PUBLIC WORKS AND UTILITIES COMMITTEE
AGENDA
There will be a meeting of the Public Works and Utilities Committee on Tuesday, October 25,
2016 to begin at 3:00 p.m. at 1st Floor Conference Room, 80 Broad Street. The following items
will be heard:
A. Invocation
B. Approval of Public Works and Utilities Committee Minutes
September 13, 2016 – DEFERRED
September 27, 2016 – DEFERRED
C. Request to Set a Public Hearing
None
D. Acceptance and Dedication of Rights-of-Way and Easements
1. Fenwick Hills Phase 1 - Acceptance and dedication of a portion of Misk Street (50-
foot right-of-way), a portion of Arrow Arum Drive (50-foot right-of-way), a portion of
Fishbone Drive from Sta. 1+80 to 15+12 (50-foot right-of-way), and a portion of
Fishbone Drive from Sta. 15+12 to 24+63 (30-foot right-of-way). All infrastructure is
complete.
a. Title to Real Estate
b. Affidavit for Taxable or Exempt Transfers
c. Plat (2)
d. Exclusive Storm Water Drainage Easements
e. Exclusive Access Easements
2 George Street, Suite 2100, Charleston, SC 29401-3506 · Phone (843) 724-3754 · Fax (843) 973-7261
2. Crowne Maybank - Acceptance and dedication of Devlin Road (40-foot right-of-
way), Reva Ridge Drive (60-foot right-of-way), Crowne Commons Way (60-foot right-
of-way), Harold Arnold Way (60-foot right-of-way), and Mitnick Lane (50-foot right-of-
way) . Sidewalk and final asphalt lift are bonded.
a. Title to Real Estate
b. Affidavit for Taxable or Exempt Transfers
c. Plat (2)
d. Exclusive Storm Water Drainage Easements
E. Requests for Permanent Encroachments
None
F. Temporary Encroachments Approved By The Department of Public Service (For
information only)
1. 1612 Oak Leaf Street – installing irrigation encroaching into right-of-way. This
encroachment is temporary. Approved 9/30, 2016.
2. 1620 Oak Leaf Street – installing irrigation encroaching into right-of-way. This
encroachment is temporary. Approved 9/30, 2016.
3. 1637 Oak Leaf Street – installing irrigation encroaching into right-of-way. This
encroachment is temporary. Approved 9/30, 2016.
4. 2536 Josiah Street – installing irrigation encroaching into right-of-way. This
encroachment is temporary. Approved 9/30, 2016.
5. 2547 Josiah Street – installing irrigation encroaching into right-of-way. This
encroachment is temporary. Approved 9/30, 2016.
6. 1444 Willtown Street – installing irrigation encroaching into right-of-way. This
encroachment is temporary. Approved 9/30, 2016.
7. 2520 Josiah Street – installing irrigation and wood fence encroaching into right-of-
way. This encroachment is temporary. Approved 9/30, 2016.
8. 739 Goodlet Circle – installing wood fence encroaching into drainage easement.
This encroachment is temporary. Approved 9/30, 2016.
9. 641 Lake Frances Drive – installing wood fence encroaching into drainage
easement. This encroachment is temporary. Approved 9/30, 2016.
10. 24 N. Market – installing 4 awnings on East Bay St and 12 awnings on N. Market St
encroaching into right-of-way. This encroachment is temporary. Approved 9/30,
2016.
11. 307 King Street – installing 20’ x 3’ awning encroaching into right-of-way. This
encroachment is temporary. Approved 9/30, 2016.
G. Miscellaneous or Other New Business
1. Update on Stormwater Policy for grandfathered commercial developments. Report
to be presented at September Public Works & Utilities Committee meeting –
DEFERRED.
2. Committee review of temporary encroachment at 1522 Savannah Highway –
installing 20’ x 36’ bridge spanning drainage canal, light poles, bollard fencing, and
concrete storm pipe encroaching into drainage easement.
Councilmember Perry K. Waring
Chairperson
HENDRICK AUTO LOT EXPANSION
CHARLESTON, SC
TIMBER VEHICULAR & PEDESTRIAN BRIDGE DESIGN
GENERAL 000
PLANS 100
NC
ELEVATIONS 200
SECTIONS 300
SC
RAILS 400
ABUTMENT 500
DETAILS 600
PROJECT LOCATION SITE LOCATION BRIDGE LOCATION SERIES INDEX
The Premier Timber Bridge Company
CB5
Note: See Sheet C9.1 for
profiles of storm sewer into
concrete channel.
CB1
WQ
Note: See Sheet C9.1 for
profiles of storm sewer into
concrete channel.
AB AB
302 301
±4.00% ±4.00%
ELEVATION - EXTERIOR 0 2' 4' 8'
1
SCALE: 1/4"=1'-0" GRAPHIC SCALE: 1/4" = 1'-0"
ELEVATION
TIMBER VEHICULAR & PEDESTRIAN BRIDGE DESIGN EXTERIOR
5 TON GVW LOADING (L/400 DEFLECTION)
85 PSF LOADING (L/360 DEFLECTION)
The Premier Timber Bridge Company
HENDRICK AUTO LOT EXPANSION
CHARLESTON, SC October 11, 2016
2420 Brunello Trace T: 800.226.4178 J. WINCHELL 216124 201B