Muyni
← Back to Charleston

Board of Architectural Review

Regular Meeting

Charleston, SC · February 9, 2015

Agenda

Agenda

BAR-DRB Approval Report --- Tuesday, February 17, 2015 at 01:38 PM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2014-11-19 2015-02-10 Single- and Two-family Addition 141119-75AnsonSt-1 Removal on 1970's addition and new construction of two story addition and BAR Staff Final stubble elevator enclosure on rear of main house. Approval 2014-11-19 2015-02-10 Single- and Two-family Addition 141119-75AnsonSt-1 Removal on 1970's addition and new construction of two story addition and BAR Staff stubble elevator enclosure on rear of main house. Preliminary Approval 2014-12-09 2015-02-12 Single- and Two Family New 141209-6KennedyCt-1 Single Family New Construction BAR Staff Final risse Construction Approval 2015-02-09 2015-02-09 Single- and Two-family Renovation 150209-44HasellSt-1 rot repairs and painting to window trim, columns and railings repairs, 2nd floor BAR Staff Final hopkins deck Approval 2015-02-09 2015-02-09 Single- and Two-family Renovation 150209-14ElliottSt-1 repaint exterior windows, shutters, door, and trim with color change. BAR Staff Final risse Approval 2015-02-09 2015-02-09 Commercial Renovation 150209-522KingSt-1 repair and paint 2nd floor window. no changes BAR Staff Final risse Approval 2015-02-09 2015-02-09 Single- and Two-family Renovation 150209-21AnsonSt-1 Rot repair limited to 12 boards, and repaint exterior to match existing. BAR Staff Final risse Approval 2015-02-09 2015-02-09 Single- and Two-family Renovation 150209-93EBaySt-1 Strip and repaint rear of building. repair 4 window openings. None of the current BAR Staff Final risse scope is visible from ROW Approval 2015-02-09 2015-02-09 Single- and Two-family Renovation 150209-134SmithSt-1 Replace rotten wood on back of house, patch column, and replace railing cap. BAR Staff Final risse None of the work is visible from the ROW. Approval 2015-02-09 2015-02-09 Sign Project 150209-616MeetingSt-1 New 9sqft facade sign and reface 12sqft freestanding sign. BAR Staff Final risse Approval 2015-02-09 2015-02-09 Single- and Two-family Renovation 150209-9KennedyCt-1 renovation of existing one-story residence BAR Staff hopkins Conceptual Approval 2015-02-10 2015-02-10 Single- and Two-family Renovation 150210-10LegareSt-1 Repainting- no changes BAR Staff Final stubble Approval 2015-02-10 2015-02-10 Single- and Two-family Renovation 150210-4CouncilSt-1 Repainting- no changes BAR Staff Final stubble Approval 2015-02-10 2015-02-10 Single- and Two-family Renovation 150210-29TraddSt-1 Repainting and column repair BAR Staff Final stubble Approval BAR-DRB Approval Report --- Tuesday, February 17, 2015 at 01:38 PM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2015-02-10 2015-02-10 Single- and Two-family Renovation 150210-34 Patch existing metal roof, to match existing. No changes. BAR Staff Final stubble 1/2MeetingSt-1 Approval 2015-02-10 2015-02-10 Sign Project 150210-50QueenSt-1 5sqft illuminated right angle sign. BAR Staff Final risse Approval 2015-02-10 2015-02-10 Single- and Two-family Renovation 150210-67-AVanderhorstSt-1 Paint color change BAR Staff Final stubble Approval 2015-02-10 2015-02-10 Uninhabitable Structures 150210-8NewSt-1 New pergola in rear- not visible from public ROW BAR Staff Final stubble Approval 2015-02-10 2015-02-10 Single- and Two-family Renovation 150210-109BroadSt-1 Repainting front facade- no changes BAR Staff Final stubble Approval 2015-02-10 2015-02-10 Single- and Two-family Renovation 150210-31ChurchSt-1 repaint front of house and spindles to match existing. No rot repair. BAR Staff Final risse Approval 2015-02-10 2015-02-10 Commercial Renovation 150210-474KingSt-1 paint exterior BAR Staff Final hopkins Approval 2015-02-11 2015-02-11 Single- and Two-family Renovation 150211-8ChurchSt-1 Maintenance repairs and repointing BAR Staff Final stubble Approval 2015-02-11 2015-02-11 Single- and Two-family Renovation 150211-52MurrayBlvd-1 Install HVAC units on rear porch as per plans approved 12/12/14 BAR Staff Final stubble Approval 2015-02-11 2015-02-11 Single- and Two-family Renovation 150211-156WentworthSt-1 Repaint exterior with color change BAR Staff Final stubble Approval 2015-02-11 2015-02-11 Multi-family Renovations 150211-24SBatterySt-1 Installation of mini-split systems- not visible from row BAR Staff Final stubble Approval 2015-02-11 2015-02-11 Single- and Two-family Renovation 150211-33KingSt-1 Touch up exterior paint to match existing. no changes. BAR Staff Final risse Approval 2015-02-11 2015-02-11 Single- and Two-family Renovation 150211-23StateSt-1 Recoat flat roof. Not visible from ROW. BAR Staff Final risse Approval 2015-02-11 2015-02-11 Commercial Renovation 150211-251KingSt-1 Repaint exterior with slight color change. BAR Staff Final risse Approval BAR-DRB Approval Report --- Tuesday, February 17, 2015 at 01:38 PM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2015-02-11 2015-02-11 Sign Project 150211-327KingSt-1 Window graphics for college corner BAR Staff Final stubble Approval 2015-02-12 2015-02-12 Single- and Two-family Renovation 150212-12TraddSt-1 Repairs to masonry at foundation- resquires removal of infilled portion to access BAR Staff Final stubble interior and then rebuilding in-kind with same material; rot repair to shutters and Approval door surround; repainting; replacement of non-historic windows at rear. 2015-02-12 2015-02-12 Single- and Two-family Renovation 150212-147ChurchSt-1 Repairs to stucco wall not visible from the street BAR Staff Final stubble Approval 2015-02-12 2015-02-12 Single- and Two-family Renovation 150212-168QueenSt-1 Repairs to foundation in kind BAR Staff Final stubble Approval 2015-02-12 2015-02-12 Single- and Two-family Renovation 150212-92TraddSt-1 Recoat roof no changes BAR Staff Final stubble Approval 2015-02-12 2015-02-12 Single- and Two-family Renovation 150212-7JudithSt-1 Recoat roof, no changes BAR Staff Final stubble Approval 2015-02-12 2015-02-12 Single- and Two-family Renovation 150212-41SocietySt-1 modfiications to existing piazza enclosure, changes to fenestration on BAR Staff hopkins dependency, replacement fixture and grilles Conceptual Approval 2015-02-13 2015-02-13 Commercial Renovation 150213-294KingSt-1 Exterior renovations to existing commercial building BAR Staff Final stubble Approval 2015-02-13 2015-02-13 Commercial Renovation 150213-296KingSt-1 Storefront replacement and repainting BAR Staff Final stubble Approval 2015-02-13 2015-02-13 Single- and Two-family Renovation 150213-181BroadSt-1 Remove skylight, remove vinyl window and replace with wood and remove BAR Staff Final keane enclosed porch. Approval 2015-02-13 2015-02-13 Sign Project 150213-2031KingSt-1 123.6 sqft facade sign. BAR Staff Final risse Approval 2015-02-13 2015-02-13 Commercial Renovation 150213-48HasellSt-1 Repainting exterior- no changes BAR Staff Final stubble Approval 2015-02-13 2015-02-13 Single- and Two-family Renovation 150213-79MontaguSt-1 Repaint trim and soffits to match existing. BAR Staff Final risse Approval 2015-02-13 2015-02-13 Single- and Two-family Renovation 150213-61AshleyAve-1 Replacement of delapidated drive gates to exactly match existing. BAR Staff Final stubble Approval BAR-DRB Approval Report --- Tuesday, February 17, 2015 at 01:38 PM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2015-02-13 2015-02-13 Single- and Two-family Renovation 150213-28MurrayBlvd-1 Repaint fence to match existing. BAR Staff Final risse Approval 2015-02-13 2015-02-13 Commercial Renovation 150213-66HasellSt-1 Repairs to column bases in-kind. BAR Staff Final stubble Approval Total Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44

Get email alerts for Charleston

A daily email when new agendas and minutes are posted.

Report an issue with this meeting