr. Recklaus said UP Development is seeking Early Review for a 16 unit development for people living with disabilities. The site is the previously considered for Boeger Place which was denied in 2010. Early Review does not commit the Village to approving or denying a development proposal; it is simply an opportunity for a developer to obtain a degree of preliminary feedback from the Board. Trustee Tinaglia recused himself as the petitioner is a client of his on another project. He left the meeting at this time. Mr. Perkins said the proposal comes with two variation requests, one to rezone the property to Institutional, the other to amend the Comprehensive Plan. Staff has identified two variations: 1) The minimum lot size. 2) Institutional Districts less than four acres must be located on a collector street and Boeger is a local street. Staff recommends a neighborhood meeting early in the process to inform neighbors of their proposal. President Hayes asked for the rationale for the Code to require four acres for Institutional properties. Mr. Perkins said he did not know. Typically a minimum district size is to avoid spot zoning. It is a little unusual that the property has to be on a collector street. The four acre requirement is per Village Code. Michael Ezgur, attorney for the project, said this is a less dense project than the one previously presented with 16 residential units and 33 parking spaces. It is designed to meet or exceed the Village' s affordable housing guidelines. Heart's Place provides permanent supportive housing for people with a variety of disabilities. Wings, Kenneth Young Center and Alexian Brothers are partners for the Development. The developer acknowledges a zoning change is required and that during the plan development process, variations would need to be discussed. They agree with Staff' s analysis to date. President Hayes said that the proposal targets people living with disabilities. He asked what kind of disabilities will be the target market. Mr. Ezgar said the target residents are victims of domestic violence, also people with mental disabilities that the Kenneth Young Center addresses. Jessica Berzac of UP Development said there is a key difference than the previous proposal. The State' s policy is different now and projects like these are required to be disability neutral. However, if there is an onsite provider, then those clients are given preference. By partnering with Wings, victims of domestic violence would be placed at the top of the eligibility pool. Other potential residents could include those with medical disabilities like heart failure or diabetes. President Hayes asked for clarification that people who are subject to domestic violence are considered disabled. Ms. Berzac said yes, they are. The selections are made via a process which includes input from County, State, Property Manager and Service Provider representatives. Wings and The Kenneth Young Center will be the onsite providers.\ President Hayes said he is happy to see this project is much different in terms of density with fewer variations. He said it is something the Board can at least explore. Trustee Rosenberg asked for clarification between on site and off site staffing. Ms. Berzac said there will be a property manager and social service providers on site with at least 2- 3 people on site each day. As the residents must be able to live independently to qualify for this housing, the clients don' t need 24 hour monitoring. Trustee Rosenberg asked if security is an issue for these clients. Ms. Berzac said the service provider would address security. All of the units have 2 bedrooms. The lease holder must be disabled to qualify. If there are two applicants who both qualify, then they could live together if they request it. Residents would not be placed together. Trustee Rosenberg asked if there were water detention issues. Mr. Perkins said water detention would be evaluated in preliminary plans and on site detention would need to be accommodated. This proposal has more green space that what was presented before. Water will most likely be detained in the green areas. Staff will also evaluate land banked parking and is already suggesting the gazebo be moved in the event that the land bank parking becomes necessary. Trustee Blackwood asked how residents will access transportation as there is no bus service on Arlington Heights Road. Ms. Berzac said Pace offers van pooling, dial- a- ride is used by many disabled people and case managers do a fair amount of driving. Residents will get around as they do where they currently live. Trustee Blackwood asked if there was a security a risk because the residents are victims of domestic violence. Ms. Berzac said she didn' t have those kinds of details now; the service provider would address this issue moving forward. Trustee Sidor asked if the building would have security. Ms. Berzac said yes, there would be security cameras and key fobs. There would not necessarily be a security person on staff, but that is yet to be determined. Trustee Sidor said he was glad to see the project again and would like to see it go through the process.\ Trustee Labedz said she is glad this is coming forward as she supported Boeger Place while on the Plan Commission. She said the need is great. She asked if this was a transitional program. Ms. Berzac said no. Trustee LaBedz asked if every apartment was fully handicapped accessible. Ms. Berzac said 20% are fully accessible, the others are fully adaptable. Trustee Labedz asked if this project was designed for families. Mr. Berzac said yes, that is the intent. Trustee Scaletta said he was supportive overall but wanted to understand how the balance of people in the building will work out. Ms. Berzac said there are other properties which have a mix of different kinds of disabled residents. The populations of these developments have shared obstacles in society and often work together despite their differing disabilities. Case managers will be able to work with those with impairments as well as those with domestic violence histories. Trustee Scaletta asked if a child has a disability, will the parent be able to live with them. Ms. Berzac said the lease holder has to have a disability, so an adult child with a disability cannot have parent live with them unless parent also qualifies. Two people per bedroom are the maximum allowed. There are also limits on number of people in a unit based on sex of children. Boy and girl children may not share a bedroom. Trustee Scaletta asked how the building would be conducive to the current Code. Mr. Perkins said other than Institutional Zoning, staff would have to look at the land area in regards to density. The parking is okay. The building could be a typical apartment building. Mr. Perkins said UP is requesting the following variations: 1) less than required minimum district size for an Institutional District 2 acres are required and they have . 9 acres. 2) The location of Institutional District is on less than four acres and should be on a collector street, this is a local street. They also need two zoning changes: 1) From B- 1/ B- 2 to Institutional. 2) Amend the Comprehensive Plan which calls for this property to be commercial. Mr. Perkins said the detailed plans might bring other variations. Trustee Scaletta said this is significantly better than what was proposed before when the unit sizes were smaller than the Code required. The square footage for each unit is now between 800 square ft. to 1200 square ft. when previously the units were from 495 square ft. to 585 square ft. Trustee Sidor asked if a child is the victim of domestic violence, can the mother and child live here. Ms. Berzac said she did not know and would investigate. President Hayes said this is Early Review and no indicator of how the Board will vote if the project goes through the process. Ms. Berzac asked for feedback on how to make the process go more smoothly. President Hayes said this was a good start. He was pleased to hear the decrease in the amount of units, the increase in the size of the units and the decrease in the number of variations. He also appreciated the support services provided to the residents. Trustee Rosenberg suggested that UP have a neighborhood meeting to make sure the neighbors understand the differences between this proposal and the previous one. He recommended they reach out to the different groups who were engaged before. 120-122 Boeger Dr - Aerial February 3, 2017 1:2,257 0 0.0175 0.035 0.07 mi 0 0.03 0.06 0.12 km Village of Arlington Heights GIS Copyright 2013   Plan  Commission   Village  of  Arlington  Heights   33  S.  Arlington  Heights  Road   Arlington  Heights,  IL  60005     Re:  PUD  proposal  for  Heart’s  Place  –  120  E  Boeger  Dr  &  5  W  Dundee  Rd       January  10,  2017     Dear  Members  of  the  Plan  Commission,     Please   accept   the   enclosed   materials   as   our   submittal   for   a   PUD   proposal   for   the   Heart’s   Place   development,   to   be   located   on   the   adjoining   lots   at   120   E   Boeger   Dr   (PIN  030810054)  and  5  W  Dundee  Rd  (PIN  0308100053).     Heart’s  Place  will  be  a  16-­‐unit,  Permanent  Supportive  Housing  apartment  building   for   people   living   with   disabilities   and   in   need   of   supportive   services,   developed   using   funds   from   the   Illinois   Housing   Development   Authority.   As   you   know,   the   Village  Board  denied  the  requested  variances  for  an  earlier  version  of  this  project  in   2010.   We   have   since   redesigned   the   proposal   to   be   more   in   keeping   with   the   Village’s  goals,  reducing  its  size  and  updating  key  features.       Thank   you   for   this   opportunity   to   bring   much-­‐needed   affordable   and   supportive   housing   to   Arlington   Heights.   We   look   forward   to   receiving   your   comments   and   answering  any  questions  that  may  be  pending  about  the  project.       Sincerely,     Jessica  H.  Berzac   Vice  President   UP  Development,  LLC           Heart’s  Place  –  Arlington  Heights,  IL     Heart's  Place  will  be  a  new  construction  apartment   building  at  120  &  122  E.  Boeger  Drive  in  Arlington   Heights,   IL.   This   is   the   same   site   as   the   previously   IHDA-­‐approved  Boeger  Place  (2010  LIHTC  Award),   which   was   denied   by   the   Village   Board   due   to   requested   variances,   specifically   for   parking   reductions  and  increased  density.    Now  re-­‐designed   as   a   small,   family   permanent   supportive   housing   development,   Heart's   Place   will   be   a   16-­‐unit   apartment   building   targeted   towards   people   living   with  disabilities  and  needing  access  to  services.  The   first   floor   will   be   a   mixture   of   ancillary   residential   spaces   including   offices,   laundry   and   a   community   room.   The   unit   mix   will   include   2   bedroom   apartments   of   various   sizes   and   targeted   to   different   referral   lists,   all   qualified   as   supportive   households.     The  Project  site  has  been  vacant  for  many  years,  is   located  in  a  well-­‐established  mixed-­‐use  area  and  is   conveniently  located  near  many  public  and  private   amenities.  The  surrounding  area  incorporates  multi-­‐family  developments,  commercial  uses,  recreational   areas  and  public  schools  along  West  Dundee  Road,  a  major  roadway  in  the  area.    Additional  amenities   within  walking  distance  include  retail  stores,  restaurants,  a  bank,  and  a  pharmacy,  in  addition  to  parks,   schools,   and   healthcare   facilities.     Arlington   Heights   offers   many   opportunities   for   employment   in   multiple   sectors   likely   to   have   wages   consistent   with   affordable   housing,   such   as   retail,   service,   manufacturing,  and  hospitality.     Heart’s   Place   residents   will   have   access   to   a   full   spectrum   of   supportive   services,   including   case   management,   life   &   parenting   skills,   and   employment   support,   that   are   individually   tailored   to   their   needs   and   designed   to   encourage   independent   living.   Services   will   be   offered   through   a   network   of   community-­‐based   service   providers   under   the   coordination   of   the   Housing   Opportunity   Development   Corporation   (“HODC”).   HODC   has   many   years   of   experience   partnering   with   supportive   services   agencies  throughout  the  north  and  northwest  suburbs  including  Thresholds,  WINGS,  Catholic  Charities,   CEDA   Northwest,   Center   of   Concern,   Journeys,   Kenneth   Young   Center,   Alexian   Brothers,   TLS   for   Veterans,  Access  Living  and  others.  HODC  has  a  reciprocal  relationship  with  many  of  these  agencies  for   tenant  referrals  and  the  provision  of  on-­‐site  services  for  residents  at  its  residential  developments,  which   ensures  that  residents  have  access  to  the  programs  and  services  they  need  to  remain  independent.     This  project  is  a  strong  candidate  for  IHDA’s  new  Permanent  Supportive  Housing  Development  Program,   a  new  program  created  to  fund  small  supportive  housing  projects  that  are  not  a  good  fit  for  Tax  Credit   funding.  This  new  program  recognizes  the  realities  and  needs  of  communities  such  as  Arlington  Heights,   where  there  is  a  serious  deficit  of  supportive  housing  but  the  development  size  is  limited  by  the  largely   built-­‐out   nature   of   the   community.   Heart’s   Place   was   thus   carefully   re-­‐designed   to   meet   the   state’s   requirements,   the   goals   of   the   Arlington   Heights   community,   and   the   needs   of   the   vulnerable   populations  it  will  serve.   ERIKSSON ENGINEERING PAVING & SURFACE ASSOCIATES, LTD. LEGEND LEGEND 145 COMMERCE DRIVE, SUITE A GRAYSLAKE, ILLINOIS 60030 phone (847) 223-4804 fax (847) 223-4864 email INFO@EEA-LTD.COM Professional Design Firm 2 STORY RESIDENTIAL BUILDING License No. 184-003220 Expires: 04/30/2017 HEART'S PLACE SURVEY PROVIDED BY: PROJECT BENCHMARKS & Reserved for Seal: GENERAL NOTES Expiration Date: No. Date Description C ERIKSSON ENGINEERING ASSOCIATES, LTD., 2016 Design By: Date: Approved By: Project No. Sheet Title: PRELIMINARY ENGINEERING PLAN Sheet No: CX001