Muyni
← Back to Charleston

Board of Architectural Review

Regular Meeting

Charleston, SC · March 16, 2015

Agenda

Agenda

BAR-DRB Approval Report --- Monday, March 23, 2015 at 09:56 AM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2014-05-29 2015-03-16 Single- and Two-family Renovation 140529-49LaurensSt-1 Rot repairs, repainting, new lanterns, alterations to existing hyphen and piazza BAR Staff Final stubble enclosure Approval 2014-12-31 2015-03-17 Single- and Two-family Addition 141231-129QueenSt-1 BZAZ approval on 12-16-14 to allow a vertical extension (bedroom) and BAR Staff Final stubble construction of a detached accessory structure (setbacks and lot occupancy). Approval Approval includes piazza restoration and tool shed addition. 2015-01-16 2015-03-17 Single- and Two-family Addition 150116-129QueenSt-1 Renovations to existing residence and new construction of vertical addition BAR Staff Final stubble Approval 2014-06-04 2015-03-18 Single- and Two Family New 140604-11PortersCt-1 Construction of new single family residence BAR Staff Final risse Construction Approval 2014-06-04 2015-03-18 Single- and Two Family New 140604-9PortersCt-1 Construction of new single family residence BAR Staff Final risse Construction Approval 2015-03-16 2015-03-16 Multi-family Renovations 150316-74SmithSt-1 repainting to match BAR Staff Final hopkins Approval 2015-03-16 2015-03-16 Single- and Two-family Renovation 150316-88DrakeSt-1 repainting roof to match BAR Staff Final hopkins Approval 2015-03-16 2015-03-16 Commercial Renovation 150316-274CalhounSt-1 repairs to masonry and wood components of house BAR Staff Final hopkins Approval 2015-03-16 2015-03-16 Commercial Renovation 150316-139AshleyAve-1 repairs to masonry and wood components BAR Staff Final hopkins Approval 2015-03-16 2015-03-16 Single- and Two-family Renovation 150316-66HasellSt-1 Repairs to roof around skylights; not visible from ROW BAR Staff Final stubble Approval 2015-03-16 2015-03-16 Single- and Two-family Renovation 150316-70TraddSt-1 Repaint fence and door to match existing. BAR Staff Final risse Approval 2015-03-16 2015-03-16 Single- and Two-family Renovation 150316-53WarrenSt-1 repaint to match existing and <50' of rot repair. BAR Staff Final risse Approval 2015-03-16 2015-03-16 Single- and Two-family Renovation 150316-79SBatterySt-1 HVAC change out on flat roof not visible from ROW. BAR Staff Final risse Approval 2015-03-16 2015-03-16 Sign Project 150316-706MeetingSt-1 9.57 sqft facade sign painted on the building BAR Staff Final risse Approval BAR-DRB Approval Report --- Monday, March 23, 2015 at 09:56 AM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2015-03-16 2015-03-16 Single- and Two-family Renovation 150316-48SouthSt-1 paint railings and columns and floors to match trim color. BAR Staff Final risse Approval 2015-03-17 2015-03-17 Single- and Two-family Addition 150317-96MorrisSt-1 new HVAC stand - more than 3' above grade BAR Staff Final risse Approval 2015-03-17 2015-03-17 Multi-family Renovations 150317-15HorlbeckAly-1 repaint exterior to match existing. BAR Staff Final risse Approval 2015-03-17 2015-03-17 Single- and Two-family Renovation 150317-70BeaufainSt-1 Repairs to shingle roof in kind BAR Staff Final stubble Approval 2015-03-17 2015-03-17 Single- and Two-family Renovation 150317-8FordCt-1 rot repairs and painting BAR Staff Final hopkins Approval 2015-03-17 2015-03-17 Single- and Two-family Renovation 150317-4 1/2KrackeSt-1 color change; modifications to steps and column BAR Staff Final hopkins Approval 2015-03-17 2015-03-17 Commercial Renovation 150317-188MeetingSt-1 repaint door and lattice; touch up graining on entry doors BAR Staff Final hopkins Approval 2015-03-18 2015-03-18 Single- and Two-family Renovation 150318-67RutledgeAve-1 Installation of minisplit on rear porch roof next to existing condensing unit- not to BAR Staff Final stubble be visible from ROW Approval 2015-03-19 2015-03-19 Single- and Two-family Renovation 150319-201WentworthSt-1Reroof, dormer repairs, hvac change out; all in kind BAR Staff Final stubble Approval 2015-03-19 2015-03-19 Single- and Two-family Renovation 150319-203BroadSt-1 Repaint same colors BAR Staff Final stubble Approval 2015-03-19 2015-03-19 Commercial Renovation 150319-484KingSt-1 Clean the paint off of the north wall of the building. (rest of the project will be BAR Staff Final risse permitted later) Approval 2015-03-20 2015-03-20 Sign Project 150320-99SMarketSt-1 new right angle sign for lionesse BAR Staff Final turner Approval Total Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26

Get email alerts for Charleston

A daily email when new agendas and minutes are posted.

Report an issue with this meeting