Board of Architectural Review
Regular MeetingCharleston, SC · October 1, 2018
Agenda
BAR Staff Approvals October 1-5, 2018
Main Address Permit Type Description Review Date Item Review Type
55 LOGAN ST Painting Minor rot repairs to first floor piazza and repainting entire house with no color changes. 10/2/2018 BAR - Quick Plan Review
88 BROAD ST Building Commercial Restoration of the exterior building envelope including windows, stucco, trim, paint, and new roof. 10/3/2018 BAR - Quick Plan Review
Stabilizing existing structure. Installing temporary utilities.
930 ASHLEY AVE Demolition Partial demo of CMU shed at rear of house - shed is less than 50 years of age. 10/3/2018 BAR - Quick Plan Review
89 BOGARD ST Mechanical - Single Family/Duplex Installation of two HVAC units at rear of building. 10/3/2018 BAR - Quick Plan Review
Dwelling
387 KING ST Communication Tower Remove 5 antennas and 3 RRU's and replace with 7 antennas and 7 RRU's 2 hybrid cables and 1 10/1/2018 BAR - Quick Plan Review
equipment rack and 1 antenna mount modification on existing structure.
54 WARREN ST Mechanical - Single Family/Duplex HVAC Changeout 10/1/2018 BAR - Quick Plan Review
Dwelling
68 WENTWORTH ST Communication Tower removal/replacement of antennas at existing cell tower 10/3/2018 BAR - Quick Plan Review
60 RADCLIFFE ST Single Family/Duplex Dwelling Replace two 9 lite sashes at first floor of southeast elevation in kind to match existing. 10/2/2018 BAR - Quick Plan Review
87 CHURCH ST Painting Repaint south-facing windows and front door surround. No changes. 10/2/2018 BAR - Quick Plan Review
100 MURRAY BLVD Demolition Removal of structurally unsound chimney 10/3/2018 BAR - Quick Plan Review
170 LOCKWOOD BLVD Communication Tower Remove 3 antennas and 3 TMA's and replacing with 6 antennas and RRU's and 3 antenna 10/3/2018 BAR - Quick Plan Review
concealment canisters.
15 THOMAS ST Fence - Single Family/Duplex New 4ft wooden fence to replace existing non-historic wood fence. 10/4/2018 BAR - Quick Plan Review
Dwelling
27 RACE ST Demolition Demolition of non-historic rear garage/carport. 10/4/2018 BAR - Quick Plan Review
85 ASHLEY AVE Painting Painting brick and trim - as per samples submitted. 10/5/2018 BAR - Quick Plan Review
346 KING ST Painting Repairs and repainting wood louvered shutters at 2nd and 3rd floors with no changes. 10/3/2018 BAR - Quick Plan Review
23 ASHE ST Demolition Demolition of 23 & 25 Ashe Street per vested Board approval 04.09.08. 10/5/2018 BAR - Quick Plan Review
112 RUTLEDGE AVE Unit C Mechanical - Single Family/Duplex HVAC change out in same location and same size 10/2/2018 BAR - Quick Plan Review
Dwelling
148 S BATTERY ST Single Family/Duplex Dwelling Repairs to copper gutters and fascia behind gutters as needed; re-glazing windows and repainting 10/1/2018 BAR - Quick Plan Review
trim, sashes, and ironwork matching existing colors. BRICK WILL NOT BE PAINTED
1 BARRE ST Communication Tower upgrade of equipment at existing cell tower 10/3/2018 BAR - Quick Plan Review
37 SPRING ST Mechanical - Single Family/Duplex Installation of one HVA unit at rear of building. 10/3/2018 BAR - Quick Plan Review
Dwelling
7 GADSDEN ST Single Family/Duplex Dwelling Repair/replace damaged siding and repaint - no changes. 10/4/2018 BAR - Quick Plan Review
8 S ADGERS WHF Single Family/Duplex Dwelling Replace existing copper gutter at rear to match existing. 10/5/2018 BAR - Quick Plan Review
2 CHISOLM ST Single Family/Duplex Dwelling Repairs to CMU Block wall at rear and sides of property; portion at tree to be completely removed. 10/5/2018 BAR - Quick Plan Review
New drawings for zoning and BAR will be required if being rebuilt.
445 KING ST Mechanical - Commercial HVAC change out for renovation first floor to create three tenant spaces. Remove and replace 10/4/2018 BAR - Quick Plan Review
storefront.
13 CARONDOLET ST Roofing - Single Family/Duplex Replace existing shingle roof. 10/1/2018 BAR - Quick Plan Review
Dwelling
Get email alerts for Charleston
A daily email when new agendas and minutes are posted.