Historic Preservation Commission
Regular MeetingGeneva, IL · September 16, 2014
Minutes
HISTORIC PRESERVATION COMMISSION MINUTES
109 James Street - Council Chambers
Geneva, Illinois 60134
September 16, 2014, 7:00 p.m.
1. Call to Order
Chairman Roy called to order the September 16, 2014 meeting of the Geneva Historic
Preservation Commission.
2. Roll Call
Present HPC: Chairman Roy; Commissioners Abplanalp, Andersson, Hiller, Salomon,
Zellmer, Zinke
Absent: None
Staff Present: Preservation Planner Lambert; Community Development Dir. Untch
Others Present: Ms. Rachel Johnson, 318 N. 4th St., Geneva; Mr. Tad Hemming with
Hemming Construction; Ms. Mara Hauser with 25 N. Community Co-
Working; Mr. Ken Overstreet with Avondale Custom Homes; Ms. Liz
Safanda with Preservation Partners, 1013 Dunstan, Geneva; Mr. Marty
Smircich, 909 S. Batavia Ave., Geneva; Mr. Jim Kautz, 1305 S. Batavia
Ave., Geneva; Recording Secretary Celeste Weilandt
3. Approval of the July 15, 2014 Minutes. Motion by Hiller, seconded by Zinke to approve
the July 15, 2014 minutes. Motion carried by voice vote of 3-0-4 (Abstain: Abplanalp, Salomon,
Zellmer, Zinke)
Approval of the August 19, 2014 Minutes. Changes included to consistently use the
word “Chair” to represent Chairwoman or Chairman throughout the minutes; Page 3, last
paragraph, concerning the comments made by Mr. Patzelt stating that the home had neglect
issues when Shodeen purchased it, Commissioner Hiller requested to add the following verbiage
“When Mr. Patzelt was asked how long Shodeen owned the building, Mr. Patzelt indicated 7
years.” Motion made by Abplanalp, seconded by Hiller to approve the August 19, 2014
minutes, with changes. Motion carried. Vote: 5-0-2 (Roy and Salomon abstain)
New commissioner, Mr. Salomon was introduced and shared why he joined the Historic
Preservation Commission.
4. HPC Review of Building Permit Application
A. 227 S. Third Street – BHBB, LLC (Coleman Land Co.) – Door Replacement -
Mr. Lambert reported this matter came before the commission but another new application was put
in for the replacement of two additional doors. One door does not require HPC review. The doors
located at the far southeast corner of the building are being requested to be replaced with the
same type of doors that have been replaced elsewhere.
On behalf of the owner, Mr. Tad Hemming, with Hemming Construction, stated that nothing
has changed and the proposed door would be a single door with no sidelights. Per questions,
Mr. Lambert stated the spec sheet from the door company did not reflect the double door and,
Historic Preservation Commission
September 16, 2014
instead, lumped the doors all in one specification, with options available, which was the only
specification offered by the door company. Mr. Hemming confirmed the door would fit within the
doorway opening. Motion by Hiller, seconded by Zellmer to approve the request for door
replacement, as presented. Roll call:
Aye: Andersson, Hiller, Salomon, Abplanalp, Zinke, Zellmer, Roy
Nay: None MOTION CARRIED. VOTE: 7-0
B. 228 N. Fifth Street – (Susan Cunningham, Owner) New Street Yard Fence. – The
applicant was not present and Mr. Lambert explained the case was straight forward as far as
material. The request was for a new street yard fence, 42 inches high. The proposal met all
zoning requirements and was not located in the visibility triangle. The fence was a stock cedar
picket fence and ran just for a corner portion of the street yard. Per Mr. Lambert, the fence is being
installed for the safety of a young child. Mr. Lambert clarified for commissioners the exact location
of the fence and its length. He further explained that there will be a transition of the fence height
from six feet to the new 42” inch fence. Motion by Andersson, seconded by Hiller to approve
the fence request for 228 N. Fifth Street. Roll call:
Aye: Andersson, Hiller, Salomon, Abplanalp, Zinke, Zellmer, Roy
Nay: None MOTION CARRIED. VOTE: 7-0
C. 21 N. Third Street – (Ashland Ventures) Mara Hauser with 21 N. Community
Coworking – Façade Renovations – Petitioner, Ms. Mara Hauser introduced herself and stated she
is the manager/founder of 25 Community CoWorking; however the corporate company was called
Catalyst Company. Ashland Ventures was the building owner and was the primary tenant.
Ms. Hauser explained that 25 CoWorking is a workplace and meeting space for freelancers and
contractors and she is proposing to highlight the building and return it to the description used in a
1954 Geneva Republican (July 22, 1954) news article. Historic photos of the original building were
presented on the overhead. Ms. Hauser described how the building changed over the years.
Examples of other Mid-Century Modern commercial buildings were then shown. Ms. Hauser
explained that the current drive-through area will have green space/sitting area, the parking lot will
be enhanced, and the building’s materials will include wood looking panels (constructed by Long
Board in light cherry tone) replacing the current stucco. The angular teller window and original
pylons of the building will remain. A pergola will be created next to the teller window and brought
into the design of the sitting space. Elevations followed.
Continuing, the Third Street elevation will return more architectural linear geometry to the
building by using wood-toned siding. The roof will be repaired and windows will be added to the
south elevation. The brick will be repainted and the brown will be left natural. Detailed plans of the
proposed paver patio (Geneva brick) and pergola were shown.
Ms. Hauser discussed that she was looking to adjust the hue of the LED lighting for the
building and explained that the plan was to have the pylon on both sides with the words “25N
CoWorking) with some vinyl graphics on the windows. Per a question about a sign permit,
Mr. Lambert confirmed that the applicant would be returning with a sign permit. Regarding the
pergola area, Ms. Hauser shared that it would be used for the users of the building and not for the
public. Commissioner Andersson cautioned Ms. Hauser that the public may view that as a public
space. Andersson suggested using a butterfly shape to the roof to provide some angular design,
wherein Ms. Hauser explained that angles that would come from the pergola and also the teller
window. Per another question, the pergola would be steel with the cross beams made out of
timber and the fins steel slotted into those. The goal was to open by January 5, 2015.
2
Historic Preservation Commission
September 16, 2014
Mr. Lambert reminded the commissioners that this application was for the site work, facade,
and the pergola and was weather-driven. The painting did not require a permit. An explanation of
the parking lot work and the installation of the proposed barrier curb followed. Ms. Hauser
indicated that she was in discussions with a bank to install a future ATM machine. Per another
question, Ms. Hauser said the landscaping plan was not completed but she envisioned having
perennials mixed with annuals and some grasses.
Motion by Zinke, seconded by Andersson to approve the proposal as presented.
Roll call:
Aye: Andersson, Hiller, Salomon, Abplanalp, Zinke, Zellmer, Roy
Nay: None MOTION CARRIED. VOTE: 7-0
D. 527 Campbell Street (Tom Kraakevik) Facade Renovations / New Porch –
Mr. Lambert explained this proposal was a permit review for exterior improvements for a new
pergola at the Campbell Street façade, along with a new porch (subject to zoning approval) on the
Sixth Street facade. The zoning was being pursued due to encroachment into a require side yard
by a few feet. The lot coverage was met. Mr. Tom Kraakevik, on behalf of the owner, stated that
the owner had received a notice from the city regarding his home’s exterior but the owner had
since complied. Proposed was a hardscape garden structure off the Campbell Street elevation.
Photos of existing conditions followed as well as the proposed elevation, with Mr. Kraakevik noting
the cedar pergola would be a painted, free-standing structure constructed in cedar with 2” inch x 2”
inch lattice. On the Sixth Street elevation, the current stoop and stairs would be redesigned to
incorporate a larger covered front porch used for safety purposes because the owners were
elderly. Currently there was no access/egress from the garage into the house and so
Mr. Kraakevik wanted to connect the garage via the porch. Shutters and a flower box would be
added to the elevation.
Mr. Lambert pointed out that if the porch roof was an open structure, it would not have to go
before the Zoning Board. The issue was whether the porch and roof were an allowable
encroachment to the side yard. Additionally, Mr. Lambert stated the design was revised from the
original submission to incorporate the small brackets on the porch that were found in the gable
window of the home. Per a question, flagstone would be used under the pergola. Andersson
suggested that the porch be a bit larger and functional for the owner since there were mobility
issues. However, Mr. Lambert stated the one of the zoning stipulations was that the request allow
for minimum encroachment.
Overall, commissioner comments were positive and that the proposal was a good solution.
Comments followed that Mr. Kraakevik consider creating the stairs on the side where the garage
was located, wherein Mr. Kraakevik stated it would encroach into the driveway and create difficulty
for the owner. The driveway was very short.
Motion by Hiller, seconded by Zellmer to approve the application, with the option that
the owner can enlarge the porch, subject to Zoning Board review and staff review. Roll call:
Aye: Andersson, Hiller, Salomon, Abplanalp, Zinke, Zellmer, Roy
Nay: None MOTION CARRIED. VOTE: 7-0
3
Historic Preservation Commission
September 16, 2014
E. 318 N. Fourth Street (Tyler DeLarme & Rachel Johnson) Siding Replacement –
Mr. Lambert shared that this case was under a stop work order for a siding issue. The historic
siding on the south elevation was removed, along with the aluminum siding and the goal (of the
owner) was to paint the house but the owners determined that the siding was not salvageable and
so the owners began a removal process. Mr. Lambert stated he has been meeting with the owners
to discuss alternatives. The contributing house was constructed in the 1855 or 1856 and was
heavily remodeled in 1908 with most of the original 4” inch siding removed at that time. The
owners were in the process of replacing the siding with Hardi-plank. However, the owners would
like to take the Hardi-plank down and place wood in its place with 3” exposure.
Owner, Ms. Rachel Johnson, explained that the original project started out as a repainting
project but on this particular side of the home, after the aluminum siding was removed, the wood
deteriorated very quickly and she began receiving letters from the City. After saving some money
she began working on the project again. Many of the boards were rotted and began falling apart.
Also, the recent storm over Labor Day did more destruction and she tried to patch up the area.
Ms. Johnson stated she knew she needed a permit but wanted to cover the holes and started
putting up siding and paper. Ms. Johnson pointed out another area next to this section of the
home, that also needed work. The trim around the windows had gaping holes also. She stated she
had about four to five different types of siding around the entire house, with add-ons and fix-ups.
Ms. Johnson said she plans to remove the Hardi siding and install cedar siding and caulk
and paint this section of the home and eventually scrape, paint and caulk the rest of the home and
leave the reveal as is. Mr. Lambert noted that the windows with the quarter-round stop will be
painted but the lintel pieces on the Hardi-plank side have a brick mold for the bed mold underneath
the drip cap and he has encouraged the owners to match the details found on the house.
Commissioners were pleased to see the home return to the 1908 look.
Motion by Abplanalp, seconded by Zellmer to approve the application, as presented.
Roll call:
Aye: Andersson, Hiller, Salomon, Abplanalp, Zinke, Zellmer, Roy
Nay: None MOTION CARRIED. VOTE: 7-0
5. HPC Review of Proposed Project Concept
A. 516 Campbell Street – (Avondale Custom Homes) New Infill Residence –
Mr. Lambert recalled that this case was before the commissioners who had some previous
refinements. Mr. Ken Overstreet, architect for the project, presented the previous design and the
new design. He stated the entry was now revised and the gables were added to the front facade.
The gable over the garage was removed with the focus on the front entry and the roof pitch was
reduced. A color rendering was presented.
Commissioners were pleased to see that the garage was minimized and the entry was
straight on. It was a good solution. Per a question, Mr. Overstreet stated the entry door would
include side-lites. Zinke was sad to see the large honey locust tree removed. However,
Mr. Overstreet stated the owners repurposed the tree to be used as tables and a mantle in the new
home. He further confirmed that the driveway was pushed over to meet lot coverage and to avoid
the utility pole. Per a question from the public, Mr. Overstreet stated the garage doors were set
back three to four feet from the front door.
4
Historic Preservation Commission
September 16, 2014
6. Secretary’s Report
Mr. Lambert referenced his monthly activity report. He asked commissioners to clarify the
distance they preferred for windows to be reviewed on side elevations, i.e., from 10 feet or 20 feet
from the public right-of-way or from the entire facade. Currently, he was considering them from the
public right-of-way. After comments and input were received, commissioner consensus was that it
would depend upon the circumstances and that Mr. Lambert would have to continue to bring such
cases forward to the HPC.
Mr. Lambert then asked the commissioners to submit their resumes to him before the new
year in order for him to submit them to the Illinois Historic Preservation Agency. As to the Historic
Preservation Ordinance, Mr. Lambert stated that staff was just beginning to start the process with
the commission as a working group. The ordinance was a stated goal for two years in the City’s
plan and more information will be forthcoming.
7. New Business
A. From the Commission – Commissioner Zinke shared information from an
informational workshop meeting she attended in Aurora on August 7, 2014 regarding the value of a
proposed statewide historic tax credit. Summarizing the meeting, Zinke stated its purpose was to
inform those in attendance on how a proposed statewide historic tax credit in combination with the
existing federal tax credit would benefit communities such as Geneva. She explained how the pilot
tax credit program would bring job creation, economic development, etc. to the economy as well as
explained how a person would obtain such credits through the pilot program. Details also followed
regarding legislation on this topic. Zinke closed by sharing that the Missouri and Iowa tax credit
programs have been very successful for their economies and that the Illinois program may have a
return of $10 to $12 of economic impact for every dollar in tax credit. Further information about the
program could be found at www.Landmarksillinois.org. Closing questions/comments followed on
where the legislation was sitting, eligibility requirements, and the fact that the pilot program ended
in 2016.
B. From the Public – Mr. Marty Smircich, 909 S. Batavia Avenue, Geneva discussed
that each of the commissioners either received or will receive a letter from him (with document
attached) regarding an application for landmarking that was submitted a few years ago for a
residence located on Sunset Road and was eventually withdrawn by the applicant due to 200
people opposing the application. Mr. Smircich stated that his discussion was not an attack on
historic preservation but was, instead, a group of people coming together to separate their
thoughts from the downtown historic district with the goal to correct errors, omissions, and division
that is found within the city’s code and its policies. He was looking for the commissioners to
understand what the actual petition was about and how the omissions and errors impacted the
Sunset application. He referenced Page 11, Sections 10.6.4 and 10.6.5 of the code and pointed
out the inconsistencies of the two sections as they related to not requiring owner’s consent or “shall
require” owner’s consent. Mr. Smircich stated this omission was brought to city staff three years
ago and had not been corrected since. Other errors were pointed out as they related to signage
notification and district owner consent (51%) for a new district. Mr. Smircich discussed his own
research regarding 13 CLG cities which received grants from the state of Illinois and in which 4 of
those cities had a requirement for 51% owner consent. He explained that those cities that had
successful owner consent had successful outreach programs. He asked the commissioners to
consider the 51% for new districts.
As to owner consent for landmarks, Mr. Smircich stated he has over 200 petitions against it
but rather than opposing it completely, he recommended removing the term “anyone” can
5
Historic Preservation Commission
September 16, 2014
nominate because it implies a lack of respect for owner‘s rights. However, he offered that if the city
insists on that requirement, he supported the requirement of a supermajority of this commission
and to involve the alderman of the same precinct.
Chairman Roy responded by stating that the commission was in the early stages of this
issue.
Ms. Liz Safanda, 1013 Dunstan Road, Geneva, stated that on behalf of Preservation
Partners of the Fox Valley, she appreciated the city’s effort to carefully review the code for any
flaws and discussed that Preservation Partners will continue to monitor any changes that are
brought before this commission and before the city council and will comment then. She
encouraged the commissioners to take advantage of the state’s free resources. She also was
pleased to see three new commission members.
Dir. Untch reported that a comprehensive review of the Historic Preservation ordinance’s
provisions was stated in the city’s Strategic Plan. However, the community development
department was very busy and approaching this matter was a high priority special project, along
with the regular flow of daily work under the preservation planner. Dir. Untch encouraged all
parties to participate in the discussion during the review process.
Mr. Jim Kautz, 1305 S. Batavia Avenue, Geneva offered to speak to Mr. Smircich regarding
the other side of his argument. He stated that while 200 to 300 people signed in opposition, it did
not mean that the houses they live in are not worthy of protection. He noted that referring to
landmarking as a negative on a person’s dwelling was not true and that the landmarked homes
continue to be occupied and maintained well. He reminded the commissioners that just because a
structure was lived in and landmarked outside the district today, it did not necessarily guaranty that
the next owner would maintain the structure. He stated it would be negligent on this commission to
think that it would leave it up to the homeowner to let the commission know if a property should or
should not be landmarked in the future. Mr. Kautz agreed and believed education was a large
component to address the public’s concerns.
8. Commissioner Training
Mr. Lambert reviewed a PowerPoint presentation on commissioner training.
9. Adjournment
The meeting was adjourned at 9:52 p.m. on motion by Commissioner Andersson, seconded
by Commissioner Abplanalp. Motion carried unanimously by voice vote of 7-0.
6
Agenda
Meeting Agenda
CITY OF GENEVA, HISTORIC PRESERVATION COMMISSION
MEETING LOCATION &
HPC INFORMATION TUESDAY, SEPTEMBER 16, 2014 MEETING
Location: 1. Call to Order
Geneva City Hall 2. Roll Call
Council Chambers
3. Approval of Meeting Minutes
109 James Street July 15, 2014
Geneva, IL 60134 August 19, 2014
4. HPC Review of Building Permit Applications
Time:
A. 227 South Third Street CASE 2014-077
7:00 p.m.
Applicant: BHBB, LLC (Coleman Land Co.)
Tad Hemming, Hemming Construction
Commissioners: Application for: Door Replacement
Scott Roy, Chairman
Jennifer Ablanalp B. 228 North Fifth Street CASE 2014-078
Nanette Andersson Applicant: Susan Cunningham, Owner
Application for: New Street Yard Fence
Al Hiller
George Salomon C. 21 North Third Street CASE 2014-080
Paul Zellmer
Applicant: Ashland Ventures
Carolyn Zinke Mara Hauser, 21 N Community Coworking
Application for: Façade Renovations
Staff Liaison:
Michael A. Lambert D. 527 Campbell Street CASE 2014-081
Preservation Planner Applicant: Tom Kraakevik, Contractor
Application for: Façade Renovations / New Porch
630/938.4541
preservation@geneva.il.us
E. 318 North Fourth Street CASE 2014-082
Applicant: Tyler DeLarme
Rachel Johnson, Owner
Application for: Siding Replacement
The Historic Preservation Commission meeting is audio-recorded and summary minutes are taken
by a recording secretary.
The City of Geneva complies with the requirements of the Americans with Disabilities Act of 1990.
Individuals with disabilities who plan to attend this meeting who require accommodations in order
to allow them to observe and or participate in this meeting are required to contact the Planning
Division at 630/232.0818 at least 48 hours in advance of the meeting to allow the City of Geneva to
make reasonable accommodations for those persons.
Meeting Agenda
CITY OF GENEVA, HISTORIC PRESERVATION COMMISSION
MEETING LOCATION &
HPC INFORMATION TUESDAY, SEPTEMBER 16, 2014 MEETING
Location:
5. HPC Review of Proposed Project Concept
Geneva City Hall
Council Chambers A. 516 Campbell Street CASE 2014-074
Applicant: Avondale Custom Homes
109 James Street
Ken Overstreet, Project Manager
Geneva, IL 60134 Application for: New Infill Residence
6. Secretary’s Report
Time:
7. New Business
7:00 p.m.
B. From the Commission
C. From the Public
Commissioners:
Scott Roy, Chairman 8. Commissioner Training Session
Jennifer Ablanalp 9. Adjournment
Nanette Andersson
Al Hiller
George Salomon Next meeting October 21, 2014
Paul Zellmer
Carolyn Zinke
Staff Liaison:
Michael A. Lambert
Preservation Planner
630/938.4541
preservation@geneva.il.us
The Historic Preservation Commission meeting is audio-recorded and summary minutes are taken
by a recording secretary.
The City of Geneva complies with the requirements of the Americans with Disabilities Act of 1990.
Individuals with disabilities who plan to attend this meeting who require accommodations in order
to allow them to observe and or participate in this meeting are required to contact the Planning
Division at 630/232.0818 at least 48 hours in advance of the meeting to allow the City of Geneva to
make reasonable accommodations for those persons.
HISTORIC PRESERVATION COMMISSION MINUTES
109 James Street - Council Chambers
Geneva, Illinois 60134
July 15, 2014, 7:00 p.m.
1. Call to Order
Chairman Roy called the July 15, 2014 meeting of the Geneva Historic Preservation
Commission to order at 7:00 p.m.
2. Roll Call
Present HPC: Chairman Roy, Commissioners Craft, Hiller, and Zinke
Absent: Commissioner Andersson
Staff Present: Preservation Planner Lambert
Others Present: Ken Overstreet with Avalon Custom Homes; Elizabeth Safanda, 1013
Dunstan Road; Bob Rasmussen, representing The Little Traveler; Kevin
and Donna Greschuk, 1440 Jeffrey Dr., Addison; Residents Margaret
Eagan, Rod McCleary, Jennifer A____; George Salomon; and Recording
Secretary Celeste Weilandt
3. Approval of the June 17, 2014 Minutes
The June 17, 2014 minutes were approved on motion by Commissioner Hiller. Seconded
by Commissioner Craft. Motion carried by voice vote of 4-0.
4. HPC Review of Building Permit Application
A. 404 S. Third Street (Case No. 2014-053); Window Replacement; Applicant: Mike
Simon/The Little Traveler - Mr. Lambert reported this project comes from the Little Traveler Shops.
It is an emergency window replacement project that is located on the Fulton Street side of the
building. The two picture windows flanking the central doors on that side are rotting and sagging
within their jambs due to internal shelving brackets attached to the muntins of the window. From
his site visit, the windows appear to be a window replacement from earlier years in an area of the
building that dates to the 1960s/1970s. Photos of the interior windows were referenced.
The proposal is to replace the two picture windows with wooden windows, with a one-and
one-half inch wide structural mull to continue the shelving and to have the basic look of a nine-light
window but to allow for structural stability.
Mr. Bob Rasmussen, representing The Little Traveler, filled in the details of the windows
and indicated there was about a one-inch gap in the glass. He stated that Mr. Simon did want to
continue to use merchandise in the window and keep the look the same from the exterior.
Mr. Rasmussen believed this was a long-term solution and also allowed for the same shelving to
be retained. The new wooden windows (SDL) will be insulated, single-pane glass and include
spacer bars with the wooden muntin bar inside and outside, maintaining the same look. Any trim,
sills, etc., will be replaced as close to existing as possible to carry the architectural nature of the
exterior. Commissioner Craft moved to approve the proposal, as presented, seconded by
Commissioner Hiller. Roll call:
Historic Preservation Commission
July 15, 2014
Aye: Craft, Hiller, Zinke, Roy
Nay: None MOTION CARRIED. VOTE: 4-0
B. 522 Campbell Street (Case No. 2014-002); New Residence; Applicant: Maurice
McNally/Ken Overstreet / Avondale Custom Homes - Mr. Lambert reviewed the site plan for this
home and noted that the city’s zoning regulations/setbacks have been met. The commission saw
this proposal as a concept review back in February and it has been returned and revised based on
commissioner input. The garage has been set back, as requested by the commission, the massing
reduced, and the porch is a full 8 feet in depth. A streetscape plan of Campbell Street was
referenced on the overhead.
Mr. Ken Overstreet, architect for Avondale Custom Homes, was present to answer
questions. None followed.
Commissioner comments on the plan were very positive. Regarding lot coverage,
Commissioner Hiller noted that the building went to the maximum coverage and cautioned
Mr. Overstreet to reduce it so that the owners could add outside amenities. Mr. Lambert
elaborated that other developments the city has been reviewing lately are maximizing lot
coverages and the homeowners are being informed of the decisions they are making.
Owner, Ms. Donna Greschuk, 1440 Jeffrey Dr., Addison, IL, indicated she was very aware
of this which was why she and her husband added the screened area so that her table could be
inside and protected from the outside.
Chairman Roy opened up the meeting to public comments.
Ms. Liz Safanda, questioned where the garage was located on the plans and confirmed
with the developer that it was set back. She shared a comment about an in-fill home at the corner
of 4th and South Street and how the owners have screened that garage in a very positive way.
Commissioner Zinke moved to approve the proposal for 522 Campbell Street, Lot 4,
being constructed by Avondale Custom Homes, as presented. Seconded by Commissioner
Craft. Roll call:
Aye: Craft, Hiller, Zinke, Roy
Nay: None MOTION CARRIED. VOTE: 4-0
6. Secretary’s Report
Mr. Lambert reported that staff: 1) is working on filling the commission’s two vacancies;
2) is very busy with processing building permits; and 3) will be reviewing the HPC’s zoning
ordinance since the ordinance is 20 years old and needs to be updated. He anticipates to bring a
drat ordinance to the commission sometime in the fall with the goal to present it to the City Council
in early winter. Mr. Lambert stated that on July 21, 2014 the Community Development department
will be making a presentation to the City Council on historic preservation and he will be discussing
the successes of the department and the commission. Commissioners were encouraged to attend.
7. New Business
A. From the Commission - Commissioner Hiller inquired about property the located on
First Street between Peyton and Hamilton and what, exactly, was being requested, wherein
2
Historic Preservation Commission
July 15, 2014
Mr. Lambert explained that Shodeen was looking for relief on lot coverage. While the building met
the bulk regulations, it did not meet the floor area ratio for the lot. The Historic Preservation
Commission previously approved this proposal and would only return to this commission if there
were some changes made. In speaking with Shodeen representatives today, Mr. Lambert stated
there was the potential for an alternative design. Also, in speaking with Dir. Untch, Mr. Lambert
shared that Geneva was one of those communities that did not have an expiration date on its HPC
approvals and believed expiration date should be issued and be spelled out in the HPC’s
ordinance. Per Commissioner Zinke’s question, staff stated that in either 2002 or 2004 the site
was approved for a two-story duplex with front-loaded garages. (It is zoned multi-family in that
area.)
Addressing the Cetron site, Commissioner Hiller noted there is a five-story, mixed-use
development planned for the site which abuts the historic district (Hiller shared renderings for
commissioners) and he asked if this commission should provide some input. Mr. Lambert reported
that Parcel 2 on the site plan would be reviewed by the HPC but no formal review of what is
abutting the district would take place. Mr. Lambert explained that because he is part of the
Community Development department he is sometimes called in to meet with staff and developers
to provide input on projects abutting the historic district. He expected the same practice would take
place with this conceptual development. However, he suggested that the commissioners appear as
residents before the Plan commission to express their views. Commissioner concerns followed
regarding the building’s location on the edge of the historic district, its massing, increased traffic,
etc., wherein Mr. Lambert explained that he will keep the commission informed of this project. As
an added comment, Mr. Lambert pointed out that the entire block to the west, which currently
includes a commercial use and a number of residential dwellings, has been marketed as a
“redevelopment block.”
Commissioner Hiller shared his disappointment that the commission did not have input on
the fire pit located on Third Street, wherein Mr. Lambert stated that according to the HPC’s
ordinance, the commissions’ purview is to review historic properties and not historic right-of-ways.
He believed historic right-of-ways, however, were one of those items that should be addressed in
the ordinance in the future. Other projects, as mentioned by Lambert, that did not have
commissioner input included the LED lights used for the bus routes at the Metra train station and
the possible removal of the Route 31 railroad overpass. Dialog then followed regarding owner
consent and the fact that Mr. Lambert did not want to jeopardize the city’s Certified Local
Government status as it relates to the HPC’s ordinance. He stated the owner consent issue
becomes a matter of a complex balance of individual property rights and communal expectations.
Commissioner Zinke praised Avondale Custom Homes and its owners for working with the
commission and staff to meet everyone’s expectations.
B. From the Public - Ms. Margaret Egan, 402 Campbell Street, voiced concern about
the proposed five-story development which was “alarming” to her since it will change Geneva as a
historic community. She asked staff if the zoning issues will be discussed wherein Mr. Lambert
offered to forward her question to Dave DeGroot at the City’s planning department, stating the
same topic has arisen by others. Zinke shared a story about an Oak Park high-rise development
and suggested staff use Oak Park’s ordinance as a resource.
Ms. Liz Safanda, 1013 Dunstan Road, recalled the survey that was done some time ago for
a potential historic district to the west of 7th Street and she believed it should be reviewed again
since there were a large number of significant contributing homes in that area. Regarding the
owner consent verbiage in the ordinance, Ms. Safanda shared that less than three years ago this
issue was reviewed closely by the HPC, its staff, and Dir. Untch. She stated there were emails
3
Historic Preservation Commission
July 15, 2014
written by residents of the entire community, not just the SW quadrant where this was the issue,
and, at that time, and the aldermen listened to the issues very well. However, she was not
supportive of opening up the entire issue again but maybe refining certain items instead. She
stated there were members of the community and the preservation community that were dismayed
by a challenge to something that has worked in Geneva for a very long time and she believed the
process was very balanced and worked well. Ms. Safanda offered the resources of Preservation
Partners, if needed. She supported bringing the zoning code up to date but not necessarily
readdressing old issues.
Chairman Roy agreed that city council most likely did not want to readdress that topic again
either.
8. Adjournment
The meeting was adjourned at 7:55 p.m. on motion by Commissioner Hiller, seconded by
Commissioner Zinke. Motion carried unanimously by voice vote of 4-0.
4
HISTORIC PRESERVATION COMMISSION MINUTES
109 James Street - Council Chambers
Geneva, Illinois 60134
August 19, 2014, 7:00 p.m.
1. Call to Order
Vice Chairman Andersson called to order the August 19, 2014 meeting of the Geneva
Historic Preservation Commission.
2. Roll Call
Present HPC: Vice Chair Andersson, Commissioners Hiller, Zellmer, Abplanalp
Absent: Commissioner Craft, Zinke, Chairman Roy
Staff Present: Preservation Planner Lambert; Community Development Dir. Untch
Others Present: Glorianne and Colin Campbell, 18 S. Sixth Street; Resident Donna
Grescheck, owner of lot 4 of the former Merritt King property; and
Recording Secretary Celeste Weilandt
New commissioners Paul Zellmer and Jennifer Abplanalp were welcomed by HPC Vice-
Chair Andersson. Zellmer and Abplanalp shared their backgrounds.
3. Approval of the July 15, 2014 Minutes
The July 15, 2014 minutes were deferred due to commissioners Zinke and Craft being
absent and the new commissioners not being able to vote on the minutes. Andersson asked to
reflect that Commissioner Craft was formerly known as Commissioner Ploppert and noted a
change in the Secretary Report, Item 6, Part 3: delete the word “dratt” and insert the word “draft”.
Mr. Lambert also stated that Commissioner Craft’s name was misspelled on tonight’s agenda and
he apologized for the error.
4. HPC Review of Building Permit Application
A. 302 N. First Street (Case No. 2014-068); Window Replacement; Applicant: Rosalie
McCafferty - Mr. Lambert reported that the subject window is viewable from a rear side yard and it
was replaced in the late 1950s or 1960s. The home is a contributing structure with remodeling
done throughout the years. Only two original windows remain on the home and are located on the
side street elevation. The proposed windows will match the existing configuration, except for
having casement flanking windows, they will be double-hung windows.
Owner Rosalie McCafferty stepped forward and explained that the window being replaced
was installed by her aunt and uncle in the 1950s and has fallen in disrepair.
Commissioner comments were positive and that the window was being replaced with
double hung windows which was more appropriate for the house. Asked why she was choosing
another Chicago-style window (a central, fixed window with narrower, operable windows flanking
either side), Ms. McCafferty stated the original window was a single window pane and was
replaced with what currently exists. She was just replacing it in-kind. Andersson suggested
Historic Preservation Commission
August 19, 2014
installing a more historically appropriate window such as two or three double-hungs next to each
other, but she left that up to the owner.
Comments from Commissioner Zinke were read into the record: I realize that the requested
window is almost a duplicate in terms of appearance to the window that is being replaced.
However I wonder, without any additional cost or trouble to Ms. McCafferty, would it be possible
that this window could be a set of 3 identical sized double-hung windows rather than the window
shown in the drawing? A three double-hung arrangement might fit the character of the house more
than the requested window, which I feel is reminiscent of a 1950s and 1960s ranch-style window.
However, if this suggestion is not feasible, I have no further concern.
Motion by Commissioner Hiller, seconded by Commissioner Zellmer to accept the
proposal as presented, with the opportunity of a change by the homeowner if they desire,
and with staff to review. Roll call:
Aye: Andersson, Hiller, Zellmer, Abplanalp
Nay: None MOTION CARRIED. VOTE: 4-0
B. 528 Campbell Street (Case No. 2014-069); New Residence; Applicant: Ed
Saloga/Saloga Builders; Owners Mike and Karen Leone - Mr. Lambert shared that this proposal
was on one of the lots being developed on the former Merritt King property. When the concept
was presented to the commissioners in the spring, the commissioners had no concerns at that
time. The site plan, elevations, floor plans and streetscape plans were placed on the overhead.
General Contractor Ed Saloga, with Saloga Design Build and on behalf of the owners,
discussed that the architecture had not changed since the concept review. Minor changes would
include a small cupola added to the carriage house and the roof would be architectural asphalt
shingle with a copper standing seam. Gutters to be aluminum. Ms. Karen Leone, future owner,
recalled that a question back in June was in regards to the preservation of a tree. She reported
that the storage area had been transferred to the opposite side to preserve the existing tree.
Mr. Lambert confirmed the zoning compatibility worksheet was received and met all
requirements.
Comments from Commissioner Zinke were read into the record: “I wonder which is correct
-- The site plan showing patios and pool and railing or the drawings which show none of these? I
assume that all the patios and pool and railing are included in the project and I think they visibly fill
up the lot too much. However, I’m glad to see the three trees are to be protected.“ Andersson
pointed out that Zinke was not aware that such changes were shown on an elevation.
Mr. Lambert added that the landscaped walls and the fences were allowed per the zoning
ordinance and while it appeared those were filling up the lot, they were all allowable under the
zoning ordinance.
Commissioner Hiller moved to approve the proposal, as presented. Seconded by
Commissioner Zellmer. Roll call:
Aye: Andersson, Hiller, Zellmer, Abplanalp
Nay: None MOTION CARRIED. VOTE: 4-0
2
Historic Preservation Commission
August 19, 2014
5. HPC Review of Zoning Permit (PUD) Application
Mr. Lambert prefaced the discussion, noting three properties were under consideration at
the corner of James and 6th Street, but would be discussed and considered separately.
A. 621 James Street (Case No. 2014-070); Demolition of Storage Building; Applicant:
Shodeen Development/Dave Patzelt, Superintendent - Mr. Lambert located the property on the
overhead and discussed the three historical districts that were created in Geneva: one in 1979,
one in 1982 and local district in 1982. In 1999 a historical survey was done of the local district
which determined structures to be either contributing, non-contributing or significant or potentially
significant. The subject property sat within the local historic district and was considered a
contributing property. Three structures were proposed to be razed but would be discussed
independently.
Mr. Dave Patzelt with Shodeen Development, 77 N. First St., Geneva, had nothing to add
on this item but was available for questions.
Comments followed that the building was not historic and Mr. Lambert had no additional
staff comments. No public comments were received.
Commissioner Zellmer moved to approve the request for demolition, seconded by
Commissioner Hiller seconded. Roll call:
Aye: Andersson, Hiller, Zellmer, Abplanalp
Nay: None MOTION CARRIED. VOTE: 4-0
B. 627 James Street 13-17 S. Seventh Street (Case No. 2014-071); Demolition of
Residence and Commercial Office Building; Applicant: Shodeen Development/Dave Patzelt,
Superintendent – Mr. Patzelt indicated to the new commissioners that this proposal was before the
commissioners several meetings ago as a concept plan and these applications were consistent
with the concept plan presented to the HPC. Mr. Lambert pointed out that this property was the
next parcel to the west and consisted of a 1904 four-square at the corner of James and Seventh.
Images of deteriorations within the interior and exterior building were referenced. Another building
(former Shodeen office building) sat to the north of this property which had been gutted.
Per Mr. Patzelt, the former Shodeen Office building (building to the north) had been on the
market for the past 4 to 5 years with no interest by a tenant. Because there was no interest, it
prompted him to revisit the corner and revitalize the entire property. The four-square initially was
considered for revitalization but the figures did not work and were submitted to staff. Staff
concurred. Mr. Lambert added that the cost analysis numbers presented were almost identical as
the numbers for 426 S. Fifth Street (a small cape cod) and he believed the numbers were in line.
Commissioner Hiller even pointed out that the corner of Sixth and James had lost its
historical context for the area and the proposed townhomes fit the context of the street. However,
he did express concern about the demolition of 627 James, noting that he saw demolition by
neglect and poor maintenance. Yet, at the same time, he said it was probably the best solution to
raze the building. Commissioner Zellmer concurred with the comments being stated and added
that other multi-unit homes existed on James Street as well as similar commercial-type buildings.
He agreed demolition by neglect was not a solution. Mr. Patzelt shared the challenges of not only
the former Shodeen office building but also with the four-square building. He reported he
purchased the home with many of the neglect issues already existing and continued to argue that if
he was neglecting the properties, the white home to the east would not have been rehabbed as it
3
Historic Preservation Commission
August 19, 2014
was. Adding to the discussion, Vice chair Andersson, pointed out that historically, Shodeen did not
neglect properties and, in fact, renovated many properties, if there was a economic benefit to them.
In this instance, Andersson stated the economics may not bear it out. She believed the structure
was a very good example of a four square and, if it was in a better location it would make a larger
difference to save it. However, it was on the edge of the historic district.
Referring to the city’s architectural survey that was done, Mr. Lambert explained that the
text in the survey was based on a variety of factors, including architectural form, and the
designations did not necessarily consider the type of condition the building was in at the time the
survey was taken but how they contributed to the character of the district. Dir. Untch also added
that the B2 District zoning had to be considered, since this was a transitional district. The zoning
was in place for a number of years but he stated there was a lack of market response for some
reason – i.e., poor parking conditions, less than ideal retail space, etc., and possibly the condition
that the building was in and the cost of bringing it into compliance.
Asked if Shodeen Development would consider someone to purchase the four square for a
$1.00 cost and relocating it, Mr. Patzelt was open to the advertising the structure for 30 days.
Vice chair Andersson proceeded to read Commissioner Zinke’s comments into the record
indicating that Zinke had no issues with the storage building. For this building – 627 James Street
and 13-17 Seventh Street – Demolition of Residence and Commercial Office Building: “The
is American Four Square is considered contributing to our historic district and I believe it is not
unique to in the district. Its exterior appearance is seems to be in very poor condition due to much
neglect. I have no issues with the demo of the 60’s brick office building.”
Mr. Lambert proceeded to review the interior conditions of the four square building stating it
was a “rough” interior but because there was one prior owner he questioned whether the building
started deteriorating when the owner began to get elderly. He stated the basement was shallow
and the foundation was parged and no significant interior architectural details were found. It was
recommended by Andersson that Mr. Patzelt provide documentation of the building to Geneva’s
History Museum.
The meeting was opened for public comment:
Ms. Glorianne Campbell, 18 S. Sixth Street, recalled from another neighbor and her own
memory that the original owner was elderly, which is when the structure began to deteriorate.
No other public comment followed.
In reviewing the photos of the interior, Dir. Untch summarized that the historic integrity of
the four square’s interior was basically “gone” and it would have had to have been recreated and
was not something the commission usually saw in the homes that came before the commission.
Commissioner Hiller moved to approve the demolition to the parcel containing 13-17
S. 7th and 627 James Street with the condition that the house be offered for sale for one
month and that historic documentation be provided to the History Museum should the home
not sell. Seconded by Commissioner Zellmer. Roll call:
Aye: Andersson, Hiller, Zellmer, Abplanalp
Nay: None MOTION CARRIED. VOTE: 4-0
4
Historic Preservation Commission
August 19, 2014
C. 13-23 S. Seventh Street (Case No. 2014-072); Construction of a Six-Unit
Townhome Building; Applicant: Shodeen Development/Dave Patzelt, Superintendent - Mr. Lambert
shared that this proposal replaces the buildings that will be demolished, as discussed above.
Proposed elevations were shown and were revised as of late this afternoon.
Petitioner, Mr. Patzelt, Shodeen Development 77 N. First Street, discussed the townhome
elevations, particularly noting that the James Street elevation is to look like a home versus a
townhome building. The initial elevation, as presented on the overhead, was to wrap the corner
with a porch and add a box bay for architectural interest. Mr. Patzelt walked through the changes
that had occurred to the elevations over time. He shared some of the challenges with the powder
room and window placement which resulted in the latest plan. He also noted that there will be no
wrapped porch on 7th in order to keep the focus on James Street. Due to staff concerns regarding
the east elevation, there will be windows on the garage doors and the roofline will be better
developed. Screening along James Street was next addressed, with Mr. Patzelt explaining that the
landscaping will be mainly new. He proceeded to point out the locations of trees, shrubs and
bushes.
Vice Chair Andersson suggesting improving the roof line and, for the windows, instead of
having the first floor single window, to either eliminate the window or move the laundry room so the
windows make sense. Mr. Patzelt was fine with the suggestions and appreciated the input.
Per concerns raised by Commissioner Hiller, Mr. Lambert briefly discussed the motions that
could be made for this petition, mentioning to clearly state what is acceptable and what is not, and
explaining that timing issues existed. Andersson stated that because it was not the first detail that
had to be worked on, she suggested approving the larger portion of the petition and then approve
the elevation at the next meeting. Commissioner Zellmer suggested giving the Plan Commission
direction but having a staff review of the final design. Mr. Patzelt answered questions about ridge
lines and gable sizes on the various elevations.
Looking to the front elevation, commissioners asked if another feature could be added to
the new elevation since a couple of the second floor windows were eliminated and it looked plain.
Mr. Patzelt said a closed shutters feature was added prior but then, after he and Mr. Lambert
reviewed it on paper, it looked too busy. Commissioners agreed that some smaller detail needed
to be added. Andersson stated her issues were with the James Street side roof line and the
windows.
For the east elevation, Vice Chairwoman Andersson read into the record Commissioner
Zinke’s comments: “I have several comments on this proposal concerning setbacks, treatment of
the end façade facing James Street and the number of units included. I appreciated the attempt to
make the James Street façade of the end unit look more like the front of the building; however, I
would like to see more detail added to this. Perhaps the single window can be made bigger, taller,
peaked or emphasized more in some fashion. I would also like the yard in front of the James
Street elevation be more of a front yard rather than a side yard as it in this plan. I believe that this
façade’s setback should respect the established setback of the other houses on the block. I am
concerned with the clear visibility of row of garage doors as one walks or drives west on James
Street to Seventh Street. Attempts to minimize this, I believe, need to be made.” On that note,
Andersson suggesting creating a darker color for the garage so it recedes, wherein Mr. Patzelt
then noted that he and staff discussed whether to soften the elevation with a tree or an evergreen
at the right-hand side or the east side of the drive in front of the white house with the conclusion
being to add landscaping to break up the view when driving west on James. Andersson was fine
with that.
5
Historic Preservation Commission
August 19, 2014
Continuing, Andersson further read Commissioner Zinke’s comments: “I believe that this
building should be five units instead of six. A smaller building would take up less of the lot,
allowing the James Street setback to match those of its neighbors. Its mass would be reduced,
allowing for more green space and the garage door row would be less visible from James Street.”
Questions followed on how the James Street setback was determined wherein Dir. Untch
explained that it was set by the development parameters that were proposed as part of the
Planned Unit Development process and by the side setback created in the Mews and the Second
Street townhomes located on Second Street. In summary, Dir. Untch explained that when
reviewing the relationship of the proposed setbacks as compared to some of the other setbacks
along James Street, there is variety in the setbacks and the proposed concept of the row houses
was purposely to place the homes as close to the front setback as possible and it worked.
Vice chair Andersson noticed on the character elevations there was a notation that stated
“no brick on north façade”, wherein Mr. Patzelt confirmed it was correct and clarified it was the
elevation up against the Cocoa Bean and there would be no walkway from the townhomes to
Seventh Street because he did not want encourage a walkway. In response to the concern about
the low walls on the Seventh Street elevation, Mr. Patzelt stated they were for a raised garden.
As part of staff’s comments, Mr. Lambert stated the applicant has been responsive to staff’s
concerns but the proposal may still have some fine tuning. Dir. Untch also followed up and
explained the review process for the new commissioners.
The public was invited to speak:
Resident, Mr. Colin Campbell, 18 S. Sixth Street, stated his property sits to the east of the
site. Mr. Campbell discussed how the area has changed over many years and he and his wife
were one of two residential properties left on this block. His plan for landscaping his backyard was
to isolate his home from the parking lot. He and his wife believed this was the best plan for the
neighborhood since other similar developments existed in the area. However, he asked Mr. Patzelt
to landscape his property by using the tallest trees possible against his property. Mr. Patzelt was
supportive.
Per a question about the landscaping plan not matching the civil plans, Mr. Patzelt
explained a comment will be coming back on the plans to pull the asphalt back.
Motion by Commissioner Zellmer, seconded by Commissioner Abplanalp to approve
the proposed townhome development at 13-23 S. 7th Street using the hand drawn James
Street elevation and with staff approval of eliminating the first floor windows. The powder
room and laundry room can be removed or revised per staff approval. On the 7th Street
elevation, add a design element above the entrances where there used to be windows. The
site plan will match the landscape plan in regards to the rear parking area. The owner will
work with the adjacent property owners to select correct height of landscape materials as a
buffer and to provide additional evergreen screening between the existing 2-story building
and the James Street driveway. Roll call:
Aye: Andersson, Hiller, Zellmer, Abplanalp
Nay: None MOTION CARRIED. VOTE: 4-0
6
Historic Preservation Commission
August 19, 2014
6. HPC Review of Proposed Project Concept
A. 516 Campbell Street (Case No. 2014-074); New Infill Residence; Applicant:
Avondale Custom Homes/Ken Overstreet, Architect – Mr. Lambert reported this was a concept
review and the last home for Lot 3. Mr. Ken Overstreet, with Avondale Custom Homes, presented
a concept elevation of the home as well as a streetscape plan on the overhead. He confirmed this
was the last lot for the in-fill project. A site plan and floor plan drawing followed. He recalled that
the commissioners initially saw a concept home that was a snout-nose drawing which was
discourage by the commission.
Commissioner comments followed. Commissioner Hiller had no issues with the setbacks
for now. Zellmer was pleased to see the study extend as far as it could go. Per questions,
Mr. Overstreet confirmed the height for this home was 28 feet versus 34 feet for the Merritt King
home. The original concept house was 30 feet high. Vice chair Andersson did not support the
frontloaded garages but understood their need. She had issues with the following: detailing of the
front-loaded garage which drew attention to one’s eye; the diagonal planking on the door (she
suggested receding the doors); the diagonal front entrance door (she suggested it to be more
square with the street with more detail); and the edges of the roofline.
Mr. Overstreet responded that the design elements seen on the garage had a light over
them to bring them out and were elements expressed to him while reviewing the other houses.
The front door was on an angle to be more inviting and useable and because it had issues with the
interior study room. Andersson disagreed and said there were ways to make the garage fit with
the house and have it recede more. Other suggestions followed.
Andersson read into the record Commissioner Zinke’s comments: “I would have liked a
new streetscape provided for us. The building is radically different than the one included in the
streetscape of June 17, (2014). I had very much hoped that this house would have a garage in the
back of the building with a long driveway alongside of the building. This would have eliminated a
Campbell Street view of six garage doors which now appears eminent. In this proposed residence,
as drawn, the garage doors, while are nicely recessed into a sort of a courtyard, are emphasized
with details that make the eye immediately drawn to them. Please change that. The front door is
almost invisible and needs many more details to draw the eye there first. Please change this too.
The massing and materials used in the concept plan seem to be acceptable. I would have
appreciated all of the elevations.”
Commissioners asked if some of the detail on the garage could be incorporated onto the
opposite side to draw attention away from the garage, wherein Mr. Overstreet asked what
elements were the commissioners looking for. Mr. Overstreet proceeded to present his 3-D video
of the streetscape. After viewing the video, Dir. Untch noted the receding was very good on the
subject home especially from the views down the street. Mr. Overstreet also stated he planned to
add trees between the homes to buffer the garages. For the new commissioners, Mr. Lambert
stated that the garage issues were discussed with the commissioners prior to this meeting. He
suggested that in working with Mr. Overstreet, there could be some landscaping opportunity along
the driveway to soften the garage doors even more. Andersson suggested making the detail of the
study and front door more prominent to make the garage doors go away.
Mr. Lambert offered to follow up with Mr. Overstreet and the owners, if necessary, to come
up with some options to address the issues raised.
The public was invited to speak.
7
Historic Preservation Commission
August 19, 2014
Mr. Colin Campbell, 18 S. Sixth Street, shared a story about an art fundraiser he
and his wife participated in when living near the Hamptons on the East Coast, recalling that back in
the 1970s, people in the community there knew about Geneva as “the little town with the lovely
homes” as well as Third Street. Mr. Campbell shared his love for the various architectural homes
in the community, but also wondered why people so desperately wanted to move into Geneva’s
historic district and construct something that belonged in Eagle Brook.
Ms. Donna Grescheck, owner of lot 4, asked if the commissioners had counted the number
of front-loaded garages in the historic district, which she noted were over 30 homes, since it
appeared this issue was a sticking point.
Commissioner Zellmer asked that the architect provide an accurate streetscape at the next
meeting. Commissioner Hiller appreciated the architect bringing the 3-D rendering.
7. Secretary’s Report
Mr. Lambert informed the commission that he will have a commission training session by
staff after the next HPC meeting. He recently attended the state’s tax credit workshop in Aurora on
August 7, 2014 which will mirror the federal tax credit program for renovations and hopes it passes
the House of Representatives. He will discuss the interpretation of windows next month. Lambert
reviewed his monthly report and some of the statistics for permits, noting that overall, permits were
increasing over the years. He is in the process of revising the 20 year-old HPC ordinance and
explained some of the research he has been participating in with other communities and agencies
as well as reviewing preservation law. Dir. Untch and Lambert explained that the ordinance will
eventually come forward as a public hearing but that staff intends to keep moving forward with this
as a priority project and keep the commissioners informed along the way. Dir. Untch also
mentioned, for the new members, that he will be retiring January 16, 2015.
8. New Business
A. From the Commission – Commissioner Hiller commented on the garage being
constructed at Fifth and Hamilton and was glad the HPC scaled it down.
B. From the Public – None.
8. Adjournment
The meeting was adjourned at 9:30 p.m. on motion by Commissioner Abplanalp, seconded
by Commissioner Hiller. Motion carried unanimously by voice vote of 4-0.
8
Community Development Department Report
CITY OF GENEVA, HISTORIC PRESERVATION COMMISSION
AGENDA ITEM 4A 227 South Third Street
September 16, 2014
Door Replacement
Applicant: BACKGROUND
Tad Hemming The structure at 227 South Third Street was constructed circa 1854 as a
Berry House Shops single family residence. The original Greek Revival building has been
significantly expanded and altered after 1945. The structure is treated
with synthetic siding and numerous replacement windows.
The existing wood doors located at the ground level are not historic
openings. The existing doors have been exposed directly to weather and
Request: the elements and have deteriorated over time. In particular, the
Permit Review: insulated glazing has “fogged” due to broken seals for the glazed
Door Replacement window unit.
The building is rated “non-contributing” according to the 1999 Survey.
HPC Case Number:
2014-077 REQUEST
Due to the exposure and minimal visibility of the non-historic doors at
the far east end of the south elevation and at the east alley elevation,
Staff Liaison: the Applicant is requesting to install paired doors that are aluminum
clad at the exterior (white, in color, to match existing) with wood
Michael Lambert
interiors. This is consistent with prior requests made in March 2014 and
Preservation Planner July 2013.
630/938.4541
mlambert@geneva.il.us
Community Development Department Report
CITY OF GENEVA, HISTORIC PRESERVATION COMMISSION
AGENDA ITEM 4B 228 North Fifth Street
September 16, 2014
Permit Review
Applicant: BACKGROUND
Susan Cunningham, The Applicant is requesting permission to erect a 42” high fence in the
Owner street yard.
REQUEST
The Applicant is seeking approval to erect a picket-style fence (see
Request: attached) in a street yard where no fence now exists. Additionally, the
Permit Review Applicant is erecting a rear yard fence which does not require HPC review.
Street Yard Fence
STAFF ANALYSIS
The subject property is contributing according to the 1999
HPC Case Number: Architectural Resources Survey. The proposed fence complies with
City of Geneva regulations for height and style; the proposed fence
2014-078
does not infringe on the “visibility triangle” at corner properties. The
case is brought to the HPC for review based on the requirements of the
Permit Review Matrix.
Staff Liaison:
Michael Lambert
Preservation Planner
630/938.4541
preservation@geneva.il.us
Community Development Department Report
CITY OF GENEVA, HISTORIC PRESERVATION COMMISSION
AGENDA ITEM 4B 228 North Fifth Street
September 16, 2014
Permit Review
Applicant: BACKGROUND
Ashland Ventures, The existing building is a former grocery store, built in 1954, and an
Owner adjacent one-story commercial building that was combined into a single
21N Community Coworking, commercial building in 1967 for the First National Bank of Geneva.
Tenant
REQUEST
The Applicant is requesting permission to modify the exterior street-
Request: facing elevations and install a new patio and free-standing pergola.
Permit Review
STAFF ANALYSIS
Façade Renovations
The subject property is non-contributing property according to the 1999
Architectural Resources Survey. The case is brought to the HPC for review
based on the requirements of the Permit Review Matrix. Specifically, the
HPC Case Number:
review is required for the construction of a new patio and pergola feature.
2014-080 However, the Applicant is seeking the opinion of the HPC regarding
proposed façade improvements for a prominent Mid-century Modern
commercial building located in the historic core of Geneva’s designated
Staff Liaison: districts.
Michael Lambert
Preservation Planner
630/938.4541
preservation@geneva.il.us
1954
Combined Into
Single Building: 1967
Pre-1954
Post-1954
Community Development Department Report
CITY OF GENEVA, HISTORIC PRESERVATION COMMISSION
AGENDA ITEM 4D 527 Campbell Street
September 16, 2014
Permit Review
Applicant: BACKGROUND
Tom Kraakevik, The Applicant has submitted a request to complete additional
Contractor architectural and landscape work in conjunction with an exterior
rehabilitation project. The property is adjacent (across the street) form
the new infill homes being erected along Campbell Street between Fifth
and Sixth streets.
Request:
REQUEST
Permit Review
Exterior Rehabilitation and As part of an exterior rehabilitation project, the Applicant is requesting
permission to install a new stoop and freestanding pergola at the existing
New Side Porch
Campbell Street (front) entrance and to construct a new user-friendly,
covered porch where an existing concrete stoop exists at the west
elevation of a later north addition.
HPC Case Number:
2014-081 STAFF ANALYSIS
The subject property, a late Cottage Bungalow with Tudor Revival massing
and minimalistic architectural details, consists of the original ca. 1939
Staff Liaison: home with a later addition that provided an attached single-car garage.
Michael Lambert The original portion of the home was clad in 7 inch wide clapboard; the
Preservation Planner later (north) addition is clad in shingle with a 5 inch exposure. The
property is identified as a contributing property within the Historic District
630/938.4541
according to the 1999 Architectural Resources Survey.
preservation@geneva.il.us
The Applicant has worked with Staff to complement the existing minimal
architectural details as elements of the proposed construction. The
Applicant.
The proposed work appears to be consistent with the SOI Standards. The
requested landscape improvements do not alter the character of the
residence. New stoops and porches are to provide safe access to the
home for its aging owners. The proposed work complies with lot coverage
requirements for the subject property. However, the proposed west
porch extends into a required street yard and, if the proposed work is
deemed acceptable and appropriate to the HPC, approval must be
conditional upon setback relief granted by the Zoning Board of Appeals
(ZBA).
Community Development Department Report
CITY OF GENEVA, HISTORIC PRESERVATION COMMISSION
AGENDA ITEM 4E 318 North Fourth Street
September 16, 2014
Permit Review
Applicant: BACKGROUND
Rachel Johnson, The property, which includes a ca. 1855 Upright and wing with multiple
Owner rear additions, is identified as a contributing property according to the
Tyler DeLarme 1999 Architectural Resources Survey. The house had been covered with
synthetic siding after ca. 1965. Previously, the aluminum siding that
covered the exterior was removed without the permission of the
Applicant. The Applicant wishes to improve the appearance of her home
but has limited funds to accomplish the work. The exposed historic siding
Request: was removed, and the Applicant was in the process of removing the
Permit Review historic siding and replacing with cementitious siding. The work was
Siding Replacement initiated without a building permit, and a Stop Work order has been
issued.
HPC Case Number: REQUEST
2014-082 The Applicant is requesting permission to install wood siding where
historic wood siding had been removed. The Applicant is seeking
approval to install new wood siding (including period-sensitive window
surrounds) at the south elevation to match the early 20th century
Staff Liaison:
replacement siding, installed at the south, east and north elevations.
Michael Lambert
Preservation Planner STAFF ANALYSIS
630/938.4541
The Applicant immediately conferred with Staff once the work was
preservation@geneva.il.us stopped and is motivated to complete the work in accordance with the
siding policies of the City of Geneva HPC. Although evidence exists of
earlier siding with a 4.25 inch exposure, the majority of the home was re-
sided (ca. 1908) with 3 inch exposure wood siding. Because more than
10% of the existing siding has been modified and requires replacement,
the approval could not be accomplished by administrative review per the
Permit Review Matrix and, therefore, has been referred to the HPC.
Community Development Department Report
CITY OF GENEVA, HISTORIC PRESERVATION COMMISSION
AGENDA ITEM 5A 516 Campbell Street – Lot 3
September 16, 2014
Concept Review
Applicant: BACKGROUND
Avondale Custom Homes The infill residence proposed for the vacant lot at the mid-block of
Maurice McNally Campbell Street between Fifth and Sixth streets is part of a larger
Ken Overstreet, Project redevelopment.
Manager
REQUEST
The proposed residence is the fourth of four (4) new residences that will
be built on the vacant land surrounding the former Merritt King home and
Request: property. The entire parcel is bounded by Fifth Street, Campbell Street
and Sixth Street.
Concept Review
New Infill Residence This is a revised architectural concept based on HPC feedback at the
August 19, 2014 regular meeting. The proposal is for a two story home
with an attached street-facing, front-load garage.
HPC Case Number:
2014-074 The architecture of the proposed home incorporates traditional forms,
massing, materials and details.
STAFF ANALYSIS
Staff Liaison:
Michael Lambert In order to provide informal feedback to the applicant, the conceptual
plans are provided for HPC review and comment.
Preservation Planner
630/938.4541 Preliminary Staff Review has been unable to identify whether or not the
preservation@geneva.il.us house complies with the bulk regulations identified in the Zoning
Ordinance. No calculations have been provided by the Applicant to verify
that lot coverage complies with Zoning Regulations for the site.
The proposed architecture is sympathetic to historic elements of 19th
century homes but is not a duplicate of other homes within the Geneva
Historic District. Exterior materials (brick, stone, shingle siding, and
asphalt shingle roof) are consistent with materials found throughout the
Geneva Historic District.
Based on previous discussions for new houses at this block in the Historic
District, the design attempts to strike a compromise between the
preferred prohibition of street-facing and snout-nosed garages (as
identified in the Design Guidelines) by setting the garage a greater
distance from the street.
Agenda Item 5A
Page 2 of 2 Concept Review
Based on the Design Guidelines and objective to minimize the impact of street-facing garages within the Historic
District, the architectural expression of the street-facing elevations emphasizes the primary street mass rather
than the recessed plane of the overhead garage doors.
The adopted Guidelines are policies intended to encourage harmonious development that is sympathetic to the
architectural rhythms and character of the existing and long-established neighborhood patterns throughout the
Historic District. However, the Guidelines were not adopted as mandatory requirements (e.g. zoning regulations)
for the development of properties within the Historic District.