Muyni
← Back to Arlington Heights

Zoning Board of Appeals

Regular Meeting

Arlington Heights, IL · August 11, 2025

AgendaPacketMinutes

Minutes

APPROVED ZONING BOARD REPORT OF PROCEEDINGS OF A MEETING BEFORE THE VILLAGE OF ARLINGTON HEIGHTS ZONING BOARD OF APPEALS OF APPEALS RE: 1015 NORTH FORREST AVENUE - ZBA #25-023 REPORT OF PROCEEDINGS had before the Village of Arlington Heights Zoning Board of Appeals taken at the Arlington Heights Village Hall, 33 South Arlington Heights Road, 1st Floor, Buechner Room, Arlington Heights, Illinois on the 11th day of August, 2025 at the hour of 7:00 p.m. MEMBERS PRESENT: BENJAMIN JAFFE, Chairperson TOM DRAKE JEFFREY LANAGHAN FRANK PORTERA ALSO PRESENT: DAN OSOBA, Planner I DARKO BOJIN, Assistant Planner LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 APPROVED CHAIRPERSON JAFFE: All right, so I'd like to call to order the Zoning Board of Appeals meeting for Monday, August 11th, 2025 and do roll call. MR. OSOBA: Mr. Portera. COMMISSIONER PORTERA: Here. MR. OSOBA: Mr. Selbka. (No response.) MR. OSOBA: Mr. O'Connor. (No response.) MR. OSOBA: Mr. Lanaghan. COMMISSIONER LANAGHAN: Yes. MR. OSOBA: Mr. Siavelis. (No response.) MR. OSOBA: Mr. Drake. COMMISSIONER DRAKE: Here. MR. OSOBA: Chair Jaffe. CHAIRPERSON JAFFE: Here. Here for the Zoning meeting? AUDIENCE MEMBER: No, Committee of the Whole. CHAIRPERSON JAFFE: Second floor? MR. OSOBA: Third floor. CHAIRPERSON JAFFE: Third floor. AUDIENCE MEMBER: Thanks. CHAIRPERSON JAFFE: All right, let's proceed with the Pledge of Allegiance. Everyone face the flag in the rear of the room. (Pledge of Allegiance recited.) CHAIRPERSON JAFFE: All right, next we need to approve the minutes from last month's meeting. Has everyone had an opportunity to review the minutes and did they find any errors? (No response.) COMMISSIONER LANAGHAN: I was not there, I'll abstain. CHAIRPERSON JAFFE: Got it. All right, nothing being called out, is there a motion to approve the minutes? COMMISSIONER DRAKE: Motion to approve. COMMISSIONER PORTERA: Second. CHAIRPERSON JAFFE: All in favor? (Chorus of ayes.) CHAIRPERSON JAFFE: All opposed? (No response.) CHAIRPERSON JAFFE: Okay, next, I'm going to go over the hearing procedures for the audience. So, first, quorum in voting. If less than six members are present, option the petitioners to continue meeting. It takes four affirmative votes to approve a variance regardless of the number of Board members in attendance. If denied a petitioner cannot reapply for a whole LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 APPROVED 3 year. So, folks, tonight you've got to go four for four; otherwise, you can petition for a continuance. The variation hardship. So, the forms that you all filled out have been submitted in packets to this Board that has reviewed them. But you're effectively asking for an exception, so we want to understand your logic and reasoning and justification. So, you're going to have to explain four elements necessary for this Board to be able to grant that variation: 1. That the proposed use will not alter the essential character of the locality and be compatible with the existing uses and zoning of nearby property; 2. That the plight of the owner is due to unique circumstances which may include the length of time the subject property has been vacant as zoned; 3. That the proposed variation is in harmony with the spirit and intent of this Chapter; and 4. That the variation requested is the minimum variation necessary to allow reasonable use of the property. A variation shall be permitted only if the evidence, in the judgment of the Board of Appeals, sustains each of the four conditions enumerated. So, again, we've read them, but our expectation is that you walk us through your logic and reasoning and justification. The Chairperson will open the agenda item and provide introductory remarks; it then will be followed by a Staff presentation which is a brief overview of the project and the variance request. The applicant will then have the opportunity to present its case in favor of zoning relief by way of documents or testimony. The applicants and any witnesses testifying must be sworn under oath and must state and spell their respective names for the record. Public comment. Members of the public may speak on the application. Speakers must be sworn under oath and state and spell their name clearly. Anyone who has formally registered in advance of the hearing as an objector shall be permitted to speak first. We do not have any formal objectors tonight? MR. OSOBA: No. CHAIRPERSON JAFFE: Okay, so then I'll just skip to the end. Public comment, you can all see on the agenda there is public comment. So, if you speak on petitions, we ask that you speak to that petition. If you have general commentary about the Village or anything else for that matter, there is a separate time in the agenda at the end of the meeting for you to do that. Once the applicant has made their closing statement, they can present any follow-up testimony or evidence. The Board will then deliberate and make a motion to close public testimony. We will deliberate and vote on the matter. All ZBA final decisions must be in writing. If the agenda packet does not include a draft final order that is acceptable to the ZBA, the substantive motion should be to direct Staff to prepare an appropriate final order for approval at a subsequent meeting. With that, we'll proceed directly to new business, which is Agenda Item A. 1015 North Forrest Avenue, ZBA Case #25-023. Is the Petitioner present? MR. PEART: All right, good morning, everyone. CHAIRPERSON JAFFE: State your name and address for the record. MR. PEART: Yes. Jordan Peart, 1015 North Forrest Avenue. (Witness sworn.) MR. OSOBA: The subject property, 1015 North Forrest Avenue, is zoned R-3 Residential Single-Family District. The Petitioner is proposing to allow a gravel driveway to the rear of the home. A new home is currently under construction on the site and the gravel drive will LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 APPROVED 4 connect the rear garage and provide required access to North Forrest Avenue. Driveways are required to be constructed of asphalt or concrete. Green infrastructure applications may be utilized in lieu of concrete or asphalt surfaces but are subject to Village Engineer approval. Therefore, the Petitioner is requesting the following variation: • A variation from Chapter 28, Section 10.2-11(1)(a) to allow gravel driveway surface where concrete or asphalt is required. MR. PEART: So, we are here today to really ask for a variance to offer a more environmentally friendly and backyard friendly approach to connecting the detached and attached part of our garages. So, given our rear detached garage is going to see very limited vehicle use, it's really primarily going to be used for access for a golf cart and some outdoor equipment. So, there will be no daily parking or pass through traffic in that rear backyard. We feel a full asphalt or concrete solution would be unnecessary from an impervious surface perspective. It will kind of disrupt our backyard and the green space that we're hoping for. There's potential increase for water runoff. So, really, our proposed option, I know we submitted a variance to have gravel, that was just because we knew there was code to have either asphalt or concrete. We do have two solutions. Our main one, which is preferred, is to keep that area between the two garages as grass. So, this provides required access while still maintaining green space and maximizing infiltration, water absorption. We've also spoken to our neighbor who has kindly joined us as well, and he's in support of the variance and would be open to the green area as well. So, that is our -- (Audience member spoke out.) CHAIRPERSON JAFFE: Sir, you're out of order. We'll wait, thank you. MR. PEART: Okay, so if the Board feels that a permanent surface is necessary, we are prepared to work with the Village and the engineer. I know they mentioned in the notes a green infrastructure surface, so we would definitely like to work with you if our first approach or preferred option is not doable. You know, in all cases, you know, we're really trying to seek balance between the functional requirement of having that detached garage and access, you know, the Village's stormwater objectives, and also just preserve the character of our backyard. So, thank you. CHAIRPERSON JAFFE: So, on the green, what's the term? MR. PEART: Green infrastructure. CHAIRPERSON JAFFE: I know Dan, you and I exchanged notes about this. So, sir, you said one of your options would be just leaving it as grass? MR. PEART: Correct, no connection point between the attached garage and the detached. CHAIRPERSON JAFFE: So, if they were to apply for this, Engineering would still have some discretion over what they would approve? It could be grass, it could be permeable pavers, it could be a number of different materials, correct? MR. OSOBA: Green infrastructure would require some level of service. Just having grass surface would be a separate variation request to a separate section because access is required to all driveways, or all garages, excuse me, and that driveway surface has to be a type of green infrastructure application, concrete or asphalt. That green infrastructure is relatively open but that can be up to the interpretation of the Village engineer in terms of what type it is. But it would not be, under the current variation request, just grass. It would have to be LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 APPROVED 5 a separate request. CHAIRPERSON JAFFE: So, you don't want to do asphalt or concrete. If gravel and grass doesn't work, what else are you open to? MR. PEART: So, we're open to either, ideally the grass, if that's a no go, we're open to whatever the engineer's comments around green infrastructure, whether that's geo- textiles, permeable pavers or whatnot, whatever would work. That was the first time I'm hearing that term. So, we've come up with a solution. We just are trying to avoid having, you know, impervious, solid asphalt or concrete driveway just because there's not going to be traffic, we think it's disrupting our backyard, right? So, we're not intending to send cars back there to and from. So, really a golf cart which, you know, I don't think maybe an asphalt or concrete makes sense. CHAIRPERSON JAFFE: Other questions? COMMISSIONER LANAGHAN: So, the obvious one to me is then do you need to keep that rear garage? You said you're putting a golf cart back there. It seems like you're building a brand new house, correct? MR. PEART: Yes. COMMISSIONER LANAGHAN: You probably tore down the other one. MR. PEART: Correct. COMMISSIONER LANAGHAN: But you left this one back there which requires some sort of access up to the front? MR. PEART: Yes, we thought it was a unique feature when we won the home and we thought, you know, it's a nice additional square footage. We heard about the previous owners and how they utilized it. We thought it was a cool feature, somewhat rare and wanted to maintain that. We did find that it was approved by the Village. Obviously, it's somewhat, I don't know if out of code is the right terminology, but it's larger than usual, but yes, we bought the property with the intent to keep it and would like to. COMMISSIONER LANAGHAN: Okay, that makes sense. I'm not sure I completely buy that the asphalt, gravel, whatever, you know, to me those are both going to be visually disruptive to your backyard if you're trying to keep it green. I don't think Engineering is going to approve, and I couldn't support just a grass because of, again, that would be a completely different variance. I think doing some sort of green infrastructure, be it in pervious pavers, I'm sure there are some various things that the engineer could work with you on. I know I've seen some where, you know, grass grows up through it. It doesn't look so much, but you can -- MR. PEART: Yes, I've seen these plastic like grid systems. COMMISSIONER LANAGHAN: Yes. MR. PEART: You can even fill it in with gravel, and that's what, I want to make sure it was clear, it would be, you know, if green wasn't approved, it would be decorative gravel, like crushed blue. Something nice. We just don't want this heavy concrete surface that's connecting the two. COMMISSIONER LANAGHAN: Yes. MR. PEART: So, we want a low profile to kind of blend in with the surrounding area -- COMMISSIONER LANAGHAN: Got you. MR. PEART: -- and if we had to go through a separate variance process, I know we submitted for the gravel, but we'd be open to doing that as well. LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 APPROVED 6 COMMISSIONER LANAGHAN: Yes, okay. CHAIRPERSON JAFFE: So, Dan, if the Petitioner is willing to submit the application for the green infrastructure request, is that still a request for a variance or is that just part of his normal process for having that material installed? MR. OSOBA: That would be part of the normal permit process, so he would be submitting a building permit showing the specifications for the green infrastructure and the Village engineer would review that. Based on the review that the Engineering Department did for this application, they would be open to green infrastructure options rather than gravel, but it would still certainly have to be something that would be reviewed by the Village engineer. If he chose to do a green infrastructure option, a variance would not be required because it's allowed by code if the Village engineer approves it. CHAIRPERSON JAFFE: So, based on everything you're hearing -- MR. PEART: Yes, I'm getting whispers from my wife. CHAIRPERSON JAFFE: Are you willing to go the route of submitting a request with the Village for a green infrastructure project? MR. PEART: Yes, if that was our only option. That was definitely something we'd want to work with the Village to accomplish, if we're ruling out gravel all together and trying to avoid the asphalt and concrete, yes. CHAIRPERSON JAFFE: So, from the order of -- or I'm sorry, did you want to say something? MRS. PEART: He's my husband. CHAIRPERSON JAFFE: Okay, I'm sorry, we have a process here. MRS. PEART: Sorry, thank you. My name is Tori, Jordan's wife. Thank you all for listening to us. CHAIRPERSON JAFFE: Please state your name and address for the record. MRS. PEART: Tori Peart, 1015 North Forrest Avenue. So, just to clarify, you're saying we cannot do the gravel driveway even if we have the infrastructure material below the gravel driveway that essentially is what the engineer said? MR. PEART: Because we've seen the green infrastructure, whether it's the grid system, and then you fill it in with gravel to make it be green. So, that's where we just want to be clear. MRS. PEART: We just want to understand what our options are before we're promising we want to go the green route. CHAIRPERSON JAFFE: I think what we're saying, and we haven't gotten to deliberation yet, but if you're kind of sensing the line of questioning, Engineering is saying code is asphalt or concrete. MR. PEART: Yes. MRS. PEART: Right. CHAIRPERSON JAFFE: You didn't want to do asphalt or concrete, so you're requesting gravel. Engineering is not supportive of gravel. My sense from the Board, myself included, is given those comments and given this is brand new construction, we're not seeing the hardship so we would not support your request for gravel. Where we're going here is we're trying to strike a deal where if a green infrastructure project is something that you would be amenable to, it sounds like the Engineering Department is also willing to entertain that. MRS. PEART: Right. CHAIRPERSON JAFFE: So, you can, now what the actual materials are and what LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 APPROVED 7 it looks like, I don't think we can confirm or guarantee what they would look like, but -- MRS. PEART: Right, right. CHAIRPERSON JAFFE: -- all we can confirm or guarantee is if it's not going to be asphalt or concrete, it's not going to be gravel. MRS. PEART: Right. CHAIRPERSON JAFFE: So, it's going to be something and it can't be grass. MRS. PEART: Right. So, your second part of that was do we need to move forward to get, or how do we proceed in the event it's none of those three things? CHAIRPERSON JAFFE: So, if you're saying that you're open to doing the request for the green infrastructure project, that would not require a variance. So, I think there was somebody in the audience who might want to speak, so I would permit public comment. But at that point, I think we'd just -- MR. OSOBA: Withdraw it. CHAIRPERSON JAFFE: Yes, because we're not approving or denying because they're no longer requesting a variance. MR. OSOBA: We could either approve or we could withdraw the application and not move forward with the variance if you were going to go through the green infrastructure route. The other alternative and maybe a more flexible alternative would be to continue it to the next meeting, and then if we decide to go to the green infrastructure route and you submit plans to the Village engineer to get the rubber stamp of yes, this is good to go, then we can say that the application is withdrawn and not needed to be continued to the engineer. Does that make sense? COMMISSIONER DRAKE: So, we would approve in that scenario an extension? MR. OSOBA: You would continue it to the next meeting. COMMISSIONER DRAKE: A continuance. MR. OSOBA: And if it's required, if, you know, the green infrastructure option is not something the Village engineer, or you're working with continuously, it's not something that's working out, then you can come back and particularly request the gravel again unless that's not something that you want to do all together and you may withdraw your application then. So, it's ultimately kind of what you want to do now. MR. PEART: Okay. MRS. PEART: Thank you. MR. PEART: Yes, we'd like to pursue the green infrastructure and just work with the Village or the engineer to come up with a solution that works for both parties. CHAIRPERSON JAFFE: So, then we would withdraw. MR. OSOBA: Yes. CHAIRPERSON JAFFE: Right? So, just because I know there was somebody here who did want to speak. MR. PEART: Yes. CHAIRPERSON JAFFE: So, why don't you have a seat? MR. PEART: Okay. CHAIRPERSON JAFFE: And then we'll hear public comment, and then as part of our deliberation, we can agree to just dismiss it, correct? MR. OSOBA: Correct. A variation wouldn't be required based on the Petitioner's testimony of what they would like to pursue. CHAIRPERSON JAFFE: Okay, so you can have a seat. The gentleman, I'll ask if LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 APPROVED 8 he wants to speak, and you will then have the opportunity to rebut anything he says, and then we'll move on. MR. PEART: Okay, sounds good. Thank you. MRS. PEART: Thank you. CHAIRPERSON JAFFE: Sir, did you want to speak? MR. STEVENS: Yes, sir. CHAIRPERSON JAFFE: Okay, you've got to come up to the front. MR. STEVENS: No problem. Hello, gentlemen and ladies. CHAIRPERSON JAFFE: Please state your name. MR. STEVENS: My name is Leroy Stevens. I live at 1011 North Forrest. I'm the guy to the south of the project here. My north property line abuts their south property line. The garage we're talking about is probably 25 feet wide by maybe 50 feet deep. It's two stories. On the bottom, you can park four cars. On top, you've got equal amount with a staircase up there. The former owners were in the construction business. They had a couple of vans; they had a couple of other things. That's then, this is now. Whatever use they want to put it to doesn't really bother me. I'm not so much concerned whether it's asphalt, concrete or gravel as I am the elevation, and this has nothing to do with this hearing today. It really has nothing with elevations. That's going to be the Engineering Department. I think if they want to do what they want to do, they have to get this Board to grant their variance so that they don't have to have concrete or asphalt. Then I think the ball would shift to Engineering to come up with what would be an appropriate material to put in there other than concrete or asphalt. I think that's how it works. So, if they wanted to explore other green ways, I think they and the Board would probably be better off just continuing it for a week or two or four so they could huddle with Engineering and see what Engineering would go with. So, I'm not against gravel, but I think there's probably better ways. Again, whatever it is, it's got to be the right way. They can't shift their water to my lot and I don't think that's what they're trying to do. Thank you. CHAIRPERSON JAFFE: Thank you. COMMISSIONER LANAGHAN: Thank you. CHAIRPERSON JAFFE: Did you want to respond to that? You don't have to. If you'd like to, you can. If you don't want to, you don't have to. MR. PEART: No, I just want to say thank you to Mr. Stevens. MR. STEVENS: No problem. CHAIRPERSON JAFFE: All right, so is there anybody else who would like to comment on this petition? (No response.) CHAIRPERSON JAFFE: Okay, we'll close it down for deliberation. So, it sounds like where we left things and based on the input from the Petitioner, they want to go the route of submitting the request for the green infrastructure project which would not require a variance. So, we could effectively offer them the opportunity to withdraw or dismiss the request for variance. COMMISSIONER LANAGHAN: I think I heard from Dan that continuance might be the most flexible for them so they could chat with Engineering, and if they come up with a solution in the next month, great. If they don't, come back here or whatever or, you know, they could withdraw at that point in time. LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 APPROVED 9 CHAIRPERSON JAFFE: I thought I heard the Petitioner say that they wanted to go with the -- COMMISSIONER LANAGHAN: Which is fine. I'm happy to withdraw and not worry about it anymore. That's fine, too. CHAIRPERSON JAFFE: So, I know we're closed for deliberation, but just to make sure the Board heard you correctly, if you could come back up? Are you going with option one or option two? Option one being you submit the request, you don't request a continuance, you withdraw the variance and you're basically free to go, or you're saying for option two, you'd like to request a continuance so you can have those discussions and come back before this Board at a future date which, Dan, do we know at this point when that would be? MR. OSOBA: September 8th. CHAIRPERSON JAFFE: Okay, to explore the green infrastructure options, that's option two. MR. OSOBA: Well, option two would be to explore further variances if needed. If green infrastructure applications were submitted to the Village engineer and not amenable and that's not something that would work, then you could submit your variance again to the Board to do a different surface that does not comply with code such as gravel or other surfaces that may not need Engineering stamps. COMMISSIONER LANAGHAN: For my own clarification, if they withdraw, they're not subject to the one-year penalty. They could apply for a different variance or the same variance later? MR. OSOBA: That is correct, yes. MR. PEART: So, it sounds like withdrawing and then just working with the Village engineer to explore a green solution is the route we'd like to go. Thank you. CHAIRPERSON JAFFE: You're welcome. So, thank you, everybody, for that clarification. So, that being said -- COMMISSIONER LANAGHAN: Do we need a vote or anything for them to withdraw? MR. OSOBA: It would be a vote to dismiss the variance request as it's not needed. CHAIRPERSON JAFFE: Before I ask if there's a motion, does anybody else have any comments they want to make and put on the record? (No response.) CHAIRPERSON JAFFE: Okay, is there a motion to dismiss the request for the variance? COMMISSIONER DRAKE: I move that we allow the Petitioner to just dismiss or remove this petition. COMMISSIONER LANAGHAN: Second. MR. OSOBA: Mr. Portera. COMMISSIONER PORTERA: Yes. MR. OSOBA: Mr. Lanaghan. COMMISSIONER LANAGHAN: Yes. MR. OSOBA: Mr. Drake. COMMISSIONER DRAKE: Yes. MR. OSOBA: Chair Jaffe. CHAIRPERSON JAFFE: Yes. MR. PEART: Thank you. LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 APPROVED 10 MRS. PEART: Thank you. CHAIRPERSON JAFFE: Have a good night. COMMISSIONER LANAGHAN: Best of luck. (Whereupon, the public hearing on the above-mentioned petition was adjourned at 7:23 p.m.) LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 APPROVED 11 ZONING BOARD REPORT OF PROCEEDINGS OF A MEETING BEFORE THE VILLAGE OF ARLINGTON HEIGHTS ZONING BOARD OF APPEALS OF APPEALS RE: 401 NORTH PINE AVENUE - ZBA #25-024 REPORT OF PROCEEDINGS had before the Village of Arlington Heights Zoning Board of Appeals taken at the Arlington Heights Village Hall, 33 South Arlington Heights Road, 1st Floor, Buechner Room, Arlington Heights, Illinois on the 11th day of August, 2025 at the hour of 7:23 p.m. MEMBERS PRESENT: BENJAMIN JAFFE, Chairperson TOM DRAKE JEFFREY LANAGHAN FRANK PORTERA ALSO PRESENT: DAN OSOBA, Planner I DARKO BOJIN, Assistant Planner CHAIRPERSON JAFFE: Okay, Agenda Item B. 401 North Pine Avenue, ZBA LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 APPROVED 12 Petition #25-024. MR. PURDOM: Hello. CHAIRPERSON JAFFE: Hello. State your name and address for the record. MR. PURDOM: I'm Kevin Purdom with 401 North Pine Avenue. (Witness sworn.) MR. OSOBA: The property at 401 North Pine Avenue is zoned R-3 Residential Single-Family District. The Petitioner is proposing to construct a second-story addition in the rear of the existing single-family dwelling along with a deck and a pergola located in the side and rear yard. The existing home is set back 4.06 feet from the interior side yard where a minimum side setback is 6.6 feet. The Petitioner is proposing to maintain this nonconforming setback for the second-story addition. The proposed deck is also encroaching into the required 6.6-foot side setback and maintaining that same nonconforming setback as the existing home and building addition at 4.06 feet. The pergola, which is considered an accessory structure, may only be located in the rear of the property and is partially proposed within the side yard. Therefore, the Petitioner is requesting the following variations: • A 2.54-foot variation from Chapter 28, Section 5.1-3.3(b) to allow a second-story addition with a side yard setback of 4.06 feet instead of the required 6.6-foot minimum, and an additional two feet for the eave; • A 2.54-foot variation from Chapter 28, Section 6.6-5.1 to allow a deck to encroach in the required side yard with a side setback of 4.06 feet instead of the required 6.6-foot minimum; and • A variation from Chapter 28, Section 6.5-2 to allow a portion of a pergola in the side yard where accessory structures are only permitted in the rear yard. MR. PURDOM: All right, so my clients just bought the house five months ago and they're looking to do some work before they move in. It's just the husband and wife who live there. They really love the character of the house and were deciding to do a dormer addition to the back of the house, adding a new deck where the patio is, and then a pergola that comes out to protect the window and the door. All we're asking for is to build in line with the existing house both the deck, the pergola, and the second story where it goes into the existing nonconforming setback. All other codes are met. We think that it's, we actually tried pushing it in to three feet for where it would be on the side and it completely kills the deck. It looks a little weird. You have all that wasted space before the landscaping that's right on the side. It just actually makes more sense to do it in line. It looks better and I think it's a reasonable ask, and I believe that's it. COMMISSIONER LANAGHAN: You said the existing deck is on top of an existing patio; is that correct? MR. PURDOM: There's an existing patio that's going to be removed. COMMISSIONER LANAGHAN: So, it's staying on the same spot, that you're not enlarging it? MR. PURDOM: Right, but since it's a patio, it can be in that side setback, but -- COMMISSIONER LANAGHAN: Got you. MR. PURDOM: -- the deck or the pergola cannot be. COMMISSIONER LANAGHAN: Got you, okay. CHAIRPERSON JAFFE: Do you know the approximate age of the house? MR. PURDOM: Pre-50's I believe. So, it's an older house with a lot of character LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 APPROVED 13 and they wanted to preserve that. CHAIRPERSON JAFFE: Do you know if the property owners talked to any of the neighbors about the project? And, if so -- MR. PURDOM: They haven't heard anything. Since they just moved in, they aren't living in it full time yet. They're still moving back and forth. But they haven't heard anything negative or positive. They've seen a bunch of people look at the sign. but no one has come out to say anything. CHAIRPERSON JAFFE: Tom or Frank? COMMISSIONER PORTERA: You confirm the two existing non-conforming, I guess characteristics of the house, that those variances are existing non-conforming; is that right? MR. PURDOM: Yes. Actually, all three are. It's the deck, the pergola, and the second story which goes to the existing building line. COMMISSIONER PORTERA: And it's on a corner lot, too. MR. PURDOM: Yes, correct. COMMISSIONER PORTERA: That's all I have. CHAIRPERSON JAFFE: Jeff, anything else? COMMISSIONER LANAGHAN: No. You know, we've seen similar stuff. I mean, you've got to stay more or less on top of the existing structure, so that makes all the sense in the world. I was asking about the deck just to make sure that it was on top of an existing type of structure so there's no other impact to what would have been there. It's already been there; they're just upgrading it basically. CHAIRPERSON JAFFE: All right, thank you, Kevin. Is there anybody in the audience who wishes to comment? (No response.) CHAIRPERSON JAFFE: Okay, we'll close it down for Board deliberation. Jeff, did you want to start? COMMISSIONER LANAGHAN: Yes, happy to. You know, corner side lots or corner lots always seem to be the ones we see the most of. They have the strangest setbacks and side yard configurations, and a lot of people consider them front yards or what have you. So, they're keeping it very much in line with what the original house was and what the original intent was. I love to see older houses get redone, so I think I'm definitely in favor of this one. COMMISSIONER DRAKE: Yes, they satisfy all the requirements as far as I'm concerned. There was no push-back from the three Staff departments. So, I know where that property is, I think it's going to be a nice use, what they're trying to do. COMMISSIONER PORTERA: Yes, I agree. Nothing further for me. CHAIRPERSON JAFFE: Okay, is there a motion? COMMISSIONER LANAGHAN: Move to approve the variances as submitted. COMMISSIONER PORTERA: Second. MR. OSOBA: Mr. Portera. COMMISSIONER PORTERA: Yes. MR. OSOBA: Mr. Lanaghan. COMMISSIONER LANAGHAN: Yes. MR. OSOBA: Mr. Drake. COMMISSIONER DRAKE: Yes. MR. OSOBA: Chair Jaffe. CHAIRPERSON JAFFE: Yes. LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 APPROVED 14 Congratulations. MR. PURDOM: Thank you. CHAIRPERSON JAFFE: Have a good night. MR. PURDOM: Thank you. (Whereupon, the public hearing on the above-mentioned petition was adjourned at 7:29 p.m.) LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 APPROVED 15 ZONING BOARD REPORT OF PROCEEDINGS OF A MEETING BEFORE THE VILLAGE OF ARLINGTON HEIGHTS ZONING BOARD OF APPEALS OF APPEALS RE: 604 WEST TECHY ROAD - ZBA #25-026 REPORT OF PROCEEDINGS had before the Village of Arlington Heights Zoning Board of Appeals taken at the Arlington Heights Village Hall, 33 South Arlington Heights Road, 1st Floor, Buechner Room, Arlington Heights, Illinois on the 11th day of August, 2025 at the hour of 7:29 p.m. MEMBERS PRESENT: BENJAMIN JAFFE, Chairperson TOM DRAKE JEFFREY LANAGHAN FRANK PORTERA ALSO PRESENT: DAN OSOBA, Planner I DARKO BOJIN, Assistant Planner LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 APPROVED 16 CHAIRPERSON JAFFE: Okay, next, Agenda Item C. 604 West Techy Road, ZBA Petition #25-026. Hello. MR. PADMANABHA: Hello, good evening, members of the Board. My name is Prakash Padmanabha. I'm the resident of 604 West Techy Road; I'm the owner of 604 West Techy Road. Should I talk about the project? (Witness sworn.) MR. BOJIN: The property is zoned R-3 Residential Single-Family District, and the Petitioner is proposing to install a pergola in the side yard. Code prohibits accessory structures such as pergolas to be built in the side yard. Therefore, the Petitioner is requesting the following variation: • A variation from Chapter 28, Section 6.5-2 to allow a pergola in the side yard where accessory structures are only permitted in the rear yard. Thank you. MR. PADMANABHA: All right, I'm here today to respectfully request a variation to install the pergola. This house was built probably in the 80's. It's a corner lot. As you can see, the entrance of the house is facing the Techy Road, and I do have a garage next to the house. So, the way they created and built the patio back in those days, it kind of, it's in the side yard, it's the corner of the side yard and the backyard. I do have an existing patio there. I do have an outdoor couch there, so whenever it rains, I line up my three kids to move the sofas, like the cushions of the couches inside. So, I want to install a pergola just to, you know, protect the couch from the rain and the sun. So, that's my request, sir. CHAIRPERSON JAFFE: I drove by your property, so that would be within the fenced area of your backyard? MR. PADMANABHA: Within the fenced area, within the patio, right, the existing patio. CHAIRPERSON JAFFE: Okay, any questions? COMMISSIONER LANAGHAN: Just one for Staff, just for my own clarification. James Court would be their front yard; is that correct? MR. BOJIN: Yes, that is correct. COMMISSIONER LANAGHAN: Okay, yes, got you. CHAIRPERSON JAFFE: Have you talked to any of your neighbors about the project? MR. PADMANABHA: Yes, we did. No, no concerns. CHAIRPERSON JAFFE: Okay, any other questions for the Petitioner? (No response.) CHAIRPERSON JAFFE: All right, thank you. You can have a seat. I don't think there's anybody else here who wants to comment, so we'll close it down for deliberation. Yes, after I read the paperwork, I wanted to see for myself so I actually took a ride by today and that was probably the only question I was going to have is, you know, confirming that it's within the fenced area of the backyard which I couldn't see that being a concern to anybody within the locality. Given it's not, and having to move various stuff in and out of the house every time it rains, I think this is a reasonable request. LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 APPROVED 17 COMMISSIONER PORTERA: Agree. CHAIRPERSON JAFFE: Is there a motion? COMMISSIONER DRAKE: I move that we approve this petition as presented. COMMISSIONER PORTERA: Second. MR. BOJIN: Mr. Portera. COMMISSIONER PORTERA: Yes. MR. BOJIN: Mr. Lanaghan. COMMISSIONER LANAGHAN: Yes. MR. BOJIN: Mr. Drake. COMMISSIONER DRAKE: Yes. MR. BOJIN: Chair Jaffe. CHAIRPERSON JAFFE: Yes. Congratulations. MR. PADMANABHA: Awesome. Thank you so much. CHAIRPERSON JAFFE: You're welcome. Do we have other business? MR. OSOBA: Just a brief announcement. The Zoning Board of Appeals application form, the actual application form has been updated. It's going to be on the Village website within the next week. I'll also make a copy of it to everybody just so you have an updated application form. It just clarified a couple of things and just from a procedural perspective of what we expect of submittals so that we have a better idea of how many petitions we'll get next year. CHAIRPERSON JAFFE: Okay, that's cool. COMMISSIONER LANAGHAN: I like that idea. CHAIRPERSON JAFFE: Yes. MR. PADMANABHA: Are we through? COMMISSIONER LANAGHAN: Yes, you are. Thank you so much. Good luck. CHAIRPERSON JAFFE: Thank you. All right, was that the only other item of other business? MR. OSOBA: Yes. CHAIRPERSON JAFFE: Public comment? (No response.) CHAIRPERSON JAFFE: Is there a motion to adjourn? COMMISSIONER LANAGHAN: So moved. COMMISSIONER DRAKE: Second. CHAIRPERSON JAFFE: All in favor? (Chorus of ayes.) CHAIRPERSON JAFFE: All opposed? (No response.) CHAIRPERSON JAFFE: We're adjourned. (Whereupon, the public hearing on the above-mentioned petition was adjourned at 7:33 p.m.) LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 APPROVED 18 STATE OF ILLINOIS ) ) SS. COUNTY OF KANE ) I, RON LeGRAND, SR., depose and say that I am a digital court reporter doing business in the State of Illinois; that I reported verbatim the foregoing proceedings and that the foregoing is a true and correct transcript to the best of my knowledge and ability. ______________________________ RON LeGRAND, SR. SUBSCRIBED AND SWORN TO BEFORE ME THIS DAY OF , A.D. 2025. ______________________________ NOTARY PUBLIC LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389

Agenda

AGENDA ZONING BOARD OF APPEALS Buechner Room, 1st Floor Arlington Heights Village Hall, 33 S. Arlington Heights Rd. Arlington Heights IL 60005 August 11, 2025 7:00 PM I. CALL TO ORDER II. ROLL CALL OF MEMBERS III. APPROVAL OF MINUTES A. Minutes 7/14/25 B. Findings 7/14/25 - 919 S. Vail Ave. C. Findings 7/14/25 - 819 N. Highland Ave. D. Findings 7/14/25 - 1319 N. Salem Blvd. E. Findings 7/14/25 - 106 S. Windsor Dr. F. Findings 7/14/25 - 513 N. Douglas Ave. IV. OLD BUSINESS V. NEW BUSINESS A. 1015 N. Forrest Ave. - ZBA25-023 B. 401 N. Pine Ave. - ZBA25-024 C. 604 W. Techy Rd. - ZBA25-026 VI. OTHER BUSINESS VII. PUBLIC COMMENT Anyone wishing to speak on a subject not on the Agenda may speak at this time. Please limit your comments to three minutes. VIII. ADJOURNMENT Persons with disabilities requiring auxiliary aids or services, such as an American Sign Language interpreter or written materials in accessible formats, should contact the Health & Human Services Department, at 33 S. Arlington Heights Road, Arlington Heights, IL 60005, healthmail@vah.com or 847/368-5760.

Packet

AGENDA ZONING BOARD OF APPEALS Buechner Room, 1st Floor Arlington Heights Village Hall, 33 S. Arlington Heights Rd. Arlington Heights IL 60005 August 11, 2025 7:00 PM I. CALL TO ORDER II. ROLL CALL OF MEMBERS III. APPROVAL OF MINUTES A. Minutes 7/14/25 B. Findings 7/14/25 - 919 S. Vail Ave. C. Findings 7/14/25 - 819 N. Highland Ave. D. Findings 7/14/25 - 1319 N. Salem Blvd. E. Findings 7/14/25 - 106 S. Windsor Dr. F. Findings 7/14/25 - 513 N. Douglas Ave. IV. OLD BUSINESS V. NEW BUSINESS A. 1015 N. Forrest Ave. - ZBA25-023 B. 401 N. Pine Ave. - ZBA25-024 C. 604 W. Techy Rd. - ZBA25-026 VI. OTHER BUSINESS VII. PUBLIC COMMENT Anyone wishing to speak on a subject not on the Agenda may speak at this time. Please limit your comments to three minutes. VIII. ADJOURNMENT Persons with disabilities requiring auxiliary aids or services, such as an American Sign Language interpreter or written materials in accessible formats, should contact the Health & Human Services Department, at 33 S. Arlington Heights Road, Arlington Heights, IL 60005, healthmail@vah.com or 847/368-5760. Page 1 of 67 Page 2 of 67 DRAFT ZONING BOARD REPORT OF PROCEEDINGS OF A MEETING BEFORE THE VILLAGE OF ARLINGTON HEIGHTS ZONING BOARD OF APPEALS OF APPEALS RE: 919 SOUTH VAIL AVENUE - ZBA #25-012 REPORT OF PROCEEDINGS had before the Village of Arlington Heights Zoning Board of Appeals taken at the Arlington Heights Village Hall, 33 South Arlington Heights Road, 1st Floor, Buechner Room, Arlington Heights, Illinois on the 14th day of July, 2025 at the hour of 7:00 p.m. MEMBERS PRESENT: BENJAMIN JAFFE, Chairperson TOM DRAKE PETER SIAVELIS MICHAEL O'CONNOR FRANK PORTERA JOSEPH SELBKA ALSO PRESENT: DEREK MACH, Development Planner DARKO BOJIN, Assistant Planner DAN OSOBA, Planner LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 Page 3 of 67 DRAFT CHAIRPERSON JAFFE: All right, we're going to call this month's Zoning Board of Appeal's meeting to order. Let's start with roll call, please. MR. OSOBA: Mr. Portera. COMMISSIONER PORTERA: Here. MR. OSOBA: Mr. Selbka. COMMISSIONER SELBKA: Here. MR. OSOBA: Mr. O'Connor. COMMISSIONER O'CONNOR: Here. MR. OSOBA: Mr. Lanaghan. (No response.) MR. OSOBA: Mr. Siavelis. COMMISSIONER SIAVELIS: Yes, here. MR. OSOBA: Mr. Drake. COMMISSIONER DRAKE: Here. MR. OSOBA: Chairman Jaffe. CHAIRPERSON JAFFE: Yes. Okay, now we'll proceed to the Pledge of Allegiance. If you'd all stand and face the flag in the corner of the room? (Pledge of Allegiance recited.) CHAIRPERSON JAFFE: Okay, next, we need to approve the minutes of the June 9th meeting. Has everyone had an opportunity to review those minutes? And if so, are they complete and accurate, or are any changes needed? COMMISSIONER SIAVELIS: I was, I'm going to abstain because I was not here at last month's meeting. So, this is an abstention. CHAIRPERSON JAFFE: Okay. All right, is there a motion? COM0MISSIONER SELBKA: Motion to approve. CHAIRPERSON JAFFE: Seconded? COMMISSIONER DRAKE: Second. CHAIRPERSON JAFFE: All in favor? (Chorus of ayes.) CHAIRPERSON JAFFE: All opposed? (No response.) CHAIRPERSON JAFFE: Okay, hearing procedures. So, for the audience, we're going to just quickly go over the order of operations and how these meetings are run. First, from a quorum, if less than six members are present, petitioners have the option to continue the meeting as it takes four affirmative votes to approve a variance regardless of the number of Board members in attendance. If denied, a petitioner cannot reapply for a whole year. So, tonight, we have six Board members with us, so you'll need to go four of six to secure approval for your variance. The hardship, so the document you completed that was submitted in LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 Page 4 of 67 your packet we've all had a chance to review, but we expect you to explain the four elements necessary for this Board to establish in order to be able to grant a variation. Those four elements are: 1. That the proposed use will not alter the essential character of the locality and will be compatible with existing uses and zoning of nearby property; 2. That the plight of the owner is due to unique circumstances which may include the length of time the subject property has been vacant as zoned; 3. That the proposed variation is in harmony with the spirit and intent of this Chapter; and finally, 4. That the variation requested is the minimum variation necessary to allow reasonable use of the property. A variation shall be permitted only if the evidence, in the judgment of the Board of Appeals, sustains each of the four conditions enumerated. So, again, we look to you, the petitioner, to explain all four of those. When you come to the stand, explain your reasoning, your logic, your justification, and we'll have some questions for you. Sequence of events. I will open each agenda item and if there's any introductory remarks. We will swear in the petitioner. We'll need your name, address, and affirm that you'll be telling the truth. Staff presentation will give a brief overview of the project and the variance request. You, the applicant, will then present your case in favor of zoning relief by way of documents or testimony. As I said, the applicant's hand and any witnesses testifying must be sworn under oath, and must state and spell their respective names for the record. Public comment. Members of the public may speak on the application. Speakers must be sworn under oath, and state and spell their name clearly. There are no formal objectors, correct? MR. OSOBA: There are none. CHAIRPERSON JAFFE: Do I have to read those sections or just go to the public comment? MR. OSOBA: You don't have to. CHAIRPERSON JAFFE: Okay, so since there are no formal objectors this evening, regarding public comment, any person who is not formally registered as an objector may speak at the hearing but must limit their comments to three minutes. The Chair may, in his or her discretion, alter the maximum time provided to public commenters provided the maximum time is applied to all speakers. Public comment is specific to the individual variances. You'll see there is an agenda item for public comment at the end if you want to ask about the Bears, taxes or anything else, but if you come to the stand, please limit your comments just to the variances being requested. The applicant will then make a closing statement and present any follow-up testimony or evidence. The applicant will rest their case. The Board will then make a motion to deliberate and close public testimony. We will deliberate and vote on the matter. All ZBA final decisions must be in writing. If the agenda packet does not include a final draft order that is acceptable to the ZBA, the substantive motion should be to direct Staff to prepare an appropriate final order for approval at a subsequent meeting. With that, we can move to new business, which is our first petition, LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 Page 5 of 67 Petition A, 919 South Vail Avenue, ZBA #25-012. Dan, do you want to start with the Staff presentation, or will Derek? MR. MACH: The Petitioner is proposing to construct an addition to the existing single-story home. The Petitioner did receive approval for a similar project on October 16, 2023 with variations from the Zoning Board. However, that approval did expire. The Petitioner is returning this evening with a slightly modified footprint and the elimination of two of the four variances that were approved back in 2023. This evening, they're proposing an expansion to the garage in order to create a two-car front load garage. The expansion for the garage is encroaching into the required side yard setback along the north property line. In addition, the two air conditioning units are encroaching into the required side yard setback along the south property line. Therefore, they're requesting: • A four-foot variation from Chapter 28, Section 5.1-3.3b to allow an addition with a side yard setback of three feet instead of the required seven feet, and an additional one foot for the eave; as well as • A variance from Chapter 28, Section 6.6-5 to allow two air conditioning units in the required side yard setback along the south property line. Thank you. CHAIRPERSON JAFFE: Thank you. Hi. MR. FLUBACKER: How are you doing tonight? CHAIRPERSON JAFFE: Good. Can you state your name? MR. FLUBACKER: Bob Flubacker with Robert Flubacker Architects. CHAIRPERSON JAFFE: And address? MR. FLUBACKER: 1895 Rohlwing Road, Rolling Meadows, Illinois. (Witness sworn.) CHAIRPERSON JAFFE: And then will you also be speaking? MS. FEATHERSTONE: Sure. Sherry Featherstone, 919 South Vail, Arlington Heights. (Witness sworn.) CHAIRPERSON JAFFE: Okay. MR. FLUBACKER: So, as Derek mentioned, we had applied for a zoning variation or a set of zoning variations back in December of '23. Due to pricing issues and just delays in being able to get the project to a scope that worked, time has elapsed on that zoning variation which, by the way, since I'm first up and I'm going to leave, I'd like to put in the public comments that these variations should be good for two years, not one. COMMISSIONER SIAVELIS: Bob, what's the basis for that? What do you want to see it doubled for? MR. FLUBACKER: The time that it takes from getting the application approved, getting the construction documents put together, going through the bid process, getting the permit, it's not uncommon that that takes longer than a year, but just, you know -- COMMISSIONER SIAVELIS: No, that's fair enough. That's why I wanted it in the record, so the basis for the request. MR. FLUBACKER: Sure. COMMISSIONER SIAVELIS: And just one other thing, how many variances LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 Page 6 of 67 have you sought and received from the Village over the years would you say approximately? And that colors your experience and impacts your view of what you just asked about. MR. FLUBACKER: I'd say somewhere between 30 and 40 probably. So, the additional project that got approved a year and a half ago had four variations. Two of them had to do with the size of the project, with lot coverage and FAR. Those have been eliminated because we have downsized the project. The two variations remain; one is for rebuilding the garage basically to the same north wall as the existing garage, just reconfiguring slightly. Then, the second one is for air conditioning units being on the side of the project rather than in the rear because we still plan on doing that other addition as a later phase and would like the variation for the air conditioners at this time. One thing we can do to kind of accommodate the neighbors in the meantime is we can put the connections on that south wall but actually move the equipment around to the back wall until that addition does happen. COMMISSIONER SIAVELIS: So, elaborate a little bit further on the last point you made. MR. FLUBACKER: So, the air conditioning units as proposed are on the southeast corner of the existing home. COMMISSIONER SIAVELIS: Right. MR. FLUBACKER: The addition that was planned went parallel to that wall into the backyard, that's why we needed the air conditioning unit at that location. What I'm suggesting is we can put the electrical and refrigerant piping connection on that south wall. The connections to the units are flexible so we can put the equipment around the corner in the back of the home today, and then when the addition happens, just pick up and move the equipment to the south side of the existing house when that addition happens. CHAIRPERSON JAFFE: So, the second unit is needed because the addition won't be hooked up to the primary residence's main -- MR. FLUBACKER: We'll have both units immediately. The addition would not add another air conditioning unit. So, the future addition wouldn't, this addition proposed would add another air conditioning unit to have two total. CHAIRPERSON JAFFE: One existing right now? MR. FLUBACKER: Right. CHAIRPERSON JAFFE: And then another one. MR. FLUBACKER: Yes. COMMISSIONER SIAVELIS: Okay, so Bob, on the drawings that were submitted to us, right, we're showing on the screen? MR. FLUBACKER: Yes. COMMISSIONER SIAVELIS: It's slightly different than what you talked about just now. What is shown on the screen is post second addition, right? MR. FLUBACKER: Right. COMMISSIONER SIAVELIS: The future addition you're contemplating. MR. FLUBACKER: Right, right. COMMISSIONER SIAVELIS: So, the paperwork you've submitted doesn't reflect what you've talked about as a -- MR. FLUBACKER: I'm just offering that -- COMMISSIONER SIAVELIS: -- compromise? Okay. LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 Page 7 of 67 MR. FLUBACKER: I'm just offering that as something we can do in the meantime. I'd like the paperwork to stay the way it's presented and have the variation for the AC units immediately. COMMISSIONER SIAVELIS: Okay, so that's where I was going to go next. MR. FLUBACKER: Yes. COMMISSIONER SIAVELIS: What are you particularly asking us about or for from a variation standpoint? MR. FLUBACKER: What's in the paperwork. COMMISSIONER SIAVELIS: Okay, got you. MR. FLUBACKER: Yes. COMMISSIONER SIAVELIS: Okay, and then just do me a favor, tell me what is the distance from the southern edge of those two units to the southern property line? MR. FLUBACKER: Well, the setback line, which you can see is just above the two AC units, is seven feet. COMMISSIONER SIAVELIS: Okay. MR. FLUBACKER: So, assuming they're two to two-and-a-half-feet wide, you know, puts it to four-and-a-half feet roughly. COMMISSIONER SIAVELIS: Okay, how many folks live in this home? MS. FEATHERSTONE: Me. COMMISSIONER SIAVELIS: Just you live in this house? MS. FEATHERSTONE: Yes. COMMISSIONER SIAVELIS: Okay. All right, how long have you lived in the neighborhood or in Arlington Heights? MS. FEATHERSTONE: Oh, my, 1990-ish -- COMMISSIONER SIAVELIS: Okay, 35 years and counting. MS. FEATHERSTONE: -- somewhere in there, yes. COMMISSIONER SIAVELIS: Okay, and have you talked to your neighbors? MS. FEATHERSTONE: They're all fine with it. COMMISSIONER SIAVELIS: Okay, nobody voiced any opposition to you? MS. FEATHERSTONE: No. MR. FLUBACKER: And then specific to the neighbor to the south. COMMISSIONER SIAVELIS: That's where I'm going with this. MS. FEATHERSTONE: Yes, the neighbor to the south was fine. COMMISSIONER SIAVELIS: The adjoining neighbor to the south would be impacted theoretically by those two units. MS. FEATHERSTONE: And they're fine. Where they sit, they sit on, I think on their side of the house it's a chimney. It's where those units would be aligned to at their house, so there is no visual. COMMISSIONER SIAVELIS: No visual impact? MS. FEATHERSTONE: No. COMMISSIONER SIAVELIS: Okay, I don't have anything else. CHAIRPERSON JAFFE: Anybody else? (No response.) CHAIRPERSON JAFFE: All right, you can take a seat and we'll see if there's any public comment. LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 Page 8 of 67 MS. FEATHERSTONE: Thank you. CHAIRPERSON JAFFE: Is there anybody present who wishes to comment on this petition? (No response.) CHAIRPERSON JAFFE: Okay, we'll close it down for Board deliberation. COMMISSIONER SIAVELIS: Sure, I'll start. I think this is a reasonable request. I understand why Bob offered up the compromise that he did, but I don't think it's necessary. Frankly, I think four-and-a-half to five feet from the property line is sufficient here. I do like the fact that the owner clarified what structure it is basically opposed or corresponds on the neighbor's side being a chimney there, and we have no neighborhood opposition. So, I'm in support of the petition and the variances sought as drafted and presented in the papers, not necessarily the compromise offered that Bob made. Although I do appreciate that, I don't think we need to get to that. CHAIRPERSON JAFFE: Any other comments, thoughts? (No response.) CHAIRPERSON JAFFE: Is there a motion? COMMISSIONER SIAVELIS: I'll move as stated. COMMISSIONER PORTERA: Second. MR. MACH: Mr. Siavelis. COMMISSIONER SIAVELIS: Yes. MR. MACH: Mr. Drake. COMMISSIONER DRAKE: Yes. MR. MACH: Mr. O'Connor. COMMISSIONER O'CONNOR: Yes. MR. MACH: Mr. Portera. COMMISSIONER PORTERA: Yes. MR. MACH: Mr. Selbka. COMMISSIONER SELBKA: Yes. MR. MACH: Chairman Jaffe. CHAIRPERSON JAFFE: Yes. Your variances have been approved. Thank you. MS. FEATHERSTONE: Thank you. MR. FLUBACKER: Thank you very much. (Whereupon, the public hearing on the above- mentioned petition was adjourned at 7:13 p.m.) LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 Page 9 of 67 ZONING BOARD REPORT OF PROCEEDINGS OF A MEETING BEFORE THE VILLAGE OF ARLINGTON HEIGHTS ZONING BOARD OF APPEALS OF APPEALS RE: 819 NORTH HIGHLAND AVENUE - ZBA #25-018 REPORT OF PROCEEDINGS had before the Village of Arlington Heights Zoning Board of Appeals taken at the Arlington Heights Village Hall, 33 South Arlington Heights Road, 1st Floor, Buechner Room, Arlington Heights, Illinois on the 14th day of July, 2025 at the hour of 7:13 p.m. MEMBERS PRESENT: BENJAMIN JAFFE, Chairperson TOM DRAKE PETER SIAVELIS MICHAEL O'CONNOR FRANK PORTERA JOSEPH SELBKA ALSO PRESENT: DEREK MACH, Development Planner DARKO BOJIN, Assistant Planner DAN OSOBA, Planner LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 Page 10 of 67 CHAIRPERSON JAFFE: Okay, next up, Agenda Item B, 819 North Highland Avenue, ZBA #25-018. How are you? MR. COCHRAN: Hi, guys. Jim Cochran, JRC Design Build. CHAIRPERSON JAFFE: Address? MR. COCHRAN: 1275 East Davis, Arlington Heights, Illinois. MS. LALL: Regina Lall, 819 North Highland Avenue. I'm the owner. (Witnesses sworn.) CHAIRPERSON JAFFE: Okay, Staff report? MR. OSOBA: The property is zoned R-3 Residential Single-Family Zone District. The Petitioner is proposing to construct a new 247 square-foot addition and interior remodel to connect the existing home to the detached garage that's existing on the north of the property. The existing garage is connected to the home with a covered breezeway and is located 4.72 feet from the north property line. Attaching the detached garage to the home would require compliance with the side yard setbacks of the R-3 District which would equal 10 percent of the lot width, or 7.5 feet on this lot. Therefore, the Petitioner is requesting the following variation: • A 2.78-foot variation from Chapter 28, Section 5.1-3.3b to allow a side setback of 4.72 feet from the newly attached garage where 7.5 feet is required. MR. COCHRAN: That is correct. Yes, so that's an existing attached garage with the roof line. Basically, what we're doing is filling it in between so that she can have her modern kitchen attached to the garage. We originally proposed to her to put the addition on the back of the home, but then there was no way to get from the garage to the house without going outside. Again, there is also a basement stairway in the back of the house that we would have had to have gotten ridden of that they want to keep. That was one of the reasons we ask for the variance. CHAIRPERSON JAFFE: Tom? COMMISSIONER DRAKE: Hello, I have a few questions. You've heard some of these already. How long in the home? MS. LALL: 10 years. COMMISSIONER DRAKE: 10 years, all right. How many folks live in the house? MS. LALL: Six. COMMISSIONER DRAKE: Six. How many drivers do you have? MS. LALL: Two right now. COMMISSIONER DRAKE: Okay, what about the neighbors? Did you physically talk to the neighbors? MS. LALL: Yes, they're all happy about it. COMMISSIONER DRAKE: No feedback? No negativity? MS. LALL: Only positivity. COMMISSIONER DRAKE: Everybody's on board? MS. LALL: Yes. COMMISSIONER DRAKE: All right, that's it. CHAIRPERSON JAFFE: Any other questions from the Board? (No response.) CHAIRPERSON JAFFE: Okay, you may have a seat. LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 Page 11 of 67 MS. LALL: Thanks. MR. COCHRAN: Thank you. CHAIRPERSON JAFFE: You're welcome. Is there anybody present who wishes to comment on this petition? (No response.) CHAIRPERSON JAFFE: Okay, none being heard, we'll close it down. Tom? COMMISSIONER DRAKE: Yes, I think this is pretty straight-forward. It's an existing non-conforming. None of the three Staff Departments had any opposition. No neighbor opposition that we heard. I think it's a good use of the space, it will give them more living space. It's a nice design and I think they satisfied all four points of the criteria we're looking for. So, I'm in favor of approval. COMMISSIONER SIAVELIS: Yes, I agree with you, Tom. Frankly, what are you supposed to do with the gap or the breezeway between there? I mean, it's a logical spot for, you know, expansion, utilization of space, especially in the context of having six folks living in this house. So, I mean, this is entirely reasonable, and there's a number of houses -- oops, sorry, apologies, houses in the Village that have that sort of configuration with the garage and like a breezeway between there, and of those, a number of them have had this type of addition or adder to it. So, I think this is entirely reasonable. CHAIRPERSON JAFFE: I just think it's an increase also in safety and security, having to walk in and out of, you know, one garage and the house and back and forth. I'm in support. Is there a motion? COMMISSIONER DRAKE: Move to approve as presented. COMMISSIONER PORTERA: Second. MR. OSOBA: Commissioner Selbka. COMMISSIONER SELBKA: Yes. MR. OSOBA: Mr. Portera. COMMISSIONER PORTERA: Yes. MR. OSOBA: Mr. O'Connor. COMMISSIONER O'CONNOR: Yes. MR. OSOBA: Mr. Drake. COMMISSIONER DRAKE: Yes. MR. OSOBA: Mr. Siavelis. COMMISSIONER SIAVELIS: Yes. MR. OSOBA: Chair Jaffe. CHAIRPERSON JAFFE: Yes. Congratulations. MR. COCHRAN: Thank you, gentlemen. MS. LALL: Thank you. (Whereupon, the public hearing on the above- mentioned petition was adjourned at 7:17 p.m.) LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 Page 12 of 67 ZONING BOARD REPORT OF PROCEEDINGS OF A MEETING BEFORE THE VILLAGE OF ARLINGTON HEIGHTS ZONING BOARD OF APPEALS OF APPEALS RE: 1319 NORTH SALEM BOULEVARD - ZBA #25-020 REPORT OF PROCEEDINGS had before the Village of Arlington Heights Zoning Board of Appeals taken at the Arlington Heights Village Hall, 33 South Arlington Heights Road, 1st Floor, Buechner Room, Arlington Heights, Illinois on the 14th day of July, 2025 at the hour of 7:17 p.m. MEMBERS PRESENT: BENJAMIN JAFFE, Chairperson TOM DRAKE PETER SIAVELIS MICHAEL O'CONNOR FRANK PORTERA JOSEPH SELBKA ALSO PRESENT: DEREK MACH, Development Planner DARKO BOJIN, Assistant Planner DAN OSOBA, Planner LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 Page 13 of 67 CHAIRPERSON JAFFE: Okay, Agenda Item C, 1319 North Salem Boulevard, ZBA #25-020. Good evening. MR. MILEWSKI: Hi. CHAIRPERSON JAFFE: What's your name? MR. MILEWSKI: I'm Tom Milewski, owner of 1319 North Salem Boulevard. CHAIRPERSON JAFFE: Okay. MRS. MILEWSKI: I'm Michelle Milewski, same address, owner. (Witnesses sworn.) CHAIRPERSON JAFFE: Staff report? MR. BOJIN: The property is zoned R-3 Residential Single-Family. The Petitioner is proposing to construct a front yard porch that is 36 feet and one-half inch wide, and 6.5 feet deep. The addition would have a front yard setback of 34.26 feet where 39.23 feet is required. Therefore, the Petitioner is requesting the following variation: • A 4.97-foot variation from Chapter 28, Section 5.1-1.3a to allow an addition with a front yard setback of 34.26 feet instead of the required 39.23 feet, and an additional one foot for the eave. Thank you. MR. MILEWSKI: So, again, thank you today. So, basically, we're asking to build a front porch of the house. We have an existing portico where we'd just like to extend on both sides of a new roof, or I guess it would be a new ceiling for that portico. So, it really isn't a, you know, it's really an extension of an existing structure of the element of the house. So, I would also like to include that four houses down has the exact same architectural style as well as the same design front porch, so it fits with the neighborhood property and aesthetics. Generally speaking, we have four kids. We'd like to, they play basketball, we'd like to be sitting outside on our porch. CHAIRPERSON JAFFE: Joe? COMMISSIONER SELBKA: Have you spoken to your neighbors about this? MR. MILEWSKI: Yes, all approved. COMMISSIONER SELBKA: And you have four kids. How long have you lived in the house? MR. MILEWSKI: Nine years. COMMISSIONER SELBKA: Those are the only questions I have. CHAIRPERSON JAFFE: Any questions from the Board? (No response.) CHAIRPERSON JAFFE: Okay, you may have a seat. MR. MILEWSKI: Thank you. CHAIRPERSON JAFFE: Is there anybody present who wishes to speak on this petition? (No response.) CHAIRPERSON JAFFE: Okay, close it down for deliberation. Joe? COMMISSIONER SELBKA: I'm in favor of the variance. I think it's a reasonable request. It's a nice design. I don't see any reason to say no. LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 Page 14 of 67 CHAIRPERSON JAFFE: Any other thoughts, comments? (No response.) CHAIRPERSON JAFFE: I would agree, this is pretty reasonable and straightforward. So, no concerns. Is there a motion? COMMISSIONER SELBKA: Motion to approve. COMMISSIONER PORTERA: Second. MR. BOJIN: Mr. Siavelis. COMMISSIONER SIAVELIS: Yes. MR. BOJIN: Mr. Drake. COMMISSIONER DRAKE: Yes. MR. BOJIN: Mr. O'Connor. COMMISSIONER O'CONNOR: Yes. MR. BOJIN: Mr. Portera. COMMISSIONER PORTERA: Yes. MR. BOJIN: Mr. Selbka. COMMISSIONER SELBKA: Yes. MR. BOJIN: Chair Jaffe. CHAIRPERSON JAFFE: Yes. Congratulations. MR. MILEWSKI: Thank you. MRS. MILEWSKI: Thank you. (Whereupon, the public hearing on the above- mentioned petition was adjourned at 7:20 p.m.) LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 Page 15 of 67 ZONING BOARD REPORT OF PROCEEDINGS OF A MEETING BEFORE THE VILLAGE OF ARLINGTON HEIGHTS ZONING BOARD OF APPEALS OF APPEALS RE: 106 SOUTH WINDSOR DRIVE - ZBA #25-021 REPORT OF PROCEEDINGS had before the Village of Arlington Heights Zoning Board of Appeals taken at the Arlington Heights Village Hall, 33 South Arlington Heights Road, 1st Floor, Buechner Room, Arlington Heights, Illinois on the 14th day of July, 2025 at the hour of 7:20 p.m. MEMBERS PRESENT: BENJAMIN JAFFE, Chairperson TOM DRAKE PETER SIAVELIS MICHAEL O'CONNOR FRANK PORTERA JOSEPH SELBKA ALSO PRESENT: DEREK MACH, Development Planner DARKO BOJIN, Assistant Planner DAN OSOBA, Planner LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 Page 16 of 67 CHAIRPERSON JAFFE: Okay, Agenda Item D, 106 South Windsor Drive, ZBA #25-021. Hi. MR. FREUDENBERGER: Hi. CHAIRPERSON JAFFE: Would you state you name? MR. FREUDENBERGER: Scott Freudenberger, 106 South Windsor. MRS. FREUDENBERGER: Deborah Freudenberger with the same address. (Witnesses sworn.) MR. OSOBA: The property is zoned R-3 Residential Single-Family District. The Petitioner has constructed a 160 square-foot shed in the rear of the property located 1.29 feet from the north side property line. A building permit was obtained for the construction of the shed; however, it was constructed at a distance of 1.29 feet from the property line instead of the required three feet as shown on the approved permit. The shed is compliant with height, size, and rear setback requirements, but is encroaching within the three-foot side yard setback required for accessory structures. Therefore, the Petitioner is requesting the following variation: • A 1.71-foot variation from Chapter 28, Section 6.5-2 to allow a shed to be located 1.29 feet from the side property line where three feet is required. MR. FREUDENBERGER: Thank you. So, yes, we wanted to build this shed. We have a 1,500 square-foot home. There's four of us, my wife and two kids. We have very limited storage in the home, no basement. So, we built the shed, or we were replacing the existing shed, there was already a shed there in the exact same location. Our landscaper contractor came in and, as Dan said, you know, got the, you know, approval but, much to our now realization, he had, you know, put it 1.29 instead of the three. It was in the exact same location, so we didn't realize that there was any issue until the final inspection. But we've lived here for 19 years. The existing shed was, we've never had an issue with any of the neighbors. No issue related to compatibility, you know. It meets the height and size requirements today. No issue with the utility easement on the back end. We did talk to our neighbor who is on the north end there. We got a letter, which I can share with you guys, of support, that they were totally good and said they thought it looked great, much better than the existing one. CHAIRPERSON JAFFE: Can you just give one copy? MR. OSOBA: I have it. CHAIRPERSON JAFFE: Oh, you already have it? MR. OSOBA: Yes. CHAIRPERSON JAFFE: Okay, yes, you can just pass it on. COMMISSIONER SIAVELIS: Once you give it to us, we can't return it. MR. FREUDENBERGER: Oh, yes. CHAIRPERSON JAFFE: Is it okay? MR. FREUDENBERGER: Yes. There should be one for each of you guys. So, I have an extra one. So, the neighbor supported the variance. You know, any of the work we've done in 19 years, we've always pulled a permit until this circumstance was one that we thought we had followed the permit process. So, you know, the shed is built. The LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 Page 17 of 67 issue of moving that, Tuff Shed who is the manufacturer said if the shed is moved, it would void the warranty on it. It would potentially cause issues with the shed and the, what do you call it, the building structure, it would jeopardize the integrity of the building structure. So, the shed has been completed. Actually, the electrical is already done and the city has already reviewed the electrical and approved it. So, we're here obviously requesting a variance approval. COMMISSIONER PORTERA: The shed that was originally there, was that there before you moved there? MR. FREUDENBERGER: Yes. COMMISSIONER PORTERA: Okay, and you just, they unfortunately put it on the exact same spot as the old shed was? MR. FREUDENBERGER: Yes, that's right. COMMISSIONER PORTERA: Okay, I think they've answered all my questions that I had. So, I really don't have any other questions for you guys. CHAIRPERSON JAFFE: More of a question to Staff. So, the sequence of events in the permit process, would there be an on-site inspection before the final shed is completed? Like should the Village have caught this before they went to the final inspection and saw that it was in the exact same place that it was before and where it shouldn't have been? MR. OSOBA: It's my understanding that the Building Department does one inspection for sheds. I don't believe that they have pre or initial inspections. It's certainly something we can look into, but from my understanding, they only do the one final inspection based on the permit. CHAIRPERSON JAFFE: What kind of base is there? MR. FREUDENBERGER: It's a cement, I believe. CHAIRPERSON JAFFE: Okay. COMMISSIONER SIAVELIS: It's cement, it's not on gravel or anything? MR. FREUDENBERGER: No, cement. COMMISSIONER SIAVELIS: Was that the pre-existing slab that was from the prior shed? MR. FREUDENBERGER: Yes. Yes. CHAIRPERSON JAFFE: Any other questions? (No response.) CHAIRPERSON JAFFE: You may have a seat. MR. FREUDENBERGER: Okay, thank you. CHAIRPERSON JAFFE: Anybody present who wishes to discuss this? (No response.) CHAIRPERSON JAFFE: Okay. All right, so we'll close it down. Do you want to take this up, Frank? COMMISSIONER PORTERA: Yes. I think this is a reasonable request. It's unfortunate how this played out. The homeowners did the right thing by pulling the permit. I will take their word that they, you know, pulled the permit properly and I'm sure it's in the record, but it's kind of a human error here. It seems that it's going to do more harm than good forcing the homeowners to move this, voiding the warranty and kind of neutralizing, you know, the structure of the shed and the concrete slab and all that. We have a neighbor letter here that is in favor and no neighbors here to object or a formally dispute the petition, so I'm in LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 Page 18 of 67 favor. COMMISSIONER SIAVELIS: Yes, I agree with you, Frank, on those points. Then just for one item of clarification, that neighbor who submitted the letter of support, Christine Ray, she's just not a neighbor, she's the direct neighbor or the adjacent neighbor. So, if there is an issue, if she flagged an issue or voiced opposition, I think this would look a little differently, but -- COMMISSIONER PORTERA: Yes. COMMISSIONER SIAVELIS: -- since they have written support from your adjacent neighbor, I think that's important. Frankly, the other point about that, that slab being the original slab and they just tore down the old shed and put the new shed on top, I can see how that error happens. It's not necessarily excusable but it's explainable. So, I'm in support for those reasons. CHAIRPERSON JAFFE: Is there a motion? COMMISSIONER PORTERA: I move to approve the variance as presented. COMMISSIONER SIAVELIS: I'll second. MR. OSOBA: Mr. Selbka. COMMISSIONER SELBKA: Yes. MR. OSOBA: Mr. Portera. COMMISSIONER PORTERA: Yes. MR. OSOBA: Mr. O'Connor. COMMISSIONER O'CONNOR: Yes. MR. OSOBA: Mr. Drake. COMMISSIONER DRAKE: Yes. MR. OSOBA: Mr. Siavelis. COMMISSIONER SIAVELIS: Yes. MR. OSOBA: Chair Jaffe. CHAIRPERSON JAFFE: Yes0 Congratulations. MRS. FREUDENBERGER: Thank you. MR. FREUDENBERGER: Thank you. CHAIRPERSON JAFFE: You're welcome. (Whereupon, the public hearing on the above- mentioned petition was adjourned at 7:27 p.m.) LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 Page 19 of 67 ZONING BOARD REPORT OF PROCEEDINGS OF A MEETING BEFORE THE VILLAGE OF ARLINGTON HEIGHTS ZONING BOARD OF APPEALS OF APPEALS RE: 513 NORTH DOUGLAS AVENUE - ZBA #25-022 REPORT OF PROCEEDINGS had before the Village of Arlington Heights Zoning Board of Appeals taken at the Arlington Heights Village Hall, 33 South Arlington Heights Road, 1st Floor, Buechner Room, Arlington Heights, Illinois on the 14th day of July, 2025 at the hour of 7:27 p.m. MEMBERS PRESENT: BENJAMIN JAFFE, Chairperson TOM DRAKE PETER SIAVELIS MICHAEL O'CONNOR FRANK PORTERA JOSEPH SELBKA ALSO PRESENT: DEREK MACH, Development Planner DARKO BOJIN, Assistant Planner DAN OSOBA, Planner LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 Page 20 of 67 18 CHAIRPERSON JAFFE: All right, next on the agenda, Item E, 513 North Douglas Avenue, ZBA #25-022. MR. GINNODO: I've got to sign in first. CHAIRPERSON JAFFE: No worries. COMMISSIONER SIAVELIS: First time here in front of this Board? MR. GINNODO: I'm late, sorry. CHAIRPERSON JAFFE: Well, while Keith is doing that, why don't we just do the Staff report? MR. OSOBA: Sure. CHAIRPERSON JAFFE: Thank you. MR. OSOBA: The property is zoned R-3 Residential Single-Family District. The Petitioner is proposing to construct a covered front porch within the front yard of the property. The front porch is proposed to match the existing 4.63-foot north side setback which is an existing non-conforming condition. The minimum side setback for this property is 5.6 feet. Additionally, the front porch encroaches eight feet into the required front yard setback of 30 feet. These proposed improvements to the front yard exceed the maximum impervious surface coverage for the front yard specifically by 87.09 square feet. Therefore, the Petitioner is requesting the following variations: • An eight-foot variation from Chapter 28, Section 5.1-3.3(a) to permit a front porch to be located 22 feet from the front property line where a front yard setback of 30 feet is required; • A 0.97-foot variation from Chapter 28, Section 5.1-3.3(b) to permit a front porch to be located 4.63 feet from the side or north property line where a side yard setback of 5.6 feet is required; and • An 87.09 square-foot variation from Chapter 28, Section 5.1-3.5(b)(2) to permit a front yard impervious surface coverage of 927.15 square feet where 840.06 square feet is required. CHAIRPERSON JAFFE: Could you state your name and address for the record? MR. GINNODO: Keith Ginnodo, Kingsley-Ginnodo Architects, 314 North Pine, Arlington Heights. (Witness sworn.) MR. GINNODO: The owner is not here; she's on vacation with her two children. The whole impetus of the front porch project is a dream that has been in the family for a while. She just wants to sit on the swing in the front porch with her kids and hang out in the front yard. That's basically what the project is all about, and the beautification of other aspects of the front of the house. So, the front porch does project in front of the house by eight feet, three feet more than, you know, the normal five by 10 that's permitted. It also extends to the north edge of the building to align with the face of the house. It's not uncommon in the neighborhood to have a front porch that's usable besides just the stoop over the front door. I discussed the purpose of the porch, so that she and her two children can swing on the porch and play on the porch and all that kind of stuff. The property has no public sidewalk that runs along the front of it, so the lawn looks really long and lovely actually, but the thing is they feel a little bit pushed back on the site. To the north of them, their front porch will align with the garage of the LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 Page 21 of 67 19 adjacent property, and to the south of them, there is a big hedge that runs between the two properties. So, they feel like they're kind of set back and they want to be part of the neighborhood and build community. So, that's the source of that. The 88 square feet of impervious surface coverage in the front yard will be approximately 190 square feet over the whole property. So, they'll still have almost 200 square feet of impervious if you include the entire property in that calculation, realizing that the front yard does have its restriction. Without that sidewalk which would be about 280 square feet, there's kind of a grass offset there and I don't think there's ever going to be a sidewalk that gets built there because it doesn't continue further south. The reason that square footage is what it is, the two young daughters will soon be driving. I mean, right now they're 11 and nine, but she's planning on living in the house for as long as she needs to until the kids matriculate college probably. So, they have widened the driveway for the one-car garage so they can get two cars to navigate side by side. That's really the largest part of it. So, I think in the end what they're asking for is beneficial. It's in keeping with the neighborhood, and it kind of, hopefully it fosters community as well. COMMISSIONER O'CONNOR: Okay, is the size of the porch, is this the absolute minimum size you can go? I know not the absolute minimum, but you know what I'm actually trying to get -- MR. GINNODO: Not the absolute, yes. So, when you get a three-person, when you get three seats on a swing, it gets to be about six feet wide, and then you've got to be able to swing in it. It's between the column and the wall. We don't want a knuckle scrape and any of that kind of stuff. COMMISSIONER O'CONNOR: Sure. MR. GINNODO: So, it's a reasonable minimum to accomplish that. COMMISSIONER O'CONNOR: Okay, and I saw the letters of support. So, the person directly to the north was one of those supporters? MR. GINNODO: Yes, and directly to the south, and directly across the street. COMMISSIONER O'CONNOR: Yes, when you go through that neighborhood, there are quite a few porches. MR. GINNODO: Yes. COMMISSIONER O'CONNOR: Some even kind of closed off -- MR. GINNODO: Yes, some of the older ones especially, yes. COMMISSIONER O'CONNOR: Yes. MR. GINNODO: Yes. COMMISSIONER O'CONNOR: Okay, and you mentioned something about expanding the driveway in the future? Is that -- MR. GINNODO: No, not in the future. There will be future drivers. COMMISSIONER O'CONNOR: Yes. MR. GINNODO: Right now, it's a one-car garage. They can kind of stick their car in front of it. We've tried to kind of keep the position of the garage as you can see on part of the driveway. It's just a matter of like making it work instead of being, again two cars scraping against each other. COMMISSIONER O'CONNOR: Yes, okay. No, I just want to make sure since the impervious surface is already an issue in the front. LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 Page 22 of 67 20 MR. GINNODO: Yes, exactly. COMMISSIONER O'CONNOR: I got you, okay. MR. GINNODO: Yes. COMMISSIONER O'CONNOR: Okay, yes, I think you answered most of my questions. Any other questions? (No response.) CHAIRPERSON JAFFE: All right, thank you. You can have a seat. I'll ask, I think I know what the answer is, is there anybody present to comment on this petition? (No response.) CHAIRPERSON JAFFE: All right, Mike, let's close it down. COMMISSIONER O'CONNOR: Yes. I think I got most of the questions answered that I was looking to get answered here. I think, you know, there was concern about the impervious surface. There is no sidewalk in this area. The whole lot is in conformance. Again, there is a front yard rule, but also when you do drive by and you go down the block, it is set back pretty far. So, I think it fit in pretty well in the neighborhood which I was a little concerned with just reading it, but I have no concerns. I'm in support of it. CHAIRPERSON JAFFE: Agreed. Is there a motion? COMMISSIONER O'CONNOR: Motion to approve as written. COMMISSIONER DRAKE: Second. MR. OSOBA: Mr. Selbka. COMMISSIONER SELBKA: Yes. MR. OSOBA: Mr. Portera. COMMISSIONER PORTERA: Yes. MR. OSOBA: Mr. O'Connor. COMMISSIONER O'CONNOR: Yes. MR. OSOBA: Mr. Drake. COMMISSIONER DRAKE: Yes. MR. OSOBA: Mr. Siavelis. COMMISSIONER SIAVELIS: Yes. MR. OSOBA: Chair Jaffe. CHAIRPERSON JAFFE: Yes. Congratulations. MR. GINNODO: Thank you very much. CHAIRPERSON JAFFE: Do we have other business? COMMISSIONER SIAVELIS: Actually, I think there is. Just one quick. Bob Flubacker's comment was actually well taken I think and well based. What's the -- MR. MACH: It is on the list, a short list of code amendments, yes, that I think Staff is going to propose. We seen that variance approximately once a year it seems. COMMISSIONER SIAVELIS: You've seen which variance? You see that issue we're talking about? MR. MACH: Yes, where projects return because the existing variance has LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 Page 23 of 67 21 then expired. COMMISSIONER SIAVELIS: Right, and you can't, the Village can't renew those variances like, you know, automatically, correct? That has to come back in front of the Board? MR. MACH: Correct, and it currently states one year. The proposal is two years. COMMISSIONER SIAVELIS: Right, the code says one year. MR. MACH: Correct. COMMISSIONER SIAVELIS: Yes. MR. MACH: Yes, no, it is on our list. CHAIRPERSON JAFFE: But is there any correlation between the period in which a permit is valid and the period in which a petitioner could re-petition? So, if one moves from one year to two years, does that mean that a petitioner being denied, does that change that calculation or is that still one year? COMMISSIONER SIAVELIS: No, I would say that's a different calculation because it's a different result, right? One comes off a denial, the other one comes off a grant or approval, right? Is that, under Bob's -- so does that make sense, Mr. Chairman? CHAIRPERSON JAFFE: Yes, sorry. COMMISSIONER SIAVELIS: Okay, so the -- CHAIRPERSON JAFFE: I'm not used to hearing that term, sorry if I was delayed in responding. COMMISSIONER SIAVELIS: You're thrown by Mr. Chairman, right? So, Bob's, the way I interpret Bob's proposal, Derek, is two years from the date of either approval by this Board or the grant of the permit, right? Because those are two different dates, right? The grant of the permit is something, well, I guess you send out, the Village sends out after a vote like this, so Bob Flubacker's client received approval of the variance, I assume that the Village sends out some sort of formal communication to them that says, you know, congratulations, your petition has been granted, the following variances are okay, right? Does the two-year clock start running from that date or today's date? MR. MACH: Today's date, the date of the hearing. COMMISSIONER SIAVELIS: Okay, so even still, I mean, how, typically, how fast does the Village send out the confirmatory letter? MR. MACH: We send the findings and the approved minutes after the next hearing date; however, the Petitioner can go apply for the permit tomorrow. You know, sometimes they're in for permitting it already, we wouldn't sign off on zoning if a variance was necessary, but yes, he can proceed to permit. COMMISSIONER SIAVELIS: Okay, so there is a situation in the current framework where there's 11 months, right, where essentially, you've received the correspondence and the clock has been ticking on you for one month already, so you have 11 months to get your act together. You have to break ground then, is that what it is, or what's -- MR. MACH: Once the permit is issued. COMMISSIONER SIAVELIS: Okay. MR. MACH: There are situations where someone is in for permit and Staff will approve the permit tomorrow if the variance was granted. LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 Page 24 of 67 22 COMMISSIONER SELBKA: But there's other situations where we have a lot of comments associated with the permit, and that's where the delays are -- COMMISSIONER SIAVELIS: And that's probably, Joe, Bob's commentary. COMMISSIONER SELBKA: Right. COMMISSIONER SIAVELIS: Maybe on projects where financing isn't secure or there is some concern, or if it's a larger residential project or dealing with -- COMMISSIONER DRAKE: When are those code changes likely to be looked at and potentially approved? Is there a timetable on that? MR. OSOBA: I think we're aiming for the end of the year, but that's very tentative at this point. There's a lot of kind of discussion and we want to make sure there's no unintended consequences. A lot of the discussion tonight is useful, but I think we're wanting to make sure that we're not making changes to code and then having to remake changes to the code. So, we want to get it right the first time, but I think the tentative timeline is the end of the year. COMMISSIONER O'CONNOR: Have you looked at what other Villages do? MR. OSOBA: Yes. COMMISSIONER O'CONNOR: Have you seen a year or two years? MR. OSOBA: It varies mostly, yes. CHAIRPERSON JAFFE: All right, any other business? Is there anybody present who wishes to make public comment? (No response.) CHAIRPERSON JAFFE: Is there a motion for adjournment? COMMISSIONER SELBKA: Motion to adjourn. COMMISSIONER O'CONNOR: I second that. CHAIRPERSON JAFFE: All in favor? (Chorus of ayes.) CHAIRPERSON JAFFE: All opposed? (No response.) CHAIRPERSON JAFFE: We're adjourned. (Whereupon, the public hearing on the above- mentioned petition was adjourned at 7:40 p.m.) LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 Page 25 of 67 23 STATE OF ILLINOIS ) ) SS. COUNTY OF KANE ) I, RON LeGRAND, SR., depose and say that I am a digital court reporter doing business in the State of Illinois; that I reported verbatim the foregoing proceedings and that the foregoing is a true and correct transcript to the best of my knowledge and ability. ______________________________ RON LeGRAND, SR. SUBSCRIBED AND SWORN TO BEFORE ME THIS DAY OF , A.D. 2025. ________________________ NOTARY PUBLIC LeGRAND REPORTING & TRANSCRIBING SERVICES (630) 894-9389 Page 26 of 67 VILLAGE OF ARLINGTON HEIGHTS, ILLINOIS ZONING BOARD OF APPEALS PUBLIC HEARING JULY 14, 2025 FINDINGS OF FACT, DECISION AND ORDER Agenda Item: 919 S. Vail Ave. – Featherstone Residence Applicant: Robert Flubacker Zoning Relief Requested: • A 4.0-foot variation from Chapter 28, Section 5.1-3.3b (Required Minimum Yards) to allow an addition with a side yard setback of 3.0 feet instead of the required 7.0 feet and an additional 1.0 feet for the eave. • A variance from Chapter 28, Section 6.6-5 (Permitted Obstructions) to allow two air conditioning units in the required side yard setback along the south property line. Date of Publication: 6/28/25 Manner of Publication: Daily Herald Zoning Board of Appeals (“ZBA”) Members Present: Drake, Portera, Selbka, Jaffe, Siavelis, O’Connor Having heard and considered the testimony and evidence at the public hearing of July 14, 2025, the ZBA makes the following findings of fact: The subject site is zoned R-3, One Family Dwelling District. The property has a total land area of 9,244 square feet and the proposed residence with the addition will be approximately 2,400 square feet. The petitioner is proposing to construct an addition to the existing single story home which includes an expansion to the garage in order to create a two car front load garage. The expansion for the garage is encroaching into the required side yard setback along the north property line. In addition, the two air conditioning units are encroaching into the required side yard setback along the south property line. For Variation Requests: (Pursuant to Chapter 6, Article II, Section 6-202(e)(2)(c), in consideration of the standards of practical difficulties or particular hardship, the ZBA shall require evidence of the below.) The ZBA finds that evidence of the following was presented at the public hearing (check all that apply with an “X”): Page 1 of 2 Page 27 of 67 _X_ The proposed use will not alter the essential character of the locality and will be compatible with existing uses and zoning of nearby property; and _X_ The plight of the owner is due to unique circumstances, which may include the length of time the subject property has been vacant as zoned; and _X__ The proposed variation is in harmony with the spirit and intent of this Chapter; and _X__ The variance requested is the minimum variance necessary to allow reasonable use of the property. Does the ZBA Find in Favor of the Applicant for Relief Requested? Relief Granted (if any): • A 4.0-foot variation from Chapter 28, Section 5.1-3.3b (Required Minimum Yards) to allow an addition with a side yard setback of 3.0 feet instead of the required 7.0 feet and an additional 1.0 feet for the eave. • A variance from Chapter 28, Section 6.6-5 (Permitted Obstructions) to allow two air conditioning units in the required side yard setback along the south property line. Reason for Determination: The Zoning Board commented that the petitioner received zoning variations for the project in December of 2023. The variances have expired since the project did not commence. Based on the information contained in the application and the testimony and evidence presented at the public hearing, the ZBA voted on the approval of these findings of fact, decision and order and the requested application resulting in the following vote: 6 ayes 0 nays 1 absent 0 abstain Date: July 14, 2025 Benjamin Jaffe, Chair Zoning Board of Appeals Village of Arlington Heights Pursuant to Chapter 6, Article II, Section 6-202(e)(3), in exercising the enumerated powers of the Zoning Board of Appeals, the ZBA may reverse, affirm, or modify the order, requirement, decision, or determination appealed form and to that end shall have all the powers of the Administrative Officer from whom the appeal is taken. Page 2 of 2 Page 28 of 67 VILLAGE OF ARLINGTON HEIGHTS, ILLINOIS ZONING BOARD OF APPEALS PUBLIC HEARING JULY 14, 2025 FINDINGS OF FACT, DECISION AND ORDER Agenda Item: 819 N. Highland Ave. – Lall Residence Applicant: Kevin Purdom / JRC Design Build Zoning Relief Requested: • A 2.78-foot variation from Chapter 28, Section 5.1-3.3(b) to allow a side setback of 4.72-feet from the newly attached garage where 7.5 feet is required. Date of Publication: 6/28/25 Manner of Publication: Daily Herald Zoning Board of Appeals (“ZBA”) Members Present: Drake, Portera, Selbka, Jaffe, Siavelis, O’Connor Having heard and considered the testimony and evidence at the public hearing of July 14, 2025, the ZBA makes the following findings of fact: The petitioner is proposing to construct a new 247 square-foot addition and interior remodel to connect the existing home to the detached garaged on the north of the property. The existing detached garage is connected to the home with a covered breezeway and is located 4.72-feet from the north side property line. Attaching the detached garage to the home with the proposed building addition will require compliance with the side yard setbacks of the R-3 District, which equals 10-percent of the lot width or 7.5-feet on this lot. For Variation Requests: (Pursuant to Chapter 6, Article II, Section 6-202(e)(2)(c), in consideration of the standards of practical difficulties or particular hardship, the ZBA shall require evidence of the below.) The ZBA finds that evidence of the following was presented at the public hearing (check all that apply with an “X”): _X_ The proposed use will not alter the essential character of the locality and will be compatible with existing uses and zoning of nearby property; and _X_ The plight of the owner is due to unique circumstances, which may include the length of time the subject property has been vacant as zoned; and Page 1 of 2 Page 29 of 67 _X_ The proposed variation is in harmony with the spirit and intent of this Chapter; and _X_ The variance requested is the minimum variance necessary to allow reasonable use of the property. Does the ZBA Find in Favor of the Applicant for Relief Requested? Relief Granted (if any): • A 2.78-foot variation from Chapter 28, Section 5.1-3.3(b) to allow a side setback of 4.72-feet from the newly attached garage where 7.5 feet is required. Reason for Determination: The Petitioner testified as to the hardship, existing conditions of the subject property, and similar improvements in the surrounding neighborhood. The Zoning Board commented that the variance is minimal, a good use of the space, and a logical location for an expansion to increase safety and security between the two structures. Based on the information contained in the application and the testimony and evidence presented at the public hearing, the ZBA voted on the approval of these findings of fact, decision and order and the requested application resulting in the following vote: 6 ayes 0 nays 1 absent 0 abstain Date: July 14, 2025 Benjamin Jaffe, Chair Zoning Board of Appeals Village of Arlington Heights Pursuant to Chapter 6, Article II, Section 6-202(e)(3), in exercising the enumerated powers of the Zoning Board of Appeals, the ZBA may reverse, affirm, or modify the order, requirement, decision, or determination appealed form and to that end shall have all the powers of the Administrative Officer from whom the appeal is taken. Page 2 of 2 Page 30 of 67 VILLAGE OF ARLINGTON HEIGHTS, ILLINOIS ZONING BOARD OF APPEALS PUBLIC HEARING JULY 14, 2025 FINDINGS OF FACT, DECISION AND ORDER Agenda Item: Milewski Residence – 1319 N. Salem Blvd. Applicant: Kevin Erdmann / Erdmann Construction Zoning Relief Requested: • A 4.97-foot variation from Chapter 28, Section 5.1-1.3.a. (Required Minimum Yards) to allow an addition (porch) with a front yard setback of 34.26 feet instead of the required 39.23 feet and an additional 1.0 foot for the eave. Date of Publication: 6/28/25 Manner of Publication: Daily Herald Zoning Board of Appeals (“ZBA”) Members Present: Drake, Portera, Selbka, Jaffe, Siavelis, O’Connor Having heard and considered the testimony and evidence at the public hearing of July 14, 2025, the ZBA makes the following findings of fact: The property is zoned R-3 and has a total land area of 15,008 square feet. The petitioner is proposing to construct a front yard porch that is 36 feet and one-half inch wide, and 6.5 feet deep. This addition would have a front yard setback of 34.26 feet where 39.23 feet is required. For Variation Requests: (Pursuant to Chapter 6, Article II, Section 6-202(e)(2)(c), in consideration of the standards of practical difficulties or particular hardship, the ZBA shall require evidence of the below.) The ZBA finds that evidence of the following was presented at the public hearing (check all that apply with an “X”): _X_ The proposed use will not alter the essential character of the locality and will be compatible with existing uses and zoning of nearby property; and _X_ The plight of the owner is due to unique circumstances, which may include the length of time the subject property has been vacant as zoned; and _X_ The proposed variation is in harmony with the spirit and intent of this Chapter; and Page 1 of 2 Page 31 of 67 _X_ The variance requested is the minimum variance necessary to allow reasonable use of the property. Does the ZBA Find in Favor of the Applicant for Relief Requested? Relief Granted (if any): • A 4.97-foot variation from Chapter 28, Section 5.1-1.3.a. (Required Minimum Yards) to allow an addition (porch) with a front yard setback of 34.26 feet instead of the required 39.23 feet and an additional 1.0 foot for the eave. Reason for Determination: The petitioner testified that the current configuration of the porch made it difficult to use. The Zoning Board commented that the variance is consistent with the character of the neighborhood and would help with the enjoyment of the property. Based on the information contained in the application and the testimony and evidence presented at the public hearing, the ZBA voted on the approval of these findings of fact, decision and order and the requested application resulting in the following vote: 6 ayes 0 nays 1 absent 0 abstain Date: July 14, 2025 Benjamin Jaffe, Chair Zoning Board of Appeals Village of Arlington Heights Pursuant to Chapter 6, Article II, Section 6-202(e)(3), in exercising the enumerated powers of the Zoning Board of Appeals, the ZBA may reverse, affirm, or modify the order, requirement, decision, or determination appealed form and to that end shall have all the powers of the Administrative Officer from whom the appeal is taken. Page 2 of 2 Page 32 of 67 VILLAGE OF ARLINGTON HEIGHTS, ILLINOIS ZONING BOARD OF APPEALS PUBLIC HEARING JULY 14, 2025 FINDINGS OF FACT, DECISION AND ORDER Agenda Item: 106 S. Windsor Dr. - Freudenberger Residence Applicant: Scott Freudenberger Zoning Relief Requested: • A 1.71 foot variation from Chapter 28, Section 6.5-2 to allow a shed side to be located 1.29 feet from the side property line where 3 feet is required. Date of Publication: 6/28/25 Manner of Publication: Daily Herald Zoning Board of Appeals (“ZBA”) Members Present: Drake, Portera, Selbka, Jaffe, Siavelis, O’Connor Having heard and considered the testimony and evidence at the public hearing of July 14, 2025, the ZBA makes the following findings of fact: The petitioner has constructed a 160 square-foot shed in the rear of the property 1.29-feet from the north side property line. A building permit was obtained for the construction of the shed; however, it was constructed a distance of 1.29-feet from the property line instead of the required 3-feet as shown on the approved permit. The shed is compliant with height, size, and rear setback requirements, but is encroaching within the required 3-foot side yard setback for accessory structures. For Variation Requests: (Pursuant to Chapter 6, Article II, Section 6-202(e)(2)(c), in consideration of the standards of practical difficulties or particular hardship, the ZBA shall require evidence of the below.) The ZBA finds that evidence of the following was presented at the public hearing (check all that apply with an “X”): _X_ The proposed use will not alter the essential character of the locality and will be compatible with existing uses and zoning of nearby property; and _X_ The plight of the owner is due to unique circumstances, which may include the length of time the subject property has been vacant as zoned; and _X_ The proposed variation is in harmony with the spirit and intent of this Chapter; and Page 1 of 2 Page 33 of 67 _X_ The variance requested is the minimum variance necessary to allow reasonable use of the property. Does the ZBA Find in Favor of the Applicant for Relief Requested? Relief Granted (if any): • A 1.71 foot variation from Chapter 28, Section 6.5-2 to allow a shed side to be located 1.29 feet from the side property line where 3 feet is required. Reason for Determination: The Petitioner testified as to the hardship, existing shed location, minimal impact on surrounding properties, and that the neighbor adjacent to the shed has no concerns with the shed placement or design. The Zoning Board commented that the request is reasonable and minimal to permit the shed location, and that the closest neighbor does not have any opposition to the request. Based on the information contained in the application and the testimony and evidence presented at the public hearing, the ZBA voted on the approval of these findings of fact, decision and order and the requested application resulting in the following vote: 6 ayes 0 nays 1 absent 0 abstain Date: July 14, 2025 Benjamin Jaffe, Chair Zoning Board of Appeals Village of Arlington Heights Pursuant to Chapter 6, Article II, Section 6-202(e)(3), in exercising the enumerated powers of the Zoning Board of Appeals, the ZBA may reverse, affirm, or modify the order, requirement, decision, or determination appealed form and to that end shall have all the powers of the Administrative Officer from whom the appeal is taken. Page 2 of 2 Page 34 of 67 VILLAGE OF ARLINGTON HEIGHTS, ILLINOIS ZONING BOARD OF APPEALS PUBLIC HEARING JULY 14, 2025 FINDINGS OF FACT, DECISION AND ORDER Agenda Item: 513 N. Douglas Ave – Organ Residence Applicant: Keith Ginnodo / Kingsley-Ginnodo Architects Zoning Relief Requested: • An 8.0-foot variation from Chapter 28, Section 5.1-3.3(a) to permit a front porch to be located 22 feet from the front property line where a front yard setback of 30 feet is required. • A 0.97-foot variation from Chapter 28, Section 5.1-3.3(b) to permit a front porch to be located 4.63 feet from the side (north) property line where a side yard setback of 5.6 feet is required. • An 87.09 square-foot variation from Chapter 28, Section 5.1-3.5(b)(2) to permit a front yard impervious surface coverage of 927.15 square-feet where 840.06 square-feet is required. Date of Publication: 6/28/25 Manner of Publication: Daily Herald Zoning Board of Appeals (“ZBA”) Members Present: Drake, Portera, Selbka, Jaffe, Siavelis, O’Connor Having heard and considered the testimony and evidence at the public hearing of July 14, 2025, the ZBA makes the following findings of fact: The petitioner is proposing to construct a covered front porch within the front yard of the property. The front porch is proposed to match the 4.63-foot north side setback of the existing home, which is an existing non-conforming condition. The minimum side setback for this property is 5.6-feet. Additionally, the porch encroaches 8-feet into the required front yard setback of 30-feet. These proposed improvements to the front yard exceed the maximum impervious surface coverage for the front yard specifically by 87.09 square-feet. For Variation Requests: (Pursuant to Chapter 6, Article II, Section 6-202(e)(2)(c), in consideration of the standards of practical difficulties or particular hardship, the ZBA shall require evidence of the below.) The ZBA finds that evidence of the following was presented at the public hearing (check all that apply with an “X”): Page 1 of 2 Page 35 of 67 _X_ The proposed use will not alter the essential character of the locality and will be compatible with existing uses and zoning of nearby property; and _X_ The plight of the owner is due to unique circumstances, which may include the length of time the subject property has been vacant as zoned; and _X_ The proposed variation is in harmony with the spirit and intent of this Chapter; and _X_ The variance requested is the minimum variance necessary to allow reasonable use of the property. Does the ZBA Find in Favor of the Applicant for Relief Requested? Relief Granted (if any): • An 8.0-foot variation from Chapter 28, Section 5.1-3.3(a) to permit a front porch to be located 22 feet from the front property line where a front yard setback of 30 feet is required. • A 0.97-foot variation from Chapter 28, Section 5.1-3.3(b) to permit a front porch to be located 4.63 feet from the side (north) property line where a side yard setback of 5.6 feet is required. • An 87.09 square-foot variation from Chapter 28, Section 5.1-3.5(b)(2) to permit a front yard impervious surface coverage of 927.15 square-feet where 840.06 square-feet is required. Reason for Determination: The Petitioner testified as to the hardship, existing site conditions, and consistency with other similar projects in the surrounding neighborhood. The Zoning Board commented that the variance is minimal, will fit in well with the surrounding neighborhood, and does not have any neighborhood opposition. Based on the information contained in the application and the testimony and evidence presented at the public hearing, the ZBA voted on the approval of these findings of fact, decision and order and the requested application resulting in the following vote: 6 ayes 0 nays 1 absent 0 abstain Date: July 14, 2025 Benjamin Jaffe, Chair Zoning Board of Appeals Village of Arlington Heights Pursuant to Chapter 6, Article II, Section 6-202(e)(3), in exercising the enumerated powers of the Zoning Board of Appeals, the ZBA may reverse, affirm, or modify the order, requirement, decision, or determination appealed form and to that end shall have all the powers of the Administrative Officer from whom the appeal is taken. Page 2 of 2 Page 36 of 67 Zoning Board of Appeals 8/11/2025 Item: 1015 N. Forrest Ave. - ZBA25-023 Department: Planning & Community Development Item Description: REQUEST • A variation from Chapter 28, Section 10.2-11(1)(a) (Parking – In Yards) to allow gravel driveway surface where concrete or asphalt is required. ATTACHMENTS: 1. Exhibits_1015 N Forrest Ave Page 37 of 67 Petition – ZBA#25-023 PIN: 03-28-102-008 ARLINGTON HEIGHTS ZONING BOARD OF APPEALS Staff Analysis Prepared By: Dan Osoba, Planner Hearing Date: August 11, 2025 Date Prepared: August 6, 2025 Project Title: Peart Residence Address: 1015 N. Forrest Ave. Background Information Petition Number: ZBA #25-023 Petitioner: Jordan & Victoria Peart Address: 1015 N. Forrest Ave. Arlington Heights IL 60004 Existing Zoning: R-3 – Residential Single-Family District Requested Action/Background Information The Petitioner is proposing to allow a gravel driveway to the rear of the home, which extends from an attached garage to the existing detached garage structure at the rear of the property. A new home is currently under construction on the site and the gravel drive would connect the rear garage and provide required access to the N. Forrest Avenue right-of-way. Driveways are required to be constructed of concrete or asphalt. Green infrastructure applications may be utilized in lieu of concrete or asphalt surfaces subject to Village Engineer approval. Therefore, the Petitioner is requesting the following variation: • A variation from Chapter 28, Section 10.2-11(1)(a) (Parking – In Yards) to allow gravel driveway surface where concrete or asphalt is required. Variation Review Standards In its consideration of the standards of practical difficulties or particular hardships, the Zoning Board of Appeals shall require evidence that (1) the proposed use will not alter the essential character of the locality and will be compatible with existing uses and zoning of nearby property; and (2) the plight of the owner is due to unique circumstances, which may include the length of time the subject property has been vacant as zoned; and (3) the proposed variation is in harmony with the spirit and intent of this Chapter; and (4) the variance requested is the minimum variance necessary to allow reasonable use of the property. A variation shall be permitted only if the evidence, in the judgment of the Board of Appeals, sustains each of the four conditions enumerated. Page 38 of 67 Petition – ZBA#25-023 PIN: 03-28-102-008 Map of General Vicinity Items required to be Submitted 15 Days Prior to Public Hearing Item Provided Dated Remarks 1. Notification Affidavit  7/24/25 2. List of Property Owners Within 250 feet of Subject Property  7/24/25 3. Letter that was Mailed  7/21/25 4. Photographs of Sign on Property  7/24/25 Page 39 of 67 Petition – ZBA#25-023 PIN: 03-28-102-008 Photographs of Existing Structure Page 40 of 67 Village of Arlington Heights To: Jordan & Victoria Peart From: Dan Osoba Department: Department of Planning and Community Development File Number: ZBA 25-023 Project: 1015 N. Forrest Avenue Date: August 6, 2025 ZONING COMMENTS: For your use and consideration, review the zoning review comments below regarding the variance to Chapter 28, Section 10.2-11.1.a to permit a gravel driveway in the rear yard to connect the existing attached one-car garage to the detached garage in the rear yard. If you have any questions, please contact dosoba@vah.com: Planning and Community Development 1. No comments. Building and Life Safety 1. No comments. Engineering 1. The Public Works & Engineering Division is NOT IN FAVOR of the requested variance to Chapter 28, Section 10.2-11.1(a) to permit a gravel driveway in the rear yard. Although the new single-family home has two sump pump discharge locations, the driveway to the garage is not impacted by the location of the sumps. Staff would be in favor of a green infrastructure application as a substitution to the hard surface required by code. Page 41 of 67 CERTIFICATE OF PUBLICATION Paddock Publications, Inc. Northwest Suburbs Daily Herald Corporation organized and existing under and by virtue of the laws of the State of Illinois, DOES HEREBY CERTIFY that it is the publisher of the Northwest Suburbs DAILY HERALD. That said Northwest Suburbs DAILY HERALD is a secular newspaper, published in Arlington Heights, Cook County, State of Illinois, and has been in general circulation daily throughout Cook County, continuously for more than 50 weeks prior to the first Publication of the attached notice, and a newspaper as defined by 715 ILCS 5/5. I further certify that the Northwest Suburbs DAILY HERALD is a newspaper as defined in "an Act to revise the law in relation to notices" as amended in 1992 Illinois Compiled Statutes, Chapter 715, Act 5, Section 1 and 5. That a notice of which the annexed printed slip is a true copy, was published 07/26/2025 in said Northwest Suburbs DAILY HERALD. This notice was also placed on a statewide public notice website as required by 5 ILCS 5/2.1. BY ______________________________________________ Designee of the Publisher of the Daily Herald Control # 299139 Page 42 of 67 Page 43 of 67 1015 N. Forrest – Variance Request Statement We are requesting a zoning variance to allow the use of a decorative gravel driveway in lieu of a continuous asphalt or concrete surface connecting our existing one-car attached garage to an existing detached garage at the rear of the property. Unique Circumstances The property has a unique layout due to the existing detached garage located at the rear of the lot. While zoning code requires a hard-surface (concrete or asphalt) driveway for access, enforcing this creates an unnecessary burden. A solid surface connection between the attached and detached garages would unnecessarily disrupt the rear yard, especially given our minimal use of the driveway. These circumstances are specific to our property and not commonly found on neighboring lots. Additionally, the property has a high water table, which increases discharge from our two sump pumps. As indicated in our civil engineering plans, these pumps discharge toward the rear of the property due to the absence of a stormwater line at the street. A properly graded gravel driveway supports natural water infiltration, reducing runoff and minimizing the risk of standing water. Minimum Variation Necessary This request represents the minimum variation required to make reasonable use of the property. We are not eliminating access or adding any new driveway paths—we are simply seeking to use a more permeable, environmentally responsible material. Harmony with the Intent of the Zoning Code The proposed gravel driveway supports the spirit and intent of the zoning ordinance by minimizing impervious surface area, reducing environmental impact, and preserving the rear yard’s green space and character. The driveway will be located out of public view and will not disrupt the streetscape or neighborhood character. A continuous paved driveway between the two garages would divide the lot both visually and physically, compromising the open backyard that is integral to the home’s overall design. In contrast, a gravel driveway is more compatible with the landscaped character of the yard and preserves its natural aesthetic. Environmental & Functional Justi cation There is no practical need for continuous vehicle circulation between the two garages. The rear garage is not used as a drive-through or for routine access from the main driveway, just an occasional use. A gravel surface provides sufficient access for occasional use while supporting the site's drainage needs and avoiding unnecessary environmental disruption. Conclusion We respectfully request approval of this variance to use a decorative gravel driveway, which provides a functional, environmentally sensitive, and aesthetically appropriate solution tailored to the unique conditions of our property. Page 44 of 67 fi 4,060 SQ. FT. (DRIVEWAY, INCL. WALK TO REAR YARD) 170 SQ. FT. (PAVER WALK) 53 SQ. FT. (A/C PAD) 851 SQ. FT. 370 SQ. FT. 992 SQ. FT. (PAVER STEPPERS) 576 SQ. FT. c 2024 Copyright JMB Architects, Ltd. All rights reserved. DATE: John Michael Belcher A.L.A. N.C.A.R.B. PERMIT: These drawings, specifications, floorplans, and elevations (collectively, "Architectural Plans") are the confidential and proprietary property of JMB SEAL DATE: REVISION: REVISION: DRAWN BY: 180 W. Park Suite #10 Architects, Ltd. ("JMB") and may not be disclosed to anyone not directly involved in the project that is the subject of these Architectural Plans or reproduced by COPYRIGHT, 2024 BY Elmhurst, Illinois 60126 PROJECT NO.: CHECKED BY: any means without the prior written permission of JMB. You may not prepare EXPIRES DATE: SHEET: JM B derivative works based on these Architectural Plans. These Architectural Plans were prepared for use on the specific site and at the issue date set forth herein and are not suitable for use on a different site or at a later date. Your use of these plans constitutes your acceptance of these terms and you agree to pay all damages and enforcement costs of JMB T1-1 JMB ARCHITECTS LTD. ARCHITECTS, LTD. E-Mail: jmbarch@JMBArchitect.com Phone: 630.279.8228 Web: JMBArchitect.com Page 45 of 67 Zoning Board of Appeals 8/11/2025 Item: 401 N. Pine Ave. - ZBA25-024 Department: Planning & Community Development Item Description: REQUEST • A 2.54-foot variation from Chapter 28, Section 5.1-3.3(b) (Required Minimum Yards) to allow a second story addition with a side yard setback of 4.06-feet instead of the required 6.6-foot minimum and an additional 2-feet for the eave. • A 2.54-foot variation from Chapter 28, Section 6.6-5.1 (Table of Permitted Obstructions) to allow a deck to encroach in the required side yard with a side setback of 4.06-feet instead of the required 6.6-foot minimum. • A variation from Chapter 28, Section 6.5-2 (Accessory Structures) to allow a portion of a pergola in the side yard where accessory structures are only permitted in the rear yard. ATTACHMENTS: 1. Exhibits_401 N Pine Ave Page 46 of 67 Petition – ZBA#25-024 PIN: 03-29-313-004 ARLINGTON HEIGHTS ZONING BOARD OF APPEALS Staff Analysis Prepared By: Dan Osoba, Planner Hearing Date: August 11, 2025 Date Prepared: August 6, 2025 Project Title: Colletti Residence Address: 401 N. Pine Ave. Background Information Petition Number: ZBA #25-024 Petitioner: Kevin Purdom – JRC Design Build Address: 1275 E. Davis St. Arlington Heights IL 60005 Existing Zoning: R-3 – Residential Single-Family District Requested Action/Background Information The Petitioner is proposing to construct a second-story addition in the rear of the existing single-family dwelling along with a deck and pergola located in the side and rear yard. The existing home is setback 4.06-feet from the interior side yard where a minimum side yard setback of 6.6-feet is required. The Petitioner is proposing to maintain this non- conforming setback for the second-story addition. The proposed deck is also encroaching into the required 6.6-foot setback and maintaining the same non-conforming setback as the existing home and building addition at 4.06-feet. The pergola, which is considered an accessory structure, may only be located in the rear of the property and is partially proposed within the required side yard. Therefore, the Petitioner is requesting the following variations: • A 2.54-foot variation from Chapter 28, Section 5.1-3.3(b) (Required Minimum Yards) to allow a second story addition with a side yard setback of 4.06-feet instead of the required 6.6-foot minimum and an additional 2-feet for the eave. • A 2.54-foot variation from Chapter 28, Section 6.6-5.1 (Table of Permitted Obstructions) to allow a deck to encroach in the required side yard with a side setback of 4.06-feet instead of the required 6.6-foot minimum. • A variation from Chapter 28, Section 6.5-2 (Accessory Structures) to allow a portion of a pergola in the side yard where accessory structures are only permitted in the rear yard. Variation Review Standards In its consideration of the standards of practical difficulties or particular hardships, the Zoning Board of Appeals shall require evidence that (1) the proposed use will not alter the essential character of the locality and will be compatible with existing uses and zoning of nearby property; and (2) the plight of the owner is due to unique circumstances, which may include the length of time the subject property has been vacant as zoned; and (3) the proposed variation is in harmony with the spirit and intent of this Chapter; and (4) the variance requested is the minimum variance necessary to allow reasonable use of the property. A variation shall be permitted only if the evidence, in the judgment of the Board of Appeals, sustains each of the four conditions enumerated. Page 47 of 67 Petition – ZBA#25-024 PIN: 03-29-313-004 Map of General Vicinity Items required to be Submitted 15 Days Prior to Public Hearing Item Provided Dated Remarks 1. Notification Affidavit ✓ 7/22/25 2. List of Property Owners Within 250 feet of Subject Property ✓ 7/22/25 3. Letter that was Mailed ✓ 7/22/25 4. Photographs of Sign on Property ✓ 7/22/25 Page 48 of 67 Petition – ZBA#25-024 PIN: 03-29-313-004 Photographs of Existing Structure Page 49 of 67 Village of Arlington Heights To: Kevin Purdom From: Dan Osoba Department: Department of Planning and Community Development File Number: ZBA 25-024 Project: 401 N. Pine Avenue Date: August 6, 2025 ZONING COMMENTS: For your use and consideration, review the zoning review comments below regarding the following variances: • A 2.54-foot variation from Chapter 28, Section 5.1-3.3(b) (Required Minimum Yards) to allow a second story addition with a side yard setback of 4.06-feet instead of the required 6.6-foot minimum and an additional 2-feet for the eave. • A 2.54-foot variation from Chapter 28, Section 6.6-5.1 (Table of Permitted Obstructions) to allow a deck to encroach in the required side yard with a side setback of 4.06-feet instead of the required 6.6-foot minimum. • A variation from Chapter 28, Section 6.5-2 (Accessory Structures) to allow a portion of a pergola in the side yard where accessory structures are only permitted in the rear yard. If you have any questions, please contact dosoba@vah.com: Planning and Community Development 1. The proposed addition appears to fit with the character of the existing house and neighborhood. However, a complete Design Commission application is required to be submitted for review. Building and Life Safety 1. No comments. Engineering 1. The Public Works & Engineering Division have no objections to the requested variance. Page 50 of 67 CERTIFICATE OF PUBLICATION Paddock Publications, Inc. Northwest Suburbs Daily Herald Corporation organized and existing under and by virtue of the laws of the State of Illinois, DOES HEREBY CERTIFY that it is the publisher of the Northwest Suburbs DAILY HERALD. That said Northwest Suburbs DAILY HERALD is a secular newspaper, published in Arlington Heights, Cook County, State of Illinois, and has been in general circulation daily throughout Cook County, continuously for more than 50 weeks prior to the first Publication of the attached notice, and a newspaper as defined by 715 ILCS 5/5. I further certify that the Northwest Suburbs DAILY HERALD is a newspaper as defined in "an Act to revise the law in relation to notices" as amended in 1992 Illinois Compiled Statutes, Chapter 715, Act 5, Section 1 and 5. That a notice of which the annexed printed slip is a true copy, was published 07/26/2025 in said Northwest Suburbs DAILY HERALD. This notice was also placed on a statewide public notice website as required by 5 ILCS 5/2.1. BY ______________________________________________ Designee of the Publisher of the Daily Herald Control # 299140 Page 51 of 67 PETITION The following petition form shall be used when submitting a petition for a variation from Chapter 28 of the Arlington Heights Municipal Code. This must be submitted with a fully executed application to the Zoning Board of Appeals. Please refer to Section 12 of Chapter 28 if the Arlington Heights Municipal Code for information regarding the criteria by which the Zoning Board of Appeals will evaluate variation requests. (Attached to this application packet.) PETITION NOW COMES the Petitioner Kevin Purdom (JRC Design Build) being the owner of the property commonly know as: 401 N Pine Ave 5.1-3.3(b); 6.6-5.1; 6.5-2 and appeals to the Zoning Board of Appeals of the Village of Arlington Heights for a Variation from Section Chapter 28, of the Arlington Heights Municipal Code, in order to: Build a second story addition, deck and pergola that encroach into the existing nonconfomring sideyard setback I hereby state that the proposed use will not alter the essential character of the locality and will be compatible with existing uses and zoning of nearby property if the variation(s) were granted (please explain): All other code and zoning requirements will be met I hereby state that the plight of the owner is due to unique circumstances, which may include the length of time the subject property has been vacant as zoned (please explain): Existing house is nonconforming so to extend the existing walls higher and build in line with the existing;we will need variance. I hereby state that the proposed variation is in harmony with the spirit and intent of this Chapter (please explain): The design of the house and deck are cohesive with the rest of the neighborhood and we are not encroaching further into the sideyard than the existing house. I hereby state that the variance requested is the minimum variance necessary to allow reasonable use of the property (please explain): We tried to build the deck within the setback but it restricted the use and size. Building in line with the building looks better and functions better. We are not asking for any further extension. Any work on the second floor would require a variance because of the existing non-conformance. Signed: Date: 07/22/2025 Petitioner 5 Page 52 of 67 Page 53 of 67 PROJECT DATA PROJECT LOCATION: 401 N PINE AVE SHEET INDEX - ARCHITECTURAL ADDITION TO THE COLLETTI RESIDENCE ZONING DISTRICT: R-3 A0 COVER SHEET 1- 06/09/2025 A1 EXISTING DRAWINGS 1- 06/09/2025 LOT AREA: 8,712 SF A2 FOUNDATION & BASEMENT PLANS 1- 06/09/2025 SITE PLAN NOTES 66.00 PIN: 03-29-313-004-0000 A3 FIRST FLOOR PLAN 1- 06/09/2025 1. INFORMATION ON THIS DRAWING IS ACCUMULATED FROM EXISTING 6'-7" 34'-5" 25'-0" A4 SECOND FLOOR PLAN 1- 06/09/2025 DOCUMENTATION AND MUST BE CONFIRMED BY THE CONTRACTOR AND COORDINATED WITH THE ARCHITECT PRIOR TO MAX LOT COVERAGE:(35%) 3,049 SF A5 ROOF PLAN & STAIR DETAILS 1- 06/09/2025 CONSTRUCTION. ARCHITECTURAL SITE PLAN IN FOR SCHEMATIC A6 ELEVATIONS 1- 06/09/2025 PURPOSES ONLY. SEE SITE ENGINEERING PLAN AND LANDSCAPE PROPOSED LOT COVERAGE: 2,302 SF 13'-2" PLAN FOR ADDITIONAL INFORMATION A7 STRUCTURAL DETAILS 1- 06/09/2025 EX EX CONC DRIVE 2. VERIFY LOCATIONS OF ALL UTILITIES AND OTHER BUILDING DETACHED 695 SF SERVICES PRIOR TO EXCAVATION. MAX FAR: 3,920 SF A8 SPECIFICATIONS 1- 06/09/2025 3. PROVIDE REQUIRED WORK TO ACCOMMODATE EXISTING UTILITIES GARAGE 400 SF 1275 E. DAVIS, ARLINGTON HEIGHTS, IL 60005 (45%) MEP1 FIRST & SECOND FLOOR MEP PLANS 1- 06/09/2025 OR OTHER BUILDING SERVICES. 4. PROTECT EXISTING LANDSCAPING DURING CONSTRUCTION, TO PHONE: (847)255-2322 2,863 SF EMAIL: KEVINJCDB@GMAIL.COM GREATEST EXTENT POSSIBLE. PROPOSED FAR: 5. PROVIDE TEMPORARY CONSTRUCTION/SECURITY FENCING AROUND C 2025 COPYRIGHT. ALL RIGHTS RESERVED X X ALL OPEN EXCAVATIONS; HEIGHT AS REQ'D BY LOCAL CODES. MAX IMPERVIOUS COVERAGE 4,356 SF PROJECT SCOPE OF WORK 6. VERIFY LOCATIONS OF ALL MATERIAL STOCKPILES AND DUMPSTERS WITH OWNER. X (50%) EX WALK OPTION 1: DESIGN BUILD A REVISED 1ST FLOOR, RELOCATING THE POWDER 7. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS PRIOR TO COMMENCING WITH THE WORK. ANY DISCREPANCIES IN FIELD 301 SF MAX FRONT YARD 1,650 SF 504 SF ROOM AND REMOVING ALL OF THE WALLS TO THE 3 BACK ROOMS. PATCH IN CONDITIONS ARE TO BE REPORTED TO THE ARCHITECT BEFORE X IMPERVIOUS (50%) ALLOWED PROPOSED HARDWOOD TO MATCH EXISTING. ADD A KITCHEN REMODEL PROCEEDING. OPTION 2: DESIGN BUILD A 2ND FLOOR ADDITION OVER THE REAR OF THE HOME 8. PLEASE NOTIFY THE ARCHITECT IMMEDIATELY IF THERE ARE ANY DISCREPANCIES IN THE CONSTRUCTION DOCUMENTS. X ADDITION TO THE PROPOSED IMPERVIOUS 9. STATE LAW: BEFORE DIGGING, CALL JULIE (811 OR 1-800-892-0123) COVERAGE: 3,608 SF AND REWORK FLOOR PLAN TO INCLUDE 4-BEDROOMS, 2-BATHS AND A LAUNDRY FOR LOCATION OF PUBLIC AND PRIVATE UTILITIES AT WORK SITE. 48 EX PATIO X COLLETTI RESIDENCE ROOM. HOUR NOTICE IS REQUIRED. 210 SF 10. THE HOUSE SHALL PASS A BLOWER DOOR TEST AND A COPY OF X MAX BUILDING HEIGHT: 25'-0" THE RESULTS SHALL BE PROVIDED TO THE BUILDING DEPARTMENT NEW OPTION 3: DESIGN BUILD A NEW 2-CAR GARAGE + DRIVE ADDITIONAL 3 OR 4 CAR. PRIOR TO SCHEDULING THE FINAL INSPECTIONS. COMPOSITE DECK/STAIRS 395 SF X 401 N PINE AVENUE 11. CONSTRUCTION DEBRIS AND REFUSE CONTAINMENT SHALL BE PROPOSED BUILDING HEIGHT: EX TO REMAIN 132.00 OPTION 4: DESIGN BUILD A REVISED HEATING SYSTEM FROM THE EXISTING REQUIRED FOR ALL JOB SITES. CONTAINMENT SHALL OCCUR ON EX WALK 122 SF ARLINGTON HEIGHTS, IL 60004 THE PROPERTY THAT IS THE SUBJECT OF THE PERMIT & SHALL BE PERGOLA, TBD LOCATION AREAS: BOILER AND ADD AC. WITHIN A DUMPSTER, STRUCTURE, OR CONTAINER THAT CAN BE ST JAMES STREET COVERED TO PREVENT WINDBLOWN DEBRIS. ALL SUCH DATE BASEMENT 1,300 SF FIRST FLOOR 1,505 SF OPTION 5: RESIDE AND REROOF THE EXISTING HOME. WITH JAMES HARDIE DUMPSTERS, STRUCTURES, OR CONTAINERS SHALL BE COVERED AT ALL TIMES WHEN NO WORK IS BEING PERFORMED ON THE 1- 06/09/2025 SECOND FLOOR 1,358 SF SIDING AND GAF PREMIUM ROOFING. PROPERTY THAT IS THE SUBJECT OF THE PERMIT. GARAGE 400 SF 12. ALL DISTURBED PARKWAY LAWN AREAS WILL BE RESTORED WITH OPTION 6: REPAINT THE ENTIRE HOME. NEW SOD ON 6" OF TOPSOIL. ALL SOD SHALL BE WATERED AS REQ'D ISSUE DATE TO SUSTAIN GROWTH. TOTAL SQUARE FOOTAGE: 2,863 SF 13. ALL PARKWAY TREES SHALL HAVE A SNOW FENCE THAT EXTENDS 1- 06/09/2025 1 - BID TO THE DRIP LINE. NO TRAFFIC SHALL GO OVER THE ROOT SYSTEM. 14. SURFACE DRAINAGE TO BE DIVERTED FROM STRUCTURE SO AS EXISTING 2 STORY DESIGN CRITERIA NOT TO CREATE A HAZARD ON THIS OR ADJACENT PROPERTY. FRAME HOUSE GRADE FROM FOUNDATION TO DROP A MINIMUM OF 6" IN 10'-0". 1,507 SF FOOTPRINT PROVIDE SWALES OR DRAINS TO ENSURE DRAINAGE FROM FLOOR STRUCTURE AND ADJACENT PROPERTY. SLEEPING ROOMS 40# LL - 10# DL ABBREVIATIONS 15. TOILET FACILITIES SHALL BE PROVIDED AT ALL JOB SITES PER ILLINOIS PLUMBING CODE. THIS WILL BE A CONDITION OF THE OTHER ROOMS 40# LL - 10# DL PERMIT. VEH. GARAGES 50# LL - 10# DL A.B. ANCHOR BOLT L. LINEN 16. PROVIDE AND MAINTAIN A 5'-0" HIGH FENCE ALONG THE FULL ABV ABOVE LAM. LAMINATE LENGTH OF INTERIOR SIDE YARDS UNTIL EXTERIOR CONSTRUCTION A.C. AIR CONDITIONING LAV. LAVATORY IS COMPLETE. WALL 60# PLF OR ACTUAL LOAD ACOUS. ACOUSTIC LL LIVE LOAD 17. PROVIDE AND MAINTAIN A 5'-0" HIGH CONSTRUCTION FENCE DURING 20 PSF WIND 0'-20' HEIGHT ADJ. ADJUSTABLE LP LOW POINT NON-WORKING HOURS THAT WILL ENCLOSE ALL OPEN EX WALK/ 25 PSF WIND 21'-29' HEIGHT A.F.F. ABOVE FINISH FLOOR MAX. MAXIMUM EXCAVATIONS UNTIL FOUNDATION IS BACK-FILLED & FIRST FLOOR STAIRS 10'-0" 100 SF ALUM. ALUMINUM MC MEDICINE CABINET DECK IS COMPLETED. 30 PSF WIND 30' HEIGHT AND ALT. ALTERNATE MECH MECHANICAL 18. ERECT PROTECTIVE SNOWFENCE PRIOR TO ANY CONSTRUCTION ABOVE A.P. ACCESS PANEL MED MEDIUM ACTIVITY. DO NOT STORE ANY EQUIPMENT OR MATERIALS WITHIN APPROX. APPROXIMATE MIN MINIMUM THE PROTECTION AREA. REMOVE THE PROTECTIVE SNOW FENCE ARCH. ARCHITECTURAL MISC MISCELLANEOUS ONLY AFTER CONSTRUCTION IS COMPLETE. CEILING @ AT ML MICROLAM 19. ALL TREES ARE TO BE PROTECTED DURING CONSTRUCTION WITH UNHAB W/O STOR 10# LL - 10# DL BD BOARD MO MASONRY OPENING FENCING FOR EVERY 1" OF TREE DIAMETER. MAINTAIN 1'-0" UNHAB LIM STOR 20# LL - 10# DL BI BUILT-IN MRBL MARBLE DISTANCE AWAY FOR FENCING. BLDG BUILDING MTL METAL 20. MAINTAIN EXISTING DRAINAGE PATTERNS. ANY DRAINAGE ISSUES HAB W/ FIX STAIR 30# LL - 10# DL BOT. BOTTOM MW MICROWAVE THAT MAY ARISE FROM THE CONSTRUCTION ASSOCIATED WITH THIS B/ BOTTOM OF NIC NOT IN CONTRACT PERMIT WILL BE ADRESSED BY THE PERMITTEE. WIND SPEED 115 MPH BRG. BEARING NO NUMBER 21. RESTORE PARKWAY AND PAVEMENT TO PRE-CONSTRUCTION 3 SECOND GUST BRG. PL. BEARING PLATE NOM NOMINAL CONDITIONS. & 89 NOMINAL B.U.R. CRPT BUILT UP ROOFING CARPET NTS O NOT TO SCALE OVEN N PINE AVE CABT C.I. CABINET CAST IRON OA OC OVERALL ON CENTER ENERGY CODE COMPLIANCE NOTES ROOF 30# LL (SNOW) - 10# DL (ALL C.J. CEILING JOISTS OPP OPPOSITE SLOPES) C.J.T. CONSTRUCTION JOINTS OPT. OPTIONAL 1. ENERGY CODE COMPLIANCE DESIGN BY PRESCRIPTIVE MEANS. CL CENTERLINE PERF. PERFORATED CLIMATE ZONE : 5 CATHEDRAL 30# LL - 15# DL (ALL SLOPES) CLG. CEILING PL POINT LOAD MAX. GLAZING U-FACTOR: 0.30 CL. C.M.U. CLOSET CONCRETE MASONRY P LAM PLYWD PLASTIC LAMINATE PLYWOOD ACTUAL U-FACTOR: MIN. SKYLIGHT U-FACTOR: 0.55 1 SITE PLAN - PROPOSED N EXT DECK 40# LL - 10# DL ACTUAL SKYLIGHT U-FACTOR: C. O UNIT CASED OPENING PSF POUNDS PER SQUARE FOOT SHGC : N R A0 1/16" = 1'-0" COL. COLUMN PSI POUNDS PER SQUARE MIN. CEILING R-VALUE: 49 EXT BALCONY 40# LL - 10# DL CONC. CONCRETE INCH ACTUAL CEILING R-VALUE: 49 CONST. CONSTRUCTION PVC POLYVINYLCHLORIDE MIN. FRAME WALL R-VALUE: 30 OR 20 + 5 OR 13+10 STAIRS 40# LL + 300# CONT. CONTINUOUS QT QUARRY TILE ACTUAL WALL R-VALUE: 30 (CLOSED CELL FOAM INSULATION) C.T. CERAMIC TILE R RADIUS MIN. FLOOR R-VALUE: 30 CONCENTRATED LOAD C.W. COLD WATER RD ROOF DRAIN ACTUAL FLOOR R-VALUE: IMPERVIOUS SF DEMO. DEMOLITION R&S ROD AND SHELF MIN. BASEMENT R-VALUE: 15 OR 19 GUARD & HANDRAILS 200# LL AT ANY DIRECTION DIA. DIAMETER REC RECESSED ACTUAL BASEMENT R-VALUE: GC TO PROVIDE PERMANENT CERTIFICATE TO BE POSTED ADJACENT WALKS/DRIVEWAY 1,096 SF DIAG. DIAGONAL REF REFRIGERATOR APPLIED AT THE TOP DIM. DISP. DIMENSION DISPOSAL REG REINF REGULAR REINFORCE TO ELECTRICAL PANEL INDICATING INSULATION AND ENERGY VALUES FOR BUILDING INSULATION, FENESTRATION AND DUCT SYSTEMS. PATIO/DECK/STAIRS 605 SF ON FROST DEPTH 42" (3'-6") DIV. DIVISION RM ROOM SPRAY FOAM BOX SILLS AND SILL PLATES, AND ADD R-15 HIGH HOUSE T I DL DEAD LOAD RO ROUGH OPENING DENSITY FRICTION FIT BATT INSULATION. 1,507 SF C RU DN. DOWN RR ROOF RAFTERS STRUCTURAL FRAMING LUMBER DWGS. DRAWINGS SECT SECTION 2. ALL PENETRATIONS THROUGH THERMAL ENVELOPE SHALL BE GARAGE 400 SF BASE VALUE (USE NO MULTIPLIERS AGAINST BASE VALUE) GRADE #2 SPECIES SPF DOMESTIC OR CANADIAN BASE Fb 875 D.S. D.W. DOWNSPOUT DISHWASHER SHLV SHT SHELVES SHEET ADEQUATELY SEALED BY CAULK, GASKET, WEATHERSTRIPPING OR OTHER BARRIER MEANS PER 2021 IECC REQUIREMENTS. PORCHES 0 SF S T EA. EACH SHWR SHOWER ALL WINDOWS AND EXTERIOR DOOR JAMBS ARE TO BE SEALED WITH N CO LOW-EXPANSION FOAM. SHED 0 SF EX. EXISTING SHTG SHEATHING SPECIFY MANUFACTURER AND NAME OF SPECIFIC BEAM EIFS EXTERIOR INSULATION SIM SIMILAR ALL BOTTOM PLATES ON EXTERIOR WALLS SHALL BE GLUED TO PRODUCT WITH THE CURRENT SIZE, Fb, AND E VALUES PER MANUFACTURER EQ FINISH SYSTEM EQUAL SL SPEC SLIDING SPECIFICATION SUB-FLOOR. TOTAL 3,608 SF O R EXP. EXPANSION SQ SQUARE 3. ALL FIREPLACES SHALL HAVE GASKETED DOORS & OUTSIDE F MANUFACTURER - TRUS-JOIST ELEC. ELEV. ELECTRICAL ELEVATION SF SS SQUARE FOOT SANITARY SUMP COMBUSTION AIR. O T PRODUCT - LVL HEADERS & BEAMS MICRO-LAM EQUIP. EQUIV. EQUIPMENT EQUIVALENT STD STL STANDARD STEEL 4. ALL RECESSED LIGHTING IN THERMAL ENVELOPE SHALL BE SEALED N E.W EACH WAY STOR STORAGE TO PREVENT AIR LEAKAGE. ALL RECESSED DOWNLIGHTING TO BE APPLICABLE CODES - ARLINGTON HEIGHTS F FURNACE STRUCT STRUCTURE IC-RATED. SITE SETBACKS (R-3) FD FLOOR DRAIN SUSP SUSPENDED FE FIRE EXTINGUISHER T&B TOP AND BOTTOM 5. PROVIDE PROGRAMMABLE THERMOSTATS FOR EACH ZONE WITH THESE DRAWINGS ARE NOT APPROVED OR REQUIRED PROPOSED FF FINISH FLOOR T/ TOP OF SETBACK AND MANUAL OVERRIDE. STAMPED FOR CONSTRUCTION AND ARE FOR FIN. FINISH TEL TELEPHONE CONCEPT/DESIGN/BIDDING PURPOSES ONLY. ALL WORK PERFORMED AND MATERIALS USED SHALL COMPLY FRONTYARD 25'-0" EX TO REMAIN DIMENSIONS, HEIGHTS, FINISHES, AND UTILITY FIXT FIXTURE T&G TONGUE AND 6. ALL DUCTWORK SHALL BE ADEQUATELY SEALED. ALL SUPPLY WITH THE FOLLOWING: FLR FLOOR GROOVE DUCTWORK IN UNCONDITIONED ATTIC TO HAVE R-8 INSULATION. LOCATIONS TO BE VERFIED. INTERIOR SIDEYARD 10% LOT WIDTH 6'-0" EX TO REMAIN FLSHG FLASHING THK THICK ALL OTHER DUCTWORK TO HAVE R-6 INSULATION. HVAC CONTRACTOR FDN FO FOUNDATION FACE OF TJI TOP TRUST JOIST TOP OF PLATE SHALL PROVIDE EITHER POST-CONSTRUCTION OR ROUGH-IN TEST OF TOTAL AIR LEAKAGE FOR DUCT SYSTEMS. INTERIOR SIDEYARD 10% LOT WIDTH 6'-0" EX TO REMAIN SITE PLAN LEGEND BUILDING CODE 2018 INTERNATIONAL RESIDENTIAL CODE FS FOOTING SUMP TV TELEVISION WITH AMENDMENTS REARYARD 30'-0" EX TO REMAIN FTG FOOTING TYP TYPICAL 7. ALL MECHANICAL SYSTEM PIPING CAPABLE OF CARRYING FLUIDS PROPERTY LINE MECHANICAL CODE 2018 INTERNATIONAL MECHANICAL CODE FURN FURNACE UC UNDER COUNTER ABOVE 105 DEG F OR BELOW 55 DEG F SHALL BE INSULATED TO A SHEET TITLE GA GAUGE UON UNLESS OTHERWISE MINIMUM OF R-3. ALL HOT WATER LINES TO HAVE R-3 PIPE HEIGHT - MEAN MAX 25'-0" EX TO REMAIN ELECTRICAL CODE 2017 NATIONAL ELECTRICAL CODE GALV GALVANIZED NOTED SETBACK LINE COVER SHEET INSULATION & MANUAL SWITCH FOR RECIRC. PUMP. WITH AMENDMENTS GFI GROUND FAULT VCT VINYL COMPOSITION EASEMENT LINE PLUMBING CODE 2014 ILLINOIS PLUMBING CODE WITH INTERRUPT TILE 8. ALL ACCESS HATCHES/DOORS TO UNCONDITIONED SPACE SHALL BE AMENDMENTS GLU-LAM GLUE LAMINATED VERT VERTICAL INSULATED & WEATHERSTRIPPED. ENERGY CODE 2021 ILLINOIS ENERGY CONSERVATION BEAM VIF VERIFY IN FIELD TABLE R301.2(1) CLIMATIC AND E ELECTRIC SERVICE SHEET NUMBER GYP. GYPSUM W/ WITH 9. 100% OF ALL LIGHTING TO HAVE HIGH-EFFICACY BULBS. CODE WITH STATE AMENDMENTS HD HEAD WC WATER CLOSET GEOGRAPHIC DESIGN CRITERIA G GAS SERVICE HDR HEADER WIC WALK IN CLOSET 10. FURNACE: +90% AFUE STORM SEWER HT HEIGHT WD WOOD WATER HEATER: +95% AFUE -ALL APPLICABLE LOCAL AND STATE CODES, ORDINANCES, AND HM HOLLOW METAL WDO WINDOW A/C: 13+ SEER GROUND WIND DESIGN SEISMIC SUBJECT TO DAMANGE WINTER ICE FLOOD AIR MEAN HAZARDS FREEZING ANNUAL SANITARY SEWER REGULATIONS. DESIGN DESIGN BARRIER A0 HORZ HORIZONTAL WH WATER HEATER SHGC: 0.27 OR BTR SNOW CATEGORY FROM TEMP UNDER INDEX TEMP LOAD CHAPTER -MANUFACTURERS' SPECIFICATIONS AND TRADE ASSOCIATIONS HP HIGH POINT W/O WITHOUT SPEED (MPH) TOPO EFFECTS SPECIAL WIND WIND- BORNE WTHRING FROST LINE TERMITE LAYMENT REQ. VILLAGE W WATER SERVICE HTG HEATING WP WATERPROOF 11. WINDOWS, SKYLIGHTS AND SLIDING GLASS DOORS SHALL HAVE AN RECOMMENDATIONS. HVAC HEATING VENTILATE WT WEIGHT REGION DEBRIS DEPTH CODE AIR INFILTRATION RATE NO MORE THAN 0.3 CFM PER SF, AND ZONE X FENCE -ACCEPTED ENGINEERING AND CONSTRUCTION PRACTICES. AIR CONDITIONING WWF WELDED SWINGING DOORS NO MORE THAN 0.5 CFM PER SF. MOD NOV INT. INTERIOR WIRE FABRIC 25 115 NO NO NO b SEVERE 42" -TO- -4 YES 6 2000 2000 47.6 HEAVY Page 54 of 67 1275 E. DAVIS, ARLINGTON HEIGHTS, IL 60005 PHONE: (847)255-2322 EMAIL: KEVINJCDB@GMAIL.COM C 2025 COPYRIGHT. ALL RIGHTS RESERVED 1 WEST ELEVATION - EXISTING FRONT A1 1/8" = 1'-0" ADDITION TO THE COLLETTI RESIDENCE 401 N PINE AVENUE ARLINGTON HEIGHTS, IL 60004 DATE 1- 06/09/2025 ISSUE DATE 1- 06/09/2025 1 - BID EX ELEC PANEL 2 EAST ELEVATION - EXISTING REAR A1 1/8" = 1'-0" PLAT OF SURVEY NTS ON 3 SOUTH ELEVATION - EXISTING SIDE T I C A1 RU 1/8" = 1'-0" S T N CO O R F O T N THESE DRAWINGS ARE NOT APPROVED OR STAMPED FOR CONSTRUCTION AND ARE FOR CONCEPT/DESIGN/BIDDING PURPOSES ONLY. DIMENSIONS, HEIGHTS, FINISHES, AND UTILITY LOCATIONS TO BE VERFIED. SHEET TITLE EXISTING DRAWINGS SHEET NUMBER 4 NORTH ELEVATION - EXISTING SIDE A1 A1 1/8" = 1'-0" Page 55 of 67 3 / A6 1275 E. DAVIS, ARLINGTON HEIGHTS, IL 60005 PHONE: (847)255-2322 EMAIL: KEVINJCDB@GMAIL.COM C 2025 COPYRIGHT. ALL RIGHTS RESERVED 1'-1" PT PERGOLA, TBD PT WOOD FRAMING TYP. 8.0:12 2X6 ROOF RAFTERS @ 16" OC SPF#2 OR BETTER 2'-7" 3'-4" ADDITION TO THE 2'-7" DS DS COLLETTI RESIDENCE +/- 4.5:12 4.5:12 2'-7" 401 N PINE AVENUE 2X10 ROOF RAFTERS SPF #2 OR BETTER @ 16" OC R-49 FOAM INSULATION TYP. ARLINGTON HEIGHTS, IL 60004 1'-8" 2X8 CEILING JOISTS @ 16" OC MATCH EX OVERHANG, VIF DS DATE 2'-0" TYP. ROOF CONSTRUCTION AT ATTIC (R-49) 1- 06/09/2025 25 YR ARCHITECTURAL GRADE ASPHALT SHINGLES RENDERING FOR DESIGN CONCEPT ONLY - SEE DETAILED DRAWINGS OR SHOPS DRAWINGS FOR EXACT FINISHES, COLORS, MATERIALS, ETC. CLASS 'C' OR BETTER 15 # ROOFING FELT ISSUE DATE 2X12 RIDGE BEAM ICE AND WATER SHIELD AT EAVES, CONTINUOUS ALUM GUTTER, MATCH EX RAKES, RIDGES, AND VALLEYS, EXTEND 24" MIN INTO HEATED SPACE 1- 06/09/2025 1 - BID 5/8" OSB ROOF SHEATHING 2X12 WOOD RAFTERS @ 16" OC INSULATION IN DEPTH TO ACHEIVE MIN, R-49 5/8" GYP BD CONTINUOUS RIDGE VENTS 2X10 ROOF RAFTERS SPF #2 OR BETTER EY LL VA 2 / A6 12 +/- 3.2:12 2X @ 16" OC R-49 FOAM INSULATION TYP. 4 / A6 2X8 CEILING JOISTS @ 16" OC +/- EX 8.0:12 VIF OF RO R VE AYO L +/- EX 8.0:12 VIF +/- EX 8.0:12 VIF EX 8.0:12 +/-, VIF EX 8.0:12 +/-, VIF ON T I C T RU N S CO O R F O T N THESE DRAWINGS ARE NOT APPROVED OR 1 / A6 STAMPED FOR CONSTRUCTION AND ARE FOR CONCEPT/DESIGN/BIDDING PURPOSES ONLY. NOTE: DIMENSIONS, HEIGHTS, FINISHES, AND UTILITY ALL DOWNSPOUTS TO DRAIN AWAY LOCATIONS TO BE VERFIED. FROM HOUSE AND TOWARDS FRONT OR BACK OF LOT TO AVOID DRAINAGE ISSUES WITH NEIGHBORING LOTS SHEET TITLE ROOF PLAN & STAIR DETAILS R905.1.2 ICE BARRIERS SHEET NUMBER IN AREAS WHERE THERE HAS BEEN A HISTORY OF ICE FORMING ALONG THE EAVES CAUSING S BACKUP OF WATER AS DESIGNATED IN TABLE R301.2(1). AN ICE BARRIER SHALL BE INSTALLED FOR ASPHALT SHINGLES, METAL ROOF SHINGLES, MINERAL-SURFACED ROLL ROOFING, SLATE AND SLATE-TYPE SHINGLE, WOOD SHINGLES AND WOOD SHAKES. THE ICE BARRIER SHALL CONSIST OF NOT FEWE THAN TWO LAYERS OF UNDERLAYMENT CEMENTED TOGTHER, OR A SELF-ADHERING POLYMER-MODIFIED BITUMEN SHEET SHALL BE USED IN PLACE OF NORMAL 1 ROOF PLAN N UNDERLAYMENT AND EXTEND FROM THE LOWEST EDGES OF ALL ROOF SURFACES TO A POINT NOT LESS THAN 24 INCHES (610 MM) INSIDE THE EXTERIOR WALL LINE OF THE BUIDLING. ON ROOF SLOPES WITH SLOPE EQUAL TO OR GREATER THAN 8 UNITS VERTICAL IN 12 UNITS HORIZONTAL. THE ICE BARRIER SHALL ALSO BE APPLIED NOT LESS A5 1/4" = 1'-0" A5 THAN 36 INCHES MEASURED ALONG THE ROOF SLOPE FROM THE EAVE EDGE OF THE BUILDING. Page 56 of 67 36X36 F/T 36X36 F/T EX 1275 E. DAVIS, ARLINGTON HEIGHTS, IL 60005 PHONE: (847)255-2322 EMAIL: KEVINJCDB@GMAIL.COM C 2025 COPYRIGHT. ALL RIGHTS RESERVED 6-0/6-8 ADDITION TO THE EX EX EX EX EX EX EX COLLETTI RESIDENCE EX EX 401 N PINE AVENUE ARLINGTON HEIGHTS, IL 60004 EX EX DATE 1- 06/09/2025 ISSUE DATE 1- 06/09/2025 1 - BID 1 WEST ELEVATION - PROPOSED FRONT 2 NORTH ELEVATION - PROPOSED SIDE A6 1/4" = 1'-0" A6 1/4" = 1'-0" 4.5: 12 8.0:12 12 4.5: 3.2:12 48x36 +/- 7'-11" EX 8.0:12 27x48 27x48 27x48 EX EX 8.0:12 3-0/6-8 +/- 9'-1" VARIES 66x42 PT EX EX 32x57 EX EX ON 6-0/6-8 T I C +/- 3'-6" VARIED EX EX T RU N S CO O R F 3 EAST ELEVATION - PROPOSED REAR 4 SOUTH ELEVATION - PROPOSED SIDE O T A6 1/4" = 1'-0" A6 1/4" = 1'-0" N THESE DRAWINGS ARE NOT APPROVED OR STAMPED FOR CONSTRUCTION AND ARE FOR CONCEPT/DESIGN/BIDDING PURPOSES ONLY. ELEVATION MATERIALS WINDOW NOTES: DIMENSIONS, HEIGHTS, FINISHES, AND UTILITY LOCATIONS TO BE VERFIED. 1. WINDOW SIZES : ROUGH OPENING TO BE VERIFIED IN FIELD W/ CHOSEN WINDOW MANUF. & CONTRACTOR PRIOR TO CONSTRUCTION LOCATION HATCH PATTERN DESCRIPTION MANUF. LOCATION HATCH PATTERN DESCRIPTION MANUF. 2. GLASS SIZES TO BE FOLLOWED AS CLOSE AS POSSIBLE PER DIFFERENT MANUF. 3. BEDROOM WINDOWS TO HAVE EGRESS HARDWARE & FOLLOW EGRESS REQUIREMENTS AS SIDING (1) HORIZ LAP SIDING MATCH EX TRIM AND FASCIA TRIM MATCH EX LABELED ON ELEVATIONS. SHEET TITLE 4. WINDOWS IN WHICH THE BOTTOM EDGE OF THE WINDOW IS LESS THAN 18" ABOVE THE TOP OF THE FLOOR ARE REQUIRED TO BE TEMPERED. ELEVATIONS BRICK 5. FIELD VERIFY EMERGENCY ESCAPE & RESCUE OPENINGS IN SLEEPING ROOMS SIDING (2) EX TO REMAIN SOFFIT AND FASCIA ALUMINUM - VENTED MATCH EX EGRESS WINDOW REQUIREMENTS PROVIDE A NET CLEAR OPENING OF 5.7 SF OR GREATER, ACHIEVED BY SIMPLY OPENING THE WINDOW ROOFING (1) ASPHALT SHINGLES MATCH EX COLUMNS WHITE MATCH EX PROVIDE A NET CLEAR OPENING OF 5.0 SF OR GREATER FOR GRADE LEVEL WINDOWS. SHEET NUMBER A MINIMUM CLEAR WIDTH OF 20" A MINUMUM CLEAR HEIGHT OF 24" MATCH EX GUTTERS, DOWNSPOUTS ALUMINUM MATCH EX A SILL HEIGHT OF LESS THAN 44" AFF DOORS STYLE TBD 6. ALL NEW WINDOWS TO HAVE A MAX. U-FACTOR OF 0.30 7. ALL BATHROOM GLASS AND GLASS IN AREAS OF HAZARD SHALL BE SAFETY GLAZING, WINDOWS VINYL (INTERIOR - EXTERIOR -) MATCH EX 8. PERMANENTLY ETCHED, AND THE ETCHING SHALL BE VISIBLE AFTER INSTALLATION TO VERIFY COMPLIANCE. SECTION: IRC R308.4 E = EGRESS T= TEMPERED AFETY GLASS A6 F= FROSTED PRIVACY GLASS EX = EXISTING WINDOW TO REMAIN Page 57 of 67 Zoning Board of Appeals 8/11/2025 Item: 604 W. Techy Rd. - ZBA25-026 Department: Planning & Community Development Item Description: REQUEST • A variation from Chapter 28, Section 6.5-2 (Accessory Structures) to allow a pergola in the side yard where accessory structures are only permitted in the rear yard. ATTACHMENTS: 1. Exhibits_604 W Techny Rd Page 58 of 67 Petition – ZBA#25-026 PIN: 03-18-207-012 ARLINGTON HEIGHTS ZONING BOARD OF APPEALS Staff Analysis Prepared By: Darko Bojin, Assistant Planner Hearing Date: August 11, 2025 Date Prepared: August 6, 2025 Project Title: Padmanabha Residence Address: 604 W. Techny Rd. Background Information Petition Number: ZBA #25-026 Petitioner: Prakash Padmanabha Address: 604 W. Techny Rd. Arlington Heights IL 60004 Existing Zoning: R-3 – Residential Single-Family District Requested Action/Background Information The property is zoned R-3 and has a total land area of approximately 10,730 square feet. The petitioner is proposing to install a pergola in the side yard. Code prohibits accessory structures to be built in the side yard. Therefore, the petitioner is requesting the following variation: • A variation from Chapter 28, Section 6.5-2 (Accessory Structures) to allow a pergola in the side yard where accessory structures are only permitted in the rear yard. Variation Review Standards In its consideration of the standards of practical difficulties or particular hardships, the Zoning Board of Appeals shall require evidence that (1) the proposed use will not alter the essential character of the locality and will be compatible with existing uses and zoning of nearby property; and (2) the plight of the owner is due to unique circumstances, which may include the length of time the subject property has been vacant as zoned; and (3) the proposed variation is in harmony with the spirit and intent of this Chapter; and (4) the variance requested is the minimum variance necessary to allow reasonable use of the property. A variation shall be permitted only if the evidence, in the judgment of the Board of Appeals, sustains each of the four conditions enumerated. Page 59 of 67 Petition – ZBA#25-026 PIN: 03-18-207-012 Map of General Vicinity Items required to be Submitted 15 Days Prior to Public Hearing Item Provided Dated Remarks 1. Notification Affidavit  7/25/25 2. List of Property Owners Within 250 feet of Subject Property  7/25/25 3. Letter that was Mailed  7/25/25 4. Photographs of Sign on Property  7/25/25 Page 60 of 67 Petition – ZBA#25-026 PIN: 03-18-207-012 Photographs of Existing Structure Page 61 of 67 Village of Arlington Heights To: Prakash Padmanabha From: Darko Bojin Department: Department of Planning and Community Development File Number: ZBA 25-026 Project: 604 W. Techny Road Date: August 6, 2025 ZONING COMMENTS: For your use and consideration, review the zoning review comments below regarding the following variances: • A variation from Chapter 28, Section 6.5-2 (Accessory Structures) to allow a pergola in the side yard where accessory structures are only permitted in the rear yard. If you have any questions, please contact dbojin@vah.com: Planning and Community Development 1. No Comments. Building and Life Safety 1. Approved with note: 1. The means and methods of anchoring to the ground should be clearly specified in the manufacturer’s specifications. If such details are not provided, a concrete footing will be required. Engineering 1. The Engineering Division has no objection to the requested variation from Chapter 28, Section 6.5-2 (Accessory Structures) to allow a pergola in the side yard where accessory structures are only permitted in the rear yard. Page 62 of 67 CERTIFICATE OF PUBLICATION Paddock Publications, Inc. Northwest Suburbs Daily Herald Corporation organized and existing under and by virtue of the laws of the State of Illinois, DOES HEREBY CERTIFY that it is the publisher of the Northwest Suburbs DAILY HERALD. That said Northwest Suburbs DAILY HERALD is a secular newspaper, published in Arlington Heights, Cook County, State of Illinois, and has been in general circulation daily throughout Cook County, continuously for more than 50 weeks prior to the first Publication of the attached notice, and a newspaper as defined by 715 ILCS 5/5. I further certify that the Northwest Suburbs DAILY HERALD is a newspaper as defined in "an Act to revise the law in relation to notices" as amended in 1992 Illinois Compiled Statutes, Chapter 715, Act 5, Section 1 and 5. That a notice of which the annexed printed slip is a true copy, was published 07/26/2025 in said Northwest Suburbs DAILY HERALD. This notice was also placed on a statewide public notice website as required by 5 ILCS 5/2.1. BY ______________________________________________ Designee of the Publisher of the Daily Herald Control # 299141 Page 63 of 67 Page 64 of 67 Page 65 of 67 Construction Plan for 10x12 Louvered Pergola Installation on Existing Paver Patio Project Overview ●​ Pergola Type: Free-standing louvered pergola (pre-manufactured kit from Amazon) ●​ Dimensions: 10 feet (width) x 12 feet (length) ●​ Height: ~8-9 feet (as per manufacturer specifications) ●​ Foundation: Existing paver patio ●​ Attachment Type: Surface-mount post bases anchored to pavers (with optional concrete footings underneath for stability) Materials Required Item Quantity Louvered Pergola Kit (from Amazon) 1 (10x12 size) Simpson Strong-Tie or similar post bases 4 (if not included) Concrete (optional, for footing anchors under 4 footing areas pavers) Anchoring bolts / concrete anchors As needed Tools (drill, level, wrench, hammer drill) - Steps to Install Pergola Step 1: Planning & Layout 1.​ Measure and mark 10 ft by 12 ft area on pavers. 2.​ Use stakes and string or chalk to outline the pergola. 3.​ Ensure the outline is square using the 3-4-5 rule or a carpenter’s square. Step 2: Prepare Anchor Points 1.​ Mark post locations at each of the 4 corners. 2.​ Option 1 (Recommended): Remove pavers at post locations and dig 12-18" deep holes. ○​ Fill holes with concrete to create a stable base. ○​ Install post base anchors into wet concrete or use wedge anchors afterward. 3.​ Option 2: Directly attach post bases (supplied with the pergola or purchased separately) to pavers using masonry anchors, per manufacturer recommendations. Step 3: Assemble Pergola Kit 1.​ Follow the manufacturer's step-by-step assembly guide included with the pergola kit. Page 66 of 67 2.​ Typically, this involves assembling the frame first, securing posts to post bases, and then assembling and attaching the louvered roof. 3.​ Use a spirit level to ensure all components are plumb and square. 4.​ Tighten all fasteners securely. Step 4: Secure Pergola to Patio 1.​ Using the provided or recommended anchors, secure the base plates of the pergola to the patio surface or concrete footings. 2.​ Verify that the pergola is stable before proceeding. Step 5: Finishing 1.​ Check louver operation to ensure smooth opening and closing. 2.​ Apply any touch-up paint or protective coating if recommended by the manufacturer. 3.​ Install any additional features provided in the kit, such as drainage systems or side screens. Optional Add-ons (if not included) ●​ Retractable canopy or side screens ●​ LED string lights ●​ Planter boxes at corners ●​ Integrated gutter for rain (if available) Estimated Time & Cost ●​ Time: 1-2 weekends (DIY with 2 people) ●​ DIY Cost Range: $1,200 - $2,000 (depending on pergola model and shipping) Safety Tips ●​ Wear gloves and eye protection. ●​ Have a friend help with lifting heavy components. ●​ Follow all manufacturer safety instructions. ●​ If unsure about anchoring, consult a local contractor for stability and safety. Page 67 of 67