Muyni
← Back to Charleston

Board of Architectural Review

Regular Meeting

Charleston, SC · June 7, 2020

Agenda

Agenda

BAR Staff Approvals June 07, 2020 - June 13, 2020 Main Address Permit Type Description Review Date Item Review Type 689 KING ST Mechanical - Commercial heat pump split with duct system upstairs. heat pump mini 06/08/2020 BAR - Quick Plan Review splits with 5 heads downstairs. 145 S BATTERY ST Single Family/Duplex Dwelling add screened in porch, potting shed, and upper balcony 06/08/2020 BAR - Quick Plan Review 2 BEDONS ALY Mechanical - Single Replacing defective 2.5 Ton Gas Pack 06/08/2020 BAR - Quick Plan Review Family/Duplex Dwelling 135 DARLINGTON AVE Roofing - Single New roof (Shingles to be type H) 06/08/2020 BAR - Quick Plan Review Family/Duplex Dwelling 513 KING ST Building Commercial repair broken storefront glass and entry. 06/08/2020 BAR - Quick Plan Review 571 KING ST Building Commercial replace 1/4" clear glass that was broken during the rioting. 06/08/2020 BAR - Quick Plan Review Also replace broken glass door with 1/4" clear laminated safety glass. 12 FRANKLIN ST Mechanical - Single HVAC changeout 06/08/2020 BAR - Quick Plan Review Family/Duplex Dwelling 170 MEETING ST Mechanical - Commercial install 2 fan coil units with duct work. 06/08/2020 BAR - Quick Plan Review 539 KING ST Sign signage for Wild Side Smoke Shop 06/09/2020 BAR - Quick Plan Review 190 KING ST Building Commercial interior framing, electrical, plumbing, sprinkler system, and 06/09/2020 BAR - Quick Plan Review masonry 188 KING ST Building Commercial interior framing, electrical, plumbing, sprinkler system, and 06/09/2020 BAR - Quick Plan Review masonry 5 GADSDENBORO ST Building Multi-Family Stucco Repairs at balconies - Northside of building only. All 06/09/2020 BAR - Quick Plan Review repairs in kind. 6 CHURCH ST Roofing - Single Remove existing roof. Install hand-crimped copper standing 06/09/2020 BAR - Quick Plan Review Family/Duplex Dwelling seam roof as per direction of City Architect. 415 KING ST Building Commercial storefront alterations/vanilla box 06/09/2020 BAR - Quick Plan Review 330 CONCORD ST UNIT Building Multi-Family Replace 6 Kitchen Sliding Doors, no changes. 06/10/2020 BAR - Quick Plan Review 6C 60 HANOVER ST Single Family/Duplex Dwelling repair wood rot, update MEP & G, replace sheetrock and 06/10/2020 BAR - Quick Plan Review flooring, repair siding Generated on 6/15/2020 Page 1 of 2 BAR Staff Approvals June 07, 2020 - June 13, 2020 Main Address Permit Type Description Review Date Item Review Type 330 CONCORD ST UNIT Building Multi-Family kitchen upfit, no changes, taking out existing and replacing 06/10/2020 BAR - Quick Plan Review 6C with new. 88 MORRIS ST Painting Exterior painting 06/11/2020 BAR - Quick Plan Review 32 SAVAGE ST Painting Paint exterior and pressure wash 06/11/2020 BAR - Quick Plan Review 95 BROAD ST Painting Re-paint, no color change 06/11/2020 BAR - Quick Plan Review 52 KING ST Single Family/Duplex Dwelling Replace existing shingle roof with copper roof; installation of 06/11/2020 BAR - Quick Plan Review copper gutters on perimeter of main roof. Installation of mini split and stand on roof which is not visible from street. (HCF Approval attached.) 5 SIRES ST Painting Exterior painting with color changes as per samples submitted. 06/12/2020 BAR - Quick Plan Review 23 MONTAGU ST Single Family/Duplex Dwelling Installing and extending a copper drip edge to deck boards on 06/12/2020 BAR - Quick Plan Review 2nd floor piazza. 45 S BATTERY ST Accessory Structure masonry garden walls, travertine pool deck and brick 06/12/2020 BAR - Quick Plan Review walkways Total Reviews: 24 Generated on 6/15/2020 Page 2 of 2

Get email alerts for Charleston

A daily email when new agendas and minutes are posted.

Report an issue with this meeting