Board of Architectural Review
Regular MeetingCharleston, SC · July 3, 2017
Agenda
BAR-DRB Approval Report --- Tuesday, July 11, 2017 at 09:20 AM
Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff
Received
2017-06-29 2017-07-06 Commercial Renovation 170629-701EBaySt-2 Interior upfit/renovation. Add exterior stair case. BAR Staff Final Approval howle
2017-07-03 2017-07-03 Commercial Renovation 170703-888KingSt-1 Install bracketed canopy and reinstall door on south elevation and brick BAR Staff Final Approval howle
repairs as necessary.
2017-07-03 2017-07-03 Commercial Renovation 170703-30StateSt-1 Revision to previously approved plans to allow restoration of two hsitoric BAR Staff Final Approval howle
door openings.
2017-07-03 2017-07-03 Sign Project 170703-56QueenSt-1 Final approval for right angle sign only for "The Healing Gallery" 18hx24w in BAR Staff Final Approval Bennett
dimensions. Denial of wall sign.
2017-07-03 2017-07-03 Commercial Renovation 170703-64SpringSt-1 Final approval for addition of first floor door at east elevation. BAR Staff Final Approval Bennett
2017-07-05 2017-07-05 Commercial Renovation 170705-28BroadSt-1 Rebuild brick wall section along Chalmers that was damaged by vehicle, BAR Staff Final Approval howle
to match exsiting.
2017-07-05 2017-07-05 Fence Project 170705-20MurrayBlvd-1 Approved for 6-ft. fence per site plan submitted. BAR Staff Final Approval howle
2017-07-05 2017-07-05 Commercial Renovation 170705-171ChurchSt-1 Repairs/repointing at parapet wall. Repairs at deck and around skylight on BAR Staff Final Approval howle
roof.
2017-07-05 2017-07-05 Single- and Two-family 170705-83SmithSt-1 Repairing front porch water damage. BAR Staff Final Approval Bennett
Renovation
2017-07-06 2017-07-06 Single- and Two-family 170706-851RutledgeAve-1 Repaint and reroof. Interior renovation. BAR Staff Final Approval howle
Renovation
2017-07-06 2017-07-06 Fence Project 170706-22LimehouseSt-1 Repair to existing wall, fence, and gate with modificaiton to avoid tree BAR Staff Final Approval howle
stump.per plans.
2017-07-06 2017-07-06 Single- and Two-family 170706-168SmithSt-1 New driveway on Morris street with concrete runners and plantation mix in BAR Staff Final Approval howle
Renovation center.
2017-07-06 2017-07-06 Single- and Two-family 170706-56WarrenSt-1 Replace existing wood gate with 7' wood gate as per drawings submitted. BAR Staff Final Approval Bennett
Renovation
2017-07-06 2017-07-06 Single- and Two-family 170706-52BullSt-1 Repair and replace siding and damaged trim. Repaint. BAR Staff Final Approval howle
Renovation
2017-07-06 2017-07-06 Sign Project 170706-134MeetingSt-1 Wall sign and window sign for Pinnacle Bank. BAR Staff Final Approval howle
2017-07-06 2017-07-06 Sign Project 170706-291EBaySt-1 Facade sign, window sign, and freestanding/wall sign reface for Pinnacle BAR Staff Final Approval howle
Bank.
BAR-DRB Approval Report --- Tuesday, July 11, 2017 at 09:20 AM
Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff
Received
2017-07-06 2017-07-06 Single- and Two-family 170706-62SocietySt-1 Change out of existing HVAC equipment on roof - same location. BAR Staff Final Approval howle
Renovation
2017-07-06 2017-07-06 Single- and Two-family 170706-21JacobsAly-1 Color change on three doors. Replace kitchen door on rear addition (not BAR Staff Final Approval howle
Renovation visible).
2017-07-06 2017-07-06 Multi-family Renovations 170706-234RutledgeAve-1 Add 32" to kitchen onto porch. BAR Staff Final Approval Bennett
2017-07-07 2017-07-07 Single- and Two-family 170707-21JacobsAly-1 HVAC change out. Same location. BAR Staff Final Approval howle
Renovation
Total Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20