Planning & Zoning Commission
Regular MeetingDeKalb, IL · July 20, 2020
Minutes
Planning and Zoning Commission
July 20, 2020
Page 1 of 6
MINUTES
CITY OF DEKALB
PLANNING AND ZONING COMMISSION
July 20, 2020
The Planning and Zoning Commission held a Meeting on July 20, 2020, at the DeKalb
Public Library in the Yusunas Meeting Room, 309 Oak St, DeKalb, Illinois. Chair Max
Maxwell called the meeting to order at 6:00 PM.
Chair Maxwell stated he wanted to thank everyone for being here tonight. He
mentioned for those attending, the meeting room has been set up to meet the CDC
recommended distancing guidelines and the Executive Order from the Governor.
A. ROLL CALL
Recording Secretary Aaron Walker called the roll. Planning and Zoning
Commission members present were: Chair Max Maxwell, Vice Chair Christina Doe
(via audio), Ron Klein, Jerry Wright, Steve Becker, and Trixy O’Flaherty. Principal
Planner Dan Olson and City Engineer Zac Gill were present representing the City.
B. APPROVAL OF THE AGENDA (Additions/Deletions)
Chair Maxwell requested a motion to approve the July 20, 2020, agenda as
presented. Mr. Klein motioned to approve the agenda as presented. Mr. Wright
seconded the motion, and the motion was approved by unanimous voice vote.
C. APPROVAL OF MINUTES
1. July 6, 2020 – Chair Maxwell requested a motion to approve the July 6, 2020,
minutes as presented. Mr. Wright motioned to approve the minutes as
presented. Mr. Becker seconded the motion, and the motion was approved by
unanimous voice vote.
D. PUBLIC PARTICIPATION (Open Floor to Anyone Wishing to Speak on Record)
None
E. NEW BUSINESS
1. Public Hearing (Continued) – A petition continued from July 6, 2020, by
DeKalb First United Methodist Church for approval of a zoning map
amendment, upon annexation, from the “SFR1” Single-Family Residential
District to the “PD-R” Planned Development – Residential District, approval of
an amendment to Ordinance 94-74, and approval of a concept plan to allow for
the construction of an approximately 7,730 sq. ft. church and accessory uses
Planning and Zoning Commission
July 20, 2020
Page 2 of 6
on approximately 16 acres of property located along the west side of N. Annie
Glidden Road across from the DeKalb County Health Facility Campus.
Principal Planner Dan Olson went through the July 16, 2020 updated staff
report. He noted at the July 6 hearing, the City had received several
correspondences and testimony from residents of Eden’s Garden stating their
concerns with current stormwater issues in their development and the impact
of the church on drainage in the area. He advised City Engineer Zac Gill has
since reviewed the comments, site conditions, past ordinances, and plans. He
stated the Public Works Department also conducted a field investigation in
Eden’s Garden. Mr. Olson displayed images from Eden’s Garden and the
surrounding area showing the flooding on the western side of the church
property and areas to the north. Mr. Olson advised Public Works cleared out
storm drains in the area to allow runoff to properly flow into the detention ponds
in Eden’s Garden.
City Engineer Zac Gill advised the City looked at the historical development of
Eden’s Gardens, specifically Phase II, which included the construction of the
detention ponds. He advised the detention pond and conveyance pipeline were
designed to accommodate the full stormwater runoff from the parcels just east
of Eden’s Garden. This also included the subject property and the property just
north of the church site.
Mr. Gill stated the outlet pipes for the detention pond just south of Beautiful
Gate Drive in Eden’s Garden were blocked with debris. He advised the City has
already taken measures to clear out the pipes and mentioned the detention
pond has already receded two to three feet. Mr. Gill noted there is a 12-inch
pipe on the eastern portion of Eden’s Garden that provides an inlet for the
backyards of the properties on Omega Circle Drive, as well as inlets for the
surrounding farm tiles. He advised this 12-inch pipe was hydraulically clogged
due to the elevation of the pond being at such a high level. He noted the
clearing of the outlet pipes corrected this issue. Mr. Gill advised with
collaboration from the Eden’s Garden Homeowner’s Association and continued
maintenance of the pipping, flooding of the properties at the western end of the
subject property (church site and areas north) can be prevented.
Mr. Gill noted the proposed church will be adding to the stormwater runoff to
the west and advised if any of the farmland is converted to greenspace, it is still
considered developed. He advised developed property that is subject to the
stormwater regulations is not isolated to only structures or parking lots. He
stated the developed land will be studied for stormwater impacts and runoff and
reports will be sent to his office for review. He advised Article 11.02.06 of the
Unified Development Ordinance governs the requirements of new
developments and stormwater impacts. He stated there are very strict
standards that all developments have to follow. He advised all runoff and
Planning and Zoning Commission
July 20, 2020
Page 3 of 6
stormwater will be contained within the detention ponds and will not be allowed
to flow onto neighboring properties.
Mr. Olson mentioned Steve Storey, Jeff Linkenheld, and Vice Chair Doe were
participating via video conference. He noted Steve Storey is the current
landowner of the subject property and Jeff Linkenheld is the engineer for
DeKalb First United Methodist Church.
Mr. Olson advised City staff has been in contact with the residents who
attended the last Commission meeting and included Sam Baker and Jim Neff.
He noted City staff have kept them up to date on actions taken by the City
Engineer and Public Works.
Mr. Olson stated changes were made to the recommended development
standards that were provided with the original motion to approve, which
required the petitioner to provide final engineering plans prior to any
construction on the subject site. He advised the engineering plans will include
stormwater calculations demonstrating it meets all storm water requirements of
the UDO. He noted the change was to now require the final development and
engineering plans to come before the Planning and Zoning Commission and
the City Council instead of just approved by City staff.
Chair Maxwell gave the public an opportunity to speak.
Sam Baker, of 1230 Omega Circle Drive, advised he has been in contact with
City staff regarding solutions to the drainage issue along Omega Circle Drive.
He pointed out the clearing of the outlet pipes has already helped with the
drainage issues. He noted Mr. Storey will also be installing larger piping to help
with drainage on the subject site. Mr. Baker said he hopes the City will continue
to work on the site in the future and keep the outlets clear.
Brad Fisher, of 1225 Omega Circle Dr, inquired if there will be a set inspection
schedule for the outlet pipes. He stated flooding is a constant issue and hopes
the City will continue to maintain and inspect the piping.
Mr. Gill clarified the detention ponds are not owned, maintained, or operated
by the City on a day to day basis. He noted the drainage district (Normal #13)
and the City of DeKalb have easements to allow for access to the ponds to
address major issues that require large equipment or removal of debris. He
said, however, the day to day maintenance is up to the Homeowner’s
Association of Eden’s Garden. He advised the City had discussions with the
Homeowner’s Association and came up with a plan to keep debris away from
the outlets. He mentioned the City will respond if there is an issue, but it is a
shared responsibility.
Planning and Zoning Commission
July 20, 2020
Page 4 of 6
Chair Maxwell gave the Commission an opportunity to speak.
Mrs. O’Flaherty advised all her concerns have been addressed. She noted the
residents seemed satisfied.
Mr. Wright said he was satisfied with the actions taken by the City and
residents.
Mr. Becker liked that fact the final development plan would be coming back to
the Commission in the future for review.
Mr. Maxwell thanked City staff for investigating and taking action to correct the
issues.
Mr. Becker moved that the Planning and Zoning Commission forward its
findings of fact and recommend to the City Council approval of a zoning map
amendment, upon annexation, from the “SFR1” Single-Family Residential
District to the “PD-R” Planned Development – Residential and approval of an
amendment to Ordinance 94-74 to allow for the construction of an
approximately 7,730 sq. ft. church and accessory uses for approximately 16
acres of property located along the west side of N. Annie Glidden Road across
from the DeKalb County Health Facility Campus. Approval is also
recommended for a concept plan, architectural elevation, landscape plan and
plat of dedication described in Exhibit A of the staff report and approval of the
Planned Development Standards described in Exhibit B of the staff report.
Mr. Wright seconded the motion.
A roll call vote was taken. Mr. Klein – Yes, Mrs. O’Flaherty – Yes, Mr. Wright –
Yes, Mr. Becker – Yes, Vice Chair Doe – Yes, Chair Maxwell – Yes. Motion
passed 6-0-0.
2. Public Hearing – A petition by Ricky Brown for approval of a variance to
Articles 7.06.3 and 7.06.6. of the Unified Development Ordinance to allow a six
(6) foot high privacy fence to encroach into the front building line along Culver
Street for the property located at 904 S. 4th Street.
Mr. Olson went through the staff report dated July 16, 2020 and advised the
proposed fence has already been constructed. He noted the subject property
was a former car wash. He stated the owners of the property, Ricky Brown and
Brian Sipes, were present to answer any questions. He advised a fence permit
was applied for by Ricky Brown, but the installation was completed before the
permit was approved. He noted there was an issue with the setback along
Culver Street and a variance has been requested.
Planning and Zoning Commission
July 20, 2020
Page 5 of 6
Mr. Olson said the UDO requires a six-foot-high privacy fence constructed on
a corner lot must be built along the front building line. He noted the constructed
fence extends approximately 20 feet into the front building line along Culver St.
and it is setback 11 feet from the sidewalk. He stated the petitioner extended
the fence past the building line to allow for more outdoor storage. He noted a
landscaping business currently leases the subject site.
Mr. Olson advised setback requirements are established to prevent any
visibility issues and to protect the sight lines of adjacent properties. He stated
the constructed fence is further setback than many of the homes on Culver
Street to the east and does not cause any visibility issues. He noted the fence
meets all the visibility requirements of the adjacent alley to the east as well.
Mr. Olson explained the constructed fence meets all the criteria for the Findings
of Fact for Variations found in the UDO. He noted the fence does not hinder
visibility, it matches the aesthetics of the neighborhood and does not have a
negative impact on the neighborhood or adjacent properties.
Mr. Olson advised email response forms were received by Noelle Jacobson of
424 Culver Street and Rich Kakkuri of 418 Culver Street, both stating their
support for the fence. He added Mr. Brian Scholle, the owner of building to the
north containing Maisy’s Video Gaming, was also in support of the fence.
Mr. Olson stated a condition was added to the variance approval stating the
storage of any loose landscaping material directly on the ground is prohibited
and all vehicles, equipment, and landscaping materials related to the business
must be stored behind the six (6) foot high privacy fence.
Mr. Sipes pointed out the fence was not only for storage, but also to prevent
vehicle traffic from cutting through their lot. He noted the fence also follows the
edge of the existing paved area along Culver Street.
Chair Maxwell gave the public an opportunity to speak. There was none.
Chair Maxwell gave the Commission an opportunity to speak.
Mr. Klein stated he visited the property and stated the fence was constructed
well and fit into the neighborhood. He noted he was in support of the fence.
Mr. Maxwell questioned if the fence was constructed early because the permit
approval process took too long. Mr. Sipes said the approval process took over
two months and the construction couldn’t be rescheduled.
Mrs. O’Flaherty moved that the Planning and Zoning Commission approve a
variance to Articles 7.06.03 and 7.06.6 of the Unified Development Ordinance
Planning and Zoning Commission
July 20, 2020
Page 6 of 6
to allow a six (6) foot high privacy fence to encroach into the front building line
along Culver Street for the property located at 904 S 4th Street as shown on the
site plan dated 7-9-20 and labeled as Exhibit A to the staff report and subject
to the following:
1. The storage of all equipment, vehicles and landscape materials related to
the business on site must be stored behind the six (6) foot high privacy fence
as shown on Exhibit A. The storage of any loose landscape materials (e.g.
sand, soil, rocks, mulch) directly on the ground is prohibited.
Mr. Klein seconded the motion.
A roll call vote was taken. Mr. Klein – Yes, Ms. O’Flaherty – Yes, Mr. Wright –
Yes, Mr. Becker – Yes, Vice Chair Doe – Yes, Chair Maxwell – Yes. Motion
was passed 6-0-0.
F. REPORTS
Mr. Olson advised the next scheduled meeting is August 3, 2020 however, no
public hearings have been set. He stated the Raising Cane’s along Sycamore
Road has started construction with plans to open by the end of the year. He
said construction has also begun on Isaac Suites located at Oakland Drive and
Sycamore Road, as well as Agora Tower located on N. 4th Street.
Mr. Olson stated the Mayor has spoken to a few candidates to replace Vicki
Buckley as a Commission member and someone should be appointed shortly.
G. ADJOURNMENT
Mr. Klein motioned to adjourn, Vice Chair Doe seconded the motion, and the
motion was approved by unanimous voice vote. The Planning and Zoning
Commission Meeting adjourned at 6:34 PM.
Agenda
DEKALB PLANNING AND ZONING COMMISSION AGENDA
JULY 20, 2020
6:00 P.M.
**NEW LOCATION**
DeKalb Public Library
Yusunas Meeting Room
309 Oak Street
DeKalb, Illinois 60115
PLANNING AND ZONING COMMISSION MEETING
Please Note: On March 16, 2020, Illinois Governor JB Pritzker issued executive order 2020-
07 which declared that during the duration of the Gubernatorial Disaster Proclamation
pertaining to the coronavirus outbreak, “the provisions of the Open Meetings Act, 5 ILCS
120/1, et seq. (the “OMA”), requiring or relating to in-person attendance by members of a
public body are suspended. Specifically, (1) the requirement in 5 ILCS 120/2.01 that
‘members of a public body must be physically present’ is suspended; and (2) the
conditions in 5 ILCS 120/7 limiting when remote participation is permitted are suspended.”
The executive order further states that when a public meeting is considered necessary by
the governing body, “public bodies are encouraged to provide video, audio, and/or
telephonic access to meetings to ensure members of the public may monitor the meeting,
and to update their websites and social media feeds to keep the public fully apprised of
any modifications to their meeting schedules or the format of their meetings due to COVID-
19, as well as their activities relating to COVID-19.” This executive order has been extended
by subsequent executive orders through the pendency of this meeting.
On Friday June 12, 2020, Public Act 100-0640 became effective law. Public Act 100-0640
amends the OMA to allow public bodies, subject to certain conditions, to (1) conduct
meetings by audio or video conference without the physical presence of a quorum of the
members of the public body; and (2) provide alternative arrangements for members of the
public to attend said meetings. Due to the COVID-19 emergency, the City of DeKalb has
determined that it may be necessary to conduct meetings by audio or video conference
without the physical presence of a quorum and provide alternative arrangements for
members of the public to attend said meetings.
The City of DeKalb has taken prudent steps to assure that virtual Commission member
attendance and public access are satisfied within the intent of the Governor’s executive
orders, Public Act 100-0640 and other applicable law.
Citizens wishing to view the meeting from home or elsewhere can tune in to Channel 14 or
by following the link provided here.
Accommodations have been made for citizens to comment on a topic listed on the agenda
(or a topic not listed on the agenda) by clicking on the link provided here. Comments will
be read by the Commission Chair at the appropriate time during the meeting.
Assistive services available upon request.
Hearing assistance devices are available in the Information & Technology
Office, which is located to the right, just before entering Council Chambers.
Planning and Zoning Commission Agenda
July 20, 2020
Page 2 of 2
A. ROLL CALL
B. APPROVAL OF AGENDA (Additions or Deletions)
C. APPROVAL OF MINUTES
1. July 6, 2020
D. PUBLIC PARTICIPATION (Open Floor to Anyone Wishing to Speak on Record)
E. NEW BUSINESS
1. Public Hearing (Continued) – A petition continued from July 6, 2020, by DeKalb First
Methodist Church for approval of a zoning map amendment, upon annexation, from the
“SFR1” Single-Family Residential District to the “PD-R” Planned Development –
Residential District, approval of an amendment to Ordinance 94-74, and approval of a
concept plan to allow for the construction of an approximately 7,730 sq. ft. church and
accessory uses on approximately 16 acres of property located along the west side of N.
Annie Glidden Road across from the DeKalb County Health Facility Campus.
2. Public Hearing – A petition by Ricky Brown for approval of a variance to Articles 7.06.3
and 7.06.6 of the Unified Development Ordinance to allow a six (6) foot high privacy fence
to encroach into the front building line along Culver Street for the property located at 904
S. 4th Street.
F. REPORTS
G. ADJOURNMENT
Planning and Zoning Commission
July 6, 2020
Page 1 of 13
MINUTES
CITY OF DEKALB
PLANNING AND ZONING COMMISSION
July 6, 2020
The Planning and Zoning Commission held a Meeting on July 6, 2020, at the DeKalb
Public Library in the Yusunas Meeting Room, 309 Oak St, DeKalb, Illinois. Vice Chair
Christina Doe called the meeting to order at 6:00 PM.
Vice Chair Doe stated she wanted to thank everyone for being here tonight. She
mentioned for those attending, the meeting room has been set up to meet the CDC
recommended distancing guidelines and the Executive Order from the Governor.
A. ROLL CALL
Recording Secretary Aaron Walker called the roll. Planning and Zoning
Commission members present were: Vice Chair Doe, Ron Klein, Jerry Wright, and
Trixy O’Flaherty. Chair Maxwell and Steve Becker were absent. Principal Planner
Dan Olson was present representing the City.
B. APPROVAL OF THE AGENDA (Additions/Deletions)
Vice Chair Doe requested a motion to approve the July 6, 2020, agenda as
presented. Mr. Wright motioned to approve the agenda as presented. Mr. Klein
seconded the motion, and the motion was approved by unanimous voice vote.
C. APPROVAL OF MINUTES
1. June 17, 2020 – Vice Chair Doe requested a motion to approve the June 17,
2020, minutes as presented. Mr. Klein motioned to approve the minutes as
presented. Ms. O’Flaherty seconded the motion, and the motion was approved
by unanimous voice vote.
D. PUBLIC PARTICIPATION (Open Floor to Anyone Wishing to Speak on Record)
None
E. NEW BUSINESS
1. Public Hearing – A petition by DeKalb First United Methodist Church for
approval of a zoning map amendment, upon annexation, from the “SFR1”
Single-Family Residential District to the “PD-R” Planned Development –
Residential District, approval of an amendment to Ordinance 94-74, and
approval of a concept plan to allow for the construction of an approximately
Planning and Zoning Commission
July 6, 2020
Page 2 of 13
7,730 sq. ft. church and accessory uses on approximately 16 acres of property
located along the west side of N. Annie Glidden Road across from the DeKalb
County Health Facility Campus.
Tom Weber, member of the DeKalb First United Methodist Church, advised he
is the Vice Chair of the Land Acquisition Team. He noted the other members
of the church present were Jim Horn, Pastor Jonathan Crail, Sally Mullis,
Marsha Goodrich, and Herb Buhr. He advised the Land Acquisition Team has
been looking for a new location to build their church in the Dekalb area. He
stated several years ago he met with Steve Storey, who along with his sisters,
own the 15.87 acres that are included in the petition. He advised the other
members would speak to the petition, but he wanted to thank City staff for their
efforts and help with the project.
Jim Horn stated the DeKalb First United Methodist Church has been serving
the Dekalb area for over 150 years. He advised the current church building
located on the corner of 4th Street and Oak Street was built in 1908. He noted
this was the third building owned by the church. He stated most of the current
building is not handicap accessible and the maintenance cost has increased
due to the age of the building. He added the current building lacks the
necessary green space for youth and adult activities.
Mr. Horn advised the funding for the new church would be raised up front, to
eliminate the need for a mortgage. He noted a 3-year capital campaign was
launched to raise money for the new church. He stated they are in the third
year of the capital campaign. He advised the amount raised would determine
the initial design of the church, but they will have space to expand in the future
if necessary. He advised the new building would be energy efficient, greatly
decreasing their maintenance costs. He noted they have been working with
Saavedra Gehlhausen Architects to design the church. He advised the new
church would be entirely handicap accessible.
Pastor Jonathan Crail stated the congregation has a very long history in DeKalb
and was formed in 1855. He advised they have been in their current building
for 112 years. He said the maintenance cost, repair costs, heating and cooling
issues, and lack of green space has led them to construct a new building. He
advised they are designing the building to be a community resource. He noted
an example such as the church being partnered with Boy Scout Troupe #4 and
Cub Scout Pack #104 for over 84 years. He noted the church holds a monthly
free dinner event for the community and allows their building to be used by
various organizations for community events. Pastor Crail stated City Officials
and DeKalb County have been working on the revitalization of Annie Glidden
North, and the project would only benefit the revitalization effort.
Planning and Zoning Commission
July 6, 2020
Page 3 of 13
Principal Planner Dan Olson went over the staff report dated July 2, 2020. He
advised the subject site is 15.87-acres and located along the west side of N.
Annie Glidden Rd and across from the DeKalb County Health Facility Campus.
He noted a portion of the subject site was annexed to the City in 1994 per
Ordinance 1994-74 as part of the Eden’s Garden Subdivision Development. He
advised the northern portion of the subject site is in unincorporated DeKalb
County. He pointed out the northern portion will have to be annexed and
rezoned from “SFR-1” Single-Family Residential District to the “PD-R” Planned
Development – Residential District, as properties are initially annexed as “SFR-
1”. He advised the petitioner is also requesting approval of a concept plan, plat
of roadway dedication, and waivers to the UDO for building height, landscaping,
minimum street standards, and parking lot standards.
Mr. Olson advised the proposed church building and parking lot will be located
on the eastern portion of the property. He noted the church building will be
approximately 7,730 sq. ft. and include a 203-seat sanctuary, classrooms,
lounge area, administrative offices, and a kitchen. He stated access will be
provided in two phases, with initial access being provided from N. Annie
Glidden Rd, across from the existing access into the DeKalb County Health
Facility Campus. He advised the right-of-way for Beautiful Gate Drive will be
dedicated to the City with the approval of the project, however the road will not
be constructed at this time. He noted the road will be extended once
development occurs to the north of the subject site or if the subject site is further
subdivided. He stated the concept plan indicates a Phase 2 layout that adds
more parking and provides for another access to N. Annie Glidden Road.
Mr. Olson stated a traffic analysis was conducted in 2018 and indicated that an
additional right turn lane will not be needed to handle existing and future traffic
generation from the church. He advised a northbound left turn lane at the
church’s entrance at N. Annie Glidden Road is warranted and re-striping will
have to occur, but a traffic signal at the entrance was not warranted.
Mr. Olson stated the UDO requires one parking space for every four seats in
the sanctuary for a church. He noted there will be 203 seats, which would
require 56 parking spaces. He advised a total of 65 parking spaces are
provided on the concept plan in the Phase 1 Development.
Mr. Olson stated a stormwater detention basin is provided on the site to the
northwest of the church. He noted water will be extended from the existing main
along N. Annie Glidden Road and sanitary sewer will be brought to the church
from the eastern edge of Eden’s Garden at Beautiful Gate Drive. He stated a
Final Plan, meeting the UDO requirements, will be required to be submitted
prior to any building permits being issued for the site and the Final Plan will be
reviewed by City staff and will not be required to be reviewed by the Planning
Planning and Zoning Commission
July 6, 2020
Page 4 of 13
and Zoning Commission as long as the plan is in substantial conformance with
the Concept Plan.
Mr. Olson advised the applicant is requesting various waivers to the UDO. He
noted the church will have a steeple, which will be at a total height of 86 feet.
He noted the UDO does allow an increase in building height for church
steeples; however, it cannot exceed the zoning height regulations in which it is
located by more than 20%. He stated he maximum height in the highest density
residential district is 45 feet, which would allow a building height of 54 feet after
applying the 20% increase. Mr. Olson noted the UDO requires structural
projections over the maximum height level to have an additional one-foot
setback for each two feet the structure is over the maximum height level. He
stated the steeple is 32 feet (86’-54’) over the maximum height allowed, which
equates to a required minimum front yard setback of 41 feet. He stated the
church will be setback about 52 feet to the north property line and 250-300 feet
away from N. Annie Glidden Road ROW, which far exceed the additional
setback required. He advised the height waiver is justified as the proposed
church will not be in close proximity to any residences and is an integral part of
the architecture of the church.
Mr. Olson advised the UDO requires berming (3’ height minimum) along public
roadways adjacent to parking lots. He noted the applicant is proposing
landscaping along N. Annie Glidden Road that meet the UDO minimum
requirements regarding shade trees and shrubs, however no berming is
proposed. He mentioned other examples including the Northern Illinois Korean
Church that has no berm and the County Health Facility that has a meandering
berm but is a much larger development.
Mr. Olson advised the petitioner requested a waiver to reduce the landscaping
along the south and west property lines, which is justified since there is no
development to the south of the site and the nearest home to the west is over
1,000 feet away. Mr. Olson noted landscaping in the parking lot and in front of
the church building is proposed, however does not meet the minimum
requirements. He stated the church does plan to install additional landscaping
in the future through memorial donations and plans to have a fully landscape
church campus in the future.
Mr. Olson advised the applicant is requesting a waiver for the access from N.
Annie Glidden Road that is in the right-of-way of Beautiful Gate Drive to not
have curb and gutter. He noted the concept plan shows a 36-foot-wide access
into the site, which would provide enough width for an entrance lane and a right
turn and left turn lane. He added once Beautiful Gate Drive is extended, a full
street profile would be provided with curb and gutter.
Planning and Zoning Commission
July 6, 2020
Page 5 of 13
Mr. Olson stated the applicant is also requesting there be no curbing at the
perimeter of the parking lot. He noted future parking is proposed to the south,
so installing curbing along the south side of the phase 1 parking lot would not
be advised. He added there is precedent, as the parking lots for the Northern
Illinois Korean Church and New Hope Missionary Baptist Church do not have
curbing.
Mr. Olson said the petitioner is meeting all the requirements of the UDO, except
for the listed waivers. He noted there are other churches in the area, and the
project will not be detrimental to the surrounding properties. He added the
sanitary sewer will be extended from the Eden’s Garden development and
water will be connected from an existing main along N. Annie Glidden Road.
Mr. Olson mentioned there were some citizen response forms regarding the
petition. He mentioned James and Kathy Maciorowski, of 1377 Omega Circle
Drive, indicated they do not support the proposal. He noted an e-mail was
received from Bertrand Simpson, of 2570 Soros Ct., mentioning a concern if
Beautiful Gate Drive would be extended. He advised City Staff responded to
Mr. Simpson indicating that Beautiful Gate Drive would not be extended with
the development of the church. He added letters were received from Karen and
Sam Baker, of 1230 Omega Circle Drive, and from the Eden’s Garden
management company indicating a concern about stormwater drainage from
the church site impacting their subdivision. Mr. Olson noted City Staff
responded mentioning the church will be providing their own stormwater
detention pond that will handle the stormwater for the site, which will have to
meet all the UDO requirements and will be checked by the City Engineer.
Mr. Olson stated since the posting of the agenda, another email was received
from Matt and Jackie Suwanski, of 1229 Omega Circle Dr, concerned about
storm water retention and the condition of Twombly Road. Mr. Olson reiterated
the detention pond requirements for the church and advised DeKalb County
will be reconstructing Twombly Road next year, as well as adding a sidewalk
on the north side of Twombly Road.
Mr. Olson advised City Staff recommends approval of the annexation, rezoning,
concept plan, and waivers to the UDO. He noted the request will allow the
church to construct a new facility that will accommodate their immediate and
future needs.
Vice Chair Doe gave the public a chance to speak.
Jim Neff, of 1245 Omega Circle Dr., stated his concern with drainage. He
advised they regularly have flooding on the subject property. He stated the land
behind his home has ponds that form that are several acres large. He noted he
Planning and Zoning Commission
July 6, 2020
Page 6 of 13
had concerns with Beautiful Gate Drive, but it was no longer an issue after Mr.
Olson’s explanation that the road will not be extended with this development.
Sam Baker, of 1230 Omega Circle Dr., advised he was one of the citizens that
mailed in a response form to the City. He advised he is not against the church
and only has an issue with the drainage and flooding behind his property and
in his subdivision. He noted ponds form every year behind the homes on
Omega Circle Dr. He wants to ensure the church is built properly and doesn’t
add to the water runoff in the area. Mr. Olson advised the petitioner is required
to conduct a stormwater impact study and ensure the proposed detention pond
contains the runoff from the project. He noted the petitioner must meet the
drainage and stormwater regulations of the UDO and the development will not
add to any existing drainage issues.
Mr. Baker said he wants a solution to the current drainage issue before any
other development occurs. He stated the flooding will get worse with any new
development if the current issue isn’t addressed. Mr. Olson advised per the
UDO; the development will not be allowed to increase runoff to neighboring
properties. He noted all runoff from the new development will be directed to the
new detention pond. Mr. Olson stated if there is a current issue at Eden’s
Garden, he could request the City Engineer to inspect the area, however, the
petitioner would not be required to remediate any existing runoff.
Steve Storey advised he is the current owner of the subject property. He said
Eden’s Garden has 8-inch tile to the surrounding detention ponds. He advised
if there was a larger tile into Eden’s Garden detention pond, it would solve the
flooding issue in the area. Mr. Baker advised that would never be approved, as
the detention ponds are already flooding. He reiterated he is not opposed to
the construction of the church but wants to ensure that water issue is remedied.
He added he does not want construction to move forward until the issue is
addressed.
Mr. Olson advised the petitioner is required to provide stormwater detention for
the development, which includes the building and parking lot. He noted they
must meet UDO requirements, which prevents the development from adding to
the water runoff problem. He stated the land on the west side of the subject
property is not going to be developed, so they are not required to remedy the
current flooding in that area. Mr. Olson reiterated he will convey the concerns
to the City Engineer and can have him address the issues with Mr. Baker.
Vice Chair Doe requested Mr. Olson clarify the property lines and development
lines of the proposed development. Mr. Olson clarified the development will
only be on the eastern part of the subject property. The western side of the
property will remain undeveloped farmland.
Planning and Zoning Commission
July 6, 2020
Page 7 of 13
Bertrand Simpson Jr, of 2570 Soros Ct, advised the south end of his property
abuts Beautiful Gate Dr. He wanted the City to clarify if there will be any
additional traffic on Beautiful Gate Dr. due to the development. Mr. Olson
advised all traffic to the church will be off N. Annie Glidden Rd. Mr. Simpson
stated he is not opposed to the church but wants the petitioner to take in mind
what effect the development will have on water runoff to neighboring properties.
Mr. Simpson questioned if the property to the north of the subject site will be
developed residential or commercial in the future. Mr. Olson advised this
development does not affect the property to the north, as it is unincorporated
DeKalb County. He noted it is designated as residential in the City’s
Comprehensive Plan.
Vice Chair Doe gave the Commissioners a chance to speak.
Ms. O’Flaherty stated she believes the proposed project is a good use of the
property. She questioned what the normal course of action would be for Mr.
Baker’s concerns regarding the present issues. Mr. Olson advised the City
Engineer would inspect the site and see if there is a resolution. Ms. O’Flaherty
would prefer the issues be addressed now before the development moves
forward.
Mr. Wright questioned if there were plans for the land to the north of the
development or west of the development. Mr. Olson advised there are no
current plans at this time. Mr. Wright questioned if there will be a southbound
right turn lane off N. Annie Glidden Rd. Mr. Olson responded the traffic study
deemed a right turn lane would not be required, but a northbound left turn lane
would be.
Mr. Wright inquired when construction will begin and end. Mr. Horn advised the
project will begin either in 2022 or 2023 and will take approximately 4 months
to complete. Mr. Wright asked the public participants and Mr. Olson to clarify if
the western part of the subject property has a current drainage issue due to
runoff from surrounding farmlands. Mr. Olson noted citizens advised there is a
current drainage issue on the subject property closest to Eden’s Garden.
Mr. Wright stated the stormwater restrictions in the UDO may have to be
expanded to cover the current drainage issue at the subject site. Mr. Olson
advised the petitioner can only be required to address the runoff caused by the
new development on their own property, not the current issue in Eden’s
Garden. Mr. Wright questioned if the regulations in the UDO need to be
adjusted to address the specific water runoff issues at this property that other
development properties may not have.
Planning and Zoning Commission
July 6, 2020
Page 8 of 13
Mr. Klein asked if the subject property is part of a drainage district. Mr. Storey
advised it is in the drainage district. Mr. Klein advised the drainage district
already has assessments of the property, which would make it subject to the
regulations of the district. Mr. Klein advised the petitioner would need to go
before the drainage district board to ensure they meet all their regulations. Vice
Chair Doe questioned if the property was annexed, would they still be subject
to the drainage district’s approval. Mr. Klein advised they would.
Mr. Olson asked the Commission what they would like to add to the petition or
review to address their concerns.
Vice Chair Doe questioned if the placement of the detention pond is laid out in
the UDO. Mr. Olson advised the placement is determined by the stormwater
impact study and engineering calculations.
Mr. Wright questioned if the Commission approves the petition tonight, how
would the runoff issue be addressed. Mr. Olson advised in Exhibit B of the
recommendation, a full stormwater report and impact study is required to be
conducted, submitted, and approved by the City Engineer prior to any
construction.
Mr. Klein inquired what will happen to the current church building. Mr. Horn
advised the church plans to sell the property. He advised there were several
inquiries, but he has not been able to solidify a sale, as the new church site has
not been approved or developed.
Mr. Klein inquired if they will be constructing any additional buildings on the
subject property. Mr. Horn advised a garage or shed may be built to store lawn
equipment and furniture, but nothing major. Mr. Klein questioned if membership
of the church has stayed stable for the last 10 years. Mr. Horn advised there
has been a slight decline, especially with COVID-19. He noted the capital
campaign has run steadily over the years, however. Mr. Klein noted the
petitioner needs to address the drainage issue with the drainage district.
Mr. Olson advised with the current concerns regarding stormwater runoff, the
Commission may wish to continue the hearing to the next meeting so the City
Engineer can address the concerns. Mr. Wright believes this is the last
opportunity to address the issues and would not want to approve the petition if
the issue isn’t addressed.
Mr. Storey questioned if the Commission would like the drainage district to
attend the continued hearing. Mr. Olson advised it would not be necessary to
have the district attend the hearing.
Planning and Zoning Commission
July 6, 2020
Page 9 of 13
Vice Chair Doe questioned where the cut off for the green space will be for the
development. Mr. Horn advised the green space will only cover the eastern
third of the subject property. He advised the green space will be sodded and
there will be bushes and trees or a fence to separate the developed property
from the farmland. Mr. Wright questioned if the farmland would continue to be
farmed. Mr. Horn advised it would be.
Mr. Baker reiterated he is not opposed to the project but wants the water issue
to be addressed now and rather than let it linger. He stated if the petitioner is
not going to be using the land, something should be done to the land now to
prevent future flooding.
Mr. Simpson understands the petitioner is following the regulations of the UDO,
but questions if the City and petitioner are doing the best they can to help the
citizens in the area. He advised Eden’s Garden was planned and went through
the same vetting process as this petition, but there are drainage issues that
arose from its development.
Mr. Klein noted this project would be ideal when it comes to drainage, as
building one church on 16 acres would prevent more runoff than 20 separate
houses.
Mr. Wright said he would prefer to hear from the City Engineer regarding the
current drainage issue in order to give consolation to the citizens living in
Eden’s Garden. Mr. Wright advised he fully supports the church but wants the
drainage issue resolved.
Ms. O’Flaherty advised she agrees with Mr. Wright and wants to hear from the
City Engineer.
Vice Chair Doe advised she is excited for the project, as she attends a
neighboring church. She added she does not want to rush the project and
wants the drainage issue resolved.
Mr. Klein moved that the Planning and Zoning Commission forward its findings
of fact and recommend to the City Council approval of a zoning map
amendment, upon annexation, from the “SFR1” Single-Family Residential
District to the “PD-R” Planned Development – Residential and approval of an
amendment to Ordinance 94-74 to allow for the construction of an
approximately 7,730 sq. ft. church and accessory uses for approximately 16
acres of property located along the west side of N. Annie Glidden Road across
from the DeKalb County Health Facility Campus. Approval is also
recommended for a concept plan, architectural elevation, landscape plan and
Planning and Zoning Commission
July 6, 2020
Page 10 of 13
plat of dedication described in Exhibit A of the staff report and approval of the
Planned Development Standards described in Exhibit B of the staff report.
There was no second to the motion made by Mr. Klein. Motion Failed.
Mr. Wright moved that the Planning and Zoning Commission continue the
public hearing to July 20, 2020 at 6:00PM at the DeKalb Public Library located
at 309 Oak Street.
Ms. O’Flaherty seconded the motion.
A roll call vote was taken. Mr. Klein – No, Ms. O’Flaherty – yes, Mr. Wright –
yes, Vice Chair Doe – yes. Motion passed 3-1-2. Chair Max Maxwell and Steve
Becker were absent.
2. Public Hearing – A petition by Municipal Resolutions on behalf of First National
Bank of Omaha for approval of a variance to Article 13.06.04 of the Unified
Development Ordinance in order to incorporate a 40 sq. ft. electronic
changeable copy sign on an existing legal non-conforming ground sign at the
First National Bank of Omaha located at 121 W. Lincoln Highway.
Karen Dodge, with Municipal Resolutions on behalf of First National Bank of
Omaha, advised they are requesting a variance to install an electronic
changeable copy sign at 121 W. Lincoln Highway. She noted the footing, post,
and cabinet for the sign was installed in the 1980’s. She added the petitioner
will only be changing the face of the sign, incorporating the electronic message
center. She advised the proposal is to increase communication to customers in
the community. She added they will not be increasing the size or height of the
sign. Ms. Dodge advised the sign will comply with Article 13.06.04 of the UDO
by only having one changeable copy sign and keeping the electronic message
center under 40 sq. ft. She also mentioned the sign will be in compliance by not
having off site advertising, maintaining a 5 second hold between messages,
not having various transitions, and installing a dimmer switch.
Ms. Dodge advised there were two correspondence received by the City from
residents north of the property. Mr. Olson advised the two properties are 150
and 200 W Locust St. He noted the residents had concerns with the potential
visibility of the sign from the second floor of their homes.
Ms. Dodge advised there should be no issues with the visibility of the sign as
they are not changing the size of the sign. She pointed out the administrative
bank building and several trees are between the resident’s homes and the sign.
She noted the residents are at a lower elevation than the bank property, so
Planning and Zoning Commission
July 6, 2020
Page 11 of 13
visibility of the sign will be minimal. She added the residence face the side of
the sign, not the illuminated portion.
Principal Planner Dan Olson went over the staff report dated July 2, 2020. He
noted the existing sign is 29 ft. and 5 ½ in. high and a total of 102 sq. ft. in size.
He noted the sign is an existing legal non-conforming ground sign and the
petitioner proposes to replace the face of the existing sign and add an
electronic message center to the sign that will be 40 sq. ft. or about 40 percent
of the overall sign size.
Mr. Olson advised on March 23, 2020 the City Council approved several
amendments to the sign regulations including allowing electronic changeable
copy signs with a sign permit as long as the sign met the requirements in the
UDO. He noted prior to the amendment, electronic changeable copy signs were
prohibited, however a few were approved by special use permits including
Hillcrest Covenant Church, Brian Bemis Auto Group, and two local schools.
Mr. Olson advised First Midwest Bank, just across the street from the subject
property, has an electronic changeable copy sign that was approved by the City
through a special use permit in 2012. He noted the First National Bank of
Omaha branch office just to the west of the site already has a ground sign which
is approximately 50 sq. ft. and 10 ft. in height and only displays the time and
temperature. He advised there are several other non-conforming signs to the
west of the subject site including American Liquors, Shell Gas Station, and Los
3 Burritos.
Mr. Olson mentioned the contractor installing the sign is the same company
that constructed the Clinton Rosette sign that was approved by the
Commission. The technology will be the same and it will have the same
capabilities. He added only 40% of the sign front will be the changeable sign
portion.
Mr. Olson noted the sign is existing and will not be a detriment to the
surrounding area. He explained there are several non-conforming signs in the
area, as well as an electronic changeable sign to the south of the site. He said
the sign is not out of character with the surround properties.
Mr. Olson advised two responses were received by nearby property owners.
He noted Valerie Flynn, of 200 W. Locust St, objected to the variance with
concerns of visibility. He noted there are buildings and landscaping between
the sign and the resident’s property, so the visibility of the sign is questionable.
A second response form was received from Joe and Jean Gastiger, of 150 W.
Locust St, regarding visibility of the sign. Mr. Olson said they were also
concerned with the street scape and the design of the corridor with the addition
Planning and Zoning Commission
July 6, 2020
Page 12 of 13
of an electronic changeable copy sign. Mr. Olson reiterated the landscaping
between the properties and that the residence faces the side of the sign, not
the face of it.
Mr. Olson stated the City Staff recommends approval of the variance as shown
in Exhibit A and with the restrictions provided in the UDO for electronic
changeable copy signs.
Vice Chair Doe gave the public a chance to speak. There were none.
Vice Chair Doe gave the Commission an opportunity to speak.
Mr. Klein questioned what the need was for a flashing sign when they already
have two large signs on the property. Ms. Dodge advised the sign will display
their products, such as home equity rates and CD rates. Mr. Klein mentioned
he is not in favor of large flashing signs and believes the bank has done well
with the two signs it currently has. Ms. Dodge pointed out the sign will not be
flashing and will be very simple and only display the bank’s different investment
rates and products.
Mr. Wright questioned if the sign would be on all day, and if the sign would get
dimmer at night. Ms. Dodge advised the sign would be on all day and would be
dimmed to meet the requirements of the UDO. Mr. Wright questioned if the
changeable portion of the sign would increase the overall size of the sign. Ms.
Dodge responded the sign size would remain the same.
Vice Chair Doe questioned why the bank decided to stay with the current sign
instead of a new one. Ms. Dodge noted visibility and cost.
Mr. Wright moved that the Planning and Zoning Commission forward its
findings of fact and recommend to the City Council approval of a variance to
Article 13.06.04 of the Unified Development Ordinance in order to allow a 40
sq. ft. electronic changeable copy sign (electronic message center) on an
existing legal non-conforming ground sign at the First National Bank of Omaha
located at 121 W. Lincoln Highway as shown on the sign detail dated 6-4-20
and labeled as Exhibit A in the staff report.
Ms. O’Flaherty seconded the motion.
A roll call vote was taken. Mr. Klein – yes, Ms. O’Flaherty – yes, Mr. Wright –
yes, Vice Chair Doe – yes. Motion was passed 4-0-2. Chair Maxwell and Steve
Becker were absent.
Planning and Zoning Commission
July 6, 2020
Page 13 of 13
F. REPORTS
Mr. Olson advised the next meeting of the Planning and Zoning Commission
would be July 20, will include the continued First United Methodist Church
public hearing, as well as variance request for a fence located at 904 S 4th St.
Mr. Olson noted on June 22 the City Council approved the Littlejohn
Elementary School modular classroom special use permit. He also mentioned
the Council approved the second reading on the 421 Grove St. rezoning for the
Swedberg contractor’s office.
Mr. Olson stated Project Ventus was announced as Facebook and thanked the
Commission for their efforts on the project.
G. ADJOURNMENT
Ms. O’Flaherty motioned to adjourn, Mr. Wright seconded the motion, and the
motion was approved by unanimous voice vote. The Planning and Zoning
Commission Meeting adjourned at 7:51 PM.
STAFF REPORT
July 2, 2020
July 16, 2020 - Updated
TO: Planning and Zoning Commission
FROM: Dan Olson, Principal Planner
RE: Zoning Map Amendment, Upon Annexation, from the “SFR1” Single-Family
Residential District to the “PD-R” Planned Development – Residential
District to allow for the construction of a Church and Accessory Uses along
the West Side of N. Annie Glidden Road (DeKalb First United Methodist
Church)
I. GENERAL INFORMATION
A. Purpose Construction of 7,730 sq. ft. church and
accessory uses
B. Owner/Applicant Stephen Storey/DeKalb First United
Methodist Church
C. Location and Size West side of N. Annie Glidden Road,
across from the DeKalb County Health
Facility Campus/Approx. 16 acres
D. Existing Zoning and Land Use “PD-R” Planned Development Residential
District and A-1 (Unincorporated);
Agricultural
E. Surrounding Zoning and Land Use North: A-1 (Unincorporated); agricultural
South: A-1 and SFR1; church,
agricultural
East: PD-R; DeKalb County Health
Facility Campus, church
West: PD-R; townhomes, single-family
F. Comprehensive Plan Designation Low Density Single-Family Residential
II. BACKGROUND AND ANALYSIS
Request/Background
DeKalb First United Methodist Church is proposing to relocate from their 4th St. and Oak
St. location to 15.87-acre site along the west side of N. Annie Glidden Road across from
the DeKalb County Health Facility Campus. Part of the site (9.33 acres) is currently in the
City and zoned PD-R and the other portion (6.54 acres) is in unincorporated DeKalb
County. The 9.33 acres was annexed to the City in 1994 (Via Ordinance 94-74) as part
of the Eden’s Gardens Subdivision development and was a means to provide contiguity
to the existing City limits at the time. The request involves the approval of a zoning map
amendment, upon annexation, from the “SFR1” Single-Family Residential District to the
“PD-R” Planned Development – Residential District for the property not currently in the
City and for approval of an amendment to Ordinance 94-74 for the property that is already
annexed. The request also involves approval of a concept plan, plat of roadway
dedication and waivers to the Unified Development Ordinance (UDO) for building height,
landscaping, minimum street standards and parking lot standards.
The 15.87-acre property stretches from N. Annie Glidden Road to eastern edge of the
Eden’s Garden development. The proposed church building and parking lot will be located
at the eastern portion of the property they are purchasing. The church will be
approximately 7,730 sq. ft. and include a 203-seat sanctuary, classrooms, coffee/lounge
area, administrative offices and a kitchen. Access will be provided from N. Annie Glidden
Road across from the existing access into the DeKalb County Health Facility Campus.
The right-of-way for Beautiful Gate Drive will be dedicated to the City with the approval of
the project, however the road will not be constructed at this time. The road will be
extended once development occurs to the north of the subject site or if the subject site is
further subdivided. The concept plan indicates a Phase 2 layout that adds more parking
and provides for another access to N. Annie Glidden Road.
The City has been working with the church for a couple of years regarding the site plan
and other development issues. We have worked out a draft annexation agreement with
the church prior to the submittal of the annexation and rezoning petitions. The agreement
was a working document between staff and the church so they were able to determine
what the general requirements for developing the site would be.
A traffic analysis was conducted in 2018 and indicated that an additional right turn lane
will not be needed to handle existing and future traffic generation from the church. A
northbound left turn lane at the church’s entrance at N. Annie Glidden Road is warranted
and re-striping will have to occur. The study also concluded a traffic signal at the entrance
and N. Annie Glidden Road was not warranted.
For churches’ the UDO requires one parking space for every four seats in the sanctuary.
There will be 203 seats in the sanctuary, which equates to 56 required parking spaces. A
total of 65 parking spaces are provided on the concept plan in the Phase I development.
Page 2 of 8
A stormwater detention basin is shown on the concept plan to the northwest of the church
building. Water will be extended from the existing main along N. Annie Glidden Road and
sanitary sewer will be brought to the church from the eastern edge of Eden’s Garden. A
Final Development Plan, meeting the UDO requirements, will be required to be submitted
prior to any building permits being issued for the site. The Plan will include engineering
details and stormwater calculations to ensure the stormwater is detained on the site per
the UDO standards. The Plan will be reviewed by City staff as well as the Planning and
Zoning Commission and City Council.
Waivers to the UDO
The applicant is requesting waivers to the UDO regarding building height, landscaping,
minimum street standards and parking lot standards and are summarized below.
Building Height – Article 5.13.07(3)(3) and Article 7.02
The church will have a steeple, which will be at a total height of 86 feet. The UDO does
allow an increase in building height for church steeples; however, it cannot exceed the
zoning height regulations in which it is located by more than 20%. The maximum height
in the highest density residential district is 45 feet, which would allow a building height of
54 feet after applying the 20% increase. The UDO also requires structural projections
over the maximum height level to have an additional one-foot setback for each two feet
the structure is over the maximum height level. The steeple is 32 feet (86’-54’) over the
maximum height allowed, which equates to a required minimum front yard setback of 41
feet (additional setback of 16 feet onto the 25-foot front yard setback required in
residential districts). The church will be setback about 52 feet to the north property line
and 250-300 feet away from N. Annie Glidden Road ROW, which far exceed the additional
setback required. The setbacks to the south property and west property line are
substantial also and meet the minimum requirements. The height waiver is justified as the
proposed church will not be in close proximity to any residences and is an integral part of
the architecture of the church.
Landscaping – Article 12.04
The applicant is requesting a waiver to the requirement of berming in the front yard along
N. Annie Glidden Road and the Beautiful Gate Drive right-of-way. The church is also
requesting to allow a reduction in the quantity of shade trees and shrubs along the interior
and rear yards of the parking lot and in the interior of the parking lot.
The UDO requires berming (3’ height minimum) along public roadways adjacent to
parking lots. The applicant is proposing landscaping along N. Annie Glidden Road that
meet the UDO minimum requirements regarding shade trees and shrubs, however no
berming is proposed. The parking lot will be about 80 feet away from the N. Annie Glidden
Rd. right-of-way so berm would not provide effective screening as much as the shade
trees and shrubs. In addition, there is no berm in front of the Northern Illinois Korean
Church and the County Health Facility has a meandering berm but is a much larger
Page 3 of 8
development. Trees, shrubs and a small berm is proposed along the right-of-way of the
future Beautiful Gate Drive. As noted before Beautiful Gate Drive will not be constructed
with the development of the church.
A waiver to reduce the landscaping along the south and west property lines is also
requested and justified since there is no development to the south of the site (future
parking is also proposed in this area) and the nearest homes to the west are over 1,000
feet away. Landscaping in the parking lot and in front of the church building is proposed,
however does not meet the minimum requirements. The church does plan to install
additional landscaping in the future through memorial donations and plans to have a fully
landscape church campus in the future.
Minimum Street Standards – Article 9.03 and Article 12.03.6(a)
The applicant is requesting a waiver for the access from N. Annie Glidden Road that is in
the right-of-way of Beautiful Gate Drive to not have curb and gutter. The concept plan
shows a 36-foot-wide access into the site, which would provide enough width for an
entrance lane and a right turn and left turn lane. Once Beautiful Gate Drive is extended,
a full street profile would be provided with curb and gutter. The waiver is justified since
the proposed access will only serve the church at this time.
Parking Lot Standards Article 12.03.6(a)
The applicant is also requesting there be no curbing at the perimeter of the parking lot.
Future parking is proposed to the south, so installing curbing along the south side of the
phase 1 parking lot would not be advised. Adequate drainage will be provided for water
coming off the parking lot surface. Curbs are proposed around the four landscape islands
in the interior of the parking lot as shown on the Concept Plan and Landscape Plan. It
should be noted that curbing is not provided around the parking lot at the Northern Illinois
Korean Church or at New Hope Missionary Baptist Church.
III. STANDARDS FOR ZONING MAP AMENDMENT
1. The proposed rezoning conforms to the Comprehensive Plan, or conditions
have changed to warrant the need for different types of land uses in that area. The
proposed rezoning is appropriate considering the length of time the property has
been vacant, as originally zoned, and taking into account the surrounding areas
trend in development.
The 2005 Comprehensive Plan recommends Single-Family Residential for the subject
site. A church is a special use in the SFR1 District. The proposed plan meets the intent
of the Comprehensive Plan and there are two other churches in the immediate area.
2. The proposed rezoning conforms to the intent and purpose of the Unified
Development Ordinance.
Page 4 of 8
The rezoning of the subject property to PD-R provides the opportunity to more directly
shape the development, use and appearance of this property in accordance with the
City’s Comprehensive Plan. The Planned Development allows the developer and the City
the flexibility to agree to a site plan and standards that meets the needs of the site. The
proposed rezoning request and development are in compliance with the Unified
Development Ordinance, except for the waivers noted in the staff report. The proposal
also meets the General Standard requirements for a Planned Development as described
in Article 5.13.07 of the UDO.
3. The proposed rezoning will not have a significantly detrimental effect on the
long-range development of adjacent properties or adjacent land uses.
The proposed rezoning will not have a detrimental effect on the adjacent properties or
land uses as it entitles the subject property to a use of the property that is complementary
with the adjacent area. There are two other churches in the immediate area. The Northern
Illinois Korean Church is located along the east side of N. Annie Glidden Road just south
of the site and New Hope Missionary Baptist Church is located just south of the subject
property along Twombly Road. The dedication of right-of-way for the future extension of
Beautiful Gate Drive will allow adjacent properties to develop.
4. The proposed rezoning constitutes an expansion of an existing zoning
district that, due to the lack of undeveloped land, can no longer meet the demand
for the intended land uses.
The subject property is currently zoned “A1” Agricultural in DeKalb County and PD-R in
the City of DeKalb. Expanding the entire property to “PD-R” zoning will allow for a well-
designed project and the flexibility to develop the property in a manner that will
complement the surrounding area and meet the needs of the church.
5. Adequate public facilities and services exist or can be provided.
Adequate public services will be provided to the subject property. Sanitary sewer will be
extended from the Eden’s Garden development and water will be connected from an
existing main along N. Annie Glidden Road. Stormwater detention will be provided on the
site per the City’s regulations. Finally, the subject property lies within adequate service
areas for other City services, such as police and fire protection.
IV. PUBLIC INPUT
The City received a Citizen Response Form from James and Kathy Maciorowski of 1377
Omega Circle Drive indicating they do not support the proposal. There was no reasoning
or comments provided with the form from the Maciorowski’s. We also received an e-mail
from Bertrand Simpson of 2570 Soros Ct. mentioning a concern if Beautiful Gate Drive
was extended with the proposal. City staff responded to the e-mail indicating that Beautiful
Gate Drive would not be extended with the development of the church. We also received
a letter from Karen and Sam Baker of 1230 Omega Circle Drive and from the Eden’s
Page 5 of 8
Garden management company indicating a concern about stormwater drainage from the
church site. At the public hearing on July 6, 2020 an e-mail from Jacki and Matt Suwanski
of 1229 Omega Circle Drive was provided to the Commission. The correspondence noted
no objection to the church, however they wanted to ensure adequate stormwater
detention would be provided. The Suwanski correspondence also noted a concern about
the condition of Twombly Road, which will be improved in 2021 with the addition of a
sidewalk. Since the hearing on July 6, we received a Citizen Response Form from Bradley
Fisher of 1225 Omega Circle Drive. Mr. Fisher objects to the proposal citing concerns on
drainage and traffic along Twombly Road.
At the public hearing on July 6, the Commission heard testimony from Jim Neff of 1245
Omega Circle Dr. Mr. Neff noted a concern about drainage and the extension of Beautiful
Gate Drive. Mr. Sam Baker of 1230 Omega Circle Dr. stated concerns about flooding in
the rear yards of homes along the east side of Omega Circle Dr. and wanted the drainage
problems in the area addressed prior to approval of the church. Bertrand Simpson of 2570
Soros Ct. was glad Beautiful Gate Dr. will not be extended and noted the water issues
were important.
V. CONCLUSIONS AND RECOMMENDATION
At the public hearing on July 6, 2020 the Commission heard concerns from residents of
Eden’s Garden Subdivision regarding drainage in their subdivision and the impact from
the development of the church site. Since that time the City Engineering has reviewed the
drainage documents and plans for Eden’s Garden. This past week the City’s Public Works
Department conducted a field investigation in Eden’s Garden and performed work to
remove silt, debris and tree branches from the storm sewer leading out of the pond south
of Beautiful Gate Drive. The work has allowed a free flow of water out of the pond and as
a result cleared out the back flow of water in the storm sewer behind the homes along the
east side of Omega Circle Dr. This work should alleviate the ponding of water in the back
yards of homes that back up to the farm field along Omega Circle Dr.
A memo from our City Engineer, Zachary Gill, is provided in the Commission’s packet that
summarizes the existing drainage situation in the area and noting the requirements for
storm water management on the church site. With these requirements, the development
of the church site will improve the overall storm water runoff of the area. Communication
with Eden’s Garden resident Sam Baker and Jim Neff have occurred with updates on the
storm water situation in the subdivision and the requirements for storm water
management for the church site.
We have also revised the recommend Development Standards to require review of the
Final Development Plans by the Planning and Zoning Commission and City Council prior
to any construction on the site. As part of the Final Development Plan submittal, a
Stormwater Management Report will be required to be submitted and reviewed by the
City Engineer to ensure compliance with the Unified Development Ordinance.
Page 6 of 8
The proposed request will allow the church to construct a new facility that will
accommodate their immediate and future needs. The well-designed project allows for
flexibility by the applicant to develop the property in a manner that will complement the
surrounding area and meet the needs of the church.
The staff’s recommendation is to approve, and a sample motion has been prepared.
Sample Motion:
Based upon the submitted petition and testimony presented, I move the Planning and
Zoning Commission forward its findings of fact and recommend to the City Council
approval of a zoning map amendment, upon annexation, from the “SFR1” Single-Family
Residential District to the “PD-R” Planned Development – Residential and approval of an
amendment to Ordinance 94-74 to allow for the construction of an approximately 7,730
sq. ft. church and accessory uses for approximately 16 acres of property located along
the west side of N. Annie Glidden Road across from the DeKalb County Health Facility
Campus. Approval is also recommended for a concept plan, architectural elevation,
landscape plan and plat of dedication described in Exhibit A of the staff report and
approval of the Planned Development Standards described in Exhibit B of the staff report.
Page 7 of 8
Exhibit A
Concept Plan and Plat of Dedication
• Concept Plan prepared by Saavedra Gehlhausen Architects dated November 15,
2018.
• Architectural Elevations prepared by Saavedra Gehlhausen Architects dated May
23, 2018.
• Landscape Plan received on May 22, 2020.
• Plat of Dedication for Roadway and Utility Purposes dated April 22, 2020 and
prepared by W.E. Hanna Surveyors.
Page 8 of 8
Exhibit B
Planned Development Standards
Permitted Uses:
A church with accessory uses including a future storage building and pavilion.
Bulk Regulations/Landscaping/Parking:
Setbacks, building lines, site coverage, building dimension limitations, height
restrictions, parking, landscaping and other similar restrictions and regulations
shall meet those standards as set forth in the “PD-R” District of the Unified
Development Ordinance, unless otherwise approved in these standards.
Road Improvements:
The property owners shall not have to pay for any improvements to the
proposed Beautiful Gate Drive including, but not limited to, curbs, gutters, storm
sewers, water mains, water services, and roadway materials unless the
property is subdivided into multiple lots and developed by the property owners
or its assignee, in which case the costs shall be borne by the respective
property owner or assignee who is developing the property.
Final Plans:
Submittal of Final Development Plan for the property shall be reviewed and
approved by the City staff, Planning and Zoning Commission and City Council
prior to issuance of a permit for construction of the church and shall be in
substantial compliance with the approved Concept Plan. As part of the Final
Development Plan submittal, a Stormwater Management Report shall be
submitted and reviewed by the City Engineer to ensure compliance with the
Unified Development Ordinance.
Waivers to the Unified Development Ordinance:
The following waivers to the Unified Development Ordinance are granted:
1. Article 5.13.07(3)(e) and Article 7.02 to allow a church steeple to be at a
height of 86 feet as shown on the Architectural Elevations incorporated in
Exhibit A.
2. Article 9.03 and Article 12.03.6(a) to waive the requirement for the access
from N. Annie Glidden Road to have curb and gutter.
Page 9 of 8
3. Article 12.03.6(a) to waive the requirement for the parking lot to have
perimeter curbs, except curbs shall be provided around the four landscape
islands in the parking lot as shown on the Concept Plan and Landscape Plan
incorporated in Exhibit A. This waiver is conditioned upon all storm water
runoff being captured on the pavement surface and conveyed in an efficient
and direct manner to the storm water detention area as reviewed and
approved by the City Engineer.
4. Article 12.04 to waive the requirement for a berm to be located in the front
yard along N. Annie Glidden Road and the right-of-way of the future Beautiful
Gate Drive; allow a reduction in quantity of shade trees and shrubs along the
interior and rear yards of the parking lot and in the interior of the parking lot,
all as shown on Landscape Plan incorporated in Exhibit A.
Page 10 of 8
DATE: July 16, 2020
TO: Dan Olson, Principal Planner
FROM: Zachary Gill, City Engineer
SUBJECT: Storm Water Drainage – DeKalb First United Methodist Church and
Eden’s Garden (N. Annie Glidden Road)
The drainage impacts of the proposed church site on the downstream facilities and
neighboring parcels will not be negatively impacted with the development’s restriction to
the City Ordinance constraints on storm water runoff release rates and accompanying
detention requirements. The existing pond and conveyance facilities immediately
downstream in Eden’s Garden are designed to accommodate such runoff pass-through
and will be able to perform with continued maintenance and monitoring.
The area north of Twombly Road in the region just west of Annie Glidden Road saw major
development in the mid/late 1990s with the establishment of multiple phases of the Eden’s
Garden Subdivision. Several hundred acres of agricultural land farmed for row crops has
remained active and un-annexed just east of Eden’s Garden. The land, regardless of use
was intended to continue to collect and drain to the west/southwest through the area
established for Eden’s Garden. The storm water drainage facilities of Eden’s Garden
were planned and constructed for such pass-through (see attached partial memo dated
August 7, 1998 “RE: Final Plat/Plan Eden’s Garden Phases II and III” from the then
Principal Planner to the Commission).
Upon announcement of this new proposed development to the east, several residents of
Eden’s Garden came forward at the July 6 public hearing to understand the drainage
impacts and advise there has been flooding in the subdivision which has impacted
portions of several lawns in the development. They have asked their concerns about the
proposed development worsening the situation be investigated and considered.
After due diligence confirmed the Eden’s Garden facilities are intended to accommodate
drainage from the east, the Public Works Dept. conducted a field investigation of the
current conditions and found several deficiencies for full capacity function. This impact is
substantially responsible for the yard encroachment as it prevented hydraulically both the
draining of the fields adjacent of the yards and the full function of the several storm drain
inlets in the yards themselves. The system has been brought back to full function and
on-going coordination with the Eden’s Garden HOA will provide the ability to monitor and
maintain such.
The proposed church development will be required to apply a restricted storm water
release to the entire parcel, as well as control and direct runoff to detention and outfalls
facilities connected directly to the existing downstream facilities. With these requirements,
the development of the church site will improve the overall storm water runoff of the area.
As it will not be commingling with the current flooding area but directed in a controlled
fashion, the proposed development lowers the threat to the concerned parcels during
heavy storm events. The storm water runoff regulations the proposed parcel is beholden
to are established and consistent under the UDO and are not subjective. Those submitted
storm water studies and engineering plans are public documents upon completion of City
review and may be reviewed independently at any community member’s discretion.
Page |2
EXHIBIT A
EXHIBIT A
EXHIBIT A
EXHIBIT A
NORTHERN ILLINOIS KOREAN CHURCH
NEW HOPE MISSIONARY BAPTIST CHURCH
LEGAL NOTICE
NOTICE is hereby given that a public hearing will be held before the DeKalb Planning and Zoning
Commission at its regular meeting on Monday, July 6, 2020 at 6:00 p.m. in the Yusunas Meeting
Room at the DeKalb Public Library, 309 Oak St., DeKalb, IL, on the petition by DeKalb First
United Methodist Church for approval of a zoning map amendment, upon annexation, from the
“SFR1” Single-Family Residential District to the “PD-R” Planned Development – Residential
District for the property described below in Legal A and approval of an amendment to Ordinance
94-74 for the property described below in Legal B. The requests are for the approval of a concept
plan and waivers to the Unified Development Ordinance for building height, landscaping,
minimum street standards and parking lot standards to allow for the construction of an
approximately 7,730 sq. ft. church and accessory uses for approximately 16 acres of property
located along the west side of N. Annie Glidden Road across from the DeKalb County Health
Facility Campus. The subject property contains Parcel Identification Number (PIN) 08-09-400-
018 and a portion of PIN 08-09-400-017 and is legally described below.
Legal A
THAT PART OF THE NORTHEAST QUARTER OF THE SOUTHEAST QUARTER OF
SECTION 9, TOWNSHIP 40 NORTH, RANGE 4 EAST OF THE THIRD PRINCIPAL
DESCRIBED AS FOLLOWS: COMMENCING AT THE SOUTHWEST CORNER OF SAID
NORTHEAST QUARTER; THENCE NORTHERLY ALONG THE WEST LINE OF SAID
NORTHEAST QUARTER, 300.00 FEET TO A POINT OF BEGINNING; THENCE
CONTINUING NORTHERLY 211.08 FEET; THENCE EASTERLY AT AN ANGLE OF 90
DEGREES 02 MINUTES 11 SECONDS MEASURED COUNTERCLOCKWISE FROM SAID
WEST LINE 849.87 FEET TO A POINT OF CURVATURE; THENCE EASTERLY 175.78
FEET ON A CURVE TO THE LEFT HAVING A RADIUS OF 700.00 FEET TO A POINT OF
REVERSE CURVE; THENCE EASTERLY 193.46 FEET ON A CURVE TO THE RIGHT
HAVING A RADIUS OF 770.00 FEET TO A POINT OF TANGENCY; THENCE EASTERLY
77.22 FEET TO THE EAST LINE OF SAID SOUTHEAST QUARTER; THENCE
SOUTHERLY AT RIGHT ANGLE TO THE LAST DESCRIBED COURSE, 257.17 FEET;
THENCE WESTERLY AT AN ANGLE OF 90 DEGREES 00 MINUTES 26 SECONDS
MEASURED COUNTERCLOCKWISE FROM THE LAST DESCRIBED COURSE 1292.56
FEET TO THE POINT OF BEGINNING, ALL IN DEKALB TOWNSHIP, DEKALB COUNTY,
ILLINOIS.
Legal B
THAT PART OF THE NORTHEAST QUARTER OF THE SOUTHEAST QUARTER OF
SECTION 9, TOWNSHIP 40 NORTH, RANGE 4 EAST OF THE THIRD PRINCIPAL
DESCRIBED AS FOLLOWS: BEGINNING AT THE SOUTHWEST CORNER OF SAID
NORTHEAST QUARTER; THENCE NORTHERLY ALONG THE WEST LINE OF SAID
NORTHEAST QUARTER, 511.08 FEET; THENCE EASTERLY AT AN ANGLE OF 90
DEGREES 02 MINUTES 11 SECONDS MEASURED COUNTERCLOCKWISE FROM SAID
WEST LINE 849.87 FEET TO A POINT OF CURVATURE; THENCE EASTERLY 175.78
FEET ON A CURVE TO THE LEFT HAVING A RADIUS OF 700.00 FEET TO A POINT OF
REVERSE CURVE; THENCE EASTERLY 193.46 FEET ON A CURVE TO THE RIGHT
HAVING A RADIUS OF 770.00 FEET TO A POINT OF TANGENCY; THENCE EASTERLY
110.22 FEET TO THE EAST LINE OF SAID SOUTHEAST QUARTER; THENCE
SOUTHERLY AT RIGHT ANGLE TO THE LAST DESCRIBED COURSE, ALONG SAID
EAST LINE, 557.17 FEET TO THE SOUTH LINE OF SAID NORTHEAST QUARTER;
THENCE WESTERLY AT AN ANGLE OF 90 DEGREES 00 MINUTES 26 SECONDS
MEASURED COUNTERCLOCKWISE FROM THE LAST DESCRIBED COURSE, ALONG
SAID SOUTH LINE, 1325.71 FEET TO THE POINT OF BEGINNING, ALL IN DEKALB
TOWNSHIP, DEKALB COUNTY, ILLINOIS, EXCEPT FOR THE PART OF THE PROPERTY
DECRIBED IN LEGAL A.
All interested persons are invited to appear and be heard at the time and place listed above.
Interested persons are also encouraged to submit written comments on the proposal to the City of
DeKalb, Community Development Department, 164 E. Lincoln Highway, DeKalb, Illinois, 60115
by 4:00 p.m. on Monday, July 6, 2020, by e-mail to dan.olson@cityofdekalb.com or the Online
Public Comment Submission Form at https://www.cityofdekalb.com/FormCenter. Further
information regarding the petition is available from the Community Development Department at
(815) 748-2070 or on the City of DeKalb’s web page at
https://www.cityofdekalb.com/1103/Public-Hearings.
Max Maxwell, Chair
DeKalb Planning and Zoning Commission
From: Karen baker
To: Olson, Dan
Cc: Nicklas, Bill; Gill, Zac
Subject: Re: FW: Zoning Response
Date: Tuesday, June 30, 2020 5:20:40 PM
Attachments: image001.png
[NOTICE: This message originated outside of the City Of DeKalb mail system -- DO NOT
CLICK on links or open attachments unless you are sure the content is safe.]
Thank you very much for your response.
K
On 06/30/2020 4:31 PM Olson, Dan <dan.olson@cityofdekalb.com> wrote:
Karen,
Thanks for your e-mail. The church will be providing their own stormwater
detention pond (see attached map- red circle) that will handle the stormwater for
their site. Prior to construction of the church they will be required to submit
stormwater calculations showing they meet the requirements in the City’s Unified
Development Ordinance. Our City Engineer will review the stormwater plan and
calculations to ensure they are complying with City codes. I have cc: our City
Engineer in this e-mail.
A copy of your letters will be provided to the church and the Planning and Zoning
Commission.
If you have any other questions, please contact me.
Dan Olson | Principal Planner
City of DeKalb | 164 E. Lincoln Highway | DeKalb, IL 60115
Phone: 815-748-2361
Email: dan.olson@cityofdekalb.com | Website: www.cityofdekalb.com
From: Karen baker
Sent: Tuesday, June 30, 2020 2:54 PM
To: Olson, Dan <Dan.Olson@CITYOFDEKALB.com>;
Subject: Zoning Response
[NOTICE: This message originated outside of the City Of DeKalb mail system --
DO NOT CLICK on links or open attachments unless you are sure the content is
safe.]
Dear Mr. Olson,
Attached please find two responses to the proposed construction of the
First United Methodist Church. While neither party is opposed to the
construction of the church, we have concerns regarding the planned
construction, if any, of retention ponds for the church.
Thank you for your consideration in advance.
Karen Baker
Disclaimer: This is a transmission from the City of DeKalb that is confidential
and proprietary. If you are not the intended recipient, copying or distributing the
contents of this message is expressly prohibited. If you have received this
message in error, please destroy it and notify the City immediately. This email is
the property of the City of DeKalb and the City reserves the right to retrieve and
read any message created, sent or received, including the right to monitor
messages of City employees or representatives at any time, without notice.
Freedom of Information Act Requests should be submitted on the City’s website
at http://www.cityofdekalb.com/. Do Not Forget That The 2020 Census Is Right
Around The Corner. For More Information On How You Can be Counted visit
https://www.census.gov/partners/2020.html
From: Olson, Dan
To: Bertrand Simpson
Cc: Aquanette Simpson
Subject: RE: First United Methodist Church
Date: Saturday, June 20, 2020 9:21:00 PM
Bertrand,
Thanks for the e-mail. Beautiful Gate Drive will not be extended with the development of the church.
The property (right-of-way) for the road will be dedicated, but the road will not go through at this
time. Future development north of the proposed church will likely require the extension of the road
to Annie Glidden Road.
I will provide a copy of your e-mail to the Planning and Zoning Commission and the applicant.
Dan Olson
Principal Planner
City of DeKalb
815-748-2361
From: Bertrand Simpson < >
Sent: Friday, June 19, 2020 4:16 PM
To: Olson, Dan <Dan.Olson@CITYOFDEKALB.com>
Cc: Aquanette Simpson < >
Subject: First United Methodist Church
[NOTICE: This message originated outside of the City Of DeKalb mail system -- DO NOT
CLICK on links or open attachments unless you are sure the content is safe.]
Greetings. Our home is near to the proposed new church. Our only concern, at this point, has
to do with whether or not this development will include, or lead to, Beautiful Gate Dr. opening
up the thru traffic? As you may be aware, the long standing nature of the quiet enjoyment of
our neighborhood, will suffer, if we are subjected to such traffic. We look forward to your
response. Thank you.
From: Olson, Dan
To: Jackie Suwanski
Cc: Nicklas, Bill; Gill, Zachary; Walker, Aaron
Subject: RE: Planning & zoning-Annie Glidden church
Date: Monday, July 06, 2020 10:40:00 AM
Attachments: 05021.04 - FUMC DEKALB_SITE PLAN 11-19-18 - Stormwater Detention.jpg
image001.png
Jackie and Matt,
Thanks for your e-mail. The church will be providing their own stormwater detention pond (see
attached map- red circle) that will handle the stormwater for their site. Prior to construction of the
church they will be required to submit stormwater calculations showing they meet the requirements
in the City’s Unified Development Ordinance. Our City Engineer will review the stormwater plan and
calculations to ensure they are complying with City codes. I have cc: our City Engineer, Zac Gill, in
this e-mail.
Twombly Road will be reconstructed next year with a new sidewalk added along the north side of
the road connecting to the existing walk in Eden’s Garden. The DeKalb County Highway Department
is in charge of the project and they are focusing on the design and utility work this fall. Traffic from
the church should have very little impact on Twombly Road, as all traffic will use N. Annie Glidden
Road for access.
A copy of your e-mail will be provided to the petitioner and the Planning and Zoning Commission.
If you have any other questions, please contact me.
Dan Olson | Principal Planner
City of DeKalb | 164 E. Lincoln Highway | DeKalb, IL 60115
Phone: 815-748-2361
Email: dan.olson@cityofdekalb.com | Website: www.cityofdekalb.com
From: Jackie Suwanski
Sent: Sunday, July 05, 2020 8:19 PM
To: Olson, Dan <Dan.Olson@CITYOFDEKALB.com>
Subject: Planning & zoning-Annie Glidden church
[NOTICE: This message originated outside of the City Of DeKalb mail system -- DO NOT
CLICK on links or open attachments unless you are sure the content is safe.]
Good afternoon,
While I don’t object to the building of the church I do have other major concerns. We bought this
home with the intention that it will be a permanent home for our family of 6. Adding this church
brings me major concerns of flooding. I feel that it is absolutely necessary to add a retention pond to
the plans to protect the homes of the current residents. The way the grading is set up will for sure
cause more flooding than we already experience.
I also worry about the safety of Twombly Road. This road is already an extremely rough ride, one
which my family already has to avoid due to excessive back conditions. The added traffic is sure to
cause even more wear and tear on this road, so I feel that for the safety of all drivers, it needs to be
repaired prior to adding additional traffic flow.
As long term residents of Dekalb, we thank you for taking the time to review and consider our
concerns.
Jackie & Matt Suwanski
1229 Omega Circle Dr
-sent from my iPhone, so I apologize for any errors-
COMMUNITY DEVELOPMENT DEPARTMENT
STAFF REPORT
July 16, 2020
TO: DeKalb Planning and Zoning Commission
FROM: Dan Olson, Principal Planner
RE: Fence Variance – 904 S. 4th St. (Ricky Brown)
I. GENERAL INFORMATION
A. Purpose Establishment of storage for landscape
business behind a six (6) foot high privacy
fence
B. Location/Size 904 S. 4th St./ .8 acres
C. Petitioner Ricky Brown
D. Existing Zoning “LC” Light Commercial District
E. Existing Land Use Former Car Wash/Outside Storage
F. Surrounding Zoning and Land Use North: “GC” and “SFR2”; Various
Commercial Uses and Single-Family
Residential
South: “LC” and “GC”; Various Commercial
Uses
East: “SFR2”; Single-Family Residential
West: “LC”; School District Admin. Office,
Day Care Center
G. Comprehensive Plan Designation Commercial
II. BACKGROUND AND ANALYSIS
The petitioner is requesting a variance to Articles 7.06.3 and 7.06.6. of the Unified
Development Ordinance (UDO) to allow a six (6) foot high privacy fence to encroach into
the front building line along Culver Street for the property located at 904 S. 4th St. The
subject site is located at the southeast corner of S. 4th St. and Culver St. and is zoned
“LC” Light Commercial District. The site formerly contained a car wash, which is no longer
in use.
The applicant did apply for a fence permit, however the fence was installed prior to the
issuance of the permit. A six (6) foot high wood fence was installed along the east and
south property lines and up to the building along S. 4th St. On the north side of the site
the fence was constructed 20 feet north of the building along Culver St. and 11 feet from
the property line (right-of-way). The installed fence does not comply with the regulations
of the UDO in relation to the location of the fence along Culver Street. Along a public
street, the UDO requires that a privacy fence over three (3) feet in height be no closer to
the street than the front building line established by the principal structure on the site. The
principal structure on the site is 31 feet away from the property line (right-of-way) along
Culver St. A privacy fence three (3) feet or less in height may be located in the front yard
up to the property line. The fence was installed along the existing edge of the former
driveway pavement of the car wash and 11 feet away from the property line thus
encroaching 20 feet into the required setback.
The petitioner installed the fence along the edge of the pavement so there would be
more useful hard surfaced storage area. The applicant has also indicated the reason for
the fence was to avoid people from driving through the site and to provide more privacy.
The installation of the fence was also intended to improve the appearance of the
property. The petitioner has leased the storage area behind the fence to a landscape
business for storage purposes. The use is permitted in the “LC” Light Commercial
District; however staff is recommending a condition be added, if the variance is
approved, that would prohibit the storage of any loose landscape materials (e.g. sand,
soil, rocks, mulch) directly on the ground.
The reason for setbacks for privacy fences over three (3) feet is based partly on aesthetics
and to also ensure adjoining properties are not blocked from view along the street. The
home directly east of the site along Culver St. (901 S. 5th St.) is located about 3-4 feet
from the property line (right-of-way). The next home to the east at 906 S. 5th St. is about
4 feet from the right-of-way. An aerial exhibit was included in the Commission’s packet
showing the area along the south side of Culver St. from S. 4th St. to S. 7th St. As one
can see there are several structures (e.g. homes, garages) that are closer to Culver St.
than the fence on the subject site. The location of the fence along Culver St. will not block
the views of any homes or visibly block any access.
Page |2
III. FINDINGS OF FACT FOR VARIATIONS
The request has been reviewed using the criteria regarding variances stated in Article 18,
Section 18.03.03 of the UDO, titled “Findings of Fact,” as follows:
1. The property in question cannot yield a reasonable return if permitted to be
used only under the conditions allowed by the regulations of that district.
Constructing the fence at the required location along Culver St. would limit the amount of
secured storage area. The home directly east of the site along Culver St. (901 S. 5th St.)
is located about 3-4 feet from the property line (right-of-way). In addition, other structures
(e.g. homes and garages) to the east along the south side of Culver St. are closer to
street than the fence on the subject site. The location of the fence along Culver St. will
not block the views of any homes or block any access points.
2. The extraordinary or exceptional conditions of the property, requiring the
request for the variance, were not caused by the applicant.
The petitioner purchased the property in 2019. The applicant did construct the fence
without a permit, however the location of the fence will not detrimental to the surrounding
area. The fence was installed along the existing edge of the former driveway pavement
of a car wash that was constructed in 1992. The petitioner installed the fence along the
edge of the pavement so there would be more useful hard surfaced storage area.
3. The proposed variance will alleviate a peculiar, exceptional, or undue
hardship, as distinguished from a mere inconvenience or pecuniary hardship.
The petitioner installed the fence along the edge of the existing driveway pavement so
there would be more useful hard surfaced storage area. The applicant has indicated the
reason for the fence was to avoid people from driving through the site and to provide more
privacy. The installation of the fence was also intended to improve the appearance of the
property. The location of the fence along Culver St. will not block the views of any homes
or visibly block any access.
4. The denial of the proposed variance will deprive the applicant of the use of
his/her property in a manner equivalent to the use permitted to be made by the
owners of property in the immediate area.
The home directly east of the site along Culver St. (901 S. 5th St.) is located approximately
3-4 feet away from the property line (right-of-way). The next home to the east at 906 S.
5th St. is about 4 feet from the right-of-way of Culver St. The location of the fence along
Culver St. will not block the views of any homes or block any access. In addition, there
are other commercial uses along S. 4th St. that have full use of their lots for storage
purposes, including vehicle repair related uses.
5. The proposed variance will result in a structure that is appropriate to and
Page |3
compatible with the character and scale of structures in the area in which the
variance is being requested.
The fence is proposed to be constructed along Culver St. at the edge of pavement for a
former car wash, still leaving 11 feet of green space between the fence and sidewalk. The
home to the east of the site along Culver St. (901 S. 5th St.) is about 3-4 feet from the
right-away. The home at 906 S. 5th St. is about 4 feet from the right-of-way. The location
of the fence along Culver St. will not block the views of any homes or block the visibility
for any driveway access. There are several structures (e.g. homes, garages) to the east
of the site that are closer to Culver St. than the fence on the subject property. The property
owners of two single-family homes and a commercial building to the north of the site have
submitted letters in support of the variance.
6. The proposed variation will not impair an adequate supply of light and air to
adjacent property; unreasonably increase the congestion in public streets,
increase the danger of fire or endanger the public safety, unreasonably diminish
or impair established property values within the surrounding area or in any other
respect impair the public health, safety, comfort, morals, or welfare of the
inhabitants of the City of DeKalb.
The portion of the fence requiring the variance is along Culver St. and will not impair an
adequate supply of light and air to adjacent properties. The location of the fence along
Culver St. will not block the views of any homes or block the visibility of any access. There
are several structures (e.g. homes, garages) to the east of the site that are closer to
Culver St. than the fence on the subject property. In addition, the fence will require a
permit and an inspection to ensure it meets the City’s UDO and Building Code
requirements.
IV. PUBLIC INPUT
The City received a Public Comment Submission Form from Noelle Jacobson of 424
Culver St. (directly north of site) indicating support of the proposal. The City also received
an e-mail from Rich Kakkuri of 418 Culver St. (directly north of site) which included some
questions about the request and mentioned support for the variance. Finally, a Citizen
Response Form was received from Brian Scholle who owns the property at 850 S. 4th St.
(State Farm, Maisy’s Video Gaming). Mr. Scholle noted support of the proposal but
wanted to know the intended business use on the property. City staff contacted Mr.
Scholle and advised a landscaping business would be using the fenced in area for storage
purposes.
V. RECOMMENDATION
Per the UDO, decisions to approve or deny variances lie solely with the Planning and
Zoning Commission. In the granting of variances, the Commission may impose such
reasonable conditions that will ensure the use of property will be as compatible as
practical with the surrounding properties.
Page |4
Sample Variation Motion:
Based on the submitted petition, testimony presented and findings of fact, I move that the
Planning and Zoning Commission approve a variance to Articles 7.06.3 and 7.06.6. of the
Unified Development Ordinance to allow a six (6) foot high privacy fence to encroach into
the front building line along Culver Street for the property located at 904 S. 4th St. as
shown on the site plan dated 7-9-20 and labeled as Exhibit A and subject to the following:
1. The storage of all equipment, vehicles and landscape materials related to the
business on site must be stored behind the six (6) foot high privacy fence as
shown on Exhibit A. The storage of any loose landscape materials (e.g. sand,
soil, rocks, mulch) directly on the ground is prohibited.
Page |5
From: noreply@civicplus.com
To: Olson, Dan; Walker, Aaron
Subject: Online Form Submittal: Online Public Comment Submission Form
Date: Sunday, July 05, 2020 4:20:19 AM
[NOTICE: This message originated outside of the City Of DeKalb mail system -- DO NOT CLICK on links or
open attachments unless you are sure the content is safe.]
Online Public Comment Submission Form
This form may be used to submit public comments to the City Council or Planning
& Zoning Commission as an alternative to attending a live meeting. Comments
must be submitted by 4 p.m. of the meeting date.
Meeting of the Planning & Zoning Commission
Meeting Date 7/20/2020
First Name Noelle
Last Name Jacobson
Email Address
Address 424 CULVER ST
City DEKALB
State Illinois
Zip Code 60115
Agenda Item Variance to articles 7.06.3 & 7.06.6
Comments to be I support the proposal
Submitted
Attachments Field not completed.
Email not displaying correctly? View it in your browser.
From: Olson, Dan
To: Rich Kakkuri
Cc: Nicklas, Bill
Subject: RE: 07/20 Zoning and Planning Meeting
Date: Monday, July 06, 2020 2:41:00 PM
Attachments: image001.png
Rich,
Thanks for your e-mail. Responses to your questions are below. A copy will be provided to the
petitioner and the Planning and Zoning Commission.
Dan Olson | Principal Planner
City of DeKalb | 164 E. Lincoln Highway | DeKalb, IL 60115
Phone: 815-748-2361
Email: dan.olson@cityofdekalb.com | Website: www.cityofdekalb.com
From: Rich Kakkuri
Sent: Monday, July 06, 2020 9:21 AM
To: Olson, Dan <Dan.Olson@CITYOFDEKALB.com>
Subject: 07/20 Zoning and Planning Meeting
[NOTICE: This message originated outside of the City Of DeKalb mail system -- DO NOT
CLICK on links or open attachments unless you are sure the content is safe.]
Good Morning Dan!
We live at 418 Culver Street and received the letter about the meeting to approve a variance to
articles 7.06.3 and 7.06.6 regarding the fence build across the street from our house.
Some questions:
1) Why take the time at the meeting to amend the articles to allow the build when the build
has already been done? (Easier to ask forgiveness than permission?) The petitioner applied for a
fence permit, however the permit was not issued. The fence encroaches in the front building line
along Culver St. The construction of the fence without a permit does not grant an automatic
variance.
2) Was there a permit issued for the fence to be built? No If so, wouldn't the need to get
approval for the variance to the ordinance have been noted then? If not, why not?
3) What would happen if we gathered enough support opposed to a fence being built even though it
is already in place? (Not going to happen) If the variance is not granted by the Planning and Zoning
Commission, the owner will have to modify the fence location so it complies with the UDO.
4) Are there any other changes that are going to happen on that property that might need a change
to the articles of the Unified Development Ordinance? None at this time.
Aside from these questions, we love the fence and so do the neighbors! It looks great and it is
awesome to have someone at that property that will take care of it. The workers coming in and out
of the property are friendly and have always said hello or waived when we have been outside. The
grass is always cut, there is not garbage blowing all over the place and best of all no-one is trying to