PUBLIC WORKS AND UTILITIES COMMITTEE
AGENDA
There will be a meeting of the Public Works and Utilities Committee on Tuesday, March 28,
2017 to begin at 3:00 p.m. at the James Island Recreational Complex, gymnasium, 1088 Quail
Drive, James Island. The following items will be heard:
A. Invocation
B. Approval of Public Works and Utilities Committee Minutes
February 14, 2017 – DEFERRED
February 28, 2017 – DEFERRED
March 14, 2017 – DEFERRED
C. Request to Set a Public Hearing
None
D. Acceptance and Dedication of Rights-of-Way and Easements
1. Sidewalk at Orleans Road – Approval to notify SCDOT that the City intends to
accept maintenance responsibility for 432 linear feet of proposed concrete sidewalk
and seven ADA ramps with detectable warning assemblies for a portion of sidewalk
located within the SCDOT right-of-way at Orleans Road (S-10-1373) near Dulsey
Road. Letter and map attached.
a. Letter
b. Map
2. Daniel Island Parcel E Phase 3 - Acceptance and dedication of Isaac Lane (20-foot
right-of-way [375 linear feet]), a portion of Chimney Back Street (50-foot right-of-way
[605 linear feet]), a portion of Dark Timber Street (50-foot right-of-way [635 linear
feet]), and a portion of Lesesne Street (50-foot right-of-way [395 linear feet]). There
are 33 lots. All infrastructure is complete.
a. Title to Real Estate
b. Affidavit for Taxable or Exempt Transfers
c. Plat
2 George Street, Suite 2100, Charleston, SC 29401-3506 · Phone (843) 724-3754 · Fax (843) 973-7261
d. Exclusive Storm Water Drainage Easements
3. The Oaks at St. Johns Crossing - Acceptance and dedication of Wellons Drive (20-
foot right-of-way [468 linear feet]), Biggio Drive (55-foot right-of-way [294 linear feet]),
Potter Lane (22-foot right-of-way [287 linear feet]), Emmets Road (right-of-way varies
[2,510 linear feet]), Chinook Crossing (20-foot right-of-way [821 linear feet]), and
Cayla Street (right-of-way varies [303 linear feet]). There are 77 lots. Sidewalks and
accessibility ramps are bonded.
a. Title to Real Estate
b. Affidavit for Taxable or Exempt Transfers
c. Plat
d. Exclusive Storm Water Drainage Easements
E. Requests for Permanent Encroachments
None
F. Temporary Encroachments Approved By The Department of Public Service (For
information only)
1. 126 ½ Beaufain Street – installed pavers encroaching into right-of-way. This
encroachment is temporary. Approved 3/3, 2017.
2. 415 Meeting Street - installing 20” x 15’9” right angle sign encroaching into right-of-
way (Homewood Suites). This encroachment is temporary. Approved 3/17, 2016.
3. 186 Coming Street - installing 12” x 30” right angle sign encroaching into right-of-
way (Sorghum & Salt). This encroachment is temporary. Approved 3/17, 2016.
4. 199 East Bay Street - installing 48” x 36” right angle sign encroaching into right-of-
way (High Cotton). This encroachment is temporary. Approved 3/17, 2016.
5. 1430 Eutaw Battalion – installing portable swim/spa over pavers encroaching into
drainage easement. This encroachment is temporary. Approved 3/17, 2016.
G. Miscellaneous or Other New Business
1. Recommendation for stormwater requirements for re-development projects -
ongoing. DEFERRED
Councilmember Rodney Williams
Chairperson
Date
Mr. Kirk R. Richards, P.E.
Assistant District Maintenance Engineer
SCDOT District Six
6355 Fain Blvd
North Charleston, SC 29406
RE: Maintenance of Standard Construction Materials within the Sidewalk at Orleans Road (S-10-1373) near
Dulsey Road
Dear Mr. Richards:
This letter concerns the proposed concrete sidewalk, 5 feet wide by 432 linear feet long and seven ADA ramps
with detectable warning assemblies to be constructed in conjunction with the Town Place Hotel and Courtyard
Marriot Hotel construction projects, within the SCDOT right-of-way at Orleans Road (S-10-1373) near Dulsey
Road. It is our intention that this will be a public sidewalk.
The City Council of Charleston, at its meeting held [date of meeting], agreed to accept full maintenance
responsibility for the proposed sidewalk within the State maintained right-of-way shown on the attached drawing
and which will be constructed under a valid SCDOT Encroachment Permit. The City of Charleston agrees to
maintain this sidewalk and corner handicap ramps in compliance with current ADA and SCDOT standards (ADA
Standards for Transportation Facilities, SC Highway Design Manual, SCDOT Standard Drawings, AASHTO
Guide for Development of Pedestrian Facilities).
Should there be any questions, please do not hesitate to contact me at 843-724-3754 or at cabinessl@charleston-
sc.gov.
Sincerely,
Laura S. Cabiness, P.E.
Cc: Michael R. Metzler, Deputy Director
Thomas F. O’Brien, Deputy Director
Eduardo A. Calderon, Senior Civil Engineer
Brian Pokrant, GIS Analyst
Earthsource Engineering
___________________________________________________________________________________
2 George Street, Suite 2100, Charleston, SC 29401-3506 • Phone (843) 724-3754 • Fax (843) 973-7261
.+/+651(&+5674$#0%'#%4'5
4'8+5+105
FINAL
PERMIT Ä 886 Johnnie Dodds Boulevard Suite 200 Office: 843.881.0525
Mt.Pleasant, SC 29464 branchgn@earthsourceeng.com
www.earthsourceeng.com
DOCUMENTS
5+&'9#.-':*+$+6
Get email alerts for Charleston
A daily email when new agendas and minutes are posted.