Board of Architectural Review
Regular MeetingCharleston, SC · February 23, 2015
Agenda
BAR-DRB Approval Report --- Monday, March 2, 2015 at 10:17 AM
Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff
Received
2015-02-23 2015-02-23 Single- and Two-family Renovation 150223-13WentworthSt-1 Repair wood rot on piazza cornice and repaint piazza to match existing. BAR Staff Final risse
Approval
2015-02-23 2015-02-23 Multi-family Renovations 150223-127ComingSt-1 New dormers to match existing BAR Staff Final stubble
Approval
2015-02-23 2015-02-23 Single- and Two-family Renovation 150223-31AshtonSt-1 Approved to instsall HVAC units as per zoning approval BAR Staff Final stubble
Approval
2015-02-23 2015-02-23 Single- and Two-family Addition 150223-57MontaguSt-1 Rear addition not visible from ROW BAR Staff Final risse
Approval
2015-02-23 2015-02-23 Single- and Two-family Renovation 150223-31AshtonSt-2 Installtion of condensing units on rear porch; to be screened BAR Staff Final stubble
Approval
2015-02-23 2015-02-23 Single- and Two-family Renovation 150223-99KingSt-1 Installation of screening around existing HVAC units at rear of property. BAR Staff Final stubble
Approval
2015-02-23 2015-02-23 Multi-family Renovations 150223-363KingSt-1 Repairs to steel an concrete walkways, Not visible from ROW BAR Staff Final risse
Approval
2015-02-23 2015-02-23 Single- and Two-family Renovation 150223-95ChurchSt-1 remove center strip from brick driveway behind privacy fence and femove two BAR Staff Final risse
exterior privacy shutters. Approval
2015-02-24 2015-02-24 Single- and Two-family Renovation 150224-9OrangeSt-1 rot reapirs and painting to match existing BAR Staff Final hopkins
Approval
2015-02-24 2015-02-24 Sign Project 150224-126ComingSt-1 replacement signage for Cathedral of St Luke and St Paul BAR Staff Final hopkins
Approval
2015-02-25 2015-02-25 Commercial Renovation 150225-121SpringSt-1 Removal of paint from brick. "corduroy" look of brick and glazing on yellow BAR Staff Final risse
brick both to be maintained. Approval
2015-02-25 2015-02-25 Single- and Two-family Renovation 150225-68SouthSt-1 repaint- no color change and minor rot repair to siding and trim. BAR Staff Final turner
Approval
2015-02-25 2015-02-25 Commercial Renovation 150225-81GadsdenSt-1 demolition of two decks,porches within two alcoves on north side of bldg. BAR Staff Final turner
Approval
2015-02-25 2015-02-25 Single- and Two-family Renovation 150225-97BogardSt-1 repaint- no color change BAR Staff Final turner
Approval
BAR-DRB Approval Report --- Monday, March 2, 2015 at 10:17 AM
Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff
Received
2015-02-25 2015-02-25 Single- and Two-family Renovation 150225-64GadsdenSt-1 misc rot repairs BAR Staff Final turner
Approval
2015-02-25 2015-02-25 Single- and Two-family Renovation 150225-85RutledgeAve-1 Minor rot repair limited to areas shown on photo and repaint porched to BAR Staff Final risse
match existing. Approval
2015-02-25 2015-02-25 Single- and Two-family Renovation 150225-12BedonsAly-1 Replace glass block window with wood true divided light window 4 over 4 BAR Staff Final risse
Approval
2015-02-26 2015-02-26 Single- and Two-family Renovation 150226-101AshleyAve-1 replace HVAC unit not visible from ROW BAR Staff Final risse
Approval
2015-02-26 2015-02-26 Single- and Two-family Renovation 150226-93EBaySt-1 Exterior repainting to match existing BAR Staff Final stubble
Approval
2015-02-26 2015-02-26 Commercial Renovation 150226-40PinckneySt-1 Replace existing HVAC unit on roof, no increase in size. BAR Staff Final stubble
Approval
2015-02-26 2015-02-26 Commercial Addition 150226-77WentworthSt-1 hyphen connector between 77 and 79 Wentworth to include courtyard garden BAR Staff Final hopkins
area. Part of 79 Wentworth hotel project. Approval
2015-02-26 2015-02-26 Commercial Addition 150226-711MeetingSt-1 replacement of porch, other bldg modifications, and parking lot BAR Staff hopkins
iimprovements Conceptual
Approval
2015-02-27 2015-02-27 Single- and Two-family Renovation 150227-4JudithSt-1 repaint to match existing. no rot repair BAR Staff Final risse
Approval
2015-02-10 2015-02-27 Demolition - Complete 150210-1401Sam Bi approval for a complete demolition BAR/DRB DEMO turner
Commercial/Mult.Fam. RittenbergBlvd-1 Approval
2015-02-27 2015-02-27 Multi-family Renovations 150227-7LoganSt-1 repaint exterior trim to match existing. BAR Staff Final risse
Approval
2015-02-27 2015-02-27 Single- and Two-family Renovation 150227-55SocietySt-1 repairs to existing entry doors BAR Staff Final hopkins
Approval
2015-02-27 2015-02-27 Commercial Renovation 150227-342EBaySt-1 Paint color change requiring removal of sample from foundation BAR Staff Final stubble
Approval
2015-02-27 2015-02-27 Multi-family Renovations 150227-97SpringSt-1 Roof and decking repairs in kind BAR Staff Final stubble
Approval
BAR-DRB Approval Report --- Monday, March 2, 2015 at 10:17 AM
Total Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
Get email alerts for Charleston
A daily email when new agendas and minutes are posted.