Board of Architectural Review
Regular MeetingCharleston, SC · August 29, 2016
Agenda
BAR-DRB Approval Report --- Tuesday, September 6, 2016 at 08:37 AM
Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff
Received
2016-07-07 2016-09-01 Communication 160707-387KingSt-1 (2015CODE)replace and install 3 addition antennas on existing rooftop cellular site BAR Staff Final Approval howle
Towers
2016-08-29 2016-08-29 Single- and Two-family 160829-72SmithSt-1 Replace two rotten porch columns. BAR Staff Final Approval howle
Renovation
2016-08-29 2016-08-29 Sign Project 160829-160ChurchSt-1 New and repalcement facade signs for Tommy Condon. BAR Staff Final Approval howle
2016-08-29 2016-08-29 Single- and Two-family 160829-128BullSt-1 Paint color change. BAR Staff Final Approval howle
Renovation
2016-08-30 2016-08-30 Single- and Two-family 160830-1MagazineSt-1 Exterior repainting (3 sides) to match existing BAR Staff Final Approval stubble
Renovation
2016-08-30 2016-08-30 Single- and Two-family 160830-1BatteryPl-1 Kitchen cabinets, appliances, windows, bath fixtures and finishes, electrical BAR Staff Final Approval stubble
Renovation fixtures, refinish floors, insulation
2016-08-30 2016-08-30 Multi-family 160830-151WentworthSt-1 Rot repairs to fascia and eaves (primarily on east facade), siding repairs and BAR Staff Final Approval stubble
Renovations repainting all to exactly match existing.
2016-08-31 2016-08-31 Single- and Two-family 160831-17JohnSt-1 Repaint with color change on main body. Removal of screens on first floor piazza. BAR Staff Final Approval howle
Renovation
2016-08-31 2016-08-31 Single- and Two-family 160831-21CouncilSt-1 Removal and replacement of architectual shingles ot match existing roof on 94 S BAR Staff Final Approval howle
Renovation Battery.
2016-08-31 2016-08-31 Single- and Two-family 160831-16ElizabethSt-1 Repaint exterior and trim- no changes. Replace 5 or 6 porch decking boards. BAR Staff Final Approval howle
Renovation
2016-08-31 2016-08-31 Sign Project 160831-24NMarket-1 New awnings for Noisy Oyster and Art Institute. BAR Staff Final Approval howle
2016-08-31 2016-08-31 Single- and Two-family 160831-253AshleyAve-1 Reroof black architectural shingles. BAR Staff Final Approval howle
Renovation
2016-08-31 2016-08-31 Sign Project 160831-73StateSt-1 Recover existing awning frame with new fabric and lettering for Porter Conrad BAR Staff Final Approval stubble
Jewelry
2016-08-31 2016-08-31 Single- and Two-family 160831-22TraddSt-1 Removal of brick front patio BAR Staff Final Approval howle
Renovation
2016-08-31 2016-08-31 Single- and Two-family 160831-27LambollSt-1 New piazza entry and stair (within existing piazza footprint) BAR Staff Final Approval stubble
Renovation
BAR-DRB Approval Report --- Tuesday, September 6, 2016 at 08:37 AM
Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff
Received
2016-09-01 2016-09-01 Sign Project 160901-98 1/2EbroadSt-1 Right angle sign for Law office of Jesse Sanchez and The Crawford Law Firm. BAR Staff Final Approval howle
2016-09-01 2016-09-01 Commercial 160901-510KingSt-1 Paint color change for exterior storefront. Proposed color is aluminum to match BAR Staff Final Approval howle
Renovation existing.
2016-09-01 2016-09-01 Commercial 160901-1KingSt-1 Final approval for revisions to awning, door, and terrace. BAR Staff Final Approval howle
Renovation
2016-09-01 2016-09-01 Single- and Two-family 160901-54QueenSt-1 Repaint exterior to match existing BAR Staff Final Approval howle
Renovation
2016-09-01 2016-09-01 Single- and Two-family 160901-59KingSt-1 Shutter color - Port Royal (blue). BAR Staff Final Approval howle
Renovation
Total Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20