Muyni
← Back to Charleston

Board of Architectural Review

Regular Meeting

Charleston, SC · March 30, 2015

Agenda

Agenda

BAR-DRB Approval Report --- Friday, April 3, 2015 at 05:24 PM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2015-03-30 2015-03-30 Single- and Two-family Renovation 150330-5GibbesSt-1 repaint exterior- no color change, repair shutters. BAR Staff Final turner Approval 2015-03-30 2015-03-30 Multi-family Renovations 150330-22BeeSt-1 Replace porch decking to match existing. BAR Staff Final risse Approval 2015-03-30 2015-03-30 Fence Project 150330-41SocietySt-1 New mechanical enclosure, gate, terraces and hardscape with lighting BAR Staff Final stubble Approval 2015-03-30 2015-03-30 Swimming Pool 150330-37LegareSt-1 New swimming pool, hardscaping and landscape lighting BAR Staff Final stubble Approval 2015-03-30 2015-03-30 Single- and Two-family Renovation 150330-27CharlotteSt-1 Repainting east facade to match existing BAR Staff Final stubble Approval 2015-03-31 2015-03-31 Single- and Two-family Renovation 150331-38NAdgersWhf-1 repainting-color change BAR Staff Final hopkins Approval 2015-03-31 2015-03-31 Single- and Two-family Renovation 150331-4SavageSt-1 replace straight balusters to ones with slight detail BAR Staff Final hopkins Approval 2015-03-31 2015-03-31 Single- and Two-family Renovation 150331-82AnsonSt-1 Exterior painting of porches BAR Staff Final risse Approval 2015-03-31 2015-03-31 Single- and Two-family Renovation 150331-61MeetingSt-1 Replacement of existing non-historic wood windows on first floor rear with new BAR Staff Final stubble hopes steel windows. Not visible. Approval 2015-03-31 2015-03-31 Single- and Two-family Renovation 150331-32PercySt-1 rot repairs and painting; replacement windows; color change BAR Staff Final hopkins Approval 2015-03-31 2015-03-31 Single- and Two-family Renovation 150331-253RutledgeAve-1 exterior painting- no changes BAR Staff Final hopkins Approval 2015-03-31 2015-03-31 Single- and Two-family Renovation 150331-1AsheSt-1 recoat roof on front house; color change and reshingling back house BAR Staff Final hopkins Approval 2015-03-31 2015-03-31 Single- and Two-family Renovation 150331-9ChurchSt-1 Repainting to match existing BAR Staff Final stubble Approval 2015-03-31 2015-03-31 Single- and Two-family Renovation 150331-41LaurensSt-1 Reroof with black shingles to match existing BAR Staff Final risse Approval BAR-DRB Approval Report --- Friday, April 3, 2015 at 05:24 PM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2015-03-31 2015-03-31 Single- and Two-family Renovation 150331-18SavageSt-1 reroof flat roof addition- not visable BAR Staff Final turner Approval 2015-03-31 2015-03-31 Single- and Two-family Renovation 150331-10WentworthSt-1 Repaint exterior to match existing. BAR Staff Final risse Approval 2015-03-31 2015-03-31 Sign Project 150331-168ChurchSt-1 New right angle sign and window graphic for House of Jerky BAR Staff Final stubble Approval 2015-04-01 2015-04-01 Sign Project 150401-179KingSt-1 change artwork on awning flap for reinert fine art BAR Staff Final turner Approval 2015-04-01 2015-04-01 Sign Project 150401-438KingSt-1 recover awning with signage on flap for mitchell hill BAR Staff Final turner Approval 2015-04-01 2015-04-01 Sign Project 150401-483KingSt-1 Awning sign BAR Staff Final turner Approval 2015-04-01 2015-04-01 Commercial Renovation 150401-77AmericaSt-1 Installation of new water fountain and small path with a plaque BAR Staff Final stubble Approval 2015-04-01 2015-04-01 Single- and Two-family Renovation 150401-51BullSt-1 HVAC change out. Not visible from ROW BAR Staff Final risse Approval 2015-04-01 2015-04-01 Single- and Two-family Renovation 150401-10AtlanticSt-1 install garden hardscaping BAR Staff Final turner Approval 2015-04-01 2015-04-01 Single- and Two-family Renovation 150401-98RutledgeAve-1 recoat roof- no color chanhe, tinners red BAR Staff Final turner Approval 2015-04-01 2015-04-01 Sign Project 150401-9CannonSt-1 1 Awning sign and 2 window graphics BAR Staff Final risse Approval 2015-04-02 2015-04-02 Single- and Two-family Renovation 150402-99SBatterySt-1 Repaint exterior to match existing. BAR Staff Final risse Approval 2015-04-02 2015-04-02 Multi-family Renovations 150402-99BullSt-1 replace alum coping on parapit wall to match existing, repairs to TPO roofing not BAR Staff Final risse visible from ROW Approval 2015-03-23 2015-04-02 Demolition - Complete Residential 150323-1825AustinAve-1 bI APPROVAL FOR A COMPLETE DEMOLITION BAR/DRB hopkins DEMO Approval BAR-DRB Approval Report --- Friday, April 3, 2015 at 05:24 PM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2015-04-02 2015-04-02 Single- and Two-family Renovation 150402-1AikenSt-1 Replacement of existing non-historic wood gates with new iron gate in same BAR Staff Final stubble location. Approval 2015-04-02 2015-04-02 Single- and Two-family Renovation 150402-165TraddSt-1 recoat roof to match; add storm windows BAR Staff Final hopkins Approval 2015-04-02 2015-04-02 Single- and Two-family Renovation 150402-86BeaufainSt-1 overlay flat roof not visible from ROW BAR Staff Final risse Approval 2015-04-02 2015-04-02 Single- and Two-family Renovation 150402-14RutledgeAve-1 change roof color to black; add shutters to piazza doors BAR Staff Final hopkins Approval 2015-04-03 2015-04-03 Sign Project 150403-1015KingSt-1 illuminated facade sign 16.22 sqft and window graphics for Cricket BAR Staff Final risse Approval 2015-04-03 2015-04-03 Commercial Renovation 150403-519EBaySt-1 add new windows on north elevation BAR Staff Final hopkins Approval 2015-04-03 2015-04-03 Swimming Pool 150403-97LoganSt-1 Inground pool at rear. BAR Staff Final risse Approval 2015-04-03 2015-04-03 Single- and Two-family Renovation 150403-52CannonSt-2 Paint color change BAR Staff Final risse Approval 2015-04-03 2015-04-03 Multi-family Renovations 150403-52CannonSt-1 Repaint with very slight color change to glad yellow BAR Staff Final risse Approval 2015-04-03 2015-04-03 Commercial Renovation 150403-134MeetingSt-1 cosmetic modifications to entrance area BAR Staff Final hopkins Approval 2015-02-03 2015-04-03 Commercial Renovation 150203-68LineSt-2 Conversion of resdiential to commerical office BAR Staff Final stubble Approval 2014-10-07 2015-04-03 Single- and Two-family Addition 141007-43LaurensSt-1 expansion of existing one-story rear addition BAR Staff Final hopkins Approval 2015-04-03 2015-04-03 Single- and Two-family Renovation 150403-29CharlotteSt-1 Repainting to match existing BAR Staff Final stubble Approval 2015-04-03 2015-04-03 Commercial Renovation 150403-139MarketSt-1 repaint first floor with very slight color change BAR Staff Final risse Approval BAR-DRB Approval Report --- Friday, April 3, 2015 at 05:24 PM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2015-04-03 2015-04-03 Single- and Two-family Renovation 150403-51SocietySt-1 repainting flowerbed walls and back gate to match existing BAR Staff Final hopkins Approval Total Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43

Get email alerts for Charleston

A daily email when new agendas and minutes are posted.

Report an issue with this meeting