Muyni
← Back to Charleston

Board of Architectural Review

Regular Meeting

Charleston, SC · July 13, 2015

Agenda

Agenda

BAR-DRB Approval Report --- Friday, July 24, 2015 at 01:41 PM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2015-07-13 2015-07-13 Commercial Renovation 150713-69BarreSt-1 Replace non historic slate roof on porch with new slate roof to match BAR Staff Final risse existing Approval 2015-07-13 2015-07-13 Multi-family Renovations 150713-208AshleyAve-1 Repairs to first floor colums and railing replacemnet to match existing. BAR Staff Final risse Approval 2015-07-13 2015-07-13 Multi-family Renovations 150713-74RutledgeAve-1 minor rot repair to siding trim and shutters, and touch up paint all to match BAR Staff Final risse existing Approval 2015-07-14 2015-07-14 Single- and Two-family Renovation 150714-212WentworthSt-1Repainting and minor trim repairs in kind BAR Staff Final stubble Approval 2015-07-14 2015-07-14 Single- and Two-family Renovation 150714-87HasellSt-1 Window repairs (maintenance) BAR Staff Final stubble Approval 2015-07-14 2015-07-14 Multi-family Renovations 150714-50SBatterySt-1 Repair roof to match existing. BAR Staff Final risse Approval 2015-07-14 2015-07-14 Commercial Renovation 150714-200MeetingSt-1 HVAC change out- same location on roof as existing (not visible from ROW) BAR Staff Final stubble Approval 2015-07-14 2015-07-14 Single- and Two-family Renovation 150714-42AmherstSt-1 Repairs and repainting in kind BAR Staff Final stubble Approval 2015-07-14 2015-07-14 Single- and Two-family Renovation 150714-44AmherstSt-1 Repairs and repainting in kind BAR Staff Final stubble Approval 2015-07-14 2015-07-14 Single- and Two-family Renovation 150714-46AmherstSt-1 Repairs and repainting to match existing BAR Staff Final stubble Approval 2015-07-14 2015-07-14 Single- and Two-family Renovation 150714-48AmherstSt-1 All repairs and repainting to match existing BAR Staff Final stubble Approval 2015-07-14 2015-07-14 Single- and Two-family Renovation 150714-2HamptonCt-1 minor rot repair to siding and repaint repairs to match existing. BAR Staff Final turner Approval 2015-07-14 2015-07-14 Single- and Two-family Renovation 150714-48KennedySt-1 Non-visible repairs to foundation BAR Staff Final stubble Approval 2015-07-14 2015-07-14 Sign Project 150714-409KingSt-1 4.5sqft right angle sign for lulu burgess BAR Staff Final risse Approval BAR-DRB Approval Report --- Friday, July 24, 2015 at 01:41 PM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2015-07-14 2015-07-14 Communication Towers 150714-1KingSt-1 New antennas and cellular equipement change out BAR Staff Final stubble Approval 2015-07-15 2015-07-15 Communication Towers 150715-24NMarket-1 Antenna change out BAR Staff Final stubble Approval 2015-07-15 2015-07-15 Single- and Two-family Renovation 150715-56ChurchSt-1 reshingle main roof with arch shingles, tepaint metal roof portions, repaint BAR Staff Final turner exterior- no changes Approval 2015-07-15 2015-07-15 Commercial Renovation 150715-7CherrySt-1 repaint exterior- color change BAR Staff Final turner Approval 2015-07-15 2015-07-15 Single- and Two-family Renovation 150715-6FranklinSt-1 rot repairs to porch and repaint porch- no changes BAR Staff Final turner Approval 2015-07-15 2015-07-15 Communication Towers 150715-14LockwoodDr-1 Antenna changeout BAR Staff Final turner Approval 2015-07-15 2015-07-15 Commercial Renovation 150715-132SpringSt-1 Alterations to storefront and hardscape (first floor is commercial) BAR Staff Conceptual stubble Approval 2015-07-15 2015-07-15 Sign Project 150715-145CalhounSt-1 canopy sign and open sign for mod pizza BAR Staff Final turner Approval 2015-07-15 2015-07-15 Single- and Two-family Renovation 150715-97AlexanderSt-1 Renovations to existing single house BAR Staff Conceptual stubble Approval 2015-03-10 2015-07-15 TRC_Site Plan 150310-MeetingSt-1 Construction plans for phase 2 expansion of the existing school BAR Final Approval stubble 2015-07-15 2015-07-15 Single- and Two-family Renovation 150715-15SmithPl-2 misc rot repairs BAR Staff Final turner Approval 2015-07-15 2015-07-15 Single- and Two-family Renovation 150715-4SavageSt-1 hvac change out- same location BAR Staff Final turner Approval 2015-07-15 2015-07-15 Single- and Two-family Renovation 150715-694RutledgeAve-1demolition of two one story rear additions. additions are non historic. BAR Staff Final turner Approval 2015-07-16 2015-07-16 Multi-family Renovations 150716-65RutledgeAve-1 repaint windows, shutters, trim and door surround to match existing. no BAR Staff Final risse painting of unpainted stucco. Approval 2015-07-16 2015-07-16 Single- and Two-family Renovation 150716-17AshleyAve-1 repaint- no color change. replace 9 rotten shutters with cedar. BAR Staff Final turner Approval BAR-DRB Approval Report --- Friday, July 24, 2015 at 01:41 PM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2015-07-16 2015-07-16 Commercial New Construction - 150716-1518MainRd-2 construct a greenhouse at rear of school DRB Staff Final turner TRC Not Required Approval 2015-06-25 2015-07-16 Demolition - Complete 150625-864FollyRd-1 COMPLETE DEMOLITION DRB Staff Final turner Commercial/Mult.Fam. Approval 2015-07-16 2015-07-16 Single- and Two-family Renovation 150716-12ChurchSt-1 Garden renovations including hardscape and lighting, not including the BAR Staff Final risse pergola by others Approval 2015-07-17 2015-07-17 Multi-family Renovations 150717-36PittSt-1 remove shutters, strip and repaint and reinstall BAR Staff Final turner Approval 2015-07-17 2015-07-17 Single- and Two-family Renovation 150717-38TraddSt-1 repaint north side of house- no changes BAR Staff Final turner Approval 2015-07-17 2015-07-17 Single- and Two-family Renovation 150717-43TraddSt-1 repair chimney cap BAR Staff Final turner Approval 2015-07-17 2015-07-17 Multi-family Renovations 150717-62BroadSt-1 repair and repaint doors and windows- no changes BAR Staff Final turner Approval 2015-07-17 2015-07-17 Commercial Renovation 150717-252ComingSt-1 renovation/restoration to storefront per 3-3-09 approved plans BAR Staff Final turner Approval 2015-07-17 2015-07-17 Single- and Two-family Renovation 150717-110ComingSt-1 stabilization of structure for future renovation and install temporary fence BAR Staff Final turner Approval Total Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38

Get email alerts for Charleston

A daily email when new agendas and minutes are posted.

Report an issue with this meeting