Muyni
← Back to Charleston

Board of Architectural Review

Regular Meeting

Charleston, SC · July 31, 2017

Agenda

Agenda

BAR-DRB Approval Report --- Monday, August 7, 2017 at 09:04 AM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2017-07-19 2017-08-04 Fence Project 170719-22CharlotteSt-2 Replace wooden fence on existing brick wall at 7ft height, designed with a BAR Staff Final Approval howle cap. 2017-07-31 2017-07-31 Single- and Two-family 170731-21HampdenCt-1 Roof shing repair/replacement.. Wood siding repair on hyphen. Repaint. BAR Staff Final Approval howle Renovation 2017-07-31 2017-07-31 Single- and Two-family 170731-27PittSt-1 Replace wills on upstairs porch. NO changes. BAR Staff Final Approval howle Renovation 2017-07-31 2017-07-31 Single- and Two-family 170731-28GadsdenSt-1 Final approval for removal of stair enclosure at piazza only. BAR Staff Final Approval Bennett Renovation 2017-07-31 2017-07-31 Multi-family Renovations 170731-259EBaySt-1 Final approval to reclad exterior with cementitious siding as per plans BAR Staff Final Approval Bennett submitted. 2017-07-31 2017-07-31 Single- and Two-family 170731-11SavageSt-1 Replace previously replaced window (6 over 6) at north elevation with 2/2 BAR Staff Final Approval Bennett Renovation lite to match originials. 2017-07-31 2017-07-31 Multi-family Renovations 170731-141Saint Rot repairs, reglazing windows, and repainting with no changes. BAR Staff Final Approval Bennett PhilipSt-1 2017-07-31 2017-07-31 Single- and Two-family 170731-32SBatterySt-1 Add a brick pad to front yard as walkway. BAR Staff Final Approval howle Renovation 2017-08-01 2017-08-01 Single- and Two-family 170801-5AlexanderSt-1 Repair rotten wood and repair south wall on 3rd floor. No changes. BAR Staff Final Approval howle Renovation 2017-08-01 2017-08-01 Communication Towers 170801-115MeetingSt-1 Adding one new antenna to existing configuration on rooftop, and adding BAR Staff Final Approval howle one new fiber line to existing cabling. 2017-08-01 2017-08-01 Commercial Renovation 170801-5ExchangeSt-1 Replace existing window in courtyard with new doors and sidelight with BAR Staff Final Approval howle ramp, stair, and awning. 2017-08-02 2017-08-02 Single- and Two-family 170802-95ChurchSt-1 Add an exhaust vent to the right side of the second floor by the second BAR Staff Final Approval Bennett Renovation window. 2017-08-02 2017-08-02 Commercial Renovation 170802-55BeeSt-1 Removal of 3-tab shingle roof and replacing with architectural 50 year BAR Staff Final Approval Bennett matching existing color. 2017-08-03 2017-08-03 Single- and Two-family 170803-23AmherstSt-1 Hurricane protection system for windows/doors on rear structure. BAR Staff Final Approval howle Renovation BAR-DRB Approval Report --- Monday, August 7, 2017 at 09:04 AM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2017-08-03 2017-08-03 Single- and Two-family 170803-19GadsdenSt-1 Replace door with window BAR Staff Final Approval minnigan Renovation 2017-08-03 2017-08-03 Single- and Two-family 170803-94MurrayBlvd-1 Replace 5 windows on front elevation to match existing. BAR Staff Final Approval howle Renovation 2017-08-03 2017-08-03 Single- and Two-family 170803-8GeorgeSt-1 Replace shingle roof with new shignles in Quarry Gray. BAR Staff Final Approval howle Renovation 2017-08-03 2017-08-03 Single- and Two-family 170803-25RutledgeAve-1 Replace flat roof. BAR Staff Final Approval howle Renovation 2017-08-03 2017-08-03 Commercial Renovation 170803-31BroadSt-1 Repairs and repaint to door and transom, and fill in hole in wall, all in BAR Staff Final Approval howle courtyard - not visible. 2017-07-31 2017-08-04 Uninhabitable Structures 170731-14LimehouseSt-1 Rear 7'x11' shed addition. BAR Staff Final Approval howle 2017-08-04 2017-08-04 BAR 170804-96SBatterySt-1 Replace rear porch and stairs, replace select door and window on north BAR Staff Final Approval minnigan and west elevations 2017-08-04 2017-08-04 Single- and Two-family 170804-134ChurchSt-1 Repair glazing and repaint windows and siding on north elevation. No BAR Staff Final Approval howle Renovation changes. 2017-08-04 2017-08-04 Single- and Two-family 170804-96SBatterySt-2 Rear deck addition. BAR Staff Final Approval howle Addition 2017-08-04 2017-08-04 Single- and Two-family 170804-22CharlotteSt-1 Repaint rear sturcture - no changes. BAR Staff Final Approval howle Renovation 2017-08-04 2017-08-04 Single- and Two-family 170804-22CharlotteSt-2 Repaint main house - no change. BAR Staff Final Approval howle Renovation 2017-08-04 2017-08-04 Single- and Two-family 170804-90LoganSt-1 Replace shingles with black architectural shingles. BAR Staff Final Approval howle Renovation 2017-08-04 2017-08-04 Single- and Two-family 170804-532RutledgeAve-1Addition of exterior stair to facilitate interior renovation and addition of BAR Staff Final Approval howle Addition third dewlling unit. 2017-08-04 2017-08-04 Single- and Two-family 170804-17NassauSt-1 Remove metal awning, repair/replace railings and siding. Color change. BAR Staff Final Approval howle Renovation Add shutters. Repair/replace gutters/downspouts. 2017-08-04 2017-08-04 Single- and Two-family 170804-17NassauSt-2 New HVAC unit at rear - not visible. BAR Staff Final Approval howle Renovation BAR-DRB Approval Report --- Monday, August 7, 2017 at 09:04 AM Total Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
Report an issue with this meeting