Committee of the Whole
Regular MeetingGeneva, IL · July 20, 2026
Agenda
Add to calendar
Agenda
1
COMMITTEE OF THE WHOLE
Monday, July 20, 2026
immediately following the City Council Meeting at 7pm
City Hall Council Chamber
109 James Street
Geneva, IL 60134
Amy Mayer, Chair
AGENDA
1. Call to Order
2. Approve Special Committee of the Whole Minutes from May 11, 2026 and Regular Committee of the
Whole Minutes from June 1, 2026
3. Items of Business
a. Consider Draft Resolution Authorizing the Execution of a Professional Services Agreement with Stanley
Consultants, Inc. for the Keslinger Substation Upgrade Project in the Projected Amount of $354,072.00.
b. Consider Draft Resolution Authorizing Execution of a Contract with IHC Construction Companies LLC at a
Cost of $324,360.00 and Allow the City Administrator to Approve Up to $32,436.00 in Change Orders for
a Total Not-to-Exceed Amount of $356,796.00 for East State Street Lead and Galvanized Water Service
Line Replacement.
c. Consider Draft Resolution Authorizing the Purchase of Fuel Through Al Warren Oil Through July 5, 2027
Under the Terms and Pricing Established in SPC RFP #230.
4. Public Comment
When recognized by the Chair, proceed to the podium, state your name for the record, and provide your
public comments. Please understand this is your time to be heard and the public body’s time to listen. No
discussion or debate will follow.
5. New Business
6. Adjournment
ADA Compliance: Any individual with a disability requesting a reasonable accommodation in order to participate in a public meeting
should contact the City at least 48 hours in advance of the scheduled meeting. The City can be reached in person at 22 S First Street,
Geneva, IL, or by telephone at (630) 232- 7494. Every effort will be made to allow for meeting participation. Notice of this meeting was
posted consistent with the requirements of 5 ILCS 120/1 et seq. (Open Meetings Act).
2
SPECIAL COMMITTEE OF THE WHOLE MINUTES
MAY 11, 2026
Present: Mayor Burns, Ald. Bowing, Malecki, Furnish, Kilburg, Kosirog, Reinecke, Marks
(remote), Mayer, Paschke, Palmquist
Absent: None
Others Atending: Administrator Voigt, Dir. Tymoszenko, Dep. Clerk Fornari, City Atorneys Fintzen
and Sandack
1. Call to Order
The mee�ng was called to order by Mayor Burns at 7pm no�ng all present with Marks remote via video.
2. Special Items
a. Proclaim Motorcycle Awareness Month
Moved by Ald. Paschke, seconded by Ald. Kosirog
Chris Hanson, with A.B.A.T.E., was present to accept the proclama�on and thanked the City for promo�ng
motorcycle safety awareness.
Voice Vote: 10/0
Mo�on carried.
3. Closed Session on the Appointment, Employment, Compensa�on, Discipline, Performance, or
Dismissal of Specific Employees of the Public Body (5 ILCS 120/2(c)(1).
Moved by Ald. Bowring, seconded by Ald. Paschke
The mee�ng was adjourned to closed session at 7:08pm.
Roll Call: Ayes: 10 Nays: 0
Mo�on carried.
On a mo�on by Ald. Bowring, seconded by Ald. Kilburg, the mee�ng was brought back to open session at
7:24pm.
Roll Call: Ayes: 10 Nays: 0
Mo�on carried.
3
SPECIAL COMMITTEE OF THE WHOLE MAY 11, 2026
4. Items of Business
a. Presenta�on and Discussion Regarding Proposed Expansion of “Des�na�on Geneva” Grant
Program.
City Admin. Voigt introduced City Atorney Scot Fintzen to present the expanded program details and
parameters. No�ng the need to expand the successful program launched in FY2026, the program allows
both Geneva non-profit and for-profit en��es the ability to apply for grants for up to $10,000 for events
within the city. The funding mechanism comes from Hotel/Motel tax revenues. Atorney Fintzen provided
informa�on on the legal ra�onale, policy framework and applica�on process. The commitee’s ques�ons
centered on insurance liability, informa�on we would require in the applica�on, the ranking/scoring
process, and addi�onal funding mechanisms besides the hotel/motel tax, and issues facing the Geneva
Chamber of Commerce and its fes�val funding. Fintzen reminded the commitee what parameters of State
law the City was required to follow, due to being a non-home rule community. At the conclusion of the
discussion, Voigt noted the item would be up for a vote at the May 18 City Council mee�ng.
5. Public Comment (none)
6. New Business (none)
7. Adjournment
On a mo�on by Ald. Kosirog, seconded by Ald. Furnish, the mee�ng was adjourned by unanimous voice
vote at 9:00pm.
-submitted by Deputy Clerk Fornari
4
GENEVA COMMITTEE OF THE WHOLE MEETING MINUTES
Monday, June 1, 2026
City Hall Council Chambers
109 James St., Geneva, IL 60134
Elected Officials Present: Ald. Bowring, Ald. Furnish, Ald. Kilburg, Ald. Kosirog,
Ald. Malecki, Ald. Mayer, Ald. Palmquist, Ald. Reinecke, Mayor Burns, Clerk
Kellick.
Elected Officials Attending by Teleconference: None.
Elected Officials Absent: Ald. Marks, Ald. Paschke.
Others Present: City Admin. Voigt, Asst. City Admin. McCready, City Attny.
Sandack, Supt. Holton, Supt. Van Gyseghem, Dir. Babica, Asst. Dir. Landers.
Others attending by video or teleconference: None.
Call to Order
Ald. Kosirog, serving as chair, called the meeting to order at 7:46 PM.
Approve Committee of the Whole Minutes from May 18, 2026.
Moved by Ald. Mayer, seconded by Ald. Palmquist.
MOTION CARRIED by voice vote of those present 8-0.
Items of Business
Consider Draft Resolution Authorizing Execution of a Contract with Arthur J.
Lootens, Inc. for Demolition of Barn Structure at 64 N. Peck Road in an Amount
Not to Exceed $28,535.96.
Moved by Ald. Mayer, seconded by Ald. Bowring.
On a question by Ald. Palmquist, Asst. Dir. Landers confirmed that the silo would
be included in the demolition.
MOTION CARRIED by voice vote of those present 7-1.
5
Consider Draft Resolution Authorizing the Purchase of a 2026 Ford Maverick
Hybrid from Sutton Auto Team in the Amount of $35,760.95 and Declare 2017
Ford Transit Connect as Surplus Property.
Moved by Ald. Bowring, seconded by Ald. Malecki.
MOTION CARRIED by voice vote of those present 8-0.
Consider Draft Resolution Waiving Competitive Bidding and Authorizing the
Purchase of the Sewer Line Rapid Assessment Tool from InfoSense, Inc., in the
Amount of $35,385.00.
Moved by Ald. Mayer, seconded by Ald. Palmquist.
On a question by Ald. Mayer, Supt. Van Gyseghem noted that numerous
communities are pleased with the tool. It will be operated by the sewer and
maintenance staff initially and will save significant staff time, water and fuel.
MOTION CARRIED by voice vote of those present 8-0.
Consider Draft Resolution Authorizing the Purchase of Underground Cable and
Material from WESCO/Anixter through Sourcewell Contract 091422wes in the
Estimated Amount of $323,933.94.
Moved by Ald. Mayer, seconded by Ald. Bowring.
On a question by Ald. Malecki, Supt. Holton noted that the quotes from April are
still good and that there is an escalation in all the contracts to address any changes.
MOTION CARRIED by voice vote of those present 8-0.
Consider Draft Resolution Waiving Competitive Bidding and Authorize Contract
with Minsait/Advance Control System for Electric Division SCADA upgrades in
the Amount of $169,581.00.
Moved by Ald. Bowring, seconded by Ald. Mayer.
On a question by Ald. Reinecke, Supt. Holton stated that he is not comfortable
answering questions about the system’s security and firewall system in a public
forum but is confident in the system’s security.
MOTION CARRIED by voice vote of those present 8-0.
Consider Draft Resolution Authorizing Execution of Labor Contract with Utility
Dynamics Corporation for the FY27 Underground Replacement Program in the
Amount of $979,141.50 and Allow City Administrator to Authorize Change
Orders Not-to-Exceed 10% of the Contract, for a total of $1,077,055.65.
Moved by Ald. Bowring, seconded by Ald. Mayer.
6
On a question by Ald, Palmquist, Supt. Holton explained that this resolution is for
labor and conduit while the previous resolution is for the owner-supplied materials
for the contract. He noted that it is typical to break out the two items for this type
of work.
On a question by Ald. Mayer, Supt. Holton noted that for the most part, the project
is on track and while conduit prices have increased, these should fall with oil
prices. The department is working with finance and will have to increase the
capital budget going forward in order to continue to accomplish what is needed.
MOTION CARRIED by voice vote of those present 8-0.
Public Comment
None.
New Business
Ald. Kilburg commented that last week he attended a presentation by the solar
company interested in developing a field in Geneva. He noted that he will not offer
an opinion on the issue but that the presentation was informative and interesting.
Adjournment
On a motion by Ald. Mayer, the meeting was adjourned by unanimous voice vote
at 8:02 PM.
‐ Submitted by Clerk Kellick
7
AGENDA ITEM EXECUTIVE SUMMARY
Agenda Item: Approve Professional Service Agreement with Stanley Consultants.
Presenter & Title: Aaron Holton – Superintendent of Electric Services
Date: August 3, 2026
Please Check Appropriate Box:
☒ Committee of the Whole Meeting ☐ Special Committee of the Whole Meeting
☒ City Council Meeting ☐ Special City Council Meeting
☐ Public Hearing ☐ Other -
Associated Strategic Plan Goal/Objective: QIS-III
Budgeted? ☒ Yes Other ☐ Yes
Estimated Cost: $354,072.00
☐ No Funding? ☒ No
If “Other Funding,” please explain how the item will be funded:
Executive Summary:
The City of Geneva advertised an RFQ to provide Professional Services for the reconstruction work
at the Keslinger Road substation. Three firms responded, and after evaluations by City staff,
Stanley Consultants was chosen for this agreement. The scope of this agreement will encompass
design, bid and procurement support, project management and close out for the removal of the
existing bus work and the installation of a new Power Distribution Center building and metal
enclosed switchgear. This work is being done to support Delnor Hospital’s need for a back-up feed
for the campus in the event of wide spread power interruptions.
Attachments: (please list)
• Resolution
• Memo from Superintendent Holton
• Professional Services Agreement from Stanley Consultants, Inc.
Voting Requirements:
This motion requires a simple majority of affirmative votes for passage. (City Council Only)
The Mayor may vote on three occasions: (a) when the vote of the alderpersons has resulted in a tie;
(b) when one half of the alderpersons elected have voted in favor of an ordinance, resolution, or
motion even though there is no tie vote; or (c) when a vote greater than a majority of the corporate
authorities is required by state statute or local ordinance to adopt an ordinance, resolution, or
motion.
Recommendation / Suggested Action: (how the item should be listed on agenda)
Recommend approving Professional Services Agreement with Stanley Consultants, Inc. for
professional services for the Keslinger Road Substation Upgrade Project in a projected amount of
$354,072.
8
RESOLUTION NO. 2026-__
RESOLUTION APPROVING PROFESSIONAL SERVICES AGREEMENT WITH
STANLEY CONSULTANTS, INC. FOR PROFESSIONAL SERVICES FOR THE
KESLINGER ROAD SUBSTATION UPGRADE PROJECT IN A PROJECTED
AMOUNT OF $354,072.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF GENEVA,
KANE COUNTY, ILLINOIS, as follows:
SECTION 1: That the City Administrator is hereby authorized to execute, on behalf of
the City of Geneva, Professional Services Agreement with Stanley Consultants, Inc. for
professional services for the Keslinger Road Substation Upgrade Project in a projected amount of
$354,072 as recommended by Staff.
SECTION 2: This Resolution shall become effective from and after its passage as in
accordance with law.
PASSED by the City Council of the City of Geneva, Kane County, Illinois, this 3rd day
of August, 2026
AYES: __ NAYS: __ ABSENT: __ ABSTAINING: __ HOLDING OFFICE: __
Approved by me this 3rd day of August, 2026.
Mayor
ATTEST:
City Clerk
9
July 20, 2026
Memo To: Mayor Burns and Members of the Committee of the Whole
From: Aaron Holton, Superintendent of Electrical Services
Re: Recommendation for Professional Services Agreement with Stanley Consultants
for Keslinger Road Substation improvements.
The Electric Division has identified improvements that can be made to the Keslinger Road
Substation to both increase reliability for the City of Geneva and establish a tertiary back-up
feed for the Delnor Hospital Campus. The Delnor Substation is fed from a ComEd 34kV line.
Due to this arrangement and historical reliability of the line, the City of Geneva has undertaken
the project to provide a third layer of reliability to the Delnor campus. This circuit will be sized to
provide power to the essential systems of the Hospital.
Working with Delnor staff, Geneva staff has established a framework that will allow Delnor
Hospital to fund their improvements and the City will fund our portion of the upgrades to better
serve all of the City’s customers. The outline of this project was included in the Electric
Division’s Capital Project plan as adopted in the 2026/27 Budget.
The first step of this project is to approve a Professional Services Agreement (PSA) for
engineering and project management services for the removal of existing bus work and
apparatus and the installation of a new Power Distribution Center (PDC) building and new metal
enclosed switchgear.
A Request for Qualifications was advertised and three consulting engineer firms responded.
Staff evaluated each submission and Stanley Consultants was the finalist with a combined
average score of 97.3 out of 100. Once Stanley was selected as the RFQ finalist, staff engaged
the firm and negotiated the PSA being presented here.
The PSA will direct Stanley to design and spec the replacement PDC and Switchgear, as well
as the needed steel and civil engineering for the improvements. Stanley will provide support for
the bidding process and award of the contracts for both the PDC as well as the construction
contract to install the PDC. Finally, Stanley will provide closeout and as-built documentation at
the conclusion of the project.
10
Staff Recommendations:
After careful review of the Statemen of Qualifications from the respective RFQ respondents, it is
staff’s recommendation to award to Stanley Consultants in the amount of $354,072 for
Professional Services for Keslinger Road Substation Improvements.
Cc: Alex Voigt, City Administrator
Rich Babica, Director of Public Works
Nate Lander, Asst. Director of Public Works
Jose Ruiz, Manager of Electric Operations
11
PROFESSIONAL SERVICES AGREEMENT
THIS IS AN AGREEMENT made as of ____________2026, between CITY OF GENEVA, ILLINOIS (CLIENT)
and STANLEY CONSULTANTS, INC. (CONSULTANT). CLIENT intends to design Keslinger Road
Substation Upgrade (hereinafter called "project").
CLIENT and CONSULTANT agree:
1. Scope of Services. CONSULTANT shall perform professional services as stated in Exhibit 1.
2. Compensation. CLIENT shall compensate CONSULTANT for CONSULTANT's services as stated in
Exhibit 2.
3. Terms and Conditions. CONSULTANT shall provide professional services in accordance with the terms
and conditions stated in Exhibit 3. If client issues a purchase order or other document to initiate the
commencement of services hereunder, it is agreed that any terms and conditions appearing thereon shall
have no application and only the provisions of this Agreement shall automatically apply.
4. CLIENT has provided or shall provide for payment from one or more lawful sources of all sums to be paid
to CONSULTANT.
5. Following exhibits are attached to and made part of this Agreement:
Exhibit 1 - Scope of Services
Exhibit 2 - Compensation
Exhibit 3 - Standard Terms and Conditions
IN WITNESS WHEREOF, the parties below have executed this Agreement as of the day and year first above
written.
By: By:
Eric Kamm, Business Dev. Manager
Attest: Attest:
Philip E. Schulz, Project Manager
Address for giving notices: Address for giving notices:
STANLEY CONSULTANTS, INC. City of Geneva, Illinois
225 IOWA AVE. 22 South First Street
MUSCATINE, IA 52761 Geneva, IL 60134
If CLIENT is a public body, attach evidence of authority to sign and resolution or other document authorizing
execution of AGREEMENT.
SC2272 1299
Stanley Consultants 12
Engineering Services for Keslinger Road Substation Upgrade | Exhibit 1: Scope of Services
PROJECT UNDERSTANDING
The Keslinger Road substation upgrade will consist of the removal of existing 12 kV bus work, reclosures and control house. A new
switchgear/power distribution center (PDC) control building will be installed and will consist of a 12 kV main and four 12 kV circuit
breakers, with provision to expand 12 kV circuit breakers to a total of six, including relaying, RTU and related communications. Existing
circuits will be incorporated into the new PDC control building, and a new circuit will be added to support the Delnor Hospital Campus.
CONSULTANT will provide design and project management services for this project.
The following phases define CONSULTANT’s proposed approach to the project.
PHASE 1 PREDESIGN ACTIVITIES
Phase 1 will commence with the notice-to-proceed. During this Phase, all tasks required to be completed before detailed
design will be provided, for example data collection.
Task 1.1 General and Administrative
The objective of this task is to establish a clear understanding of the procedures to be adhered to throughout the project. Detailed task
descriptions, specific schedules, control and reporting methods and quality control programs will be developed and reviewed by all
concerned parties. This task will commence with a project kick-off meeting and continue throughout the project, with specific
deliverables being made on a mutually agreeable schedule.
Task 1.1.1 – Scheduling
A project design schedule using P6 will be developed and maintained by CONSULTANT. The design schedule identifying
Project Milestones, such as completion dates for deliverables, will be maintained.
Deliverable:
• Baseline Schedule and periodic Schedule updates
Task 1.1.2 – Status Reporting and Coordination Meetings
CONSULTANT will maintain contact with CLIENT to provide timely project status and coordination. Coordination meetings will
be scheduled during design to provide verbal updates on progress (anticipated 8 meetings). Significant issues will be
conveyed to CLIENT, in writing, as they arise.
Deliverables:
• Status Reports
• Virtual Coordination Meetings
• Meeting Notes
Task 1.1.3 – Review Meetings
CONSULTANT will maintain contact with CLIENT through teleconference meetings. The Scope of Work includes one
teleconference with CLIENT regarding each of the three procurement packages.
Deliverables:
• Virtual Review Meetings (three meetings)
• Meeting Notes
Task 1.1.4 – City/Council Meeting Attendance
CONSULTANT may, if requested, attend necessary City Council committee or other meetings to present professional
recommendations of award for contracts or to provide technical and progress updates.
Deliverables:
• City Council meeting(s) attendance
• Meeting presentation slides
Task 1.1.5 – Weekly Coordination Meetings
Due to complexity of this project and importance of schedule, CONSULTANT will hold weekly internal coordination meetings.
These will be held during the design stage, and used to coordinate work, schedule and submittals.
Stanley Consultants 13
Engineering Services for Keslinger Road Substation Upgrade | Exhibit 1: Scope of Services
Deliverable:
• Internal Coordination Meetings
Task 1.2 – Project Kick-Off
The project kick-off meeting will be held in person and will be attended by the CONSULTANT project manager and lead engineer.
Task 1.3 – Survey and Geotech
A Survey is not anticipated as the site falls within an existing substation. A geotechnical report may be needed and will be prepared by
others prior to detailed design for use in the foundation, grounding and grading design. A bid specification will be prepared by
CONSULTANT and provided to CLIENT to procure a geotechnical company to provide these documents.
Task 1.3.1 – Geotech
CONSULTANT will provide a technical specification and boring location sketch to CLIENT for procurement of a geotechnical
firm to provide soil boring report including soil resistivity and thermal measurements in the substation and distribution area for
use in design. CLIENT will procure geotechnical company and provide Geotech report to CONSULTANT for their use.
Deliverables:
• Geotech Specification
• Boring Location Sketch
Task 1.4 – Permitting Assistance
CONSULTANT does not anticipate permitting support as the work will occur within an existing substation and disturb less than an acre
of ground.
PHASE 2 SWITCHGEAR/PDC CONTROL BUILDING SPECIFICATIONS/PROCUREMENT PACKAGE
Phase 2 will commence after the notice-to-proceed has been received and will coincide with Phase 3. Technical
specifications and shop drawings review will be provided. EJCDC front-end documents will also be provided by
CONSULTANT.
Task 2.1 – Procurement Specifications
The objective of this task is to develop the technical and administrative specifications for use in procuring one new
prefabricated/prewired control building. Wiring exits will be via conduits from below. A one-line, building layout and switchgear
elevation will be provided with the specifications for bidding purposes.
Deliverables:
• Prefabricated/Prewired Control Building Technical Specifications
• One-Line, Building Layout and Switchgear Elevation
Task 2.2 – Bidding Services
CONSULTANT will provide construction bidding documents to CLIENT. The CLIENT will solicit bids from qualified control building
manufacturers. CONSULTANT services for this task include answering bidder questions, review and evaluation of bids received, and
recommendation of award.
Deliverables:
• Recommendation for Award of Control Building Contract
• Conformed Contract
Task 2.3 – Shop Drawing Review
CONSULTANT will review requested vendor and contractor submittals and stamp as “Reviewed,” “Reviewed as Noted,” “Resubmit,” or
“For Information Only.”
Deliverable:
• Prefab/Prewired Control Building Shop Drawing Review
Stanley Consultants 14
Engineering Services for Keslinger Road Substation Upgrade | Exhibit 1: Scope of Services
PHASE 3 SUBSTATION PACKAGE SPECIFICATIONS/PROCUREMENT PACKAGE
Phase 3 will commence after the notice-to-proceed has been received and will coincide with Phase 2. Technical
specifications and shop drawings review will be provided. EJCDC front-end documents will also be provided by
CONSULTANT. This Phase may be incorporated into Phase 4 to develop a construction material and labor contract.
Task 3.1 – Substation Package Specifications
The objective of this task is to develop the technical and administrative specifications for use in procuring necessary substation steel,
fittings and material to transition existing low-side overhead transformer connection to underground. A one-line, plan drawing and
elevation drawing of substation will be provided with the specification for use in bidding.
Deliverables:
• Steel Technical Specification
• Materials Technical Specification
• EJCDC Procurement Documents
• One-Line Diagram
• Plan and Elevation Drawings
Task 3.2 – Bidding Services
CONSULTANT will provide construction bidding documents to CLIENT. CLIENT will solicit bids from qualified package contractors.
CONSULTANT services for this task include issuing addenda, answering bidder questions, review and evaluation of bids received, and
recommendation of award.
Deliverables:
• Issue Addenda
• Recommendation for Award of Package Contract
• Conformed Contract
Task 3.3 – Shop Drawing Review
CONSULTANT will review requested vendor and contractor submittals and stamp as “Reviewed,” “Reviewed as Noted,” “Resubmit,” or
“For Information Only.”
Deliverables:
• Steel Computations and Shop Drawing Review
• Equipment and Material Shop Drawing Review
PHASE 4 SUBSTATION DESIGN/SPECIFICATIONS/CONSTRUCTION PACKAGE
Phase 4 will commence after Phases 2 and 3. Phase 3 may be incorporated into the construction package to achieve
potential cost and/or schedule efficiencies. Technical specifications and shop drawings review will be provided. EJCDC
front-end documents will also be provided by CONSULTANT.
Task 4.1 – Substation Construction Specifications
The objective of this task is to develop the technical and administrative specifications for use in constructing the substation. This will
include below-grade, structural and electrical design. Drawings provided from the vendors, as well as additional design drawings to aid
in construction will be part of the construction documents. Relay settings for new relays supplied in the PDC will be provided by
CONSULTANT. Set points for relay settings will be taken from the existing relays in the substation. Existing relay settings files to be
provided by CLIENT. Settings for the new Hospital feeder will be developed by CONSULTANT. The CONSULTANT will prepare
technical testing and commissioning specifications for use by the CLIENT in procuring an independent testing firm to test the
contractor’s work.
Deliverables:
• Foundation Technical Specification
• Construction Technical Specification
• EJCDC Contract Documents
• Vendor Drawings
• Design Drawings
Stanley Consultants 15
Engineering Services for Keslinger Road Substation Upgrade | Exhibit 1: Scope of Services
• Relay Settings
• Testing and Commissioning Specification
Task 4.2 – Bidding Services
CONSULTANT will provide construction bidding documents to CLIENT. CLIENT will solicit bids from qualified construction contractors.
CONSULTANT services for this task include attending a prebid meeting, issuing addenda, answering bidder questions, review and
evaluation of bids received, and recommendation of award.
Deliverables:
• Attend Prebid Meeting
• Issue Addenda
• Recommendation for Award of Construction Contract
• Conformed Contract
Task 4.3 – Shop Drawing Review
CONSULTANT will review requested contractor submittals and stamp as “Reviewed,” “Reviewed as Noted,” “Resubmit,” or “For
Information Only.” Submittals that are not requested by CONSULTANT will be returned “For Information Only”. Task includes
CONSULTANT’s single review of one full set of Material Shop Drawings.
Deliverable:
• Material Shop Drawing Review
PHASE 5 CONSTRUCTION SUPPORT
CONSULTANT will attend a construction kick-off meeting and perform a final walk-through inspection. CONSULTANT will
also provide office-based construction support and pay application reviews and recommendations.
Task 5.1 – Construction Kick-Off
The objective of this task is to conduct a construction kick-off meeting with CLIENT and awarded construction contractor at CLIENT’s
office for both the substation contract and the distribution contract. CLIENT, CONSULTANT and construction contractor will participate
in a site visit following the meeting.
Deliverables:
• Meeting Agenda
• Meeting Notes
Task 5.2 – Office-based Construction Support
The objective of this task is to provide office-based technical support to the construction contractor and CLIENT during construction.
CONSULTANT will review pay applications submitted by the contractor and make recommendations for payment. CONSULTANT will
also develop Instructions to Contractor (ITCs) and contract addenda during the construction process. CONSULTANT will maintain ITC
and Change Order Logs throughout the project for submittal with close-out documentation. CONSULTANT has included 40 hours for
this task.
Deliverables:
• Office-based technical support
• Pay Application recommendations for payment
• ITC and Addendum documentation
• ITC and Change Order Logs
Task 5.3 – Final Walk-Through Inspection
The objective of this task is to assist CLIENT in final on-site review of construction contractor’s work in accordance with the
specification. Punchlist items will be compiled into a final report to be given to construction contractor for correction. A final walk-
through will be performed for the substation contract.
Deliverables:
• Meeting Notes
• Punchlist
Stanley Consultants 16
Engineering Services for Keslinger Road Substation Upgrade | Exhibit 1: Scope of Services
PHASE 6 INSTALLATION RECORD DRAWINGS
In this Phase, CONSULTANT will create the Installation Record Drawings for the project by incorporating changes noted on
the construction drawings.
Task 6.1 – Record Drawings
The objective of this task will be to produce Installation Record Drawings for the substation by incorporating changes noted on the
construction drawings. The construction contractor will transmit one submittal of consolidated construction drawings with red-lines to
indicate changes to CONSULTANT. CONSULTANT will incorporate the changes as marked up by the contractor, and provide CLIENT
with final record drawings in MicroStation digital format.
Deliverable:
• Substation Installation Record Drawings
DELIVERABLE FORMAT AND DISTRIBUTION
Submittal of the design package deliverables, as listed above, will be made as outlined. All submittals shall be concurrently submitted
via email in electronic format as PDF files, plus paper submittals in accordance with the following table:
Phase Deliverables Number of Sets
Preliminary Design Electronic via Email or FTA Site 1
Bidding Documents Electronic via Email or FTA Site 1
Documents: 8-1/2” x 11” 2*
Drawings: 11” x 17” 2*
Conformed Documents
Drawings: Full Size, Stamped 2*
Electronic via Email or FTA Site 1
General Correspondence Electronic via Email and PDF Distribution, as appropriate
Notes: *Two hard copy sets of conformed documents consists of one set for CLIENT and one set for
20
vendor/manufacturer.
Documents will be provided in the following formats:
Documents Format Method of Transmittal
General Correspondence PDF Email
Specifications Microsoft Word (PDF) Email or via FTA Site
Review Drawings PDF Email or via FTA Site
Issued for Bidding (IFB) Drawings,
Scanned PDF*** FTA Site
PE Sealed**
PDF and MicroStation FTA Site
Record Drawings 1 full size and 3 half size paper Mailed or hand delivered
copies
Notes: **Issued for Bid Documents will be sealed by a Professional Engineer registered in the State of Illinois with
signature and date.
***The physically stamped drawings will be scanned to electronic format and issued as an Adobe PDF file for record.
MicroStation format drawings will not contain signatures.
Stanley Consultants 17
Engineering Services for Keslinger Road Substation Upgrade | Exhibit 1: Scope of Services
SCHEDULE
Final schedule will be developed at kickoff meeting and coordinated with the client throughout the project. Anticipated duration is 18
months after notice to proceed with the following milestone durations.
Milestone Duration Predecessor
Kick off meeting 1 day 1 week after NTP
Switchgear Bidding 3 weeks 8 weeks after kickoff
Packager Bidding 4 weeks 18 weeks after kickoff
Construction Bidding 4 weeks 21 weeks after kickoff
Project Completion 1 week 18 months after kickoff
WORK NOT INCLUDED IN PROPOSAL
Work not specifically listed in Project Approach is not included in the proposal provided by CONSULTANT. Specific exclusions of this
proposal are as follows:
• Geotechnical Investigation will be completed by others. CONSULTANT may subcontract this service if requested.
• Testing and Commissioning Services will be completed by others. CONSULTANT may subcontract this service if requested.
• Switchgear Schematics and Wiring Diagrams (by Switchgear/Control Building Vendor).
• Configuration Programing for RTU, Time Sync Clock, or Remote SCADA Control (provided by CLIENT).
ADDITIONAL SERVICES
CONSULTANT can, at CLIENT’s request, provide assistance in items stated in the “Work Not Included in Proposal” section above.
Additional services authorized in writing by CLIENT and accepted by CONSULTANT will be compensated as mutually agreed upon.
Stanley Consultants 18
Engineering Services for Keslinger Road Substation Upgrade | Exhibit 2: Compensation
COMPENSATION
Based on the services identified in Exhibit 1 – Scope of Services, Phases 1 through 7, the CONSULTANT will provide professional
services on an Hourly Fee and Expense basis with a not-to-exceed fee of Three Hundred Fifty-Four Thousand Seventy-two Dollars
($354,072).
Invoices will be submitted monthly for time and expenses incurred during the month based on the attached hourly fee schedule and
expenses.
Below is an estimated breakout of the hours for this project.
Estimated Hours
Keslinger Road Substation Upgrade
Labor Hours
Philip Schulz (BC19) 393
Nate Pierson (BC14) 12
John Sovers (BC21) 12
Holly Rudolph (BC3) 25
Mandy Hoag (BC5) 30
Jaime Guzman (BC23) 15
Mike Clark (BC17) 107
John Kremer (BC17) 4
Emily McCormick (BC10) 11
Eric Cole (BC13) 12
Seth Weiss (BC11) 663
Stephanie Worrell (BC8) 220
Total Hours 1504
T&E Fee(w/ expenses) $ 354,072.00
19
1. CLIENT'S RESPONSIBILITIES
1.1 Name CLIENT's representative with authority to receive information and transmit instructions for CLIENT.
1.2 Provide CLIENT's requirements for project, including objectives and constraints, design and construction
standards, bonding and insurance requirements, and contract forms.
1.3 Provide available information pertinent to project upon which CONSULTANT may rely.
1.4 Arrange for access by CONSULTANT upon public and private property, as required.
1.5 Examine documents presented by CONSULTANT, obtain legal and other advice as CLIENT deems appropriate,
and render written decisions within reasonable time.
1.6 Obtain consents, approvals, licenses, and permits necessary for project.
1.7 Advertise for and open bids when scheduled.
1.8 Provide services necessary for project but not within scope of CONSULTANT's services.
1.9 Indemnify CONSULTANT, its employees, agents, and consultants against claims arising out of CONSULTANT's
design, if there has been a deviation from the design beyond the CONSULTANT's control or failure to follow
CONSULTANT's recommendation and such deviation or failure caused the claims.
1.10 Promptly notify CONSULTANT when CLIENT learns of contractor error or any development that affects scope or
timing of CONSULTANT's services.
1.11 Nothing in this agreement shall create a fiduciary duty between the parties.
2. PERIOD OF SERVICE
2.1 CONSULTANT is not responsible for delays due to factors beyond its control.
2.2 If CLIENT requests changes in project, compensation for and time of performance of CONSULTANT's services
shall be adjusted appropriately.
3. CONSTRUCTION COST AND COST ESTIMATES
3.1 Construction Cost. Construction cost means total cost of entire project to CLIENT, except for CONSULTANT's
compensation and expenses, cost of land, rights-of-way, legal and accounting services, insurance, financing charges,
and other costs which are CLIENT's responsibility as provided in this Agreement.
3.2 Cost Estimates. Since CONSULTANT has no control over cost of labor, materials, equipment, or services
furnished by others, over contractors' methods of determining prices, or over competitive bidding or market conditions,
its estimates of project construction cost will be made on the basis of its employees' experience and qualifications and
will represent their best judgment as experienced and qualified professionals, familiar with the construction industry.
CONSULTANT does not guarantee that proposals, bids, or actual construction cost will not vary from its estimates of
project cost.
4. GENERAL
4.1 Termination.
4.1.1 Either party may terminate their obligation to provide further services upon twenty (20) days' written notice, after
material default by other party through no fault of terminating party.
4.1.2 CLIENT may terminate CONSULTANT's obligation to provide further services upon twenty (20) days' written
notice if project is abandoned. In such event, progress payments due to CONSULTANT for services rendered plus
unpaid reimbursable to expenses, shall constitute total compensation due.
4.2 Reuse of Documents.
20
4.2.1 All tangible items prepared by CONSULTANT are instruments of service, and CONSULTANT retains all
copyrights. CLIENT may retain copies for reference, but reuse on another project without CONSULTANT's written
consent is prohibited. CLIENT will indemnify CONSULTANT, its employees, agents, and consultants against claims
resulting from such prohibited reuse. Said items are not intended to be suitable for completion of this project by others.
4.2.2 Submittal or distribution of items in connection with project is not publication in derogation of CONSULTANT's
rights.
4.2.3 Confidentiality. Each party acknowledges that in connection with this Agreement it may receive certain
confidential or proprietary technical and business information and materials of the other party (“Confidential
Information”). Each party, its agents and employees shall hold and maintain in strict confidence all Confidential
Information, shall not disclose Confidential Information to any third party, and shall not use any Confidential Information
except as may be necessary to perform its obligations under the agreement except as may be required by a court or
governmental authority. CLIENT and CONSULTANT shall keep all information and communications related to the
project confidential in the same manner each party protects its own confidential information, to the extent that it is
marked “proprietary” or “confidential or with a similar label or which by the nature of the information generally would be
regarded as proprietary or confidential. This clause shall not apply to information that is previously known by either
party, lawfully becomes public knowledge, or is required to be disclosed by law or a court order. CONSULTANT shall
be allowed to use non-confidential information on the project, including CLIENT name, project location, and project
details for marketing purposes.
4.3 Payment.
4.3.1 CONSULTANT shall submit a monthly statement for services rendered and reimbursable expenses incurred.
CLIENT shall make prompt monthly payments.
4.3.2 If CLIENT fails to make payment within thirty (30) days after receipt of statement, interest at maximum legal rate
or at a rate of 18%, whichever is less, shall accrue; and, in addition, CONSULTANT may, after giving seven (7) days'
written notice, suspend services until it has been paid in full all amounts due it.
4.3.3 CLIENT has provided or shall provide for payment from one or more lawful sources of all sums to be paid to
CONSULTANT.
4.3.4 CONSULTANT's compensation shall not be reduced on account of any amounts withheld from payments to
contractors.
4.3.5 If services performed by CONSULTANT are subject to state or local sales taxes, said taxes will be reflected in
the invoices and remitted according to state law. If CLIENT claims a status that would make the transaction exempt,
then CLIENT shall provide appropriate proof of exempt status to CONSULTANT.
4.4 Controlling Law. Agreement shall be governed by the law of the State where the project is located, excluding its
choice of law rules. Jurisdiction shall similarly be where the project is located.
4.5 Successors and Assigns.
4.5.1 The parties bind themselves, their successors, and legal representatives to the other party and to successors
and legal representatives of such other party, in respect to all covenants and obligations of this Agreement.
4.5.2 Neither party shall assign, sublet, or transfer any interest in this Agreement without written consent of the other,
provided CONSULTANT may employ such independent consultants, associates, and subcontractors as it may deem
appropriate.
4.5.3 Nothing in this Agreement shall be construed to give any rights or benefits to anyone other than the parties.
4.6 CONSULTANT's Accounting Records. Records of CONSULTANT's personnel time, reimbursable expenses,
and accounts between parties shall be kept on a generally-recognized accounting basis.
4.7 Separate Provisions. If any provisions of this Agreement shall be held to be invalid or unenforceable, remaining
provisions shall be valid and binding.
21
4.8 Waiver. No waiver shall constitute a waiver of any subsequent breach.
4.9 Warranty.
4.9.1 CONSULTANT shall use reasonable care to reflect requirements of all applicable laws, rules, or regulations of
which CONSULTANT has knowledge or about which CLIENT specifically advises in writing, which are in effect on date
of Agreement. CONSULTANT INTENDS TO RENDER SERVICES IN ACCORDANCE WITH GENERALLY
ACCEPTED PROFESSIONAL STANDARDS AT THE TIME SERVICES ARE PERFORMED, BUT NO OTHER
WARRANTY IS EXTENDED, EITHER EXPRESS OR IMPLIED, IN CONNECTION WITH SUCH SERVICES. CLIENT's
rights and remedies in this Agreement are exclusive.
4.9.2 CONSULTANT shall not be responsible for contractors' construction means, methods, techniques, sequences,
or procedures, or for contractors' safety precautions and programs, or for contractors' failure to perform according to
contract documents.
4.9.3 The CONSULTANT believes that any computer software provided under this Agreement is suitable for the
intended purpose, however, it does not warrant the suitability, merchantability, or fitness for a particular purpose of this
software.
4.9.4 Subject to the standard of care set forth in Paragraph 4.9.1, CONSULTANT and its Subconsultants may use or
rely upon design elements, work, and information ordinarily or customarily furnished by others, including, but not limited
to, CLIENT or his authorized representatives, public record, specialty contractors, manufacturers, suppliers, and
publishers of technical standards.
4.10 Period of Repose. Any applicable statute of limitations or repose shall commence to run and any alleged cause
of action shall be deemed to have accrued not later than completion of services to be performed by CONSULTANT.
4.11 Indemnification. To the fullest extent permitted by law, CONSULTANT shall indemnify and hold harmless
CLIENT, CLIENT's officers, directors, partners, and employees from and against any and all third party claims for
bodily injury and for damage to tangible property to the extent caused by the negligent acts or omissions of
CONSULTANT or CONSULTANT's officers, directors, partners, employees, agents, and CONSULTANT's consultants
in the performance and furnishing of CONSULTANT's services under this Agreement. Any indemnification shall be
limited to the terms and amounts of coverage of the CONSULTANT's insurance policies and Section 4.12, Limitation
of Liability.
To the fullest extent permitted by law, CLIENT shall indemnify and hold harmless CONSULTANT, CONSULTANT's
officers, directors, partners, employees, and agents and CONSULTANT's consultants from and against any and all
third party claims for bodily injury and for damage to tangible property to the extent caused by the negligent acts or
omissions of CLIENT or CLIENT's officers, directors, partners, employees, agents, and CLIENT's consultants with
respect to this Agreement on the Project. In addition to the indemnity provided under this section, and to the fullest
extent permitted by law, CLIENT shall indemnify and hold harmless CONSULTANT and its officers, directors, partners,
employees, and agents and CONSULTANT's consultants from and against all claims, costs, losses, and damages
(including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all
court or arbitration or other dispute resolution costs) caused by, arising out of, or relating to the presence, discharge,
release, or escape of asbestos, PCBs, petroleum, hazardous waste, or radioactive material at, on, under, or from the
Project site.
4.12 Limitation of Liability. TO THE FULLEST EXTENT PERMITTED BY LAW, AND NOTWITHSTANDING ANY
OTHER PROVISION OF THIS AGREEMENT, THE TOTAL LIABILITY, IN THE AGGREGATE, OF THE CONSULTANT
(INCLUDING ITS OFFICERS, DIRECTORS, EMPLOYEES, AGENTS AND SUBCONSULTANTS), TO CLIENT AND
ANYONE CLAIMING BY, THROUGH OR UNDER CLIENT, FOR ANY AND ALL CLAIMS, LOSSES, COSTS, OR
DAMAGES WHATSOEVER ARISING OUT OF, RESULTING FROM, OR IN ANY WAY RELATED TO THE
PERFORMANCE OF SERVICES UNDER THIS AGREEMENT FROM ANY CAUSES, INCLUDING BUT NOT LIMITED
TO NEGLIGENCE, PROFESSIONAL ERRORS OR OMISSIONS, OR WARRANTEES EXPRESSED OR IMPLIED,
OF CONSULTANT OR CONSULTANT’S CONSULTANTS, SHALL NOT EXCEED $50,000.00 OR THE TOTAL
COMPENSATION RECEIVED BY CONSULTANT FOR THE PROJECT, WHICHEVER IS GREATER. THIS
LIMITATION INCLUDES LIABILITY UNDER SECTION 4.11. IN NO EVENT SHALL CONSULTANT BE LIABLE TO
CLIENT FOR ANY INDIRECT, SPECIAL, INCIDENTAL, PUNITIVE, OR CONSEQUENTIAL DAMAGES OF ANY KIND
ARISING OUT OF OR RELATED TO THIS AGREEMENT.
22
4.13 Extent of Agreement. This Agreement represents the entire agreement between the parties and may be
amended only by written instrument signed by both parties.
4.14 INSURANCE. CONSULTANT shall purchase and maintain insurance for the coverages and for not less than the
limits of liability set forth below:
(a) Workers' Compensation: workers' compensation insurance as required by the laws of the states or countries with
jurisdiction of the services to be performed, including employer's liability insurance, with a limit of $1,000,000 per
accident.
(b) Commercial General Liability: commercial general liability, including coverage for all premises, operations,
operations of independent contractors, products and completed operations, and contractual liability. Coverage shall
have limits of not less than $1,000,000 for each occurrence and aggregate.
(c) Commercial Automobile Liability: commercial automobile liability covering the use of all owned, non-owned, and
hired automobiles with minimum combined single limits of $1,000,000.
(d) Professional Liability: professional liability insurance for claims arising out of performance of professional services
caused by any negligent error, omission, or act for which the insured is legally liable, with a minimum limit of $1,000,000,
to be kept in force for two (2) years after completion of project.
CONSULTANT shall provide certificates or other evidence from insurance carriers of the required insurance coverages,
if requested by CLIENT in writing within 30 days of start of performance. All insurance except workers’ compensation
and professional liability shall designate CLIENT as additional insured.
(e) Cyber Liability: Data Breach and Privacy/Cyber Liability Insurance in a limit of not less than $1,000,000 per
occurrence.
4.15 Subrogation Waiver. The parties waive all rights against each other, and against contractors, consultants,
agents, and employees of the other for
damages covered by any property insurance during construction, and each shall require similar waivers from their
contractors, consultants, and agents.
4.16 Force Majeure. Parties will not be liable for delays in delivery or for failure to perform obligations, other than
payment, due to causes beyond their reasonable control, including, but not limited to, product allocations, material
shortages, labor disputes, transportation delays, unforeseen circumstances, acts of God, acts or omissions of other
parties, acts or omissions of civil or military authorities, government priorities, fire, strikes, floods, epidemics, quarantine
restrictions, riots, terrorists acts, or war. CONSULTANT's time for delivery or performance will be automatically
extended by the period of such delay or CONSULTANT may, at its option, cancel any services, in whole or in part,
without liability by giving notice to CLIENT.
4.17 EQUAL EMPLOYMENT OPPORTUNITY CLAUSE. When applicable, the CONSULTANT and
SUBCONSULTANT shall abide by the requirements of 41 CFR 60-1.4(a), 60-300.5(a), 60-741.5(a) and Appendix
A of Subpart A of 29 CFR 471. These regulations prohibit discrimination against qualified individuals based on
their status as protected veterans or individuals with disabilities, and prohibit discrimination against all
individuals based on their race, color, religion, sex, or national origin. Moreover, these regulations require that
covered prime CONSULTANTS and SUBCONSULTANTS take affirmative action to employ and advance in
employment individuals without regard to race, color, religion, sex, national origin, protected veteran status
or disability.
4.18 FLORIDA PROJECTS ONLY - NO EMPLOYEE OR AGENT OF CONSULTANT IS A PARTY TO THIS
CONTRACT. PURSUANT TO FLORIDA STATUTE 558.0035, AN INDIVIDUAL EMPLOYEE OR AGENT OF
CONSULTANT MAY NOT BE HELD INDIVIDUALLY LIABLE FOR NEGLIGENCE OCCURING WITHIN THE COURSE
AND SCOPE OF THIS CONTRACT. CONSULTANT MAINTAINS PROFESSIONAL LIABILITY INSURANCE AS
REQUIRED UNDER THIS CONTRACT AND ANY DAMAGES ARE SOLEY ECONOMIC IN NAUTRE AND THE
DAMAGES DO NOT EXTEND TO PERSONAL INJURIES OR PROPERTY NOT SUBJECT TO THE CONTRACT.
23
Hourly Rates
Compensation for office-based personnel in the U.S. for time in the performance of the work, including
travel time, shall be in accordance with the following Hourly Rates.
Client City of Geneva
Description Misc Services BC rates when billed as BC Rate
Location 03 N/A
Hourly Rates subject to revision on or after . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. .03. Apr 2027
Billing Category* Hourly Rate
BC-02 $75.00
BC-03 $89.00
BC-04 $103.00
BC-05 $116.00
BC-06 $130.00
BC-07 $144.00
BC-08 $157.00
BC-09 $171.00
BC-10 $185.00
BC-11 $198.00
BC-12 $212.00
BC-13 $226.00
BC-14 $239.00
BC-15 $253.00
BC-16 $267.00
BC-17 $280.00
BC-18 $294.00
BC-19 $308.00
BC-20 $321.00
BC-21 $335.00
* Representative Labor Classifications for each BC can be provided upon request
Printed 4/22/2026
24
SCHEDULE OF CHARGES
Fiscal Year 2026-2027
I. Compensation for items of expense and other charges incurred in connection with the performance of the
work shall be in accordance with the following schedule:
Automobile $0.79/mile
Ground Transportation (rental car, taxi, etc.) At Cost Plus 10%
Air Travel (commercial and charter) At Cost Plus 10%
Equipment Rental At Cost Plus 10%
II. Reprographics:
Copying
Black/white copies: 1-100 $0.17 for 8.5 x 11 $0.35 for 11 x 17
Color Copies: 1-100 copies $0.42 for 8.5 x 11 $0.72 for 11 x 17
Bindery
Manual Process $68/hour
Mechanical Process $45/hour
III. Large Format Engineer Drawings:
Large Format color plots $0.83 per sq. ft.
Large Format B/W up to 100 Sq. Ft. $0.35 per sq. ft.
Scan to File Service – Large Format over 17 In.
1-25
26-100 $1.76/scan
100+ $0.90/scan
IV. Compensation for purchases, items of expense, and other charges not scheduled above, incurred in
connection with the performance of the work, shall be at cost plus 10%.
V. Subconsultant fees will be filled with the addition of a contract management and risk markup of not
more than 10%. Subconsultant markups will be stated and agreed to ahead of engagement.
VI. Charges are subject to revision on or after April 3, 2027.
Page 1 of 1
25
AGENDA ITEM EXECUTIVE SUMMARY
Agenda Item: E. State Street Lead & Galvanized Water Service Line Replacement
Presenter & Title: Bob Van Gyseghem, Superintendent of Water & Wastewater
Date: August 3, 2026
Please Check Appropriate Box:
☒ Committee of the Whole Meeting ☐ Special Committee of the Whole Meeting
☒ City Council Meeting ☐ Special City Council Meeting
☐ Public Hearing ☐ Other -
Associated Strategic Plan Goal/Objective: QIS-III
Budgeted? ☒ Yes Other ☐ Yes
Estimated Cost: $324,360.00
☐ No Funding? ☐ No
Executive Summary:
The FY27 budget has funds for the replacement of private side lead and galvanized water services on E. State as
part of the reconstruction. The project will include the installation of water services from the Right-of-Way to the
water meter. Staff is aware of nine (9) lead and galvanized water services, however the bid includes up to twenty
(20) replacements. A bid was placed in the Daily Herald and on the City Web Site. Two (2) bids were received on
July 13th with the low bid provided by IHC Construction Companies LLC. Staff is recommending that a 10%
contingency be included in the overall not-to-exceed amount to account for any unforeseen field changes that may
occur. Any field changes (Change Orders) must be approved by the City Administrator to be applied to the
contingency.
Attachments: (please list)
• Resolution
• Bid Summary
• Bid Form
Voting Requirements:
This motion requires a simple majority of affirmative votes for passage. (City Council Only)
The Mayor may vote on three occasions: (a) when the vote of the alderpersons has resulted in a tie; (b)
when one half of the alderpersons elected have voted in favor of an ordinance, resolution, or motion
even though there is no tie vote; or (c) when a vote greater than a majority of the corporate authorities is
required by state statute or local ordinance to adopt an ordinance, resolution, or motion.
Recommendation / Suggested Action: (how the item should be listed on agenda)
Recommend approval of a Resolution authorizing the City Administrator to enter into a contract with
IHC Construction Companies LLC at a cost of $324,360.00 and allow the City Administrator to approve
up to $32,436.00 in change orders for a total not-to-exceed amount of $356,796.00
26
RESOLUTION NO. 2026-__
RESOLUTION AUTHORIZING CONTRACT FOR
E. State Street Lead & Galvanized Water Service Line Replacement
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF GENEVA, KANE
COUNTY, ILLINOIS, as follows:
SECTION 1: That the City Administrator is hereby authorized to approve, on behalf of the
City of Geneva, a contract with IHC Construction Companies LLC for lead & galvanized water
service replacements on E. State Street.
SECTION 2: This Resolution shall become effective from and after its passage as in
accordance with law.
PASSED by the City Council of the City of Geneva, Kane County, Illinois, this ____ day of
_________, 2026
AYES: __ NAYS: __ ABSENT: __ ABSTAINING: __ HOLDING OFFICE: __
Approved by me this ____ day of __________, 2026.
Mayor
ATTEST:
City Clerk
27
City of Geneva
Summary of Bids
Name of Project: Lead Service Line Replacement E. State Recorded By: Bob Van Gyseghem
Opened By: Jennifer Milewski Date/Time: 7-13-2026 10:00 AM
Approved Engineer Estimate/ Budget : $
BID BOND % TYPE OF PAYMENT FOR BID
CONTRACTOR NAME BID PRICE REMARKS ADDENDUM
OF PRICE BOND
10%
IHC Construction
$16,400.00/Each
Private Side Less Than 50-Feet
$15,626.00/Each
Private Side Greater Than 50-Feet
$205/Each
Interior Ball Valve
$324,360.00
Total Bid
10%
Trine Construction
$17,768.80/Each
Private Side Less Than 50-Feet
$19,006.60/Each X
Private Side Greater Than 50-Feet
$1,722.30/Each
Interior Ball Valve
$402,200.00
Total Bid
28
29
30
31
32
33
AGENDA ITEM EXECUTIVE SUMMARY
Fuel Purchasing – SPC Joint Purchasing Program (RFP #230) / Al Warren Oil
Agenda Item:
Co., Inc.
Presenter & Title: Dan Javed; Superintendent of Streets and Fleet
Date: July 20, 2026
Please Check Appropriate Box:
☒ Committee of the Whole Meeting ☐ Special Committee of the Whole Meeting
☒ City Council Meeting ☐ Special City Council Meeting
☐ Public Hearing ☐ Other -
Associated Strategic Plan Goal/Objective:SGII
Fiscal Responsibility – Leverage cooperative purchasing to reduce costs on essential municipal fuel
services.
Budgeted? ☒ Yes Other ☐ Yes
Estimated Cost: N/A
☐ No Funding? ☐ No
If “Other Funding,” please explain how the item will be funded:
Executive Summary:
The City of Geneva is seeking City Council approval to purchase gasoline and diesel from Al Warren Oil
through the Suburban Purchasing Cooperative (SPC).
Pricing Structure (per gallon, net taxes): Pricing is based on the daily OPIS Chicago Index Low Rack
rate plus a fixed contractor profit/overhead markup. Three delivery volume tiers apply: under 2,500
gallons ($0.200 markup); 2,500–6,000 gallons ($0.110 markup); and over 6,000 gallons ($0.044 markup).
Benefit to the City: Participation in the SPC joint purchasing program allows the City of Geneva to
benefit from competitively bid, volume-based fuel pricing without the administrative burden of
conducting monthly requests for pricing. This cooperative purchasing approach aligns with the City’s
commitment to responsible stewardship of public funds.
Attachments: (please list)
• Resolution
• SPC RFP #230 Pricing Schedule – Al Warren Oil Co., Inc.
• 2026–2027 Fuel Renewal Agreement with SPC (signed)
Voting Requirements:
This motion requires a simple majority of affirmative votes for passage. (City Council Only)
The Mayor may vote on three occasions: (a) when the vote of the alderpersons has resulted in a tie; (b)
when one half of the alderpersons elected have voted in favor of an ordinance, resolution, or motion even
though there is no tie vote; or (c) when a vote greater than a majority of the corporate authorities is
required by state statute or local ordinance to adopt an ordinance, resolution, or motion.
Recommendation / Suggested Action: (how the item should be listed on agenda)
Recommendation to approve purchase of fuel exclusively through Al Warren Oil utilizing SPC Fuel
Contract #230 through July 5, 2027, under the terms and pricing established in SPC RFP #230.
34
RESOLUTION NO. 2026-
RESOLUTION AUTHORIZING PURCHASE OF FUEL FROM
Al Warren Oil Co., Inc. through SPC Fuel Contract #230
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF GENEVA, KANE
COUNTY, ILLINOIS, as follows:
SECTION 1: That the City Administrator, the Director of Public Works, the Assistant
Director of Public Works, and the Superintendent of Streets and Fleet are each hereby authorized to
purchase, on behalf of the City of Geneva, gasoline and diesel fuel from Al Warren Oil Co., Inc.
utilizing SPC Fuel Contract #230, under the terms and pricing established in SPC RFP #230, through
July 5, 2027.
SECTION 2: This Resolution shall become effective from and after its passage as in
accordance with law.
PASSED by the City Council of the City of Geneva, Kane County, Illinois, this 3rd day of
August, 2026
AYES: __ NAYS: __ ABSENT: __ ABSTAINING: __ HOLDING OFFICE: __
Approved by me this ____ day of __________, 2026.
Mayor
ATTEST:
City Clerk
35
SPC RFP #230 PRICING AL WARREN OIL
ESTIMATED UNIT QUANTIY 100,000 <6,000 gallons 2,500 - 6,000 gallons >2,500 gallons
Extended Extended
01 87 Octane-Deliveries UOM
Unit Price Extended Price Unit Price Price Unit Price Price
OPIS Chicago Index Low Rack 2.5930 Gallon $ $ $ $ $ $
Profit/Overhead ________Gallon $ 0.0440 $ $ 0.1100 $ $ 0.2000 $
Total Cost/gallon (Net Taxes) ________Gallon $ 2.6370 $ 263,700.00 $ 2.7030 $ 270,300.00 $ 2.7930 $ 279,300.00
03 89 Octane-Deliveries
OPIS Chicago Index Low Rack 2.7897 Gallon $ $ $ $ $ $
Profit/Overhead ________Gallon $ 0.0440 $ $ 0.1100 $ $ 0.2000 $
Total Cost/gallon (Net Taxes) ________Gallon $ 2.8334 $ 283,370.00 $ 2.8997 $ 289,970.00 $ 2.9897 $ 298,970.00
05 93 Octane-Deliveries
OPIS Chicago Index Low Rack 3.0591 Gallon $ $ $ $ $ $
Profit/Overhead ________Gallon $ 0.0440 $ $ 0.1100 $ $ 0.2000 $
Total Cost/gallon (Net Taxes) ________Gallon $ 3.1031 $ 310,310.00 $ 3.1691 $ 316,910.00 $ 3.2591 $ 325,910.00
04 Grade #2 Diesel Fuel-Deliveries
OPIS Chicago Index Low Rack 2.4405 Gallon $ $ $ $ $ $
Profit/Overhead ________Gallon $ 0.0440 $ $ 0.1100 $ $ 0.2000 $
Total Cost/gallon (Net Taxes) ________Gallon $ 2.4845 $ 248,450.00 $ 2.5505 $ 255,050.00 $ 0.2641 $ 264,050.00
05 Winter Mixture, 30% & 70% Grad Deliveries
OPIS Chicago Index Low Rack 2.4935 Gallon $ $ $ $ $ $
Profit/Overhead ________Gallon $ 0.0440 $ $ 0.1100 $ $ 0.2000 $
Total Cost/gallon (Net Taxes) ________Gallon $ 2.5375 $ 253,750.00 $ 2.6035 $ 260,350.00 $ 2.6935 $ 269,350.00
06 Grade #1 Diesel Fuel-Deliveries
OPIS Chicago Index Low Rack 2.6173 Gallon $ $ $ $ $ $
Profit/Overhead ________Gallon $ 0.0440 $ $ 0.1100 $ $ 0.2000 $
36
Total Cost/gallon (Net Taxes) ________Gallon $ 2.6613 $ 266,130.00 $ 2.2727 $ 272,730.00 $ 2.8173 $ 281,730.00
*07 E75 Ethanol-Deliveries
OPIS Chicago Index Low Rack 2.1721 Gallon $ $ $ $ $ $
Profit/Overhead ________Gallon $ 0.0440 $ $ 0.1100 $ $ 0.2000 $
Total Cost/gallon (Net Taxes) ________Gallon $ 2.2152 $ 221,520.00 $ 2.2812 $ 228,120.00 $ 2.3712 $ 237,120.00
*No OPIS price shown
used OPIS Low E-85 & 2.1561
OPIS Low-E-65 2.1863
4.3424 /2 = $2.1712
08 E85 Ethanol-Deliveries
OPIS Chicago Index Low Rack 2.1561 Gallon $ $ $ $ $ $
Profit/Overhead ________Gallon $ 0.0440 $ $ 0.1100 $ $ 0.2000 $
Total Cost/gallon (Net Taxes) ________Gallon $ 2.2001 $ 220,010.00 $ 2.2661 $ 226,610.00 $ 2.3561 $ 235,610.00
TOTAL
37
38
Get email alerts for Geneva
A daily email when new agendas and minutes are posted.