Planning & Zoning Commission
Regular MeetingDeKalb, IL · August 1, 2022
Minutes
Planning and Zoning Commission
August 1, 2022
Page 1 of 5
MINUTES
CITY OF DEKALB
PLANNING AND ZONING COMMISSION
August 1, 2022
The Planning and Zoning Commission held a meeting on August 1, 2022, at the DeKalb Public
Library in the Yusunas Meeting Room located at 309 Oak Street, DeKalb, Illinois. Chair Max
Maxwell called the meeting to order at 6:00 PM.
A. ROLL CALL
Planning Director Dan Olson called the roll. Planning and Zoning Commission members
present were: Steve Becker, Trixy O’Flaherty, Maria Pena-Graham, Shannon Stoker, Bill
McMahon, and Chair Max Maxwell. Jerry Wright was absent. City Manager Bill Nicklas,
Planning Director Dan Olson, and City Engineer Zac Gill were present representing the
City of DeKalb.
B. APPROVAL OF THE AGENDA (Additions/Deletions)
Chair Maxwell requested a motion to approve the August 1, 2022, agenda as presented.
Mr. McMahon motioned to approve the agenda as presented. Ms. Stoker seconded the
motion, and the motion was approved by unanimous voice vote.
C. APPROVAL OF MINUTES
1. July 18, 2022 –Chair Maxwell requested a motion to approve the July 18, 2022,
minutes as presented. Mr. Becker motioned to approve the minutes as presented. Ms.
O’Flaherty seconded the motion, and the motion was approved by unanimous voice
vote.
D. PUBLIC PARTICIPATION (Open Floor to Anyone Wishing to Speak on Record)
None
E. NEW BUSINESS
1. Public Hearing – Project Wildcat - A petition by ChicagoWest Business Center and
Trammell Crow Company-Chicago and JJK 343, LLC, property owner, for approval of
the annexation, rezoning, and a preliminary development plan for an approximately
160-acre property located at the northwest corner of Gurler Road and Peace Road to
accommodate a distribution, packing and storage company and accessory uses.
Chair Maxwell recused himself due to a conflict of interest. Vice-Chair McMahon took
over as Chair for the hearing.
Jerry Krusinski, on behalf of ChicagoWest Business Center and JJK 343, spoke on
the request. He stated its for approval of the annexation of 160 acres directly east of
the Ferrara and Amazon projects in the ChicagoWest Business Center. Mr. Krusinski
added they are requesting approval of a site plan for Project Wildcat which will consist
Planning and Zoning Commission
August 1, 2022
Page 2 of 5
of two buildings, one being approximately 1.2 million square feet for a distribution,
packing and storage company, and another building being added in phase two.
Josh Udelhofen of Trammell Crow Company described phase one of Project Wildcat
being a building approximately 1.24 million square feet on the west side of Peace
Road. Mr. Udelhofen pointed out a unique characteristic of the building will be an
automatic storage and retrieval system which consist of about 1/3 of the building. He
explained the system uses rack heights up to 120-130 feet which results in the building
being just under 140 feet tall.
Josh Udelhofen said all the truck traffic will be accessed off Gurler Road with a secure
truck entrance and egress in the middle of the site. He explained this may ultimately
service both sites (Phase I and II) but that will be determined after a traffic study is
completed. Mr. Udelhofen told the Commission the building will also be serviced by
rail with a private Union Pacific spur that would come in on the northern side of the
building into an enclosed train shed. He spoke about the south side of the building
being office space which will be about 50,000 to 60,000 square feet. Mr. Udelhofen
stated total employment for the entire building will be at approximately 700 people
across a two-shifts and there is adequate parking for the number of employees on both
shifts.
Mr. Udelhofen spoke on the proposed phase two of Project Wildcat and stated they
will hopefully break ground in 2023, although they do not have a precise timeline yet.
He explained Phase II will likely have two phases of its own: the first being a building
around 500,000 to 600,000 square feet with a potential addition taking it up to 850,000
to 950,000 square feet.
Mr. Udelhofen focused on phase one of Project Wildcat and stated the timeline is
accelerated and they hope to break ground in September of 2022 with mass grading
activities, roadway expansions, and utility connections. He discussed the need for an
accelerated timeframe even though the building is not opening until 2025. Mr.
Udelhofen added the core of the building will be completed in the first or second
quarter of 2024 which will then allow the erection of the ASRS space. He mentioned
there will be phased occupancy starting in early 2024 with the final occupancy coming
in early 2025.
Mr. Udelhofen mentioned all aspects of the development are being worked out with
City staff including proposed roadways and utility connections. He added there will be
an updated plat of subdivision that creates three separate lots, two for the buildings,
and one for a future ComEd substation to service the facility and others in the area.
Planning Director Olson went over the staff report dated July 28, 2022, and said this
is an expansion to the ChicagoWest Business Center and stated two buildings will be
constructed in two phases in an area that is not in the City so that is the reason for the
request for annexation. Mr. Olson added as a part of the request, the petitioner is
requesting rezoning to the Planned Development Industrial District, approval of a
preliminary development plan, and approval of a final plat.
Mr. Olson explained there are three points of access along Gurler Road, two being for
employee parking, one for truck traffic with emergency vehicle access being off Peace
Planning and Zoning Commission
August 1, 2022
Page 3 of 5
Road. He added there is adequate parking and two large detention areas. He also
noted sanitary sewer will be extended from the west, and water will be brought to the
site from the south side of Gurler Road.
Mr. Olson touched on the timing of the project noting grading will start in early
September of this year and completion of the project occurring in 2025. He stressed
the plan has been reviewed by City staff and the Kishwaukee Water Reclamation
District. He mentioned one of the conditions is the final plan can be reviewed by the
City staff, and not the Commission or City Council, if it’s in substantial compliance with
the preliminary plan.
Mr. Olson explained the three variance requests to the Unified Development
Ordinance. He stated one is exceeding the maximum building height which is 75 feet.
He said the petitioner is requesting 140 feet in the phase one building. Mr. Olson added
the maximum site coverage which is 70% and the petitioner is requesting up to 80%.
Finally, he noted the applicant is requesting the parking spaces be reduced from 19
feet long to 18 feet. Mr. Olson stated the City supports all three requests.
Planning Director Olson said the proposed plan for rezoning meets the intent of the
Comprehensive Plan, is compatible with the trend of development in the surrounding
area and meets all the requirements of the UDO except for the three requests for
variances discussed previously. Mr. Olson stated there were no public comments
received for the proposal.
Mr. Olson stated the Staff recommends approval of the rezoning, upon annexation,
the preliminary development plan and final plat
Vice Chair McMahon asked if there were any questions from the Commission
members.
Steve Becker questioned the amount of potential employment with phase two since it
was discussed phase one will employ close to 700 people. Josh Udelhofen replied
they do not have clarity at the moment, but it will be proportional to the phase one
building in regard to building size and the number of employees. Mr. Becker asked if
there was an approximate count for truck traffic coming in and out daily. Mr. Udelhofen
conferred with Mr. Krusinski, and stated they did not have a count but said it will be
typical of an industrial area and similar to Ferrara.
Mr. Becker requested clarification as to the number of bays for the trucks. Mr.
Udelhofen said there are 120 dock doors with an additional 70 punchouts that could
be added later. He added a preliminary traffic analysis has been conducted, however
he doesn’t know the number of trucks off the top of his head.
Mr. Becker voiced his concern with the impact on the ingress and egress to the facility
and entrance and exit from Peace Road to I-88 and wondered if there will be a
congestion of trucks along the roadways that serve the site.
City Engineer Zachary Gill said he has not seen the traffic numbers but stated the
roundabout (Peace and Gurler) should allow for no backup on southbound Peace
Road traffic. Mr. Gill added a right turn lane has been added on Peace Road for tollway
Planning and Zoning Commission
August 1, 2022
Page 4 of 5
access for eastbound traffic. He said the only location he possibly could see an issue
is on Peace Road exiting I-88 wanting to make a left turn. He added other sites add to
this issue. Mr. Becker mentioned with the continued development in the area the
development opportunities are fantastic but does not want to see traffic congestion on
Peace Road doubling out onto the interstate.
Bill McMahon asked about the height of the building and questioned if the City had the
fire protection necessary for this request. Planning Director Olson stated the Fire
Department has reviewed the plans and they do not have any concerns regarding the
height of the building. He added they want the ability to access the front and sides of
the building which can be cleared up when they go into the final plan design.
Mr. McMahon questioned the railroad spur and where it is going to connect to. Mr.
Olson showed the tracks at Route 23 going along the north side of Ferrara and
Amazon and will connect along the north side of the two proposed buildings.
Mr. Krusinski added with the annexation of the original 343 acres (ChicagoWest
Business Center) they planned for a rail spur along the north side of the site and the
subject site. He added the rail connection is on the east side of Route 23 so there is
no disruption for Route 23 traffic.
Trixy O’Flaherty had a question on the building height (Phase I) compared to I-88. City
Engineer Gill informed the Commission there is an 18-foot vertical difference between
the bridge deck at Peace Road and I-88 and the roundabout at Gurler and Peace
Roads, but he is not sure where the foundation will be for the Phase I building.
Shannon Stoker asked with the facility being a two-shift operation, would there be
large amounts of time in which the building would be empty. Josh Udelhofen stated it
would be like other distribution centers where the facility will not fully operational during
some overnight times.
Vice Chair McMahon asked if there were any questions or comments from the public.
Paul Borek, Executive Director of the DeKalb County Economic Development
Corporation, located at 2179 Sycamore Road in DeKalb read a letter stating his
support for the annexation, rezoning, and preliminary plan for this project. Mr. Borek
stated the detailed material provided shows the project conforms with the accepted
standards for zoning map amendments and the Comprehensive Plan. He added this
proposal will not have a detrimental effect on future development in the area. Mr. Borek
stated the project will expand the DeKalb County economy, diversify the tax base, and
provide additional jobs which will increase the need for residential development and
lead to potential population growth.
Mr. Borek continued by stating the project fully addresses the county wide economic
development policy. He went on to state the DeKalb County Comprehensive Economic
Development Strategy calls for DCEDC and DeKalb County communities to identify
and recruit industries. Mr. Borek summarized this project will expand the DeKalb
County economy, create jobs, and increase tax revenue which will allow taxing bodies
to reduce taxes. He respectfully asked for the Commission to approve this proposal.
Planning and Zoning Commission
August 1, 2022
Page 5 of 5
Bill McMahon stated this is an exciting opportunity and will be great for the community.
Steve Becker inquired if the jobs are going to be union jobs. The applicant stated they
could not answer the question at this time.
Mr. Becker moved that based on the submitted petitions and testimony presented, the
Planning and Zoning Commission forward its findings of fact and recommend to the
City Council approval of the rezoning, upon annexation, from the “SFR1” Single-Family
Residential District to the “PD-I” Planned Development Industrial District for a 160-
acre property located at the northwest corner of Peace Road and Gurler Road for the
construction of an approximately 1,240,000 sq. ft. phase 1 building and an
approximately 936,000 square foot building in phase 2 to accommodate a distribution,
packaging and storage company and accessory uses per preliminary development
plan, architectural elevations and final plat of subdivision as listed in Exhibit A subject
to the standards listed in Exhibit B and subject to all comments being addressed to the
satisfaction of City staff prior to any permits being issued for the subject property and
prior to the recording of the final plat.
Ms. Pena-Graham seconded the motion.
A roll call vote was taken. Mr. Becker - Yes, Ms. O’Flaherty – Yes, Ms. Pena-Graham
- Yes, Ms. Stoker – Yes, Vice Chair McMahon – Yes. Jerry Wright was absent and
Max Maxwell recused himself. Motion passed 5-0-2.
Chair Maxwell returned to the meeting after the public hearing was closed.
F. REPORTS
Planning Director Olson announced the next scheduled Commission meeting will be
held on Monday, August 15 at the DeKalb Police Department and there will be three
hearings. He noted the first one will be on the update to the Comprehensive Plan, the
second will be a text amendment on solar farms and the final one being a special use
request for a solar farm on Pleasant Street. Mr. Olson informed the Commission that
on July 25 the City Council approved the three requests from the previous Commission
meeting (modular classroom at Brooks School, special use permit for 922 S. 4th St.
and the final plat for the Midland Trust Co. – Jim Planey).
G. ADJOURNMENT
Ms. O’Flaherty motioned to adjourn, Ms. Stoker seconded the motion, and the motion
was approved by unanimous voice vote. The Planning and Zoning Commission
Meeting adjourned at 6:36 PM.
Minutes prepared by: Stephanie Turner Approved: August 15, 2022
Agenda
DEKALB PLANNING AND ZONING COMMISSION AGENDA
Monday, August 1, 2022
6:00 P.M.
DeKalb Public Library
Yusunas Meeting Room
309 Oak Street
DeKalb, IL 60115
A. ROLL CALL
B. APPROVAL OF AGENDA (Additions or Deletions)
C. APPROVAL OF MINUTES
1. July 18, 2022
D. PUBLIC PARTICIPATION (Open Floor to Anyone Wishing to Speak on Record)
E. NEW BUSINESS
1. Public Hearing – Project Wildcat - A petition by ChicagoWest Business Center and Trammell Crow
Company-Chicago and JJK 343, LLC, property owner, for approval of the annexation, rezoning, and a
preliminary development plan for an approximately 160-acre property located at the northwest corner of
Gurler Road and Peace Road to accommodate a distribution, packing and storage company and
accessory uses.
F. REPORTS
G. ADJOURNMENT
COVID-19 Notice: The corporate authorities of the City of DeKalb intend to conduct this meeting in-person with a physically present
quorum that is open to the public and in compliance with all applicable public health requirements. Pursuant to current public
health guidelines, persons attending this meeting are not required to wear protective face masks/coverings.
Planning and Zoning Commission
July 18, 2022
Page 1 of 5
MINUTES
CITY OF DEKALB
PLANNING AND ZONING COMMISSION
July 18, 2022
The Planning and Zoning Commission held a meeting on July 18, 2022, at the DeKalb Public
Library in the Yusunas Meeting Room located at 309 Oak Street, DeKalb, Illinois. Vice-Chair Bill
McMahon called the meeting to order at 6:00 PM.
A. ROLL CALL
Recording Secretary Stephanie Turner called the roll. Planning and Zoning Commission
members present were: Steve Becker, Trixy O’Flaherty, Maria Pena-Graham, Shannon
Stoker and Vice Chair Bill McMahon. Jerry Wright and Max Maxwell were absent. Planning
Director Dan Olson was present representing the City of DeKalb.
B. APPROVAL OF THE AGENDA (Additions/Deletions)
Vice Chair McMahon requested a motion to approve the July 18, 2022, agenda as
presented. Ms. Stoker motioned to approve the agenda as presented. Ms. O’Flaherty
seconded the motion, and the motion was approved by unanimous voice vote.
C. APPROVAL OF MINUTES
1. June 21, 2022 –Vice Chair McMahon requested a motion to approve the June 21,
2022, minutes as presented. Mr. Becker motioned to approve the minutes as
presented. Ms. Pena-Graham seconded the motion, and the motion was approved by
unanimous voice vote.
D. PUBLIC PARTICIPATION (Open Floor to Anyone Wishing to Speak on Record)
None
E. NEW BUSINESS
1. Public Hearing – A petition by DeKalb CUSD #428 for approval of an amendment to
the Final Plan of The Bridges of RiverMist, Phase 2, approved by Ordinance 97-110
to allow a modular classroom on the Gwendolyn Brooks Elementary School site
located at 3225 Sangamon Road.
Tammy Carson, Director of Facility and Safety Operations for DeKalb School District,
informed the Commission the petition was filed to allow for a modular classroom to be
located on the south side of the existing school building on a blacktop surface. Ms.
Carson stated the purpose for this petition is to add an intensive classroom inside the
school building, which currently has no available space. She explained the intensive
classroom would be placed in the current music room and the music room would be
moved to half of the modular classroom with the other half reserved for storage. Ms.
Carson said if approved the modular classroom would be in place for the 2022-2023
school year and they are requesting a three-year approval.
Planning and Zoning Commission
July 18, 2022
Page 2 of 5
Dan Olson, Planning Director, covered the Staff Report dated July 14, 2022, and
added there was a Final Plan approved in 1997 for Brooks School so any change to
the Plan, including adding a modular classroom, requires a public hearing. Mr. Olson
reiterated the music room would be moved out to the modular classroom so an
intensive classroom could be placed in the current music room. He added with the
additional classroom, the site still has plenty of parking available. Mr. Olson stressed
the location of the modular classroom is south of the school and furthest from the
residences to the north. He added there is quite a bit of distance to homes to the west
of the proposed location.
Mr. Olson discussed the approval of other modular classrooms in the past at Tyler,
Clinton Rosette, and Littlejohn Schools. Mr. Olson said a public comment form was
received from Edward Bosic of 544 Katherine Cir. and Eileen Bosic Living Trust of 550
Katherine Cir. noting they do not support the request due to the modular classroom
being stored in the parking lot before being approved. Planning Director Olson stated
Cynthia Hadad of 648 Sterling Court sent a letter noting support for the request.
Mr. Olson said the Staff recommends approval of this request with the condition of a
three-year term for the modular classroom to be on the site. He added if a longer time
is needed, the School District would have to address it with the Commission.
Vice Chair McMahon asked if there were any comments from the public or questions
from the Commission members.
Shannon Stoker wanted clarification on the location of the modular classroom in
comparison to the complainants in Katherine Cir. She asked if it would be located
behind the building away from their residence. Mr. Olson showed an aerial image
noting the modular classroom will be south of the building and away from the homes.
Ms. O’Flaherty moved that based on the submitted petition and testimony presented,
the Planning and Zoning Commission recommend to the City Council approval of an
amendment to the Final Plan of The Bridges of RiverMist, Phase 2, approved by
Ordinance 97-110 to allow a modular classroom at Gwendolyn Brooks Elementary,
3225 Sangamon Road, as shown on the attached Exhibit A, subject to the following
condition:
1. The modular classroom may remain on the subject site in the location as shown
on Exhibit A for no more than three (3) years of the date of approval of the
Ordinance granting the amendment and shall, on or before said date, be removed
from the property.
Ms. Pena-Graham seconded the motion.
A roll call vote was taken. Mr. Becker - Yes, Ms. O’Flaherty – Yes, Ms. Pena-Graham
- Yes, Ms. Stoker – Yes, Vice Chair McMahon – Yes. Jerry Wright and Max Maxwell
were absent. Motion passed 5-0-2.
Planning and Zoning Commission
July 18, 2022
Page 3 of 5
2. Public Hearing – A petition by Proper Hospitality Group, LLC represented by Peter
Panagakis for approval of a special use permit for a drive-thru restaurant for the site
at 922 S. 4th Street.
Peter Panagakis, representing Proper Hospitality Group, discussed the request for a
special use permit for a drive-thru restaurant at 922 S. 4th Street. He said they
purchased the building in September of 2021 and the building is now completely
empty. Mr. Panagakis stated their plan is to improve and update the existing building
and property. He noted the restaurant will be called Anna’s Sandwich Shoppe with
operating hours of 10:30 a.m. to 8:00 p.m. Monday through Saturday, being closed on
Sunday’s and holidays.
Mr. Panagakis stated indoor seating will consist of about 40 seats with additional
outdoor dining available. He stressed the drive-thru will only be used for mobile order
pickup and pre-ordered carryout orders. Peter Panagakis discussed the menu and
informed that catering and delivery will be available.
Planning Director Olson went over the Staff Report dated July 14, 2022, and informed
the Commission a revised plan was received after the posting of the agenda in which
a copy was provided. Mr. Olson stated the building has been closed since 2009 and a
special use permit is needed for a drive-thru in commercial zoning districts.
Mr. Olson discussed the access point being located on the south end of the building
with one-way traffic flow. He added the parking lot will be re-striped and the access
point from the alley will be removed. He also noted a 6-foot-high sight-proof fence will
be added along the east lot line and landscaping will be added around the property.
The exit point onto S. 4th St. will be located on the north side of the building and there
is adequate parking.
Mr. Olson informed the existing brick on the building would be cleaned with wood grain
panels being added to the top of the building. He continued by mentioning a small
vestibule and tower will be added at the southwest corner of the building. Mr. Olson
said a recommendation of operating hours between 6:00 a.m. and 8:00 p.m. is being
suggested due to the proximity of residents to the east and south of the site. He stated
this proposal is compatible with the surrounding area and brings much needed
assistance to the S. 4th St. corridor.
Mr. Olson covered public responses received starting with Stephanie Kness of 932 S.
5th Street who questioned the hours of operation and signage. Glenn Miller of 1004 S.
Street submitted concerns about the external speakers and any noise coming from the
site. Mr. Olson addressed both concerns with the individuals. He went on and said the
City received two letters of support from Noelle Jacobson of 424 Culver Street and
Tom Winkle and Lorraine Scurti of 834 Leonard Avenue.
Mr. Olson said the Staff strongly recommends approval of this proposal with a
condition that the hours of operation be between 6:00 a.m. and 8:00 p.m.
Vice Chair McMahon asked if there were any comments or questions from the public,
in which there were none.
Planning and Zoning Commission
July 18, 2022
Page 4 of 5
Vice Chair McMahon asked if there were any comments or questions from the
Commission members.
Steve Becker commented it will be nice to see something go in this building after being
vacant for so long.
Bill McMahon questioned the limited drive-thru availability and if the speaker would be
used. Peter Panagakis responded it will be used for mobile order pick-up, call ahead
pick-up, and third-party delivery pick-up. He added the person will come up to the
drive-thru and announce what order they are there for. He added a speaker would be
used as a means of communication. Mr. McMahon said it seemed the concerns that
were submitted by nearby residents have been addressed and he thinks it will be great
to have something in the building.
Mr. Becker moved that based upon the submitted petition, testimony presented and
findings of fact, the Planning and Zoning Commission forward its findings of fact and
recommendation to the City Council approval of a special use permit for a drive-
through restaurant located at 922 S. 4th Street per the site plan dated 7-13-22 and
building elevation dated 5-11-22 and labeled as Exhibit A and per the condition that
the hours of operation for the restaurant shall be limited between 6:00 a.m. and 8:00
p.m.
Ms. Stoker seconded the motion.
A roll call vote was taken. Mr. Becker - Yes, Ms. O’Flaherty – Yes, Ms. Pena-Graham
- Yes, Ms. Stoker – Yes, Vice Chair McMahon – Yes. Jerry Wright and Max Maxwell
were absent. Motion passed 5-0-2.
3. Minor Subdivision – Approval of a Final Plat submitted by James Planey, Midland
Trust, for SV CSG DeKalb South Subdivision – North side Gurler Road, east of S. 1st
Street.
Bill French, Regional Director of Project Development for SunVest Solar, appeared on
behalf of James Planey. Mr. French said he is seeking approval for the subdivision in
order to begin work on the solar project in late August or early September. He
described the southern portion being used for the solar project and the remainder of
the land would be used for potential development by Mr. Planey. Mr. French read a
letter from James Planey expressing his gratitude and wonderful experience working
with the City.
Planning Director Olson went through the Staff Report dated July 14, 2022, and said
an ordinance was approved in February 2021 rezoning the site and approving the solar
farm. He added the applicant would like to do a one-lot subdivision on about 23 acres
of the 36.1-acre site. Mr. Olson said the applicant is subdividing a portion of the site in
order for the solar project to move forward. He stated all comments have been
addressed and there are a few minor labeling issues to clear up before the plat can be
recorded.
Planning and Zoning Commission
July 18, 2022
Page 5 of 5
Vice Chair McMahon asked if there were any comments or questions from the
Commission members, in which there were none.
Shannon Stoker moved the Planning and Zoning Commission recommend approval
of the Final Plat for SV CSG DeKalb South Subdivision dated 6-27-22 prepared by
Wendler Engineering Services as shown on Exhibit A subject to all staff comments
being addressed prior to recording the Plat.
Ms. Pena-Graham seconded the motion.
A roll call vote was taken. Mr. Becker - Yes, Ms. O’Flaherty – Yes, Ms. Pena-Graham
- Yes, Ms. Stoker – Yes, Vice Chair McMahon – Yes. Jerry Wright and Max Maxwell
were absent. Motion passed 5-0-2.
F. REPORTS
Planning Director Olson announced the next scheduled Commission meeting will be
held on Monday, August 1 and it will consist of one public hearing. He said Project
Wildcat is 160 acres at the northwest corner of Peace Road and Gurler Road and will
contain a distribution, packing and storage company.
Mr. Olson stated the August 15th meeting will be conducted at the Police Department
since the library will be used for a budget meeting by the City Council. He noted one
of the hearings on the 15th will be on the Comprehensive Plan update. He added there
will also be a hearing regarding SunVest for their solar farm planned along Pleasant
Street near the Airport.
Mr. Olson reminded the Commission that Recording Secretary Stephanie Turner will
send out calendar invites a week prior to the first scheduled meeting for the month.
G. ADJOURNMENT
Ms. O’Flaherty motioned to adjourn, Ms. Pena-Graham seconded the motion, and the
motion was approved by unanimous voice vote. The Planning and Zoning Commission
Meeting adjourned at 6:28 PM.
STAFF REPORT
July 28, 2022
TO: Planning and Zoning Commission
FROM: Dan Olson, Planning Director
RE: Project Wildcat – Approval of the rezoning, upon annexation, from the
“SFR1“, Single-Family Residential District to the “PD-I”, Planned
Development Industrial District; Preliminary Development Plan and Final
Plat of Subdivision (NW corner of Peace Road and Gurler Road)
I. GENERAL INFORMATION
A. Purpose Construction of an approximately
1,240,000 sq. ft. phase 1 building and
936,000 sq. ft phase 2 building to
accommodate a distribution, packaging
and storage company and accessory
uses.
B. Owner/Applicant ChicagoWest Business Center and
Trammell Crow Company – Chicago,
represented by Josh Udelhofen, and JJK
343, LLC, property owner
C. Location and Size Northwest corner of Peace Road and
Gurler Road/ Approximately 160 acres
D. Existing Zoning and Land Use A-1 (unincorporated); Agriculture
E. Surrounding Zoning and Land Use North: ORI; Tollway, Distribution Facility
South: PD-I; Meta Data Center
East: A-1 (Unincorporated); Agriculture
West: PD-I; Distribution, Packaging
F. Comprehensive Plan Designation 2005 Plan – Office/Research,
Commercial; Draft 2022 Plan - Industrial
II. BACKGROUND AND ANALYSIS
Request/Background
ChicagoWest Business Center and Trammell Crow Company – Chicago, represented by
Josh Udelhofen, and JJK 343, LLC, property owner, have submitted a petition to annex,
rezone and have a preliminary development plan approved for a 160-acre site at the
northwest corner of Peace Road and Gurler Road. Approval of a final subdivision plat is
also requested. The proposed development is an expansion of the ChicagoWest
Business Center and goes by the name Project Wildcat. The development will be
constructed in two phases and will consist of a distribution, packaging and storage
company and accessory uses. The site is currently in unincorporated DeKalb County,
but contiguous to the City to the west (ChicagoWest Business Center) and south (Meta –
Facebook). The applicant is requesting annexation of the property and rezoning to the
“PD-I”, Planned Development Industrial District. The petitioner also seeks approval of a
preliminary development plan, building elevation and final plat which are part of the
petition, along with the approval of associated development standards to accommodate
the construction.
The site is broken down into two phases. Phase I will contain an approximately 1,240,000
square foot building. Phase II will consist of one building constructed in two phases
totaling about 936,000 sq. ft. The final plat of subdivision consists of three lots. Lot 1 (86.6
acres) will cover the Phase I building and Lot 2 (65.3 acres) will contain the Phase II
building and future expansion. Lot 3 (2.1 acres) will encompass a proposed ComEd
substation at the southeast corner of the subject site. Six acres is reserved for dedication
to the Gurler Road and Crego Road rights-of-way.
Three points of access are proposed along Gurler Road. Two access points are proposed
off Lot 1 for the employee/visitor parking area. The main truck access is off Gurler Road
in the middle of the subject site. An emergency vehicle access is shown at the southeast
portion of the site extending to Peace Road. This access will also serve the ComEd
Substation and a NICOR above ground service area. Two future points of access are
shown along Crego Road. A Union Pacific Railroad spur will be extended from the west
to the north side of the proposed buildings.
There will be approximately 764 parking spaces in Phase I. In addition, there will be 120
loading dock stalls, 466 trailer stalls and 65 knock out dock stalls in Phase I. Although the
number of employees was not provided, the applicant intends to provide parking per the
Unified Development Ordinance, which is based upon the number of employees for this
type of use.
Adequate public services will be provided to the subject property. Large detention areas
are proposed on the east and southwest portions of the site. Sanitary sewer will be
extended from the west along the north side of Gurler Road. The intent is to extend the
sewer around the ComEd substation and under Peace Road to serve the site to the east
Page 2 of 7
(Goldin Property) for possible future development. Water will be connected to the main
along the south side of Gurler Road and along Crego Road.
The applicant is proposing to start site work on Phase I in early September 2022 and
completion of the building core and shell by the first quarter of 2024. Completion of the
ambient high bay portion of the building in Phase I will be completed in the first quarter of
2025 and the building fully optional by the first quarter of 2025.
The plans were distributed to the various City Departments including Kishwaukee Water
Reclamation District (KWRD). The site is already annexed to the KWRD and the
petitioner has communicated with the District on the required fees and permits. A final
Plan consisting of an engineering plan, landscape plan, photometric plan, meeting the
UDO requirements, will be required to be submitted. The proposed standards have the
final plan reviewed by staff and not the Planning & Zoning Commission and City Council
as long as the plan is in substantial compliance with the preliminary development plan.
Waivers to the Unified Development Ordinance are requested for maximum building
height, parking design requirements and maximum site coverage.
Waivers to the UDO
Building Height: The maximum building height in the Industrial Districts is 75 feet. Project
Wildcat will utilize an Automated Storage and Retrieval System (ASRS) in approximately
409,000 sq. ft. or 33% of the 1,240,000 sq. ft. Phase I building. This high bay portion of
the facility will be located at the northern portion of the building up to a height of 140 feet
and is a critical component to the tenant’s operations. The applicant notes the ASRS
system has been used in other communities in the Chicagoland area with great success.
Staff would recommend approval of the waiver request. The additional height is needed
in the operation of the facility and the applicant is in the process of securing the necessary
permit from the FAA for the building height and temporary crane installations required for
construction.
Maximum Site Coverage: The maximum site coverage in the PD-I District is 70%. Site
coverage is defined as the area covered by buildings, parking/loading areas, but
excluding open space, plazas, and pedestrian walkways. The applicant indicates the site
coverage to be about 68% on the current plans but would like the ability to have the site
coverage extend up to 80%. It should be noted the site will be landscaped per the UDO
standards and staff supports the request.
Parking Stall Dimension: The minimum parking stall dimension in the UDO is 9’ x 19’. The
applicant indicates in their supporting documents they are still evaluating the impacts of
providing an emergency access and the addition of landscape islands. The applicant
would like the ability to reduce the stall length from 19’ to 18’, if needed to accommodate
the tenant’s parking demands. The staff support this request as the parking area will be
mostly used by employees and just a few visitors. In addition, the 18’ long spaces will
give the applicant the ability to provide adequate fire apparatus access to the building.
Page 3 of 7
III. STANDARDS FOR ZONING MAP AMENDMENT
1. The proposed rezoning conforms to the Comprehensive Plan, or conditions
have changed to warrant the need for different types of land uses in that area. The
proposed rezoning is appropriate considering the length of time the property has
been vacant, as originally zoned, and taking into account the surrounding areas
trend in development.
The 2005 Comprehensive Plan recommends the subject site for Office/Research and
Commercial uses. The draft 2022 Comprehensive Plan recommends Industrial and
Transportation & Utilities for the site. An approximately 700,000 sq. ft. distribution facility
is under construction just to the west of the subject site and the 1.6 million sq. ft. Ferrara
distribution facility and packing center lies further to the west along Gurler Road. The Meta
(Facebook) Data Center campus lies directly south of the site and has approximately 2.4
million sq. ft. under construction. Additional acreage for future manufacturing, distribution,
office/research, and technology uses are available in the area. The rezoning of the subject
site to the “PD-I” Planned Development – Industrial District and the approval of the
distribution, packaging and storage company meets the intent of the City’s Comprehensive
Plan and is compatible with the trend of development in the area.
2. The proposed rezoning conforms to the intent and purpose of the Unified
Development Ordinance.
The rezoning of the subject property to “PD-I” provides the opportunity to more directly
shape the development, use and appearance of this property in accordance with the
City’s Comprehensive Plan. The Planned Development allows the developer and the City
the flexibility to agree to a development plan and standards. The proposed rezoning
request and development are in compliance with the Unified Development Ordinance,
except for the waivers noted in the staff report. The proposal also meets the General
Standard requirements for a Planned Development as described in Article 5.13.07 of the
UDO.
3. The proposed rezoning will not have a significantly detrimental effect on the
long-range development of adjacent properties or adjacent land uses.
The proposed rezoning will not have a detrimental effect on the adjacent properties or
land uses as it entitles the subject property to a use of the property that is complementary
with the surrounding area. Large distribution facilities lie to the west and a one billion data
center is located directly across Gurler Road. The proposed rezoning request and
preliminary plan will allow the development of a project that will strengthen the
community’s economic, employment, and tax base.
4. The proposed rezoning constitutes an expansion of an existing zoning
district that, due to the lack of undeveloped land, can no longer meet the demand
for the intended land uses.
Page 4 of 7
The subject property is unincorporated and will be rezoned to the “PD-I”, Planned
Development Industrial District. Rezoning the property to “PD-I” will allow for a well-
designed project and the flexibility by the applicant to develop the property in a manner
that will complement the surrounding area. Additional acreage for future manufacturing,
distribution, office/research, and technology uses are available in the area.
5. Adequate public facilities and services exist or can be provided.
Adequate public services will be provided to the subject property. Large detention areas
are proposed on the east and southwest portions of the site. Sanitary sewer will be
extended from the west along the north side of Gurler Road. Water will be connected to
the main along the south side of Gurler Road and along Crego Road. Adequate parking
will be provided onsite, and the adjacent roadways are constructed to handle the
additional traffic impacts.
IV. PUBLIC INPUT
As of the posting of the agenda on July 28, the City has not received any written public
comments regarding the project.
V. CONCLUSIONS AND RECOMMENDATION
Project Wildcat is an expansion of the growing ChicagoWest Business Center and will
generate significant benefits to the community’s economy in the form of investment,
construction, new tax revenue and job creation. The staff strongly recommends approval,
and a sample motion has been prepared.
Sample Motion:
Based upon the submitted petitions and testimony presented, I move that the Planning
and Zoning Commission forward its findings of fact and recommend to the City Council
approval of the rezoning, upon annexation, from the “SFR1“ Single-Family Residential
District to the “PD-I” Planned Development Industrial District for a 160 acre property
located at the northwest corner of Peace Road and Gurler Road for the construction of
an approximately 1,240,000 square foot phase 1 building and an approximately 936,000
sq. ft. building in Phase II to accommodate a distribution, packaging and storage company
and accessory uses per preliminary development plan, architectural elevations and final
plat of subdivision as listed in Exhibit A subject to the standards listed in Exhibit B and
subject to all comments being addressed to the satisfaction of City staff prior to any
permits being issued for the subject property and prior to the recording of the final plat.
Page 5 of 7
Exhibit A
Preliminary Development Plan and Final Plat
• Schematic Site Plan and Floor Plan (Sheets SA0.01 and SA1.01) prepared by BL
Companies dated 7-26-22.
• Site Plan Exhibit prepared by Jacob & Hefner Associates dated 7-26-22.
• Architectural Elevations (Sheet SA4.01 and SA5.10) prepared by BL Companies
dated 7-26-22.
• Final Plat of Subdivision for Chicago West Business Center – Phase 3 prepared
by Jacob & Hefner Associates dated 7-19-22.
Page 6 of 7
Exhibit B
Planned Development Standards
Permitted Uses:
Distribution, packaging and storage company and accessory uses.
Electrical Substation
Bulk Regulations/Landscaping/Parking/Open Space:
Setbacks, building lines, site coverage, building dimension limitations, height
restrictions, parking, landscaping and other similar restrictions and regulations
shall meet those standards as set forth in the “HI” and “PD-I” District of the UDO,
except as listed below.
1. The maximum height requirements under the City’s Unified Development
Ordinance to permit a building height not to exceed 140 feet above grade
as shown on the architectural elevations dated 7-26-22 as shown on Exhibit
A attached hereto.
2. The maximum site coverage requirements under the UDO to permit a
maximum coverage ratio of eighty percent (80%).
3. The minimum parking stall dimensions under the UDO to permit minimum
parking stall dimensions of 9’ x 18’.
Final Development Plan Review
The UDO’s procedures for Final Development Plan review and approval to allow
City Staff to review and approve the Final Development Plan for substantial
compliance with the Preliminary Development Plan prior to the construction of the
project, and if City Staff determines that the Final Development Plan substantially
complies with the Preliminary Development Plan, then neither the City’s corporate
authorities nor the City’s Planning and Zoning Commission need to review and
approve the Final Development Plan.
Page 7 of 7
EXHIBIT A N
2
3
4
5
901.7
6
B92 DR
7
8
9
10
11
12
13
8558
900.0
B91 DR
14
15
16
17
18
19
20
21
899.7
B90 DR
22
23
24
25
1333 Butterfield Rd, Suite 300, Downers Grove, IL 60515
26
27
PHONE: (630) 652-4600, FAX: (630) 652-4601
28
29
30
www.jacobandhefner.com
31
32
33
34
35
36
37
38
M L K J H G F E D C B
Architecture
Engineering
Environmental
Land Surveying
EXHIBIT A
Companies
355 Research Parkway
Meriden, CT 06450
(203) 630-1406
(203) 630-2615 Fax
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39
A
B
C
1771 EAST GURLER ROAD
PROJECT WILDCAT
D
E
ASRS CONVENTIONAL
DEKALB, IL
F
WAREHOUSE WAREHOUSE
G
H
J
K
L
M
N
NO DATE DESCRIPTION
C:\Users\DKeil\Documents\2201406-Arch-R20-Central_dkeil8XYR4.rvt
REVISIONS
1 7/26/22 FINAL SECHEMATIC
ELEVATION EXHIBIT
Designed: Designer
Drawn: Author
Reviewed: Approver
Project No.: 2201406
Date: 07/21/2022
Issued for:
SCHEMATIC DESIGN
Title:
SCHEMATIC SITE PLAN
7/26/2022 10:35:38 PM
Sheet No.
OVERALL SCHEMATIC SITE PLAN
1 1" = 100'-0"
N
TRUE NORTH
SA0.01
© 2022 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Architecture
Engineering
Environmental
Land Surveying
Companies
355 Research Parkway
Meriden, CT 06450
(203) 630-1406
(203) 630-2615 Fax
1 1 2
SA5.10 SA4.01 SA5.10
REMOTE RR UTILITY SHIPPING OFFICE /
TRUCKERS LOUNGE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39
36' - 10" 2000' - 0"
55' - 6" 80' - 0" 91' - 0" 91' - 0" 91' - 0" 91' - 0" 91' - 0" 91' - 0" 91' - 0" 50' - 2" 83' - 2" 91' - 0" 91' - 0" 91' - 0" 91' - 0" 91' - 0" 91' - 0" 91' - 0" 91' - 0" 91' - 0" 91' - 0" 84' - 4" 99' - 10"
REPACK
102
Not Enclosed OFFICE AREA
14' - 5 1/2"
1771 EAST GURLER ROAD
PROJECT WILDCAT
A
ASRS MAINT. CORRIDOOR
60' - 0"
70' - 0" KHC REPACK
OFFICE ENTRY
24 K.O. OPENINGS 12 DOCK DOORS 28 K.O. OPENINGS
17' - 10"
DEKALB, IL
18' - 0" B
48' - 0"
SHIPPING OFFICE
211
C
160' - 0"
KHC REPACK OFFICE
48' - 0" 101
24099 SF
D
48' - 0"
ASRS E
48' - 0"
+/- 409,000 SF
F
PHASE ONE AMBIENT HIGH PHASE ONE CONDITIONED PHASE TWO AMBIENT HIGH OTHER STORAGE MHE &
48' - 0"
BAY ASRS HIGH BAY ASRS BAY ASRS MAINT.
KHC REPACK 2
160' - 0"
3 105 106 107 108 MAIN ENTRY
ASRS CONTROL SA4.01
SA4.01 253996 SF 45025 SF 121217 SF 715948 SF
402 G
4872 SF
48' - 0"
KHC MAIN
ENTRY
H
48' - 0"
52'-0" X 48'-0"
TYP. BAY
52' - 0"
J
KHC MAIN OFFICE
48' - 0" 48' - 0" 151
25440 SF
160' - 0"
K
48' - 0"
L
RECEIVING OFFICE KHC OFFICE
48' - 0"
206 52'-0" X 70'-0" ENTRY
TYP. SPEED BAY
52' - 0"
NO DATE DESCRIPTION
M
108 DOCK DOORS 12 K.O. OPENINGS
C:\Users\DKeil\Documents\2201406-Arch-R20-Central_dkeil8XYR4.rvt
80' - 0" OFFICE AREA
70' - 0" 70' - 0"
REVISIONS
N
1 7/26/22 FINAL SECHEMATIC
36' - 10" 43' - 10" 56' - 0" 91' - 0" 91' - 0" 91' - 0" 91' - 0" 91' - 0" 91' - 0" 91' - 0" 91' - 0" 91' - 0" 91' - 0" 84' - 4" 84' - 8" 91' - 0" 91' - 0" 91' - 0" 91' - 0" 91' - 0" 91' - 0" 91' - 0" 91' - 0" 65' - 0" 28' - 2"
64' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 52' - 0" 64' - 0" ELEVATION EXHIBIT
Designed: Designer
Drawn: Author
REMOTE RR & RECIEVING OFFICE / REMOTE RR
Reviewed:
Project No.:
Approver
2201406
BREAKROOM TRUCKERS LOUNGE
Date:
Issued for:
07/21/2022
SCHEMATIC DESIGN
Title:
1 4
SA5.10 2 OVERALL SCHEMATIC
SA4.01 SA5.10 FLOOR PLAN
7/26/2022 10:35:42 PM
Sheet No.
OVERALL SCHEMATIC FLOOR PLAN
1 1/64" = 1'-0"
N
TRUE NORTH
SA1.01
© 2022 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Architecture
2
SA5.10 EXHIBIT A 1
SA5.10 Engineering
Environmental
B.O.D. - HIGH
134' - 0" Land Surveying
Companies
T.O.P. - LOW
48' - 6"
T.O.P. - HIGH
51' - 0"
B.O.D. - LOW
43' - 4 3/4"
355 Research Parkway
Meriden, CT 06450
(203) 630-1406
1ST FLOOR (203) 630-2615 Fax
0"
BUILDING SERVICES
SHIPPING OFFICE / TRUCKERS LOUNGE
2 (ELECTRIC ROOM AND FIRE PUMP) 1 TRUCK COURT
SA5.10 SA5.10 -4' - 0"
SCHEMATIC EAST ELEVATION
1 1" = 60'-0"
B.O.D. - HIGH
134' - 0" B.O.D. - HIGH
134' - 0"
T.O.P. - HIGH T.O.P. - HIGH
TOP OF ROOF
51' - 0" 51' - 0"
135' - 10"
T.O.P. - LOW
T.O.P. - LOW
48' - 6"
48' - 6"
B.O.D. - LOW
43' - 4 3/4" B.O.D. - LOW
51' - 0"
43' - 4 3/4"
1ST FLOOR
0" 1ST FLOOR
0"
KHC OFFICE MAIN KHC MAIN REPACK REPACK OFFICE
ENTRY ENTRY ENTRY ENTRY TRUCK COURT
-4' - 0"
SCHEMATIC SOUTH ELEVATION SCHEMATIC NORTH ELEVATION
2 1" = 60'-0" 3
1771 EAST GURLER ROAD
PROJECT WILDCAT
1" = 60'-0"
1 2
DEKALB, IL
SA5.10 SA5.10
B.O.D. - HIGH
134' - 0"
T.O.P. - LOW
48' - 6"
T.O.P. - HIGH
51' - 0"
B.O.D. - LOW
43' - 4 3/4"
1ST FLOOR
0"
RECEIVING OFFICE /
1 TRUCKERS LOUNGE 2 TRUCK COURT
SA5.10 SA5.10 -4' - 0"
SCHEMATIC WEST ELEVATION
4 1" = 60'-0"
NO DATE DESCRIPTION
C:\Users\DKeil\Documents\2201406-Arch-R20-Central_dkeil8XYR4.rvt
REVISIONS
1 7/26/22 FINAL SECHEMATIC
ELEVATION EXHIBIT
Designed: Designer
Drawn: Author
Reviewed: Approver
Project No.: 2201406
Date: 07/21/2022
Issued for:
SCHEMATIC DESIGN
Title:
SCHEMATIC EXTERIOR
ELEVATIONS
7/26/2022 10:35:50 PM
Sheet No.
SCHEMATIC PERSPECTIVE
5
SA4.01
© 2022 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Architecture
Engineering
Environmental
Land Surveying
Companies
355 Research Parkway
Meriden, CT 06450
N M L K J H G F E D C B A (203) 630-1406
(203) 630-2615 Fax
18" ALLOWANCE
FOR MEP & FP B.O.D. - HIGH
134' - 0"
TO TOP OF ROOF
139' - 10"
PHASE ONE AMBIENT HIGH
BAY ASRS 128' - 0" CLEAR
105
T.O.P. - HIGH
253996 SF
51' - 0"
T.O.P. - LOW
48' - 6"
B.O.D. - LOW
43' - 4 3/4"
38' - 0" CLEAR
20' - 0"
1ST FLOOR
0"
TRUCK COURT
1771 EAST GURLER ROAD
PROJECT WILDCAT
-4' - 0"
DEKALB, IL
SCHEMATIC BUILDING SECTION - E/W AXIS - NORTH FACING
1 3/64" = 1'-0"
A B C D E F G H J K L M N
70' - 0" 48' - 0" 48' - 0" 48' - 0" 48' - 0" 48' - 0" 48' - 0" 48' - 0" 48' - 0" 48' - 0" 48' - 0" 70' - 0"
B.O.D. - HIGH
134' - 0"
NO DATE DESCRIPTION
8 1/4"
7" ROOF T.O.P. - HIGH
C:\Users\DKeil\Documents\2201406-Arch-R20-Central_dkeil8XYR4.rvt
PARAPET 51' - 0"
T.O.P. - LOW
REVISIONS
48' - 6"
1 7/26/22 FINAL SECHEMATIC
B.O.D. - LOW
43' - 4 3/4"
49' - 10"
40' - 0" CLEAR
B.O.D
38' - 0" CLEAR
ELEVATION EXHIBIT
1ST FLOOR
0" Designed: Designer
TRUCK COURT Drawn: Author
-4' - 0" Reviewed: Approver
Project No.: 2201406
Date: 07/21/2022
Issued for:
SCHEMATIC DESIGN
Title:
SCHEMATIC BUILDING SECTION - E/W AXIS - SOUTH FACING SCHEMATIC BUILDING
2 3/64" = 1'-0"
SECTIONS
7/26/2022 10:35:52 PM
Sheet No.
SA5.10
© 2022 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
EXHIBIT A
“ ”
“ ”
“ ”
“ ”
“ ”
“ ”
“ ”
1333 Butterfield Road, Suite 300, Downers Grove, IL 60515
PHONE: (630) 652-4600, FAX: (630) 652-4601
www.jacobandhefner.com
Illinois Professional Design Firm
License No. 184-003073 Exp. 4/30/23
: m.
1333 Butterfield Road, Suite 300, Downers Grove, IL 60515
PHONE: (630) 652-4600, FAX: (630) 652-4601
www.jacobandhefner.com
Illinois Professional Design Firm
License No. 184-003073 Exp. 4/30/23
Project Wildcat - Vicinity Map
Subject
Site
143rd St
LEGAL NOTICE
Notice is hereby given that a public hearing will be held before the DeKalb Planning and Zoning
Commission at its regular meeting on Monday, August 1, 2022, at 6:00 p.m. in the Yusunas
Meeting Room at the DeKalb Public Library, 309 Oak St., DeKalb, IL on the petition by
ChicagoWest Business Center and Trammell Crow Company – Chicago, represented by Josh
Udelhofen for approval of the annexation, rezoning and a preliminary development plan for an
approximately 160 acre property located north of Gurler Road, south of I-88, east of Crego Road
and west of Peace Road, has a Parcel Identification Number 08-36-300-001 and legally described
below. The requested zoning map amendment would change the zoning of the subject property,
after annexation, from the “SFR1” Single-Family Residential District to the “PD-I” Planned
Development Industrial District. The petitioner also seeks approval of a preliminary development
plan and building elevation which are part of the petition, along with the approval of associated
development standards to accommodate the construction of an approximately 1,250,000 square
foot phase 1 building and 565,000 square foot phase 2 building to accommodate a distribution,
packing and storage company and accessory uses. A potential 435,000 square foot future building
expansion in phase 2 is also requested. An approximately 2.1-acre site for a ComEd substation is
proposed at the southeast corner of the subject property. Waivers to the Unified Development
Ordinance are requested for maximum building height, parking design requirements, maximum
site coverage and other approvals as required for the subject property to allow for the construction
as proposed and indicated on the preliminary development plan and building elevation.
Legal Description
The Southwest Quarter of Section 36, Township 40 North, Range 4 East of the Third Principal
Meridian, DeKalb County, Illinois.
All interested persons are invited to appear and be heard at the time and place listed above.
Interested persons are also encouraged to submit written comments on the proposal to the City of
DeKalb, Community Development Department, 164 E. Lincoln Highway, DeKalb, Illinois, 60115
by 12:00 p.m. on Monday, August 1, 2022, or by e-mail to dan.olson@cityofdekalb.com. Further
information regarding the petition is available from the Community Development Department at
(815) 748-2361 or on the City of DeKalb’s web page at
https://www.cityofdekalb.com/1103/Public-Hearings.
Max Maxwell, Chair
DeKalb Planning and Zoning Commission
July 6, 2022
City of DeKalb
Mr. Dan Olson, AICP
Planning Director
164 E. Lincoln Highway
Dekalb, IL 60115
RE: Project Wildcat – Annexation Petition, Rezoning Petition, and Planned Development –
Preliminary Plan Application Documents
Dear Dan,
It is with great excitement that Trammell Crow Chicago Development, Inc., in partnership with
ChicagoWest Business Center (collectively, “Petitioner” or “Applicant”), is submitting the enclosed
Annexation Petition, Rezoning Petition, and Planned Development – Preliminary Plan Application
Documents, for the development of ~160 acres of ground located in the Northwest quadrant of E. Gurler
and Peace Roads (the “Subject Site”).
As discussed during our Pre-Application Conference on June 23rd, 2022, the contemplated development
(“Project Wildcat”) will be realized in two phases, with the first phase commencing as early as September
of this year. Additional detail on the Development Plan is provided below in the “Development Plan”
section of this letter.
In addition to the information outlined in this letter, we are also submitting the following documents for the
City of DeKalb’s review and consideration:
• Annexation Petition
• Rezoning Petition
• Planned Development – Preliminary Plan Application
• Vicinity Map of the area identifying the Subject Site
• ALTA Land Title Survey of Parcel #08-36-300-001
o 3 Copies of 24” x 36” Hard Copies to be Delivered via FedEx
• Preliminary Site Plan (Phases 1 & 2)
o 3 Copies of 24” x 36” Hard Copies to be Delivered via FedEx
• Preliminary Building Elevations (Phase 1 Only)
Development Plan
Applicant is proposing the development of a two-phase logistics facility broken down as follows (illustrated
in more detail on the attached Preliminary Site Plan and Preliminary Building Elevations):
• Phase 1: The design of Phase 1 has undergone significant design review and is ready for
Preliminary Site Plan Review based on the following:
o 1,250,000 SF Building
o ~750 Car Parking Stalls
o ~400 Trailer Storage Stalls
o Rail Served by a to be constructed Union Pacific Railroad Spur
o Up to 140’ Clear in the ASRS (Automated Storage & Retrieval System) Portion of the
Building
~545,000 SF of the Facility
A Maximum Building Height Variance Request has been Included in the
Preliminary Plan Application
o ~40’ Clear Height in the non-ASRS Portion of the Building
~705,000 SF of the Facility
• Phase 2: The design of Phase 2 is conceptual in nature at this time, and will be refined at a later
date, prior to being submitted for review to the City of DeKalb:
o Up to 1,000,000 SF Building
Likely to be constructed in two phases
o TBD Car Parking Stalls
o TBD Trailer Storage Stalls
o Rail Served by a to be constructed Union Pacific Railroad Spur
o Final Design will include both 40’ clear height portions as well as up to 140’ clear height
portions of ASRS space.
We believe the contemplated development is in conformance with the City’s Comprehensive Plan and will
be a logical compliment to the existing, and under construction, uses directly adjacent to the Subject Site.
Given its compliment to the existing uses in the ChicagoWest Business Center, Project Wildcat will no
doubt have a positive impact on the value of adjacent properties, as well as the broader DeKalb economy.
Development Timeline
Described below is a preliminary timeline for the construction of Phase 1 of Project Wildcat:
• September 2022: Commencement of Construction
• Q1 2024: Completion of Building Core & Shell, exclusive of the ASRS Portion of the Building
• Q1 2025: Completion of ASRS Portion of the Building
• Q1 2025: Building Fully Operational
Applicant cannot state with certainly at this time the Timeline for Phase 2 of Project Wildcat but is
optimistic that further clarity will be achievable prior to the end of 2022.
DeKalb County Enterprise Zone
As previously discussed during the Pre-Application Conference, Applicant is requesting the inclusion of
the Subject Site into the DeKalb County Enterprise Zone. To this end, Applicant has had a preliminary
meeting with Paul Borek, Executive Director of DC EDC, to begin the application process and respectfully
requests the City’s cooperation with securing the Enterprise Zone designation.
Union Pacific Rail Spur
As referenced throughout the application materials, Project Wildcat requires access to the Union Pacific
Rail line that currently intersects Highway 23, just south of I-88. Applicant has begun the coordination
Page 2 of 3
process with Union Pacific Railroad and is awaiting further direction on next steps. As the spur will need
to cross Highway 23 and Crego Road, Applicant respectfully requests the City’s cooperation to secure the
necessary right of ways and complete review of the associated design.
Dekalb Taylor Municipal Airport – FAA Approval
Given the unique location of the Subject Site in the context of the North/South runway at DeKalb Taylor
Municipal Airport, Applicant has begun the process of securing an FAA Permit allowing for the necessary
height clearances associated with the building, as well as any temporary crane installations required for
construction. Applicant respectfully requests the City’s cooperation to secure such permit from the FAA
should it be required.
Based on our review of the submittal requirements outlined during our Pre-Application Conference, we
believe that we have submitted all the necessary information and documents for the DeKalb Planning Staff
to complete a review of our proposed development. Should you feel we have a deficiency on any item(s),
please contact me as soon as possible so we can provide the additional information your team requires.
We look forward to working with the City of DeKalb on this exciting project and encourage you to reach
out with any question or concerns that you may have.
Best,
Josh Udelhofen
Trammell Crow Chicago Development, Inc
cc: Jerry Krusinski – Krusinski Construction
Grady Hamilton, Jerry Ebert, Abby Marshall – Trammell Crow Company
Marcus Mollison, Sarah Zach – Dorsey
Page 3 of 3
July 8, 2022
City of DeKalb
Mr. Dan Olson, AICP
Planning Director
164 E. Lincoln Highway
Dekalb, IL 60115
RE: Project Wildcat – Exceptions Detail Letter
Dear Dan,
Per your request, I have provided additional detail below on the three Exceptions requested by Applicant
in the Planned Development – Preliminary Plan application submitted on July 6th for Project Wildcat:
• Maximum Building Height of 140’ vs. 75’ (application form mistakenly stated 70’): As
illustrated throughout the application documents, Project Wildcat will utilize an Automated Storage
& Retrieval System (“ASRS”) in approximately 545,000 SF of the 1,250,000 SF facility. The
inclusion of the ASRS system, installed at a height of up to 140’, is critical to the tenant’s operations
within the facility. ASRS systems have been utilized in other municipalities around the
Chicagoland area with great success. Applicant can provide additional operating detail if requested.
• Maximum Site Coverage Ratio of 80% vs. 70%: As noted on the Preliminary Site Plan, and
associated application documents, Applicant anticipates site coverage ratios in excess of 70%, but
below 80%, as additional site planning details are finalized. Of note, the increased coverage ratio
is impacted by the (1) dedication of the southeast parcel to ComEd for the construction of a new
electrical substation as well as (2) the construction, installation, and dedication, of an additional
turning lane along E. Gurler Road.
• Minimum Parking Stall Dimensions of 9’ x 18’ vs. 9’ x 19’: As Applicant is still coordinating
the final impacts of providing for (1) emergency vehicle access, and (2) other coordination items
such as landscape islands, in the car parking area, Applicant requests the ability to reduce the stall
length to 18’, from 19’, if needed to accommodate the tenants parking needs.
Please let me know if any additional detail is required to assure that we have property illustrated the need
for these exceptions.
Best,
Josh Udelhofen
Trammell Crow Chicago Development, Inc
1333 Butterfield Road, Suite 300, Downers Grove, IL 60515
PHONE: (630) 652-4600, FAX: (630) 652-4601
www.jacobandhefner.com
Illinois Professional Design Firm
License No. 184-003073 Exp. 4/30/21