Historic Preservation
Regular MeetingHighland Park, IL · May 14, 2026
Agenda
Historic Preservation Commission Meeting
City Hall - Council Chambers
May 14, 2026
6:30 PM
Agenda
PUBLIC NOTICE
In accordance with the Statutes of the State of Illinois and the Ordinances of the City of
Highland Park, the next regular meeting of the Historic Preservation Commission of the City of
Highland Park is scheduled to be held at the hour of 6:30 PM on Thursday, May 14, 2026, at
City Hall - Council Chambers, 1707 St Johns Avenue, Highland Park, Illinois, during which
meeting it is anticipated that there will be a discussion of the following items.
The Historic Preservation Commission has elected to conduct the hearing entirely in-
person, and without opportunity for virtual viewing or participation. Please contact the
Department of Community Development – Planning Division at (847) 432-0867 for up-to-
date information on the conduct of the hearing.
Individuals with questions or feedback about an agenda item may email the Staff Liaison Maddy
Markle. Comments and emails received prior to the Thursday before the scheduled meeting will
be included in the meeting packet. Public comments received by 4:30 PM the day of the meeting
will be read under Business from the Public. Any comments received during the meeting will be
held until the end of the meeting. Individuals who wish to have their comments read into the
public record are limited to 200 words or less. Public comments should be emailed and contain
the following information:
• In the subject line, identify, “HPC (Date of Meeting)”
• Name
• Address (optional)
• City
• Phone (optional)
• Organization, agency representing, if applicable
• Topic or agenda item number of interest
All emails received will be acknowledged. Individuals with no access to email may leave a voice
message with Maddy Markle at 847.926.1856.
The City, in compliance with the Americans with Disabilities Act, requests that persons with
disabilities who require certain accommodations to allow them to observe and/or participate in
this hearing, or who have questions about the accessibility of the meeting facilities, email the
City’s ADA coordinator Emily Taub or call at 847.926.1005.
I. Call to Order
II. Roll Call
III. Approval of Minutes
A. 4-15-26 Special Meeting Minutes
B. 5-7-26 Special Meeting Minutes
IV. Scheduled Business
A. Certificate of Appropriateness — 1442 Forest Avenue
B. Certificate of Appropriateness —2012 Grange Avenue
V. Discussion Items
VI. Business from the Public (Individuals wishing to be heard regarding items not listed
on this agenda)
VII. Other Business
A. Next Regular Meeting to Occur June 11, 2026
VIII. Staff Report
IX. Adjournment
Packet
Historic Preservation Commission Meeting
City Hall - Council Chambers
May 14, 2026
6:30 PM
Agenda
PUBLIC NOTICE
In accordance with the Statutes of the State of Illinois and the Ordinances of the City of
Highland Park, the next regular meeting of the Historic Preservation Commission of the City of
Highland Park is scheduled to be held at the hour of 6:30 PM on Thursday, May 14, 2026, at
City Hall - Council Chambers, 1707 St Johns Avenue, Highland Park, Illinois, during which
meeting it is anticipated that there will be a discussion of the following items.
The Historic Preservation Commission has elected to conduct the hearing entirely in-
person, and without opportunity for virtual viewing or participation. Please contact the
Department of Community Development – Planning Division at (847) 432-0867 for up-to-
date information on the conduct of the hearing.
Individuals with questions or feedback about an agenda item may email the Staff Liaison Maddy
Markle. Comments and emails received prior to the Thursday before the scheduled meeting will
be included in the meeting packet. Public comments received by 4:30 PM the day of the meeting
will be read under Business from the Public. Any comments received during the meeting will be
held until the end of the meeting. Individuals who wish to have their comments read into the
public record are limited to 200 words or less. Public comments should be emailed and contain
the following information:
• In the subject line, identify, “HPC (Date of Meeting)”
• Name
• Address (optional)
• City
• Phone (optional)
• Organization, agency representing, if applicable
• Topic or agenda item number of interest
All emails received will be acknowledged. Individuals with no access to email may leave a voice
message with Maddy Markle at 847.926.1856.
The City, in compliance with the Americans with Disabilities Act, requests that persons with
disabilities who require certain accommodations to allow them to observe and/or participate in
this hearing, or who have questions about the accessibility of the meeting facilities, email the
City’s ADA coordinator Emily Taub or call at 847.926.1005.
I. Call to Order
II. Roll Call
Page 1 of 124
III. Approval of Minutes
A. 4-15-26 Special Meeting Minutes
B. 5-7-26 Special Meeting Minutes
IV. Scheduled Business
A. Certificate of Appropriateness — 1442 Forest Avenue
B. Certificate of Appropriateness —2012 Grange Avenue
V. Discussion Items
VI. Business from the Public (Individuals wishing to be heard regarding items not listed
on this agenda)
VII. Other Business
A. Next Regular Meeting to Occur June 11, 2026
VIII. Staff Report
IX. Adjournment
Page 2 of 124
1 MINUTES OF A SPECIAL MEETING
2 HISTORIC PRESERVATION COMMISSION
3 OF THE CITY OF HIGHLAND PARK, ILLINOIS
4
5
6 MEETING DATE: Wednesday, April 15, 2026
7
8 MEETING LOCATION: Council Chambers, City Hall, 1707 St. Johns Avenue, Highland Park, IL
9
10 CALL TO ORDER
11 At 6:35 p.m., Chairperson Weeder called the meeting to order. This Commission meeting takes place on-site.
12 Staff was asked to call the roll.
13
14 ROLL CALL
15 Commissioners Present: Chairperson Weeder; Commissioners Ehrlich, Gonka, Greenbaum, Hartinger, Pines,
16 & Portman
17
18 Councilmember Present: Blumberg
19
20 Student Council Absent: Cooper Baum
21
22 Student Council Present: Gabi Goldstein
23
24 Staff declared that a quorum was present.
25
26 Staff Present: Coleman & Markle
27
28 Guests Present: Cal Bernstein, Attorney/Samuels & Bernstein
29
30 Others Present: Gale Cerabona, Recorder
31
32 APPROVAL OF MINUTES
33 Chairperson Weeder stated she received a request to move the Approval of Minutes until later in the
34 meeting and will carry out that request.
35
36 SCHEDULED BUSINESS
37 1. 147 Central Avenue – Review of Written Report to the Plan & Design Commission regarding Planned
38 Development
39 Planner Markle offered a presentation:
40 • Commission Consideration Required
41 • Prior HPC Consideration – January 8, 2026
42 • Recommendation
43
44 Mr. Cal Bernstein, Attorney, thanked the HPC for having a Special Meeting, so this matter can move forward.
45
46 Chairperson Weeder asked if anyone in the audience wishes to speak. There was no one.
47
48 Planner Markle shared information on nearby properties and illustrated a graph of same.
Historic Preservation Commission Minutes
April 15, 2026 - Page 1
Page 3 of 124
1
2 Some HPC comments are…..
3 • Commissioner Pines:
4 o asked if these are actual or zoning setbacks. Planner Markle said this is existing streetscape
5 information.
6 o expressed, regarding the Cornelius House, a 45’ setback from the lot line to the house.
7 o discussed the massing, scale, and proportionality.
8 o said Lot 2 could potentially be 12’ from the lot line; this could be very negative if something
9 was built.
10 o stated the HPC would like to see this property preserved and not disappear.
11 • Chairperson Weeder:
12 o referenced the house at 175 Central Avenue; a huge difference in side yards (from the
13 proposed property at 147 Central Avenue). Planner Markle verified the table indicates the
14 site plan attachment.
15 o said she would mirror the existing to the lot line. Planner Markle said that would be 68’.
16 • Commissioner Hartinger asked, and Planner Markle noted the restrictions/requirements (for new
17 construction).
18 • Commissioner Greenbaum identified a wraparound porch on the east side. Her concern is, when it
19 was designed, it was intended to see the east view.
20
21 Councilmember Blumberg said, when one engages on what the owners can see, that speaks to the
22 interior. This exceeds the purview of the HPC. He is referring to the distances between the houses.
23 It’s an air and light issue; a Plan & Design issue.
24
25 • Commissioner Ehrlich believes the entire property should be preserved. The HPC’s role should not be
26 to give guidance to the PDC. He cares about people walking past this house and noticing the oldest
27 and most majestic house in Highland Park. Anyone wishing to change that should present to the
28 HPC. The draft written recommendation doesn’t reflect his viewpoint. The property has changed
29 (since the bridge). Perhaps the easement, setbacks have changed.
30
31 Senior Planner Coleman noted the Draft Report recommends denial, etc.
32
33 Commissioner Ehrlich said there could be hypotheticals.
34
35 • Commissioner Portman said he felt all along that the HPC’s recommendation should stand on its own.
36 He would like to see no provisions after the fact.
37 • Commissioner Hartinger said the HPC can’t control what the PDC does. He discussed if the lots
38 become separated.
39 • Commissioner Portman said it was determined that it is still a protected property. Increasing the
40 front setback is important.
41
42 Senior Planner Coleman needs to review COAs. He noted there are 14 standards for construction.
43 The COA standards don’t regulate setbacks.
44
45 • Chairperson Weeder said, if the HPC takes Commissioner Ehrlich’s stand, the HPC is taking the
46 perfect over the practical. She recommends the side yard be increased between 147 & 175 Central
47 Avenue from 12’ to 45-50’, and reminded this is a nonbinding recommendation.
Historic Preservation Commission Minutes
April 15, 2026 - Page 2
Page 4 of 124
1 • Commissioner Pines asked if the recommendation should be skimmed.
2
3 Councilmember Blumberg suggested keeping the recommendations within the purview of what the
4 PDC is requesting. He expounded.
5
6 • Commissioner Greenbaum reiterated, when it was designed, the view was meant to be there. To
7 make this more practical, and because taxes are outrageous, she feels a setback should be assigned,
8 so this estate could have a lake view. Though the HPC is against separating the lots, she wonders if
9 recommendations should be given. Senior Planner Coleman said this is the HPC’s opportunity.
10 • Commissioner Hartinger asked if there have been situations where if a lot is split, the HPC gave
11 recommendations on what to look for. Senior Planner Coleman stated there haven’t been instances.
12
13 Councilmember Blumberg said, if the lot is subdivided, that requires the Petitioner to come back.
14 The new lot is not automatically de-landmarked. He expounded.
15
16 • Chairperson Weeder asked about de-landmarking. Planner Markle found the HPC did not
17 recommend landmark removal. If split, Lot B would still be landmarked.
18 • Commissioner Ehrlich:
19 o asked if a COA was granted without a plan. He stated it is not the HPC’s place to give
20 guidance. It could be given when a COA is presented to the HPC. Planner Markle reminded
21 the PDC wants the HPC’s guidance and direction.
22 o said, if a COA is to be given, a plan must be submitted. He doesn’t want to mislead anyone
23 by suggesting various numbers of feet.
24
25 Councilmember Blumberg said the HPC is not being asked to say anything about a COA. He
26 reminded the HPC is being asked to give a recommendation with any restrictions, suggestions.
27 Councilmember Blumberg said, if this property is not subdivided, someone could present a plan on
28 the un-subdivided area. Limitations could be placed on the lot.
29
30 • Chairperson Weeder mentioned the crux of the issue is noted at the end of the Staff Report. She
31 expounded on parameters.
32 • Commissioner Pines concurred.
33
34 Commissioner Gonka arrived at 7:41 p.m.
35
36 • Commissioner Ehrlich would like the HPC to review the 14 criteria and noted, this matter could be
37 continued.
38 • Commissioner Pines said the restrictions are not as grave as Commissioner Ehrlich is making them
39 out to be.
40 • Commissioner Hartinger said the Staff Report covers 98% of the HPC’s view. Setback issues could be
41 added.
42 • Commissioner Portman concurred with the exception of the specification from the HPC. It was
43 stated Staff intended to include the second 3-page nonbinding recommendation.
44 • Chairperson Weeder named the specific areas to address and suggested moving the discussion
45 toward that. It’s about the experience of the public viewing this.
46
47 Chairperson Weeder asked if anyone in the audience wishes to speak. There was no one.
Historic Preservation Commission Minutes
April 15, 2026 - Page 3
Page 5 of 124
1
2 Senior Planner Coleman summarized the additional 50’ is a new point to add.
3
4 More HPC comments are…..
5 • Commissioner Gonka asked:
6 o about the process. Planner Markle explained same.
7 o what the HPC is actually saying regarding 50’ in addition to 12’. Planner Markle explained
8 same.
9 • Commissioner Pines said Lot 2 is approximately 90,000 sq. ft.; over 2 acres. The amount that’s
10 buildable is likely 25,000-30,000 sq. ft.; a robust footprint. The site plan has to be handled artfully.
11
12 Councilmember Blumberg suggested the two other agenda items be given attention at this time, as the
13 public may wish to speak on those.
14
15 2. 670 De Tamble Avenue – Final Consideration of Landmark Nomination
16 Planner Markle offered a presentation:
17 • Summary
18 • Arthur Vetter House
19 • Tudor style
20 • Built in 1928
21 • Landmark Designation Process
22 • Previous Consideration
23 • Findings of Fact
24 • Landmark Criteria
25 • Recommendation
26
27 Commissioner Greenbaum moved that this meets Criteria 1, 3, 4, & 6; has sufficient integrity of design; and
28 recommends City Council adopt a Landmark Designation Ordinance. Commissioner Gonka seconded the
29 motion.
30
31 On a roll call vote
32 Voting Yea Chairperson Weeder; Commissioners Ehrlich, Gonka, Greenbaum, Hartinger, Pines,
33 & Portman
34 Voting Nay: None
35
36 Staff declared that the motion passed unanimously.
37
38 3. 273 Sheridan Road – Final Consideration of Landmark Nomination
39 Planner Markle offered a presentation:
40 • Previous Consideration
41 • Marshall Johnson House
42 • Significant rating in the 2003 Braeside survey
43 • French Eclectic style
44 • Built in 1935
45 • Findings of Fact
46 • Landmark Criteria
47 • Additional Information
Historic Preservation Commission Minutes
April 15, 2026 - Page 4
Page 6 of 124
1 o architect is William Betts who designed 18 homes in Highland Park
2 o elevations of those homes were shown
3 • Recommendation
4
5 Commissioner Greenbaum moved that Criteria 1, 3, 4, 5, 6, & 7 are met. This house has sufficient integrity of
6 design. The HPC wishes to adopt a Landmark Designation recommendation and the drafted Findings of Fact
7 and Planning Report with new information about Marshall Johnson & William Betts added. Commissioner
8 Gonka seconded the motion.
9
10 On a roll call vote
11 Voting Yea Chairperson Weeder; Commissioners Ehrlich, Gonka, Greenbaum, Hartinger, Pines,
12 & Portman
13 Voting Nay: None
14
15 Staff declared that the motion passed unanimously.
16
17 Back to…..
18
19 1. 147 Central Avenue – Review of Written Report to the Plan & Design Commission regarding Planned
20 Development
21 Chairperson Weeder reminded the HPC was discussing setbacks and reducing bulk.
22
23 Commissioner Ehrlich asked, and Planner Markle said the site plan was the only thing submitted. They
24 stated the PDC is waiting for the HPC.
25
26 Mr. Bernstein said, as far as he knows, nothing’s been designed for this property. He noted the potential
27 buyer for Lot B has retained James Fraerman, Principal at Fraerman Associates Architecture, who is well
28 versed on the HPC’s view and the 14 standards. Fraerman has served on HPC in the past.
29
30 Final HPC comments…..
31 • Commissioner Pines summarized that setback and height information be added to the Staff Report.
32 • Commissioner Gonka maintained that 80’ is not enough and said whatever is built shouldn’t be taller
33 than the existing house; side setback should be 100’ from the proposed lot line.
34 • Commissioner Greenbaum maintains that a more restrictive front yard setback would maintain the
35 Lot 1’s view.
36 • Commissioner Ehrlich maintains that the HPC should not include conditions of approval in written
37 report.
38 • Commissioner Pines believes that is excessive; 80’ would meet the same objective.
39
40 Commissioner Pines moved to approve the written report presented by Staff with the changes:
41 • to increase the west side-yard setback to 80’ for Lot 2
42 • require that the height of a new structure not exceed that of the Cornelius Field home
43
44 Commissioner Portman seconded the motion.
45
46 On a roll call vote
47 Voting Yea Chairperson Weeder; Commissioners Hartinger, Pines, & Portman
Historic Preservation Commission Minutes
April 15, 2026 - Page 5
Page 7 of 124
1 Voting Nay: Commissioners Ehrlich, Gonka, & Greenbaum
2
3 Planner Markle declared that the motion passed 4-3. Planner Markle advised they will attend the PDC
4 meeting.
5
6 Mr. Bernstein reminded HPC Commissioners cannot discuss this at the PDC meeting due to the Open
7 Meetings Act.
8
9 Councilmember Blumberg said speaking separately is contrary to what the HPC, as a whole, has put forth.
10
11 Back to…..
12
13 APPROVAL OF MINUTES
14 Regular Meeting of the Historic Preservation Commission – March 12, 2026
15
16 Commissioner Gonka expressed that the HPC did an incredible job on the motions at the last meeting.
17 Chairperson Weeder thanked Gale Cerabona, Recorder; Planner Markle, and Senior Planner Coleman for the
18 incredible job they’ve been doing.
19
20 Commissioner Gonka moved to approve the regular meeting minutes of March 12, 2026. Commissioner
21 Greenbaum seconded the motion.
22
23 On a voice vote
24 Voting Yea Chairperson Weeder; Commissioners Ehrlich, Gonka, Greenbaum, Hartinger, Pines,
25 & Portman
26 Voting Nay: None
27
28 Staff declared that the motion passed unanimously.
29
30 DISCUSSION ITEMS
31 1. 2026 Preservation Awards
32 Planner Markle reminded the event for the Preservation Awards is at the Willits House on May 7, 2026, at
33 6:30 p.m. They noted sparkling water is being provided. Snacks are welcome. Nominations are posted.
34 Judges made a decision on the winners. Chairperson Weeder offered to bring snacks.
35
36 BUSINESS FROM THE PUBLIC
37 There was no Business from the Public.
38
39 OTHER BUSINESS
40 1. Next Regular Meeting is Scheduled for May 14, 2026
41 It was noted the next regular HPC Meeting is scheduled for May 14, 2026.
42
43 STAFF REPORT
44 There was no Staff Report.
45
46 ADJOURNMENT
47 Commissioner Greenbaum moved to adjourn at 8:34 p.m. Commissioner Portman seconded the motion.
48
Historic Preservation Commission Minutes
April 15, 2026 - Page 6
Page 8 of 124
1 On a voice vote
2 Voting Yea Chairperson Weeder; Commissioners Ehrlich, Gonka, Greenbaum, Hartinger, Pines,
3 & Portman
4 Voting Nay: None
5
6 Staff declared that the motion passed unanimously.
7
8 Respectfully Submitted,
9
10
11 Gale Cerabona
12 Recorder
13
14 MINUTES OF A REGULAR MEETING ON MARCH 12, 2026, WERE APPROVED WITHOUT CORRECTIONS.
Historic Preservation Commission Minutes
April 15, 2026 - Page 7
Page 9 of 124
1 MINUTES OF A SPECIAL MEETING
2 HISTORIC PRESERVATION COMMISSION
3 OF THE CITY OF HIGHLAND PARK, ILLINOIS
4
5
6 MEETING DATE: Thursday, May 7, 2026
7
8 MEETING LOCATION: Ward Willits House, 1445 Sheridan Road, Highland Park IL
9
10 CALL TO ORDER
11 The meeting began at 6:30 pm. This Commission meeting takes place off-site at 1445 Sheridan Road.
12
13 ROLL CALL
14 Commissioners Present: Chairperson Weeder; Commissioners Ehrlich, Gonka, Hartinger, Pines, & Portman
15
16 Councilmember Present: Blumberg, Ross, Mayor Rotering
17
18 Student Council Absent: Cooper Baum & Gabi Goldstein
19
20 Student Council Present: None
21
22 Staff declared that a quorum was present.
23
24 Staff Present: Planner Markle, Senior Planner Coleman, and City Manager Neukirch
25
26 Guests Present: Thomas Hiller, Peijian Sun, Cedar Roofing Company, Northshore School District
27 112, and Mary Seyfarth.
28
29 APPROVAL OF MINUTES
30 There was no approval of minutes.
31
32 SCHEDULED BUSINESS
33 Staff presented the winners of the 2026 Historic Preservation Awards.
34
35 Winners Thomas Hiller and representatives of North Shore School District 112 spoke about their
36 preservation projects.
37
38 Resident Mary Seyfarth spoke about the Rocky the Raccoon Weathervane and the relocation of “The Flight
39 of Time” clock.
40
41 DISCUSSION ITEMS
42 There were no discussion items.
43
44 BUSINESS FROM THE PUBLIC
45 There was no Business from the Public.
46
47 OTHER BUSINESS
48 There was no Other Business
Historic Preservation Commission Minutes
April 15, 2026 - Page 1
Page 10 of 124
1
2 STAFF REPORT
3 There was no Staff Report.
4
5 ADJOURNMENT
6 Meeting adjourned at 8:30 pm.
7
8 Respectfully Submitted,
9
10 Maddy Markle
11 Commission Secretary
Historic Preservation Commission Minutes
April 15, 2026 - Page 2
Page 11 of 124
To: Historic Preservation Commission
From: Maddy Markle, Planner I
Date: May 14, 2026
Subject: Certificate of Appropriateness – 1442 Forest Avenue
Location: 1442 Forest Avenue
Historical Name: Stewart House
Historical Status: Local Landmark (1993)
Structure: Style: Colonial Revival
Architect: Robert Seyfarth
Built: 1913
Petitioner: Andrew Venamore (contractor) on behalf of Michael Goldner (owner)
602 Academy Dr Northbrook, IL 60062
Project Architect: Heartland Garage Builders
602 Academy Drive, Northbrook, Illinois 60062
SUMMARY OF THE PETITION
Contractor Andrew Venamore, on behalf of property owner Michael Goldner, has submitted an application
for a Certificate of Appropriateness for the demolition of a detached garage and construction of a new detached
garage at the property located at 1442 Forest Avenue. The application was submitted April 10, 2026.
The historic “Stewart House” designed by Robert Seyfarth in 1913, is the primary residential structure on the
property.
Figure 1. Current Historic Garage Figure 2. Location
Prior Commission Consideration.
This property was designated a Local Landmark in 1993 (see Attachment A). The residential structure on the
site was designated a Local Landmark for its associations with architect Robert Seyfarth, its Colonial Revival
Style, and its embodiment of significant design details (Landmark Criteria 4, 5, and 6). See the 1993 Landmark
Nomination materials in Attachment B.
In 2023 the Historic Preservation Commission (“HPC”) granted Certificates of Appropriateness (“COA”) to
the current owners to remodel the home and modify window openings (see Attachment C). The HPC found
these changes appropriate. Furthermore, the Commission granted the remodel a 2025 Historic Preservation
Award (see Attachment D).
Page 1 of 5
Page 12 of 124
Garage History.
A 1924 Sanborn Map shows that a large dog kennel used to exist on the back of the property.
Figure 3. 1924 Sanborn Map
In 1932 the City reviewed a permit application (Attachment F) to demolish a portion of the kennel and move
the remnants farther east. The building permit application states “present building 40x20 to be split in half. East half
to be made into garage. West half to be torn down.” Staff concludes that the current garage is the east half of the 1920s
dog kennel that was moved and repurposed into a garage in 1932.
Figure 4. 1932 sketch describing proposed alterations to 1920s dog kennel.
PROPOSED MODIFICATIONS
The applicant proposes to demolish the existing 1932 garage and replace it with a new structure of similar
dimensions and with a similar roofline. The new structure will be located west of the current structure. The
Page 2 of 5
Page 13 of 124
applicant proposes that the new garage be vinyl. The applicant’s proposed plans can be found in Attachment
H.
Figure 5. Proposed New Structure.
STANDARDS FOR CERTIFICATES OF APPROPRIATENESS
The following are the Standards for Certificates of Appropriateness as listed in Section 24.030(C), which are
for an application for a Certificate of Appropriateness for New Construction. The applicant has provided
comments that address each standard in Attachment I.
Code excerpts are in BLACK. The applicant’s commentary is in RED. Additional staff comments are in BLUE.
(1) Height. The height of the proposed new Structure shall be visually compatible with properties,
structures, sites, public ways, objects, and places to which it is visibly related.
The proposed detached garage will be less than 16 feet to the ridge (based on a 6/12 pitch) and
will be located some 85 feet behind the existing SFR. This accessory structure will therefore be
compatible with the home and not detract from it.
Staff adds that the proposed garage will be the same height as the historic garage.
(2) Proportion of front façade. The relationship of the width to the height of the front elevation of the
proposed new Structure shall be visually compatible with properties, structures, sites, public ways,
objects, and places to which it is visually related.
At 22 feet in width and 16 feet in height, the proposed garage will be of a standard size for
parking 2 vehicles. Since it will be located some distance behind the SFR, there will not be an
adverse relationship to the house, and the existing hip style roof will be mirrored on the garage.
Additionally, the existing trees that will remain on the lot (within the driveway area) will also form
an additional visual barrier down the driveway, as will the location for the replacement structure
being +/- 30 further into the rear yard.
(3) Proportion of openings. The relationship of the width to height of windows and doors of the proposed
new Structure shall be visually compatible with properties, structures, sites, public ways, objects, and
places to which the building is visually related
The new garage has been designed to be very proportional with the 22-foot width dispersed with
a 16-foot x 7-foot overhead door that is centrally located on that front elevation.
(4) Rhythm of solids to voids in front facades. The relationship of solids to voids in the front façade of
the proposed new Structure shall be visually compatible with properties, structures, sites, public ways,
objects, and places to which it is visually related.
Page 3 of 5
Page 14 of 124
As noted above, the front elevation will have continuity of style, with the overhead door having a
glass panel to provide additional interest.
(5) Rhythm of spacing and structures on streets. The relationship of the proposed new Structure or
object to the open space between it and adjoining structures or objects shall be visually compatible with
the properties, structures, sites, public ways, objects, and places to which it is visually related.
This basic-sized garage (22’x22’), has been located in an area of the rear yard that will provide a
reasonable amount of open space, within a quite heavily wooded yard. This location is
compatible with the subject property and is standard for many neighborhood homes with
detached garages.
(6) Rhythm of entrance porches, storefront recesses and other projections. The relationship of
entrances and other projections of the proposed new Structure to sidewalks shall be visually compatible
with the properties, structures, sites, public ways, objects, and places to which it is visually related.
The entrance is on the side of the garage which is quite standard for a detached structure.
Staff notes that the garage’s entrance is on the east façade and is consistent with the door placement
on the historic garage.
(7) Relationship of materials and texture. The relationship of the materials and texture of the façade of
the proposed new Structure shall be visually compatible with the predominant materials used in the
structures to which it is visually related.
The proposed project will have white vinyl siding and white LP Smartside trim, with the overhead
door (with glass in the top panel) colored Evergreen to match the shutter details on the house.
Staff notes that vinyl is not consistent with the main structure’s wood siding and is a modern
material. The commission should consider if a modern material like vinyl is compatible with the
historic materials of the original garage and the historic Stewart House.
(8) Roof shapes. The roof shape of the proposed new Structure shall be visually compatible with the
structures to which it is visually related.
As noted previously the garage will have a hip roof that reflects the SFR
The new proposed roof shape is the same as the historic garage’s roof shape.
(9) Walls of continuity. Facades and property and site structures, such as masonry walls, fences, and
landscape masses, shall, when it is a characteristic of the area, form cohesive walls of enclosure along a
street, to ensure visual compatibility with the properties, structures, sites, public ways, objects, and places
to which such elements are visually related.
Not Applicable
(10) Scale of a structure. The size and mass of the proposed new Structure in relation to open spaces,
windows, door openings, porches, adjacent structures, and balconies shall be visually compatible with the
properties, structures, sites, public ways, objects, and places to which they are visually related.
Since the replacement garage is of a basic (i.e., 2-car) size, it will maintain spatial compatibility
with the home and the surrounding accessory buildings within the neighborhood.
(11) Directional expression of front elevation. The proposed new Structure shall be visually compatible
with the properties, structures, sites, public ways, objects, and places to which it is visually related in its
directional character, whether this be vertical character, horizontal character, or nondirectional character.
As an accessory building, the new garage will be compatible with the existing character aspects of
the lot and neighborhood.
(12) Destruction or alteration of historic features. The distinguishing historic qualities or character of a
Property, Structure, site or Object and its environment shall not be destroyed. The Alteration of any
historic or material or distinctive architectural features should be avoided when possible
The SFR will not be altered at all as a result of this work; it is the existing, extremely decrepit
accessory building (i.e., detached garage) that will be demolished. Its replacement will allow the
owner’s to actually park in their garage and will remove an eyesore from the property, while
furthering the preservation of the existing tree.
(13) Archaeological and natural resources. Every reasonable effort shall be
Page 4 of 5
Page 15 of 124
made to protect and preserve archaeological and natural resources affected by, or adjacent
to any project.
The existing garage has no archaeological or natural resources value: it was built within the past few
decades and holds no historical significance relative to the house.
The existing garage was not built within the last few decades. At the very least, the current garage
is 94 years old. The material of the garage itself is from the 1920s, possibly earlier. See “Garage
History” above. However, this does not necessarily mean the garage has archeological value.
(14) Architectural compatibility. In considering new construction, the Commission shall not impose a
requirement for the use of a single architectural style or period, though it may impose a requirement for
compatibility.
With a hip roof and (color) finishes that match the SFR, the replacement garage is compatible
with the existing historic home.
RECOMMENDATION
Based on the findings presented above, staff recommends that the Historic Preservation Commission consider
approval of the Certificate of Appropriateness for the demolition of the 1936 garage and construction of a new
structure at 1442 Forest Avenue. Staff asks that the Commission consider if vinyl is an appropriate material
substitute for wood siding.
ATTACHMENTS
Attachment A. 1993 Landmark Ordinance
Attachment B. 1993 Landmark Nomination Materials
Attachment C. Previous 2023 HPC Consideration
Attachment D. 2024 Historic Preservation Award Winners
Attachment E. 1924 Sanborn Map
Attachment F. 1932 Building Permit Application
Attachment G. 1932 Building Permit
Attachment H. Current Conditions
Attachment I. Project Narrative
Attachment J. Project Plan Set
Page 5 of 5
Page 16 of 124
Page 17 of 124
Page 18 of 124
Page 19 of 124
Page 20 of 124
DATE: May 12, 2023
REGULATED
STRUCTURE:
Alexander Stewart House
ADDRESS: 1442 Forest Avenue
OWNERS: John Eifler
ARCHITECT: John Eifler (312) 362-0180
PROPOSED ALTERATION:
1. Window replacement & window modification
COMMISSION
REVIEW DATE:
May 11, 2023
ABSTAIN: N/A
VOTE: 4-0
ACCEPT PROPOSAL X
REJECT PROPOSAL
ATTACHED Plan Set, 6 pages, submitted by applicant
DOCUMENTS:
COMMENTS: -Overall support for project
SIGNED:
Zubin Coleman, Planner II
Page 1 of 1
Page 21 of 124
2025 Historic Preservation Award
Winners
Page 22 of 124
1442 Forest Avenue Summary
Location 1442 Forest Avenue
Historical Name Alexander Stewart House
Historical Historic Local Landmark –
Status Designated 1993
Structure Colonial Revival
c. 1913
Architect Robert Seyfarth
Current Owner Michael Goldner &
Ashley Buxbaum
Petitioners John Eifler, Eifler &
Associates
2
Page 23 of 124
Project Location
3
Page 24 of 124
Awarded Project Scope
• Restoration Award
• Mostly Interior of the home
• Original massing, windows & architectural details maintained
• Restored pine shingle cladding
• Kitchen enlarged and remodeled
• Powder room installed
• Primary bedroom layout reconfigured
• Interior paint
• Bathroom remodel with new fixtures, tiles and marble
• Original windows restored
• Completed in 2024
4
Page 25 of 124
Before
5
Page 26 of 124
6
Page 27 of 124
7
Page 28 of 124
8
Page 29 of 124
9
Page 30 of 124
After
10
Page 31 of 124
11
Page 32 of 124
12
Page 33 of 124
13
Page 34 of 124
14
Page 35 of 124
15
Page 36 of 124
16
Page 37 of 124
17
Page 38 of 124
18
Page 39 of 124
Page 40 of 124
File under
S
OWNER' i.
I.
NAME ... L_ iLE% c3r7L
I tom.
BUILDING DEPARTMENT, CITY OF HIGHLAND PARK
APPLICATION FOR BUILDING PERMIT
To be filled out in ink
Per it No: 76 0
7.:,
t3.-
C.
Highland Park, Ill.,__.
The Ort
Lea/
thil/
undersigned/ hereby applies to the building department of the City of
Highland Park, Ill.,for a permit to erect, alter, construct, or enlarge the structure or part thereof herein described,
and if granted the permit applied for 0/
7 will comply with all requirements of the city ordinances relating
thereto and pay the fee
required by such ordinances. This building is to be used for the purpose of
and located Lot 7 on 7t.
Block.....
Subdivision No. 6076 St. .'
y7°
and constructed of dcv, !I of / stories, 212 feet wide feet long, and
o c7
feet high, consisting of J rooms, attic, Basement. There will be
u
Bath, Lavatories, Toilets, Sinks, Laundry Tubs, other plumbing
r-/ Fl. Dr. The building will be heated by Lighted by G/
Ventilated , fire escapes will be The items are more fully set
forth in the plans submitted with this application, the estimate of the cost of the work contemplated includes plumb -
ON
ing, heating, wiring, and all construction work necessary to complete the structure
C -
This estimate is made by Address
PiMir
i
7
Z:
The owner is Address !/ 12 01 Phone
General Contractor Z/
S-
G izC e/
r ±-
I1/
xJCl1/
G jL Address C l?{ G c-
Js
h,,,,,.
Subcontractor Address Phofi&
M:.. 4.,.
Electrician Address Phone
Plumber Address Phone
Architect Address Phone
No error or omission in either the plans or application, whether said plans or application has been approved by the
building inspector or not shall permit or relieve the applicant from constructing the work in any other manner than
that provided for in the ordinances of this city relating thereto.
The applicant having read
thisyapplication and fullyand
made are true to the best of .. y'
understanding the intent thereof declares that the statements
be lief.
3
L.
d. knowledge
Signature of Owner
Address Phone
BUIL Il G LINE RECORD
NOTE: This application shall be accompanied by Building Line record when required by the Commissioner of Build-
ings. T.he Building Line Record shall be: An accurate plat of the block in which the premise of the applicant for
a certificate of occupancy is located ( one side of the street only) drawn to scale on tracing cloth cut to the size of
this application and in ink with a left margin of i 11/ inches. On it show: ( 1) Front line of premises and depth
of block to rear line. ( 2) Street wall line of all buildings. ( 3) Distance of each street wall from front line, indi-
cating if wall is of porch, bay, or main wall. ( 4). Use of each building. ( 5) Location of the premises of applicant,
and ( 6) Points of the compass. This plat must be signed by the owner.
Use sheet this size if additional space is needed)
Street Wall: The main wall of a building nearest to and facing on a street, including sun parlors, but not in-
cluding bay windows nor ground story porches nor piazzas that are not closed in.)
Page 41 of 124
BUILDING DEPARTMENT, CITY OF HIGHLAND PARR
St. & No. 4 T707efi Use Dint. 1.. ( l "' - Exam.
APPLICATION FOR CERTIFICATE OF OCCUPANCY AND CONFORMITY OF PREMISES
This application must be submitted with the " application for Building Permit" or before a change or extension of
a non - conforming use is made.)
City of Highland Park, Commissioner of Buildings:
Application is hereby made for a certifivate of occupancy of premises situated on the P-
f
l/' side of
esf"
o
street, distant feet of t e corner formed by the intersec-
tion of sc. _...._
Pi1l.._..
CV) /
and _. C
and known as number 6/ Street .. FQ / sS
e_ 7Z- 41 f
Underline below whether ( New Building) ( Remodeling or addition to existing buildings) ( Change in use) —(Single
Family Dwelling) ( Apartment over Stores) ( Commercial use) ( Manufacturing use).
If use is commercial or manufacturing, state if retail store or other commercial or manufacturing use. State
fully nature of the business, storage or manufacturing, with manufacturing processes, raw materials used, kind of
machinery, and power used, methods of handling materials and products; operations such as processes or materials
to be carried on outside of buildings, . and if processes or handling of materials are of a nature which would create
dust, fire, gas, smoke, noise, fumes, odors, vibrations, sudden fire or explosions. If the premises are to be used
in part for residential purposes and in part for commercial purposes, state how each floor
or business or part
thereof is to be used. If the premises are in commercial district, state area to be devoted to and its
yard storage
location on the premises. If all information is not available state why:
2' 00.
3
Area of Lot .
List below all buildings ( name those to be demolished) st ating which exist, which are proposed or which are to
be altered. State use of each.
Buildings Area Cubic Contents Height
74O ie/
Ars .
Or $' A 20
sift/./ E 2 7L0 jam'
17c) rh_a arm
drYll
This application shall be accompanied by a plat in duplic ate of the
premises showing the location of all.proposed
buildings and of existing buildings ( Drawn to Scale). The plat shall be complete with dimensions of premises and
buildings, including the height to top of walls along the s ide lines, and on sheet cut to the size of this application
form.
I certify to the correctness of the plat and of the above.
t]___ r .,
This .........:.... must ,__ signed ,_ the is
owner e premises or duly authorized agents.)
Signature s .. ; Owner
by Agent
Address
over)
Page 42 of 124
Permit No. 76 Q
a-
Building Department, City of Highland Park a
j
No. l /. tOf'.'
St. , Lot
1"/ ''/ 7 Block 7/ Sub X7/
1?
Draw below, to scale, plat of lot, locating all buildings and show distances from buildings
to lot lines. Show average building line of existing houses in block.
yl1
2+
o
0
0
rn
IT;I MOVED
T°
Signature
Page 43 of 124
H.P.C. GARAGE SITE PHOTOS
CITY OF HIGHLAND PARK
1442 Forest Avenue – Michael Goldberg & Ashley Buxbaum
`
VIEW FROM
EAST/DRIVEWAY
NORTH SIDE
INSIDE OF
GARAGE
Page 45 of 124
H.P.C. GARAGE SITE PHOTOS
CITY OF HIGHLAND PARK
1442 Forest Avenue – Michael Goldberg & Ashley Buxbaum
OAK TREE ON
NORTH SIDE
VIEW FROM
WEST/REAR
NORTH-WEST
CORNER
Page 46 of 124
H.P.C. PROJECT NARRATIVE
CITY OF HIGHLAND PARK
1442 Forest Avenue – Michael Goldberg & Ashley Buxbaum
Criteria for Certificate of Appropriateness for New Construction. An application
for a Certificate of Appropriateness for Construction of new Structure within a
Historic District shall conform to the standards set forth below:
(1) Height. The height of the proposed new Structure shall be visually
compatible with properties, structures, sites, public ways, objects, and places to
which it is visibly related.
The proposed detached garage will be less than 16 feet to the ridge (based on a 6/12
pitch) and will be located some 85 feet behind the existing SFR. This accessory
structure will therefore be compatible with the home and not detract from it.
(2) Proportion of front façade. The relationship of the width to the height of the
front elevation of the proposed new Structure shall be visually compatible with
properties, structures, sites, public ways, objects, and places to which it is
visually related.
At 22 feet in width and 16 feet in height, the proposed garage will be of a standard size
for parking 2 vehicles. Since it will be located some distance behind the SFR, there will
not be an adverse relationship to the house, and the existing hip style roof will be
mirrored on the garage. Additionally, the existing trees that will remain on the lot
(within the driveway area) will also form an additional visual barrier down the
driveway, as will the location for the replacement structure being +/- 30 further into
the rear yard.
(3) Proportion of openings. The relationship of the width to height of windows
and doors of the proposed new Structure shall be visually compatible with
properties, structures, sites, public ways, objects, and places to which the
building is visually related.
The new garage has been designed to be very proportional with the 22-foot width
dispersed with a 16-foot x 7-foot overhead door that is centrally located on that front
elevation.
(4) Rhythm of solids to voids in front façades. The relationship of solids to voids
in the front façade of the proposed new Structure shall be visually compatible
with properties, structures, sites, public ways, objects, and places to which it is
visually related.
As noted above, the front elevation will have continuity of style, with the overhead
door having a glass panel to provide additional interest.
Page 47 of 124
H.P.C. PROJECT NARRATIVE
CITY OF HIGHLAND PARK
1442 Forest Avenue – Michael Goldberg & Ashley Buxbaum
(5) Rhythm of spacing and structures on streets. The relationship of the proposed
new Structure or object to the open space between it and adjoining structures
or objects shall be visually compatible with the properties, structures, sites,
public ways, objects, and places to which it is visually related.
This basic-sized garage (22’x22’), has been located in an area of the rear yard that will
provide a reasonable amount of open space, within a quite heavily wooded yard. This
location is compatible with the subject property and is standard for many
neighborhood homes with detached garages.
(6) Rhythm of entrance porches, storefront recesses and other projections. The
relationship of entrances and other projections of the proposed new Structure
to sidewalks shall be visually compatible with the properties, structures, sites,
public ways, objects, and places to which it is visually related
The entrance is on the side of the garage which is quite standard for a detached
structure.
(7) Relationship of materials and texture. The relationship of the materials and
texture of the façade of the proposed new Structure shall be visually compatible
with the predominant materials used in the structures to which it is visually
related
The proposed project will have white vinyl siding and white LP Smartside trim, with
the overhead door (with glass in the top panel) colored Evergreen to match the shutter
details on the house.
(8) Roof shapes. The roof shape of the proposed new Structure shall be visually
compatible with the structures to which it is visually related
As noted previously the garage will have a hip roof that reflects the SFR.
(9) Walls of continuity. Façades and property and site structures, such as
masonry walls, fences, and landscape masses, shall, when it is a characteristic of
the area, form cohesive walls of enclosure along a street, to ensure visual
compatibility with the properties, structures, sites, public ways, objects, and
places to which such elements are visually related.
Not Applicable.
(10) Scale of a structure. The size and mass of the proposed new Structure in
relation to open spaces, windows, door openings, porches, adjacent structures,
Page 48 of 124
H.P.C. PROJECT NARRATIVE
CITY OF HIGHLAND PARK
1442 Forest Avenue – Michael Goldberg & Ashley Buxbaum
and balconies shall be visually compatible with the properties, structures, sites,
public ways, objects, and places to which they are visually related.
Since the replacement garage is of a basic (i.e., 2-car) size, it will maintain spatial
compatibility with the home and the surrounding accessory buildings within the
neighborhood.
(11) Directional expression of front elevation. The proposed new Structure shall
be visually compatible with the properties, structures, sites, public ways,
objects, and places to which it is visually related in its directional character,
whether this be vertical character, horizontal character, or nondirectional
character.
As an accessory building, the new garage will be compatible with the existing character
aspects of the lot and neighborhood.
(12) Destruction or alteration of historic features. The distinguishing historic
qualities or character of a Property, Structure, site or Object and its environment
shall not be destroyed. The Alteration of any historic or material or distinctive
architectural features should be avoided when possible.
The SFR will not be altered at all as a result of this work; it is the existing, extremely
decrepit accessory building (i.e., detached garage) that will be demolished. Its
replacement will allow the owner’s to actually park in their garage and will remove an
eyesore from the property, while furthering the preservation of the existing tree.
(13) Archaeological and natural resources. Every reasonable effort shall be
made to protect and preserve archaeological and natural resources affected by,
or adjacent to any project.
The existing garage has no archaeological or natural resources value: it was built
within the past few decades and holds no historical significance relative to the house.
(14) Archaeological compatibility. In considering new construction, the
Commission shall not impose a requirement for the use of a single architectural
style or period, though it may impose a requirement for compatibility.
With a hip roof and (color) finishes that match the SFR, the replacement garage is
compatible with the existing historic home.
Page 49 of 124
45"
BURR
OAK
A ZLO
CK
JA K
EXISTING W
TE
S
I
SITE PLAN M
IL O
ET I N
T E, L L
I
Page 50 of 124
F.A.R. CALCULATION:
Existing SFR & Garage 3,228.75 SF
13.45%
Additional Garage 61.82 SF
76.00' 0.30%
TOTAL 3,290.57 SF
13.71%
~52.25' 22.00' ~85.17'
45"
BURR
OAK
22.00' NEW 3' APRON
GRAVEL
22'x22' DRIVEWAY
GARAGE EXTENSION
BY OTHERS
2.00'
SPOT SURVEY IS REQUIRED FOR
THE FOUNDATION PRIOR TO
FRAMING THE GARAGE
A ZLO
CK
PROPOSED
JA K
TE
SITE PLAN
W S
I
IL M I
O
N
ET
T E, L L
I
Page 51 of 124
SOFFIT ON SOUTH SIDE TO REMAIN
UNVENTED FOR FIRE-RATING PURPOSES
W
22'-0"
(/(&75,&'(7$,/
v &,5&8,76 $03*$ $03*$
D/S
S N v &217$,1(',13/4" 5,*,'67((/&21'8,7
v %85,$/'(37+,1&+(6
v :,5,1*6(3$5$7(&,5&8,7672(/(&75,&$/3$1(/
2x6 CROSS TIES @ 48" O.C. E
GFI
PITCH SLAB 1/8" PER FOOT
1-HOUR FIRE RATED 2x8 RIDGE (TO BE
WALL (SEE DETAIL 25 YEAR FIBERGLASS ONE SIZE LARGER
ON SHEET 3) T/RIDGE SHINGLES OVER 12# FELT THAN RAFTERS)
UNDERLAYMENT OVER
GFI 1/2" CDX SHEATHING
2x6 CUSTOM HEEL
18'-0" CUT ROOF RAFTERS
TOWARDS O.H. DOOR
12
@ 12" O.C. 6
GFI
22'-0" 2x6 CROSS TIES
@ 48" O.C.
OHD
6" FASCIA T/PLATE
A
12" VENTED SOFFIT
15'-7"
w/ 5" GUTTERS
2x4 COLLAR TIES @
9'-0"
4" VINYL SIDING 24" O.C. IN UPPER 1/3
1/2" CDX
GARAGE PL. HT.
SHEATHING
(2) 2x4 POSTS FOR (2) 2x6
3'-0"
2x4 CONST. GRADE
HEADER, TYP. LUMBER @ 16" O.C.
HEADER (2) 2x4 AT CORNERS
& OPENINGS
6"
1'-0"
16.00' x 8.00' O.H. GARAGE DOOR
MIN.
T/SLAB
(2) 1-3/4"x11-7/8" HEADER SIDE TO SIDE EXISTING
D/S
1'-0"
GRADE
3'-0" 3'x3' LANDING 2x4 TREATED SILL PLATE 5" CONCRETE SLAB
TO BE NOT (1) #4 REBAR ANCHORED WITH 1/2" DIA. STEEL ON 4" GRANULAR FILL
NEW CONC. APRON 1'-0"
MORE THAN TOP & BOTTOM ANCHOR BOLTS 10" LONG SET @ WITH 6x6 / 10x10 WWF
3'-0" 16'-0" 3'-0" 7-3/4" BELOW 6'-0" O.C. (2) @ EVERY PIECE AND
THRESHOLD CORNERS WITH NUTS AND
22'-0" WASHERS TIGHTENED
FLOOR PLAN building section
SCALE:1/4"=1'-0"
SCALE:1/4"=1'-0"
CONTRACTOR: SHEET NAME:
HEARTLAND GARAGE
DETACHED GARAGE - HIP ROOF BUILDERS
602 ACADEMY DRIVE
FLOORPLAN&
BUILDINGSECTION
1442 Forest Avenue, Highland Park NORTHBROOK, IL 60062 SHEET NUMBER:
PHONE: (224) 619-4539
Goldner Residence EMAIL: INFO@HLGBS.COM 1 OF 4
THESE PLANS REMAIN THE PROPERTY OF MACH 1, INC. AND THEIR REPRODUCTION IS EXPRESSLY FORBIDDEN.
Page 52 of 124
T/RIDGE HIP VENT
ASPHALT SHINGLES
12 12
6 6
BOXED IN EAVES
COMPLETELY
SEALED T/PLATE
1'-0"
15'-7" 4" VINYL SIDING
9'-0"
FINISHED CORNER
BOARDS (TYP.)
GARAGE PL. HT.
WEATHERSTRIPPING
AROUND OVERHEAD
DOOR
SIDING BUTTED
TO CASINGS (TYP.)
T/SLAB
EXISTING
GRADE CONCRETE
SECTIONAL
OVERHEAD DOOR
east elevation APRON
north elevation
SCALE:1/4"=1'-0" SCALE:1/4"=1'-0"
12 12
6 6
CONCRETE
west elevation south elevation APRON
SCALE:1/4"=1'-0" SCALE:1/4"=1'-0"
CONTRACTOR: SHEET NAME:
HEARTLAND GARAGE
DETACHED GARAGE - HIP ROOF BUILDERS
602 ACADEMY DRIVE
ELEVATIONS
1442 Forest Avenue, Highland Park NORTHBROOK, IL 60062 SHEET NUMBER:
PHONE: (224) 619-4539
Goldner Residence EMAIL: INFO@HLGBS.COM 2 OF 4
THESE PLANS REMAIN THE PROPERTY OF MACH 1, INC. AND THEIR REPRODUCTION IS EXPRESSLY FORBIDDEN.
Page 53 of 124
3-D PERSPECTIVES
*These drawings are for illustration purposes only. Vaulted ceiling or attic heights are approximate and will be
confirmed with the permit submission plans.
*Exact materials, colors and styles will be selected on proposal.
Michael & Ashley Goldner Date: March 7th, 2026
1442 Forest Avenue
Highland Park, IL 60035 H.G.B. OFFICE: 602 Academy Drive, Northbrook, Illinois 60062
Page 54 of 124
To: Historic Preservation Commission
From: Maddy Markle, Planner I
Date: May 14, 2026
Subject: Certificate of Appropriateness – 2012 Grange Avenue
Location: 2012 Grange Avenue
Historical Name: Sparkling Springs Well House
Historical Status: Local Landmark (2013)
Structure: Style: Utilitarian
Architect: Unknown
Built: c. 1896
Petitioner: Barry Hammer (Developer) on behalf of Lisa Herzberg (Owner)
1033 Crofton Ct Highland Park, IL 60035
Project Architect: Scott Renken
555 Oakwood Avenue Lake Forest, IL 60045
SUMMARY OF THE PETITION
Developer Barry Hammer, on behalf of property owner Lisa Herzberg, has submitted an application to amend
a previously approved Certificate of Appropriateness for the rehabilitation of the historic well house and
construction of an attached single-family home at the property located at 2012 Grange Avenue. The proposed
amendment pertains specifically to the well-house structure, not the prior-approved design of the new single-
family dwelling. The application was submitted April 27, 2026.
The historic Sparkling Spring Well House is a square utilitarian structure with a pyramidal roof and venting
tower (also referred to as copula). The structure was historically built and owned by the Sparking Springs
Mineral Water Company, the oldest family-owned business in Highland Park (founded c. 1896).
Figure 1. Historic Structure. Figure 2. Location
Prior Commission Consideration.
This property was designated a Local Landmark in 2013 (see Attachment A). The property was designated a
Local Landmark for its associations with the Sparkling Springs Mineral Water Company (Landmark Criteria 1,
7, and 8). See the 2013 Landmark Nomination materials in Attachment B .
Page 1 of 4
Page 55 of 124
In October of 2024 the Historic Preservation Commission (“HPC ”) granted a Certificate of Appropriateness
(“COA”) to the current applicant to rehabilitate the historic structure and incorporate it into a new single-
family dwelling (see Attachment C ) using the plans originally approved in 2013 1. In April of 2025, the HPC
granted a COA to the same applicant that included an updated plan set. The applicant applied for a COA that
incorporated an updated design of the proposed home that isn’t identical to the same design approved in 2013
and 2024 (see Attachment D). As part of this past approval the applicant committed to repairing the venting
cupola on the roof.
PROPOSED AMENDMENT
The applicant proposes to amend the 2025 COA to reconstruct the venting cupola, as opposed to repairing it.
The project architect, Scott Renken, states, “Upon closer examination of the Historical Building portion of this project,
particularly the cupola front dormer and portions of the roof structure, it has become apparent that the current poor quality and
deterioration of materials require replacement vs. saving of existing materials…. All proportions, details and dimensions of the
original design will be maintained. The replacement materials will be an asphalt shingle roof (as originally proposed), Hardie Bd.
cementitious trim or real cedar would be used for all trim and conventional 2x new wood framing as needed for structure. The
vents will either be wood or a Hardie Bd. product and would match as closely as possible the original design.” The applicant’s
project narrative and proposed amended plans are available in Attachment E .
The reconstructed cupola will resemble the current, in terms of massing, proportion, height, and roof shape.
The proposed materials will be the same as the current structure with the exception of possible Hardie Board
trim and vents. As part of their evaluation of “Standard 7 – Relationship of Materials and Textures,” found in Sec.
24.030 of Code, the Commission should consider if Hardie Board (fiber cement) is an appropriate material
replacement for wood. National Parks Service Preservation Brief 16, “Use of Substitute Materials on Historic
Building Exteriors” 2 is available in Attachment F as a resource.
Figure 3. Proposed amendment. Cupola will be totally re-built rather than repaired. Materials will be asphalt
roofing, Hardie Board (fiber cement) trim and 2x framing members. Proportions, details, and dimensions
will match original structure.
1 The Oct. 10, 2024 COA was approved by HPC with a condition that the Applicant would return to a subsequent HPC
meeting to present an updated plan set of the proposed single-family dwelling.
2 The HPC does not evaluate applications using National Parks Service standards. Applications are evaluated using the
Certificate of Appropriateness standards in Ch. 24.030 of Code. The attached is information about modern replacement
materials that the Commission may take into account as they evaluate “Standard 7 – Relationship of Material and Texture.”
Page 2 of 4
Page 56 of 124
CITY INSPECTION
The Department of Community Development’s Senior Plan Examiner / Inspector Horatiu Wolff, and Senior
Inspector Jim Ferber inspected the site on April 23, 2026 to verify the Applicant’s claims of the cupola’s poor
structural condition. Both City inspectors concluded that the cupola requires reconstruction and cannot
reasonably be repaired (see Attachment G).
Inspector Wolff notes the following:
1. Internal Observations
a. Existing wood rafters supporting the roof structure, show signs of deterioration from water
infiltration and age (especially at the bearing ends over the wood top plates along the
perimeter exterior masonry block walls), a condition that has progressed over the life span of
the existing construction and would render the wood frame construction unable to support
building code required structural loads.
b. Existing wood framing members framing the rough opening/support for the existing cupola,
likewise show signs of deterioration from water infiltration and age.
2. Exterior Observations
a. Existing asphalt shingled roof has long exceeded the life expectancy attributed to such a
roofing type: with portions of the roof missing roof shingles and the roof shingles themselves
curled, cracked and extremely weathered.
b. The cupola itself appears to be warped: appears to have rotated slightly around the vertical
axis. Horizontal slats on the exterior vent panels of the cupola, are missing and the cupola
wood construction itself shows sign of extreme weathering.
Inspector Wolff concludes that, “In consideration of such observations, it would be prudent to replace the entire roof structure,
with a new roof structure that matches the existing overall design of the existing natural spring/well house: i.e. a hip roof, with a
dormer on the South elevation and a rectangular plan shaped, venting cupola (having [2] vent panels on North/South elevations
and [1] vent panel on East/West elevations), and with sweeping rafters framing the cupola roof.”
These observations are consistent with the project architect and developer’s assessment.
STANDARDS FOR CERTIFICATES OF APPROPRIATENESS
The following are the Standards for Certificates of Appropriateness as listed in Section 24.030(C), which are
for an application for a Certificate of Appropriateness for New Construction .
(1) Height. The height of the proposed new Structure shall be visually compatible with properties,
structures, sites, public ways, objects, and places to which it is visibly related.
(2) Proportion of front façade. The relationship of the width to the height of the front elevation of the
proposed new Structure shall be visually compatible with properties, structures, sites, public ways,
objects, and places to which it is visually related.
(3) Proportion of openings. The relationship of the width to height of windows and doors of the proposed
new Structure shall be visually compatible with properties, structures, sites, public ways, objects, and
places to which the building is visually related
(4) Rhythm of solids to voids in front facades. The relationship of solids to voids in the front façade of
the proposed new Structure shall be visually compatible with properties, structures, sites, public ways,
objects, and places to which it is visually related.
Page 3 of 4
Page 57 of 124
(5) Rhythm of spacing and structures on streets. The relationship of the proposed new Structure or
object to the open space between it and adjoining structures or objects shall be visually compatible with
the properties, structures, sites, public ways, objects, and places to which it is visually related.
(6) Rhythm of entrance porches, storefront recesses and other projections. The relationship of
entrances and other projections of the proposed new Structure to sidewalks shall be visually compatible
with the properties, structures, sites, public ways, objects, and places to which it is visually related.
(7) Relationship of materials and texture. The relationship of the materials and texture of the façade of
the proposed new Structure shall be visually compatible with the predominant materials used in the
structures to which it is visually related.
(8) Roof shapes. The roof shape of the proposed new Structure shall be visually compatible with the
structures to which it is visually related..
(9) Walls of continuity. Facades and property and site structures, such as masonry walls, fences, and
landscape masses, shall, when it is a characteristic of the area, form cohesive walls of enclosure along a
street, to ensure visual compatibility with the properties, structures, sites, public ways, objects, and places
to which such elements are visually related.
(10) Scale of a structure. The size and mass of the proposed new Structure in relation to open spaces,
windows, door openings, porches, adjacent structures, and balconies shall be visually compatible with the
properties, structures, sites, public ways, objects, and places to which they are visually related.
(11) Directional expression of front elevation. The proposed new Structure shall be visually compatible
with the properties, structures, sites, public ways, objects, and places to which it is visually related in its
directional character, whether this be vertical character, horizontal character, or nondirectional character.
(12) Destruction or alteration of historic features. The distinguishing historic qualities or character of a
Property, Structure, site or Object and its environment shall not be destroyed. The Alteration of any
historic or material or distinctive architectural features should be avoided when possible
(13) Archaeological and natural resources. Every reasonable effort shall be
made to protect and preserve archaeological and natural resources affected by, or adjacent
to any project.
(14) Architectural compatibility. In considering new construction, the Commission shall not impose a
requirement for the use of a single architectural style or period, though it may impose a requirement for
compatibility.
RECOMMENDATION
Based on the findings presented above, staff recommends that the Historic Preservation Commission consider
approval of an amendment to the 2025 Certificate of Appropriateness for the rehabilitation at 2012 Grange
Avenue. Staff asks that the Commission consider if Hardie Board trim is an appropriate material replacement
for wood trim and vents as part of the proposed reconstruction.
ATTACHMENTS
Attachment A. 2013 Ordinance
Attachment B. 2013 Landmark Nomination
Attachment C. 2024 COA
Attachment D. 2025 COA
Attachment E. Applicant Submission
Attachment F. NPS Preservation Brief 16
Attachment G. City Inspector Opinion
Page 4 of 4
Page 58 of 124
Page 59 of 124
Page 60 of 124
Page 61 of 124
Page 62 of 124
HP Zelp, LLC – Landmark Nomination for Well House at 1629 Park Ave. West
Exhibit A – Statement of Eligibility
The Well House was built in the 1890s as a shelter for pumping equipment for the Sparkling Springs
Water Company. It is the oldest surviving structure on the site. The City’s 1999 architectural survey gave the
Well House an S-Significant historical status and noted it was probably eligible for inclusion on the National
Registry of Historic Places. The Well House is a unique example of a utilitarian structure that illustrates the
early development of the west Highland Park area. The Applicant desires to preserve the overall form of the
Well House (minus two non-historic brick additions) and incorporate it into a residential adaptive reuse within
the Grange Woods Subdivision pursuant to the terms and conditions of a pending proposed planned
development special use and development agreement which will be subject to final approval by the City
Council.
The Well House is eligible for landmark designation on the basis of the following landmarks criteria:
(1), (7), and (8).
The Historic Preservation Commission has previously issued (i) a Certificate of Appropriateness for a
proposed design for adaptive reuse, and (ii) demolition permits for the two non-historic brick additions.
Page 63 of 124
HP Zelp, LLC – Landmark Nomination for Well House at 1629 Park Ave. West
Exhibit B – Photograph of Well House
Page 64 of 124
HP Zelp, LLC – Landmark Nomination for Well House at 1629 Park Ave. West
Exhibit C – Survey of Original Spring House (Well House)
Page 65 of 124
DATE: October 11, 2024
REGULATED
STRUCTURE:
Well house structure
ADDRESS: 2012 Grange Road / 1629 Park Ave W
OWNERS: Lisa Ruby
ARCHITECT: N/A
PROPOSED ALTERATION:
1. Incorporating the landmarked well house structure into a new single-family dwelling
COMMISSION
REVIEW DATE:
October 10, 2024
ABSTAIN: N/A
VOTE: 5-0
ACCEPT PROPOSAL X
REJECT PROPOSAL
-Plan Set, 7 pages, submitted by applicant
ATTACHED
DOCUMENTS:
-This site is part of a PUD approval (2013).
-The attached plans were approved by HPC in 2012 and homeowner
COMMENTS: wanted to resubmit them for a COA approval.
-The expectation is for the homeowner to come back to HPC with
modifications to the approved design at a subsequent meeting.
SIGNED:
Zubin Coleman, Planner II
Page 1 of 1
Page 66 of 124
The contractor shall verify and confirm in writing all elevations
and dimensions of existing work. Copies of the official survey
are available upon request.
Contractors and subcontractors shall examine architectural
drawings and drawings of all other trades to verify the location
of fixtures, equipment and roughing, and for the coodination of
all trades.
Copyright 2012 Becker Architects Limited. All rights reserved.
OWNER:
HP ZELP, INC.
2001 NORTH HALSTED STREET
CHICAGO, IL 60614
312.943.1812
LAND PLANNER:
TESKA ASSOCIATES
627 GROVE STREET
EVANSTON, IL 60201
847.869.2015
-
Brick Warehouse Addition (North & West)
NEW
RESIDENCE
INCORPORATING
HISTORIC SPRING
HOUSE
PARK AVE WEST & GRANGE
HIGHLAND PARK, IL
PRELIMINARY
NOT FOR CONSTRUCTION
Issues
Original Spring House By Date For
Brick Warehouse Addition (East)
MES 7.19.12 HP HPC SUBMITTAL
Drawing Title
EXISTING
SPRINGHOUSE
PLAN
Scale NORTH
AS NOTED
1
EXISTING BUILDING PLAN Issue Date
N.T.S. SEE ABOVE
Drawn By Project Number
2012-0016
MES HP ZELP. LLC
Drawing
Number
A200
Page 67 of 124
The contractor shall verify and confirm in writing all elevations
and dimensions of existing work. Copies of the official survey
are available upon request.
Contractors and subcontractors shall examine architectural
drawings and drawings of all other trades to verify the location
of fixtures, equipment and roughing, and for the coodination of
all trades.
Copyright 2012 Becker Architects Limited. All rights reserved.
OWNER:
HP ZELP, INC.
2001 NORTH HALSTED STREET
CHICAGO, IL 60614
312.943.1812
LAND PLANNER:
TESKA ASSOCIATES
627 GROVE STREET
EVANSTON, IL 60201
847.869.2015
FRZR. REF.
DN
GREAT ROOM
22'9"x25'10"
-
BEDROOM #5
12'8"x12'0"
NEW
TV
W.I.C. POWDER
RESIDENCE
5'6"x7'6" 5'6"x7'6" INCORPORATING
BREAKFAST HISTORIC SPRING
BATH #5 HOUSE
8'6"x5'0" KITCHEN PARK AVE WEST & GRANGE
20'0"x22'0" HIGHLAND PARK, IL
DN
GARAGE
22'10"x36'8" FOYER OPEN
UP 11'2"x13'0" DN PORCH PRELIMINARY
MUD ROOM OPEN TO
NOT FOR CONSTRUCTION
ABOVE
AND
BELOW
Issues
By Date For
SUNROOM
W.I.C.
6'2"x7'0"
DINING
19'6"x15'6"
STORAGE
8'6"x11'9"
PANTRY LIVING ROOM
5'10"x6'2" 20'9"x15'0"
MES 7.19.12 HP HPC SUBMITTAL
Drawing Title
1
PROPOSED 1ST FLOOR PLAN
Scale: 1/4" = 1'-0"
PROPOSED
1ST FLOOR PLAN
Scale NORTH
AS NOTED
Issue Date
SEE ABOVE
Drawn By Project Number
2012-0016
MES HP ZELP. LLC
Drawing
Number
A201
Page 68 of 124
The contractor shall verify and confirm in writing all elevations
and dimensions of existing work. Copies of the official survey
are available upon request.
Contractors and subcontractors shall examine architectural
drawings and drawings of all other trades to verify the location
of fixtures, equipment and roughing, and for the coodination of
all trades.
Copyright 2012 Becker Architects Limited. All rights reserved.
OWNER:
HP ZELP, INC.
2001 NORTH HALSTED STREET
CHICAGO, IL 60614
312.943.1812
LAND PLANNER:
TESKA ASSOCIATES
627 GROVE STREET
EVANSTON, IL 60201
847.869.2015
MASTER
BATH
10'0"x14'3"
-
MASTER
BEDROOM
14'0"x19'6" NEW
BEDROOM #4 CL RESIDENCE
12'8"x14'0" MASTER INCORPORATING
W.I.C. HISTORIC SPRING
14'6"x7'6"
HOUSE
PARK AVE WEST & GRANGE
HIGHLAND PARK, IL
BATH #3 HALLWAY
8'0"x8'0"
DN
PRELIMINARY
NOT FOR CONSTRUCTION
DRYER LAUNDRY/ W.I.C. Issues
LINEN 9'6"x5'6" By Date For
BEDROOM #3 WASHER
11'0"x8'6"
12'8"x14'0"
BEDROOM #2
14'0"x14'0"
W.I.C.
BATH #2
5'0"x11'0"
MES 7.19.12 HP HPC SUBMITTAL
1
PROPOSED 2ND FLOOR PLAN
Scale: 1/4" = 1'-0" Drawing Title
PROPOSED
2ND FLOOR PLAN
Scale NORTH
AS NOTED
Issue Date
SEE ABOVE
Drawn By Project Number
2012-0016
MES HP ZELP. LLC
Drawing
Number
A202
Page 69 of 124
The contractor shall verify and confirm in writing all elevations
and dimensions of existing work. Copies of the official survey
are available upon request.
Contractors and subcontractors shall examine architectural
drawings and drawings of all other trades to verify the location
of fixtures, equipment and roughing, and for the coodination of
"ARCHITECTURAL" all trades.
REPAIR WOOD TRIM ASPHALT SHINGLES Copyright 2012 Becker Architects Limited. All rights reserved.
(TYP.)
OWNER:
HP ZELP, INC.
REPAIR CUPOLA 2001 NORTH HALSTED STREET
CHICAGO, IL 60614
312.943.1812
STANDING SEAM STANDING SEAM
METAL ROOFING METAL ROOFING LAND PLANNER:
(TYP.) TESKA ASSOCIATES
627 GROVE STREET
NEW "ARCHITECTURAL" EVANSTON, IL 60201
ASPHALT SHINGLES 847.869.2015
(TYP.)
HALF-ROUND GUTTERS
& DOWNSPOUTS (TYP.)
-
NEW
RESIDENCE
INCORPORATING
HISTORIC SPRING
HOUSE
PARK AVE WEST & GRANGE
EXIST. MASONRY TO BE REPLACEMENT DOUBLE REPAIR FASCIA DOUBLE HUNG BRICK (TYP.) HIGHLAND PARK, IL
REPAIRED & PAINTED HUNG WINDOWS - SDL NEW HALF ROUND WINDOWS - SDL
IN EXIST. OPENINGS GUTTERS & (TYP.)
DOWNSPOUTS
1
PROPOSED SOUTH ELEVATION
Scale: 1/8" = 1'-0"
PRELIMINARY
NOT FOR CONSTRUCTION
Issues
By Date For
MES 7.19.12 HP HPC SUBMITTAL
Drawing Title
PROPOSED
ELEVATIONS
Scale
AS NOTED
Issue Date
SEE ABOVE
2
PROPOSED EAST ELEVATION Drawn By Project Number
Scale: 1/8" = 1'-0" MES
2012-0016
HP ZELP. LLC
Drawing
Number
A301
Page 70 of 124
The contractor shall verify and confirm in writing all elevations
and dimensions of existing work. Copies of the official survey
are available upon request.
Contractors and subcontractors shall examine architectural
drawings and drawings of all other trades to verify the location
of fixtures, equipment and roughing, and for the coodination of
"ARCHITECTURAL" all trades.
ASPHALT SHINGLES REPAIR WOOD TRIM
Copyright 2012 Becker Architects Limited. All rights reserved.
(TYP.)
OWNER:
HP ZELP, INC.
REPAIR CUPOLA 2001 NORTH HALSTED STREET
CHICAGO, IL 60614
312.943.1812
STANDING SEAM STANDING SEAM
METAL ROOFING METAL ROOFING LAND PLANNER:
(TYP.) TESKA ASSOCIATES
627 GROVE STREET
NEW "ARCHITECTURAL" EVANSTON, IL 60201
ASPHALT SHINGLES 847.869.2015
(TYP.)
HALF-ROUND GUTTERS
& DOWNSPOUTS (TYP.)
-
NEW
RESIDENCE
INCORPORATING
HISTORIC SPRING
HOUSE
PARK AVE WEST & GRANGE
HIGHLAND PARK, IL
1
PROPOSED NORTH ELEVATIONBRICK (TYP.) DOUBLE HUNG
WINDOWS - SDL
REPAIR FASCIA
NEW HALF ROUND
STONE SILLS TO
MATCH EXISTING
NEW DOUBLE HUNG
WINDOWS - SDL
NEW RUSTICATED CONC.
BLOCK TO MATCH EXISTING
Scale: 1/8" = 1'-0" (TYP.) GUTTERS & - PAINTED
DOWNSPOUTS
PRELIMINARY
NOT FOR CONSTRUCTION
Issues
By Date For
MES 7.19.12 HP HPC SUBMITTAL
Drawing Title
PROPOSED
ELEVATIONS
Scale
AS NOTED
Issue Date
SEE ABOVE
NEW CUSTOM WOOD NEW RUSTICATED CONC.
2
PROPOSED WEST ELEVATION OVERHEAD DOORS BLOCK TO MATCH EXISTING Drawn By Project Number
Scale: 1/8" = 1'-0" - PAINTED MES
2012-0016
HP ZELP. LLC
Drawing
Number
A302
Page 71 of 124
The contractor shall verify and confirm in writing all elevations
and dimensions of existing work. Copies of the official survey
are available upon request.
Contractors and subcontractors shall examine architectural
drawings and drawings of all other trades to verify the location
of fixtures, equipment and roughing, and for the coodination of
all trades.
Copyright 2012 Becker Architects Limited. All rights reserved.
OWNER:
HP ZELP, INC.
2001 NORTH HALSTED STREET
CHICAGO, IL 60614
312.943.1812
LAND PLANNER:
TESKA ASSOCIATES
627 GROVE STREET
EVANSTON, IL 60201
847.869.2015
-
1
PROPOSED SOUTHEAST VIEW
N.T.S. 2
PROPOSED NORTHEAST VIEW
N.T.S.
NEW
RESIDENCE
INCORPORATING
HISTORIC SPRING
HOUSE
PARK AVE WEST & GRANGE
HIGHLAND PARK, IL
PRELIMINARY
NOT FOR CONSTRUCTION
Issues
By Date For
MES 7.19.12 HP HPC SUBMITTAL
Drawing Title
3d VIEWS @
GROUND LEVEL
3
PROPOSED SOUTHWEST VIEW
N.T.S. 4
PROPOSED NORTHWEST VIEW
N.T.S.
(MASSING STUDY)
Scale
AS NOTED
Issue Date
SEE ABOVE
Drawn By Project Number
2012-0016
MES HP ZELP. LLC
Drawing
Number
A303
Page 72 of 124
The contractor shall verify and confirm in writing all elevations
and dimensions of existing work. Copies of the official survey
are available upon request.
Contractors and subcontractors shall examine architectural
drawings and drawings of all other trades to verify the location
of fixtures, equipment and roughing, and for the coodination of
all trades.
Copyright 2012 Becker Architects Limited. All rights reserved.
OWNER:
HP ZELP, INC.
2001 NORTH HALSTED STREET
CHICAGO, IL 60614
312.943.1812
LAND PLANNER:
TESKA ASSOCIATES
627 GROVE STREET
EVANSTON, IL 60201
847.869.2015
-
1
PROPOSED SOUTHEAST VIEW
N.T.S. 2
PROPOSED NORTHEAST VIEW
N.T.S.
NEW
RESIDENCE
INCORPORATING
HISTORIC SPRING
HOUSE
PARK AVE WEST & GRANGE
HIGHLAND PARK, IL
PRELIMINARY
NOT FOR CONSTRUCTION
Issues
By Date For
MES 7.19.12 HP HPC SUBMITTAL
Drawing Title
3d VIEWS @ AERIAL
LEVEL
(MASSING STUDY)
3
PROPOSED SOUTHWEST VIEW 4
PROPOSED NORTHWEST VIEW
N.T.S. N.T.S.
Scale
AS NOTED
Issue Date
SEE ABOVE
Drawn By Project Number
2012-0016
MES HP ZELP. LLC
Drawing
Number
A304
Page 73 of 124
DATE: April 11, 2025
REGULATED
STRUCTURE:
Well house structure
ADDRESS: 2012 Grange Road / 1629 Park Ave W
OWNERS: Lisa Ruby
ARCHITECT: Scott Renken
PROPOSED ALTERATION:
1. Incorporating the landmarked well house structure into a new single-family dwelling
COMMISSION
REVIEW DATE:
April 10, 2025
ABSTAIN: N/A
VOTE: 4-2
ACCEPT PROPOSAL X
REJECT PROPOSAL
-Plan Set, 8 pages, submitted by applicant
ATTACHED -Project Narrative, 3 pages, submitted by applicant
DOCUMENTS:
-This site is part of a PUD approval (2013).
-The attached plans were approved by HPC in 2012 and
COMMENTS:
-The commission generally favored this design and felt it was an
improvement from the previously-approved design.
SIGNED:
Zubin Coleman, Planner II
Page 1 of 1
Page 74 of 124
Page 75 of 124
Page 76 of 124
Page 77 of 124
Page 78 of 124
Page 79 of 124
Page 80 of 124
Page 81 of 124
Page 82 of 124
Renken Architects & Builders LLC
STATEMENT OF INTENT
Re: Park Ave & Grange Ave. property
March 5, 2025
Mr. Zubin Coleman
City of Highland Park
Planning Division
1150 Half Day Rd.
Highland Park, Il. 60035
Dear Mr. Coleman & HPC Members;
We respectfully submit the attached COA application and supporting documents for a new single
family home that incorporates the existing historical building formerly known as the “Spring
House”. This project is part of an earlier subdivision of properties along Grange Ave. for single
family homes. The building envelope was pre-determined, and this new home needs to incorporate
the existing historical structure into the design. A previous scheme by another Owner was
presented approx. 2012 but did not proceed. We think this submittal is superior and relates better
to the existing historical structure and to the neighboring properties.
SITE PLAN:
The parameters of the site were pre-determined based on the building envelope. The new home
will extend to the east of the existing structure and be connected. We decided to use the existing
structure as a 3-car garage and mudroom. The front entry will be facing Grange Ave. to relate to
all of the other homes on the street, with the south elevation facing Park Ave. of particular
importance due to the historic character of the existing structure and exposure to the public.
ELEVATIONS:
It is required that the south elevation of the historical structure remain as-is with new repairs as
needed:
• The 3 windows locations and stone surrounds remain (with new windows)
• The painted rough conc. blocks remain
• The dormer remains with new windows & trim
• The repaired cupola remains
• The existing asphalt shingle roof will be replaced & match the home
• The fascia, soffit & gutter will be replaced but remain in size & position.
555 Oakwood Ave Lake Forest, Il. 60045 Ph: 847-343-8162
Page 83 of 124
Renken Architects & Builders LLC
The new portion of the house is 2-story with a 1-story link. Here are the characteristics of the new
portion:
• 8/12 +/- pitch on all visible roof forms to match the existing building.
• All soffit depths match at 16” +/- on old and new buildings
• New casement windows with a cross pattern in old & new
• The existing dormer on historical building is duplicated on the east side of the new building
for continuity.
• The painted masonry on the existing building will be similar to the painted brick elements
of the new building.
• The fascia sizes will be the same and the link fascia will match the existing in height
• The horizontal siding on the new will match the side & rear of the existing building.
COLOR & TEXTURE OF MATERIALS:
• The trim & siding will be cement-fiber such as a Hardie product.
• The gutters and downspouts will be pre-finished aluminum
• The windows will be aluminum clad wood or fiberglass. The muntins will be simulated
divided lites.
• The roof will be architectural asphalt shingle.
• All masonry will be painted
ARCHITECTURAL STYLE:
The existing building has certain characteristics of a “gentleman farmhouse” with the shape,
cupola, dormer, window spacing & hipped roof. These date from the early to mid twentieth
century. The front has a rugged painted concrete block, while the sides & rear are in a state of
disrepair. We chose to complement this architecture with a more modern farmhouse with
traditional features such as front porch, dormer, etc. The roof pitches and soffit overhangs match.
The painted masonry is duplicated on old & new. Also, in order to break up the the visual height of
the new portion and add interest, a horizontal band is added under the second-floor windows and
above is board & batten for the top 1/3. We feel that the existing structure is seamlessly
incorporated into the overall home design and the result is a new residence that satisfies the
needs of today while respecting the historical portion.
COMPARISON OF 2012 SUBMITTAL TO THIS SUBMITTAL
• New submittal has roof forms & pitches that match the existing instead of 1-1/2 steep gable
roofs with shed dormers w/ metal roofs of the previous.
• New submittal incorporates existing forms such as the hipped dormer while the previous
submittal did not.
• New submittal has better compatibility of material, specifically, no standing seam roofs.
• The new design fits in better with the neighbors in scale & style, specifically the adjacent
home to the north.
555 Oakwood Ave Lake Forest, Il. 60045 Ph: 847-343-8162
Page 84 of 124
Renken Architects & Builders LLC
• Superior floor plan
555 Oakwood Ave Lake Forest, Il. 60045 Ph: 847-343-8162
Page 85 of 124
Page 86 of 124
Page 87 of 124
Page 88 of 124
Page 89 of 124
Page 90 of 124
Page 91 of 124
Page 92 of 124
Page 93 of 124
Page 94 of 124
Page 95 of 124
Page 96 of 124
Page 97 of 124
Page 98 of 124
Page 99 of 124
16 PRESERVATION
BRIEFS
The Use of Substitute Materials
on Historic Building Exteriors
John Sandor, David Trayte, and Amy Elizabeth Uebel
National Park Service
U.S. Department of the Interior
Technical Preservation Services
The Secretary of the Interior's Standards for Rehabilitation The term substitute materials is used to describe building
generally require that deteriorated distinctive architectural materials that have the potential to match the appear-
features of a historic property be repaired rather than ance, physical properties, and related attributes of historic
replaced. Standard 6 of the Standards for Rehabilitation materials well enough to make them alternatives for use
further states that when replacement of a distinctive in current preservation practice when historic materials
feature is necessary, the new feature must “match the old require replacement.
in composition, design, color, texture, and other visual
properties, and, where possible, materials” (emphasis Compelling reasons to use a substitute material instead
added). While the use of matching materials to replace of the historic material include the unavailability or poor
historic ones is always preferred under the Standards for performance of the historic material, or environmental
Rehabilitation, the Standards also purposely recognize pressures or code-driven requirements that necessitate a
that flexibility may sometimes be needed when it comes change in material. When using a substitute material for
to new and replacement materials as part of a historic replacement it is critical that it match the historic material
rehabilitation project. Substitute materials that closely in all of its visual and physical properties to preserve the
match the visual and physical properties of historic historic character of the building and minimize the impact
materials can be successfully used on many rehabilitation on its integrity.
projects in ways that are consistent with the Standards.
Substitute materials can be cost-effective, permit the ac-
The flexibility inherent in the Standards for Rehabilitation curate visual duplication of historic materials, and provide
must always be balanced with the preservation of the improved durability. While the behavior of traditional, his-
historic character and the historic integrity of a building, toric materials is generally well understood, the behavior
of which historic materials are an important aspect. of newer materials can be less established and sometimes
Any replacement work reduces the historic integrity of less predictable. Substitute materials are most successful
a building to some degree, which can undermine the when the properties of both the original material and the
historic character of the property over time. With limited substitute are thoroughly understood by all those involved
exceptions, replacement should only be considered when in the design and construction process. The architect must
damage or deterioration is too severe to make repair be adept at the selection of substitute materials and their
feasible. When needed replacement is made with a incorporation into architectural plans and specifications.
material that matches the historic material, the impact The contractor or tradesperson in the field must also be
on integrity can be minimal, especially when only a small experienced with their use.
amount of new material is needed. When a substitute
material is used for the replacement, the loss in integrity This Preservation Brief provides general guidance on the
can sometimes, although not always, be greater than use of substitute materials as replacement materials for
that of a matching material. Also, whether historic or distinctive features on the exterior of historic buildings.
substitute material, there is a point where the amount Due to the ever-evolving product market for construction
of replacement can become excessive and the building’s materials, this Brief does not provide specifications
historic integrity is diminished to an unacceptable for substitute materials. This guidance should be used
degree, regardless of the material used—that is, a loss of in conjunction with qualified professionals who are
authenticity and the physical features and characteristics knowledgeable in current construction and historic
closely associated with the property’s historic significance. preservation practices.
1
Page 100 of 124
This Brief includes a discussion of the appropriate use teenth and early twentieth centuries for details on stone
of substitute materials and provides a path for decision- or brick buildings as well as for the entire skin of large and
making in their use. In considering the use of substitute elaborately detailed buildings.
materials, such issues as the deterioration or failure of
the historic building component and material must be Cast iron was also used to imitate stone, often with very
understood. The existing component’s physical and visual decorative profiles, for a variety of architectural features
properties, profile, surface texture, dimensions, and ranging from window hoods to columns, piers, balus-
performance should be identified to establish the basis for trades, and even whole façades. Cast iron offered its own
evaluating a possible replacement material. The physical set of efficiencies including cost, fabrication time, and
and visual properties of the various substitute materials weight, but required a painted finish.
available should also be assessed and compared to the
original material for their physical and visual compatibility. While cast stone, terra cotta, and cast iron offered effi-
Lastly, the suitability of a given substitute replacement ciencies over quarried and, particularly, carved stone, they
material should be determined based on how well the were not cheap or impermanent materials. Less costly, but
material matches both the physical and visual properties also less durable, stamped or brake-formed sheet metal,
of the existing material as well as any specific performance typically galvanized, could also be used instead of masonry
or application needs. The Brief’s descriptions of common for cornices, window hoods, roofing tiles, and even entire
substitute materials are not meant to be comprehensive, building façades.
and, as the performance history of newer materials
continues to grow and new materials are developed,
available options will change, and our understanding of
current material performance will continue to evolve. Substitute Materials and
Applying the Standards for
Historical Use of Substitute Rehabilitation
Materials
The Standards for Rehabilitation are focused on
The tradition of using affordable and common materials
preserving the important and distinctive
in imitation of more expensive and less available materi-
character-defining features of a historic property
als is a long one. At Mount Vernon, for example, George
(Standards 2 and 6), and they are to be applied in a
Washington used wood painted with sand-impregnated
reasonable manner, taking into account economic
paint to imitate rusticated stone. This technique, along
and technical feasibility (36 CFR 67.7 and 36 CFR
with scoring stucco into block patterns, was common in
68). The Standards have an inherent flexibility that
Colonial America to imitate stone.
facilitates their application to diverse projects,
historic properties, and conditions. They are to
Nineteenth-century technology made a variety of materi-
be applied on a “cumulative-effect” basis, when
als readily available and widely used that were not only
the overall effect of all work in the context of the
able to imitate traditional materials but were also cheaper
specific conditions of the property and the project is
to fabricate and easier to use. Traditionally, carved stone
consistent with the property's historic character.
units were individually worked. Molded or cast materials
greatly increased efficiency in creating repetitive ele-
ments. Cement-based products such as cast stone could The Standards for Rehabilitation require that the
provide convincing imitations of natural stone with care- replacement of a distinctive feature match the old
fully chosen aggregates and cements and was typically a in physical and visual properties. While the use of
commercially manufactured product. It could be tooled matching materials is always preferred, the Standards
like natural stone, though that could reduce much of purposely allow for the use of substitute materials
the cost advantage. These carefully-crafted cementitious when the use of original materials is not reasonably
products were widely used as trim elements for masonry possible, such as in consideration of economic and
structures or as the face material for an entire building. technical feasibility or in new construction. They
At the other end of the spectrum, mail-order catalogs also provide additional flexibility in the treatment
provided a wide variety of forms for molding concrete of secondary, less distinctive features that are
that were merely evocative of natural stone and did little less important in defining the historic character
to match its appearance. Concrete masonry units could be of the property. The Standards for Rehabilitation
fabricated locally and on site, avoiding expensive quarry- recognize that flexibility is appropriate to facilitate
ing and shipping costs. “a compatible use for a property … while preserving
those portions or features which convey its historical,
Offering similar efficiencies as cast stone for reproducing cultural, or architectural values” (definition of
repetitive and even complex decorative shapes, terra cotta “Rehabilitation,” 36 CFR 67.2(b)).
could mimic the surface characteristics of stone with vari-
ous textures and glazes. It was popular in the late nine-
2 Page 101 of 124
Examples of Historical Use of Substitute Materials
Figure 2a. Casting concrete blocks to mimic quarried Figure 2b: The 19th century also produced a variety of
stone was a popular late 19th- to mid 20th-century metal products used to imitate other materials. Across the
technique. Concrete masonry units could be completed by country, cast iron was used in storefronts to imitate stone.
local craftsman, saving time and shipping costs. Photo: John Sandor, NPS.
Photo: John Sandor, NPS.
Figure 2c: Stucco has been used to imitate a number of Figure 2d: Terra cotta gained popularity in the late 19th
building materials for many centuries. Seen here, stucco century as a cheap and lightweight alternative to stone.
was applied to a brick structure and scored to represent a Glazing techniques allowed the blocks to imitate a variety
stone façade. Photo: John Sandor, NPS. of natural stone materials. Photo: John Sandor, NPS.
3
Page 102 of 124
These examples of one material used to imitate another,
more often in initial construction than for later repair and
replacement purposes, are referred to as imitative materi-
als in the Guidelines for Preserving, Rehabilitating, Restor-
ing & Reconstructing Historic Buildings, updated in 2017,
that accompany the Secretary of the Interior's Standards
for the Treatment of Historic Properties. These imitative
materials, while evoking other materials, usually had dis-
tinctive qualities of their own and were not always a very
close match in appearance to the historic material they
were meant to imitate.
Many of the traditional materials discussed above are still
available and used to replace damaged or missing original
features, both to replace matching historic materials and
sometimes as substitute materials. Because of their exten-
sive use over time and their known physical and chemical Figure 3: Incremental repair is best done using in-kind material to
properties, cast stone, cast iron, and terra cotta are well minimize differences in the performance characteristics that could
understood substitute materials. This continued usage negatively affect the overall assembly. Photo: NPS.
and familiarity means their installation requirements and
service life are well established, which in turn makes it tures or units of historic material must be replaced. While
easier to determine when and how to use these traditional achieving an effective match of all of the visual qualities of
materials as substitutes for a deteriorated material. Howev- a material can be challenging, even when replacement is
er, innovation in replacement materials continues, and new in kind, it can be even more challenging when the replace-
products (many of them consisting of synthetic materials) ment is a substitute material. A good visual match is not
are continually introduced. These non-traditional products the only consideration when a substitute material is to be
are an increasing part of both the new construction and used for incremental replacement within a larger assem-
rehabilitation industries. Some materials, like glass fiber bly of historic material. When an individual siding board
reinforced polymers, glass fiber reinforced concrete, or or a single block of ashlar is being replaced, it is usually
fiber cement, have been in use long enough for an accu- best achieved with the original material. Introduction of
rate prediction of their service life and performance. Other a different material into an intact assembly requires that
newer, non-traditional materials may be too new to have its inherent properties, such as expansion and contraction,
established performance records, thus, understanding moisture resistance, or permeability, be thoroughly consid-
their material properties is critical, and their use should be ered relative to those of the surrounding historic materials
approached with more caution. to avoid causing damage.
When to Consider Using Substitute
Materials in Preservation Projects
According to the Standards for Rehabilitation, deteriora-
tion should generally be addressed through repair if in
repairable condition. Repair can entail a variety of treat-
ments that retain the unit of building material and remove
and patch or replace only the damaged portion. This ap-
proach can be done with traditional methods and materi-
als such as a dutchman, where like-kind material is pre-
cisely inserted into wood or stone, or it may employ other
materials such as epoxies for wood repair or cementitious
compounds for masonry. As long as the repair methods are
sound and do not damage or accelerate the deterioration
of the historic material, repairs are generally preferable to
replacement of an entire element. More complex manufac-
tured products, typical of more recent historic materials (as Figure 4. While occasionally used to imitate other materials such as
well as a lot of modern building materials generally), may wood or slate shingle, many asbestos shingles and siding materials
be more difficult to repair, if they can be repaired at all. had their own distinct shape and profile. No longer manufactured
today, alternative materials must be found to replace these
There are situations, however, when the level of deterio- materials when they are distinctive features on a historic structure.
ration makes localized repairs infeasible and entire fea- Drawing: Association for Preservation Technology, Building
Technology Heritage Library.
4 Page 103 of 124
Figure 5. (Left) Asbestos shingles were often used as a substitute for traditional slate roof shingles. The historic asbestos roof on this rehabilitation
project had reached the end of its lifespan and required complete replacement. (Right) Given the limited replacement materials available to match
the historic asbestos shingles, utilizing natural slate was determined to be the best visual match for the original shingles and design intent in this
instance. Photos: Crosskey Architects.
Circumstances in which the use of substitute materials a natural material, which was the case with asbestos
may generally be considered appropriate, taking into shingles meant to imitate slate, the natural material
consideration technical and economic feasibility reasons, may now be an appropriate substitute material to
include: the unavailability of historic materials; the consider for the manufactured one that is no longer
unavailability of skilled artisans or historic craft techniques; produced.
inadequate durability of the original materials; the
replacement of a secondary feature; construction of a •
new addition; the reconstruction of a missing feature;
code-required performance; and for enhanced resilience
and sustainability:
•
•
Many manufactured materials that were used
historically on buildings are no longer made. Terne-
plated steel, which was the material most typically
used for painted standing-seam or flat-seam roofing,
is no longer made. However, because it was always
painted, other metals including galvanized steel or
copper can generally be substituted if painted. When
the historic material needing to be replaced is a
manufactured product developed as an imitation of
5
Page 104 of 124
The ready availability of manufactured ornamental Figure 6. The dramatic
wood features fed a nineteenth-century taste for difference in the number
decorative architectural details that were often of growth rings between
used on the exterior of buildings with little concern old-growth wood and
wood that was recently
for how they would be affected by moisture or
harvested from second-
maintained. Even old-growth wood from decay-
or third-growth forests
resistant species often could not prevent features
is indicative of the
with severe exposure from eventually needing to be diminished dimensional
replaced. Today’s available commercial supplies of stability and durability
lumber no longer provide the denser, more decay- of most lumber currently
resistant wood of old-growth forests, so even careful available. Photo:
matching to species, which is not always possible, will Zachary Dettmore.
not yield a replacement equal in performance to the
historic material. Old-growth wood is likely to be very such a feature, the retention of the overall historic
expensive, if it can be found, and may not be available character should still guide selection of an appropriate
from a sustainable, environmentally responsible replacement material. For example, replacing
source. When features with severe exposure need to secondary features such as those with limited visibility
be replaced or reproduced, substitute materials that (e.g., siding materials on a rear elevation) may permit
are less susceptible to decay can have a longer life, and replacement materials that are similar in appearance
when the feature is painted, as exterior wood features or character without having to be a perfect match.
generally are, the visual effect of a substitute material
can be minimal. • Construction of a new addition. The Standards
require that new additions to historic buildings and
• Replacement of a secondary feature. When it related new construction be differentiated from the
is necessary to replace a less distinctive, secondary old as well as be compatible with the historic character
feature that is less important in defining the historic of the property and its site and environment. Using
character of the property, there is more flexibility in materials that evoke, without matching, the historic
how it can be replaced. While it may be less important material can be an effective means of achieving
to find an exact match in materials when replacing the needed balance between compatibility and
Figure 7. A new addition replaced non-historic construction on the rear elevation of this building. Fiber cement gives the addition a compatible
appearance without replicating the exposure for thickness of the historic siding. Photo: Ward Architecture + Preservation.
6 Page 105 of 124
differentiation for new additions and
new construction. Even if differentiation
is achieved through design rather than
materials, there generally is no basis for
requiring the use of matching historic
materials for new additions and new
construction as part of a rehabilitation
project.
• Reconstruction of a missing feature.
Many buildings lose significant features
over the course of their lives for reasons
such as those previously discussed. When a
missing feature is to be reconstructed, the
importance of matching the original mate-
rial may be less important to the effect
replacing the missing feature may have on
the overall historic character and appear-
ance of the building. Though replacement
of missing features must be substantiated
by documentary, physical, or pictorial
evidence, in many cases the authenticity
of the material may be secondary to the
overall visual qualities. The use of a more
cost-effective substitute material for the
construction of a missing feature can often
be an important factor in the feasibility of
undertaking such work.
• Code-required performance.
Modern building codes are regularly
amended to require higher performance
levels for new and existing buildings in such
areas as life safety, seismic retrofits, and
accessibility. Rehabilitation projects often
trigger compliance with code requirements
that were not in place when a building
was constructed. Although building codes
may often allow for the retention of
historic materials and assemblies, substitute
materials can offer an alternative in
situations when the historic materials are
non-compliant and cannot otherwise be
reasonably retained. In these instances, a
change in material may be appropriate to
meet code requirements, while in other
instances selecting the optimal code
compliance method for the project may
achieve code-compliant solutions that also
allow for the preservation of a building’s
historic materials and finishes.
For example, fire codes may require
increased resistance to flame spread for
buildings within dense urban environments
where building proximity and separation
between buildings is a concern. Some
substitute materials are non-combustible,
have good ratings for flame spread, and Figure 8. A long-missing cast-iron steeple was reconstructed in aluminum and
can provide an alternative to help meet fiber-reinforced polymer (FRP). Photo: John Sandor, NPS, Inset: Quinn Evans.
7
Page 106 of 124
fire code requirements. Depending on the building they may have shorter lifespans to their historic mate-
component and the material, however, a substitute rial counterparts. When either greater resilience or
material may not resist fire any better than the sustainability is a factor, all feasible alternatives should
historic material. In addressing code issues, all feasible be considered in finding a balanced approach that
alternatives should be considered to minimize the maintains historic character while meeting resilience
impact on the historic character of the building while and sustainability goals.
still meeting code requirements.
With specific provisions in building code related to Substitute Materials and
issues such as seismic hazards, the choice of materials
for features inherently unstable in a seismic event can Economic Feasibility
be a key part of a code-compliant retrofit solution.
Elements at risk of falling such as parapets, finials, and Economic feasibility is inevitably a concern when choosing
overhanging cornices may be made safe by anchoring a material for any part of a project, whether a historic
them to new structural frames. However, for some or substitute material, but it should not be the sole
heavy masonry features, especially where there is determinant factor at the expense of maintaining the
deterioration or the feature is difficult to effectively
brace, adequately anchoring the existing feature
may not prove feasible. In such cases removing and
replacing these features with lighter-weight replicas
that incorporate a resilient structural framework can
help preserve the historic character of the building
while improving life safety performance.
• Enhanced resilience and sustainability. Wildfires,
earthquakes, floods, hurricanes, and other extreme
weather events put historic buildings and their occu-
pants at risk and may require adaptive treatments that
are more invasive than might be accepted in other cir-
cumstances, including related to the use of substitute
materials. In these contexts, it is still necessary to try
to minimize impacts on a building’s historic character
as much as possible while still adapting it to be more
resilient. Widespread wildfires, for example, have
increased demand for fire resistant materials for the
exterior building envelope. Flood events may neces-
sitate the replacement of historic materials that have
been damaged or inundated with hazardous substanc-
es in contaminated floodwaters. When undertaking
repairs in such circumstances, substitute materials may Figure 9. Previously bricked-in openings below the flood line were
offer greater resilience to anticipated future exposure reopened and new aluminum windows installed with cellular
to natural hazard risks. PVC trim detailed to hold back moderate flood waters and survive
exposure to water. Photo: John Sandor, NPS.
Similarly, efforts to improve energy efficiency and
performance may include the use of substitute materi- historic character and historic integrity of a building. Other
als as replacement components when modifications to factors may prompt the consideration of a substitute
building assemblies are required and the historic mate- material, such as the cost of maintaining the historic
rials cannot be preserved. When evaluating substitute material, because it is comparatively difficult or costly to
materials in the context of sustainability objectives, reach or access, or the frequency of required maintenance
factors such as the environmental impact of produc- the historic material needs. Additionally, where in-
tion, the full life cycle of products, and the embodied kind replacement material is found to be prohibitively
carbon of the materials already in place should be expensive, it may be reasonable to consider a substitute
carefully analyzed. There may be more sustainable that offers an alternative and is a good physical and
choices for a replacement material, including the use visual match. Not all substitute materials are, however,
of more traditional materials in place of manufactured cost-effective replacements. Long-term durability and
products that may consist of non-renewable resources maintainability are other factors that should be considered
or hazardous materials. While some synthetic substi- in conjunction with initial cost.
tute materials are made from recycled materials or
are otherwise sustainably produced, many are not Maintenance of a material, particularly where accessibil-
repairable, salvageable, or recyclable themselves, and ity is difficult or expensive, can be an important part of a
8 Page 107 of 124
cost evaluation. Maintenance costs should not be consid- characteristics of a historic natural material with a
ered without also considering life-cycle expenses. While man-made substitute can often be quite difficult.
some substitute materials may offer reduced initial costs,
they may be as or more costly than traditional materials to When the color and surface characteristics of
maintain over time. For example, many substitute materials an existing material are important, cleaning the
are not readily repairable, necessitating full replacement material should be the starting point for evaluating
when damaged. The cost to replace a material or assem- a potential matching material. In situations where
bly at the end of its lifespan may also be greater than the there are subtle variations in color and texture
accumulated incremental expense to maintain the historic within the original material, the substitute
material, particularly if it is a more traditional, repairable material should be similarly varied so that it is not
material. Maintenance cost should never be the sole reason conspicuous by its uniformity. If a material is custom
for replacing a historic material that is not deteriorated. fabricated, a sufficient number of samples should
be supplied to permit on-site comparison of color,
texture, detailing, and other critical visual qualities.
Criteria for the Appropriate Use For a manufactured product with preset choices
of color or texture, it may be necessary to look at
of Substitute Materials samples from more than one manufacturer to find
the best match. Similarly, prefabricated products,
Substitute materials must meet three basic criteria to be such as roofing slate, may offer limited, if any,
considered: they must be compatible with the historic choice of unit size, which can be a critical factor
materials in appearance; their physical properties must be for achieving a good match. A substitute material
similar to those of the historic materials, or the materials should not be used to replace distinctive, character-
must be installed in a manner that tolerates differences; defining materials and features if an adequate
and they must meet certain basic performance expecta- match in design and appearance is not possible.
tions over an extended period of time.
As all exposed materials are subject to ultraviolet
• Matching the Appearance of the Historic degradation, samples of a new material, particularly
Material when custom formulated, should be prepared
Any material’s appearance varies depending on the during the early planning phases to allow for
nature of the material and how it is used. Some evaluation of the effects of weathering on
historic materials, such as wood and ferrous metals, color stability. When that is not possible, or if a
were typically painted, making the color of the prefabricated product is used, the fabricator or
substitute unimportant, though the texture of the manufacturer may be able to identify regional
surface, which telegraphs through a paint layer, is locations where equivalent products have been
still an important consideration. Texture can be a installed long enough ago to get a better sense of
large part of distinguishing a material formed by how the material weathers and performs.
hand from one that is machine-made. Many historic
materials, such as most building stones, are used While a perfect match is the desired goal for
without any coating, making the color, pattern, and replacing distinctive features, it is not always
reflectivity, as well as surface texture, dependent on possible, even when the same matching material is
the material itself. Matching the color and surface chosen for the replacement. When any compromise
Figure 10. Polymer slates
offer a choice of shapes but
not sizes, limiting their
ability to achieve a good
visual match for some
historic slate. With the size
of the polymer slates (right)
being nearly twice that of
the historic slates (left), the
scale of the entire feature is
incompatibly altered. The
molded edges of this mate-
rial, which contribute to its
ability to replicate slate,
would be lost if each shingle
was resized by cutting.
Photo: John Sandor, NPS.
9
Page 108 of 124
Figure 12. Cellulose composite materials, like wood, expand and
contract with moisture. Here it was used to reconstruct a missing
storefront. Unlike solid wood that is dimensionally stable parallel to
the grain, this composite moves equally in all dimensions, resulting
in gaps that were not adequately anticipated in the design.
Photo: John Sandor, NPS.
by carefully designed joints and fasteners. Joints
can play a role both in accommodating movement
of materials as well as in managing moisture, either
to keep it from entering the enclosure assembly or
to let it escape from the building envelope, or both.
Figure 11. The thickness of the wood siding on the front (left) Because some synthetic materials are less permeable
creates a deeper shadow line than is achieved with the fiber cement to moisture than more traditional materials,
siding used on the side (right) elevation. While the exposure can
installations must take into account the potential
be adjusted, fiber cement siding is not available in a matching
to trap moisture and cause deterioration of historic
thickness. Photo: John Sandor, NPS.
and new materials. An assembly incorporating new
must be made in the precision of the match, it is and historic materials should be designed so that if
wise to consider the vantage point from which material failures occur, the failures occur within the
the material will be seen. Sometimes what seems new material rather than the historic one.
important at close range, such as variations in the
texture of a surface, may be secondary to other During installation, surface preparation is critical to
aspects of the material when viewed from some ensure proper attachment. Deteriorated underlying
distance. The closer a feature is to the viewer, the material must be removed or stabilized. Non-
more closely the material and craftsmanship should corrosive anchoring devices or fasteners that are
match the original. An on-site mock-up using a designed to carry the new material and to withstand
sample of the proposed material can help evaluate wind, rain, snow, and other destructive elements
whether it is an adequate visual match. should be used. Since physical failures often result
from poor anchorage or improper installation
• Matching the Physical Properties of the techniques, a structural engineer should be
Historic Material included in planning any major project. For readily
Carefully chosen substitute materials can often available, off-the-shelf materials, manufacturers’
closely match the appearance of historic materials, recommendations for attachment and spacing should
but their physical properties may differ greatly. These be followed.
differences are most critical when incrementally
replacing components of a larger assembly that retains Nearly all substitute materials have some properties
significant historic material. The chemical composition that are different from the historic materials they
of the material (e.g., the presence of acids, alkalis, may replace. Even when substitute materials are
salts, or metals) should be evaluated to ensure that isolated from historic materials and features, it is
the replacement materials will be compatible with the important to understand the substitute materials’
adjacent historic materials. Materials that will cause properties in order to use them successfully.
galvanic corrosion or other chemical reactions must be
isolated from one another. • Performance of the Material Over Time
When more traditional materials are used to replace
The thermal- and moisture-driven expansion and damaged historic materials and features, their perfor-
contraction coefficients of each adjacent material mance is predictable in most cases. An exception may
must be within narrow limits or be accommodated be modern wood that has durability and other prop-
10 Page 109 of 124
erties different than those of historic wood from old- Many traditional building materials can be repaired
growth forests. Many of the materials used as substi- either with traditional methods and materials or with
tutes have been in use long enough to provide some more modern conservation techniques using sub-
idea of how they perform over time. Other material stances like epoxies. However, many modern substitute
may only have test results from accelerated weather- materials (particularly synthetic ones) are not as easily
ing. The length of manufacturer warranties may be an repaired, if repairable at all, as their more traditional
indicator of expected durability and lifespan. War- counterparts. Confirming that a material is repairable
ranties only predict a manufacturer’s expectation of may be important for those used, e.g., where impact
a product’s performance and are no guarantee that or significant wear or abrasion is likely.
the manufacturers will still be in business at the time
needed to stand behind them. Just as new manufac- Finally, it is critical that the substitute materials be
turers emerge with new materials, others disappear. documented as part of the historical record of the
Where possible, projects involving substitute materi- building so that proper care and maintenance of all of
als in similar installations and exposures should be the building materials continue, ensuring the contin-
examined before selecting a new, less-tested material. ued life of the historic building.
It is unrealistic to expect a substitute material, which
can be quite different in composition than the historic
material, not to age differently. Choosing an Appropriate
Substitute Material
Even traditional materials will not perform well if
not used or detailed appropriately, and experienced Once all reasonable options for repair and replacement
architects, engineers, fabricators, and installers rely in kind have been considered and sufficient justification
on their professional knowledge and experience to for substitute materials has been established, the choice
ensure proper installation and techniques when work- among the variety of substitute materials currently
ing with familiar materials. This is just one of many available must be made. Rapidly developing technologies
reasons that using the original materials for needed allow a wide variety of materials to choose from that are
replacement is usually the best choice. Some of the intended to mimic historic materials. Many of the materials
materials now available as substitutes have properties that were historically used as substitutes for more
that differ greatly from the traditional materials they traditional historic materials have themselves become
may be used to replace. It is critical to the successful historic, and some of these early substitutes continue to
performance of substitute materials that everyone be reasonable options as substitute materials today. No
involved in the selection, design, and installation fully substitute material will exactly match the historic material
understands the material’s properties, especially how in all aspects, but many are able to adequately match
it is different than the material it is replacing, and the appearance and relevant physical attributes to make
how that will affect the surrounding materials and for a potential substitute. If a substitute material is not
building systems.
Figure 13. Cast stone was used to effectively replace individual blocks of sandstone. Both the original ( left) and the substitute material (right)
retain similar physical and visible properties. Having weathered for over 30 years, some erosion of the binder has revealed quartz grains of
the aggregate (inset), but it is only noticeable upon close inspection. Photo: John Sandor, NPS.
11
Page 110 of 124
an adequate physical and visual match given the specific
conditions of the building and the project, then it should Considering Substitute
not be used to replace distinctive, character-defining
materials and features. Materials
Listed below are various building components or Considering the use of a substitute material
features and the substitute materials which may, in should begin with the following questions about
some circumstances, be considered for use as possible the conditions and location where it will be used:
replacement materials in a historic rehabilitation project
• Will the significance or visibility of the
consistent with the Standards for Rehabilitation. This list
historic feature require a very precise match?
includes different substitute material options available
today for these building features and poses questions • Is the entire feature being replaced or just a
that should be asked and considered when choosing component of it?
between the original material and various types of
substitute materials. This is followed by a list of some of • Are pre-existing conditions contributing to
the more commonly used, currently available materials the failure of the existing material, and, if so,
that may have some applications as substitute materials how will they be addressed/corrected?
and the properties of each that affect their suitability
for use as substitutes. This list should not be read as an • Is the need for replacement due to inherent
endorsement of any of these materials, generally, or their deficiencies of the original material?
appropriateness for use as a substitute material, but it
• Will the material need to resist any
serves as a reminder that the successful use of any building
environmental hazards such as flooding
material requires a careful consideration of its properties
or fire?
relative to where and how it will be used.
Historic Features and Substitute Materials
Historic Building Features
Masonry Architectural Siding Roofing Decking Molding / Trim
Historic Building Features Stone, terra Metals Wood, asbestos Wood shingle, Tongue-and- Wood
cotta Cast & wrought slate, tile groove &
iron, steel, square-edge
pressed metal wood
Aluminum • • • •
Cast Stone & Precast
• •
Potential Substitute Materials
Concrete
Fiber Reinforced
Concretes •
Glass Fiber Reinforced
Polymers • •
Fiber Cement • • •
Mineral / Polymer
Composite • • • •
Cellulose Fiber /
Polymer Composite • • • •
Non-composite
Polymers • • •
Cellular PVC • • •
The above chart lists materials that are sometimes used as substitutes for replacement of historic building features. Even within a given
category, all materials may not be equally suitable as a substitute replacement material for the actual historic material or feature. Any
substitute material should be selected based on its specific physical and visual characteristics, conditions, and intended application
consistent with the Secretary of the Interior's Standards for Rehabilitation.
12 Page 111 of 124
Historic Building Features: Criteria for selecting an
appropriate replacement material
Masonry Architectural Metals
FEATURES: corbels, brackets, balusters, cornices, FEATURES: pilasters, door and window surrounds,
window and door surrounds, friezes, wall surfaces, cornices, incidental ornament, columns, spandrels,
horizontal surfaces, incidental ornament, columns ceilings, sheathing, roofing
HISTORIC MATERIALS: terra cotta, cast stone, HISTORIC MATERIALS: cast and wrought iron, steel,
stone, concrete bronze, lead, aluminum, and stamped steel (usually
galvanized or terne-coated)
POTENTIAL SUBSTITUTES: cast stone, pre-cast concrete,
GFRC, GFRP, non-composite polymers (polyurethane), POTENTIAL SUBSTITUTES: GFRP, aluminum,
cast or stamped metal non-composite polymer (polyurethane), GFRC,
metallic/polymer composite
Questions to ask about the replacement material:
• Can it serve a structural function? Questions to ask about the replacement material:
• How is the material affected by moisture? • Will the replacement material serve a structural
or cosmetic role?
• Can the material survive flooding and be
reused? • Will it expand and contract with temperature
change enough to require special
• Can it reproduce the surface texture of the accommodation in its installation?
original?
• If part of an assembly of mixed materials, how
• Is its shrinkage in curing low enough to allow it will any expansion and contraction of the
to be molded from existing stones? dissimilar materials be accommodated?
• Can matching color be achieved without a • Will the replacement material increase
coating and with UV stability? deterioration of the historic or surrounding
• Can an adequate match of the surface (color elements, for instance due to galvanic corrosion,
and texture) be achieved with a coating? moisture entrapment, jacking of original
material, off-gassing creating a corrosive
• Is a coating required? environment, or poor original design of the
• If it is not self-supporting, is it lightweight historic material?
enough to be supported by an underlying • How will the replacement material mimic the
framework? surface color/patination of the original material?
• Can multiple original units be replicated with a • If a coating is needed, what preparation is
single replacement piece? needed, and what is its durability or service life
• Where thermal movement is different from the of the finish?
original material, how will joints accommodate? • What attachment and support systems are
• Is the material combustible? necessary?
• If the original element is structural, but the new
material is not, how can supplemental structure
be introduced to support the new?
13
Page 112 of 124
Figure 14. Surface texture is an important aspect in matching the appearance of a historic material, especially when a material is viewed at close
range. As seen in these two images, many of the substitute materials produced for siding and trim have an embossed wood grain, making them
incompatible for replacing historic wood that was typically planed to a smooth surface. Some substitute products are available with a smooth
surface as well. Photos: John Sandor, NPS.
Siding Roofing
FEATURES: clapboard, tongue-and-groove or shiplap HISTORIC MATERIALS: wood shingle, slate shingle,
siding, board and batten, shingles asbestos shingle, clay tile, concrete tile, metal
HISTORIC MATERIALS: wood and asbestos POTENTIAL SUBSTITUTES: fiber cement, mineral/poly-
mer composite, wood fiber/polymer composite, pre-cast
POTENTIAL SUBSTITUTES: cellular PVC, wood fiber/ concrete, metal
polymer composite, fiber cement, mineral/polymer
composite Questions to ask about the replacement material:
• What sizes and shapes are available?
Questions to ask about the replacement material:
• What are color choices?
• What are the widths, lengths, profiles, thicknesses,
and textures available? • What is the color stability of the new material,
and how will it age/weather?
• What, if any, are the finishing requirements,
and/or is it available factory-finished? • What is the impact resistance?
• How well does it hold paint, and can prefinished • What is its flame spread rating?
surfaces be renewed? • What are the installation requirements of the
• What tools are needed to cut it, and can it be new material?
machined? • Can the feature being replaced be custom-
• Does it absorb moisture and, if so, to what effect? produced if ready-made ones of the new
material are not an accurate match?
• Can the material survive flooding and be reused?
• What is the expected lifespan and/or warranty?
• Will it expand and contract with temperature
change enough to require special
accommodation in its installation?
• What characteristics can affect its handling
(e.g., weight, flexibility, brittleness)?
• Does it have specific fastening requirements?
• Is it susceptible to insect damage?
• What is its impact resistance?
• Does it have a flame spread rating?
• What is the expected lifespan and/or warranty?
14 Page 113 of 124
Decking Molding / Trim
FEATURES: tongue-and-groove, square-edge flooring FEATURES: run moldings, flat boards, casings, cornice,
frieze, railings, balustrade, columns
HISTORIC MATERIALS: wood
HISTORIC MATERIALS: wood, metal
POTENTIAL SUBSTITUTES: cellular PVC, wood fiber/
polymer composite, mineral/polymer composite, non- POTENTIAL SUBSTITUTES: cellular PVC, wood fiber/
composite polymers (solid PVC) polymer composite, mineral/polymer composite, non-
composite polymer (polyurethane), GFRP, sheet metal
Questions to ask about the replacement material:
• What are the widths, lengths, and textures Questions to ask about the replacement material:
available? • What are the widths, lengths, and textures
• Is it site painted or prefinished? available?
• How well does it hold paint, and can prefinished • What, if any, are the finishing requirements
surfaces we renewed? and/or is it available factory-finished?
• What tools are needed to cut it, and can it be • How well does it hold paint, and can prefinished
machined? surfaces be renewed?
• What dimensional span does its strength allow? • What tools are needed to cut it, and can it
be machined?
• Does it absorb water, and if so, to what effect?
• Does it absorb moisture, and if so, to what
• Can the material survive flooding and be effect?
reused?
• Can the material survive flooding and be
• Does it require a drainage plane, or can it be reused?
installed atop a membrane?
• Will it expand and contract with temperature
• Will it expand and contract with temperature change enough to require special
change enough to require special accommodation in its installation?
accommodation in its installation?
• What characteristics can affect its handling
• Is it susceptible to insect damage? (e.g., weight, flexibility, brittleness)?
• Is it impact resistant? • Does it have specific fastening requirements?
• Does it have a flame spread rating? • Is it susceptible to insect damage?
• What is the expected lifespan and/or warranty? • What is its impact resistance?
• Does it have a flame spread rating?
• What is the expected lifespan and/or warranty?
Figure 15. Tongue-and-
groove porch flooring is
manufactured in several
different substitute
materials. Each type has
different properties, though
most are more moisture-
resistant than wood. The
prefinished product shown
can be painted when
worn, but repainting is not
recommended for some
product choices. Photo: Oak
Alley Foundation.
15
Page 114 of 124
Potential Substitute Materials: Matching properties
and performance needs
Physical Composition and Properties
After assessing different material options based on the intended application, the appropriateness
of a substitute material should also be considered in context of the material’s physical composition,
associated properties, and necessary visual match.
Aluminum
MATERIAL: Aluminum is a highly corrosion-resistant
alloy that can be cast, wrought, or extruded. Molten alu-
minum is cast into permanent (metal) molds or one-time
sand molds forming cast aluminum. Extruded aluminum
is formed by passing heated aluminum through a die
which produces the desired form. Wrought aluminum
is worked using the heated metal and then bending,
stamping, and otherwise shaping the metal. If not self-
supporting, aluminum elements are generally screwed or
bolted to a structural frame. Aluminum can be welded,
but more often sections, particularly extruded ones, are
mechanically connected.
PROPERTIES:
• Isotropic
• Lightweight
• Thermal movement greater than cast iron or wood
• Corrosion-resistant, but direct contact with other
metals may trigger galvanic corrosion
• Lower structural strength that iron or steel
• Ductile - less brittle than cast iron
• Non-combustible
• Retains high defnition through molding process and Figure 16. Aluminum is a highly corrosion-resistant metal
produces crisp profles through extrusion that is commonly used as a substitute material for cast iron.
• Can be given a durable metallic fnish through Aluminum can be a more afordable and lightweight alternative
anodization. Surface etching required for paint to cast iron that retains a similar texture, shape, and
adhesion maintenance cycle. Photo: NPS.
• Can be machined into a large variety of shapes/
dimensions
16 Page 115 of 124
Figure 17. The balustrade con-
sists of multiple prior campaigns
of using cast stone to replace
the natural stone. The efective
match for the surface texture
and color of the original stone
allowed individual elements
to be incrementally replaced
only when they had failed, thus
retaining the maximum amount
of original material as long as
possible. Photo: EverGreene
Architectural Arts.
Cast Stone & Precast Concrete
MATERIAL: A cement lime and aggregate mixture that PROPERTIES:
is dry-tamped into a mold is generally referred to as • Isotropic
cast stone. Cast stone is one of the original substitute
materials. Its longevity has proved that the material ages • Weight equivalent to stone
compatibly with stone. A wet mix of cement and aggre- • Expansion/contraction similar to stone
gate poured into molds also has a long history of being • Water absorption may differ from that of any
used to produce concrete masonry units mimicking stone particular stone
and roofng tiles mimicking clay tile. Both methods have
• Can be structural
minimal shrinkage during curing, though they employ
different curing and fnishing techniques. Both can • Non-combustible
include reinforcing bars and anchorage devices installed • Vapor-permeable
during fabrication. The dry-tamp fabrication method is
• May achieve a wide range of color and surface
especially effective at producing an outer surface with
textures by varying mix, but use of pigments may
the appearance of stone.
reduce UV stability
• Can be coated
• May be tooled to match the appearance of
tooled stone
• Repairs similarly to stone
17
Page 116 of 124
Figure 18. Missing
historic terra cotta
spandrel panels on
all foor levels were
recreated utilizing glass
fber reinforced concrete
(GFRC) replacements.
New spandrels were
fabricated as individual
components and
attached with metal
clips between historic
terra cotta piers. Photo:
Kris Frail, Dewberry.
Fiber Reinforced Concretes (GFRC, CFRC)
MATERIAL: Fiber reinforced concretes are lightweight PROPERTIES:
concrete compounds modifed with additives and rein- • Isotropic
forced with alkaline resistant glass fbers (GFRC), or less
frequently carbon fbers (CFRC). They are generally fab- • Lighter weight than solid masonry
ricated as thin-shelled panels and applied to a separate • Expansion/contraction similar to stone
structural frame or anchorage system. GFRC is typically • No load bearing capacity, so underlying framework
sprayed into forms, although it can be poured, and an- must be used to accommodate any loads
choring devices are included in the fabrication. The color
• Material can be fre-rated
is derived from the natural aggregates and, if necessary,
a small percentage of added pigments. Because of its • Vapor-permeable
low shrinkage in curing, it can be produced using molds • Can be produced in larger sections effciently
taken directly from the building. reproducing repetitive elements or features that
were originally made up of small individual units
• Large range of colors achievable by varying
aggregates, but when pigments are needed UV
stability may be reduced
• May be left uncoated or may be painted
18 Page 117 of 124
Figure 19. A new, lightweight fber reinforced polymer is attached to a new metal armature to replicate damaged and missing
elements of a terra cotta cornice. Photo: Quinn Evans.
Glass Fiber Reinforced Polymers (FRP, Fiberglass)
MATERIAL: Fiberglass is the most well-known of PROPERTIES
the FRP products generally produced as a thin, rigid, • Isotropic
laminate shell formed by pouring a polyester or
epoxy resin gelcoat into a mold. When tack-free, • Lighter weight than masonry, similar to sheet metal
layers of chopped glass or glass fabric are added • More thermally driven expansion than masonry
along with additional resins. The surface gel coat or metals
can be pigmented or painted. Reinforcing rods and • No load bearing capacity, so underlying framework
attachment devices can be added when necessary. must be used to accommodate any loads
Because of is low shrinkage in curing, it can be
• High strength to weight ratio
produced using molds taken directly from the building.
Rather than being produced as standard components, • Flammable
FRP is custom fabricated for individual applications. • Not vapor-permeable
• Can be produced in larger sections effciently
reproducing repetitive elements or features that
were originally made up of small individual units
• May be diffcult to match false joints in multi-
unit assemblies to actual joints that need to
accommodate movement
• Color can be incorporated into the surface gel-coat,
or the surface may be coated
19
Page 118 of 124
Figure 20. Cement board was used to replace a non-historic infll and mimics the confguration of a typical vehicular door of the period.
Photos: Historic Augusta.
Fiber Cement
MATERIAL: Fiber cement products are made from PROPERTIES:
fber, sand that is ground to a powder, cement, and • Products are minimally orthotropic
proprietary additives to reduce moisture absorption.
The fber used in roof products is glass fber alone, • Heavier and more brittle than wood, limiting
available lengths
whereas siding and trim board products are primarily
wood fber. The material is formed with a smooth or • Very little thermal- and no moisture-driven
textured surface, cut to standard sizes of panels, boards, movement
or shingles, and cured in an autoclave. Roofng material • Low water absorption, but not recommended for
has integral color, but board and siding products are ground or roof contact
produced with a primer, if not fully factory fnished.
• Class A fame spread
Most siding and trim boards are embossed with a wood
grain on one surface and are smooth on the other, the • Resists insect damage
smooth side being the appropriate surface to imitate • Available in limited thicknesses and widths
planed wood.
• Not machinable, but may be cut with special carbide
blades; cutting requires dust collection and personal
protective equipment
• Cut edges require sealing
• Available unfnished, primed, or prefnished, and
must be painted (with latex paint)
• 15-year limited warranty typical
20 Page 119 of 124
Figure 21. A mineral
polymer composite
siding was available in
the profle very similar
to the historic siding.
The replacement siding
was used where the
original material was
almost completely
missing beneath
a more modern
covering. Areas where
the original wood
was largely intact
were replaced with
matching wood to
sustain more of the
material integrity of
the building. Photo:
Belk Architecture.
Mineral / Polymer Composite
MATERIAL: Calcium carbonate or fy ash are mineral • Must be painted
ingredients held in a matrix of various polymers to • 30-year limited warranty typical
produce materials formed or molded into a number of
building products. Additives found in some of the roof- Calcium carbonate or recycled rubber (roofng)
ing products include pigments and UV stabilizers. Some
use a substantial portion of recycled material. Different • Isotropic
combinations yield products with different properties, • More thermally-driven movement than slate
each formulated for a specifc building component. or wood
When the material is fy ash with some glass fbers • Little to no moisture absorption
bound in a matrix of polyurethane, it is identifed as
• As shingles: lighter and more fexible than slate
polyash. Siding, trim, bead board, and deck products
are primed or prefnished, whereas roof products have • As tongue-and-groove decking: heavier and
integral color. harder than wood
• Not vulnerable to insect damage
PROPERTIES:
• Available in limited dimensions
Fly ash (siding and trim)
• As shingles: Class 4 impact resistance, and fame
• Isotropic spread ratings ranging from Class A to Class C
• Heavier and more brittle than wood, and lacking depending on the specifc product
structural capacity • As shingles: integral color, that may be subject
• Little thermal or moisture-driven movement to fading
• Suffciently low water absorption to permit ground • As tongue-and-groove decking: prefnished
contact with non-renewable fnish, and can be cut with
woodworking tools
• Class C fame spread
• 50-year limited warranties on roofng products
• Resists insect damage typical
• Available in limited thicknesses and widths
• Machinable with carbide tools blades; requires dust
collection
• Cut edges do not require sealing
21
Page 120 of 124
Cellulose Fiber / Polymer Composite
MATERIAL: Wood strands or fbers are coated with PROPERTIES:
resin for moisture resistance and zinc-borate for insect
and fungal-decay resistance, then consolidated under Predominantly Cellulose (siding, trim and decking)
heated pressure. Solid composite core boards are cut • Minimal thermal movement
from sheets of material, then factory-primed or fnished.
Resulting siding and trim board products can be referred • Resistant to moisture-driven movement
to as engineered wood, fber board, or hardboard. • Lighter and more fexible than solid wood, but lacks
Products may be embossed with a wood grain or have structural capacity
a smooth fnish, the smooth side being the appropriate • Rice hull cellulose: can span typical foor-framing
surface to imitate planed wood. Siding, trim, and spacing as decking
tongue-and-grove decking with a slightly different
• Low water absorption (for wood, no ground or roof
properties are produced by extruding polyvinyl chloride
contact)
(PVC) combined with non-wood cellulose. Roofng
shingles are molded from fne wood fbers, color • Class A or Class C fame spread
additives, and UV stabilizers bound with polypropylene • Resists insect damage
or polyethylene (thermoplastics).
• Available in limited dimensions
• Machinable with woodworking tools
• Wood cellulose: Cut edges must be sealed and
may need additional surface prep for fnish; must
be painted if unfnished or primed, also available
prefnished
• Rice hull cellulose: Accepts stain/paint, but no
fnish required
• 30–50 year limited warranty, depending on
manufacturer
Predominantly Polymer (roofng)
• Minimal thermal movement
• Little to no moisture absorption
• Lighter and more fexible than slate
• Class 4 impact-resistance
• Class A fame spread
• Available in limited shingle size
• 50-year limited warranty typical
Figure 22. A porch was reconstructed using posts fabricated on
site from a smooth-surface cellulose/polymer composite material.
Though the face of the posts are painted, the lack of paint on the
bottom at the cut ends is not consistent with manufacturers’
recommendations. This treatment will allow moisture to be
absorbed, shortening the life of the new replacement feature.
Photo: John Sandor, NPS.
22 Page 121 of 124
Figure 23. 3-D printing using various polymers is occasionally used to replicate missing metal or wood features. This new application is
continually being refned, but the application can be successful when a painted, lightweight feature needs to be replicated. Photo: NPS.
Non-composite Polymers
MATERIALS: The main two polymer materials used • Supplied primed and must be painted (latex paint)
without signifcant other components are polyurethane • Lifetime limited warranty typical
and polyvinyl chloride (PVC). Polyurethane millwork is
constructed of urethane foam created by mixing isocya- Solid PVC (fooring)
nate and resin. The polyurethane mixture is kept under
pressure in a mold as it expands to any desired shape. • Isotropic
These molded products have a closed-cell, foamed core • Heavier and less fexible that wood
with a denser surface skin. Polyurethane products can • Minimal thermal movement
have exterior applications but are more often used
for interior features. Polyvinyl chloride (PVC) in a solid • Does not absorb water
extruded form is another polymer that can have archi- • Strength to span typical foor-framing spacing
tectural application as tongue-and-groove decking. Vari-
• Impact-resistance greater than wood
ous polymers formed using 3-D printing are also being
explored as replacements for painted metal or wood • Class A fame spread
ornamental features. • No insect susceptibility
• Good paint adhesion, but also available prefnished
PROPERTIES: Each of the two groupings has distinct
physical properties • 20-year warranty typical
Urethane Foam (moldings and decorative elements)
• Lightweight and fexible, but lacking structural
capacity
• More thermally-driven movement than wood or
stone, but less than cellular PVC
• Does not absorb water
• Flammable
• Resists insect damage
• Can be cut with standard woodworking tools
• Adhesive and mechanical fasteners both
recommended for installation
23
Page 122 of 124
Cellular Polyvinyl Chloride (PVC)
MATERIAL: Varying amounts of calcium carbonate • For longer pieces, thermal movement requires
and a foaming agent are added to melted PVC before manufacturer’s specifcations to be followed for
passing through an injection die and then a calibrator attachment, and inclusion of expansion joints when
to produce the shape and size of the fnished product. installed at low temperature (joints should be glued)
Cellular PVC is produced as sheets, boards, and mold- • Class A fame spread
ings. Differences in the specifcs of the equipment and
• Resists insect damage
the rate of cooling create two varieties of product, with
distinct properties. One is known as free-foam, having a • Machinable with woodworking tools, though cut
fairly consistent structure throughout its section, and the edges may need additional surface prep for fnish
other is identifed as Celuka, having a skin that is denser • Good paint adhesion; if painted, high light
than its core. This primarily affects the ease with which refectance (HLV) is recommended to minimize heat
the product can be milled and shaped. The material is driven expansion
white and needs no applied fnish. When produced for • 25–30-year limited warranty, depending on
decking the material has a colored and textured wear manufacturer
layer over the PVC core.
PROPERTIES
• Isotropic
• Lighter and more fexible than wood
• Less strong than wood (in tension and shear), but can
span typical foor- framing spacing as decking
• More impact-resistance than wood
Figure 24. Cellular PVC when painted can be used to replace
• Negligible water absorption; no moisture-driven
deteriorated wood features. This beadboard set in a wood frame
movement, unlike wood
was not historically designed to shed water efectively and had
• Subject to thermal expansion and contraction deteriorated. Cellular PVC was able to match the appearance of the
signifcantly greater than wood, though the thermal wood details, while its properties were well matched to the shady
movement is less for the same dimension than the location, painted fnish, and limited size and confguration within
cross-grain moisture-driven movement of wood the overall assembly; thus, it should provide a long-lasting solution
for this application. Photo: Jennifer Balson Alvarez, NPS.
Acknowledgements
John Sandor, Architectural Historian, David Trayte, Historical Architect, and Amy Elizabeth Uebel, Architectural Historian,
Technical Preservation Services, National Park Service, revised Preservation Brief 16: The Use of Substitute Materials on Historic
Building Exteriors, originally written by Sharon C. Park, FAIA, FAPT, and published in 1988. The revised Brief contains expanded
and updated information as well as new color photographs describing the general issues and application of substitute
materials on historic buildings.
The authors wish to thank the following: Peyton Hall, FAIA, Principal Architect Emeritus, Historic Resources Group, Mary
Jablonski, President, Jablonski Building Conservation, Inc., Thomas Jester, FAIA, FAPT, LEED AP, Principal, Quinn Evans, Sharon
Park, FAIA, FAPT, Associate Director Emerita, Smithsonian Institution, Debra Slaton, Principal, Wiss, Janney, Elstner Associates,
Inc., for their guidance and review of this revision; and to Brian Goeken, Chief of Technical Preservation Services, National Park
Service, and Jo Ellen Hensley, Elizabeth Tune, and Jennifer Oeschger, Technical Preservation Services, National Park Service,
for their help in the editing of the publication. Illustrations not specifcally credited are from National Park Service fles. Front
cover image: Installation of a new roof feature on a ca.1895 commercial building. The dome was constructed of fber-reinforced
polymer to replicate the missing original feature in Aurora, Illinois, 2023. Photo: Kelsey Cozens/JH Real Estate Partners LLC.
This publication has been prepared pursuant to the National Historic Preservation Act of 1966, as amended, which directs
the Secretary of the Interior to develop and make available information concerning historic properties. This publication is
available from the Technical Preservation Services website at http://www.nps.gov/tps/ or hard copies may be purchased from
the Government Printing Offces at the U.S. Government Bookstore at https://bookstore.gpo.gov/. Comments about this
publication should be addressed to Technical Preservation Services, National Park Service, 1849 C Street, NW, Mail Stop 7243,
Washington, DC 20240, or by email to NPS_TPS@nps.gov.
This publication is not copyrighted and can be reproduced without penalty. Normal procedures for credit to the authors and
the National Park Service are appreciated. The photographs used in this publication may not be used to illustrate other
publications without permission of the owners.
October 2023
24 Page 123 of 124
Good afternoon Maddy,
As a follow-up to the Site Visit to 2012 Grange Avenue, made by Jim Ferber and I on Thursday
4/23/2026, the following was observed in regards to the condition of the existing natural spring/well
house construction.
1. Internal Observations-
a. Existing wood rafters supporting the roof structure, show signs of deterioration
from water infiltration and age (especially at the bearing ends over the wood top
plates along the perimeter exterior masonry block walls), a condition that has
progressed over the life span of the existing construction and would render the
wood frame construction unable to support building code required structural loads.
b. Existing wood framing members framing the rough opening/support for the existing
cupola, likewise show signs of deterioration from water infiltration and age.
2. Exterior Observations-
a. Existing asphalt shingled roof has long exceeded the life expectancy attributed to
such a roofing type: with portions of the roof missing roof shingles and the roof
shingles themselves curled, cracked and extremely weathered.
b. The cupola itself appears to be warped: appears to have rotated slightly around the
vertical axis. Horizontal slats on the exterior vent panels of the cupola, are missing
and the cupola wood construction itself shows sign of extreme weathering.
In consideration of such observations, it would be prudent to replace the entire roof structure, with
a new roof structure that matches the existing overall design of the existing natural spring/well
house: i.e. a hip roof, with a dormer on the South elevation and a rectangular plan shaped, venting
cupola (having [2] vent panels on North/South elevations and [1] vent panel on East/West
elevations), and with sweeping rafters framing the cupola roof.
Thank you for your review and commentary.
Horatiu Wolff
Senior Plan Examiner / Inspector
Page 124 of 124