Muyni
← Back to Charleston

Board of Architectural Review

Regular Meeting

Charleston, SC · June 8, 2015

Agenda

Agenda

BAR-DRB Approval Report --- Wednesday, July 15, 2015 at 11:01 AM Date Reviewed Project Type Project ID and Description of Work Proposed Action Taken Staff Received Address 2015-02-26 2015-06-08 Commercial Addition 150226-711MeetingSt-1 replacement of porch, other bldg modifications, and parking lot BAR Staff Final stubble iimprovements Approval 2015-05-20 2015-06-08 Single- and Two-family Addition 150520-63SmithSt-1 Single family addition/renovation, rot repairs, structural porch repairs, BAR Staff Final risse foundation work to hyphen, rebuild front porch stair, interior reno to kitchen, Approval bath, NEW stair construction from 1st to 2nd floor 2015-06-08 2015-06-08 Single- and Two-family Renovation 150608-103KingSt-1 replace HVAC unit with new smaller unit BAR Staff Final risse Approval 2015-06-08 2015-06-08 Sign Project 150608-516McLernonTrce-1 new monument sign for marsh view place apartments DRB Staff Final turner Approval 2015-06-09 2015-06-09 Commercial Renovation 150609-46JohnSt-1 Installation of coolers on roof; to be permanently screened from ROW BAR Staff Final stubble Approval 2015-06-09 2015-06-09 Commercial Renovation 150609-231CalhounSt-1 recoat roof tinners red, replace up to 15 boards of siding. BAR Staff Final stubble Approval 2015-06-09 2015-06-09 Single- and Two-family Renovation 150609-108SBatterySt-1 reattach existing brick Veneer with stich ties and repoint to match existing BAR Staff Final risse historic mortar Approval 2015-06-09 2015-06-09 Single- and Two-family Renovation 150609-39CannonSt-1 HVAC change out not visible from ROW BAR Staff Final risse Approval 2015-06-09 2015-06-09 Sign Project 150609-630SkylarkDr-1 install 2 facade signs, one tenant panel on freestanding sign and window DRB Staff Final turner graphics Approval 2015-06-09 2015-06-09 Sign Project 150609-1300SavannahHwy-1 install one facade sign for the waypot DRB Staff Final turner Approval 2015-06-09 2015-06-09 Sign Project 150609-1422Ashley install one freestanding monument sign for advanced spinal care DRB Staff Final turner RiverRd-1 Approval 2015-06-09 2015-06-09 Single- and Two-family Renovation 150609-106SBatterySt-1 Repoint entire house to match original reddish mortar BAR Staff Final stubble Approval 2015-06-09 2015-06-09 Sign Project 150609-15SmithSt-1 install maibox for 4 units BAR Staff Final turner Approval 2015-06-09 2015-06-09 Sign Project 150609-480KingSt-1 New right-angle sign for Beerworks BAR Staff Final stubble Approval BAR-DRB Approval Report --- Wednesday, July 15, 2015 at 11:01 AM Date Reviewed Project Type Project ID and Description of Work Proposed Action Taken Staff Received Address 2015-06-09 2015-06-09 Commercial Renovation 150609-186KingSt-1 repaint to match existing BAR Staff Final stubble Approval 2015-06-09 2015-06-09 Fence Project 150609-42RadcliffeSt-1 Replace existing chain link fence with wrought iron fence, masonry piers and BAR Staff Final stubble knee wall, as shown on plans Approval 2015-06-09 2015-06-09 Single- and Two-family Renovation 150609-72AnsonSt-1 paint color change (mainly doors to red) BAR Staff Final stubble Approval 2015-06-10 2015-06-10 Single- and Two-family Renovation 150610-159BroadSt-1 Minor rot repair and repaint to match existing. BAR Staff Final risse Approval 2015-06-10 2015-06-10 Single- and Two-family Renovation 150610-1PricesAly-1 replace window trim on up to 10 windows. All work to match existing. only 4 BAR Staff Final risse affected windows are visible from ROW Approval 2015-06-10 2015-06-10 Sign Project 150610-975SavannahHwy-1 install new facade sign for jasons deli DRB Staff Final turner Approval 2015-06-10 2015-06-10 Sign Project 150610-1975MagwoodDr-1 new facade sign for atomic wings DRB Staff Final turner Approval 2015-06-11 2015-06-11 Multi-family Renovations 150611-180BroadSt-1 HVAC change out not visible from ROW BAR Staff Final risse Approval 2015-06-11 2015-06-11 Single- and Two-family Renovation 150611-73AshleyAve-1 Repairs to soffitt, deck and porch ceiling. all repairs to match existing BAR Staff Final risse Approval 2015-06-11 2015-06-11 Single- and Two-family Renovation 150611-166QueenSt-1 Replace existing shingle room with new gray shingle roof. BAR Staff Final risse Approval 2015-06-11 2015-06-11 Fence Project 150611-109RutledgeAve-1 Replace existing metal fence with new metal fence of the same height BAR Staff Final risse Approval 2015-06-11 2015-06-11 Commercial Addition 150611-4VanderhorstSt-1Approved for patio and deck addiition (575sf) for outside patronn use area, per BAR Staff Final stubble BZAZ approval on 2-18-14. Approval 2015-06-11 2015-06-11 Multi-family Renovations 150611-7KrackeSt-1 Rot repair and setting nails BAR Staff Final stubble Approval 2015-06-12 2015-06-12 Single- and Two-family Renovation 150612-30AmherstSt-1 Approved for exterior renovation, removing steps and relocating the HVAC BAR Staff Final turner units to the west side. Approval BAR-DRB Approval Report --- Wednesday, July 15, 2015 at 11:01 AM Total Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28

Get email alerts for Charleston

A daily email when new agendas and minutes are posted.

Report an issue with this meeting