Muyni
← Back to Charleston

Board of Architectural Review

Regular Meeting

Charleston, SC · January 23, 2021

Agenda

Agenda

BAR Staff Approvals January 23, 2021 - January 29, 2021 Main Address Permit Type Description Review Date Item Review Type 82 HANOVER ST Single Family/Duplex Dwelling renovate house per plans- currently a duplex turning into sf 01/25/2021 BAR - Quick Plan Review 139 BROAD ST Painting Painting exterior of house, color change 01/25/2021 BAR - Quick Plan Review 624 1/2 RUTLEDGE Building Commercial tenant upfit- alteration of interior space to create functional 01/25/2021 BAR - Quick Plan Review AVE kitchen, bar and dining space. relocation and replacement of grease trap 509 KING ST Painting painting exterior storefront to new color 01/25/2021 BAR - Quick Plan Review 81 ASHLEY AVE Building Commercial Remove and install new entry door - new door to be painted 01/25/2021 BAR - Quick Plan Review Charleston green to match existing. 64 CHURCH ST Painting Exterior painting with color change as per samples submitted 01/26/2021 BAR - Quick Plan Review 21 ALLWAY ST Painting exterior painting 01/26/2021 BAR - Quick Plan Review 33 CANNON ST UNIT B Painting Minor wood repair around windows, repaint windows - no color 01/26/2021 BAR - Quick Plan Review change. 16 RUTLEDGE AVE Painting Prep and repaint the house, no color changes. 01/26/2021 BAR - Quick Plan Review 36 ASHTON ST Painting Exterior painting 01/26/2021 BAR - Quick Plan Review 742 RUTLEDGE AVE Painting Paint exterior & porch 01/26/2021 BAR - Quick Plan Review 79 S BATTERY ST Accessory Structure installation of generator on 8ft stand 01/26/2021 BAR - Quick Plan Review 7 GIBBES ST Fence - Single Family/Duplex construct fence 6' tall on south side of property. 01/26/2021 BAR - Quick Plan Review Dwelling 2 CHARLES ST Painting Repaint no change of color, oyster shell. 01/26/2021 BAR - Quick Plan Review 285 E BAY ST Building Commercial repair and renovate to secure building and make storage 01/26/2021 BAR - Quick Plan Review access easier. 95 CHURCH ST Painting Prep and repaint windows and one wall on heighbor side. No 01/26/2021 BAR - Quick Plan Review color changes. Generated on 2/8/2021 Page 1 of 2 BAR Staff Approvals January 23, 2021 - January 29, 2021 Main Address Permit Type Description Review Date Item Review Type 33 1/2 CANNON ST Painting Minor wood repair around windows, repaint windows - no color 01/26/2021 BAR - Quick Plan Review change. 221 SAINT PHILIP ST Single Family/Duplex Dwelling New SF Construction 01/27/2021 BAR - Quick Plan Review UNIT C 55 SOCIETY ST Roofing - Commercial Recoating existing roof with GAF Hydrostop. No color change 01/27/2021 BAR - Quick Plan Review (Tinners Red) 253 COMING ST Roofing - Single Roof coating and membrane. Coating is a GAF Hydrostop. No 01/27/2021 BAR - Quick Plan Review Family/Duplex Dwelling color change (Tinners Red). Remove existing low slope area and replace with fully adhered single ply membrane. 172 RUTLEDGE AVE Roofing - Commercial New roof. 01/27/2021 BAR - Quick Plan Review 99 S MARKET ST Building Commercial Replace in kind HVAC (swap out on roof), remove and replace 01/27/2021 BAR - Quick Plan Review tile flooring, replace existing flooring, paint interior. 17 LEGARE ST Fence - Single Family/Duplex New stucco over block wall 01/27/2021 BAR - Quick Plan Review Dwelling 254 COMING ST Single Family/Duplex Dwelling Siding and trim repairs as needed. Remove aluminum and 01/28/2021 BAR - Quick Plan Review repair wood underneath. 202 KING ST Sign placement of vinyl signage on storefront windows and mount 01/28/2021 BAR - Quick Plan Review 90 degree blade sign on front facade for "Beachables" 38 NEW ST Roofing - Single Clean, patch, and coat roof. Color to be Tinners Red on main 01/28/2021 BAR - Quick Plan Review Family/Duplex Dwelling house. No other changes. 158 DARLINGTON AVE Roofing - Single Replace existing 3 tab shingle roof with architectural grade 01/28/2021 BAR - Quick Plan Review Family/Duplex Dwelling shingles "Black" 474 KING ST Roofing - Commercial Selective roof replacement on 474, 476, 476 1/2 King St. 01/28/2021 BAR - Quick Plan Review Repair stucco on 3 chimneys and repoint brick on 1. Repair parapet brick and counterflash stair stringer on south elevation. 66 LENWOOD BLVD Single Family/Duplex Dwelling Replace 2 electric lights on either side of front door with 2 01/28/2021 BAR - Quick Plan Review copper gas lamps as per cut sheets submitted 34 ROSE LN Single Family/Duplex Dwelling construction of new single family dwelling 01/29/2021 BAR - Quick Plan Review Total Reviews: 30 Generated on 2/8/2021 Page 2 of 2

Get email alerts for Charleston

A daily email when new agendas and minutes are posted.

Report an issue with this meeting