Muyni
← Back to Charleston

Board of Architectural Review

Regular Meeting

Charleston, SC · January 25, 2016

Agenda

Agenda

BAR-DRB Approval Report --- Monday, February 8, 2016 at 03:20 PM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2015-12-08 2016-01-26 Commercial Renovation 151208-371KingSt-1 30 day extension for scaffolding for developement of engineering drawings BAR Staff Final turner Approval 2016-01-08 2016-01-26 Single- and Two-family 160108-14CouncilSt-1 interior renovation to residence, new windows are not visible from ROW, exterior BAR Staff Final turner Renovation in kind repairs to door trim, hand rails and pickets, hvac to be relocated will need Approval BAR approval 2016-01-25 2016-01-25 Commercial Renovation 160125-119RomneySt-1 reroof with black arch shingles BAR Staff Final turner Approval 2016-01-25 2016-01-25 Sign Project 160125-292KingSt-1 rignt angle sign for marine layer BAR Staff Final turner Approval 2016-01-25 2016-01-25 Commercial Renovation 160125-292KingSt-2 replace non-historic tile at corner entrance to retail unit. BAR Staff Final turner Approval 2016-01-25 2016-01-25 Multi-family Renovations 160125-51Elizabeth-1 raise height of non-historic brick wall BAR Staff Final turner Approval 2016-01-25 2016-01-25 Commercial Renovation 160125-40EBaySt-1 garden renovations including hardscape BAR Staff Final turner Approval 2016-01-25 2016-01-25 Single- and Two-family 160125-102RutledgeAve-1 minor rot repairs to soffit- minimally visible. repaint- no color change BAR Staff Final turner Renovation Approval 2016-01-25 2016-01-25 Commercial Renovation 160125-161RutledgeAve-1 remove non-historic building skin (faux stone, siding, stucco, etc) for exploratory BAR Staff Final turner work to determine what historic materials and details are underneath for Approval restoration. 2016-01-25 2016-01-25 Single- and Two-family 160125-163QueenSt-1 hydrostop roof and add low profile chimney caps. BAR Staff Final turner Renovation Approval 2016-01-25 2016-01-25 Commercial Renovation 160125-19ExchangeSt-1 includes 17 exchange. recoat metal roof. BAR Staff Final turner Approval 2016-01-25 2016-01-25 Single- and Two-family 160125-6ElizabethSt-1 repaint- no color change and replace minor amount of siding with wood siding BAR Staff Final turner Renovation Approval 2016-01-25 2016-01-25 Single- and Two-family 160125-9PricesAly-1 Modification to original approval to include rebuilding of 1974 portion of stucco BAR Staff Final stubble Renovation wall in kind, with new control joints per original design. Approval 2016-01-25 2016-01-25 Single- and Two-family 160125-180TraddSt-1 repaint- no color change BAR Staff Final turner Renovation Approval BAR-DRB Approval Report --- Monday, February 8, 2016 at 03:20 PM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2016-01-25 2016-01-25 Commercial Renovation 160125-289EBaySt-1 Hardscape improvements for courtyard dining. BAR Staff Final stubble Approval 2016-01-25 2016-01-25 Multi-family Renovations 160125-135AshleyAve-1 Repairs/patch slate roof, fascia and soffit due to fire damage in kind. Repaint- no BAR Staff Final stubble color change. Approval 2016-01-25 2016-01-25 Single- and Two-family 160125-104ChurchSt-1 Window repairs and repainting in kind BAR Staff Final stubble Renovation Approval 2016-01-25 2016-01-25 Sign Project 160125-29ElliottSt-1 Replacement of existing parking signage. BAR Staff Final stubble Approval 2016-01-25 2016-01-25 Single- and Two-family 160125-51HasellSt-1 New tabby and brick drive BAR Staff Final stubble Renovation Approval 2016-01-26 2016-01-26 Single- and Two-family 160126-6OrangeSt-1 sash replacement and window repairs BAR Staff Final turner Renovation Approval 2016-01-26 2016-01-26 Sign Project 160126-100ColumbusSt-1 replace existing right angle sign with new one BAR Staff Final turner Approval 2016-01-27 2016-01-27 Single- and Two-family 160127-57SocietySt-1 Repainting to match existing BAR Staff Final stubble Renovation Approval 2016-01-27 2016-01-27 Commercial Renovation 160127-396MeetingSt-1 Recoat flat roof- no changes; not visible from ROW BAR Staff Final stubble Approval 2016-01-27 2016-01-27 Sign Project 160127-39JohnSt-1 Pole sign for Hutson Alley BAR Staff Final stubble Approval 2016-01-27 2016-01-27 Commercial Renovation 160127-61StateSt-1 Paint color change and facade sign for Sushi Blue BAR Staff Final stubble Approval 2016-01-27 2016-01-27 Sign Project 160127-47SMarketSt-1 RIght Angle sign for Shirt Off My Back BAR Staff Final stubble Approval 2016-01-27 2016-01-27 Commercial Renovation 160127-716MeetingSt-1 minor rot repairs to siding and replace existing vinyl windows with vinyl of an BAR Staff Final turner equal or better quality. Approval 2016-01-27 2016-01-27 Commercial Renovation 160127-292KingSt-1 repaint- color change BAR Staff Final turner Approval BAR-DRB Approval Report --- Monday, February 8, 2016 at 03:20 PM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2016-01-29 2016-01-29 Commercial Renovation 160129-1153KingSt-1 Replace shingle roof in kind. BAR Staff Final stubble Approval 2016-01-29 2016-01-29 Commercial Renovation 160129-243CalhounSt-1 Repaint faccia nd soffit with new color BAR Staff Final howle Approval 2016-01-29 2016-01-29 Commercial Renovation 160129-30RaceSt-1 Replacement of 3 pairs of front doors and refinishing of 3 single doors BAR Staff Final howle Approval 2016-01-29 2016-01-29 Commercial Renovation 160129-273MeetingSt-1 Reroof with existing color architectural shingles BAR Staff Final howle Approval 2016-01-29 2016-01-29 Commercial Renovation 160129-135MeetingSt-1 installation of hardscaping fro gibbs museum BAR Staff Final turner Approval 2016-01-29 2016-01-29 Sign Project 160129-122MeetingSt-1 RIght angle sign with raised lettering BAR Staff Final howle Approval Total Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
Report an issue with this meeting