Joint Biddeford-Saco Committee
Regular MeetingBiddeford, ME · January 31, 2017
Agenda
City of Biddeford
Biddeford-Saco Cooperation Commitee
January 31, 2017 6:00 PM People's Choice Saco
1. Call to Order
2. Introductory Remarks - Mayor Casavant and Mayor Michaud
3. Interchange Traffic Study
- Randy Dunton, Gorril Palmer, Downtown Traffic Impacts
3.a. Interchange Evaluation Memo
Interchange Evaluation Memo 012717.pdf
3.b. Biddeford Volumes
Biddeford Volumes 11x17.pdf
3.c. Saco Volumes
Saco Volumes 11x17.pdf
4. Community Updates - Saco Main Street and Heart of Biddeford
5. Land Use and Downtown
5.a. Breakout Sessions
5.b. Report from Breakout Sessions
6. Discussion - Possible areas for Future Collaboration
7. Adjournment
Page | 1
Packet
City of Biddeford
Biddeford-Saco Cooperation Commitee
January 31, 2017 6:00 PM People's Choice Saco
1. Call to Order
2. Introductory Remarks - Mayor Casavant and Mayor Michaud
3. Interchange Traffic Study
- Randy Dunton, Gorril Palmer, Downtown Traffic Impacts
3.a. Interchange Evaluation Memo
Interchange Evaluation Memo 012717.pdf
3.b. Biddeford Volumes
Biddeford Volumes 11x17.pdf
3.c. Saco Volumes
Saco Volumes 11x17.pdf
4. Community Updates - Saco Main Street and Heart of Biddeford
5. Land Use and Downtown
5.a. Breakout Sessions
5.b. Report from Breakout Sessions
6. Discussion - Possible areas for Future Collaboration
7. Adjournment
1
Page | 1
Biddeford-Saco Cooperation Commitee
Agenda Item Report
Agenda Item No. 2016-561
Submitted by: Andrea Fagan
Submitting Department:
Meeting Date: January 31, 2017
SUBJECT
Interchange Evaluation Memo
Recommendation:
ATTACHMENTS
Interchange Evaluation Memo 012717.pdf
2
707 Sable Oaks Drive, Suite 30
South Portland, Maine 04106
207.772.2515
Summary Evaluation Memo
Potential Interchange Roadway Impacts for
Biddeford & Saco, Maine
Date: January 27, 2017
Subject: Evaluation of Traffic Impacts Associated with Potential Interchange
Biddeford & Saco, Maine
To: Municipalities of Biddeford & Saco
From: Randy Dunton, Gorrill Palmer (JN 2850.03)
____________________________________________________________________________________
Understanding of Project Evaluation
Gorrill Palmer (GP) has been retained by the Cities of Biddeford and Saco to evaluate, on a very
macroscopic level, the potential traffic implications of a new I-95 interchange if it were located
somewhere between the existing Exit 32 in Biddeford and Exit 36 in Saco. The goal of a new
interchange would be to provide access to the downtowns in such a way as to reduce the distance
a vehicle would have to travel from the Interstate to the downtown. This would have the impact
of reducing vehicles miles traveled (VMT) and decrease unnecessary traffic volume on roadways
and through intersections that are already at or nearing capacity and would require significant
investments in the future to maintain adequate levels of service. This evaluation is intended to
provide information to the municipalities to assist them in making an informed decision of
whether or not to move the project to the next level.
Traffic Volumes
The construction of an additional interchange between Exits 32 and 36 could significantly impact
the distribution of existing traffic on a regional level. GP has been working with Mr. Kevin Hooper
and the PACTS model that he created in 2015 to evaluate potential traffic volume redistributions
should a new interchange be constructed. Mr. Hooper provided GP with a summary of his
analysis for an interchange in the area of the South Street overpass in Biddeford that estimates
the potential increase and decrease in traffic volumes for different locations in the Biddeford and
Saco area. Based on discussions with Mr. Hooper, the same regional impacts could be expected
with the interchange in either Biddeford or Saco; however, immediate roadway networks in the
proximity of the interchanges could be different depending on the location of the interchange.
The attached Figures show existing annual average daily traffic (AADT) volumes as well as
increases and decreases in traffic as a result of a potential interchange in either Biddeford (Figure
1) or Saco (Figure 2). The potential interchanges are shown on the South Street overpass for
Biddeford and the Boom Road overpass for Saco. The purpose of this evaluation was NOT to
evaluate those two locations for adequacy of an interchange and their respective roads to
3
January 27, 2017
Page 2
accommodate the increased traffic of an interchange, but were chosen because they each
represent a point in their municipality approximately half way between Exits 32 & Exit 36. If an
interchange is pursued, a separate evaluation would be required to identify the best location for
an interchange.
Traffic Impacts of Potential Interchange
Regardless of whether the interchange is in Saco or Biddeford, the regional impacts of the
interchange would be expected to be about the same. The primary difference in traffic impacts
between the two municipalities would be expected within a mile from the centers of the
downtowns. Generally, regardless of interchange location, on the periphery of the downtowns
an approximately 10% reduction in traffic volume could be expected on the major primary routes
into / out of the downtowns. Saco could experience 15%-20% reduction on Route 1 between
the “triangle” and Ocean Park Road, due to a combined decrease in traffic from both Exit 36 and
Route 1 to the north. Each municipality is described more in detail as follows:
Biddeford:
The primary benefits to Biddeford of an interchange (in either municipality) is a decrease in traffic
volumes at Exit 32, along Route 111 and through the “five points” intersection. This is especially
critical since “five points” is known to have capacity issues now, which will only be exacerbated
with future development and background growth. This intersection has been modified over the
years to improve operations; however, at the expense of using all available area for
improvements. Therefore, any future improvements to the intersection would be expected to
come at considerable cost and acquisition of property.
Getting closer to the downtown the benefit of the reduction of traffic is dispersed with still some
minor benefits on Route 111 and Route 1.
The challenges to an interchange in Biddeford would be expected to occur along Route 1 closer
to downtown. Since Route 1 is the first major north-south road parallel to I-95, this would be
the first major intersection with a road that carries traffic from the potential interchange toward
downtown. Because this area is well established with structures and existing roadways, costs
would be expected to be significant with acquisition of property required.
4
January 27, 2017
Page 3
Saco:
The primary benefits to Saco of an interchange (in either municipality) is a decrease in traffic
volume along Route 1, primarily from Ocean Park Road to the “triangle” (Elm / Route 112 /
Route 1 / Main / Beach). This is especially critical since this section of roadway is at or nearing
capacity. In addition, the “triangle” has undergone numerous evaluations over the years and is
identified as an especially troublesome location given the combination of three closely spaced
signalized intersections in a “triangle” pattern with high traffic volumes on all legs. This location
is made more challenging by several significant structures in close proximity. Therefore, any
reduction of traffic to this location would help to improve the operations of Route 1 and Route
9.
The section of Route 1 from the “triangle” toward Biddeford and Route 9 from the “triangle”
toward Biddeford may also experience some reduction of traffic but to a lesser degree.
The primary challenge to an interchange in Saco is where and how it would enter into the
downtown area. The connector from a proposed interchange into downtown Saco could be
expected to carry over 8,000 vehicles per day, and wherever that road intersects in the Saco
downtown area, it will have significant impacts and most likely require significant mitigation to
address. In addition, those vehicles between Biddeford and a new interchange in Saco would be
expected to use Route 1 and Pine Street on Springs Island or Route 1 and Lincoln Street, neither
location can easily be modified to accommodate more traffic due to the close proximity of
bridges.
Potential for Infill
Both Biddeford and Saco should be aware of the potential for “infill”. This phenomenon is first
started when a location is improved from an operational standpoint either through adding
additional capacity (such as another through lane) or decreasing the traffic volume by creating an
alternate route (or interchange). Drivers who currently avoided the area before due to the poor
operations now alter their routes through the location since operations have now been approved.
This unfortunately results in the capacity that was just created being absorbed by the rerouted
traffic and the location is back to where it started prior to the increased capacity. This will;
however, typically improve lesser side roads that the drivers were using as alternate routes.
Conclusion
A new interchange located between Exit 32 in Biddeford and Exit 36 in Saco would be expected
to have benefits (regardless of municipality) to key locations in each municipality and improve
operations on significant corridors within each community. The most significant challenges to
each community if they were to have the interchange in their community would be wherever the
5
January 27, 2017
Page 4
connector from the new interchange intersected the downtown. Wherever this intersection
occurs, it is expected to require significant mitigation and the acquisition of property. Based on
this preliminary macroscopic evaluation, it would appear that Saco may have a more significant
challenge in accommodating an interchange in their community than Biddeford.
Although a potential interchange would have challenges in each municipality, an interchange would
reduce overall vehicle miles travelled (VMT) by providing a closer access to the downtowns and
as a result, would have an overall net benefit to the adjacent roadway network both short term
and in long term maintenance.
6
Biddeford-Saco Cooperation Commitee
Agenda Item Report
Agenda Item No. 2016-562
Submitted by: Andrea Fagan
Submitting Department:
Meeting Date: January 31, 2017
SUBJECT
Biddeford Volumes
Recommendation:
ATTACHMENTS
Biddeford Volumes 11x17.pdf
7
Biddeford Interchange Traffic Volumes Figure No. 1
Bo
Sa om New
South Bi d co
Rd
St
de Cou
rd
n ty R
fo
Potential Interchange d
I-95 (Maine Turnpike
)
5,600 +8
,2
5,017
19 Exit 36
Exit 36
80 17 20
Exit
Exit 32 32 16 18 29,300
14 agee
2,300
Shad
15
-2,420
26,100
10 South 12 21field St
-3,2 10 13 24 Gar Rd 17,438
St
9 11 26 25
Bradley St
27,700 1,005
28 27 23 Industrial Park Rd -360
3,900 30
29 22 1,653
Lin Tasker St
M 31 co
-2 ain ln 5,003
,74 St St
0 7,008 Franklin St 112
2,032
Maple St 16,247
ute
Ro I-195
+500
+4,220
20,300
+4
14,979 ,06 5,898
7,071
0 4,672
13,094 5,800 5,600
-2,060
Route 1 (Elm St) -1470 16,480 Spring St
-410 17,011
2,752
-340 -15 18,700
14,466
11,300 80 10,443
17,130 Alfred Elm
St
-1340 7,521 0
10,769 St
-1,35
15,492
Route 1 -3, 93 0
X,XXX Annual Average Daily Traffic (AADT)
50
XX Decrease in AADT -18 20,071 8,548 25,800 16,100
21,500
XX Increase in AADT
Bea
Potential Interchange Location ch
St
BIDDEFORD-SACO INTERCHANGE TRAFFIC IMPACT STUDY
BIDDEFORD & SACO, MAINE
8
Design:
Draft:
EAT Scale:
Date:
NONE
JANUARY 2017
G RRILL Relationships. Responsiveness. Results.
www.gorrillpalmer.com
Checked: RED File Name: 2850.03-Volumes P LMER 207.657.6910
Biddeford-Saco Cooperation Commitee
Agenda Item Report
Agenda Item No. 2016-563
Submitted by: Andrea Fagan
Submitting Department:
Meeting Date: January 31, 2017
SUBJECT
Saco Volumes
Recommendation:
ATTACHMENTS
Saco Volumes 11x17.pdf
9
Saco Interchange Traffic Volumes Figure No. 2
Bo
Sa om New
South Bi d co Rd
de Potential Interchange Cou
St
n ty R
ford
d
I-95 (Maine Turnpike
)
1,079
+8
5,600 ,2
80
5,017
19 Exit 36
17 20
Exit 32 16 18 29,300
14 15 agee
Shad
2,300
-2,420
26,100
10 South 12 21rfield St
10 13 24 Ga Rd 17,438
9 11
-3,2 St 26 25
Bradley St
27,700
+280
28 27 23 1,005
Industrial Park Rd -360
3,900 30
29 22 1,653
Lin Tasker St
M 31 co
-2 ain ln 5,003
,74 St
Franklin St
St
0 7,008
2,032 +500 Maple St 16,247
112
+250 I-195
+5000
20,300 ute
+2 Ro
14,979 5,898 08
0 7,071
4,672
13,094 5,800 5,600
-2,060
Route 1 (Elm St) -1470 +5000 Spring St
-410 17,011
2,752 16,480 18,700
11,300
-340
14,466 Elm 10,443
17,130 Alfred
St St
-1340 0
-1,35
10,769 7,521
15,492
-3, 93 0
X,XXX Annual Average Daily Traffic (AADT) Route 1
65
XX Decrease in AADT -19 20,071 8,548 21,500 25,800 16,100
XX Increase in AADT
Bea
Potential Interchange Location ch
St
BIDDEFORD-SACO INTERCHANGE TRAFFIC IMPACT STUDY
BIDDEFORD & SACO, MAINE
10
Design: EAT Scale: NONE
JANUARY 2017
G RRILL Relationships. Responsiveness. Results.
www.gorrillpalmer.com
P LMER
Draft: Date:
Checked: RED File Name: 2850.03-Volumes 207.657.6910
Biddeford-Saco Cooperation Commitee
Agenda Item Report
Agenda Item No. 2016-559
Submitted by: Andrea Fagan
Submitting Department:
Meeting Date: January 31, 2017
SUBJECT
Breakout Sessions
Recommendation:
ATTACHMENTS
11
Biddeford-Saco Cooperation Commitee
Agenda Item Report
Agenda Item No. 2016-560
Submitted by: Andrea Fagan
Submitting Department:
Meeting Date: January 31, 2017
SUBJECT
Report from Breakout Sessions
Recommendation:
ATTACHMENTS