Muyni
← Back to Charleston

Board of Architectural Review

Regular Meeting

Charleston, SC · January 8, 2018

Agenda

Agenda

BAR Staff Approvals Jan 8-12, 2018 Main Address Permit Type Description Review Date Item Review Type 102 S BATTERY ST Single Family/Duplex Dwelling Reconstruction of existing deck, pergola and HVAC platforms at rear. 1/8/2018 BAR - Quick Plan Review 40 PINCKNEY ST Building Commercial interior nonstructural demoliton and renovation (interior/exterior) to Pinckney Hotel 1/10/2018 BAR - Quick Plan Review approved in BP 62 QUEEN ST Demolition Partial demolition of rear portion, per plans. 1/8/2018 BAR - Quick Plan Review 24 MORRIS ST Single Family/Duplex Dwelling Repair and repaint exterior - no changes. Replace shingle roof with new architectural 1/10/2018 BAR - Quick Plan Review shingles. 18 LOGAN ST Pool - Single Family/Duplex inground swimming pool 1/12/2018 BAR - Quick Plan Review Dwelling 28 MURRAY BLVD Painting Repaint porch on east elevation, reseal flat porch roof, and repaint gazebo. No 1/10/2018 BAR - Quick Plan Review changes. 22 GADSDEN ST Painting Paint duplex at rear of 22 Gadsden 1/11/2018 BAR - Quick Plan Review 65 VANDERHORST ST Building Multi-Family Temporarily removal of 3rd floor windows to allow for repairs and repainting of same 1/9/2018 BAR - Quick Plan Review with reinstallation of all windows in same location. 8 BOGARD ST Painting Repainting with no color changes. 1/9/2018 BAR - Quick Plan Review 131 CHURCH ST Single Family/Duplex Dwelling Reline chimneys. No exterior changes. 1/8/2018 BAR - Quick Plan Review 281 CALHOUN ST Sign New facade signs, directional signs, and menu boards/canopy for Starbucks. 1/10/2018 BAR - Quick Plan Review 102 S BATTERY ST Single Family/Duplex Dwelling renovation/replacement to existing pergola/deck for single family residence 1/8/2018 BAR - Quick Plan Review 753 MEETING ST Single Family/Duplex Dwelling Replace existing shingle roof with new shingles to match existing. 1/8/2018 BAR - Quick Plan Review 85 TRADD ST Single Family/Duplex Dwelling interior renovation, moving load bearing wall, MEP work/exterior work to include 1/8/2018 BAR - Quick Plan Review replacement of door and addition of dormer above door 274 HUGER ST Building Multi-Family Exterior envelope repairs consisting of Hardie siding removal/replacement; window 1/9/2018 BAR - Quick Plan Review removal/replacement; incidental masonry work and associated waterproofing repairs to the underlying substrate all in kind. Per RF does not need FMD review 66 SOUTH ST Single Family/Duplex Dwelling Addition of new handicap ramps and interior (and minor exterior) renovation to 1/10/2018 BAR - Quick Plan Review facilitate ADA accessibility of dwelling. additional scope attached in documents 64 SPRING ST Mechanical - Commercial Relocation and replacement of HVAC units at rear, per previously approved plans. 1/10/2018 BAR - Quick Plan Review 59 KING ST Apt A Single Family/Duplex Dwelling Renovate first floor to include kitchen, powder room, painting, and floors. 1/10/2018 BAR - Quick Plan Review 114 BROAD ST Single Family/Duplex Dwelling Repointing on an as needed basis of mortar joints, matching existing mortar in 1/12/2018 BAR - Quick Plan Review composition, strenghth, texture, and joint. 485 E BAY ST Communication Tower sprint is removing/replacing existing antennas, adding 3 new RRUs to existing 1/10/2018 BAR - Quick Plan Review configuration 75 BULL ST Single Family/Duplex Dwelling Replace tile on porch roof with standing seam copper and repair main roof with 1/8/2018 BAR - Quick Plan Review salvaged tile. 8 GEORGE ST Painting Repainting with no color changes. 1/9/2018 BAR - Quick Plan Review 164 KING ST Building Commercial Remove 2 windows (one on west elevation, one of south elevation) to replicate for 1/11/2018 BAR - Quick Plan Review mock-up of new windows. 116 CANNON ST Single Family/Duplex Dwelling Replace four rotten boards under windows on west elevation and repaint. No 1/10/2018 BAR - Quick Plan Review changes. BAR Staff Approvals Jan 8-12, 2018 Main Address Permit Type Description Review Date Item Review Type 19 VENDUE RANGE Building Commercial Renovating the first floor coffee shop into a dining room for a restaurant. There will be 1/12/2018 BAR - Quick Plan Review modifications to the back of the house spaces to accommodate access from the kitchen to the new dining room/restaurant. Egress stairs to be re-routed to the front of the building. 44 LEGARE ST Painting Repaint porch elements including decking, railing, pickets, and columns. No 1/11/2018 BAR - Quick Plan Review changes. 171 WENTWORTH ST Single Family/Duplex Dwelling New doors, terrace, screen infill on piazza 1/9/2018 BAR - Quick Plan Review 16 BOYCES WHF Building Multi-Family Replace stucco on 9 chimneys to match existing and repair flashing around 1/11/2018 BAR - Quick Plan Review chimneys. Replace stucco and repair flashing on columns bases at 7 balconies. 134 WENTWORTH ST Single Family/Duplex Dwelling Replace door at piazza screen and repaint with color changes. 1/11/2018 BAR - Quick Plan Review 263 RUTLEDGE AVE Painting Repaint with new colors. 1/10/2018 BAR - Quick Plan Review 98 WENTWORTH ST Building Commercial New bluestone pad and concrete bench for bus stop. 1/10/2018 BAR - Quick Plan Review

Get email alerts for Charleston

A daily email when new agendas and minutes are posted.

Report an issue with this meeting