Muyni
← Back to Charleston

Board of Architectural Review

Regular Meeting

Charleston, SC · January 12, 2015

Agenda

Agenda

BAR-DRB Approval Report --- Tuesday, January 20, 2015 at 02:05 PM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2014-10-02 2015-01-16 Commercial Renovation 141002-125DoughtySt-1 new porte-cochere for Medical Office Building (MOB) BAR Staff Final hopkins Approval 2015-01-12 2015-01-12 Multi-family Renovations 150112-259RutledgeAve-1Reroof with 5 v crimp roof BAR Staff Final risse Approval 2015-01-12 2015-01-12 Sign Project 150112-441MeetingSt-2 3.44 sqft right angle sign BAR Staff Final risse Approval 2014-08-18 2015-01-12 Demolition - Complete Residential 140818-2SheppardSt-1 complete demolition of one-story residence BAR/DRB hopkins DEMO Approval 2015-01-12 2015-01-12 Single- and Two-family Renovation 150112-31AshtonSt-1 after-the-fact approval for complete renovation BAR Staff Final hopkins Approval 2015-01-12 2015-01-12 Multi-family Renovations 150112-46QueenSt-1 addition of fire escape and screening at rear BAR Staff Final hopkins Approval 2015-01-13 2015-01-13 Single- and Two-family Renovation 150113-24BogardSt-1 Paint exterior to match existing as part of the larger housing renovation. BAR Staff Final risse Approval 2015-01-13 2015-01-13 Fence Project 150113-14RutledgeAve-1 freestanding gate and columns at end of driveway BAR Staff Final hopkins Approval 2015-01-13 2015-01-13 Fence Project 150113-14MenottiSt-1 7' masonry wall to replace existing fence and match existing wall BAR Staff Final risse Approval 2015-01-13 2015-01-13 Demolition - Complete 150113-2031KingSt-1 demo of 2 storage sheds BAR/DRB stubble Commercial/Mult.Fam. DEMO Approval 2015-01-13 2015-01-13 Single- and Two-family Renovation 150113-100BullSt-1 minor revisions to previously approved renovation plans. BAR Staff Final risse Approval 2015-01-13 2015-01-13 Commercial Renovation 150113-225CalhounSt-1 replace roof with 5V metal BAR Staff Final hopkins Approval 2015-01-13 2015-01-13 Multi-family Renovations 150113-14ReidSt-1 reroofing BAR Staff Final hopkins Approval 2015-01-13 2015-01-13 Multi-family Renovations 150113-19AmherstSt-1 reroofing BAR Staff Final hopkins Approval BAR-DRB Approval Report --- Tuesday, January 20, 2015 at 02:05 PM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2015-01-13 2015-01-13 Single- and Two-family Renovation 150113-5AikenSt-1 color change BAR Staff Final hopkins Approval 2015-01-13 2015-01-13 Sign Project 150113-86QueenSt-1 awnings for G Sergeant Antiques BAR Staff Final hopkins Approval 2015-01-13 2015-01-13 Single- and Two-family Renovation 150113-68AmherstSt-1 repairs to existing windows and trim with limited sash replacement BAR Staff Final hopkins Approval 2015-01-14 2015-01-14 Commercial Renovation 150114-129CannonSt-1 HVAC changeout. same size number of units and location BAR Staff Final risse Approval 2015-01-14 2015-01-14 Commercial Renovation 150114-119SpringSt-1 Repair wood on dormers and gable ends. Repaint to match existing BAR Staff Final risse Approval 2015-01-14 2015-01-14 Sign Project 150114-513KingSt-1 4 sqft right angle sign. non-illuminated. BAR Staff Final risse Approval 2015-01-14 2015-01-14 Single- and Two-family Renovation 150114-129TraddSt-1 replace exist panel box winth new panel box and sub panel box. BAR Staff Final turner Approval 2015-01-14 2015-01-14 Commercial Renovation 150114-375MeetingSt-2 Pressure wash and repaint to match existing. No changes. BAR Staff Final risse Approval 2015-01-14 2015-01-14 Commercial Renovation 150114-132EBaySt-1 Replacement of 3 windows in-kind on 1st floor south side BAR Staff Final stubble Approval 2015-01-14 2015-01-14 Commercial Renovation 150114-24NMarketSt-1 Repainting exterior wood trim in kind. BAR Staff Final stubble Approval 2015-01-15 2015-01-15 Multi-family Renovations 150115-24BeeSt-1 Minor rot repair on porch and repaint to match existing. scope of rot repair is BAR Staff Final risse shown on photos. Approval 2015-01-15 2015-01-15 Commercial Renovation 150115-85 1/2SpringSt-1 addition of a 3.5' deep exterior ramp BAR Staff Final risse Approval 2015-01-15 2015-01-15 Single- and Two-family Renovation 150115-37AsheSt-1 Renovation of an existing house and addition into a single family residence. BAR Staff Final risse Approval 2015-01-16 2015-01-16 Single- and Two-family Renovation 150116-172BroadSt-1 rot repairs and painting- no changes BAR Staff Final hopkins Approval BAR-DRB Approval Report --- Tuesday, January 20, 2015 at 02:05 PM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2015-01-16 2015-01-16 Sign Project 150116-895Island 11sqft facade sign non illuminated BAR Staff Final risse ParkDr-1 Approval 2015-01-16 2015-01-16 Fence Project 150116-4SAdgersWhf-1 New iron fence to replace non-historic fence; removal of concrete pineapples BAR Staff Final stubble Approval 2015-01-16 2015-01-16 Single- and Two-family Renovation 150116-12ShortSt-1 Siding and trim repair on the right side of the house. repairs limited to 50% of BAR Staff Final risse siding. No wholesale removal. only indifidual pieces that can not be repaired Approval can be replaced. 2015-01-16 2015-01-16 Commercial Renovation 150116-561KingSt-1 Replacement of flat roof- not visible BAR Staff Final stubble Approval 2015-01-16 2015-01-16 Single- and Two-family Renovation 150116-127AshleyAve-1 replace steps and walkway; stucco existing coping wall; add fence with piers BAR Staff Final hopkins and gate around front yard Approval 2015-01-16 2015-01-16 Multi-family Renovations 150116-58RutledgeAve-1 Removal of non-historic brick garden wall at parking area BAR Staff Final stubble Approval 2015-01-16 2015-01-16 Commercial Renovation 150116-72QueenSt-1 Repair and replacement of porch elements in kind BAR Staff Final stubble Approval 2015-01-16 2015-01-16 Single- and Two-family Addition 150116-129QueenSt-1 Renovations to existing residence and new construction of vertical addition BAR Staff stubble Preliminary Approval 2015-01-16 2015-01-16 Commercial Renovation 150116-303KingSt-1 storefront replacement and painting BAR Staff hopkins Preliminary Approval 2015-01-16 2015-01-16 Single- and Two-family Renovation 150116-10SiresSt-1 Major renovation of entire building. BAR Staff Final risse Approval Total Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38

Get email alerts for Charleston

A daily email when new agendas and minutes are posted.

Report an issue with this meeting