Muyni
← Back to Charleston

Board of Architectural Review

Regular Meeting

Charleston, SC · September 19, 2016

Agenda

Agenda

BAR-DRB Approval Report --- Monday, September 26, 2016 at 04:38 PM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2016-09-19 2016-09-19 Single- and 160919-113PresidentSt-1 Replace asphalt shingles. BAR Staff Final howle Two-family Approval Renovation 2016-09-19 2016-09-19 Single- and 160919-38AshleyAve-1 Paint color change. BAR Staff Final howle Two-family Approval Renovation 2016-09-19 2016-09-19 Single- and 160919-18LambollSt-1 Repair and repaint stucco on east elevation. BAR Staff Final howle Two-family Approval Renovation 2016-09-19 2016-09-19 Multi-family 160919-38HasellSt-1 Repoint corbels on parapet to match, no changes. BAR Staff Final howle Renovations Approval 2016-09-19 2016-09-19 Multi-family 160919-1KingSt-1 Clean and repaint deck same color of building. BAR Staff Final howle Renovations Approval 2016-09-19 2016-09-19 Single- and 160919-46PittSt-1 repaint piazza ceiling BAR Staff Final turner Two-family Approval Renovation 2016-09-19 2016-09-19 Single- and 160919-10 1/2ComingSt-2 replace existing hvac unit with mini split- same location BAR Staff Final turner Two-family Approval Renovation 2016-09-19 2016-09-19 Commercial 160919-652RutledgeAve-1 Paving and brickwork for parking. BAR Staff Final howle Renovation Approval 2016-09-20 2016-09-20 Single- and 160920-101TraddSt-1 Repaint same color BAR Staff Final stubble Two-family Approval Renovation 2016-09-20 2016-09-20 Sign Project 160920-91BroadSt-1 Right angle sign for McDonnell and Associates. BAR Staff Final howle Approval 2016-09-20 2016-09-20 Single- and 160920-205ComingSt-1 Demolition of non-historic rear addition. BAR Staff Final howle Two-family Approval Renovation BAR-DRB Approval Report --- Monday, September 26, 2016 at 04:38 PM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2016-09-20 2016-09-20 Single- and 160920-9LegareSt-1 Replacement of two units on roof- same location as existing BAR Staff Final stubble Two-family Approval Renovation 2016-09-20 2016-09-20 Single- and 160920-5RutledgeBlvd-1 Touch up painting and window reglazing to match existing BAR Staff Final stubble Two-family Approval Renovation 2016-09-20 2016-09-20 Communication 160920-100BroadSt-1 4 temporary antenna on rooftop of judicial for a period of 12 months. BAR Staff Final turner Towers Approval 2016-09-20 2016-09-20 Single- and 160920-62BogardSt-1 install 5 light fixtures BAR Staff Final turner Two-family Approval Renovation 2016-09-20 2016-09-20 Manufactured 160920-201PresidentSt-1 two temporary construction office trailers for stormwater tunnel/shaft project BAR Staff Final stubble Home/Office Approval 2016-09-20 2016-09-20 Single- and 160920-249RutledgeAve-1 selective demo for investigative purposes, stabilization, weatherproofing and BAR Staff Final turner Two-family repairs Approval Renovation 2016-09-20 2016-09-20 Single- and 160920-31ChurchSt-1 minor rot repairs to siding and shutters on east elevation and repaint no color BAR Staff Final turner Two-family change. Approval Renovation 2016-09-20 2016-09-20 Single- and 160920-60BogardSt-1 Siding replacement, replace 4 windows and stucco repair to foundation. BAR Staff Final turner Two-family Approval Renovation 2016-09-21 2016-09-21 Commercial 160921-161EBaySt-1 Repaint existing doors and columns on first floor - no changes. BAR Staff Final howle Renovation Approval 2016-09-21 2016-09-21 Commercial 160921-556KingSt-1 Color changes. BAR Staff Final howle Renovation Approval 2016-09-21 2016-09-21 Commercial 160921-85SMarketSt-1 Commercial upfit to include new storefront system, painting and lighting (signage BAR Staff Final stubble Renovation must be submitted separately). Approval 2016-09-21 2016-09-21 Commercial 160921-343EBaySt-1 Remove asbestos containing caulking from around exterior windows. BAR Staff Final howle Renovation Approval BAR-DRB Approval Report --- Monday, September 26, 2016 at 04:38 PM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2016-09-21 2016-09-21 Sign Project 160921-282KingSt-1 Right angle sign for Madewell. BAR Staff Final howle Approval 2016-09-21 2016-09-21 Commercial 160921-227Saint PhilipSt-1 repairs to roof. Not visible being behind the parapet wall. BAR Staff Final turner Renovation Approval 2016-09-21 2016-09-21 Sign Project 160921-804MeetingSt-1 new canopy sign and new wall sign for goat sheep cow. BAR Staff Final turner Approval 2016-09-21 2016-09-21 Single- and 160921-16ShortSt-1 replace roof shingles matching existing BAR Staff Final turner Two-family Approval Renovation 2016-09-21 2016-09-21 Single- and 160921-109QueenSt-1 approval is for 109, 111 and 113 Queen. All one roof. Reroof flat roof. BAR Staff Final turner Two-family Approval Renovation 2016-09-21 2016-09-21 Single- and 160921-120SBatterySt-1 Rot repair on 2 columns and window sash repair. Add supplemental framing to BAR Staff Final howle Two-family back porch celing. Approval Renovation 2016-09-21 2016-09-21 Single- and 160921-121ChurchSt-1 Installation of HVAC per approved plans for addition. BAR Staff Final howle Two-family Approval Renovation 2016-09-21 2016-09-21 Sign Project 160921-441MeetingSq-1 Right angle sign for Poke Tea House BAR Staff Final howle Approval 2016-09-21 2016-09-21 Single- and 160921-2EElliottSt-1 Remove shingles and replace with same color architectural shingles. BAR Staff Final howle Two-family Approval Renovation 2016-09-21 2016-09-21 Demolition - 160921-2ExchangeSt-1 Demolition to townhouse due to structure failure of the roof and east wall and BAR Staff Final howle Complete Residential concern for public safety. Approval 2016-09-21 2016-09-21 Commercial 160921-99NassauSt-1 Repair/replace exterior siding and windows due to rot, and repaint. BAR Staff Final howle Renovation Approval 2016-09-22 2016-09-22 Commercial 160922-556KingSt-1 Repair of stucco and trim. BAR Staff Final howle Renovation Approval BAR-DRB Approval Report --- Monday, September 26, 2016 at 04:38 PM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2016-09-22 2016-09-22 Single- and 160922-95BeaufainSt-1 Repaint - color change. BAR Staff Final howle Two-family Approval Renovation 2016-09-22 2016-09-22 Single- and 160922-13ThomasSt-1 Stain front porch flooring and steps - no color change. Paint front door at lower BAR Staff Final howle Two-family left side only and stoop - no change. Approval Renovation 2016-09-22 2016-09-22 Single- and 160922-6TrumboSt-1 Removal of non-historic brick porch floor and metals piers/columns; replacement BAR Staff Final stubble Two-family with new tongue and groove porch floor and wood columns; repainting Approval Renovation 2016-09-22 2016-09-22 Single- and 160922-15PricesAly-1 Paint color changes. BAR Staff Final howle Two-family Approval Renovation 2016-09-22 2016-09-22 Single- and 160922-9PricesAly-1 Relocation of electrical and gas meets to central location in the driveway. BAR Staff Final howle Two-family Location of two new skylights. Approval Renovation 2016-09-22 2016-09-22 Multi-family 160922-51Elizabeth-1 Electric scones on second floor piazza to match first floor piazza. BAR Staff Final howle Renovations Approval 2016-09-23 2016-09-23 Single- and 160923-36NassauSt-2 Paint color change. BAR Staff Final howle Two-family Approval Renovation 2016-09-23 2016-09-23 Single- and 160923-19PinckneySt-1 Repaint exterior - no changes. BAR Staff Final howle Two-family Approval Renovation 2016-09-23 2016-09-23 Communication 160923-115MeetingSt-1 Swapping out 3 antennas on existing rooftop. BAR Staff Final howle Towers Approval 2016-09-23 2016-09-23 Commercial 160923-297EBaySt-1 Color change. BAR Staff Final howle Renovation Approval 2016-09-23 2016-09-23 Sign Project 160923-297EBaySt-2 Facade sign for east west partners. BAR Staff Final howle Approval BAR-DRB Approval Report --- Monday, September 26, 2016 at 04:38 PM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2016-09-23 2016-09-23 Single- and 160923-20SBatterySt-1 Repair flat roof leak and associated rot at trim; repaint to match existing. BAR Staff Final stubble Two-family Approval Renovation 2016-09-23 2016-09-23 Single- and 160923-29SmithSt-1 Minor rot repair, stucco repair at foundations, repainting and new shingle roof. All BAR Staff Final stubble Two-family to match existing. Approval Renovation 2016-09-23 2016-09-23 Single- and 160923-168SmithSt-1 Miscellaneous minor rot repair; replacement of stair treads. No changes. BAR Staff Final stubble Two-family Approval Renovation 2016-09-23 2016-09-23 Single- and 160923-89MontaguSt-1 Reroof existing shingle roof with architectural shingles in weather wood. BAR Staff Final howle Two-family Approval Renovation 2016-09-23 2016-09-23 Single- and 160923-104ColumbusSt-1 New wood door. BAR Staff Final howle Two-family Approval Renovation Total Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51

Get email alerts for Charleston

A daily email when new agendas and minutes are posted.

Report an issue with this meeting