Muyni
← Back to Charleston

Board of Architectural Review

Regular Meeting

Charleston, SC · August 15, 2016

Agenda

Agenda

BAR-DRB Approval Report --- Monday, August 22, 2016 at 03:31 PM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2016-05-31 2016-08-16 Multi-family 160531-61VanderhorstSt-2 interior/exterior renovations to Radcliffe House, site work including BAR Staff Final courtney Renovations curb extension, trash enclosure, tree protection Approval 2016-07-14 2016-08-16 Uninhabitable 160714-47KingSt-1 (2015CODE)construction of new garage for single family residence BAR Staff Final courtney Structures Approval 2016-08-15 2016-08-15 Commercial 160815-165KingSt-1 Replacement of condensor on roof. BAR Staff Final howle Renovation Approval 2016-08-15 2016-08-15 Commercial 160815-300KingSt-1 Color change and light fixture. BAR Staff Final howle Renovation Approval 2016-08-15 2016-08-15 Single- and Two-family 160815-93BeaufainSt-1 Re-roof shingle roof. BAR Staff Final howle Renovation Approval 2016-08-15 2016-08-15 Single- and Two-family 160815-107KingSt-1 BAR Staff Final turner Addition Approval 2016-08-15 2016-08-15 Commercial 160815-495MeetingSt-1 exterior renovations BAR Staff Final turner Renovation Approval 2016-08-15 2016-08-15 Multi-family 160815-38BullSt-1 construct exterior stairs. BAR Staff Final turner Renovations Approval 2016-08-15 2016-08-15 Single- and Two-family 160815-31ChapelSt-1 Repaint and rot repair. BAR Staff Final howle Renovation Approval 2016-08-15 2016-08-15 Single- and Two-family 160815-53SBatterySt-1 Replace asphalt shingle roof to match existing. BAR Staff Final howle Renovation Approval 2016-08-15 2016-08-15 Sign Project 160815-38AlexanderSt-1 Wall sign on door for Redan Construction. BAR Staff Final howle Approval 2016-08-15 2016-08-15 Single- and Two-family 160815-5TrapmanSt-1 Window in plance of existing door. Replace sliding door with french BAR Staff Final howle Renovation doors. Approval BAR-DRB Approval Report --- Monday, August 22, 2016 at 03:31 PM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2016-08-16 2016-08-16 Single- and Two-family 160816-156TraddSt-1 Changing exterior PVC railing to wood. BAR Staff Final howle Renovation Approval 2016-08-16 2016-08-16 Single- and Two-family 160816-25JohnSt-1 HVAC screen at roof. Minor exterior rot repairs and touch up paint. BAR Staff Final howle Renovation Approval 2016-08-16 2016-08-16 Sign Project 160816-162WentworthSt-1 Right angle sign for Charleston Tuxedo. BAR Staff Final howle Approval 2016-08-16 2016-08-16 Sign Project 160816-162WentworthSt-2 Right angle sign for YOJ Events BAR Staff Final howle Approval 2016-08-17 2016-08-17 Single- and Two-family 160817-45TraddSt-1 Rooftop deck BAR Staff Final howle Renovation Approval 2016-08-17 2016-08-17 Single- and Two-family 160817-56SmithSt-1 Repair rotten areas in wood sideing, repalce several peices of BAR Staff Final howle Renovation rotten siding in kind. Cault and repaint repaired areas to match Approval existing. 2016-08-17 2016-08-17 Commercial 160817-155EBaySt-1 Install new fans on roof for new first floor kitchen BAR Staff Final howle Renovation Approval 2016-08-17 2016-08-17 Single- and Two-family 160817-95ChurchSt-1 Repainting to match existing- minor rot repair (a few boards) BAR Staff Final stubble Renovation Approval 2016-08-17 2016-08-17 Single- and Two-family 160817-83TraddSt-1 Infill of ground floor of rear porch BAR Staff Final stubble Renovation Approval 2016-08-18 2016-08-18 Single- and Two-family 160818-26SocietySt-1 interior renovation of single family residence, alteration of exterior BAR Staff Final stubble Renovation door not visible from ROW Approval 2016-08-18 2016-08-18 Single- and Two-family 160818-172WentworthSt-2 Repainting to match existing with allowance for minor rot repair if BAR Staff Final stubble Renovation found, but no wholesale replacement. Approval 2016-08-18 2016-08-18 Single- and Two-family 160818-14QueenSt-1 Miscellaneous repairs to exterior to include roof, stucco, gate and BAR Staff Final stubble Renovation piers, and rot repair-- no wholesale replacement; repainting to Approval match existing; new operable shutters; rear work is not visible from ROW. BAR-DRB Approval Report --- Monday, August 22, 2016 at 03:31 PM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2016-08-18 2016-08-18 Single- and Two-family 160818-3PercySt-1 Swap location of one door and one window on second floor of BAR Staff Final stubble Renovation piazza reusing existing door/sash/trim Approval 2016-08-18 2016-08-18 Commercial 160818-219Meeting-1 Installation of roof deck behind parapet for use by residential unit BAR Staff Final stubble Renovation only. Not to be visible from ROW Approval 2016-08-19 2016-08-19 Commercial 160819-328KingSt-1 repaint- no color change BAR Staff Final turner Renovation Approval 2016-08-19 2016-08-19 Fence Project 160819-96WentworthSt-1 Construction of six foot wood fence internal to property. BAR Staff Final turner Approval 2016-08-19 2016-08-19 Commercial 160819-96WentworthSt-2 hardscape to include paving, retaining wall and seat wall. BAR Staff Final turner Renovation Approval 2016-08-19 2016-08-19 Commercial 160819-510KingSt-1 install awning and door lock set. BAR Staff Final turner Renovation Approval Total Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30

Get email alerts for Charleston

A daily email when new agendas and minutes are posted.

Report an issue with this meeting