Committee of the Whole
Regular MeetingElgin, IL · December 17, 2025
Minutes
COMMITTEE OF THE WHOLE MEETING
December 17, 2025
The regular Committee of the Whole meeting was called to order by Mayor Kaptain at 6:00 p.m.
in the Council Chambers. Present: Councilmembers Alfaro, Dixon, Good, Martinez, Ortiz,
Powell, Steffen, Thoren, and Mayor Kaptain. Absent: None.
Approval of Minutes
Councilmember Good made a motion, seconded by Councilmember Martinez, to approve the
minutes of the December 3, 2025 regular meeting. Upon a roll call vote: Yeas: Councilmembers
Alfaro, Dixon, Good, Martinez, Ortiz, Steffen, Thoren, and Mayor Kaptain. Nays: None.
Public Comment
Sue Webb from the Southwest Area Neighborhood (SWAN) asked for assistance with the
National Street Railroad Crossing and the Lord Sewer Basin Project and Walnut Avenue Project
to be completed.
Fire Protection Agreements with Illinois Tool Works and Covestro, LLC
A resolution was presented at the Council meeting for adoption of fire protection agreements
with Illinois Tool Works and Covestro, LLC to provide an economically beneficial way for the
fire department to service commercial properties located outside the city’s corporate limits.
Federal Emergency Management Agency (FEMA) Flood Insurance Rate 2026 Map
Revisions and Attendant Kane County Stormwater Management Ordinance Amendments
Councilmember Ortiz made a motion, seconded by Councilmember Good, to maintain the city’s
compliance with the Federal Emergency Management Agency’s National Flood Insurance
Program and the Kane County’s “certified community” status by adopting the updated Flood
Insurance Rate Maps and establishing automatic adoption of Kane County Stormwater
Management ordinance amendment updates. Upon a roll call vote: Yeas: Councilmembers
Alfaro, Dixon, Good, Martinez, Ortiz, Powell, Steffen, Thoren, and Mayor Kaptain. Nays:
None.
Committee of the Whole
December 17, 2025
Page 2
Federal Surface Transportation Program (STP) Funding—Resolution Committing Local
Funds for Various Transportation Improvement Projects
Councilmember Good made a motion, seconded by Councilmember Powell, to move forward
with adopting the proposed resolution committing local funds for various transportation
improvement projects in accordance with the Kane/Kendall Council of Mayors’ Federal Surface
Transportation Program. Upon a roll call vote: Yeas: Councilmembers Alfaro, Dixon, Good,
Martinez, Ortiz, Powell, Steffen, Thoren, and Mayor Kaptain. Nays: None.
Kimball Street Traffic Signal Interconnect Project—Joint Funding Agreement and
Resolution for Improvement under the Illinois Highway Code with the Illinois Department
of Transportation
Councilmember Steffen made a motion, seconded by Councilmember Good, to enter into a joint
funding agreement with the Illinois Department of Transportation confirming Elgin’s twenty
percent funding share in the amount of $135,306 which establishes cost sharing levels and
responsibilities between the state of Illinois and city of Elgin for the Kimball Street Traffic
Signal Interconnect Project, which has been awarded federal funding through a “Congestion
Mitigation and Air Quality” (CMAQ) grant. Upon a roll call vote: Yeas: Councilmembers
Alfaro, Dixon, Good, Martinez, Ortiz, Powell, Steffen, Thoren, and Mayor Kaptain. Nays:
None.
Winter Maintenance Services—Intergovernmental Agreement with Hanover Township
Councilmember Powell made a motion, seconded by Councilmember Martinez, to approve the
2025/2026 extension of an intergovernmental maintenance facility agreement with Hanover
Township for certain winter maintenance services. Upon a roll call vote: Yeas: Councilmembers
Alfaro, Dixon, Good, Martinez, Ortiz, Powell, Steffen, Thoren, and Mayor Kaptain. Nays:
None.
Public Improvements Acceptance—1007 North Randall Road (Starbucks Coffee) ($383
Estimated Five-Year Maintenance Cost)
Councilmember Ortiz made a motion, seconded by Councilmember Martinez, to approve the
acceptance of the public improvements for ownership and maintenance within the site located at
1007 North Randall Road to fulfill the city’s obligation to maintain reliable infrastructure for
serving businesses and residents. Upon a roll call vote: Yeas: Councilmembers Alfaro, Dixon,
Good, Martinez, Ortiz, Powell, Steffen, Thoren, and Mayor Kaptain. Nays: None.
Committee of the Whole
December 17, 2025
Page 3
Parking Structure Repairs and Painting—Change Order No. 1 for Bid 25-043
Councilmember Dixon made a motion, seconded by Councilmember Martinez, to approve
Change Order No. 1 with Golf Construction in the amount of $87,385 to perform additional
work to repair broken tendons, additional concrete repairs, and membrane surface replacement to
maintain structural integrity of the Spring Street parking deck. Upon a roll call vote: Yeas:
Councilmembers Alfaro, Dixon, Good, Martinez, Ortiz, Powell, Steffen, Thoren, and Mayor
Kaptain. Nays: None.
Removal and Disposal of Water Treatment Lime Residuals for 2026—Agreement with
Stewart Spreading, Inc., Amendment No. 4
Councilmember Ortiz made a motion, seconded by Councilmember Steffen, to award the
Amendment Agreement No. 4 to Stewart Spreading, Inc. in the amount of $3,107,010 for the
removal and disposal of water treatment lime residuals from the city’s water treatment process.
Upon a roll call vote: Yeas: Councilmembers Alfaro, Dixon, Good, Martinez, Ortiz, Powell,
Steffen, Thoren, and Mayor Kaptain. Nays: None.
Lead Service Line Replacement (LSLR) Program Year 5 Improvements—Engineering
Services Agreement with Engineering Enterprises, Inc. (EEI), Amendment No. 1
Councilmember Powell made a motion, seconded by Councilmember Martinez, to award
Amendment No. 1 to Engineering Enterprises, Inc., in the amount of $2,875,816 for construction
engineering services for Year 5 of the Lead Service Line Replacement Program. Upon a roll call
vote: Yeas: Councilmembers Alfaro, Dixon, Good, Martinez, Ortiz, Powell, Steffen, Thoren, and
Mayor Kaptain. Nays: None.
Announcements from Council
Councilmember Alfaro wished everyone Happy Holidays. She thanked those nonprofits that help
everyone at this time of year with food and toys. She also thanked those that are doing their part
to protect the community.
Councilmember Ortiz echoed Councilmember Alfaro’s comments and wished the White Sox a
better season and a good first round draft pick in 2026.
Councilmember Martinez commented on the recently opened satellite office for the Kane County
Clerk’s office located on Point Boulevard.
Councilmember Thoren wished all Happy Holidays and urged residents to check in on their
neighbors, especially the seniors.
Committee of the Whole
December 17, 2025
Page 4
Announcements from Staff
Police Chief Lalley provided an update on the investigation of the incident on Maple Lane
involving Immigration and Customs Enforcement (ICE). She noted the number of calls for
service that were received, and the police reports made, including one for a traffic crash. The
information has been forwarded to the Kane County Attorney General for review. She urged
individuals with further information to submit it to be part of the investigation.
Adjournment
Councilmember Martinez made a motion, seconded by Councilmember Good, to adjourn the
meeting. Upon a roll call vote: Yeas: Councilmembers Alfaro, Dixon, Good, Martinez, Ortiz,
Powell, Steffen, Thoren, and Mayor Kaptain. Nays: None.
The meeting adjourned at 6:24 p.m.
s/ Kimberly Dewis January 14, 2026
Kimberly Dewis, City Clerk Date Approved
Agenda
CITY COUNCIL
COMMITTEE OF THE WHOLE MEETING AGENDA
DECEMBER 17, 2025|6:00 PM
CITY COUNCIL CHAMBERS
Call to Order
Roll Call
Approval of Minutes of Previous Meeting – December 3, 2025
Public Comment
Items on Both Agendas
A. Fire Protection Agreements with Illinois Tool Works and Covestro, LLC
($97,899 Revenue)
Objective: Provide an economically beneficial way for the fire department to service com-
mercial properties located outside the city’s corporate limits.
Initiatives and Other Items
B. Federal Emergency Management Agency (FEMA) Flood Insurance Rate 2026 Map Revi-
sions and Attendant Kane County Stormwater Management Ordinance Amendments
(No Cost)
Objective: Maintain the city’s compliance with the Federal Emergency Management
Agency’s National Flood Insurance Program and the Kane County’s “certified community”
status by adopting the updated Flood Insurance Rate Maps and establishing automatic
adoption of Kane County Stormwater Management ordinance amendment updates.
C. Federal Surface Transportation Program (STP) Funding—Resolution Committing Local
Funds for Various Transportation Improvement Projects (No Cost)
Objective: Demonstrate local agency commitment to funding various transportation im-
provement projects in compliance with the Kane/Kendall Council of Mayors’ federal Sur-
face Transportation Program funding competitive application criteria.
Committee of the Whole Agenda – December 17, 2025 Page 2
D. Kimball Street Traffic Signal Interconnect Project—Joint Funding Agreement and Reso-
lution for Improvement Under the Illinois Highway Code with the Illinois Department of
Transportation ($135,306)
Objective: Establishing cost sharing levels and responsibilities between the state of Illinois
and city of Elgin for funding for the Kimball Street traffic signal interconnect project which
has been awarded federal funding through a “Congestion Mitigation and Air Quality”
(CMAQ) grant.
E. Winter Maintenance Services—Intergovernmental Agreement with Hanover Township
(No Cost)
Objective: Approve the 2025-26 intergovernmental agreement with Hanover Township for
certain winter maintenance services.
F. Public Improvements Acceptance—1007 North Randall Road (Starbucks Coffee) ($383
Estimated Five-Year Maintenance Cost)
Objective: Fulfill the city’s obligation to maintain reliable infrastructure for serving busi-
nesses and residents.
G. Parking Structure Repairs and Painting—Change Order No. 1 for Bid 25-043 ($87,385)
Objective: Perform additional work to repair broken tendons, additional concrete repairs,
and membrane surface replacement to maintain structural integrity of the Spring Street
parking deck.
H. Removal and Disposal of Water Treatment Lime Residuals for 2026—Agreement with
Stewart Spreading, Inc., Amendment No. 4 ($3,107,010)
Objective: Continue treatment of the city’s drinking water by responsibly handling the
lime softening waste residual from the city’s water treatment process.
I. Lead Service Line Replacement (LSLR) Program Year 5 Improvements—Engineering Ser-
vices Agreement with Engineering Enterprises, Inc. (EEI), Amendment No. 1 ($2,875,816)
Objective: Contract with EEI for construction engineering services for Year 5 of the Lead
Service Line Replacement Program.
Announcements from Council
Announcements from Staff
Adjournment
PLEASE NOTE: The City of Elgin is subject to the requirements of the Americans with Disabilities Act of 1990. Individ-
uals with disabilities who plan to attend this meeting and who require certain accommodations in order to allow
them to observe and/or participate in this meeting, or who have questions regarding the accessibility of the meeting
or the facilities, are requested to contact the Human Resources Department at (847) 931-6076 or TT/TDD (847) 931-
5616 promptly to allow the City of Elgin to make reasonable accommodations for those persons.
Packet
CITY COUNCIL
COMMITTEE OF THE WHOLE MEETING AGENDA
DECEMBER 17, 2025|6:00 PM
CITY COUNCIL CHAMBERS
Call to Order
Roll Call
Approval of Minutes of Previous Meeting – December 3, 2025
Public Comment
Items on Both Agendas
A. Fire Protection Agreements with Illinois Tool Works and Covestro, LLC
($97,899 Revenue)
Objective: Provide an economically beneficial way for the fire department to service com-
mercial properties located outside the city’s corporate limits.
Initiatives and Other Items
B. Federal Emergency Management Agency (FEMA) Flood Insurance Rate 2026 Map Revi-
sions and Attendant Kane County Stormwater Management Ordinance Amendments
(No Cost)
Objective: Maintain the city’s compliance with the Federal Emergency Management
Agency’s National Flood Insurance Program and the Kane County’s “certified community”
status by adopting the updated Flood Insurance Rate Maps and establishing automatic
adoption of Kane County Stormwater Management ordinance amendment updates.
C. Federal Surface Transportation Program (STP) Funding—Resolution Committing Local
Funds for Various Transportation Improvement Projects (No Cost)
Objective: Demonstrate local agency commitment to funding various transportation im-
provement projects in compliance with the Kane/Kendall Council of Mayors’ federal Sur-
face Transportation Program funding competitive application criteria.
Committee of the Whole Agenda – December 17, 2025 Page 2
D. Kimball Street Traffic Signal Interconnect Project—Joint Funding Agreement and Reso-
lution for Improvement Under the Illinois Highway Code with the Illinois Department of
Transportation ($135,306)
Objective: Establishing cost sharing levels and responsibilities between the state of Illinois
and city of Elgin for funding for the Kimball Street traffic signal interconnect project which
has been awarded federal funding through a “Congestion Mitigation and Air Quality”
(CMAQ) grant.
E. Winter Maintenance Services—Intergovernmental Agreement with Hanover Township
(No Cost)
Objective: Approve the 2025-26 intergovernmental agreement with Hanover Township for
certain winter maintenance services.
F. Public Improvements Acceptance—1007 North Randall Road (Starbucks Coffee) ($383
Estimated Five-Year Maintenance Cost)
Objective: Fulfill the city’s obligation to maintain reliable infrastructure for serving busi-
nesses and residents.
G. Parking Structure Repairs and Painting—Change Order No. 1 for Bid 25-043 ($87,385)
Objective: Perform additional work to repair broken tendons, additional concrete repairs,
and membrane surface replacement to maintain structural integrity of the Spring Street
parking deck.
H. Removal and Disposal of Water Treatment Lime Residuals for 2026—Agreement with
Stewart Spreading, Inc., Amendment No. 4 ($3,107,010)
Objective: Continue treatment of the city’s drinking water by responsibly handling the
lime softening waste residual from the city’s water treatment process.
I. Lead Service Line Replacement (LSLR) Program Year 5 Improvements—Engineering Ser-
vices Agreement with Engineering Enterprises, Inc. (EEI), Amendment No. 1 ($2,875,816)
Objective: Contract with EEI for construction engineering services for Year 5 of the Lead
Service Line Replacement Program.
Announcements from Council
Announcements from Staff
Adjournment
PLEASE NOTE: The City of Elgin is subject to the requirements of the Americans with Disabilities Act of 1990. Individ-
uals with disabilities who plan to attend this meeting and who require certain accommodations in order to allow
them to observe and/or participate in this meeting, or who have questions regarding the accessibility of the meeting
or the facilities, are requested to contact the Human Resources Department at (847) 931-6076 or TT/TDD (847) 931-
5616 promptly to allow the City of Elgin to make reasonable accommodations for those persons.
AGENDA ITEM: A
MEETING DATE: December 17, 2025
ITEM:
Fire Protection Agreements with Illinois Tool Works and Covestro, LLC
($97,899 Revenue)
OBJECTIVE:
Provide an economically beneficial way for the fire department to service commercial properties
located outside the city’s corporate limits.
RECOMMENDATION:
Approve fire protection agreements with Illinois Tool Works and Covestro, LLC.
The city currently has one-year fire protection agreements with two companies located outside
the city’s corporate limits: Illinois Tool Works and Covestro, LLC. The fire protection services pro-
vided under each agreement include the same firefighting response and ambulance service as if
the property was located within the city’s corporate limits. During the past twenty-three years,
the fire department has responded to a total of 112 calls for service under the terms of these
agreements, three of which occurred in 2025. Payment to the city under these agreements is de-
rived from a tax rate that currently equates to $2.10 per $100 equalized assessed valuation.
BACKGROUND
The city began offering fire protection contracts in 1962 to Illinois Tool Works, Chicago Rawhide,
Leewards and McGraw Edison. Beginning in 1967, the fire protection contracts established a tax
rate based on real estate and personal property assessed valuations. The tax rate only included
operating costs and capital expenditures of the fire department. Insurance costs, depreciation
and pension contributions were added to the formula in 1976 which currently equates to a rate
of $2.10 per $100 equalized assessed valuation.
OPERATIONAL ANALYSIS
The city currently has one-year fire protection agreements with two companies located outside
the city’s corporate limits: Illinois Tool Works and Covestro, LLC. The fire protection services pro-
vided under each agreement include the same firefighting response as if the property was located
within the city’s corporate limits. Ambulance service is also provided under each agreement no
differently than that afforded to city residents.
INTERESTED PERSONS CONTACTED
Representatives from Illinois Tool Works and Covestro, LLC were contacted and notified of the
proposed 2026 fire protection agreements.
FINANCIAL ANALYSIS
The fees collected for this service are recorded as revenue in the general fund. The revenues
received from these two companies in 2025 totaled $90,172. The fees for 2026 are calculated to
be $97,899. The increase of $7,727 is due to increases in each property’s equalized assessed val-
uation. During the past twenty-three years, the fire department has responded to a total of 112
calls (three in 2025) for service under the terms of these agreements.
BUDGET IMPACT
FUND(S) ACCOUNT(S) PROJECT #(S) AMOUNT AMOUNT
BUDGETED AVAILABLE
N/A N/A N/A N/A N/A
LEGAL IMPACT
None.
ALTERNATIVES
The city council may choose not to provide fire protection to Illinois Tool Works and Covestro,
LLC.
NEXT STEPS
Prepare contracts and then invoice and collect fees.
Originators: Debra Nawrocki, Chief Financial Officer
Final Review: Christopher Beck, Corporation Counsel
Richard G. Kozal, City Manager
ATTACHMENTS
A. Fire Protection Agreement with Covestro, LLC
B. Fire Protection Agreement with Illinois Tool Works
2
FIRE PROTECTION AGREEMENT
THIS AGREEMENT made and entered into as of January 1, 2026, by and between the
City of Elgin, an Illinois municipal corporation (hereinafter referred to as the “City”) and Covestro
LLC, a Pennsylvania limited liability company authorized to operate and do business in the State
of Illinois (hereinafter referred to as the “Company”).
WITNESSETH
WHEREAS, the Company is the owner of certain property located south of the corporate
limits of the City of Elgin on Illinois Route 25 at the property commonly known as 1122 St. Charles
Street, in Elgin Township, Kane County, Illinois, (hereinafter referred to as the “Subject Property”)
which property and improvements located thereon are outside the corporate limits of any
municipality; and
WHEREAS, Company has requested the City to furnish fire protection service for the
Subject Property; and
WHEREAS, City has agreed to provide said fire protection service on the terms and
conditions hereinafter stated.
NOW, THEREFORE, in consideration of the mutual promises of the parties hereto and the
covenants hereinafter contained, the sufficiency of which is hereby acknowledged, it is agreed as
follows:
1. That City shall furnish fire protection service to Company for the Subject Property
for a period of one (1) year commencing January 1, 2026 and terminating on December 31, 2026.
Fire protection service shall consist of extending to the Company the regular firefighting facilities
of the City in case of a fire upon the Company’s premises at the Subject Property in the same
manner as if said property were situated within the corporate limits of the City of Elgin. In addition
to such regular fire protection services, City shall furnish ambulance service at the Subject Property
as is generally available to residents of City. As a condition of the furnishing of fire protection
services, Company agrees to permit City to make inspections to determine compliance with the
fire code of the City of Elgin and agrees to comply with same. Failure to do so shall constitute
grounds for termination of this agreement without penalty to City and without refund of any kind
to Company.
2. That in consideration of said fire protection service, Company agrees to pay to City
the sum of Forty-Seven Thousand One Hundred Fourteen and no/100 Dollars ($47,114.00). Said
payment shall be paid no later than January 2, 2026.
3. That any rights of Company arising pursuant to or in connection with this
agreement may from time to time be assigned with respect to all of the above described premises
or portions thereof. Written notice of such assignment shall be given to City within thirty (30)
days.
4. That it is agreed and understood that the fire protection services, ambulance
services and other services to be provided by the City pursuant to this agreement are intended to
be the same services generally available to the general public for properties located within the
corporate city limits of the City of Elgin and that no additional or special legal obligations or duties
are intended or shall be construed to have been created by this agreement. It is further understood
and agreed that this agreement is not intended nor shall be construed to alter, limit or constitute a
waiver of any of the civil immunities afforded the City and/or its officials, officers, employees
and/or agents pursuant to the Local Governmental and Governmental Employees Tort Immunity
Act at 745 ILCS 10/1-101 et seq., as amended, the Emergency Telephone System Act at 50 ILCS
750/0.01 et seq., as amended, the Emergency Medical Services Systems Act at 210 ILCS 50/1 et
seq., as amended, and/or otherwise provided by law, it being agreed that all of the civil immunities
as set forth in such Acts, as amended, and/or otherwise provided by law, shall fully apply to any
and all claims asserted or which might be asserted against the City and/or its officials, officers,
employees and/or agents as a result of this Agreement or any of the actions of the parties pursuant
to this Agreement. Without limiting the foregoing, it is further agreed and understood that the City
and/or its officials, officers, employees and/or agents as a result of this Agreement or any of the
actions of the parties pursuant to this Agreement shall not be liable to any party to this Agreement
or any other person or entity for failure to provide adequate fire protection, rescue, or emergency
service, failure to suppress or contain a fire, failure to provide or maintain sufficient personnel,
equipment, or other fire protection facilities, failure to provide emergency medical services, and/or
for any act and/or omission in connection with the developing, adopting, operating or
implementing any plan or system relating to the City's emergency telephone systems.
Notwithstanding anything to the contrary in this Agreement, it is agreed and understood that no
third-party beneficiaries are intended to be created by the provisions of this Agreement and it is
the intention of the parties hereto that no action may be commenced by any person or entity against
the City and/or its officials, officers, employees, agents and/or other related persons or entities for
monetary damages for any alleged breach or failure to provide services described in this
Agreement.
5. This Agreement may be executed in counterparts, each of which shall be an original
and all of which shall constitute one and the same agreement. This Agreement may be executed
electronically, and any signed copy of this Agreement transmitted by facsimile machine, email, or
other electronic means shall be treated in all manners and respects as an original document. The
signature of any party on a copy of this Agreement transmitted by facsimile machine, email, or
other electronic means shall be considered for these purposes an original signature and shall have
the same legal effect as an original signature.
[SIGNATURE PAGE FOLLOWS]
2
IN WITNESS WHEREOF the City Manager and City Clerk have executed this agreement
for and on behalf of the City of Elgin and the below duly-authorized officers of Covestro LLC
have executed this agreement for and on behalf of said Company and each have caused their
respective corporate seals to be affixed.
Dated: ______________________________ Dated: ________________________________
CITY OF ELGIN COVESTRO LLC
By _________________________________ By ___________________________________
City Manager Reg. Head of Local Site Services NA
Attest: Attest:
____________________________________ ______________________________________
City Clerk Secretary
Legal Dept\Agreement\FireProtection-Covestro-2026.docx
3
FIRE PROTECTION AGREEMENT
THIS AGREEMENT made and entered into as of January 1, 2026, by and between the
City of Elgin, an Illinois municipal corporation (hereinafter referred to as the “City”) and Illinois
Tool Works, Inc., a Delaware corporation authorized to operate and do business in the State of
Illinois (hereinafter referred to as the “Company”).
WITNESSETH
WHEREAS, the Company is the owner of certain property located south of the corporate
limits of the City of Elgin on Illinois Route 25 located at the property commonly known as 1201
St. Charles Street, in Elgin Township, Kane County, Illinois, (hereinafter referred to as the
“Subject Property”) which property and improvements located thereon are outside the corporate
limits of any municipality; and
WHEREAS, Company has requested the City to furnish fire protection service for the
Subject Property; and
WHEREAS, City has agreed to provide said fire protection service on the terms and
conditions hereinafter stated.
NOW, THEREFORE, in consideration of the mutual promises of the parties hereto and the
covenants hereinafter contained, the sufficiency of which is hereby acknowledged, it is agreed as
follows:
1. That City shall furnish fire protection service to Company for the Subject Property
for a period of one (1) year commencing January 1, 2026 and terminating on December 31, 2026.
Fire protection service shall consist of extending to the Company the regular firefighting facilities
of the City in case of a fire upon the Company’s premises at the Subject Property in the same
manner as if said property were situated within the corporate limits of the City of Elgin. In addition
to such regular fire protection services, City shall furnish ambulance service at the Subject Property
as is generally available to residents of City. As a condition of the furnishing of fire protection
services, Company agrees to permit City to make inspections to determine compliance with the
fire code of the City of Elgin and agrees to comply with same. Failure to do so shall constitute
grounds for termination of this agreement without penalty to City and without refund of any kind
to Company.
2. That in consideration of said fire protection service, Company agrees to pay to City
the sum of Fifty Thousand Seven Hundred Eighty-Six and no/100 Dollars ($50,786.00). Said
payment shall be paid no later than January 2, 2026.
3. That any rights of Company arising pursuant to or in connection with this
agreement may from time to time be assigned with respect to all of the above-described premises
or portions thereof. Written notice of such assignment shall be given to City within thirty (30)
days.
4. That it is agreed and understood that the fire protection services, ambulance
services and other services to be provided by the City pursuant to this agreement are intended to
be the same services generally available to the general public for properties located within the
corporate city limits of the City of Elgin and that no additional or special legal obligations or duties
are intended or shall be construed to have been created by this agreement. It is further understood
and agreed that this agreement is not intended nor shall be construed to alter, limit or constitute a
waiver of any of the civil immunities afforded the City and/or its officials, officers, employees
and/or agents pursuant to the Local Governmental and Governmental Employees Tort Immunity
Act at 745 ILCS 10/1-101 et seq., as amended, the Emergency Telephone System Act at 50 ILCS
750/0.01 et seq., as amended, the Emergency Medical Services Systems Act at 210 ILCS 50/1 et
seq., as amended, and/or otherwise provided by law, it being agreed that all of the civil immunities
as set forth in such Acts, as amended, and/or otherwise provided by law, shall fully apply to any
and all claims asserted or which might be asserted against the City and/or its officials, officers,
employees and/or agents as a result of this Agreement or any of the actions of the parties pursuant
to this Agreement. Without limiting the foregoing, it is further agreed and understood that the City
and/or its officials, officers, employees and/or agents as a result of this Agreement or any of the
actions of the parties pursuant to this Agreement shall not be liable to any party to this Agreement
or any other person or entity for failure to provide adequate fire protection, rescue, or emergency
service, failure to suppress or contain a fire, failure to provide or maintain sufficient personnel,
equipment, or other fire protection facilities, failure to provide emergency medical services, and/or
for any act and/or omission in connection with the developing, adopting, operating or
implementing any plan or system relating to the City's emergency telephone systems.
Notwithstanding anything to the contrary in this Agreement, it is agreed and understood that no
third-party beneficiaries are intended to be created by the provisions of this Agreement and it is
the intention of the parties hereto that no action may be commenced by any person or entity against
the City and/or its officials, officers, employees, agents and/or other related persons or entities for
monetary damages for any alleged breach or failure to provide services described in this
Agreement.
5. This Agreement may be executed in counterparts, each of which shall be an original
and all of which shall constitute one and the same agreement. This Agreement may be executed
electronically, and any signed copy of this Agreement transmitted by facsimile machine, email, or
other electronic means shall be treated in all manners and respects as an original document. The
signature of any party on a copy of this Agreement transmitted by facsimile machine, email, or
other electronic means shall be considered for these purposes an original signature and shall have
the same legal effect as an original signature.
[SIGNATURE PAGE FOLLOWS]
2
IN WITNESS WHEREOF the City Manager and City Clerk have executed this agreement
for and on behalf of the City of Elgin and the below duly-authorized officers of Illinois Tool
Works, Inc. have executed this agreement for and on behalf of said Company and each have caused
their respective corporate seals to be affixed.
Dated: _______________________________ Dated: _______________________________
CITY OF ELGIN ILLINOIS TOOL WORKS, INC.
By __________________________________ By __________________________________
City Manager Its President
Attest: Attest:
_____________________________________ _____________________________________
City Clerk Secretary
Legal Dept\Agreement\FireProtection-Illinois Tool Works-2026.docx
3
AGENDA ITEM: B
MEETING DATE: December 17, 2025
ITEM:
Federal Emergency Management Agency (FEMA) Flood Insurance Rate 2026 Map Revisions and
Attendant Kane County Stormwater Management Ordinance Amendments
(No cost)
OBJECTIVE:
Maintain the city’s compliance with the Federal Emergency Management Agency’s National
Flood Insurance Program and the Kane County’s “certified community” status by adopting the
updated Flood Insurance Rate Maps and establishing automatic adoption of Kane County Storm-
water Management ordinance amendment updates.
RECOMMENDATION:
Adopt the proposed Federal Emergency Management Agency’s Flood Insurance Rate Map Revi-
sions and the associated Kane County Stormwater Management ordinance amendments.
The Federal Emergency Management Agency (FEMA) regularly reviews Flood Insurance Rate
Maps (FIRMs) to identify flood hazards, assess flood risks, and provide accurate data to guide
stakeholders in taking effective mitigation actions that result in safer and more resilient commu-
nities. This process supports the National Flood Insurance Program (NFIP) and provides the basis
for community floodplain management regulations and flood insurance requirements. To main-
tain Elgin’s NFIP “certified community” status, the city must adopt FIRM revisions and appropri-
ately revise its stormwater ordinance. Doing so will allow Elgin property owners to participate in
the NFIP, which provides flood insurance to help reduce the economic impact of floods by provid-
ing an insurance resource that is not typically covered by homeowners’ insurance.
BACKGROUND
Driven by the occurrence of increased flood flows related to regional land development and ur-
banization over time, the Federal Emergency Management Agency (FEMA) partnered with the
Illinois State Water Survey to re-evaluate the Cook and Kane Counties hydraulic discharge models
used to determine expected floodplain boundaries. The results of that study, which indicated a
64 percent increase in peak flood flow values in the Elgin area, formed the basis for the pending
Flood Insurance Rate Map (FIRM) flood map revisions being considered under this measure.
Residents and business owners use flood maps to learn about flood risk as they purchase prop-
erty and investigate how best, financially and physically, to protect their property from flooding.
Flood maps are used by local agencies to understand and communicate the local flood risk, to
manage development activities within the floodplain, and establish safety requirements for new
or substantially improved buildings. Mortgage lenders and insurance providers use flood maps
to help determine a property’s flood risk, potential flood insurance requirements, and insurance
costs. In conjunction with this risk identification process, the National Flood Insurance Program
(NFIP) provides insurance to help reduce the socio-economic impact of floods. It is managed by
FEMA and offered directly to the public through many insurance companies.
By adopting the revised FEMA flood maps and the Kane County Stormwater Management ordi-
nance, both of which are used to define risk areas and technical requirements of building activi-
ties within the floodplain, the city will maintain its status as a NFIP “certified Community.” Doing
so will allow Elgin property owners to participate in the NFIP and have access to flood insurance
options that are not typically covered by homeowners’ insurance. Maintaining certified commu-
nity status also qualifies property owners to receive flood disaster assistance, as federal agencies
may not provide assistance unless the community participates in the program.
Elgin adopted the Kane County Stormwater Management ordinance (KCSMO) in 2001 and has
adopted revisions over time, most recently in 2019. To maintain compliance with the NFIP, FEMA
and the Illinois Department of Natural Resources (IDNR/OWR) have directed certified communi-
ties to adopt the updated maps and certain storm water ordinance revisions. This action will
adopt the new FEMA maps and establish a dynamic adoption clause allowing the city’s ordinance
to automatically incorporate future updates to the KCSMO, ensuring continued consistency and
compliance. Cook County map updates, which cannot be automatically adopted due to FEMA re-
strictions, will still require separate Council action when future revisions are issued.
OPERATIONAL ANALYSIS
When the revised flood maps become effective in January 2026, they will impact approximately
554 properties within the city limits located along Poplar Creek and the Lord’s Park tributary to
Poplar Creek on the city’s east side. These revisions will have varying degrees of impact but will
generally place properties and structures into a defined flood area that were previously not in-
cluded under that designation.
These map revisions do not change the risk of flooding; their goal is to accurately identify flood
risks under current storm water conditions. Some of the properties and structures within the
newly defined floodplain are likely to have experienced flooding in the past even though they
were not in a designated flood zone. The principal impact to the affected properties is the poten-
tial for increased flood insurance coverage requirements. Structures located within flood zones
may be required by lenders to purchase flood insurance through the NFIP. Some lenders, partic-
ularly those programs with federally backed funds, may require the purchase of flood insurance
prior to approving loans or mortgages. Moreover, development in floodplain must meet mini-
mum NFIP standards as well as additional permitting requirements in accordance with the
KCSMO.
2
Elgin participates in the NFIP and maintains “certified community” status under the KCSMO.
Upon implementation of the revised FIRM flood maps, property owners may be contacted by
their lenders or insurance providers to discuss any required or optional changes in insurance cov-
erage requirements. Residents can also review the FEMA flood insurance website
https://www.fema.gov/flood-insurance or contact their insurer to discuss participation in the
NFIP. Although the city does not manage or coordinate the NFIP, staff can help identify if a prop-
erty is located within the newly mapped floodplain.
The proposed ordinance updates will not change day-to-day development review or stormwater
permitting processes. By adopting the updated FEMA FIRM/FIS and establishing automatic adop-
tion of future KCSMO revisions, the city ensures that its regulations remain current and consistent
with county, state and federal requirements. This will streamline future updates, preserve “cer-
tified community” status, and maintain resident eligibility for flood insurance under the NFIP.
INTERESTED PERSONS CONTACTED
None.
FINANCIAL ANALYSIS
There are no direct immediate costs associated with acceptance of the amendments however
developments may incur additional costs to implement some of the new requirements into their
projects.
BUDGET IMPACT
FUNDS (S) ACCOUNT(S) PROJECT #(S) AMOUNT AMOUNT
BUDGETED AVAILABLE
N/A N/A N/A N/A N/A
LEGAL IMPACT
None.
ALTERNATIVES
The city council may choose not to adopt the proposed updates; however, this would risk loss of
Certified Community status and could jeopardize the availability of flood insurance for residents
and businesses.
NEXT STEPS
1. Approve a resolution adopting the amendments to the Kane County Stormwater Man-
agement Ordinance.
3
2. Update the City’s website.
Originators: Amanda Olsen, Engineer I
Mike Pubentz, Public Services Director
Final Review: Debra Nawrocki, Chief Financial Officer
Christopher J. Beck, Corporation Counsel
Richard G. Kozal, City Manager
ATTACHMENTS
A. Proposed Section 21.01.015: Automatic Adoption of the Kane County Stormwater Man-
agement Ordinance Amendments
B. Proposed Section 21.01.040: Base Flood Elevations and Floodplain Map Adoption
4
Section 21.01.015. Automatic Adoption of Future Amendments to the Kane County
Stormwater Management Ordinance.
Pursuant to Section 21.01.010, the City of Elgin has adopted the Kane County Stormwater
Management Ordinance. All future amendments, revisions, additions, and restatements to the
Kane County Stormwater Management Ordinance, including all appendices, technical
manuals, and referenced standards incorporated therein, shall become part of the City’s
stormwater and floodplain management regulations upon their effective date at Kane County
unless expressly rejected by the City Council.
A copy of the Kane County Stormwater Management Ordinance, including the most current
amendments as hereafter adopted, shall be maintained on file in the Office of the City Clerk
and made available for public inspection.
Section 21.01.040. – Base Flood Elevations and Floodplain Maps
This ordinance’s protection standard is the base flood. The best available base flood data are
listed below. Whenever a party disagrees with the best available data, the party shall finance the
detailed engineering study needed to replace the existing data with better data and submit it to
the FEMA and IDNR/OWR for approval prior to any development of the site.
A. The BFE for the floodplains shall be as delineated on the base flood profiles in the
countywide Flood Insurance Study (FIS) of Cook County prepared by the FEMA and
dated January 23, 2026. Flood Insurance Rate Map (FIRM), panel number
17031C0142K, 17031C0144K, 17031C0153K, 17031C0161K, 17031C0163K, dated
January 23, 2026 and panel number 17031C0135J, 17031C0305J, dated August 19, 2008.
B. For those floodplain areas within the corporate limits of the City of Elgin that lie within
Kane County, the base flood elevations, Regulatory Floodplain, and floodway limits shall
be as established by Section 9-136.A of the Kane County Stormwater Management
Ordinance, as adopted by the City under Ordinance No. G49-19. The current FEMA
Flood Insurance Study (FIS) and Flood Insurance Rate Maps (FIRMs) for Kane County,
including any amendments, additions, revisions, Letter of Map Revisions (LOMRs), or
substitutions adopted and published by FEMA, are hereby incorporated by reference and
made part of this ordinance as if fully set forth herein.
C. The BFE for each floodplain delineated as an “AH Zone” or “AO Zone” shall be that
elevation (or depth) delineated on the FIRM.
D. The BFE for each of the remaining floodplains delineated as an “A Zone” on the FIRM
shall be according to the best data available from federal, state, or other sources. Should
no other data exist, an engineering study must be financed by the applicant to determine
BFEs.
E. Establishing a BFE is required in a Zone A for all new subdivision proposals and other
proposed developments (including proposals for manufactured home parks and
subdivisions) greater than 50 lots or 5 acres, whichever is the lesser.
F. The BFE for the floodplains of those parts of unincorporated County that are within the
extraterritorial jurisdiction, or that may be annexed, shall be as delineated on the base
flood profiles in the FIS and FIRM prepared by the FEMA.
AGENDA ITEM: C
MEETING DATE: December 17, 2025
ITEM:
Federal Surface Transportation Program (STP) Funding—Resolution Committing Local Funds for
Various Transportation Improvement Projects
(No Cost)
OBJECTIVE:
Demonstrate local agency commitment to funding various transportation improvement projects
in compliance with the Kane/Kendall Council of Mayors’ federal Surface Transportation Program
funding competitive application criteria.
RECOMMENDATION:
Adopt the resolution committing local funds for various transportation improvement projects in
accordance with the Kane/Kendall Council of Mayors’ federal Surface Transportation Program
funding competitive application criteria.
The Kane/Kendall Council of Mayors (KKCOM) about every two years opens a call for projects that
serves as an invitation to municipalities to apply for federal funding towards eligible projects.
KKCOM’s 2026 call for projects will be ranking projects seeking federal Surface Transportation
Program (STP) funds to design and construct transportation improvement projects. To participate
in the call for projects and apply to receive STP funds, the city must commit local funds to pay for
portions of the projects being applied for. This resolution identifies the city’s plan to commit local
funds towards the Phase I and II Engineering and portions of the construction cost for transpor-
tation improvement projects being applied for in the KKCOM 2026 call for projects.
Since 2018 the city has received over $22.5 million in federal STP funding commitments for road-
way projects including East Chicago Street ($2.5M); Dundee Avenue from Summit Street north to
Page Street ($6.5M); US Route 20 at Reinking Road roundabout ($2.5M), Dundee/Center/Villa
reconstruction ($2.5M), Larkin Ave and Airlite Street intersection improvements ($2.5M), and the
Douglas Avenue reconstruction ($2.5M).
BACKGROUND
The federal Surface Transportation Program (STP) provides funding to municipalities for trans-
portation improvement projects on the Federal-Aid Highway System, a system that is comprised
of roadways that service large numbers of the motoring public. Northeastern Illinois is divided
into eleven Councils of Mayors, which are allocated STP funding for local transportation projects.
The Kane/Kendall Council of Mayors receives approximately $8 million a year in STP funds.
Approximately every two years, the KKCOM has a call for projects, which is an opportunity for
municipalities to apply to receive STP funds for eligible projects. The projects submitted during
the call for projects are ranked according to the KKCOM methodology, and the rankings are uti-
lized by the Transportation Policy Committee to prepare a programming recommendation. The
Policy Committee program recommendation is forwarded to the Full Council for final approval.
The program is submitted to the Chicago Metropolitan Agency for Planning (CMAP) to be devel-
oped into the regional Transportation Improvement Program (TIP), the northeastern Illinois five-
year agenda of transportation projects. The TIP seeks to distribute funds among a wide range of
communities and project types, and with this goal in mind, municipalities are responsible for
funding an agreed upon portion of the project cost.
The KKCOM is currently accepting applications for the 2026 call for projects, and city staff have
been collaborating with local engineering firms to submit funding applications for eligible trans-
portation improvement projects within the city, which include the following projects:
• Douglas Avenue Reconstruction from Kimball Street to River Bluff Road*
• Kimball Street at Grove Avenue Intersection Improvements and Resurfacing
• Larkin Avenue Resurfacing from Airlite Street to McLean Boulevard
• National Street Reconstruction*
• Congdon Avenue and River Bluff Road Resurfacing
• McLean Boulevard at Sports Way/Spartan Drive Intersection Improvements*
• Shales Parkway Resurfacing from E. Chicago Street/Illinois 19 to Bode Road
• Damisch Road Resurfacing from Reinking Road to Big Timber Road
• South Grove Avenue Resurfacing from National Street to E. Chicago Street
(*) indicate previously submitted projects that were placed on the STP funding contingency funding list.
These projects must be resubmitted and may be placed on either the active or contingency list.
As part of the funding application process, applicants are required commit to providing a portion
of the total requested project funding. Staff recommends the use of the city’s Motor Fuel Tax
allotment to fund its obligation, which is anticipated to be the cost of Phase I and II Engineering,
and the local share of construction costs for the aforementioned projects with these costs spread
over several budget years. The applications for funding will likely be rejected if the city does not
commit local funds to finance the projects’ local funding obligation.
Since 2018, the city has received over $22.5 million in federal STP funding commitments for road-
way projects. Those projects include East Chicago Street ($2.5M); Dundee Avenue from Summit
Street north to Page Street ($6.5M); US Route 20 at Reinking Road roundabout ($2.5M); Dun-
dee/Center/Villa Streets reconstruction ($2.5M); Larkin Avenue and Airlite Street intersection
improvements ($2.5M); Douglas Avenue reconstruction ($2.5M); Coombs-Highland-McDonald
2
Road resurfacing ($1.4M); Highland and Lyle Avenues roundabout ($630K); Lillian-South Street-
Walnut Avenue resurfacing ($500K); McLean Boulevard at Sports Way intersection improve-
ments ($448K); and the National Street reconstruction ($476K).
OPERATIONAL ANALYSIS
City staff have been working with various engineering consultants to prepare applications for
four transportation improvement projects. These applications will be submitted to the KKCOM’s
2026 call for projects in December 2025. The KKCOM will rank the project applications and these
rankings will be utilized by the Transportation Policy Committee to prepare a programming rec-
ommendation. The KKCOM and CMAP will review the programming recommendation and will
develop the regional Transportation Improvement Program (TIP) based on the recommendation.
The TIP, which will show which projects have been selected to receive STP funding, is tentatively
scheduled to be released in fall, 2026. If it is determined that funds will be awarded towards city
transportation improvement projects, city staff will begin the Phase I Engineering process and
will present engineering services agreements at future city council meetings.
INTERESTED PERSONS CONTACTED
None.
FINANCIAL ANALYSIS
Passage of the resolution does not immediately obligate city funds to the proposed projects. If
the projects are successfully included in the TIP, it is anticipated that city Motor Fuel Tax (MFT)
would be used to pay for the city’s share of engineering and construction services. Use of federal
STP funds through this program allows the city to recoup 70-80% of project costs.
FUND(S) ACCOUNT(S) PROJECT #(S) AMOUNT AMOUNT
BUDGETED AVAILABLE
LEGAL IMPACT
None.
ALTERNATIVES
1. The city council may choose to reject the proposed resolution committing local funds to-
wards various transportation improvement projects.
2. The city council could provide staff direction to alter the resolution and bring it back for
further consideration.
3
3. The city council could choose not to apply for STP funding as part of the KKCOM 2026 call
for projects. The city would not receive STP funds for various transportation improvement
projects and would be responsible for providing all funds to design and construct the pro-
jects.
NEXT STEPS
1. Submit the resolution to the KKCOM alongside project applications for the 2026 call for
projects.
2. Receive notice from the KKCOM regarding projects selected to receive STP funding.
3. Form Phase I Engineering services agreements on projects selected to receive STP fund-
ing.
Originators: Mike Pubentz, Public Services Director
Final Review: Debra Nawrocki, Chief Financial Officer
Christopher J. Beck, Corporation Counsel
Richard G. Kozal, City Manager
ATTACHMENTS
A. Resolution Committing Local Funds for Proposed Federal Surface Transportation Program
(STP) Funding
4
Resolution Number 25-xx
RESOLUTION
AUTHORIZING COMMITMENT OF LOCAL FUNDS FOR SURFACE TRANSPORTATION
PROGRAM (STP) PROJECTS
WHEREAS, the U.S. Department of Transportation through the Surface Transportation
Program (STP) provides funding through the regional Councils of Mayors to municipalities for
projects on the Federal-Aid Highway System; and
WHEREAS, the Kane-Kendall Council of Mayors currently has opened the application
period for all eligible projects, which will be evaluated and considered for inclusion into the
Chicago Metropolitan Agency for Planning (CMAP) regional Transportation Improvement
Program (TIP); and
WHEREAS, the City of Elgin, Illinois desires to make an application to the Kane-Kendall
Council of Mayors Surface Transportation Program for grant funding for the improvement of the
following projects:
• Douglas Avenue Reconstruction from Kimball Street to River Bluff Road
• Kimball Street at Grove Avenue Intersection Improvements and Resurfacing
• Larkin Avenue Resurfacing from Airlite Road to McLean Boulevard
• National Street Reconstruction
• Congdon Avenue and River Bluff Road Resurfacing
• McLean Boulevard at Sports Way/Spartan Drive Intersection Improvements
• Shales Parkway Resurfacing from E. Chicago Street/IL 19 to Bode Road
• Damisch Road Resurfacing from Reinking Road to Big Timber Road
• South Grove Avenue Resurfacing from National Street to E. Chicago Street
WHEREAS, for each approved project the City will be required to provide a portion of the
total requested project funding and intends to use its Motor Fuel Tax allotment to fund its
obligation: and
WHEREAS, the City Council of the City of Elgin, Illinois believes it is in the best interests
of the city to submit applications for funding for the aforementioned projects.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
ELGIN, ILLINOIS, the City of Elgin hereby agrees to commit funds required in the Kane-Kendall
Council of Mayors Surface Transportation Program (STP) for its local share of the cost of the
aforementioned projects, including all funds required for Phase I and II Engineering for the
aforementioned projects if they are selected by the Kane-Kendall Council of Mayors Surface
Transportation Program.
_______________________________________
David J. Kaptain, Mayor
Presented:
Adopted:
Vote: Yeas Nays
Recorded:
Attest:
_________________________
Kimberly A. Dewis, City Clerk
2
AGENDA ITEM: D
MEETING DATE: December 17, 2025
ITEM:
Kimball Street Traffic Signal Interconnect Project— Joint Funding Agreement and Resolution for
Improvement Under the Illinois Highway Code with the Illinois Department of Transportation
($135,306)
OBJECTIVE:
Establishing cost sharing levels and responsibilities between the state of Illinois and city of Elgin
for funding for the Kimball Street traffic signal interconnect project which has been awarded fed-
eral funding through a “Congestion Mitigation and Air Quality” (CMAQ) grant.
RECOMMENDATION:
Enter into joint funding agreement with the Illinois Department of Transportation establishing
cost sharing levels and responsibilities between the state of Illinois and city of Elgin for the Kim-
ball Street Traffic Signal Interconnect Project confirming Elgin’s twenty percent funding share in
the amount of $135,306.
The Kimball Street traffic signal interconnect project will modernize and coordinate the traffic
signals along Kimball Street from Dundee Avenue to North Grove Avenue. The city has been
awarded a federal “Congestion Mitigation and Air Quality” (CMAQ) grant providing 80 percent
funding for the Kimball Street traffic signal interconnect project. The CMAQ program requires
local public agencies to provide a twenty percent funding match. For this project, the city’s share
totals $135,306, consisting of $9,978 for construction engineering and $125,328 for construction
costs. IDOT, which administers the federal funding, requires local public agencies to both enter
into a joint funding agreement and adopt a formal resolution committing these local funds prior
to project letting. The project is set to be publicly bid during the first quarter of 2026 with con-
struction complete by year end.
BACKGROUND
Elgin has been awarded federal funding through the federal “Congestion Mitigation and Air Qual-
ity” (CMAQ) Improvement Program for the Kimball Street Traffic Signal Interconnect Project. This
initiative will improve traffic flow, reduce congestion and enhance safety along the Kimball Street
corridor between Dundee Avenue and North Grove Avenue. In response to the 2023 Chicago
Metropolitan Agency for Planning (CMAP) call for projects, the city, with the support of Hampton,
Lenzini, and Renwick, Inc. (HLR), submitted the project for CMAQ consideration. The project was
selected and awarded $541,225 in federal funds, representing 80 percent of eligible construction
and construction engineering costs.
As the “Local Public Agency” (LPA), the city is required by the Illinois Department of Transporta-
tion (IDOT) to formally commit its twenty percent local share, totaling $135,306, which consists
of $125,328 for construction and $9,978 for construction engineering. IDOT requires an executed
LPA resolution demonstrating the city’s intention to provide these funds before federal partici-
pation can be authorized.
The Kimball Street Traffic Signal Interconnect Project includes replacement of five traffic signal
cabinets and controllers, installation of new video detection equipment, deployment of uninter-
ruptible power supply systems, select signal post upgrades and the installation of approximately
2,000 feet of fiber-optic cable to create a coordinated signal system. These improvements will
modernize corridor operations, enhance intersection reliability and support regional air-quality
objectives by reducing unnecessary vehicle idling.
The joint funding agreement and accompanying resolution satisfy IDOT’s requirement for a writ-
ten LPA funding commitment and enables the project to advance toward final design, bidding,
and construction in accordance with federal and state guidelines.
OPERATIONAL ANALYSIS
IDOT requires all LPA’s receiving federal transportation funds to formally document their com-
mitment to the local cost share associated with each project. This ensures that federal funds are
only obligated once the LPA demonstrates the ability and intent to cover its portion of the project
expenses.
For the Kimball Street Traffic Signal Interconnect Project, the city has been awarded $541,225 in
federal CMAQ funding, representing 80 percent of eligible construction costs. To activate these
funds, the city must commit to the remaining 20 percent, totaling $135,306, which includes
$125,328 for construction and $9,978 for construction engineering.
With CMAQ funding being used for this project, IDOT requires that the city uses the BLR 05310C—
Joint Funding Agreement for Construction Work form, an IDOT document, to form the funding
agreement. When using the Joint Funding Agreement, IDOT also requires passage of the com-
panion form BLR 0911 - Resolution for Improvement Under the Illinois Highway Code to ensure
local agency commitment to funding the local share of the project.
Upon approval, the joint funding agreement and resolution will be transmitted to IDOT as part of
the federal authorization process. This action enables IDOT to proceed with funding eligibility
reviews, secure federal authorization for construction, and ensure the project remains on sched-
ule for its programmed 2026 fiscal year letting.
2
INTERESTED PERSONS CONTACTED
None.
FINANCIAL ANALYSIS
The approval of this resolution commits to Elgin’s local share of the project funds in the amount
of $135,306. The 2026 Proposed Riverboat Budget provides funding for this initiative.
BUDGET IMPACT
FUND(S) ACCOUNT(S) PROJECT #(S) AMOUNT AMOUNT
BUDGETED AVAILABLE
Riverboat 275-0000-791.93-80 275009 $135,306 $135,306
LEGAL IMPACT
None.
ALTERNATIVES
The city council may choose not to approve this resolution and by doing so, the city risks losing
the awarded CMAQ funding.
NEXT STEPS
1. Approve resolution committing 2026 funds to the Kimball Street Traffic Signal Intercon-
nect project
2. Execute five (5) copies of the IDOT BLR 05310C Joint Funding Agreement for Federally
Funded Construction agreement document.
Originators: Aaron Neal, Director of Public Works
Mike Pubentz, Public Services Director
Final Review: Debra Nawrocki, Chief Financial Officer
Christopher J. Beck, Corporation Counsel
Richard G. Kozal, City Manager
3
ATTACHMENTS
A. Joint Funding Agreement with the Illinois Department of Transportation for Federally
Funded Construction
B. Resolution for Improvement under the Illinois Highway Code with the Illinois Department
of Transportation
4
AGENDA ITEM: E
MEETING DATE: December 17, 2025
ITEM:
Winter Maintenance Services—Intergovernmental Agreement with Hanover Township
(No Cost)
OBJECTIVE:
Approve the 2025-26 intergovernmental agreement with Hanover Township for certain winter
maintenance services.
RECOMMENDATION:
Approve the 2025/2026 extension of an Intergovernmental Maintenance Facility Agreement with
Hanover Township.
The city and Hanover Township have been operating under the terms of a 2017 intergovernmental
agreement (IGA) designed to enhance snow and ice control efficiencies for their respective con-
stituents. Under the IGA, Hanover Township has access to and may store up to 500 tons of road
salt at the city’s Shales Parkway salt storage facility. In exchange, Hanover Township provides
winter maintenance services on certain roadways under the city’s jurisdiction.
The current IGA was originally executed in 2017 with an initial five-year term, followed by annual
one-year extensions, allowing both the township and the city to continue under the same terms.
Staff recommends approval of the 2025–2026 annual extension of the current agreement and
plans to present a revised multi-year agreement with the township in the latter portion of 2026.
BACKGROUND
The city and Hanover Township have recognized that collaboration can improve the efficiency of
winter operations within their respective service areas. Elgin’s Shales Parkway salt storage facility
is conveniently located near Hanover Township’s western jurisdictional boundaries. Allowing the
township to store and access road salt at this facility provides cost savings by eliminating the
need for them to construct and maintain a separate salt storage facility.
In return, Hanover Township provides winter maintenance on certain city roadways, including
Spaulding Road, Gasket Drive, Chestnut Drive, Rohrssen Road and Cardinal Drive. This arrange-
ment enables more efficient service delivery, as these streets are adjacent to roadways already
maintained by the township.
The current intergovernmental agreement was executed in 2017. Staff plans to draft a new multi-
year agreement in 2026 for consideration by the city council.
OPERATIONAL ANALYSIS
The Shales Parkway facility is the largest of the city-owned salt storage sites, with a capacity of
nearly 7,500 tons. Under the proposed intergovernmental agreement, Hanover Township may
store up to 500 tons of salt (purchased by the township) for use on its roadways. The township is
responsible for the costs associated with loading this salt into the city-owned facility via the con-
veyor system.
The city and Hanover Township track salt usage to ensure that Elgin road salt is not used for
township roads. Additionally, the city provides the township to a liquid blend of calcium chloride,
salt water, and beet juice allowing the Township to maintain roadways under the agreement in
a manner consistent with city street operations during snow and ice events.
The current intergovernmental agreement formally terminated on April 1, 2021, but includes
language allowing annual extensions by mutual written consent. This 2025–2026 extension will
be the final annual extension under the 2017 agreement.
INTERESTED PERSONS CONTACTED
Hanover Township.
FINANCIAL ANALYSIS
There is no direct cost to the city for this agreement.
BUDGET IMPACT
FUND(S) ACCOUNT(S) PROJECT #(S) AMOUNT AMOUNT
BUDGETED AVAILABLE
N/A N/A N/A N/A N/A
LEGAL IMPACT
None.
2
ALTERNATIVES
The city may choose not to extend the intergovernmental agreement. That action will require
the city to reconfigure the current snow plowing routes to incorporate the Elgin roads contem-
plated for service under the agreement terms while also provided notice to Hanover Township
that they can no longer store salt at the city’s Shales Parkway Facility.
NEXT STEPS
Execute the 2025/2026 extension of an Intergovernmental Maintenance Facility Agreement with
Hanover Township.
Originators: Aaron Neal, Director of Public Works
Final Review: Debra Nawrocki, Chief Financial Officer
Christopher J. Beck, Corporation Counsel
Richard G. Kozal, City Manager
ATTACHMENTS
A. 2025/2026 Extension of Intergovernmental Maintenance Facility Agreement between Hano-
ver Township and the City of Elgin
B. 2017 Intergovernmental Maintenance Facility Agreement between Hanover Township and
the City of Elgin
3
AGENDA ITEM: F
MEETING DATE: December 17, 2025
ITEM:
Public Improvements Acceptance—1007 North Randall Road (Starbucks Coffee)
($383 Estimated Five-Year Maintenance Cost)
OBJECTIVE:
Fulfill the city’s obligation to maintain reliable infrastructure for serving businesses and residents.
RECOMMENDATION:
Approve the acceptance of the public improvements for ownership and maintenance within the
site located at 1007 North Randall Road.
A resubdivision within the Valley Creek Subdivision was completed to accommodate the develop-
ment at 1007 North Randall Road for Starbucks coffeehouse. The public improvements to be ac-
cepted include the sanitary main and its respective appurtenances.
BACKGROUND
CAGE Engineering provided engineering plans for the development located at 1007 North Randall
Road. These plans were reviewed and approved by the engineering department in 2024. This
development is for a Starbucks located on the east side of Randall Road and north of Royal Boule-
vard. A location map is provided as Attachment A.
Certain single lot developments, including the subject site, are required to extend public utilities
onto private property. The public improvements constructed as part of the building at 1007 North
Randall Road include sanitary sewer and its respective appurtenances.
At this time, it is being requested that the city accept the public improvements constructed with
the site for ownership and maintenance. The engineering department provided field inspection
throughout the construction process of the public improvements. To process the acceptance of
public improvements by the city council, the engineering department developed a final punch
list of items to be addressed. After final inspection, it was determined that all items were properly
addressed and therefore considered acceptable.
OPERATIONAL ANALYSIS
Acceptance of the public improvements will add the following city-maintained facilities: 854 lin-
eal feet of eight-inch sanitary sewer; five sanitary sewer manholes and all respective appurte-
nances for those public improvements. The city will perform a follow-up inspection within the
twelve-month maintenance period from the date of the resolution accepting the public improve-
ments.
The city’s acceptance of the public improvements will ensure proper general maintenance,
providing residents and visitors with reliable infrastructure for business and leisure activities.
INTERESTED PERSONS CONTACTED
None.
FINANCIAL ANALYSIS
There are no direct immediate costs associated with acceptance of the public improvements.
Maintenance and operating costs associated with the sanitary main and its appurtenances will
increase over time and will be included as part of the annual budgeting process. The total cost of
maintenance is estimated to be $383 over the next five years.
BUDGET IMPACT
FUND(S) ACCOUNT(S) PROJECT #(S) AMOUNT AMOUNT
BUDGETED AVAILABLE
N/A
LEGAL IMPACT
None.
ALTERNATIVES
None.
NEXT STEPS
1. Approve a resolution accepting the public improvements.
2. Secure a twelve-month surety in the amount of ten percent of the cost for the accepted
improvements to ensure them against defects caused by faulty workmanship or inferior
materials.
2
3. If no defects are found within twelve months after city council’s acceptance of the public
improvements, return the twelve-month surety to Premier Design and Build.
Originators: Amanda Olsen, CFM, Engineer I
Final Review: Debra Nawrocki, Chief Financial Officer
Christopher J. Beck, Corporation Counsel
Richard G. Kozal, City Manager
ATTACHMENTS
A. Location Map
B. Final Plat of Subdivision for Valley Creek Resubdivision
3
Attachment B
AGENDA ITEM: G
MEETING DATE: December 17, 2025
ITEM:
Parking Structure Repairs and Painting—Change Order No. 1 for Bid 25-043
($87,385)
OBJECTIVE:
Perform additional work to repair broken tendons, additional concrete repairs, and membrane
surface replacement to maintain structural integrity of the Spring Street parking deck.
RECOMMENDATION:
Approve Change Order No. 1 for the Spring Street parking structure maintenance repairs and the
Centre Parking Structure painting contract, awarded to Golf Construction, for $87,385 to allow
for the completion of additional safety repairs that will preserve the integrity of the Spring Street
parking deck.
The Spring Street parking deck, which is now more than forty years old, requires ongoing mainte-
nance to protect its structural components and concrete surfaces from continuous exposure to
the elements. This project included the removal and replacement of joint sealants, the application
of new traffic coatings, and minor concrete floor repairs.
When the project was initially bid, concrete repair work was included. Those preliminary inspec-
tions did not indicate that numerous tendons were broken beneath the surface of the concrete in
the Spring Street Parking Deck. To maintain the structural integrity and protect the longevity of
the parking deck, these tendons must be repaired. These repairs are required to provide safety for
patrons utilizing the parking deck and to preserve the aging structure. With the request for this
additional work, all work is now scheduled for completion by the end of April 2026.
BACKGROUND
The city council in August of this year approved a bid to perform necessary maintenance repairs
required at the Spring Street parking deck and to paint The Edward Schock Centre of Elgin parking
deck to enhance that structure’s aesthetics.
Parking structures require ongoing preventative maintenance to limit damage and deterioration.
Key activities include replacing flexible expansion joints on the exposed upper levels, along with
minor concrete patching and repair work. These measures are essential to protect surfaces and
structural components from salt and other contaminants.
The Spring Street parking deck, constructed in 1982, is now over 40 years old and requires these
preventative efforts to remain in safe, stable condition. Replacing the deck would cost an esti-
mated $11 million to provide an equivalent number of parking spaces in this high-demand down-
town location.
OPERATIONAL ANALYSIS
Regular maintenance is essential to protect a parking structure’s components from corrosion
caused by moisture and other contaminants. Over time, age and exposure to the elements cause
joint seal materials to become brittle, shrink, and deteriorate. Once this happens, moisture and
debris can penetrate the joints, accelerating structural damage. Routine upkeep, including con-
crete patching and minor repairs to exposed surfaces, help prevent this deterioration.
The proposed repairs for the Spring Street parking structure included minor concrete restoration
and joint seal replacements throughout the facility to reduce water infiltration and prolong its
lifespan. During this work, in the Spring Street parking deck, additional structural and safety
needs were identified. Multiple support tendons were discovered to be broken during the con-
crete repairs. Repairing these tendons requires hundreds of additional square feet of concrete
repairs as well. All maintenance and aesthetic upgrades under this contract were originally sched-
uled for completion by November 2025. With the newly identified repairs required, completion
is now anticipated by the end of April 2026.
INTERESTED PERSONS CONTACTED
None.
FINANCIAL ANALYSIS
Sufficient funding is available to cover the cost of this change order.
BUDGET IMPACT
FUND ACCOUNT PROJECT # AMOUNT AMOUNT
BUDGETED AVAILABLE
Central Area TIF 262-0000-791.40-04 N/A $87,385 $87,385
LEGAL IMPACT
None.
2
ALTERNATIVES
The city council may choose not to approve the change order with Golf Construction and provide
staff with further direction.
NEXT STEPS
Execute the change order with Golf Construction.
Originators: Greg Hulke, Parks and Facilities Superintendent
Jen Hermonson, Parks and Recreation Director
Final Review: Debra Nawrocki, Chief Financial Officer
Christopher J. Beck, Corporation Counsel
Richard G. Kozal, City Manager
ATTACHMENTS
A. Change Order No. 1
3
City of Elgin Change Order
ELGIN, ILLINOIS
PROJECT: Bid No. 25-043
CHANGE ORDER No. 1
CONTRACT: Parking Structure Repairs and Painting – Bid No. 25-043
SCOPE: To perform additional concrete and tendon repair work necessary after discovery of
broken tendons during originally contracted repairs
REASONS FOR CHANGE: When the project was initially bid, site conditions and inspections
did not suggest that there were multiple support tendons broken within the concrete floor structure
of the deck. To maintain the integrity and longevity of the Spring St. Parking Deck, additional
concrete and support tendons must be repaired as they are discovered.
The circumstances said to necessitate the change in performance were not reasonably foreseeable
at the time the contract was signed. The change is germane to the original contract as signed. This
change order is in the best interests of the City of Elgin and authorized by law.
SUMMARY OF CHANGES IN CONTRACT AMOUNT: This contract is being increased by
$87,385. This will allow the contractor to perform the additional concrete replacement and support
tendons as described above.
ORIGINAL CONTRACT AMOUNT: $199,375
CHANGE ORDER No. 1
Perform additional concrete and support tendon repairs ADD $87,385
TOTAL FOR CHANGE ORDER NO. 1 ADD $87,385
TOTAL REVISED CONTRACT AMOUNT: $286,760
The original amount of the contract with Golf Construction was $199,375. Change Order No. 1
totaling $87,385 will increase the original contract amount by a total of $87,385, that sum
representing 43.8% of the original contract amount. The new contract amount, inclusive of all
change orders, is $286,760.
OTHER CONTRACT PROVISIONS: All other contract provisions remain the same.
CHANGE ORDER No. 1
Agreed to this day of , 2025.
Recommended by:
Parks and Recreation Department
By: Greg Hulke
Title: Parks and Facilities Superintendent
Date: December 17, 2025
Signature:
Accepted by:
Golf Construction
Party of the Second Part (Contractor)
By:
Title:
Date:
Signature:
Approved by:
CITY OF ELGIN
Party of the First Part (Owner)
By: Richard G. Kozal
Title: City Manager
Date:
Signature:
Legal Dept\Agreement\Golf Construction
AGENDA ITEM: H
MEETING DATE: December 17, 2025
ITEM:
Removal and Disposal of Water Treatment Lime Residuals for 2026—Agreement with Stewart
Spreading, Inc., Amendment No. 4
($3,107,010)
OBJECTIVE:
Continue treatment of the city’s drinking water by responsibly handling the lime softening waste
residual from the city’s water treatment process.
RECOMMENDATION:
Award the Amendment Agreement No. 4 to Stewart Spreading, Inc. of Sheridan, Illinois, for the
Removal and Disposal of Water Treatment Lime Residuals.
The city’s water treatment plants produce lime residuals that are stored at two lagoon sites. The
lime residuals in these lagoons must be regularly removed to provide continuous capacity. The
city has contracted with Stewart Spreading, Inc. since 2021 to remove the lime residuals and re-
purpose the product for agricultural soil replenishment. Approval of this amendment will author-
ize Stewart Spreading to continue removal and land application during 2026 of lime residuals
produced by the water treatment process.
BACKGROUND
The Leo Nelson Riverside and Airlite Water Treatment Plants produce lime residuals as a by-prod-
uct of the water softening process. This material, consisting mostly of calcium carbonate, is
stored at two lagoon sites. The Riverside Plant pumps the lime residuals directly to lagoons im-
mediately south of the Highlands Golf Course. The Airlite Plant storage lagoons are located at the
treatment plant. Regular removal and disposal of the lime residuals in these lagoons is required
to provide continuous capacity for the waste stream, which is integral to continually treat the
water.
In 2021, the city contracted with Stewart Spreading, Inc., to handle the lime residuals, which was
the first year of a five-year renewable contract.
OPERATIONAL ANALYSIS
The removal and disposal of lime residuals is vital for the success of the water treatment process.
Utilizing the most cost-effective and beneficial solution for removal is the most sustainable
method to handle the residuals. Land application has been determined to be the most cost-ef-
fective and sustainable method for disposing of the lime residuals.
Staff and the contractor work diligently to dispose of as much of the material as feasible through
land application. Additionally, land application also incorporates a very beneficial reuse of the
waste stream residuals to benefit the farming community. Land application of lime residuals in-
creases the pH of the soil and is effective in improving the soil characteristics. Land application
of the residuals requires significant permitting from the Illinois Environmental Protection Agency,
and the terms of the agreement ensure that the handling of the residuals meet these regulations.
The contractor will continue to assist the city with the renewals of the permit and reporting the
locations of residuals land application.
The greatest challenge of land application is that it can only be completed during short windows
of time when crops are not in the fields and weather permits, which is generally late fall and early
spring. At times, the option to landfill lime residuals can be utilized if lagoon capacity is required
but the land application option is not available. City staff will work diligently to minimize the
landfill wasting of the material.
The land application window described above is particularly challenging at the Airlite Water
Treatment Plant site where the lagoons require multiple cycles of cleaning each year. The need
for a well-planned and managed residuals handling operation is imperative, and Stewart Spread-
ing has proven they can handle the residuals from the Airlite facility.
INTERESTED PERSONS CONTACTED
None.
FINANCIAL ANALYSIS
The method of payment for the lime sludge residuals is per dry ton of residuals removed from
the McLean Lagoons and per gallon of Airlite residual transferred for additional drying to the
McLean Lagoons. Staff recommend awarding Amendment Agreement No. 4 to Stewart Spread-
ing, Inc. of Sheridan, Illinois. Expenditures for the removal and disposal of water treatment lime
residue for 2026 will not exceed $3,107,010. The 2026 Proposed Utility Fund Budget includes
funding for this contract.
2
BUDGET IMPACT
FUND(S) ACCOUNT(S) PROJECT #(S) AMOUNT AMOUNT
BUDGETED AVAILABLE
Utility 401-4002-771.45-99 N/A $3,107,010 $3,107,010
LEGAL IMPACT
The proposed agreement requires an exception to the procurement ordinance, which requires
approval by two-thirds of the members of the city council.
ALTERNATIVES
The city council may choose to reject the agreement; however, direction would be required to
staff, on how to proceed with handling the treatment residuals. Within three months, the lack of
a residuals handling contractor would affect the ability to treat water, and the city does not cur-
rently have the resources to complete the residuals handling in-house.
NEXT STEPS
1. Agreement is executed
2. Issue notice to proceed
Originators: Nora Bertram, Water Director
Final Review: Debra Nawrocki, Chief Financial Officer
Christopher J. Beck, Corporation Counsel
Richard G. Kozal, City Manager
ATTACHMENTS
A: Amendment Agreement No. 4
3
FOURTH EXTENSION OF
PURCHASE AGREEMENT
THIS FOURTH EXTENSION OF PURCHASE AGREEMENT (hereinafter referred to
as the “Extension Agreement” is hereby made and entered into this ____ day of
_________________, 2025, by and between the City of Elgin, Illinois, a municipal corporation
(hereinafter referred to as the “City”), and Stewart Spreading, Inc., an Illinois corporation
(hereinafter referred to as “Contractor”).
WHEREAS, the City and Contractor hereto have previously entered into an agreement
dated October 27, 2021 (hereinafter referred to as "Original Agreement"), wherein the City
engaged the Contractor to remove lime residue from lagoons located at the South McLean site
and lagoons located at the Airlite Water Treatment Plant (hereinafter referred to as the
"Project"); and
WHEREAS, the term of the Original Agreement terminated on December 31, 2022
WHEREAS, the Original Agreement further provides that the parties may agree to enter
into subsequent one-year extension agreements under the same terms and conditions as provided
for in the Original Agreement, subject to an annual price adjustment based upon the Consumer
Price Index (CPI) published on January 1 of each year; and
WHEREAS, the Original Agreement provided for a maximum payment by the City of
$4,130,000 for all work performed through December 31, 2022; and
WHEREAS, the parties entered into a First Extension of Purchase Agreement, dated
April 26, 2023, which extended the Original Agreement for a term commencing on January 1,
2023 and terminating on December 31, 2023 (the “First Extension Agreement”); and
WHEREAS, the parties entered into a Second Extension of Purchase Agreement, dated
March 6, 2024, which extended the Original Agreement for a term commencing on January 2024
and terminating on December 31, 2024 (the “Second Extension Agreement”); and
WHEREAS, the parties entered into a Third Extension of Purchase Agreement, dated
February 12, 2025, which extended the Original Agreement for a term commencing on January
1, 2025 and terminating on December 31, 2025 (the “Third Extension Agreement”); and
WHEREAS, the Illinois Prevailing Wage Act (820 ILCS 130/1 et seq.) (the “Act”) was
amended effective January 1, 2024 to provide that the services to be provided by Contractor
under the Original Agreement are considered public works that are subject to the requirements of
the Act, thereby necessitating an increase in the contract price; and
WHEREAS, the parties have determined it to be in their mutual best interests to extend
the term of the Original Agreement for an additional one-year term upon the same terms and
conditions of the Original Agreement, subject to the additional services and price adjustment
provided for herein; and
1
WHEREAS, the parties hereto have determined and agree that the total maximum
payment for the work performed and services described in this Fourth Extension Agreement
shall be in an amount of $3,107,010; and
WHEREAS, the changes provided to the Original Agreement in this Fourth Extension of
Purchase Agreement are germane to the Original Agreement as signed and this Fourth Extension
of Purchase Agreement is in the best interest of the City and authorized by law.
NOW, THEREFORE, for and in consideration of the mutual undertakings provided
herein, and other good and valuable consideration, the receipt and sufficiency of which is hereby
mutually acknowledged, the parties hereto agree as follows:
1. The above recitals are incorporated into and made part of this Fourth Extension
Agreement as if fully recited herein.
2. The parties agree to extend the term of the Original Agreement for an additional
one-year term, which shall be deemed to have commenced on January 1, 2026, and which shall
terminate on December 31, 2026, under the same terms of the Original Agreement except as
expressly provided for in this Fourth Extension Agreement.
3. Attachment A of the Original Agreement, under the heading "Stewart Spreading,
Inc. will be responsible for:," is hereby amended to read as follows:
"Stewart Spreading, Inc., shall provide certain additional services to include:
a. If there is need, removal of lime residual from the decant ponds and will maintain the
decant ponds located at the McLean Lagoons site, up to $40,986 per year for time and
materials;
b. Approved lagoon site maintenance and/or lagoon improvements shall be provided on
a time and materials basis."
4. Attachment A of the Original Agreement, under the heading "Contract Rates," is
hereby amended by adding a new provision thereto to read as follows:
"Anything to the contrary in this Agreement or Attachment A thereto notwithstanding,
the total amount that the City shall pay Stewart Spreading, Inc., for any work performed
during the term of the Fourth Extension Agreement, said term being January 1, 2026 to
December 31, 2026, shall not exceed the total amount of $3,107,010.00. The detailed
basis of the fee schedule associated with the work performed under the Fourth Extension
Agreement shall be as follows:
• Airlite- Water Treatment Plant $0.0799 per gallon transferred from the Airlite
2
lagoons to the McLean lagoons.
• McLean Lagoons - $115.175 per Dry Ton for Lime removed and land applied from
South McLean Boulevard Lagoons and the McLean temporary storage lagoon for
Airlite Lime.
• McLean Lagoons - $183.737 per Dry Ton for Lime removed and landfilled from the
South McLean Boulevard Lagoons and the McLean temporary storage lagoon for
Airlite Lime."
5. That except as amended by this Fourth Extension Agreement the Original
Agreement shall remain in full force and effect.
6. That in the event of any conflict between the terms of the Original Agreement, as
amended by the First Extension Agreement, the Second Extension Agreement and the Third
Extension Agreement, and the provisions in this Fourth Extension Agreement, the provisions of
this Fourth Extension Agreement shall control.
7. This Fourth Extension Agreement may be executed in counterparts, each of which
shall be an original and all of which shall constitute one and the same agreement. This Fourth
Extension Agreement may be executed electronically, and any signed copy of this this Fourth
Extension Agreement transmitted by facsimile machine, email, or other electronic means shall be
treated in all manners and respects as an original document. The signature of any party on a
copy of this Fourth Extension Agreement transmitted by facsimile machine, email, or other
electronic means shall be considered for these purposes an original signature and shall have the
same legal effect as an original signature.
IN WITNESS WHEREOF, the undersigned have entered into and executed this Fourth
Extension Agreement as of the date and year first written above.
CITY OF ELGIN STEWART SPREADING, INC.
By: _ City Manager
Attest: Attest:
City Clerk
Legal Dept\Agreement\Stewart Spreading Inc-Extension Agr No 4-11-24-25-clean.docx
3
AGENDA ITEM: I
MEETING DATE: December 17, 2025
ITEM:
Lead Service Line Replacement (LSLR) Program Year 5 Improvements—Engineering Services
Agreement with Engineering Enterprises, Inc. (EEI), Amendment No. 1
($2,875,816)
OBJECTIVE:
Contract with EEI for construction engineering services for Year 5 of the Lead Service Line Re-
placement Program.
RECOMMENDATION:
Award an Amendment No. 1 to the agreement with Engineering Enterprises, Inc., for construc-
tion engineering services related to the Lead Service Line Replacement Program Year 5 in the
amount of $2,875,816.
Elgin’s Lead Service Line Replacement Program has been ongoing since 2020. Year 1 replaced
approximately 390 lead service lines utilizing the proceeds of a $4 million principal forgiven loan
from the Illinois Environmental Protection Agency (IEPA). Year 2 was a larger program with an
opportunity to secure a second $4 million principal forgiveness loan from the IEPA and utilizing
approximately $9.5 million in ARPA funding that has been committed to Lead Service Line Re-
placements. The Year 2 program replaced over 870 service lines. The Year 3 program replaced
over 900 service lines in 2024 using an IEPA loan, the remaining ARPA funds and additional capital
funds. The Year 4 program replaced service lines utilizing IEPA funds, DCEO Grant funds, congres-
sional directed funds and other funding sources, it is expected that approximately 1,200 services
will be replaced once the Year 4 program is complete. The Year 5 program will utilize IEPA funds
and other funding sources to replace approximately 900 services, as well as approximately 20,000
feet of water main replacement. Engineering Enterprises, Inc., (EEI), has prepared and are plan-
ning to bid six contracts for this year’s program. This amendment agreement is for construction
engineering and daily oversight of those six contracts.
BACKGROUND
Lead pipes were historically used to convey water from the city-owned and operated water mains
into homes, businesses and other facilities. This industry accepted construction practice contin-
ued until approximately 1970 when copper replaced lead as the industry choice.
National regulations governing water treatment require that drinking water be treated so that a
scale occurs from the process of the drinking water flowing through a water service line pipe.
Additionally, in 2022 the Lead Service Line Replacement and Notification Act was implemented
by the State, which places a requirement on the city to replace all lead service lines over the next
several decades. The replacement requirements are dependent on the final inventory of lead
service lines in the system by 2027.
The city contracted with EEI in December of 2019 to prepare a project plan in order to request
funding from the Illinois Environmental Protection Agency (IEPA) State Revolving Loan Fund that
is specifically earmarked for lead service line replacement (LSLR). The program allows for up to
$4 million in principal forgiveness to each entity per year, therefore, this funding is more similar
to a grant than a loan. In June of 2020, EEI and city staff finalized the project plan and submitted
the plan to the IEPA. In 2022 and 2023 the city secured the funding for Year 1 and Year 2 of the
IEPA principal forgiveness loan in the amount of $4 million. Year 3 utilized a zero interest IEPA
State Revolving Fund loan. Year 4 utilized both a principal forgiven loan, zero-interest IEPA loans,
congressionally directed spending funds and DCEO grant funds. Year 5 provides for some princi-
pal forgiveness loan funding, and the city is currently pursuing additional zero interest loan funds
from IEPA as well.
OPERATIONAL ANALYSIS
Utilizing IEPA loans and local funding, the city plans to award six separate contracts for the Lead
Service Line and Water Main Replacement Program in 2026. EEI is currently preparing the bidding
documents for all six contracts and will be submitting the necessary paperwork for the IEPA loan,
which will be used to fund three of the contracts. The other three contracts will be funded
through local funding. Construction engineering services will be required for the daily inspection,
field reporting, record keeping and contractor communication as well as overall project coordi-
nation of the lead service line replacements. The city regularly uses engineering consulting firms
to provide these services.
INTERESTED PERSONS CONTACTED
The bidding documents for the IEPA funded projects will be submitted to the IEPA and reviewed,
in order for the construction engineering to be loan eligible this agreement must be approved
prior to submittal to IEPA for review.
FINANCIAL ANALYSIS
The proposed Amendment Agreement No. 1 totals $2,875,816. The engineering services pro-
vided by Engineering Enterprises will include six separate construction contracts. The 2026 Pro-
posed Utility Fund budget includes funding for this contract amendment.
2
BUDGET IMPACT
FUND(S) ACCOUNT(S) PROJECT #(S) AMOUNT AMOUNT
BUDGETED AVAILABLE
Utility 401-4002-771.30-03 409950 $2,875,816 $2,875,816
LEGAL IMPACT
Approval of this agreement requires an exception to the procurement ordinance, which requires
approval by two-thirds of the city council for acceptance.
ALTERNATIVES
The city council may choose to reject the agreement and direct staff to request proposals from
other engineering firms for construction engineering services. This option will likely delay re-
placement of lead service lines and may lead to loss of IEPA funding.
NEXT STEPS
1. Execute the agreement with EEI.
2. Issue directive to engineer to begin work.
Originators: Nora Bertram, Water Director
Final Review: Debra Nawrocki, Chief Financial Officer
Christopher J. Beck, Corporation Counsel
Richard G. Kozal, City Manager
ATTACHMENTS
A. Amendment Agreement No. 1 with Engineering Enterprises, Inc.
3
AMENDMENT AGREEMENT NO. 1
THIS AMENDMENT AGREEMENT No. 1 is hereby made and entered into this ____
day of _________________, 2026, by and between the City of Elgin, Illinois, a municipal
corporation (hereinafter referred to as the “City”), and Engineering Enterprises, Inc., an Illinois
corporation (hereinafter referred to as “Engineer”).
WHEREAS, the City and Engineer hereto have previously entered into an agreement
dated August 13, 2025 (the “Original Agreement”), wherein the City engaged the Engineer to
furnish certain professional services in connection with the Lead Service Line Replacement
Program – Year 5 Improvements (hereinafter referred to as the “Original Agreement” and the
“Project”); and
WHEREAS, the City has determined that the proposed scope of the PROJECT should be
further modified to include Construction Phase Professional Engineering Services; and
WHEREAS, the contract price for the Original Agreement was $682,974.00. The
contract price for Engineering services pursuant to Amendment No. 1 is $2,875,816.00.
WHEREAS, the changes contemplated by this Amendment Agreement No. 1 are
germane to the Original Agreement as signed; and this Amendment Agreement No. 1 is in the
best interests of City and is authorized by law.
NOW, THEREFORE, for and in consideration of the mutual promises and covenants provided
for herein, and other good and valuable consideration, the sufficiency of which is hereby
acknowledged, the parties hereto agree as follows:
1. The above recitals are incorporated into and made a part of this agreement as if fully
recited hereby.
2. Section 1C of the Original Agreement is hereby further amended by adding the following
to the end thereof:
“ENGINEER shall perform the Services described in “Attachment A-1”, entitled
“Scope of Services”. No Supplemental Services shall be performed by the
ENGINEER nor shall the City be responsible for Payment of any Supplemental
Services unless and until such Supplemental Services are authorized in advance
in writing by the City.”
3. Section 2B of the Original Agreement is hereby further amended by adding the following
to the end thereof:
“A project schedule for the PROJECT is included as Attachment B-1 attached
hereto. Progress will be recorded on the project schedule and submitted monthly
as a component of the Status Report described in C below”
4. Section 4A of the Original Agreement is hereby amended by adding the following to the
end thereof:
“For services provided pursuant to Amendment No. 1 the ENGINEER shall be
paid in accordance with the Estimate of Level of Effort and Associated Cost dated
November 25, 2025, attached as Attachment C-1 and incorporated herein by this
reference, and in accordance with the ENGINEER’S Standard Schedule of
Charges dated January 1, 2026, attached hereto as Attachment D-1 for personnel
employed on the PROJECT, with the total fees and expenses to be paid to the
ENGINEER not to exceed $2,875,816.00. regardless of the actual costs incurred
by the ENGINEER unless substantial modification to the scope of work are
authorized in writing by the DIRECTOR and approved by way of written
amendment to this agreement.”
5. Section 4B of the Original Agreement is hereby amended by adding the following to the
end thereof:
“Outside service expenses are included within the total fee amount not to exceed
$2,875,816.00. referred to in Section 4A hereof.”
6. Section 4C of the Original Agreement is hereby amended by adding the following to the
end thereof:
“Reimbursable expenses are included within the total fee amount not to exceed
$2,875,816.00. referred to in Section 4A hereof.”
7. Section 4D of the Original Agreement is hereby amended by adding the following to the
end thereof:
Payment Schedule
ESTIMATED
INVOICE ESTIMATED VALUE OF ESTIMATED INVOICE
%
DATE WORK COMPLETE VALUE
COMPLETE
Jan-26 2% $ 57,516.32 $ 57,516.32
Feb-26 5% $ 143,790.80 $ 86,274.48
Mar-26 10% $ 287,581.60 $ 143,790.80
Apr-26 15% $ 431,372.40 $ 143,790.80
May-26 20% $ 575,163.20 $ 143,790.80
Jun-26 25% $ 718,954.00 $ 143,790.80
Jul-26 35% $ 1,006,535.60 $ 287,581.60
Aug-26 45% $ 1,294,117.20 $ 287,581.60
Sep-26 55% $ 1,581,698.80 $ 287,581.60
Oct-26 65% $ 1,869,280.40 $ 287,581.60
Nov-26 75% $ 2,156,862.00 $ 287,581.60
Dec-26 85% $ 2,444,443.60 $ 287,581.60
Jan-27 95% $ 2,732,025.20 $ 287,581.60
Feb-27 95% $ 2,732,025.20 $ -
Mar-27 95% $ 2,732,025.20 $ -
Apr-27 95% $ 2,732,025.20 $ -
May-27 98% $ 2,818,299.68 $ 86,274.48
Jun-27 99% $ 2,847,057.84 $ 28,758.16
Jul-27 100% $ 2,875,816.00 $ 28,758.16
Total = $ 2,875,816.00
8. The changes provided to the Original Agreement, as provided in this Amendment
Agreement No. 1 are germane to the Original Contract, and this Amendment Agreement
No. 1 is in the best interests of the City of Elgin and is authorized by law.
9. That except as amended in this Amendment Agreement No. 1, the Original Agreement
shall remain in full force and effect, including Section F-1 “IEPA Professional Services
Contract Clauses”.
10. That in the event of any conflict between the terms of the Original Agreement, and the
provisions in this Amendment Agreement No. 1, the provisions of this Amendment
Agreement No. 1 shall control.
IN WITNESS WHEREOF, the undersigned have entered into and executed this Amendment
Agreement as of the date and year first written above.
CITY OF ELGIN CONSULTANT
By:_________________________________ By:_________________________________
City Manager Its Principal
Attest: Attest:
___________________________________ ___________________________________
City Clerk Its Executive Assistant
CITY OF ELGIN, IL YEAR 5 LSLR PROGRAM
ATTACHMENT A-1
SCOPE OF SERVICES
LEAD SERVICE LINE REPLACEMENT – YEAR 5
City of Elgin, IL
Professional Services Agreement - Construction Engineering
The City of Elgin has identified approximately 870 lead services lines to be replaced (main to meter)
using funds from the IEPA Public Water Supply Loan Program (PWSLP) and local funds. The service
replacements are divided into six separate construction contracts:
Year 5 Contract Min. No. of Funding
LSLR
Contract A (LSLR & associated water main replacement) 193 IEPA and local
Contract B (IEPA $4M) 258 IEPA
Contract C (IEPA bypass funding) 357 IEPA
Contract D (Emergency Repairs) 60 Local
Contract E (St. Charles St. IDOT LSLR) 33 Local
2026 Water Main Improvements (no LSLR) N/A Local
Total 901
Contract A includes approximately 8,300 linear feet of new water main installation. A separate, water
main replacement only contract includes approximately 12,400 feet of new water main installation.
The City is currently nearing the completion of the design phase of this project and is seeking to
proceed to the construction phase.
Due to construction costs running lower than anticipated for Year 4, the City also identified an
additional 123 lead service lines to be replaced under Year 4 Contracts B and C (IEPA L17-5873
eligible). The City also added an additional 37 lead service line replacements to Year 4 under
Contracts D, F, and G (local funding). This amendment includes construction engineering services
for the additional 160 lead service line replacements added to Year 4.
The following list of work items establishes the scope of engineering services for this project:
CONSTRUCTION ENGINEERING
3.1 Construction Administration
Project Management
Preparation of on-line data management tool (Field Maps)
Prepare for, attend, and facilitate the preconstruction meeting including preparation of meeting
minutes
Shop drawing review
Resident notifications (3 total; English and Spanish)
o Overall project information and general schedule
o Notice of service replacement
o Restoration and flushing guidelines
Project manager attendance of field meetings; 2 meetings per month for 10 months -
(excluding Contract D - Emergency Repairs)
Prepare pay estimates and change orders
IEPA disbursement requests – Contract A, Contract B, and Contract C only
IEPA Project Closeout – Contract A, Contract B, and Contract C only
PAGE 1
CITY OF ELGIN, IL YEAR 5 LSLR PROGRAM
3.2 Construction Layout and Record Drawings
Contract A Water Main and 2026 Water Main Improvements contracts only
Stake proposed water main, structures, and curb and gutter. B-boxes will not be staked.
Perform post construction field survey for record drawings
Prepare and review record drawings
3.3 Construction Observation and Documentation – Water Main
Contract A and 2026 Water Main Improvements contracts only
Take pre-construction videos and photos of pre-existing conditions
Provide resident engineering services for construction
Provide quantity tracking, documentation, and daily field reports (e-mails and Salesforce)
On-site meetings with the City as needed
Punch walks and letters
3.4 Construction Observation and Documentation – LSLR
Home assessments with Contractor and City
Provide resident engineering services for construction
Provide quantity tracking, documentation, and daily field reports (e-mails and Salesforce)
On-line data management using Field Maps
On-site meetings with the City as needed
Punch walks and letters
The following scope of services will be provided by EEI’s Subconsultant:
On-call CCDD testing and certification – LPC 662/663 (Rubino Engineering Inc.)
Waste profile testing (Rubino Engineering Inc.)
Material testing (Rubino Engineering Inc.)
Plumbing and grounding inspections (B&F Construction Code Services, Inc.)
EXCLUSIONS
The above scope of services excludes the following:
Attendance at City Council Meeting
Construction layout for LSLRs
Post construction field survey and/or record drawings for LSLRs
Resident coordination during construction (by Contractor)
The above scope summarizes the work items that will be completed for this contract. Additional work
items, including additional meetings beyond the meetings defined in the above scope shall be
considered outside the scope of the base contract and will be billed in accordance with EEI’s Standard
Schedule of Charges (Attachment D-1) in affect at the time the extra work is performed.
PAGE 2
ATTACHMENT B-1: ESTIMATED SCHEDULE
CLIENT PROJECT NUMBER
CITY OF ELGIN EG2503
PROJECT TITLE DATE PREPARED BY
LEAD SERVICE LINE REPLACEMENT - YEAR 5 - CONSTRUCTION ENGINEERING 11/25/25 KMM
TASK
TASK DESCRIPTION 2026 2027
NO.
MAY JUNE JULY AUG SEPT OCT NOV DEC JAN FEB MAR APRIL MAY JUNE JULY
CONTRACT A
3.1 Construction Administration
3.2 Construction Layout and Record Drawings - Water Main
3.3 Construction Observation and Documentation - Water Main
3.4 Construction Observation and Documentation - LSLR
CONTRACT B
3.1 Construction Administration
3.4 Construction Observation and Documentation - LSLR
CONTRACT C
3.1 Construction Administration
3.4 Construction Observation and Documentation - LSLR
CONTRACT D
3.1 Construction Administration
3.4 Construction Observation and Documentation - LSLR
CONTRACT E
3.1 Construction Administration
3.4 Construction Observation and Documentation - LSLR
WATER MAIN IMPROVEMENTS
3.1 Construction Administration
3.2 Construction Layout and Record Drawings - Water Main
3.3 Construction Observation and Documentation - Water Main
YEAR 4 - ADDITIONAL SCOPE
3.1 Construction Administration
3.4 Construction Observation and Documentation - LSLR
52 Wheeler Road, Sugar Grove, IL 60554 Tel: 630.466.6700 Fax: 630.466.6701 www.eeiweb.com
ATTACHMENT C-1: ESTIMATE OF LEVEL OF EFFORT AND ASSOCIATED COST
PROFESSIONAL ENGINEERING SERVICES
CLIENT PROJECT NUMBER
CITY OF ELGIN EG2503
PROJECT TITLE DATE PREPARED BY
LEAD SERVICE LINE REPLACEMENT - YEAR 5 11/25/25 KMM
ROLE PIC PM SPE I PE PM SPT II SPT I GIS ADMIN
TASK
TASK DESCRIPTION E-3 E-1 P-5 P-4 E-1 T-6 T-5 P-2 A-3 HOURS COST
NO.
RATE $262 $228 $203 $184 $228 $191 $179 $153 $79
CONTRACT A (IEPA L17-5874 where indicated)
3.1 Construction Administration (IEPA; 148 services) 30 110 6 6 152 $ 34,332
3.1 Construction Administration (Local; Water Main + 45 services) 80 250 6 6 342 $ 79,352
3.2 Construction Layout and Record Drawings - Water Main 9 105 40 154 $ 29,267
3.3 Construction Observation and Documentation - Water Main 1,950 1,950 $ 358,800
3.4 Construction Observation and Documentation - LSLR (IEPA; 148 Services) 1,108 1,108 $ 198,332
3.4 Construction Observation and Documentation - LSLR (45 Services) 340 340 $ 60,860
Contract A Subtotal: 110 360 - 1,950 9 105 1,488 12 12 4,046 $ 760,943
DIRECT EXPENSES (IEPA L17-5874) DIRECT EXPENSES (LOCAL)
Mailing and Printing $ 1,500 Mailing and Printing $ 500
Plumbing and Electrical Inspection (B&F) $ 7,400 Plumbing and Electrical Inspection (B&F) $ 2,250
Material Testing (Rubino) $ 1,500 Material Testing (Rubino) $ 1,500
DIRECT EXPENSES (IEPA) = $ 10,400 DIRECT EXPENSES (LOCAL) = $ 4,250
LABOR SUMMARY (IEPA L17-5874) LABOR SUMMARY (LOCAL)
EEI Labor Expenses = $232,664 EEI Labor Expenses = $ 528,279
TOTAL LABOR EXPENSES (IEPA) $232,664 TOTAL LABOR EXPENSES (LOCAL) $ 528,279
CONTRACT A COST (IEPA L17-5874) $243,064 CONTRACT A COST (LOCAL) $ 532,529
CONTRACT A TOTAL COST $ 775,593
PAGE 1 OF 4
ATTACHMENT C-1: ESTIMATE OF LEVEL OF EFFORT AND ASSOCIATED COST
PROFESSIONAL ENGINEERING SERVICES
CLIENT PROJECT NUMBER
CITY OF ELGIN EG2503
PROJECT TITLE DATE PREPARED BY
LEAD SERVICE LINE REPLACEMENT - YEAR 5 11/25/25 KMM
ROLE PIC PM SPE I PE PM SPT II SPT I GIS ADMIN
TASK
TASK DESCRIPTION E-3 E-1 P-5 P-4 E-1 T-6 T-5 P-2 A-3 HOURS COST
NO.
RATE $262 $228 $203 $184 $228 $191 $179 $153 $79
CONTRACT B (IEPA L17-7580)
3.1 Construction Administration (IEPA; 236 services) 40 200 240 $ 56,080
3.1 Construction Administration (Local; 22 services) 8 12 20 $ 4,832
3.4 Construction Observation and Documentation - LSLR (IEPA; 236 Services) 1,716 1,716 $ 315,744
3.4 Construction Observation and Documentation - LSLR (Local; 22 Services) 160 160 $ 29,440
Contract B Subtotal: 48 212 - 1,876 - - - - - 2,136 $ 406,096
DIRECT EXPENSES (IEPA L17-7580) DIRECT EXPENSES (LOCAL)
Mailing and Printing $ 2,400 Mailing and Printing $ 300
Plumbing and Electrical Inspection (B&F) $ 11,800 Plumbing and Electrical Inspection (B&F) $ 1,100
Material Testing (Rubino) $ 2,400 Material Testing (Rubino) $ 220
DIRECT EXPENSES (IEPA) = $ 16,600 DIRECT EXPENSES (LOCAL) = $ 1,620
LABOR SUMMARY (IEPA L17-7580) LABOR SUMMARY (LOCAL)
EEI Labor Expenses = $371,824 EEI Labor Expenses = $ 34,272
TOTAL LABOR EXPENSES (IEPA) $371,824 TOTAL LABOR EXPENSES (LOCAL) $ 34,272
CONTRACT B COST (IEPA L17-7580) $388,424 CONTRACT B COST (LOCAL) $ 35,892
CONTRACT B TOTAL COST $ 424,316
ROLE PIC PM SPE I PE PM SPT II SPT I GIS ADMIN
TASK
TASK DESCRIPTION E-3 E-1 P-5 P-4 E-1 T-6 T-5 P-2 A-3 HOURS COST
NO.
RATE $262 $228 $203 $184 $228 $191 $179 $153 $79
CONTRACT C (IEPA L17-5874)
3.1 Construction Administration 50 312 362 $ 84,236
3.4 Construction Observation and Documentation - LSLR 2,598 2,598 $ 478,032
Contract C Subtotal: 50 312 - 2,598 - - - - - 2,960 $ 562,268
DIRECT EXPENSES (IEPA L17-5874)
Mailing and Printing $ 3,600
Plumbing and Electrical Inspection (B&F) $ 17,850
Material Testing (Rubino) $ 3,600
DIRECT EXPENSES (IEPA) = $ 25,050
LABOR SUMMARY (IEPA L17-5874)
EEI Labor Expenses = $562,268
TOTAL LABOR EXPENSES (IEPA) $562,268
CONTRACT C COST (IEPA L17-5874) $587,318
PAGE 2 OF 4
ATTACHMENT C-1: ESTIMATE OF LEVEL OF EFFORT AND ASSOCIATED COST
PROFESSIONAL ENGINEERING SERVICES
CLIENT PROJECT NUMBER
CITY OF ELGIN EG2503
PROJECT TITLE DATE PREPARED BY
LEAD SERVICE LINE REPLACEMENT - YEAR 5 11/25/25 KMM
ROLE PIC PM SPE I PE PM SPT II SPT I GIS ADMIN
TASK
TASK DESCRIPTION E-3 E-1 P-5 P-4 E-1 T-6 T-5 P-2 A-3 HOURS COST
NO.
RATE $262 $228 $203 $184 $228 $191 $179 $153 $79
CONTRACT D (EMERGENCY REPAIR)
3.1 Construction Administration 12 40 8 8 68 $ 14,120
3.4 Construction Observation and Documentation - LSLR 450 450 $ 80,550
Contract D Subtotal: 12 40 - - - - 450 8 8 518 $ 94,670
CONTRACT E (ST. CHARLES ST. LSLR)
3.1 Construction Administration 8 18 8 8 42 $ 8,056
3.4 Construction Observation and Documentation - LSLR 248 248 $ 44,392
Contract E Subtotal: 8 18 - - - - 248 8 8 290 $ 52,448
WATER MAIN IMPROVEMENTS
3.1 Construction Administration (Water Main) 100 326 8 8 442 $ 102,384
3.2 Construction Layout and Record Drawings - Water Main 18 143 58 219 $ 41,799
3.3 Construction Observation and Documentation - Water Main 3,010 3,010 $ 538,790
Water Main Improvements Subtotal: 100 326 - - 18 143 3,068 8 8 3,671 $ 682,973
CONTRACTS D, E, AND WM IMP. DIRECT EXPENSES (LOCAL)
Mailing and Printing $ 2,000
Plumbing and Electrical Inspection (B&F) $ 4,650
Material Testing (Rubino) $ 2,000
DIRECT EXPENSES (LOCAL) = $ 8,650
CONTRACTS D, E, AND WM IMP. LABOR SUMMARY (LOCAL)
EEI Labor Expenses = $ 830,091
TOTAL LABOR EXPENSES (LOCAL) $ 830,091
CONTRACTS D, E, AND WM IMP. TOTAL COST $ 838,741
LEAD SERVICE LINE REPLACEMENT - YEAR 5 TOTAL COST $ 2,625,968
PAGE 3 OF 4
ATTACHMENT C-1: ESTIMATE OF LEVEL OF EFFORT AND ASSOCIATED COST
PROFESSIONAL ENGINEERING SERVICES
CLIENT PROJECT NUMBER
CITY OF ELGIN EG2503
PROJECT TITLE DATE PREPARED BY
LEAD SERVICE LINE REPLACEMENT - YEAR 5 11/25/25 KMM
YEAR 4 - ADDITIONAL SCOPE
ROLE PIC PM SPE I PE PM SPT II SPT I GIS ADMIN
TASK
TASK DESCRIPTION E-3 E-1 P-5 P-4 E-1 T-6 T-5 P-2 A-3 HOURS COST
NO.
RATE $262 $228 $203 $184 $228 $191 $179 $153 $79
YEAR 4 (IEPA L17-5873 where indicated)
3.1 Construction Administration (IEPA; 123 services) 20 96 116 $ 27,128
3.1 Construction Administration (Local; 37 services) 10 26 36 $ 8,548
3.4 Construction Observation and Documentation - LSLR (IEPA; 123 Services) 852 852 $ 156,768
3.4 Construction Observation and Documentation - LSLR (Local; 37 Services) 256 256 $ 47,104
Year 4 Subtotal: 30 122 - 1,108 - - - - - 1,260 $ 239,548
DIRECT EXPENSES (IEPA L17-5873) DIRECT EXPENSES (LOCAL)
Mailing and Printing $ 1,300 Mailing and Printing $ 400
Plumbing and Electrical Inspection (B&F) $ 6,150 Plumbing and Electrical Inspection (B&F) $ 1,850
Material Testing (Rubino) $ 400 Material Testing (Rubino) $ 200
DIRECT EXPENSES (IEPA) = $ 7,850 DIRECT EXPENSES (LOCAL) = $ 2,450
LABOR SUMMARY (IEPA L17-5873) LABOR SUMMARY (LOCAL)
EEI Labor Expenses = $183,896 EEI Labor Expenses = $ 55,652
TOTAL LABOR EXPENSES (IEPA) $183,896 TOTAL LABOR EXPENSES (LOCAL) $ 55,652
YEAR 4 COST (IEPA L17-5873) $191,746 YEAR 4 COST (LOCAL) $ 58,102
YEAR 4 - ADDITIONAL SCOPE TOTAL COST $ 249,848
AMENDMENT NO. 1 TOTAL COST $ 2,875,816
PAGE 4 OF 4
ATTACHMENT D-1
ENGINEERING ENTERPRISES, INC.
52 Wheeler Road, Sugar Grove, IL 60554
Ph: 630.466.6700 •Fx: 630.466.6701
www.eeiweb.com
STANDARD SCHEDULE OF CHARGES ~ JANUARY 1, 2026
EMPLOYEE DESIGNATION CLASSIFICATION HOURLY RATE
Senior Principal E-4 $268.00
Principal E-3 $262.00
Senior Project Manager E-2 $254.00
Project Manager E-1 $228.00
Senior Project Engineer/Surveyor II P-6 $218.00
Senior Project Engineer/Surveyor I P-5 $203.00
Project Engineer/Surveyor P-4 $184.00
Senior Engineer/Surveyor P-3 $169.00
Engineer/Surveyor P-2 $153.00
Associate Engineer/Surveyor P-1 $139.00
Senior Project Technician II T-6 $191.00
Senior Project Technician I T-5 $179.00
Project Technician T-4 $167.00
Senior Technician T-3 $153.00
Technician T-2 $138.00
Associate Technician T-1 $120.00
Engineering/Land Surveying Intern I-1 $ 89.00
Director of Marketing and Business Development M-4 $141.00
Marketing Coordinator M-2 $105.00
Executive Administrative Assistant A-4 $ 84.00
Administrative Assistant A-3 $ 79.00
VEHICLES. DRONE, EXPERT TESTIMONY, REPROGRAPHICS AND DIRECT COSTS*
Vehicle for Construction Observation $ 20.00
Unmanned Aircraft System / Unmanned Aerial Vehicle / Drone $245.00
Expert Testimony $300.00
In-House Scanning and Reproduction $0.25/Sq. Ft. (Black & White)
$1.00/Sq. Ft. (Color)
Reimbursable Expenses (Direct Costs) Cost
Services by Others (Direct Costs) Cost + 10%
* unless specified otherwise in agreement