Board of Architectural Review
Regular MeetingCharleston, SC · August 26, 2019
Agenda
BAR Staff Approvals August 26-30, 2019
Main Address Permit Type Description Review Date Item Review Type
227 SAINT PHILIP ST Painting Repaint with color change. 8/30/2019 BAR - Quick Plan Review
64 BOGARD ST APT A Single Family/Duplex Dwelling 12' x 19' deck; Interior renovation to include interior wall removal to make 1 large 8/28/2019 BAR - Quick Plan Review
bedroom, bathroom renovation, new flooring,
135 TRADD ST Accessory Structure Pool house on south end of property. 8/26/2019 BAR - Quick Plan Review
6 PRICES ALY Painting Repaint - no changes. 8/29/2019 BAR - Quick Plan Review
42 LAURENS ST Single Family/Duplex Dwelling Replace five wood louvered shutters in kind to match existing and replace trim of 8/28/2019 BAR - Quick Plan Review
door surround with repainting of same to match.
7 MONTAGU ST Painting Paint new exterior windows - no color change. 8/26/2019 BAR - Quick Plan Review
591 KING ST Demolition After the fact demolition of structure. 8/27/2019 BAR - Quick Plan Review
103 SAINT PHILIP ST Building Commercial Replacement of existing cool tower with a new cooling tower in the same location. 8/26/2019 BAR - Quick Plan Review
scope of work includes new steel support structure and foundation work.
21 BROAD ST Painting Color changes matching color palette of 88 Broad Street. 8/26/2019 BAR - Quick Plan Review
5 LONGITUDE LN Retaining Wall - Single Replace existing architectural grade shingle roof in kind to match; 5 & 7 Longitude is 8/27/2019 BAR - Quick Plan Review
Family/Duplex Dwelling a duplex
29 BROAD ST UNIT B Building Commercial 3rd Floor Rear addition of bathroom for unit B 8/28/2019 BAR - Quick Plan Review
54 HASELL ST Single Family/Duplex Dwelling Remove window security bars; restore, reinstall at basement windows; restore and 8/26/2019 BAR - Quick Plan Review
repair windows of main house; one window frame/sash to be replicated and one
fram/sash to be repaired extensively; install exterior sconces on front facade of
house to replace flood lights.
73 SPRING ST Painting Repaint storefront with color change. 8/28/2019 BAR - Quick Plan Review
114 TRADD ST Single Family/Duplex Dwelling non structual interior reno. new floors, cabinets/builtins, plumbing, mechanical, 8/26/2019 BAR - Quick Plan Review
lighting, interior trim, paint, sheetrock
125 GORDON ST Single Family/Duplex Dwelling Raising house to conform to FEMA. To include rear bump out of existing house: 1st 8/27/2019 BAR - Quick Plan Review
floor screen porch and 2nd floor "dormer" to extend livable space upstairs. All MEPs
and opening interior floor plan with provided structurals. See plans.
8 CHALMERS ST Painting Repaint windows - no changes. 8/26/2019 BAR - Quick Plan Review
41 BARRE ST Single Family/Duplex Dwelling New Construction- Orignal house on lot moving with addition and renovation of 8/28/2019 BAR - Quick Plan Review
existing. Does not include pool or accessory structure.
140 BROAD ST Painting Repaint - no changes. 8/28/2019 BAR - Quick Plan Review
426 KING ST Painting Painting store front with no color changes. 8/28/2019 BAR - Quick Plan Review
26 CHARLOTTE ST Painting After the fact approval for exterior painting with no color changes. 8/27/2019 BAR - Quick Plan Review
54 HASELL ST Single Family/Duplex Dwelling Remove cementious stucco from front facade, install stainless steel lintels per 8/26/2019 BAR - Quick Plan Review
engineer's spec, repair brick using historic mortar, lime plaster with historical lime
plaster and score replicating keystones, quoins and blockwork.
35 BARRE ST Single Family/Duplex Dwelling Turning 2 units into one residence. Exterior Renovation (Porch, Front Door, CHimney) 8/28/2019 BAR - Quick Plan Review
Addition of side Porch
138 S BATTERY ST Painting Repaint windows, trim, door, back porch, fence/gate - no changes. 8/28/2019 BAR - Quick Plan Review
304 KING ST Painting Repaint storefornt and clear coat doors - no changes. 8/28/2019 BAR - Quick Plan Review
64 TRADD ST Demolition Demolition of non-historic rear addition. 8/30/2019 BAR - Quick Plan Review
BAR Staff Approvals August 26-30, 2019
Main Address Permit Type Description Review Date Item Review Type
54 HASELL ST Single Family/Duplex Dwelling Removal of latex paint and application of limewash as per samples submitted. *** 8/26/2019 BAR - Quick Plan Review
update: upon removal of paint, it was discovered that the front facade needs
extensive stucco repairs before limewashing. BAR staff (KH) site visit confirms and
approved for repairs including composition for the finish coat. Update includes
window repairs (sand, repair, reglaze, repaint, reinstall), and jamb repairs (in place)
and repaint.
28 PITT ST Building Commercial Core & shell renovation. Upfit of first floor business space. 8/30/2019 BAR - Quick Plan Review
141 SPRING ST Painting Repaint - no changes. Rot repair. Remove second story porch screening. 8/30/2019 BAR - Quick Plan Review
24 COUNCIL ST Painting Repaint - no changes. 8/30/2019 BAR - Quick Plan Review
174 MEETING ST Building Commercial clean and restore wood panels around window frames. restore and clean for 8/28/2019 BAR - Quick Plan Review
preventative measures.
420 KING ST Painting Refinish wooden storefront and repaint second floor windows - no changes. 8/26/2019 BAR - Quick Plan Review
Get email alerts for Charleston
A daily email when new agendas and minutes are posted.