Board of Architectural Review
Regular MeetingCharleston, SC · June 7, 2020
Agenda
BAR Staff Approvals
June 07, 2020 - June 13, 2020
Main Address Permit Type Description Review Date Item Review Type
689 KING ST Mechanical - Commercial heat pump split with duct system upstairs. heat pump mini 06/08/2020 BAR - Quick Plan Review
splits with 5 heads downstairs.
145 S BATTERY ST Single Family/Duplex Dwelling add screened in porch, potting shed, and upper balcony 06/08/2020 BAR - Quick Plan Review
2 BEDONS ALY Mechanical - Single Replacing defective 2.5 Ton Gas Pack 06/08/2020 BAR - Quick Plan Review
Family/Duplex Dwelling
135 DARLINGTON AVE Roofing - Single New roof (Shingles to be type H) 06/08/2020 BAR - Quick Plan Review
Family/Duplex Dwelling
513 KING ST Building Commercial repair broken storefront glass and entry. 06/08/2020 BAR - Quick Plan Review
571 KING ST Building Commercial replace 1/4" clear glass that was broken during the rioting. 06/08/2020 BAR - Quick Plan Review
Also replace broken glass door with 1/4" clear laminated
safety glass.
12 FRANKLIN ST Mechanical - Single HVAC changeout 06/08/2020 BAR - Quick Plan Review
Family/Duplex Dwelling
170 MEETING ST Mechanical - Commercial install 2 fan coil units with duct work. 06/08/2020 BAR - Quick Plan Review
539 KING ST Sign signage for Wild Side Smoke Shop 06/09/2020 BAR - Quick Plan Review
190 KING ST Building Commercial interior framing, electrical, plumbing, sprinkler system, and 06/09/2020 BAR - Quick Plan Review
masonry
188 KING ST Building Commercial interior framing, electrical, plumbing, sprinkler system, and 06/09/2020 BAR - Quick Plan Review
masonry
5 GADSDENBORO ST Building Multi-Family Stucco Repairs at balconies - Northside of building only. All 06/09/2020 BAR - Quick Plan Review
repairs in kind.
6 CHURCH ST Roofing - Single Remove existing roof. Install hand-crimped copper standing 06/09/2020 BAR - Quick Plan Review
Family/Duplex Dwelling seam roof as per direction of City Architect.
415 KING ST Building Commercial storefront alterations/vanilla box 06/09/2020 BAR - Quick Plan Review
330 CONCORD ST UNIT Building Multi-Family Replace 6 Kitchen Sliding Doors, no changes. 06/10/2020 BAR - Quick Plan Review
6C
60 HANOVER ST Single Family/Duplex Dwelling repair wood rot, update MEP & G, replace sheetrock and 06/10/2020 BAR - Quick Plan Review
flooring, repair siding
Generated on 6/15/2020 Page 1 of 2
BAR Staff Approvals
June 07, 2020 - June 13, 2020
Main Address Permit Type Description Review Date Item Review Type
330 CONCORD ST UNIT Building Multi-Family kitchen upfit, no changes, taking out existing and replacing 06/10/2020 BAR - Quick Plan Review
6C with new.
88 MORRIS ST Painting Exterior painting 06/11/2020 BAR - Quick Plan Review
32 SAVAGE ST Painting Paint exterior and pressure wash 06/11/2020 BAR - Quick Plan Review
95 BROAD ST Painting Re-paint, no color change 06/11/2020 BAR - Quick Plan Review
52 KING ST Single Family/Duplex Dwelling Replace existing shingle roof with copper roof; installation of 06/11/2020 BAR - Quick Plan Review
copper gutters on perimeter of main roof. Installation of mini
split and stand on roof which is not visible from street. (HCF
Approval attached.)
5 SIRES ST Painting Exterior painting with color changes as per samples submitted. 06/12/2020 BAR - Quick Plan Review
23 MONTAGU ST Single Family/Duplex Dwelling Installing and extending a copper drip edge to deck boards on 06/12/2020 BAR - Quick Plan Review
2nd floor piazza.
45 S BATTERY ST Accessory Structure masonry garden walls, travertine pool deck and brick 06/12/2020 BAR - Quick Plan Review
walkways
Total Reviews: 24
Generated on 6/15/2020 Page 2 of 2
Get email alerts for Charleston
A daily email when new agendas and minutes are posted.