Board of Architectural Review
Regular MeetingCharleston, SC · October 21, 2019
Agenda
BAR Staff Approvals
October 21, 2019 - October 25, 2019
Main Address Permit Type Description Review Date Item Review Type
18 MONTAGU ST Painting Repaint Pitt Street side. No changes. 10/21/2019 BAR - Quick Plan Review
72 WARREN ST Single Family/Duplex Dwelling Converting rear screened porch to bedroom. Interior 10/21/2019 BAR - Quick Plan Review
renovation to include reframing of 1st and second floor
bathrooms. remove utility chimney and patch roof. *Revised:
shifting rear door from bedroom to office.*
16 RUTLEDGE AVE Single Family/Duplex Dwelling Renovate existing 3rd floor and 2nd floor baths (remove tub, 10/21/2019 BAR - Quick Plan Review
add shower, new vanities), add new bath to existing 3rd floor
bedroom; trim, paint, and replace electrical fixtures throughout
the house.
141 E BAY ST Building Commercial Replacement of HVAC platform on roof due to deterioration 10/21/2019 BAR - Quick Plan Review
(per plans)
173 KING ST Building Commercial Rear 2nd floor roof deck 10/21/2019 BAR - Quick Plan Review
71 WARREN ST Accessory Structure Addition of 9x16' storage shed as per plans 10/22/2019 BAR - Quick Plan Review
42 VANDERHORST ST Painting Repairs to siding due to storm damage with repainting of same 10/22/2019 BAR - Quick Plan Review
- No Changes.
11 1/2 SAINT PHILIP ST Demolition Temporary Shoring and partial demolition 10/22/2019 BAR - Quick Plan Review
312 KING ST Painting Repainting exterior 10/22/2019 BAR - Quick Plan Review
19 FRANKLIN ST Single Family/Duplex Dwelling Remove siding from 3 dormers and reflash same; replace 10/22/2019 BAR - Quick Plan Review
wood siding to match existing and paint. Replace 6"
half-round gutters in kind to match.
73 MOULTRIE ST Roofing - Single Replacing shingles using H rated shingles 10/22/2019 BAR - Quick Plan Review
Family/Duplex Dwelling
59 PIEDMONT AVE Sign New freestanding sign (new panel between existing posts) for 10/22/2019 BAR - Quick Plan Review
Bright City Church.
238 SAINT PHILIP ST Single Family/Duplex Dwelling New single family dwelling 10/22/2019 BAR - Quick Plan Review
207 BROAD ST Single Family/Duplex Dwelling Repair damaged fascia and soffit above bay window. No 10/22/2019 BAR - Quick Plan Review
changes.
Generated on 10/28/2019 Page 1 of 2
BAR Staff Approvals
October 21, 2019 - October 25, 2019
Main Address Permit Type Description Review Date Item Review Type
33 CALHOUN ST STE Mechanical - Commercial HVAC change out on roof - same size and location. 10/22/2019 BAR - Quick Plan Review
245
126 SPRING ST Single Family/Duplex Dwelling single family new construction 10/22/2019 BAR - Quick Plan Review
900 KING ST Building Commercial shade and storage structure 10/23/2019 BAR - Quick Plan Review
10 GILLON ST Building Commercial Renovate interior of historic residence for conversion to wine 10/23/2019 BAR - Quick Plan Review
bar & bookstore.
312 KING ST Sign Facade sign and door graphics for "Hampden" 10/23/2019 BAR - Quick Plan Review
577 MEETING ST Accessory Structure Mock up panel for 577 Meeting 10/24/2019 BAR - Quick Plan Review
263 KING ST Building Commercial Repairs to stucco on front elevation - no changes. 10/24/2019 BAR - Quick Plan Review
83 KING ST Single Family/Duplex Dwelling Replace side door, remove metal canopy at rear, replace rear 10/25/2019 BAR - Quick Plan Review
windows with fench doors on non-historic addition.
After-the-fact removal of non-historic quipment shed.
58 SOCIETY ST Painting Repaint with color change. 10/25/2019 BAR - Quick Plan Review
195 E BAY ST Roofing - Commercial Replacement of 1980's traditional standing seam copper roof 10/25/2019 BAR - Quick Plan Review
at Lodge Alley Inn Operations BUIdling located behind
Magnolias. Parapet repairs to match exisitng. No changes.
1 MEETING ST Single Family/Duplex Dwelling Caulk windows and add downspout and scupper on north 10/25/2019 BAR - Quick Plan Review
elevation.
233 ASHLEY AVE UNIT Painting For both main house and rear house: Exterior painting with a 10/25/2019 BAR - Quick Plan Review
B color change for main body of building; addition of wood
shutters on front house - paneled on first floor and louvered
on second floor to match rear house. Shutter must be wood,
sized to fit the windows, operable with appropriate hardware.
Shutters to be painted "Wrought Iron Gate"
9 AIKEN ST Painting Minor rot repairs if needed and repainting matching existing 10/25/2019 BAR - Quick Plan Review
colors.
Total Reviews: 27
Generated on 10/28/2019 Page 2 of 2
Get email alerts for Charleston
A daily email when new agendas and minutes are posted.