Board of Architectural Review
Regular MeetingCharleston, SC · September 26, 2016
Agenda
BAR-DRB Approval Report --- Monday, October 3, 2016 at 09:12 AM
Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff
Received
2016-02-23 2016-09-30 Single- and Two-family Renovation 160223-71BullSt-1 Alterations to entry, new steps and porch enclosure. BAR Staff Final stubble
Approval
2016-03-22 2016-09-27 Single- and Two-family Addition 160322-52MapleSt-2 Interior Renovations of existing house with rear demo and addition. BAR Staff Final howle
Approval
2016-09-14 2016-09-26 Communication Towers 160914-100CalhounSt-1 Installation of antennas and communications equipment cabinet on BAR Staff Final howle
rooftop. Approval
2016-09-26 2016-09-26 Single- and Two-family Renovation 160926-51RadcliffeSt-1 Siding repair to rot damage. BAR Staff Final howle
Approval
2016-09-26 2016-09-26 Swimming Pool 160926-46SBatterySt-1 New 18ftx18ft inground pool at rear of property. BAR Staff Final howle
Approval
2016-09-26 2016-09-26 Commercial Renovation 160926-229KingSt-1 Repair roof to match existing. BAR Staff Final howle
Approval
2016-09-26 2016-09-26 Single- and Two-family Renovation 160926-11LegareSt-1 Replace asphalt shingle roof to match existing. BAR Staff Final howle
Approval
2016-09-26 2016-09-26 Single- and Two-family Renovation 160926-75AshleyAve-1 Repaint exterior - no changes. BAR Staff Final howle
Approval
2016-09-26 2016-09-26 Single- and Two-family Renovation 160926-72VanderhorstSt-2 Roof leak repair in kind and color. BAR Staff Final howle
Approval
2016-09-26 2016-09-26 Commercial Renovation 160926-275KingSt-1 Change out of HVAC system on rooftop - not visible. BAR Staff Final howle
Approval
2016-09-26 2016-09-26 Single- and Two-family Renovation 160926-159BroadSt-1 Repaint - no changes. BAR Staff Final howle
Approval
2016-09-27 2016-09-27 Commercial Renovation 160927-161KingSt-1 Modifications to storefront to include windows and doors. BAR Staff Final howle
Approval
2016-09-27 2016-09-27 Commercial Renovation 160927-106GroveSt-1 Partial exterior demolition BAR Staff Final stubble
Approval
2016-09-27 2016-09-27 Commercial Renovation 160927-160EBaySt-1 repaint- no color change BAR Staff Final turner
Approval
BAR-DRB Approval Report --- Monday, October 3, 2016 at 09:12 AM
Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff
Received
2016-09-27 2016-09-27 Single- and Two-family Renovation 160927-126 1/2BeaufainSt-1 Hardscaping to include driveway, driveway apron, and retaining wall. BAR Staff Final howle
Approval
2016-09-27 2016-09-27 Single- and Two-family Renovation 160927-24ChurchSt-1 replace deteriorated wood doors in kind. Per site visit. BAR Staff Final turner
Approval
2016-09-27 2016-09-27 Single- and Two-family Renovation 160927-17LineSt-1 remove aluminum siding and reconstruct piazza screen wall and hood per BAR Staff Final turner
drawings. Approval
2016-09-27 2016-09-27 Sign Project 160927-55WentworthSt-1 freestanding sign for bohemian hotel BAR Staff Final turner
Approval
2016-09-27 2016-09-27 Commercial Renovation 160927-585KingSt-1 add enclosure at base of stairs BAR Staff Final turner
Approval
2016-09-27 2016-09-27 Commercial Renovation 160927-287MeetingSt-1 repaint- no color change BAR Staff Final turner
Approval
2016-09-28 2016-09-28 Single- and Two-family Renovation 160928-83SmithSt-1 HVAC change out. BAR Staff Final howle
Approval
2016-09-28 2016-09-28 Commercial Renovation 160928-267RutledgeAve-2 Renovation to existing structure. Plumbing, electrical, HVAC sheetrock, trim BAR Staff Final howle
finishes, window repair and replacement, siding repair. Approval
2016-09-28 2016-09-28 Single- and Two-family Renovation 160928-83KingSt-1 Repaint with color change. BAR Staff Final howle
Approval
2016-09-28 2016-09-28 Commercial Renovation 160928-76QueenSt-1 Hardscaping at rear to resurface parking lot. BAR Staff Final howle
Approval
2016-09-28 2016-09-28 Single- and Two-family Renovation 160928-16CharlotteSt-1 Replace rotten window sashes and doors. BAR Staff Final howle
Approval
2016-09-29 2016-09-29 Single- and Two-family Renovation 160929-10ColonialSt-1 Rebuild front steps with consistent risers and treads - no footprint change. BAR Staff Final howle
Approval
2016-09-29 2016-09-29 Commercial Renovation 160929-10ExchangeSt-1 Paint color change - Main body to be "silk brocade." BAR Staff Final howle
Approval
2016-09-29 2016-09-29 Commercial Renovation 160929-51GeorgeSt-1 Repaint storefronts of units A, B, and C. No changes. BAR Staff Final howle
Approval
BAR-DRB Approval Report --- Monday, October 3, 2016 at 09:12 AM
Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff
Received
2016-09-29 2016-09-29 Commercial Renovation 160929-635EBaySt-1 Minor rot repair, recoat roofs and repaint all to match existing (carriage BAR Staff Final stubble
houses only) Approval
2016-09-29 2016-09-29 Single- and Two-family Renovation 160929-28RoseLn-1 Rot repair, siding replacement to match existing. BAR Staff Final howle
Approval
2016-09-29 2016-09-29 Single- and Two-family Renovation 160929-29KennedySt-1 Addition of small window on back of house (change to previously approved BAR Staff Final howle
plans) and color change. Approval
2016-09-30 2016-09-30 Single- and Two-family Renovation 160930-11LegareSt-1 Reroof with architectural shingles to match existing. BAR Staff Final howle
Approval
2016-09-30 2016-09-30 Single- and Two-family Renovation 160930-107MagnoliaAve-1 roof repair to existing sfr, does not need Zoning approval, checking with BAR BAR Staff Final howle
staff to confirm they do not need to review Approval
2016-09-30 2016-09-30 Single- and Two-family Renovation 160930-139QueenSt-1 Restain front porch flooring. BAR Staff Final howle
Approval
2016-09-30 2016-09-30 Single- and Two-family Renovation 160930-57HanoverSt-1 Elevate and renovate residence as part of Foundry Alley PUD (work applies BAR Staff Final stubble
to entire structure) Approval
2016-09-30 2016-09-30 Single- and Two-family Renovation 160930-82NassauSt-1 Elevate and renovate residence as part of Foundry Alley PUD BAR Staff Final stubble
Approval
2016-09-30 2016-09-30 Single- and Two-family Renovation 160930-90NassauSt-1 Elevate and renovate residence as part of Foundry Alley PUD BAR Staff Final stubble
Approval
2016-09-30 2016-09-30 Sign Project 160930-509KingSt-1 New right angle sign for "The Editor" BAR Staff Final stubble
Approval
2016-09-30 2016-09-30 Single- and Two-family Renovation 160930-5NunanSt-1 Renovation to residence and modifications to existing shed BAR Staff Final stubble
Approval
Total Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
Get email alerts for Charleston
A daily email when new agendas and minutes are posted.