Muyni
← Back to Charleston

Board of Architectural Review

Regular Meeting

Charleston, SC · August 22, 2016

Agenda

Agenda

BAR-DRB Approval Report --- Monday, August 29, 2016 at 08:55 AM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2016-08-11 2016-08-25 Single- and Two-family 160811-50SouthSt-1 interior renovation including Repair piazza, repair siding, paint, new electrical, BAR Staff Final howle Renovation new plumbing, new HVAC, Approval 2016-08-11 2016-08-24 Single- and Two Family New 160811-80HalseyBlvd-2 Construction of a new single family residence BAR Staff Final stubble Construction Approval 2016-08-19 2016-08-25 Commercial Renovation 160819-532KingSt-1 mock up panel for Super Bad store BAR Staff Final stubble Approval 2016-08-22 2016-08-22 Single- and Two-family 160822-38AshleyAve-1 Replace 6 porch columns to match existing, but reinforced. BAR Staff Final howle Renovation Approval 2016-08-22 2016-08-22 Single- and Two-family 160822-23ComingSt-1 HVAC changeout. BAR Staff Final howle Renovation Approval 2016-08-22 2016-08-22 Multi-family Renovations 160822-152SpringSt-1 HVAC changeout to replace existing system for 2nd floor. BAR Staff Final howle Approval 2016-08-22 2016-08-22 Multi-family Renovations 160822-152SpringSt-2 HVAC changeout to replace existing system for 3rd floor. BAR Staff Final howle Approval 2016-08-22 2016-08-22 Single- and Two-family 160822-58 1/2BroadSt-1 Repaint existing roof, decking, trim, windows, dormer siding. BAR Staff Final howle Renovation Approval 2016-08-22 2016-08-22 Commercial Renovation 160822-5FultonSt-1 Repair rotten trim, stairs, and window boxes. No Changes. BAR Staff Final howle Approval 2016-08-23 2016-08-23 Single- and Two-family 160823-15MenottiSt-1 Reroof to match existing (shingles) BAR Staff Final stubble Renovation Approval 2016-08-23 2016-08-23 Single- and Two-family 160823-32HasellSt-1 Rot repair to section of first floor porch decking. No wholesale removal. To BAR Staff Final stubble Renovation exactly match existing. Approval 2016-08-23 2016-08-23 Commercial Renovation 160823-68CannonSt-1 new hardscape for both 68/72 Cannon development BAR Staff Final turner Approval 2016-08-23 2016-08-23 Single- and Two-family 160823-207WentworthSt-1 Replace existing shingle roof in kind BAR Staff Final stubble Renovation Approval 2016-08-23 2016-08-23 Commercial Renovation 160823-249KingSt-1 minor stucco repair and repaint no color change BAR Staff Final turner Approval BAR-DRB Approval Report --- Monday, August 29, 2016 at 08:55 AM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2016-08-24 2016-08-24 Commercial Renovation 160824-708MeetingSt-1 Replace two portion of church roof with new standing seam metal roof. BAR Staff Final howle Approval 2016-08-24 2016-08-24 Commercial Renovation 160824-468KingSt-1 Repaint front of building, siding and trim. Color change of trim. BAR Staff Final howle Approval 2016-08-24 2016-08-24 Single- and Two-family 160824-1RutledgeBlvd-1 Replace brick in steps where needed. Replace first flloor decking. Replace rotten BAR Staff Final howle Renovation siding. Repaint exteior with color change - antique pewter. Approval 2016-08-24 2016-08-24 Commercial Renovation 160824-35SMarketSt-1 Remove current flat roof coating and replace, not visible from street. BAR Staff Final howle Approval 2016-08-24 2016-08-24 Single- and Two-family 160824-177QueenSt-1 Exterior repairs - siding, porch railing and decking, and painting. No changes. BAR Staff Final howle Renovation Approval 2016-08-25 2016-08-25 Commercial Renovation 160825-343EBaySt-1 Repair large crack in stucco. Paint buidling. Install shutters. Replace black EPDM BAR Staff Final howle roof. Approval 2016-08-25 2016-08-25 Single- and Two-family 160825-151TraddSt-1 Remove door and stoop. Replace siding between existing joints and fill in BAR Staff Final howle Renovation driveway with brick to match exisitng. Lattice between piers to match existing. Approval 2016-08-25 2016-08-25 Single- and Two-family 160825-49MontaguSt-1 Gutter repairs BAR Staff Final howle Renovation Approval 2016-08-25 2016-08-25 Multi-family Renovations 160825-4CromwellAly-1 Repair leaking roof with no visual changes. BAR Staff Final howle Approval 2016-08-25 2016-08-25 Single- and Two-family 160825-5TrapmanSt-1 HVAC change out- same location as existing BAR Staff Final stubble Renovation Approval 2016-08-25 2016-08-25 Single- and Two-family 160825-23CannonSt-1 Replace first floor piazza door in kind. BAR Staff Final stubble Renovation Approval 2016-08-25 2016-08-25 Single- and Two-family 160825-8AmherstSt-1 Repair roof, repair windows, and repair/replace porch handrail and spindles. BAR Staff Final howle Renovation Approval 2016-08-25 2016-08-25 Multi-family Renovations 160825-49PittSt-1 Powerwash siding and touch up paint on soffitt and siding - no color change. BAR Staff Final howle Approval 2016-08-26 2016-08-26 Single- and Two-family 160826-39CannonSt-1 Paint color change. BAR Staff Final howle Renovation Approval BAR-DRB Approval Report --- Monday, August 29, 2016 at 08:55 AM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2016-08-26 2016-08-26 Single- and Two-family 160826-38KingSt-1 Paint color changes. BAR Staff Final howle Renovation Approval 2016-08-26 2016-08-26 Commercial Renovation 160826-153EBaySt-1 Installation of exhaust fan on roof (adjacent to other mechanical equipment)-not BAR Staff Final stubble to be visible from ROW Approval 2016-08-26 2016-08-26 Single- and Two-family 160826-113SmithSt-1 Replacement of 3 fire damaged windows to exactly match existing BAR Staff Final stubble Renovation Approval 2016-08-26 2016-08-26 Multi-family Renovations 160826-22GadsdenSt-1 Replace damaged siding to match existing. BAR Staff Final howle Approval Total Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32

Get email alerts for Charleston

A daily email when new agendas and minutes are posted.

Report an issue with this meeting