Muyni
← Back to Charleston

Board of Architectural Review

Regular Meeting

Charleston, SC · September 5, 2016

Agenda

Agenda

BAR-DRB Approval Report --- Monday, September 12, 2016 at 08:41 AM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2016-08-18 2016-09-09 Communication 160818-1KingSt-1 Antenna modification/installation for ATandT at existing rooftop wireless telecom facility. BAR Staff Final howle Towers Approval 2016-09-06 2016-09-06 Single- and Two-family 160906-30 1/2StateSt-1 Repaint roof to match existing color. BAR Staff Final howle Renovation Approval 2016-09-06 2016-09-06 Single- and Two-family 160906-2ExchangeSt-1 Shoring on east wall to stabilize building. BAR Staff Final howle Renovation Approval 2016-09-06 2016-09-06 Commercial 160906-161RutledgeAve-1 Demolition of exterior masonry siding down to original siding so BAR can look at it BAR Staff Final howle Renovation Approval 2016-09-06 2016-09-06 Commercial 160906-177ChurchSt-1 Paint first floor exterior windows and door - no changes. BAR Staff Final howle Renovation Approval 2016-09-06 2016-09-06 Single- and Two-family 160906-197RutledgeAve-1 Siding repairs and painting - No changes. BAR Staff Final howle Renovation Approval 2016-09-06 2016-09-06 Single- and Two-family 160906-75SpringSt-1 Repair/replace rotten wood on porch and repaint. No changes. BAR Staff Final howle Renovation Approval 2016-09-06 2016-09-06 Commercial 160906-124ChurchSt-1 Repaint exterior facing street - no changes. BAR Staff Final howle Renovation Approval 2016-09-06 2016-09-06 Commercial 160906-17ChalmersSt-1 Repaint exterior facing the street and parking lot - no changes. BAR Staff Final howle Renovation Approval 2016-09-06 2016-09-06 Commercial 160906-112AshleyAve-1 Replace roofing and trim on canopy at rear entrance. Paint to match existing. Reroof BAR Staff Final howle Renovation with shingles to match existing. Approval 2016-09-06 2016-09-06 A Simple Permit 160906-10ExchangeSt-1 Plaque signs and new awning for Cirque Salon. BAR Staff Final howle Approval 2016-09-07 2016-09-07 Single- and Two-family 160907-75AshleyAve-1 Replace rotted column at entry to piazza. BAR Staff Final howle Renovation Approval 2016-09-07 2016-09-07 Single- and Two-family 160907-38RutledgeAve-1 Repainting exterior, no changes. BAR Staff Final stubble Renovation Approval 2016-09-07 2016-09-07 Single- and Two-family 160907-93BeaufainSt-1 replace existing 3 tab shingle roof with 30 year architect. shingle-same color BAR Staff Final stubble Renovation Approval BAR-DRB Approval Report --- Monday, September 12, 2016 at 08:41 AM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2016-09-07 2016-09-07 Commercial 160907-328MeetingSt-1 repaint windows on the north and south sides of the building. BAR Staff Final turner Renovation Approval 2016-09-07 2016-09-07 Commercial 160907-237MeetingSt-1 exterior renovations to porte cochere BAR Staff Final turner Renovation Approval 2016-09-07 2016-09-07 Single- and Two-family 160907-69EBaySt-1 New shutters on street side and a replacement shutter at rear. BAR Staff Final howle Renovation Approval 2016-09-07 2016-09-07 Single- and Two-family 160907-1NewSt-1 Paint colors. BAR Staff Final howle Renovation Approval 2016-09-07 2016-09-07 Commercial 160907-753MeetingSt-1 Minor repair and repaint on garage with color change. Replace 4 windows on south BAR Staff Final howle Renovation side. Replace garage roof. Approval 2016-09-07 2016-09-07 Commercial 160907-131WentworthSt-1 Repair window sashes. Replace 8 boards. Repaint door. BAR Staff Final howle Renovation Approval 2016-09-07 2016-09-07 Single- and Two-family 160907-29StateSt-1 Repaint exterior the same color. BAR Staff Final howle Renovation Approval 2016-09-07 2016-09-07 Single- and Two-family 160907-60AnsonSt-1 Pressur wash and repaint windows and shutters. Minor repointing around roof flashing. BAR Staff Final howle Renovation Approval 2016-09-08 2016-09-08 Commercial 160908-45ComingSt-1 Minor rot repair and trim painting - no changes. BAR Staff Final howle Renovation Approval 2016-09-08 2016-09-08 Commercial 160908-233CalhounSt-1 Repaint siding and trim at left, front and back - no color changes. BAR Staff Final howle Renovation Approval 2016-09-08 2016-09-08 Single- and Two-family 160908-134BroadSt-1 Paint color change. BAR Staff Final howle Addition Approval 2016-09-08 2016-09-08 Single- and Two-family 160908-134BroadSt-2 Paint color changes. BAR Staff Final howle Renovation Approval 2016-09-08 2016-09-08 Commercial 160908-24AnnSt-1 Move intake louver and add sprinker heads under canopy. Add wood banquet. BAR Staff Final howle Renovation Approval 2016-09-08 2016-09-08 Single- and Two-family 160908-5LimehouseSt-1 Door color change and touch up paint. BAR Staff Final howle Renovation Approval BAR-DRB Approval Report --- Monday, September 12, 2016 at 08:41 AM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2016-09-08 2016-09-08 Single- and Two-family 160908-104ColumbusSt-1 Paint color change. Shuttles on front and sides. BAR Staff Final howle Renovation Approval 2016-09-08 2016-09-08 Single- and Two-family 160908-120SBatterySt-1 Repaint - no changes. BAR Staff Final howle Renovation Approval 2016-09-08 2016-09-08 Sign Project 160908-701EBaySt-2 Deminsional letters on awning for Koko Fit Club. BAR Staff Final howle Approval 2016-09-09 2016-09-09 Sign Project 160909-180SpringSt-1 Right angle sign for Kelly Law Firm BAR Staff Final howle Approval 2016-09-09 2016-09-09 Single- and Two-family 160909-58MurrayBlvd-1 HVAC changeout. BAR Staff Final howle Renovation Approval 2016-09-09 2016-09-09 Single- and Two-family 160909-422SumterSt-1 replace damaged decking-railings at front porch; replace damaged fence at backyard BAR Staff Final howle Renovation Approval 2016-09-09 2016-09-09 Single- and Two-family 160909-12CliffordSt-1 Color change. BAR Staff Final howle Renovation Approval 2016-09-09 2016-09-09 Multi-family 160909-70ChurchSt-1 Repaint all surfaces same color. BAR Staff Final howle Renovations Approval 2016-09-09 2016-09-09 Single- and Two-family 160909-15ShortSt-1 installing a rear double patio door. BAR Staff Final stubble Renovation Approval Total Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37

Get email alerts for Charleston

A daily email when new agendas and minutes are posted.

Report an issue with this meeting