Muyni
← Back to Charleston

Board of Architectural Review

Regular Meeting

Charleston, SC · October 31, 2016

Agenda

Agenda

BAR-DRB Approval Report --- Monday, November 7, 2016 at 08:40 AM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2016-09-26 2016-10-31 Single- and Two-family 160926-63RadcliffeSt-1 Renovation of existing single family dwelling. BAR Staff Final stubble Renovation Approval 2016-10-13 2016-11-01 Single- and Two-family 161013-107EBaySt-1 interior renovation and enclosure of existing courtyard at existing single family BAR Staff Final stubble Addition residence Approval 2016-10-20 2016-10-31 Sign Project 161020-342KingSt-1 Awning and facade sign for vomFass BAR Staff Final howle Approval 2016-10-31 2016-10-31 Single- and Two-family 161031-1EBatterySt-1 Replace flat roof portion of building, which was damaged from high windows, BAR Staff Final howle Renovation with hydro stop roof system. Approval 2016-10-31 2016-10-31 Multi-family Renovations 161031-8Cromwell Alley-1 Roof repairs in kind BAR Staff Final stubble Approval 2016-10-31 2016-10-31 Multi-family Renovations 161031-63BeaufainSt-1 Rot repair to one window sill and stucco repair at chimney- no changes BAR Staff Final stubble Approval 2016-10-31 2016-10-31 Single- and Two-family 161031-283AshleyAve-1 Rot repair and repaint - no changes. BAR Staff Final howle Renovation Approval 2016-11-01 2016-11-01 Single- and Two-family 161101-43ChurchSt-1 Repainting to match existing with minor rot repair. No wholesale replacement or BAR Staff Final stubble Renovation changes. Approval 2016-11-01 2016-11-01 Fence Project 161101-97AlexanderSt-1 New fence along south property line BAR Staff Final stubble Approval 2016-11-01 2016-11-01 Single- and Two-family 161101-123AshleyAve-1 Rot repair and repaint - no changes. BAR Staff Final howle Renovation Approval 2016-11-02 2016-11-02 Single- and Two-family 161102-153TraddSt-1 Replace shingle roof with charcoal gray shingles. Repair fascia, soffit, and trim to BAR Staff Final howle Renovation match existing with color change. Paint windows, shutters, and front door - color Approval change. Replace gutters/downspouts.install HVAC ductwok 2016-11-02 2016-11-02 Single- and Two-family 161102-1MontaguSt-1 Repaint color change. BAR Staff Final howle Renovation Approval 2016-11-02 2016-11-02 Single- and Two-family 161102-131BroadSt-1 Refinish/restore mail slot, doorbell, and knob on front door. Refinish door. Replace BAR Staff Final howle Renovation damaged glass to match existing. No changes. Approval 2016-11-02 2016-11-02 Single- and Two-family 161102-144BroadSt-1 Repair window sill. No change. BAR Staff Final howle Renovation Approval BAR-DRB Approval Report --- Monday, November 7, 2016 at 08:40 AM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2016-11-03 2016-11-03 Single- and Two-family 161103-87TraddSt-1 Paint color change. BAR Staff Final howle Renovation Approval 2016-11-03 2016-11-03 BAR 161103-61AmherstSt-1 New construction of a duplex BAR Staff Final stubble Approval 2016-11-03 2016-11-03 Single- and Two-family 161103-120SBatterySt-1 Installation of 5 new HVAC systems. BAR Staff Final howle Renovation Approval 2016-11-03 2016-11-03 Single- and Two-family 161103-56AsheSt-1 Remove brick veneer and metal siding and repair/replace wood siding. Replace BAR Staff Final howle Renovation rear exterior stair. Approval 2016-11-03 2016-11-03 Fence Project 161103-120WentworthSt-1 New fence on side of property, front portion 4-5.5 feet tall varying by grade, rear BAR Staff Final howle portion 6 feet tall. Approval 2016-11-04 2016-11-04 Single- and Two-family 161104-61LaurensSt-1 Replace rotten piazza decking - no change. BAR Staff Final howle Renovation Approval 2016-11-04 2016-11-04 Single- and Two-family 161104-117LineSt-1 Remove aluminum siding to repair wood siding and reconstruct piazza screen. BAR Staff Final howle Renovation Approval 2016-11-04 2016-11-04 Single- and Two-family 161104-169DunnemannAve-1 Repaint trim, shutters and iron railings. BAR Staff Final howle Renovation Approval 2016-11-04 2016-11-04 Multi-family Renovations 161104-31ComingSt-1 Paint color change. BAR Staff Final howle Approval 2016-11-04 2016-11-04 Multi-family Renovations 161104-29ComingSt-1 Paint color change. BAR Staff Final howle Approval 2016-11-04 2016-11-04 Single- and Two-family 161104-65SocietySt-1 Exterior brick work around plant beds. BAR Staff Final howle Renovation Approval 2016-11-04 2016-11-04 Multi-family Renovations 161104-67LegareSt-1 Replacement of existing tim roof with hand-crimped standing seam aluminum, BAR Staff Final howle copper, or steel. Approval 2016-11-04 2016-11-04 Single- and Two-family 161104-221Saint PhilipSt-1 Demolition of rear/accesorry building. BAR Staff Final howle Renovation Approval 2016-11-04 2016-11-04 Single- and Two-family 161104-12TrapmanSt-1 Repaint and rot repairs - no changes. BAR Staff Final howle Renovation Approval BAR-DRB Approval Report --- Monday, November 7, 2016 at 08:40 AM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2016-11-04 2016-11-04 Single- and Two-family 161104-48SpringSt-1 Repair/relevel brick pathway (same brick). BAR Staff Final howle Renovation Approval 2016-11-04 2016-11-04 Single- and Two-family 161104-213MeetingSt-1 Repaint windows and trim for 213-215 Meeting. No change. BAR Staff Final howle Renovation Approval 2016-11-04 2016-11-04 Commercial Renovation 161104-556KingSt-1 Exterior light fixture. BAR Staff Final howle Approval 2016-11-04 2016-11-04 Single- and Two-family 161104-131BroadSt-1 Paint color change. BAR Staff Final howle Renovation Approval Total Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32

Get email alerts for Charleston

A daily email when new agendas and minutes are posted.

Report an issue with this meeting