Parks Committee
Regular MeetingGreen Bay, WI · December 10, 2025
Minutes
MINUTES OF THE PARKS COMMITTEE
WEDNESDAY, DECEMBER 10, 2025, 5:00 PM
In person at City Hall, Room 310.
Virtual attendance is also available via Zoom.
A. ZOOM MEETING INFORMATION.
1. Join Zoom Meeting Online:
https://us02web.zoom.us/j/84314784824?pwd=THBkdmRwT1k4MG5DV3hhbC9xVDhXdz09
Or call in by phone: +1 312 626 6799
Meeting ID: 843 1478 4824
Passcode: 278667
If you wish to speak at this public meeting or leave a comment, please fill out the online
Comment Form prior to the meeting. More detailed Zoom Instructions can be found
online.
B. ROLL CALL.
1. Members: Melinda Eck, Joey Prestley, Ben Delie, Jim Ridderbush
C. APPROVAL OF THE AGENDA.
1. Approval of the agenda for the Wednesday, December 10, 2025, meeting of the Parks
Committee.
Moved by Ald. Joey Prestley, seconded by Ald. Melinda Eck to approve.
Motion Passed.
Yes-Joey Prestley, Melinda Eck, Ben Delie, No-None, Abstain-None.
D. APPROVAL OF MINUTES.
1. Approval of the minutes from the November 19, 2025 Parks Committee meeting.
Moved by Ald. Joey Prestley, seconded by Ald. Melinda Eck to approve.
Motion Passed.
Yes-Joey Prestley, Melinda Eck, Ben Delie, No-None, Abstain-None.
E. REGULAR BUSINESS.
1. Consideration with possible action on accepting a $1,000 Green Gifts grant from Cellcom to
support the Green Bay Conservation Corps free native plant kit giveaway program.
Moved by Ald. Melinda Eck, seconded by Ald. Joey Prestley to approve accepting a $1,000
Green Gifts grant from Cellcom to support the Green Bay Conservation Corps free native
plant kit giveaway program.
Motion Passed.
Yes-Joey Prestley, Melinda Eck, Ben Delie, No-None, Abstain-None.
2. Consideration with possible action on hiring Water Technology, Inc. for $179,568 to
complete the necessary engineering and construction documents for the Phase 1
improvements to the Joannes Aquatic Center.
Moved by Ald. Melinda Eck, seconded by Ald. Joey Prestley to approve hiring Water
Technology, Inc. for $179,568 to complete the necessary engineering and construction
documents for the Phase 1 improvements to the Joannes Aquatic Center.
Motion Passed.
Yes-Joey Prestley, Melinda Eck, Ben Delie, No-None, Abstain-None.
3. Consideration with possible action on the request by One Astor Holdings LLC for a 15'
wide Permanent Storm Sewer Easement along the Fox River Trail on Parcel 15-2 for the
One Astor Park residential development.
Moved by Ald. Melinda Eck, seconded by Ald. Joey Prestley to approve the request by One
Astor Holdings LLC for a 15' wide Permanent Storm Sewer Easement along the Fox River
Trail on Parcel 15-2 for the One Astor Park residential development.
Motion Passed.
Yes-Joey Prestley, Melinda Eck, Ben Delie, No-None, Abstain-None.
F. INFORMATIONAL.
1. Director's Report on updates and recent activities of the Parks, Recreation & Forestry
Department.
Moved by Ald. Melinda Eck, seconded by Ald. Joey Prestley to receive and place on file.
Motion Passed.
Yes-Joey Prestley, Melinda Eck, Ben Delie, No-None, Abstain-None.
2. Next Meeting: January 14, 2026.
G. ADJOURNMENT.
1. Adjournment of the Wednesday, December 10, 2025, meeting of the Parks Committee.
Moved by Ald. Melinda Eck, seconded by Ald. Joey Prestley to adjourn.
Motion Passed.
Yes-Joey Prestley, Melinda Eck, Ben Delie, No-None, Abstain-None.
Agenda
AGENDA OF THE PARKS COMMITTEE
WEDNESDAY, DECEMBER 10, 2025, 5:00 PM
In person at City Hall, Room 310.
Virtual attendance is also available via Zoom.
A. Zoom Meeting Information.
1. Join Zoom Meeting Online:
https://us02web.zoom.us/j/84314784824?pwd=THBkdmRwT1k4MG5DV3hhbC9xVDhXdz09
Or call in by phone: +1 312 626 6799
Meeting ID: 843 1478 4824
Passcode: 278667
If you wish to speak at this public meeting or leave a comment, please fill out the online
Comment Form prior to the meeting. More detailed Zoom Instructions can be found
online.
B. Roll Call.
1. Members: Melinda Eck, Joey Prestley, Ben Delie, Jim Ridderbush
C. Approval of the Agenda.
1. Approval of the agenda for the Wednesday, December 10, 2025, meeting of the Parks
Committee.
D. Approval of Minutes.
1. Approval of the minutes from the November 19, 2025 Parks Committee meeting.
E. Regular Business.
1. Consideration with possible action on accepting a $1,000 Green Gifts grant from Cellcom to
support the Green Bay Conservation Corps free native plant kit giveaway program.
2. Consideration with possible action on hiring Water Technology, Inc. for $179,568 to
complete the necessary engineering and construction documents for the Phase 1
improvements to the Joannes Aquatic Center.
Agenda of the Parks Committee
December 10, 2025
Page 1
3. Consideration with possible action on the request by One Astor Holdings LLC for a 15'
wide Permanent Storm Sewer Easement along the Fox River Trail on Parcel 15-2 for the
One Astor Park residential development.
F. Informational.
1. Director's Report on updates and recent activities of the Parks, Recreation & Forestry
Department.
2. Next Meeting: January 14, 2026.
G. Adjournment.
1. Adjournment of the Wednesday, December 10, 2025, meeting of the Parks Committee.
1) THIS MEETING IS RECORDED: THE VIDEO OF THIS MEETING AND MINUTES ARE AVAILABLE ONLINE
AT www.greenbaywi.gov
2) ACCESSIBILITY: Any person wishing to attend who requires special accommodation because of a disability,
should contact the City Safety Manager at 920-448-3125 at least 48 hours before the scheduled meeting time so
that arrangements can be made.
3) QUORUM: Please take notice that a majority or quorum of the Common Council will attend this Parks
Committee meeting and will constitute a meeting of the Common Council for purposes of discussion and
information gathering relative to this agenda.
4) REPRESENTATION: The party requesting the communication, or their representative, should be present at this
meeting.
Agenda of the Parks Committee
December 10, 2025
Page 2
Packet
AGENDA OF THE PARKS COMMITTEE
WEDNESDAY, DECEMBER 10, 2025, 5:00 PM
In person at City Hall, Room 310.
Virtual attendance is also available via Zoom.
A. Zoom Meeting Information.
1. Join Zoom Meeting Online:
https://us02web.zoom.us/j/84314784824?pwd=THBkdmRwT1k4MG5DV3hhbC9xVDhXdz09
Or call in by phone: +1 312 626 6799
Meeting ID: 843 1478 4824
Passcode: 278667
If you wish to speak at this public meeting or leave a comment, please fill out the online
Comment Form prior to the meeting. More detailed Zoom Instructions can be found
online.
B. Roll Call.
1. Members: Melinda Eck, Joey Prestley, Ben Delie, Jim Ridderbush
C. Approval of the Agenda.
1. Approval of the agenda for the Wednesday, December 10, 2025, meeting of the Parks
Committee.
D. Approval of Minutes.
1. Approval of the minutes from the November 19, 2025 Parks Committee meeting.
E. Regular Business.
1. Consideration with possible action on accepting a $1,000 Green Gifts grant from Cellcom to
support the Green Bay Conservation Corps free native plant kit giveaway program.
2. Consideration with possible action on hiring Water Technology, Inc. for $179,568 to
complete the necessary engineering and construction documents for the Phase 1
improvements to the Joannes Aquatic Center.
Agenda of the Parks Committee
December 10, 2025
Page 1
3. Consideration with possible action on the request by One Astor Holdings LLC for a 15'
wide Permanent Storm Sewer Easement along the Fox River Trail on Parcel 15-2 for the
One Astor Park residential development.
F. Informational.
1. Director's Report on updates and recent activities of the Parks, Recreation & Forestry
Department.
2. Next Meeting: January 14, 2026.
G. Adjournment.
1. Adjournment of the Wednesday, December 10, 2025, meeting of the Parks Committee.
1) THIS MEETING IS RECORDED: THE VIDEO OF THIS MEETING AND MINUTES ARE AVAILABLE ONLINE
AT www.greenbaywi.gov
2) ACCESSIBILITY: Any person wishing to attend who requires special accommodation because of a disability,
should contact the City Safety Manager at 920-448-3125 at least 48 hours before the scheduled meeting time so
that arrangements can be made.
3) QUORUM: Please take notice that a majority or quorum of the Common Council will attend this Parks
Committee meeting and will constitute a meeting of the Common Council for purposes of discussion and
information gathering relative to this agenda.
4) REPRESENTATION: The party requesting the communication, or their representative, should be present at this
meeting.
Agenda of the Parks Committee
December 10, 2025
Page 2
Report to the
Parks Committee
of the City of Green Bay
MEETING DATE PREPARED BY
December 10, 2025
AGENDA ITEM # D.1
Approval of the minutes from the November 19, 2025 Parks Committee meeting.
BACKGROUND
RECOMMENDATION
FISCAL IMPACT
ATTACHMENTS
1. Parks Committee Minutes November 19, 2025
100 North Jefferson Street, Green Bay, Wisconsin 54301-5026
greenbaywi.gov
Report to the
Parks Committee
of the City of Green Bay
MEETING DATE PREPARED BY
December 10, 2025 Dan Ditscheit, Parks Director
AGENDA ITEM # E.1
Consideration with possible action on accepting a $1,000 Green Gifts grant from Cellcom to support the
Green Bay Conservation Corps free native plant kit giveaway program.
BACKGROUND
At the November 19, 2025 Parks Committee meeting you approved accepting a $3,850 grant from the C.D.
Besadny Conservation Fund / Natural Resources Foundation to provide a free native plant giveaway to 200
residents. This funding for this grant will be used to improve and expand its greenhouse operations with
additional materials such as soil, seed, trays, and a hoop house for expanded space to accommodate this
program.
Celcom just awarded $1,000 to the City of Green Bay through their Green Gifts grant program to also
support this initiative. If this grant award is approved, the funding will be used specifically to purchase yard
signs to promote this program.
RECOMMENDATION
To approve
FISCAL IMPACT
There is no cost to the City if this grant award is approved. The total cost for the purchase of all materials
associated with this program is $4,850.
$3,850 - C.D. Besadny Conservation Fund / Natural Resources Foundation grant (Already approved)
$1,000 - Cellcom Green Gifts grant (Approval under consideration)
ATTACHMENTS
1. Cellcom Grant Notification
2. Cellcom Grant Application 2025
3. Cellcom Grant Tracking Form
100 North Jefferson Street, Green Bay, Wisconsin 54301-5026
greenbaywi.gov
From: Skifton, Nathan <Nathan.Skifton@cellcom.com>
Sent: Monday, December 1, 2025 2:44 PM
To: Maria Otto <Maria.Otto@greenbaywi.gov>
Subject: [EXTERNAL] Congratulations! You're a 2025 Green Gifts Recipient!
Caution: This email originated from a sender outside of your organization. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
Dear Maria,
On behalf of the entire team at Cellcom, we are thrilled to inform you that your
organization, City of Green Bay – Conservation Corps, has been selected as a recipient of a
2025 Green Gifts grant!
We received a record number of applications this year from incredible organizations
dedicated to environmental stewardship. Your project stood out for its innovative
approach and potential to make a significant, positive impact on our community's
sustainability.
Congratulations!
We are proud to support your work with a grant in the amount of $1000.
Your commitment to protecting our environment is inspiring, and we are excited to see
your project come to life. The work you do is essential for building a healthier, more
sustainable future for everyone in Wisconsin and the Upper Peninsula of Michigan.
Thank you for your thoughtful application and for the vital work your organization does
every day.
In order to create a check, we will need a copy of your current W9. We have attached a
blank form for reference.
If you have any questions on next steps, please reach out via email to
nathan.skifton@cellcom.com
Sincerely,
The Cellcom Team
Nathan Skifton | Marketing Specialist | Cellcom | 450 Security Blvd. Green Bay, WI
54313 | Email: nathan.skifton@cellcom.com
Cellcom is an Nsight Company
Cellcom - Green Gifts Grant Application
Organization* City of Green Bay – Conservation Corps
Contact Name* Maria Otto
Phone Number* 920-604-9171
Email Address* maria.otto@greenbaywi.gov
Street Address* 100 N Je/erson Street
City* Green Bay
State* WI
Zip* 54301
Tax ID Number (to verify non-profit status)* FEIN # 39-6005458
About Your Organization
Brief History of Organization (50 words or less)*
With 2,658 acres in the City of Green Bay Parks, the City created an AmeriCorps program to bring
more conservation e/orts to Green Bay. Conservation Corps crews are responsible for improving
trail systems throughout Green Bay, invigorating pollinator habitats with new native plantings, and
improving native habitats with restoration practices.
About Your Green Initiative or Project
Overview, goals, timeline, and project activities:
The Green Bay Conservation Corps has been working to create the “Pollinator Corridor” throughout
the City by establishing native plantings. At the same time, the Green Bay Sustainability
Commission has been seeking an alternative program to “No Mow May” to better support
pollinators in our area.
In the spring of 2026, the Conservation Corps will launch a free native plant kit giveaway for Green
Bay residents to meet the goals of both groups. The program will distribute 200 free native plant
kits, each containing 15 plants (sun/shade variations), grown by AmeriCorps members. These kits
will include planting plans, maintenance guides, a yard sign, and educational materials.
Breakdown of projected costs for the project including requested amount:
We are requesting $1,000 to help partner with this free plant kit giveaway project.
The expected costs of the project include $400 for soil, $600 for pots, $250 for seeds, $200 for a
hoophouse, $1,100 for greenhouse supplies and improvements, $300 for promotional and
educational packets, and $2,000 for yard signs to promote the program. We have secured $3,850
from the Natural Resource Foundation and are seeking funding for the remaining $1,000.
Describe the community need addressed by your program or project:
Native plants benefit the local wildlife, as well as improve water filtration and quality. Both are local
needs of Green Bay. This program removes the financial barrier and educational gaps that may
prevent Green Bay residents from benefiting from a native garden.
Describe any educational components of your program or project:
Each plant kit will have an educational packet. This packet will include how-to guides for preparing
a planting site, how to plant, and how to maintain plantings. Additionally, they will include
suggested plant designs, descriptions of each species, the benefits of native species, and
resources for future projects. All educational documents will be made available for download on
the Conservation Corps’ website.
Plant kits will also come with a yard sign to promote the native plantings. These signs will have QR
codes to the guides online. It is the intention that the yard signs will help spread awareness and
educate neighbors about pollinators, native species, and water quality improvements.
Describe how the project will be evaluated:
Recipients of a kit will be asked to complete a follow-up survey assessing residents’ knowledge
gain, satisfaction with the kit, likelihood to maintain or expand native plantings, and
photographic documentation of installed plantings. The number of residents who apply, receive
kits, and report planting success will be tracked, mapped, and documented for future
expansion.
Provide examples of past measurable impact of organization’s environmental work:
The Green Bay Conservation Corps has installed over 50,000 native flower species in city parks.
These plantings included a rain garden at Navarino Park that eliminated flooding in the park.
Surveys of the installed plantings have also resulted in documenting the Federally Endangered
Rusty Patched Bumblebee at 11 new sites within the City of Green Bay. This resulted in the Fish and
Wildlife Service updating the Rusty Patched Bumblebee “high potential” zones for federal funding.
The Conservation Corps has also removed nearly 200 acres of invasive species, planted over 500
native trees and shrubs, hosted an annual average of 350 volunteers, and installed/maintained over
3 miles of public trails annually.
GRANT TRACKING FORM
PART #1: Notification of Grant Funds
(emailto:PamelaMa@greenbaywi.gov)
APPLICANT DEPARTMENT: PRF DATE: 12/01/2025
APPLICANT DEPARTMENT GRANT CONTACT NAME/TITLE: Maria Otto/Conservation Corps Coordinator
APPROPRIATE COMMITTEE: Finance/Parks
NAME OF GRANT/FUNDING SOURCE: Green Gifts / Cellcom
AMOUNT OF GRANT REQUEST: $1,000 LOCAL MATCH REQUIREMENT: $0
SOURCE OF MATCH: General Fund Non-General Fund Not Applicable
TIMEFRAME OF GRANT: 01/01/2026 through 06/30/2026
TYPE OF GRANT REQUEST: Monetary Other (explain under ‘purpose of grant’)
PURPOSE OF GRANT (summary): Fund the free native plant kit giveaway, specifically with the cost of yard signs.
How does the grant meet City/Department needs? Promotes GSI practices, the Planned Natural Landscape
Ordinance, and pollinator habitat improvements.
What are the personnel requirements (include both existing and new staff) of the grant? Conservation
Corps Coordinator required minimal time for the grant – submitting the application, completing reports,
and ordering supplies.
DEPARTMENT HEAD SIGNATURE: _________________________________________________________________
PART #2: Request to Accept Grant Funds
(complete after notification of grant award; emailto:PamelaMa@greenbaywi.gov)
AMOUNT OF GRANT AWARD: $1,000 CFDA/STATE ID #:
LOCAL MATCH REQUIREMENT: $0
Please describe the source of match, if applicable: N/A
Please describe any major changes in proposed grant-funded activities: None.
Please describe what the grant money will be spent on: Promotional items and yard signs for plant kit giveaway.
PART TO: DATE: TO: DATE:
#1: Request to Apply Finance Dept FC – Info/Action
#2: Request to Accept Finance Dept FC – Action
FC = Finance Committee
Report to the
Parks Committee
of the City of Green Bay
MEETING DATE PREPARED BY
December 10, 2025 Dan Ditscheit, Parks Director
AGENDA ITEM # E.2
Consideration with possible action on hiring Water Technology, Inc. for $179,568 to complete the necessary
engineering and construction documents for the Phase 1 improvements to the Joannes Aquatic Center.
BACKGROUND
The Joannes Aquatic Center opened in 1996. It is nearing 30 years old and is in need of some major
maintenance repairs in the next few years just to keep this facility open to the public. The Parks
Department hired a consultant and created a masterplan/phasing plan for improvements to Joannes aquatic
center. This plan was approved by the Parks Committee and City Council.
Planned Phase 1 improvements included mechanical equipment replacement, new pool gutters, concrete
repair to the surge tank, re-plastring the entre pool basin and various upgrades to water play amenities
within the pool basin footprint.
Staff sent out requests for proposals to 8 consultanting firms. Only 2 companies submitted a proposal. Staff
is recommending to contract services with the low quote, Water Technology, Inc., for a total cost of
$179,568. The selected consultant will be required to complete the necessary engineering and construction
bid documents for the planned Phase 1 improvements.
RECOMMENDATION
To approve.
FISCAL IMPACT
The total cost to hire the consultant is $179,568.
The City bonded $200,000 in 2025 to hire this consultant.
The total estimated cost to construct the Phase 1 improvements is $2,250,000. The City approved bonding
$1,125,000 in 2026 and committed to bonding $1,125,000 in 2027 to construct this project.
ATTACHMENTS
1. Proposal Summary - Joannes Aquatic Center Phase 1
2. WTI Proposal_Joannes Aquatic Center
100 North Jefferson Street, Green Bay, Wisconsin 54301-5026
greenbaywi.gov
CITY OF GREEN BAY, WISCONSIN
SUMMARY OF PROPOSALS FOR:
ENGINEERING DESIGN SERVICES: JOANNES AQUATIC CENTER - PHASE I
UPGRADES
CONSULTANT QUOTE
Water Technology, Inc. $ 179,568.00
Burbach Aquaticcs, Inc. $ 216,000.00
Note: RFP was sent to eight (8) companies. Two (2) companies provided a quote,
one (1) declined the RFP, and five (5) had no response.
JOANNES AQUATIC CENTER
W T I P R O P O S A L | 12.03.2025
TA B L E O F C O N T E N T S
LETTER OF INTEREST......................................................................................................... 3
WTI TEAM........................................................................................................................... 4
FIRM OVERVIEW................................................................................................................................................. 5
PROJECT TEAM RESUMES............................................................................................................................. 6
PROJECT OWNER REFERENCES......................................................................................... 9
RELEVANT EXPERIENCE .................................................................................................. 10
PROFESSIONAL SERVICES PROPOSAL............................................................................ 16
HOURLY FEE SCHEDULE................................................................................................................................ 25
PROPOSAL FOR ENGINEERING DESIGN SERVICES
J O A N N E S A Q UAT I C C E N T E R - P H A S E 1 U P G R A D E S
City of Green Bay Department of Parks, Recreation and Forestry
Submission Date: December 3, 2025
Dear Emma Browne,
Water Technology, Inc. (WTI) is pleased to submit the enclosed proposal in response to the City of Green
Bay Department of Parks, Recreation, and Forestry’s Request for Proposals for professional design
services for the Joannes Aquatic Center – Phase I Upgrades. With the facility approaching three decades
of successful operation, we recognize the importance of addressing essential repairs while positioning
the Center for the next chapter of community use.
Our Team brings more than 40 years of dedicated aquatic design expertise, supported by licensed
engineers, designers, and technical specialists who work daily within Wisconsin’s regulatory
environment. We maintain a deep working knowledge of codes, regulation, and permitting—along with
strong relationships with state and local officials—ensuring that all design documents meet or exceed
applicable standards and industry best practices. This experience, paired with a national portfolio of
renovations, modernizations, and new-build aquatic environments, gives us a clear understanding of the
complexities of restoring aging infrastructure while seamlessly integrating new features that improve
safety, enhance guest experience, and support long-term operational efficiency.
The City’s defined structure for Phase I—divided into Phase A and Phase B—is clear in its intent to ensure
each component is independently bid-ready. Based on our experience and expertise with multi-phase
aquatic improvements, WTI is proposing an approach that advances Phase A and Phase B concurrently.
This method maximizes efficiencies for the City by:
» Allowing coordinated design development that avoids duplication of work across two separate timelines;
» Ensuring constructability alignment between repairs and new features; and
» Producing a seamless bid package where Phase B elements can be cleanly carried as alternates,
fully contingent upon funding.
Should the City prefer to maintain strict separation between phases, WTI has provided a clear delineation
of deductive cost associated with removing Phase B components from the combined development
effort. Please note that this deductive value differs from what it would cost to reintroduce Phase B after
Phase A has been completed independently.
Per the outlined scope, WTI does not anticipate the need for subconsultants on this project. Should
that change at any point, we will notify the City to fully disclose the role and scope of any added team
members.
We are committed to delivering solutions that are technically sound, community-focused, financially
responsible, and aligned with the City’s long-term vision for Joannes Aquatic Center. WTI appreciates
the opportunity to support Green Bay in revitalizing this well-loved facility, and we look forward to the
opportunity to collaborate with your team on a successful and sustainable upgrade. If any questions or
clarifications arise during your review, our team is readily available and happy to assist.
Sincerely,
Matt Freeby
Project Director
Water Technology, Inc.
3
WTI
TEAM
4
WATER TECHNOLOGY, INC.
FIRM OVERVIEW
The WTI team is a highly qualified group of individuals comprised of creative
architects, landscape architects, engineers, designers, business developers
and administrators, all with a passion for aquatics. Together, we combine our
talents to develop original, aquatic facilities from concept to reality. In addition,
WTI maintains solid relationships with other consultants and contractors and
continues to set the standards in the aquatic industry across the United States
and around the world.
PHILOSOPHY
WTI’s creative energy and passion embraces the philosophy that aquatic
recreation completes communities and makes them a better place to live.
COMPANY DETAILS
• Established in 1983
• Largest Aquatic Design Firm in North America, Staff of 70+
• Quality Control Implementation
• Collaborative Team Process
• International Portfolio
• Specialized Aquatic Professionals on Staff:
• Executive Team (5)
• Project Development (13)
• Project Manager/Engineer (22)
• Licensed Architect (4)
• Project Designer (7)
• Mechanical Designer/BIM (9)
• Technical Designer (6)
• Administrative (7)
WTI ADVANTAGES
• Solution driven planning and philosophy
• Two-way sharing process between WTI and client
• Forward-looking designs that support dynamic community programs
• Revit / BIM Capabilities
• 150+ AQUATIC Projects Per Year
• Historical database of cost estimates and realistic timelines
EXTENSIVE PORTFOLIO
• Waterparks • Water Playgrounds
• Resort and Hotel Pools • Public Facilities
• Competition Pools • Therapy and Wellness Pools
• Faith Based Community Centers • Schools and Universities
HEADQUARTERS TEXAS UK
100 Park Avenue 6636 N Riverside Dr. 8 Jayes Park Courtyard
Beaver Dam, WI 53916 Ste. 500B Ockley, Surrey RH5 5RR. UK
T. 920.887.7375 Fort Worth, TX 76137 T. 682.708.7007
T. 682.708.7007
5
M A T T F R E E B Y , AIA, LEE D AP, NC A R B
PROJECT DIRECTOR
Matthew Freeby brings extensive experience in designing and constructing various
building types and structures. Responsible for large project development, he has
managed projects ranging from $1 million to $100 million, from conceptual planning
to construction management.
Matt is relied upon to define project scope, goals and deliverables that support
WTI’s business goals in collaboration with senior management. He helps to
determine and assess need for additional staff and/or consultants and make the
appropriate recruitments if necessary during project cycle. A registered Architect in
22 states and a NSPF Certified Pool/Spa Operator, Mr. Freeby is a LEED Accredited
Professional with an advanced depth of knowledge in green building practices and
sustainable aquatic design and operations. Matt’s attention to detail and persistent
pursuit of excellence provides the industry benchmark in aquatic design.
E DUCATION REGISTR ATIONS
Masters Degree | Architecture AIA Architect: AL, AR, CA, DE, FL, HI, IN, LA, MI,
Washington University | St. Louis, Missouri MN, MO, NE, NJ, NM, NV, NY, OK, RI, TN, UT, WA, WI
Bachelor of Business Administration | Finance LEED Accredited Professional
University of Wisconsin - Whitewater NSPF Certified Pool / Spa Operator (CPO)
Whitewater, WI PROFESSIONAL AFFILIATIONS
Bachelor of Arts | Architecture Themed Entertainment Association (TEA)
Washington University | St. Louis, Missouri American Institute of Architects (AIA)
National Council of Architectural
Registration Boards (NCARB)
FE ATURE D PROJECTS
Buchner Park Pool Conceptual Design Water Feature
Waukesha, WI Lake Delton, WI
Erb Park Swimming Pool Christmas Mountain Village
Appleton, WI Lake Delton, WI
Richland Center Aquatic Center Goeres Park Pool
Richland Center, WI Lodi, WI
Baldwin Medical Center Madison Goodman Pool Expansion Study
Baldwin, WI Madison, WI
Port Superior Marina Madison Metropolitan School District
Bayfield, WI Madison, WI
Chippewa Falls Soderholm Aquatic Center at UW-Madison
Chippewa Falls, WI Madison, WI
VFW Park Design Manitowoc Family Aquatic Center
De Pere, WI Manitowoc, WI
Elm Grove Western Racquet Club Design Bay Area Medical Center
Elm Grove, WI Marinett, WI
Leonard-Leota Park and West Side Park Bucks Arena
Evansville, WI Milwaukee, WI
Village Pointe Commons Columbia St. Mary’s Hospital
Grafton, WI Milwaukee, WI
Green Bay Colburn Pool Saint John’s on the Lake
Green Bay, WI Active Independent Living Center
The Tundra Lodge Milwaukee, WI
Green Bay, WI South Suburban YMCA
Milwaukee, WI
6
ADAM JANESZ
PROJECT MANAGER
Adam joined WTI in 2023 with over six years of experience in project management
and business development within the construction industry. Adam excels in
leading diverse teams and managing numerous mid to large-scale projects. With
a Bachelor’s Degree in Construction Management, Adam enriches each project by
providing unique insights into practical aspects of design decisions, risk mitigation,
cost control, schedule management, and quality assurance. In addition, he is
well-poised in identifying new business opportunities and cultivating strategic
partnerships. Known for his strong communication skills and ability to build strong
relationships with clients, stakeholders, and team members alike, Adam brings
incredible value to each project team! He is an avid learner who is passionate and
committed to remain at the forefront of emerging trends and best practices in the
aquatic industry.
E DUCATION PROFESSIONAL AFFILIATIONS
Bachelor of Science | Construction Management, Safety Trained Supervisor in Construction
Construction Management Technology (STSC Certification #STSC-20675)
Eastern Michigan University | Ypsilanti, MI OSHA 30 Hour (Certification #600341837)
REGISTR ATIONS National Association for Industrial and Office Parks
(NAIOP)
NSPF Certified Pool / Spa Operator (CPO)
Revit Certified Professional
FE ATURE D PROJECTS
Spencer Outdoor Aquatic Center Marshall Family Aquatic Center
Spencer, IA Marshall, MN
Byron High School Winona Municipal Pool Mechanical Renovation
Byron, IL Winona, MN
South Elgin High School Natatorium Renovation Gameday Bay
Elgin, IL Canton, OH
Glenview Park Splash Pad Columbus Buckeye Swim Club
Glenview, IL Columbus, OH
Sand Park Pool Liner Replacement Hilliard Recreation and Wellness Center
Loves Park, IL Hilliard, OH
Greencastle YMCA Sandusky Community Aquatic Center
Greencastle, IN Sandusky, OH
Lowell High School Ehrnfelt Recreation & Senior Center Evaluation
Lowell, IN Strongsville, OH
Adams Central High School Pool Leonard-Leota Park & West Side Park
Monroe, IN Evansville, WI
Kennedy Park Outdoor Aquatic Center Kohler Spa Phase II
South Bend, IN Kohler, WI
Indiana University: Bradford Woods Riverbend Cold Plunge Evaluation
Martinsville, IN Kohler, WI
Wawasee Middle School Erickson Pool Mechanical Renovation
Syracuse, IN La Crosse, WI
Deming Park Pool La Crosse Area YMCA
Terre Haute, IN La Crosse, WI
Battle Creek Waterworks Remodel Ramsey County Ridgewood on the River Renovation
Maplewood, MN Plover, WI
7
MIRANDA CHRISTIANSON
DIRECTOR OF PRODUCTION
Miranda joined WTI in 2016 and has since played an integral role in driving both
project and team success. With a solid background in Revit and AutoCAD and nearly
two decades of hands-on experience in technical design, she has grown into a
leadership role where her passion for precision and process truly shines.
As WTI’s Director of Production, Miranda leads the Production Team with a focus on
delivering high-quality, accurate construction documents and ensuring timely design
deliverables. Known for her collaborative spirit, Miranda thrives on cross-functional
teams, often acting as the bridge between Technical Design, Project Management,
Mechanical Design, and the Design Team.
Miranda is engaged throughout the project lifecycle, with a strong presence from
Schematic Design through Construction Documents. Her detail-oriented mindset
drives an understanding of how all the pieces come together to form a cohesive
whole—an approach that consistently results in clear, coordinated, and buildable
documentation. Her expertise in Revit and 3D design software remains instrumental
in maintaining WTI’s technical standards. Under her leadership, she not only manages
teams and resources but also mentors staff, fostering a robust team dynamic and
commitment to quality. A natural problem-solver with an eye for both the big picture
and the smallest detail, Miranda brings clarity, structure, and guidance to every
project, making her an invaluable asset across all project teams.
E DUCATION
Associate of Applied Science | Architectural Commercial Design
Northwood Technical College | Rice Lake, WI
FE ATURE D PROJECTS
Centennial High School The Saginaw Chippewa Indian Tribe Community Center
Champaign, IL Mount Pleasant, MI
Magic Waters Waterpark Moores Park Pool
Cherry Valley, IL Lansing, MI
Arndt Park Pool Wayland Union School Competition Pool
Des Plaines, IL Wayland, MI
Great Wolf Lodge Bamboo Bay
Gurnee, IL Shoreview, MN
Ultimate Swim VFW Park Design
Oak Brook, IL De Pere, WI
Riverside Swim Club Evansville Aquatic Center at Larson Acres Park
Riverside, IL Evansville, WI
Rock Island YWCA Colburn Pool
Rock Island, IL Green Bay, WI
Romeoville Aquatic Center West Side YMCA Renovation
Romeoville, IL Green Bay, WI
New Trier High School Hartford Union High School
Winnetka, IL Hartford, WI
Stonewater Aquatic Center Kohler Spa Phase II
Wonder Lake, IL Kohler, WI
JLA Hotel Pool Soderholm Family Aquatic Center at the Nicholas
Detroit, MI Recreation Center, University of Wisconsin - Madison
Kalamazoo College Natatorium Renovation Madison, WI
Kalamazoo, MI Bucks Arena
Grand Hotel Milwaukee, WI
Mackinac Island, MI Wisconsin Rapids Regional Aquatic Center
Wisconsin Rapids, WI
8
PROJECT OWNER REFERENCES
WISCONSIN RAPIDS REGIONAL AQUATIC CENTER MAYFIELD HEIGHTS COMMUNITY & AQUATICS CENTER
Joseph M. Terry, P.E., Director of Public Works, City of WI Rapids Sean Ward, Director of Recreation, City of Mayfield Heights
715.421.8255 | jterry@wirapids.org 440.442.2626 ext. 400 | seanward@mayfieldheightsohio.gov
CLARKSVILLE COVE AQUATIC CENTER RENOVATION EVANSVILLE AQUATIC CENTER
Brian Kaluzny, Superintendent, Clarksville Park Jason Sergeant, City Administrator, City of Evansville
812.283.5313 | bkaluzny@clarksvilleparks.com 608.882.2285 | j.sergeant@evansvillewi.gov
NICHOLAS RECREATION CENTER FMC NATATORIUM
Zane Hugo, Aquatics Director, University of Wisconsin Mary Ann Kaufman, Owner & Founder, FMC
608.265.6222 | zane.hugo@wisc.edu 630.537.1188 | fmcaquaticopportunities@gmail.com
9
RELEVANT
EXPERIENCE
10
E VA N S V I L L E A Q UAT I C C E N T E R PROJECT DE TAILS
E V A N S V I L L E, W I S C O N S I N
The City of Evansville exemplified its commitment to enhancing the community’s
quality of life in revitalizing two key recreational spaces—Larson Acres Park and
OWNE R
City of Evansville
Leonard-Leota Park. The Evansville Aquatic Center replaces the aging municipal pool,
31 S Madison St.
and is now relocated to a 24-acre site, formerly West Side Park, now known as Larson
Acres Park. Named in honor of Don and Virginia Larson, local community members P.O. Box 529
whose family farmed the land for decades and played a pivotal role in supporting Evansville, WI 53536
park improvement projects. The vibrant aquatic center quickly became a cherished
Evansville centerpiece. COMPLE TE D
Opened the same summer, at Leonard-Leota Park, a state-of-the-art Spray Pad also 2024
serves the Evansville Community. WTI worked alongside the prime architect, who
led the master planning and design for this dual park upgrade. WTI provided aquatic AWARDS / FE ATURES
planning, design, and engineering services for both the Aquatic Center and Spray Pad. Aquatic Design Portfolio
The Evansville Aquatic Center features one multi-purpose body of water, providing Athletic Business, 2025
aquatic recreation, play, competition, and leisure. The zero-depth-entry splash and
play area invites and promotes play for little ones and their parents or guardians. WE BSITE
Deeper water connects this play area to the circular activity pool; basketball hoops evansvillewi.gov
anchor this space, and guests may find themselves competing here for hours. Open
water provides endless opportunities for recreational play. The current channel offers
aerobic programming opportunities such as resistance walking, as well as provides a
space for guests looking to relax and leisurely float. The six-lane, 25-yard competition
pool is ideal for lap swimming, swim practice, and meets. In addition to diving blocks,
an aquatic climbing wall is also located in this space. Completing the aquatic offering
is a waterslide tower, featuring two body slides terminating into runouts.
AQUATIC AMENITIES
8,917 SF Lifestyle Pool 6-Lane, 25-Yard Competition Pool
180 LF Current Channel Starting Blocks
Zero-Depth Entry
Play Structure, Water Table
Aquatic Climbing Wall
Basketball Hoops
Water Slide Complex
11
V F W A Q UAT I C C E N T E R PROJECT DE TAILS
D E P E R E, W I S C O N S I N
After several years, the original VFW pool in DePere suffered from extensive OWNE R
amounts of damage and the City of DePere began searching for funds for a new City of De Pere
aquatic center. The city received an abundance of support. “The referendum passed 925 S. Sixth Street
overwhelmingly, so we are here for the community wants. We’re here for the quality De Pere, WI 54115
of life. The community said this is a need for us” says Marty Kosobucki, Director of
Parks, Recreation, and Forestry. Plans for the new aquatic center had been in the COMPLE TE D
works for 5-years before coming to full fruition. 2021
WTI was hired alongside the architect of record to assess the existing aquatic facility
and incorporate feedback into the design from key stakeholders which was gathered AWARDS / FE ATURES
through public meetings and interviews. Several renderings and budgets were Outstanding Facility
prepared and presented before the City approved the final rendering and budget. Design & Renovation
Wisconsin Park and
Groundbreaking for the $7.14 Million aquatic facility took place in July of 2020.
Recreation Association, 2021
Despite the COVID-19 Pandemic, the project stayed on track with little to no delays.
By June of 2021, the final touches were being put in place and the aquatic center
WE BSITE
opened to the public on Saturday, June 12th, just in time for some summer fun.
deperewi.gov
The 5,300 SF VFW Pool is the perfect beat-the-heat summer destination. It is
equipped with a lap pool, a zero-depth entry leisure pool, diving boards, climbing wall,
basketball hoop, water walk, drop slides, and a tot area for the little ones. In addition,
it features a 6,150 SF bathhouse with bathrooms and changing rooms, office and
guard spaces, first aid, entry lobby, meeting rooms, and concessions. There is truly
something for everyone to enjoy at this family-friendly aquatic destination located on
the west side of the city.
AQUATIC AMENITIES
5,300 SF Lifestyle Pool 1,800 SF Wading Pool
6 lanes, 25-Meter Zero Depth Entry
Diving Boards Play Structure
Activity Zone Interactive Water Features
Water Walk
Drop Slide Body Slides with Runouts
Water Basketball
Climbing Wall
12
W I S C O N S I N R A P I D S R E G I O N A L A Q UAT I C S C E N T E R PROJECT DE TAILS
W I S C O N S I N R A P I D S, W I S C O N S I N
After years of public discussion and engagement, the City of Wisconsin Rapids
decided to improve the Witter Field Park with the addition of a water park. OWNE R
Community feedback indicated a strong desire for having aquatics that serve both a The City of Wisconsin Rapids
multigenerational community and tourists who visit Wisconsin Rapids. The $12 Million 521 Lincoln St
project has been funded through a mix of public funds, matching grants, private Wisconsin Rapids, WI 54494
donations, and corporate contributions.
COMPLE TE D
Water Technology, Inc. (WTI) was hired to provide aquatic planning, design, and 2020
engineering services for the future Wisconsin Rapids Regional Aquatic Center.
Because of uncertainties in final funding totals, WTI developed multiple designs AWARDS / FE ATURES
to accommodate various funding levels without compromising key amenities and Aquatic Design Portfolio
features. Athletic Business, 2021
Two principals guided the aquatic design: to appeal to the multigenerational families
of Wisconsin Rapids and to become a regional attraction. WTI designed three Aquatics International
separate aquatic spaces to meet the diverse community needs. The first space is Dream Designs, 2022
designed for those with small children who will enjoy the 2553 SF zero-depth entry
tot pool which has geysers, interactive play features, a tot slide, and toddler-sized lazy WE BSITE
river. The second space features an enormous 7,667 SF leisure pool, with an activity wirapids.org/aquatics.html
area, a lazy river with action channel, and a three-story waterslide that terminates into
a refreshing plunge area. The final space is designed for fun exercise opportunities
for the whole family, including a climbing wall, a diving board, and a three lane Wibit
obstacle course that is fun for the whole family.
The Wisconsin Rapids Regional Aquatic Center opened its doors on July 6, 2020 to a
great reception from the local community.
AQUATIC AMENITIES
7667 SF Leisure Pool Action Channel (75 FT)
Activity Pool 2333 SF Lazy River (260 FT)
1M Diving Board Tot Pool Zero-Depth Entry (2553 SF)
Climbing Wall Tot Slide
Wibit Course Play Features
Water Basketball Geysers
Body Slide
Plunge Area for Lazy River
13
W O O D M A N A Q UAT I C C E N T E R PROJECT DE TAILS
R I C H L A N D C E N T E R, W I S C O N S I N
After careful consideration, The City of Richland Center decided it was time to replace OWNE R
the existing 50-year-old pool in favor of something new with reduced operational City of Richland Center
expenses. The existing pool had aged and presented operational issues such as a 450 South Main Street
major leak in the pool vessel, lighting issues, and mechanical equipment that was Richland Center, WI 5358
barely functioning. WTI was hired alongside the local architect to provide aquatic
planning, design, and engineering to replace this beloved community pool. COMPLE TE D
The new Woodman Aquatic Center features a multi-purpose lap pool with diving, 2020
zero-entry area with various activities, a splash pad with interactive water features, a
winding lazy river, and sun decks for optimal relaxation. The slide complex features AWARDS / FE ATURES
Outstanding Aquatic Facility Design/
an open-flume tube slide, along with space and associated engineering for a phased
Renovation - Wisconsin Park & Recre-
addition with another waterslide.
ation Association, 2021
This transformative project was made possible through support from local businesses
and the Joan Woodman Ortan McCallum Foundation which provided $2 million of WE BSITE
the $4.8 million project budget. Strategic collaboration between the local architect, richlandcenterwi.gov/parksrec/page/
WTI, and the city helped to bring the project into budget by putting a strong focus on woodman-aquatic-center
operational expenses.
Following its grand opening in 2020, The Woodman Aquatic Center, won the 2020
Outstanding Facility Design and Renovation Award from the Wisconsin Parks and
Recreation Association.
AQUATIC AMENITIES
8,673 SF Leisure Pool 81 SF Splash Pad
Two 1-Meter Diving Boards Interactive Water Features
1 Tube Slide
1 Tot Slide
Zero Depth Entry
2 Basketball Hoops
Interactive Water Features
Geysers
14
E R B PA R K P O O L PROJECT DE TAILS
A P P L E T O N, W I S C O N S I N
The Appleton Parks & Recreation Committee and Common Council approved a $10.5 OWNE R
million budget to update and reconstruct the beloved neighborhood Erb Pool, bathhouse, Appleton Parks & Recreation 100 N.
and pavilion. The funds were also intended to update the overall park including parking lots,
Appleton St. Appleton, WI 54911
vehicular and pedestrian traffic, park use and aesthetics.
(920) 832-5905
WTI worked with the City of Appleton Parks and Recreation and the lead consultant, MSA
Professional Services, Inc. of Baraboo, to create and present three preliminary plans for COMPLE TE D
public input. Each option included an eight-lane, 50-meter pool, and a second pool with a 2017
zero-depth entry featuring an area dedicated to intermediate swimmers and possible water
slides. The team held interviews with stakeholders and public meetings to determine the AWARDS / FE ATURES
final plan presented to the Parks and Recreation Committee for review and comment. Once Aquatic Design Portfolio
approved, WTI began work on the detailed drawings for construction. Athletic Business, 2019
The facility celebrated its grand opening in July of 2017 with massive crowds and lots of
smiles. This historic park has been rejuvenated and will continue to be a recreational pillar of
WE BSITE
strength in the Appleton area. appletonparkandrec.org
AQUATIC AMENITIES
50 Meter Competition Pool Run-out Body Slides
8 Lanes Concessions
1 Meter Spring Board Diving Sun Turf
6,177 SF Leisure Pool Shade
Geysers and Deck Sprays
Custom Elevations
Interactive Water Features
Tot Slide
Water Basketball
15
PROFESSIONAL
SERVICES PROPOSAL
16
Professional Services Proposal
Joannes Aquatic Center-Phase 1 Upgrades
Green Bay, Wisconsin
WTI Project Number: 25460.01
December 3, 2025
Client
Green Bay Parks Department
100 North Jefferson Street, Room 510
Green Bay, WI 54301
Emma Brown, PE
Park Planner
T. 920.448.3383
emma.brown@greenbaywi.gov
Consultant
Water Technology, Inc. (WTI)
100 Park Avenue, PO Box 614
Beaver Dam, WI 53916
www.wtiworld.com
Matthew W. Freeby, AIA, LEED AP, NCARB
Project Leader
M. 920.210.2194
mfreeby@wtiworld.com
Camryn Ballweg
Strategic Partnerships
M. 608.393.9685
cballweg@wtiworld.com
Project Understanding
Scope
The Aquatic Scope of services is defined in the RFP “Engineering Design Services Joannes Aquatic Center – Phase I
upgrades” dated 10-14-2025.
Description
This proposal is based on the following preliminary design criteria for tasks defined in the RFP as Phase A & B;
• Phase A
o Pool basin replastering
o Gutter Replacement
o Surge Tank Repairs
o Other general maintenance needs as identified
• Phase B
o Add aquatic play structure to pool
o Add aquatic play table to pool
o Add 1 shade structure in pool
o Add two basketball hoops to pool
o Add one AquaZip’n to pool
Budget
The project budget for Phase A is anticipated to be approximately $1.76 million.
The project budget for Phase B is anticipated to be approximately $470,000.
Scope of Services
Program and Concept Review
WTI will review and validate the pool’s conceptual design provided in a previous study and propose revised layouts where
needed or applicable taking into consideration: serviceability, accessibility, size (considering project occupancy),
efficiency, code requirements and best practice. WTI will also:
• Phase A
o Confirm Aquatic scope for pool finish replacement
o Confirm Aquatic scope for pool gutter replacement
o Confirm Aquatic scope for pool surge tank repairs
o Confirm Aquatic scope for general maintenance items
• Phase B
o Review options for addition of a play structure to pool
o Review options for addition of an aquatic play table to pool
o Review options for addition of one shade structure to pool
o Review options for addition of two basketball hoops to pool
o Review options for addition of one AquaZip’n to pool
Schematic Design
WTI will consult with the Client to confirm project goals and requirements and develop the spatial relationships of the
aquatic components of the project. For the Schematic Design (SD) phase, WTI will perform the following tasks:
• Phase A
o Document Aquatic scope for pool finish replacement
Project # 25460 • 3-DEC-2025 • Page 18
o Document Aquatic scope for pool gutter replacement
o Document Aquatic scope for pool surge tank repairs
o Document Aquatic scope for general maintenance items
• Phase B
o Confirm Aquatic scope for addition of a play structure to pool
o Confirm Aquatic scope for addition of an aquatic play table to pool
o Confirm Aquatic scope for addition of one shade structure to pool
o Confirm Aquatic scope for addition of two basketball hoops to pool
o Confirm Aquatic scope for addition of one AquaZip’n to pool
• Develop Aquatic Drawings
o SD Level Plans, Sections, and Details
• Develop Rough Order of Magnitude (ROM) Aquatic Construction Cost Opinion
Schematic Design - Deliverables
• SD Drawings (60% documentation)
• ROM Aquatic Construction Cost Opinion
Client shall review phase specific deliverables and provide written approval.
Design Development
Based on the Client approved SD Deliverables, WTI will develop designs of the aquatic areas and systems. For the Design
Development (DD) phase, WTI will perform the following tasks:
• Conduct Inter-Disciplinary Review and Coordinate with other Consultants of the Client
• Finalize Pool Wall Profile(s)
o Shapes and Depths
• Define Pool Specialty and Mechanical Equipment
• Develop Pool Mechanical Equipment Layout
• Develop Aquatic Drawings (Phase A)
o Detail Aquatic scope for pool finish replacement
o Detail Aquatic scope for pool gutter replacement
o Detail Aquatic scope for pool surge tank repairs
o Detail scope for general maintenance items
• Develop Aquatic Drawings (Phase B)
o Document Aquatic scope for addition of a play structure to pool
o Document Aquatic scope for addition of an aquatic play table to pool
o Document Aquatic scope for addition of one shade structure to pool
o Document Aquatic scope for addition of two basketball hoops to pool
o Document Aquatic scope for addition of one AquaZip’n to pool
• Develop Draft Specifications
• Develop Preliminary Aquatic Construction Cost Opinion
Design Development - Deliverables
• DD Drawings (75% documentation)
• Draft Specifications
• Preliminary Aquatic Construction Cost Opinion
Client shall review phase specific deliverables and provide written approval.
Project # 25460 • 3-DEC-2025 • Page 19
Construction Documents
Based on the Client approved DD Deliverables, WTI will finalize the designs of the aquatic areas and systems. Final CD
Deliverables will contain information suitable for contractors to provide construction pricing or bidding. Final CD Drawings
provided by WTI will contain the Professional Seal of an Architect or Engineer licensed in the State/Province of the project
site and will be suitable for review by permitting agencies with jurisdiction over the project. Some elements of the pool or
pool systems selected may require delegation to the contractor for design services and the certifications of a design
professional licensed in the project location (Delegated Design). The Owner and the Architect will specify performance
and design criteria that such services must satisfy. The contractor shall be entitled to rely upon the adequacy and accuracy
of the performance and design criteria provided in the contract documents. The contractor shall cause such services and
or certifications to be provided by a properly licensed design professional, whose signatures and seal shall appear on all
drawings, specifications, certifications, shop drawings, and other submittals prepared by such professional. For the
Construction Document (CD) phase, WTI will perform the following tasks:
• Finalize Coordination with other Consultants of the Client
• Finalize Utility Requirements
• Finalize and Assemble Pool and Pool Mechanical Aquatic Drawings
o Pool Plans, Sections, and Details – Finish Demolition
o Pool Plans, Sections, and Details – Finish Replacement
o Pool Plans, Sections, and Details – Pool Gutter Demolition
o Pool Plans, Sections, and Details – Pool Gutter Replacement
o Plans, Sections, and Details – Surge Tank repair selective demolition
o Plans, Sections, and Details – Surge Tank repairs
o Pool Plans, Sections, and Details – general maintenance items
o Pool Plans, Sections, and Details – Play Structure installation required demolition
o Pool Plans, Sections, and Details – Play Structure installation
o Pool Plans, Sections, and Details – Play Structure installation required piping
o Pool Plans, Sections, and Details – Aquatic Play Table installation required demolition
o Pool Plans, Sections, and Details – Aquatic Play Table installation
o Pool Plans, Sections, and Details – Aquatic Play Table installation required piping
o Pool Plans, Sections, and Details – Shade Structure installation required demolition
o Pool Plans, Sections, and Details – Shade Structure installation
o Plans, Sections, and Details – Basketball Hoops installation required demolition
o Plans, Sections, and Details – Basketball Hoops installation
o Plans, Sections, and Details – AquaZip’n installation required demolition
o Plans, Sections, and Details – AquaZip’n installation
o Pool Equipment and Finish Schedules
o Pool Mechanical Plans, Schedules, and Details
o Pool Piping Plans, Schedules and Details
o Pool Mechanical Schematics
• Finalize Specifications
• Perform Internal Quality Assurance Procedure
• WTI will complete draft Swimming Pool permit applications with project specific information for local jurisdiction.
Construction Documents - Deliverables
• 95% CD Drawings
• Final CD Drawings
• Final Specifications
• Draft Pool Permit Application(s)
WTI shall provide a 90% review set in advance of final deliverable. Client to provide comments and feedback no later than
30 days prior to final deliverable due date. Client shall review phase specific deliverables and provide written approval.
Project # 25460 • 3-DEC-2025 • Page 20
Bidding and Negotiation
WTI will assist the Client during bid document preparation and negotiation of the Contract Documents. For the Bidding
and Negotiation (BN) phase, WTI will perform the following tasks:
• Address Questions and Comments from Permitting Agencies
• Respond to aquatic related Request For Information (RFI)
• Provide information and clarifications for Client’s Addenda
• Assist in the interview of the Pool Contractors, if requested by Client
• Conformed Aquatic Documents
Bidding and Negotiation - Deliverables
• RFI Responses (if required)
• Addenda Support Documents (if required)
• Conformed Aquatic Documents
Client shall provide approved Swimming Pool permit prior to construction. Client shall review phase specific deliverables
and provide written approval.
Construction Administration
WTI will assist the Client during construction of the project. WTI will periodically visit the project site and will endeavor to
observe the construction for conformance to the CD Deliverables. For the Construction Administration (CA) phase, WTI
will perform the following tasks:
• Review and respond to requested Submittals including Shop Drawings and other information
• Review and respond to Pool Contractor Change Order requests
• Correspond with Permitting Agencies regarding aquatic questions
• Review and respond to Pool Contractor prepared Aquatic Operation and Maintenance Manual
• Conduct Site Visit(s)
• Provide Field Reports on Site Observations
• Review Punch List prepared by Pool Contractor
Construction Administration - Deliverables
• Shop Drawing Responses
• Change Order Responses
• O&M Responses
• Field Reports
• Punch List Responses
Client shall review phase specific deliverables and provide written approval.
Requirements
The following information, materials, and approvals are required for WTI to effectively and efficiently perform the
services described in this proposal. The Client shall provide WTI, at no cost, with the following:
• Project site surveys
• Original design drawings
• As-built record drawings
• Suction outlet fixture assembly (SOFA) certifications (including SOFA certification statement, make/model,
installation date, & connected pump maximum flow rate/s)
• Registered Design Professional (RDP) SOFA Reports for non-manufactured SOFAs
• Project site geotechnical analysis and reports
Project # 25460 • 3-DEC-2025 • Page 21
o WTI will base design upon standard soils conditions with an assumed bearing capacity of 2,500 pounds
per square foot. If soil conditions differ, or include expansive, environmental, high groundwater, organics
or other deleterious conditions, additional structural services and fees may be required.
• Project site water analysis and testing
• Preferred title block, sheet sizes, or other drawing format details
• Background drawings and models, including site and building(s), for incorporation of WTI designs
• Written approval of WTI produced Deliverables at the completion of each Phase of work
• Construction contract bid documents and addenda
• Construction contract bid responses and results
Participant BIM Project Brief
WTI will produce digital designs for incorporation into the Client’s drawings and models. WTI anticipates producing three-
dimensional BIM models consisting of 3D model geometry and digital data required to necessitate the requested BIM LOD
up to BIM LOD 300. WTI design models will only contain information pertinent to our services and will not include
information relevant to fabrication, construction, or facilities management. Inclusion of additional data in digital models,
such as ongoing model updates for record drawings, facility management, etc. may be requested as an Additional Service.
Reference WTI’s BIM Level Definitions document for an outline of what may be included with each level. WTI will
participate in Revit model exchanges and typical BIM coordination phone calls as requested (not to exceed a once per
weekly meeting and not including detailed clash detection).
Schedule
Our fee is based on the following projected phase schedule:
Programming and Review: 1 - 2 weeks
Schematic Design: 2 - 4 weeks
Design Development: 4 - 6 weeks
Construction Document Preparation and Quality Control Review: 6 - 8 weeks
We understand that abbreviated schedules may sometimes be required, however in our experience, this puts the
Owner, Client and WTI at risk. To expedite a project, please be aware that a discussion of those risks is required, in
addition to a corresponding fee adjustment.
Services Provided by Others (Coordinated with WTI)
WTI will assist with coordinating all WTI provided services with other disciplines of the project team. A non-comprehensive
outline of scope for coordination and exclusion from the proposed WTI Scope of Services is below. The following services
and project scope shall be the responsibility of the Client, or other Consultants of the Client.
Architecture / Landscape Architecture
• Building or enclosures
• Change facilities, locker rooms, food areas, retail areas, offices and/or other support spaces
• Pool mechanical, chemical and equipment storage rooms
• New pumps for new or revised pool activities, if required
• Landscaping and irrigation
• Fences, perimeter barriers and pedestrian walks
• Shade structures and pavilions, other than one shade structure in pool as outlined in RFP
• Pool safety, directional or other signage
Civil Engineering
• Parking and vehicular access
• Storm and Sanitary sewers
• Site grading and drainage
Project # 25460 • 3-DEC-2025 • Page 22
• Pool filter backwash disposal piping
• Utility distribution, including gas, electric and water
• Pool underdrain or dewatering systems, if required
• Earthwork/soil improvement required for pool construction.
Structural Engineering
• Building foundations, footings, bearing and spanning systems, including building support of pool vessels, pool
area, pool mechanical equipment, and pool piping
• Surge tank concrete and reinforcement, access hatch, and ladder if required
• Pump pit(s) concrete and reinforcement, grating, railings, and stairs if required
• Waterproofing Specification. (Waterproofing scope recommended by structural.)
• Filtration and other mechanical equipment pads and slabs
• Pool area concrete and reinforcement, and joint sealant
• Any special inspections required by permitting officials
Mechanical Engineering
• Boilers, pool water heat exchangers, controls and booster pumps required for flow to water heating equipment
• Pool heater venting and exhaust
• Pool chemical storage room venting and exhaust
• Pool mechanical equipment room HVAC
Electrical Engineering
• Aquatic Electrical Drawings
o Layout and Specification of Pool Electrical Equipment including electrical disconnects, variable frequency
drives, and/or motor starters for all pool pumps.
o Power supply distribution schedules and coordination complete to pool equipment.
• Bonding and grounding plans and details for all pools, adjacent decks, deck equipment, and pool electrical
equipment.
• Pool mechanical equipment room subpanel(s) and breakers
• Pool room/area lighting and outlet power
• Pool mechanical equipment room lighting and outlet power
• Controls and low voltage wiring
Plumbing
• Pool deck drains, drain locations, and drain piping to waste
• Pool mechanical equipment room floor drains and drain piping to waste
• Pool filter backwash/drain plumbing, sump, and duplex sump pump system
• Pool mechanical equipment room potable water supply including piping to pool auto-fill
• Pool mechanical equipment room emergency eyewash station
• Fire protection system
Testing and Analysis
• Geotechnical testing and analysis
• Local water testing and analysis
• Water loss and leak detection
• 3D Laser Scan of Pool
Feasibility and Operations
• Demographic research and analysis
• Revenue and expense forecasting
• Operational evaluation and analysis
Project # 25460 • 3-DEC-2025 • Page 23
• Facility and market research
Administrative
• Permits and regulatory fees.
o WTI will provide pool system information to the Client to complete construction permit applications but
is not responsible for submission nor payment of fees.
• Front-end specifications
• LEED® Registration and Application
• Document reproduction and distribution
• Preparation of addenda
• Maintenance of the plan holder list
• Record Drawings (unless accepted as an Additional Service)
Project # 25460 • 3-DEC-2025 • Page 24
Terms and Conditions
Basis of Agreement
This proposal incorporates by reference AIA Document B101-2017, Standard Form of Agreement Between Owner and Architect, or
AIA Document C401-2017, Standard Form of Agreement Between Architect and Consultant. The general conditions of the contract
will be defined in AIA Document A201-2017, General Conditions of the Contract for Construction.
Scope of Services
Services offered are limited to those services described in the proposal. No other services are offered or implied unless specifically
addressed in the proposal.
Expiration
The attached proposal is considered valid for a period of ninety (90) days from the date of the proposal or its last revision date, if any.
Proposals older than ninety (90) days are expired, unless reissued by WTI with a reissue date.
Payment
All proposals are based upon payment in US dollars. Invoices will be issued monthly and are payable within forty-five (45) days of date
of invoice. An interest rate of one percent (1.0%) per month will be payable on any amount not paid within this time period. Attorney’s
fees and any other costs incurred in collecting delinquent accounts shall be paid by Client. WTI will invoice professional fees monthly,
on a percent complete basis, throughout the project term.
Hourly Charges/Additional Services
WTI personnel will be charged at the following rates:
Principal/Director $250.00
Project Manager/Engineer $185.00
Creative Studio $160.00
Project Design $145.00
Mechanical Design $170.00
Technical Design $105.00
Administrative $75.00
These rates are valid for a period of twelve (12) months from date of an accepted proposal. These rates are not valid for work involving
claims settlement, expert witness or litigation work. Additional services, if requested by Client, will be performed on a stipulated sum
or hourly basis, as agreed to in writing by both parties prior to initiating the additional services.
Reimbursable Expenses
Expenses and services not directly provided by WTI will be invoiced at one and 10/100 (1.10) times cost. International travel is business
class air. Domestic airfare will be premium economy (changeable and refundable). These costs are not included in WTI’s fee unless
specifically noted as included in our proposal. Air fares are based on seven (7) days advanced purchase. Costs associated with customer
requested modifications to travel arrangements after purchase by WTI will be an addition to the contract sum.
Additional Project Related Costs
The following costs are not included in our proposal and should be anticipated in the owner’s budgeting: geotechnical services and
reports, topographic and boundary surveys (site surveys), testing, project related insurance, legal and safety consultant services,
permits and fees, and marketing and operations development.
Standard of Care
Services provided by WTI under this Agreement will be performed in a manner consistent with that degree of skill and care ordinarily
exercised by members of the same profession currently practicing under similar circumstances and in accordance with the governing
codes and regulations adopted at the time of the execution of this Agreement. No other warranty or representation, either expressed
or implied, is included or intended in our proposals, contracts, plans and specifications or reports.
Risk Allocation
Client agrees that to the fullest extent permitted by law, WTI’s total liability to Client for any and all injuries, claims, losses, expenses,
damages or claims expenses arising out of this Agreement from any cause or causes, shall not exceed the total amount of fees for
services for this project or twenty-five thousand and no/100 dollars ($25,000.00), whichever is greater.
Governance
This Agreement shall be governed by the laws of the State of Wisconsin.
Insurance
Notwithstanding any other provisions in this Agreement, nothing shall be construed so as to void, vitiate, adversely affect or in any
other way impair any insurance coverage held by either party to this Agreement. During the term of this agreement, WTI agrees to
provide evidence of insurance coverage as shown in the example Insurance Certificate attached hereto. In addition, WTI will attempt
to maintain continuous professional liability coverage for the period of design and construction of this project, and for a period of
three (3) years following substantial completion, if such coverage is reasonable available at commercially affordable premiums. For
the purposes of this agreement, “reasonably available” and “commercially affordable” shall mean that more than half the design
Project # 25460 • 3-DEC-2025 • Page 25
professionals practicing in this state in this discipline are able to obtain such coverage. Owner will require that any party hired for the
construction of the project, including but not limited to the general contractor, construction manager, and subcontractors will include,
in addition to the Owner, Water Technology, Inc. and it’s consultants as additional insured for all policies related to the project.
Standard insurance carried by WTI is as follows:
General Liability (Occurrence) $1.0 Million USD
General Aggregate (Project) $2.0 Million USD
Automobile $1.0 Million USD
Umbrella/ Excess (Occurrence) $4.0 Million USD
Workers Compensation Statutory
Professional Liability (Occurrence) $2.0 Million USD
Professional Liability (Aggregate) $4.0 Million USD
Costs for additional coverage limits, if requested, will be paid for by Client.
Photography
The project architect agrees that any published photos, descriptions or award submittals of the project that include reference to the
aquatic work shall include WTI as the aquatic consultant.
Client Services
As part of WTI’s quality assurance program, WTI will contact the Owner regarding services provided by WTI.
Dispute Resolution
In an effort to resolve any conflicts that arise during the design or construction of the project or following the completion of the
project, Client and WTI agree that all disputes between them arising out of or relating to this agreement shall be submitted to
nonbinding mediation unless the parties mutually agree otherwise. Client and WTI further agree to include a similar mediation
provision in all agreements with independent contractors and consultants retained for the project and to require all independent
contractors and consultants also to include a similar mediation provision in all agreements with subcontractors, subconsultants,
suppliers or fabricators so retained, thereby providing all mediation as the primary method for dispute resolution, between the parties
to those agreements. No mediation arising out of or relating to this agreement shall include, by consolidation, joinder or in any other
manner, an additional person or entity not a party to this agreement, except by written consent containing a specific reference to this
agreement signed by Client, WTI and any other person or entity sought to be joined. Consent to mediation involving an additional
person or entity duly consented to by the parties to this agreement shall be specifically enforceable in accordance with applicable law
in any court having jurisdiction thereof.
Hazardous Materials
Client represents to WTI that to the best of Client’s knowledge no hazardous or toxic substances within the meaning of any applicable
statute or regulation are presently stored, or otherwise located, on the project site or adjacent thereto. Further, within the definition
of such statutes or regulations, no part of the project site or adjacent real estate, including the ground water located thereon, is
presently contaminated.
Existing Conditions
Inasmuch as the remodeling and/or rehabilitation of an existing site/structure requires that certain assumptions be made regarding
existing conditions, and because some of these assumptions may not be verifiable without expending additional sums of money or
destroying otherwise adequate or serviceable portions of the building, Client agrees, to fullest extent permitted by law, to indemnify
and hold the design professional harmless from any claim, liability or cost (including reasonable attorney’s fees and costs of defense)
for injury or economic loss arising or allegedly arising out of the professional services provided under this agreement, excepting only
those damages, liabilities or costs attributable to the sole negligence or willful misconduct of the design professional.
Termination
Either party may terminate the agreement for convenience after seven (7) days written notice of intent to terminate. Client shall be
responsible for all costs and charges incurred up to the date of termination, including reasonable costs for WTI to close the work and
organize files. WTI agrees not to charge for lost or anticipated profits on the work not completed and will provide copies of work files
to Client upon receipt of final payment.
Project # 25460 • 3-DEC-2025 • Page 26
Fee for Professional Services
Fee
WTI professional services are offered for a stipulated lump sum and are contingent upon WTI Terms and Conditions.
Fee for Professional Services .......................................................................................................... $ 179,568.00 USD
Fee Breakdown per Phase
Program and Concept Review ..................................................................................................... 8%
Schematic Design....................................................................................................................... 15%
Design Development ................................................................................................................. 30%
Construction Documents ........................................................................................................... 35%
Bidding & Negotiation ................................................................................................................. 2%
Construction Administration ..................................................................................................... 10%
Meetings & Trips
WTI anticipates the following number of meetings and trips to facilitate the proposed work.
Design and Coordination Meetings ............................................................................... 6 (virtual)
Design and Coordination Meetings .......................................................................... 4 (in person)
Construction Administration Meetings ........................................................................ 4 (virtual)
Construction Administration Site Visits.................................................................... 3 (in-person)
Reimbursable Expenses
Project related reimbursable expenses such as travel, shipping and printing are included in WTI’s proposed fee. Swimming
Pool permit review fees, if applicable, are also included.
Acknowledgement
This proposal will remain valid for a period of 90 days. Please provide the signature of an authorized representative on
the line below indicating acceptance of the proposed scope and fee for professional services.
Water Technology, Inc. City of Green Bay Department of Parks, Recreation, and
Forestry
Signature Signature
Name / Title Name / Title
Date Date
Project # 25460 • 3-DEC-2025 • Page 27
Additional Services
As an additional service for our Clients, WTI proposes the following supplementary scope of work for consideration. Please
indicate acceptance by initialing box next to selected alternate.
Alternate 1: Additional Site Visits ............................................................................. $ 1,700.00 USD
If additional site visits are requested, WTI will charge an additional fee per trip.
Alternate 2: Record Drawings – Construction Record ..................................... 15% of CD Phase Fee
WTI will issue, at the completion of the project, a set of record documents which will include Contractor
provided documented modifications. Modifications are limited to contractor supplied information, and
could include dimensional modifications, equipment locations, pipe routing. Services do not include
evaluation of modifications, coordination, structural revisions, or permit revision submission.
Alternate 3: Deletion of Phase IB Services ................................................... …….<$ 36,825.00 USD>
WTI will delete the SD, DD and CD phase documents, in addition to Bidding and Construction
Administration support, as needed to complete the Phase IB document package for the proposed
conceptual design.
Alternate 4: Addition of Phase IB services after Completion of Phase IA documents……… $ 74,525.00 USD
WTI will add the SD, DD and CD phase documents, in addition to Bidding and Construction
Administration support, as needed to complete the Phase IB document package for the proposed
conceptual design after the completion of Phase IA documentation.
Project # 25460 • 3-DEC-2025 • Page 28
Report to the
Parks Committee
of the City of Green Bay
MEETING DATE PREPARED BY
December 10, 2025 Dan Ditscheit, Parks Director
AGENDA ITEM # E.3
Consideration with possible action on the request by One Astor Holdings LLC for a 15' wide Permanent
Storm Sewer Easement along the Fox River Trail on Parcel 15-2 for the One Astor Park residential
development.
BACKGROUND
One Astor Holdings LLC requested a 15' wide permanent storm sewer easement on parcel 15-2 to
accommodate their stormwater outfall pipe for their proposed adjacent residential development. They are
proposing to bury a stormwater pipe under the Fox River Trail. They are currently scheduled to break
ground on their 125-unit development in the next few months.
RECOMMENDATION
To approve.
FISCAL IMPACT
There is no financial impact to the city by granting this easement. All costs associated with this work will be
covered by the developer.
ATTACHMENTS
1. One Astor Property Map 1B
2. Storm Sewer Easement
3. Storm Sewer Easement Exhibit
4. One Astor Park Plan
100 North Jefferson Street, Green Bay, Wisconsin 54301-5026
greenbaywi.gov
EASEMENT FOR STORM SEWER PURPOSES
It having been deemed necessary for the improvement,
maintenance or protection of public or private property to occupy
or use lands owned by the CITY OF GREEN BAY, A
WISCONSIN MUNICIPAL CORPORATION (hereinafter
‘GRANTOR’), in the City of Green Bay, Brown County,
Wisconsin.
KNOWN ALL BY THESE PRESENTS that the GRANTOR for
and in consideration of the sum of Ten and no/100 dollars ($10.00) Return this document to:
paid to it the receipt of which is hereby acknowledged, does City of Green Bay - Clerk
100 N. Jefferson Street
convey unto ONE ASTOR HOLDINGS LLC, (hereinafter Green Bay, WI 54301-5026
‘GRANTEE’), a PERMANENT EASEMENT and right-of-way Tax parcel Numbers:
including the perpetual right to enter upon the real estate 15-2
hereinafter described at any time that it may seem fit and construct,
maintain and repair storm sewer drainage facilities and structures for the purpose of conveying
water across, through and under the lands described in EXHIBIT A, together with the right to
excavate and refill trenches for the location of said storm sewer drainage facilities and structures
and the further right to remove trees, bushes, undergrowth and other obstructions interfering with
the location, construction and maintenance of said storm sewer drainage facilities and structures
over the lands described in EXHIBIT A.
It is expressly understood and agreed that during the construction of said storm sewer drainage
facilities and structures, materials and excavation may be placed beyond the limits of the lands as
described in EXHIBIT A, said materials and soil shall be removed immediately upon completion of
construction and ground restored to the condition prior to construction.
After the construction of said storm sewer drainage facilities and structures, the GRANTOR and its
successors shall have and retain all rights to the use and occupation of said lands described in
EXHIBIT A, provided that no structures shall be erected over said described lands.
For the purpose of the construction, maintenance and repair of said storm sewer drainage facilities
and structures, the said GRANTEE shall have the right to enter, pass over and use said easement
area across the GRANTOR’S premises and the lands adjacent thereto for the transportation, laying
down, and storage of materials, tools and equipment, the depositing and removal of excavated
materials, and for other purposes incidental to the work, but shall do so with the least inconvenience
practicable to the GRANTOR, and provided that in the event any damage is caused to said real
estate or to the lands adjacent thereto, including buildings erected thereon, by reason of the
GRANTEE entering thereon for the purpose of the maintenance and/or repair of said storm sewer
drainage facilities and structures, said GRANTEE shall fully compensate said GRANTOR or
I:\DeptData\PRF\D&D\Park Committee Info\Park Committee 2025\12-10-25\Storm Sewer Easement.docx
successors thereof. The GRANTOR retains the right to enter the easement area at any time for any
municipal purpose, provided such entry does not unreasonably interfere with the GRANTEE’S
storm sewer facilities.
This agreement is binding upon the heirs, successors and assigns of the parties hereto.
x x
Print or type name and title above Print or type name and title above
STATE OF )
) SS.
COUNTY OF )
Personally, came before me this ______ day of __________________, 20 , the above named
______ __
to me known to be the persons who executed the foregoing instrument and acknowledged the same.
(Print or Type name of notary above)
Notary Public, ,
County State
My Commission Expires:
This instrument drafted by:
Excel Engineering, Inc.
Project: One Astor Storm Sewer Facilities
Parcel Numbers: 15-2
I:\DeptData\PRF\D&D\Park Committee Info\Park Committee 2025\12-10-25\Storm Sewer Easement.docx
EXHIBIT A
DESCRIPTION OF STORM SEWER EASEMENT AREA
GRANTOR: CITY OF GREEN BAY, A WISCONSIN MUNICIPAL CORPORATION
GRANTEE: ONE ASTOR HOLDINGS LLC
LEGAL DESCRIPTION:
A 15’ Public Storm Sewer Easement located within Outlot 1 of Cerfied Survey Map No.
9713, recorded in the Brown County Register of Deeds as Document No. 3054697, being located in
the City of Green Bay, Brown County, Wisconsin being more parcularly described as follows:
Commencing at the Northeast corner of said Outlot 1; thence South 09°-49’-50” West along
an Easterly line of said Outlot 1, a distance of 145.59 feet; thence Southwesterly 16.59 feet along
an Easterly line of said Outlot 1 on a curve to the le6 having a radius of 107.00 feet, the chord of
said curve bears South 05°-23’-20” West, a chord distance of 16.57 feet to the point of beginning;
thence connuing Southeasterly 12.59 feet along said Easterly line on a curve to the le6 having a
radius of 107.00 feet, the chord of said curve bears South 02°-25’-24” East, a chord distance of
12.58 feet; thence South 05°-47’-38” East along an Easterly line of said Outlot 1, a distance of 2.48
feet; thence North 87°-59’-50” West, a distance of 50.14 feet; thence North 02°-00’-10” East, a
distance of 15.00 feet; thence South 87°-59’-50” East, a distance of 48.83 feet to the point of
beginning.
I:\DeptData\PRF\D&D\Park Committee Info\Park Committee 2025\12-10-25\Storm Sewer Easement.docx
EXHIBIT A CONTINUED
INSERT MAP OF STORM SEWER EASEMENT AREA
I:\DeptData\PRF\D&D\Park Committee Info\Park Committee 2025\12-10-25\Storm Sewer Easement.docx
100 Camelot Drive
Fond Du Lac, WI 54935
Phone: (920) 926-9800
www.EXCELENGINEER.com
ARCHITECTS ● ENGINEERS ● SURVEYORS
Always aBetter PlanJOB NO. 250019900
Report to the
Parks Committee
of the City of Green Bay
MEETING DATE PREPARED BY
December 10, 2025 Dan Ditscheit, Parks Director
AGENDA ITEM # F.1
Director's Report on updates and recent activities of the Parks, Recreation & Forestry Department.
BACKGROUND
RECOMMENDATION
FISCAL IMPACT
ATTACHMENTS
1. Director's Report 12.10
100 North Jefferson Street, Green Bay, Wisconsin 54301-5026
greenbaywi.gov
PARKS COMMITTEE
DIRECTOR’S REPORT
WEDNESDAY, DECEMBER 10, 2025
PARK DIVISION
• The recent snowfall has put a wrap on our leaf mulching and fall clean up season.
• Park crews started their snow removal season with the recent snowfall.
• In between snow events crews will be working on cleaning up lawn mowers for the
mechanics to go through and service for the 2026 mowing year.
• Over the winter months Park crews will go through and repair broken picnic tables and
park benches.
• Park crews have begun work on the ice-skating rinks so that we can have them
skateable as soon as possible.
• Park caretakers continue to have a presence in the parks picking litter, emptying
garbage cans, and checking buildings to ensure there is no vandalism or graffiti.
• Ballfield crews will be building two new sets of bleachers for Perkins Ballfield over the
winter months.
• Park Carpenters are continuing to work on outdoor projects at the Wildlife Sanctuary
habitat cages. Once those are completed the carpenters will transition into indoor
projects.
• Winterzation of the wading pools and aquatic facilities has been completed for the
season. A few smaller off-season pool projects are continuing.
FORESTRY DIVISION
• Crews have started winter tree removal operations. Crews are starting on the far
westside this year and working to the east. The current removal list is approximately
600 trees.
• Cycle pruning efforts are focused on the westside area near Beaumont Park and the
stadium. Typical cycle pruning includes raising tree limbs for clearance, deadwood
pruning and structure pruning to help reduce the chances of breakage during storms.
• Pruning crews are also working on resident request pruning needs on the eastside.
• Fall tree planting season has been completed. Crews have completed many other
seasonal tasks to prepare for the winter season. Kudos go out to the crews for their
hard work in completing all these projects before the winter weather arrived.
• Forestry staff continue to work with IT staff on transferring our tree inventory to a GIS
format. This will be an ongoing process for the next year.
DESIGN & DEVELOPMENT DIVISION
• Staff are working with a consultant to complete the wildlife viewing platform and
shoreline walk construction plans for Bay Beach Amusement Park. Staff hired a
consultant to complete the quality assurance requirements in the EPA grant for the
wildlife viewing platform and shoreline walk work. This project will be bid out for
construction in a few weeks. Construction would begin in the fall of 2026, after the
amusement park season ends.
• Shipyard Phase II design work has begun. The consultant recently submitted the 50%
bid plan sets for review.
• Planning continues for the Joliet Park Area of Concern habitat restoration project. The
consultant is approximately 75% complete with the construction documents.
• Construction of the JBS project is well underway. The infrastructure/road project is
nearly completed. The construction of the Park/Boulevard has begun but was put on
hold for the winter season. Staff is working to close out the grant for this project.
• Planning continues for the Bay Beach Wildlife Sanctuary and Renard Island
Nearshore Area. A Quality Assurance Project Plan (QAPP) has been completed.
• Planning for the Bay Beach Wildlife Sanctuary Strategic and Master Planning has
begun.
• The Leicht Memorial Park Pavilion bids were due on December 4, 2025.
• A consultant has been hired to design improvements for Joannes Sk8 Park. The
consultant developed a conceptual plan that is ready for public comment.
• Construction of the Bay Beach HVAC Pavilion Project began on September 8, 2025
and will be completed in spring 2026.
• A consultant has been hired for Baird Creek Mountain Bike Flow Track Improvements.
• The City received quotes for the Joannes Aquatic Center Phase 1 engineering.
GREEN BAY CONSERVATION CORPS
• Crews finished cutting and treating woody invasive species at the Westside Trail and
Newberry Conservancy. They continue to cut and treat invasive species at He-Nis-
Ra Park, McAuliffe Park, and East River Van Beaver Park.
• Crews continue to produce biochar in partnership with the Lake Michigan Bird
Observatory to create a soil amendment for tree plantings.
• Staff and members hosted a free CPR/AED training at the WLS in collaboration with
We All Rise: African American Resource Center and the Shock and Compress
Foundation.
• Crew members have begun compiling a 2025 Year in Review Story Map and are
working to release an interactive map of the Pollinator Corridor project. Both maps
are expected to be released by the end of the year.
• Staff and members finished mapping Perkins Park habitats and will order native seed
mixes and prepare for the large-scale restoration approved in the master plan.
• Members began planning efforts for the annual day of service in celebration of Martin
Luther King Jr. The event will be held at the Brown County Library Downtown on
January 19th from 2:30 p.m. - 6 p.m. This event will include community conversations,
resource tables, and building care packages, and will end with a free community meal
provided by Lil Jamaica.
• Staff have been meeting with other organizations across the state to develop a state
coalition of programs dedicated to youth career development and community service.
Other programs include Operation Fresh Start, WisCorps, and multiple Youth Build
programs.
• Staff continue to research and write grants for the department. Recently, staff were
awarded $3,850 from the Natural Resources Foundation and $1,000 from Cellcom
Green Gifts to launch a free native plant kit giveaway program in place of “No Mow
May”.
• Staff received a $7,000 donation from Wild One’s Green Bay Chapter to help promote
and launch the roving crew.
RECREATION DIVISION
• The adult basketball program began on November 5th at various high schools.
• We are currently taking registration for our Winter Table Tennis League. It will be held
on Wednesday evenings beginning January 7 at Franklin Middle School.
• 2025-2026 Chill Chaser. There will be 20 parks around Green Bay with a symbol
hanging in the window of the shelter located at the park. Participants will receive
prizes for the number of symbols they find. The program will run December 19 –
January 5.
• A Winter LEGO Event will be held at the Wildlife Sanctuary on December 13th 10 a.m.–
5 p.m. and December 14th 10 a.m. – 3 p.m.
• Open Gyms are available on Mondays, Thursdays, and Saturdays at various Green
Bay Public School District locations.
• Registration is underway for our Mini-Dribblers youth basketball programs. These will
be held at King and Red Smith Schools starting January 26th.
• Youth Dance program is underway on Tuesday and Wednesday nights at the Wildlife
Sanctuary and Edison Middle School. Classes are learning routines for the February
recital. Costumes have been ordered.
• Recreation Staff participated in the Find Your Inspiration Event with the Green Bay
Chamber at the Resch Expo Hall on Wednesday, November 5th. This event exposed
thousands of local 8th graders to different career opportunities within the Parks,
Recreation and Forestry Department.
• Staff have initiated the planning process for future programming at new facilities,
including Shipyard and Leicht Park.
AQUATICS
• This off-season, staff will continue to evaluate the staffing shortage we continue to
endure. Some notes to consider:
o Types of schedules
o Length of shifts
o Scheduling software
o Incentives
o Weekend bonus pay
• Staff are working on completing the 2025 Annual Aquatics Report. This will assist in
making decisions for the 2026 season.
• Staff completed program analyses for 2025 and are using it to evaluate program
planning in 2026.
• Lifesavers Pathway
o Staff are working on writing a curriculum for a new program that will help promote
and certify lifeguards. In conjunction with the Green Bay Y and through a donation
from Jones Signs, we are hopeful to roll out the new program in 2026.
• We are looking into other possible options for scheduling and time clock platforms to
decide which is best for our needs and makes the most sense financially.
• Rehire paperwork has gone out to staff.
o 58 Facility Attendants
o 66 Lifeguards
o 9 Pool Directors
• Our Lifeguard position is posted an active, we will activate the Facility Attendant
position in January; this is to help ensure we do not over hire for this position and
allows more staff to complete rehire paperwork before we begin interviews.
BAY BEACH AMUSEMENT PARK
• Ride Repairs
o Sea Dragon: lap bars have been delivered.
o Most of the rides have been taken down for the winter.
o Annual painting and maintenance have begun.
• Inclusive Playground
o The bathrooms have been winterized and closed for the season.
o The parking lot will remain open until the snow flies. At that point the playground
and parking lot will be closed for the season.
• Staffing
o Staff attended the International Association of Amusement Parks and Attractions
(IAAPA) conference in Orlando for professional development, learned new trends,
and found some options for park improvements.
o Onboarding documents are updated for 2026 season and rehire paperwork has
been sent out.
o The scheduling process is being re-evaluated.
• Improvements
o The pavilion dancehall HVAC construction is well underway.
o Staff are researching ways to increase special events for the 2026 season.
METRO BOAT LAUNCH
• All docks have been removed for the winter season.
TRIANGLE HILL
• Triangle Hill Snowmaking infrastructure construction is underway and should be
completed in mid-December. We can start making snow after that.
• Staff have been working on purchasing supplies and hiring seasonal staff for the
ski/tubing hill operations.
WILDLIFE SANCTUARY
• Work continues on the cage repairs behind the Observation Building. Preparation
for enclosure (cage/two kiosks) relocation is underway. New fencing options and
plantings/landscaping plan development is scheduled for Summer/Fall ’26
construction.
• Work/planning continues on the Sanctuary’s Strategic & Master planning initiatives.
The next round of in-person interviews being scheduled.
• The OAK 4K school year is going well with a great deal of positive feedback. Interest
for next year is high with multiple tours with prospective families set up each week.
• The wildlife rehabilitation program remains busy now with animals dealing with cold
issues / roadways / nest/den disturbance. We recently released a coyote and bobcat
back into the wild.
• New quarantine and nursery room stainless steel caging donated by the FOWLS is
being installed in the Observation Building.
ADMINISTRATION
• Staff are continuing to support special event requests.
• Table Tennis and Mini Dribblers programs are available for signup.
• Gift cards are available to purchase by phone or in person in our office.
• Metal Detecting Permits are available for purchase online, or in person in our office.
• Posted social media events, programs, and information.
• Preparation has begun in our reservation system for the upcoming facility rental
season which opens on January 2nd, for the 2026 season.
• Posting seasonal positions has begun with a number of applicants for various
positions.