Muyni
← Back to Charleston

Board of Architectural Review

Regular Meeting

Charleston, SC · February 29, 2016

Agenda

Agenda

BAR-DRB Approval Report --- Monday, March 7, 2016 at 08:45 AM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2016-02-03 2016-03-01 Single- and Two Family 160203-5EHampsteadSq-2 Construction of a SFN residence - Unit A BAR Staff Final stubble New Construction Approval 2016-02-29 2016-02-29 Commercial Renovation 160229-62StateSt-1 Replace HVAC ductless condenser - same location BAR Staff Final howle Approval 2016-02-29 2016-02-29 Commercial Renovation 160229-243KingSt-1 Repair cracks and repair top overhang cornice. BAR Staff Final howle Approval 2016-02-29 2016-02-29 Commercial Renovation 160229-102ChurchSt-1 Recoating roof (flat membrane) BAR Staff Final howle Approval 2016-02-29 2016-02-29 Commercial Renovation 160229-48HasellSt-1 Exterior stucco repairs and cleaning BAR Staff Final howle Approval 2016-02-29 2016-02-29 Single- and Two-family 160229-123WentworthSt-1 Replace non-historic front door with 6-panel wooden door painted charleston BAR Staff Final howle Renovation green. Approval 2016-03-01 2016-03-01 Single- and Two-family 160301-37SmithSt-1 Repairs to broken window and several rotten deck boards; repaint to match BAR Staff Final stubble Renovation existing Approval 2016-03-01 2016-03-01 Single- and Two-family 160301-18MenottiSt-1 Replacement of approx. 100ft of rotten siding and select trim in kind. Building is BAR Staff Final stubble Renovation not historic. Approval 2016-03-01 2016-03-01 Single- and Two-family 160301-92SmithSt-1 Repaint roof to match existing BAR Staff Final stubble Renovation Approval 2016-03-01 2016-03-01 Sign Project 160301-455KingSt-1 Facade sign in pen-mounted letters for Hooley/Resails BAR Staff Final howle Approval 2016-03-01 2016-03-01 Single- and Two-family 160301-14NewSt-1 Misc. renovations to house and site BAR Staff Final stubble Renovation Approval 2016-03-01 2016-03-01 Single- and Two-family 160301-61AshleyAve-1 repair masonry site wall that was hit by city vehicle BAR Staff Final stubble Renovation Approval 2016-02-03 2016-03-01 Single- and Two Family 160203-5EHampsteadSq-3 Construction of a SFN residence - Unit D BAR Staff Final stubble New Construction Approval 2016-02-03 2016-03-01 Single- and Two Family 160203-5EHampsteadSq-1 Construction of a SFN residence - Unit B and C BAR Staff Final stubble New Construction Approval BAR-DRB Approval Report --- Monday, March 7, 2016 at 08:45 AM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2016-03-01 2016-03-01 Multi-family Renovations 160301-51DrakeSt-1 remove and replace siding BAR Staff Final turner Approval 2016-03-02 2016-03-02 Single- and Two-family 160302-136QueenSt-1 Repaint front of house - no changes BAR Staff Final howle Renovation Approval 2016-03-02 2016-03-02 Fence Project 160302-45GibbesSt-1 Approved to increase the height of existing brick wall from 4' to 7' as shown on BAR Staff Final howle plans Approval 2016-03-02 2016-03-02 Single- and Two-family 160302-17RoseLn-1 Touch up paint - no changes BAR Staff Final howle Renovation Approval 2016-03-02 2016-03-02 Single- and Two-family 160302-135TraddSt-2 replace lattice panels in existing wall with stucco panels to match adjacent BAR Staff Final turner Renovation Approval 2016-03-02 2016-03-02 Single- and Two-family 160302-7GibbesSt-1 repaint- no color change BAR Staff Final turner Renovation Approval 2016-03-02 2016-03-02 Commercial Renovation 160302-271AshleyAve-1 repaint- no color change BAR Staff Final turner Approval 2016-03-03 2016-03-03 Single- and Two-family 160303-3SiresSt-2 Exterior painting - no changes and rot repair BAR Staff Final howle Renovation Approval 2016-03-03 2016-03-03 Multi-family Renovations 160303-517KingSt-1 Replace 8 glass panels in iron framed windows. BAR Staff Final howle Approval 2016-03-03 2016-03-03 Single- and Two-family 160303-135WentworthSt-1 Repaint trim and sutters - no changes BAR Staff Final howle Renovation Approval 2016-03-03 2016-03-03 Single- and Two-family 160303-16NewSt-1 Re-establish window on north wall - custom 6 over 6 - with new fixed louver BAR Staff Final howle Renovation shutters to match window above. Review horizontal pipes. Approval 2016-03-03 2016-03-03 Single- and Two-family 160303-4PittSt-1 Temporary water stop to be corrected at a later date BAR Staff Final howle Renovation Approval 2016-03-04 2016-03-04 Single- and Two-family 160304-109QueenSt-1 Reroof with architectural shingles BAR Staff Final howle Renovation Approval 2016-03-04 2016-03-04 Single- and Two-family 160304-111QueenSt-1 Reroof with architectural shingles BAR Staff Final howle Renovation Approval BAR-DRB Approval Report --- Monday, March 7, 2016 at 08:45 AM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2016-03-04 2016-03-04 Single- and Two-family 160304-64 1/2SBatterySt-1 Work is actually at 64 1/4 (attached)-- repairs to flat roof at rear. BAR Staff Final stubble Renovation Approval 2016-03-04 2016-03-04 Commercial Renovation 160304-78QueenSt-1 Relevel brick pavers; apply sealoflex to roof, extend downspout; replace door. All BAR Staff Final stubble in kind. At rear. Approval 2016-03-03 2016-03-04 Uninhabitable Structures 160303-42 1/2BarreSt-1 Approved for 8x12' shed at rear as shown on plans BAR Staff Final stubble Approval 2016-03-04 2016-03-04 Commercial Renovation 160304-271AshleyAve-1 New colors for Luke's Craft Pizza. BAR Staff Final howle Approval 2016-03-04 2016-03-04 Commercial Renovation 160304-472MeetingSt-1 Remove existing roof membrane and edge metal. Install new ISO membrance BAR Staff Final howle and edge metal to match existing. Approval 2016-03-04 2016-03-04 Commercial Renovation 160304-82WentworthSt-2 after the fact approval for installation of kitchen exhaust hood and installation of BAR Staff Final turner exhaust and supply fan. Not visible hiden behing rear parapet wall. Approval Total Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34

Get email alerts for Charleston

A daily email when new agendas and minutes are posted.

Report an issue with this meeting