Muyni
← Back to Charleston

Board of Architectural Review

Regular Meeting

Charleston, SC · July 1, 2019

Agenda

Agenda

BAR Staff Approvals July 1-5, 2019 Main Address Permit Type Description Review Date Item Review Type 53 MONTAGU ST Single Family/Duplex Dwelling Replacement of existing asphalt shingle roof to match existing. (Type H shingles required) 7/1/2019 BAR - Quick Plan Review 40 E BAY ST Building Commercial At West elevation - repointing areas of deteriorated mortar at front entry way; repair and replace existing gutter; 7/3/2019 BAR - Quick Plan Review replace existing fan light at 3rd floor in kind to match and remove light fixture above entrance. 328 KING ST Building Commercial Repairs to windows/trim/fascia on front of building with repainting of same. 7/1/2019 BAR - Quick Plan Review 58 WARREN ST Fence - Single Family/Duplex Dwelling Installing new iron gate 7/5/2019 BAR - Quick Plan Review 0 ZIG ZAG ALY Single Family/Duplex Dwelling Color changes to white - not visible from public r.o.w. 7/3/2019 BAR - Quick Plan Review 73 BULL ST Fence - Single Family/Duplex Dwelling Fence, coping wall and lighting 7/5/2019 BAR - Quick Plan Review 2 CHARLES ST Painting Minor rot repairs and repainting with no changes. 7/5/2019 BAR - Quick Plan Review 15 BOYER CT Single Family/Duplex Dwelling Demo of roof and porch to create parking and renovate building 7/5/2019 BAR - Quick Plan Review 150 COMING ST Single Family/Duplex Dwelling Replace flat roof on rear addition. No change. 7/1/2019 BAR - Quick Plan Review 164 KING ST Building Commercial Repainting with color changes to match Library Society Color Palette. 7/3/2019 BAR - Quick Plan Review 110 ASHLEY AVE Pool - Single Family/Duplex Dwelling In-ground pool 7/5/2019 BAR - Quick Plan Review 25 BULL ST Building Multi-Family Reglazing windows at Bull Street elevation with repainting of same - repainting of ceiling of door hood at rear. 7/3/2019 BAR - Quick Plan Review 8 ADDISON ST Painting Minor rot repairs and repainting with all repairs in kind with no changes. 7/2/2019 BAR - Quick Plan Review 5 CLIFFORD ST Building Commercial Replacement of "L" shape gutterat right side of church and repairs to two masonry columns with all repairs in kind to 7/3/2019 BAR - Quick Plan Review match existing. 80 1/2 SOCIETY ST Roofing - Commercial Replace roof shingles to match existing. will use 140mph rated shingles 7/1/2019 BAR - Quick Plan Review 152 BROAD ST Single Family/Duplex Dwelling Minor rot repairs to siding and trim as need with all repairs in kind; repainting matching existing colors. 7/5/2019 BAR - Quick Plan Review 46 SIMONS ST Painting Minor rot repairs and repainting with no changes. 7/2/2019 BAR - Quick Plan Review 321 KING ST Painting Repair and repaint three windows at second floor with all repairs in kind with no changes. 7/2/2019 BAR - Quick Plan Review 33 HESTER ST Single Family/Duplex Dwelling Exterior: replace roof shingles, paint siding. Interior: flooring, minor remodeling, cabinets, sheetrock, paint. 7/1/2019 BAR - Quick Plan Review 42 MORRIS ST Painting Stucco repairs and repainting with no changes. 7/2/2019 BAR - Quick Plan Review 151 MEETING ST Building Commercial Non-structural tenant upfit to include MEP, non-structural walls, relocation of fire devices, new exterior ATM, sprinkler 7/2/2019 BAR - Quick Plan Review work. 92 BULL ST Single Family/Duplex Dwelling Reconstruction of two sets of stairs as per previously approved plans. 7/3/2019 BAR - Quick Plan Review

Get email alerts for Charleston

A daily email when new agendas and minutes are posted.

Report an issue with this meeting