Board of Architectural Review
Regular MeetingCharleston, SC · February 18, 2020
Agenda
BAR Staff Approvals
February 17, 2020 - February 21, 2020
Main Address Permit Type Description Review Date Item Review Type
101 TRADD ST Pool - Single Family/Duplex new residential pool 02/18/2020 BAR - Quick Plan Review
Dwelling
113 ALEXANDER ST Single Family/Duplex Dwelling Exterior work- replace damaged ceiling on porch. repair and 02/18/2020 BAR - Quick Plan Review
repaint second floor porch floor
83 SMITH ST Roofing - Single Replace roof shingles and recoat metal. 02/18/2020 BAR - Quick Plan Review
Family/Duplex Dwelling
342 MEETING ST Painting Repaint steeple - no changes. 02/18/2020 BAR - Quick Plan Review
1 KING ST UNIT 201 Building Multi-Family Replace four windows to match existing. No changes. 02/18/2020 BAR - Quick Plan Review
42 ANN ST Sign Repair existing neon sign - no change to sign or neon color. 02/18/2020 BAR - Quick Plan Review
294 KING ST Sign Repair existing awning. No changes. 02/18/2020 BAR - Quick Plan Review
52 SAINT MARGARET Mechanical - Single Change out of HVAC unit and replacment of ductwork. 02/18/2020 BAR - Quick Plan Review
ST Family/Duplex Dwelling
243 CALHOUN ST Building Commercial Tenant Upfit for Nail Salon- Renovation of building 02/18/2020 BAR - Quick Plan Review
69 MONTAGU ST Single Family/Duplex Dwelling new wood window replacement - 6 count 02/19/2020 BAR - Quick Plan Review
28 WENTWORTH ST Electrical - Single Remove old service and install new meter and overhead 02/19/2020 BAR - Quick Plan Review
Family/Duplex Dwelling service as per photographic documentation. Same location.
9 PITT ST Single Family/Duplex Dwelling Repair/reglaze/repaint windows on north facade. 02/19/2020 BAR - Quick Plan Review
79 SPRING ST Roofing - Single Replace roof shingles and snap lock metal with new hand 02/19/2020 BAR - Quick Plan Review
Family/Duplex Dwelling crimped metal roof. Recoat existing standing seam roof on
rear porch.
198 E BAY ST UNIT 100 Building Commercial Replace existing entry door to match existing - no changes. 02/19/2020 BAR - Quick Plan Review
728 KING ST Roofing - Single Replace roof shingles. 02/19/2020 BAR - Quick Plan Review
Family/Duplex Dwelling
66 CANNON ST Demolition to demo garage / race 02/19/2020 BAR - Quick Plan Review
Generated on 2/25/2020 Page 1 of 2
BAR Staff Approvals
February 17, 2020 - February 21, 2020
Main Address Permit Type Description Review Date Item Review Type
65 SPRING ST Building Commercial Repaint with color change on exterior. Repair interior drywall, 02/19/2020 BAR - Quick Plan Review
paint cabinets. Retile.
595 KING ST Building Commercial existing building - restaurant upfit 02/19/2020 BAR - Quick Plan Review
71 GIBBES ST Painting Repaint trim - no changes. 02/20/2020 BAR - Quick Plan Review
804 MEETING ST Sign New painted facade signs for Punchlist 02/20/2020 BAR - Quick Plan Review
12 JUDITH ST Painting EXTERIOR Repainting with color changes - minor rot repair. 02/20/2020 BAR - Quick Plan Review
15 BOYER CT Demolition Complete demolition of what is left of this structure 02/20/2020 BAR - Quick Plan Review
1 HENRIETTA ST Sign Replace existing sign panels: digital print with lamination or 02/21/2020 BAR - Quick Plan Review
cut vinyl for "Riverland Realty" at both store front sign panels.
Non-illuminated.
287 HUGER ST Sign New facade sign on I-beam for Element 29 02/21/2020 BAR - Quick Plan Review
302 KING ST Painting Repaint windows - no changes. 02/21/2020 BAR - Quick Plan Review
3 KRACKE ST APT B Painting Touch up coating of roof - no changes. 02/21/2020 BAR - Quick Plan Review
Total Reviews: 26
Generated on 2/25/2020 Page 2 of 2
Get email alerts for Charleston
A daily email when new agendas and minutes are posted.