Village Board of Trustees Standing Committee
Regular MeetingHoffman Estates, IL · June 8, 2026
Agenda
AGENDA
Public Health & Safety Committee
Special Meeting
Village Hall
1900 Hassell Road, Hoffman Estates, IL 60169
June 8, 2026 Council Chambers Immediately following
Transportation and Road
Improvements Committee
1. CALL TO ORDER/ROLL CALL
2. PUBLIC COMMENT
3. NEW BUSINESS
A. Review and Acceptance of the Construction Manager’s Recommendation of the Qualified
Low Bidders and Guaranteed Maximum Price Proposal for the construction of Fire Station
#22.
4. ADJOURNMENT
Further details and information can be found in the agenda packet attached hereto and incorporated herein and
can also be viewed online at www.hoffmanestates.org and/or in person in the Village Clerk's office. The Village of
Hoffman Estates complies with the Americans with Disabilities Act (ADA). For accessibility assistance, call the
ADA Coordinator at 847/882-9100.
Page 1
Packet
AGENDA
Public Health & Safety Committee
Special Meeting
Village Hall
1900 Hassell Road, Hoffman Estates, IL 60169
June 8, 2026 Council Chambers Immediately following
Transportation and Road
Improvements Committee
1. CALL TO ORDER/ROLL CALL
2. PUBLIC COMMENT
3. NEW BUSINESS
A. Review and Acceptance of the Construction Manager’s Recommendation of the Qualified
Low Bidders and Guaranteed Maximum Price Proposal for the construction of Fire Station
#22.
4. ADJOURNMENT
Further details and information can be found in the agenda packet attached hereto and incorporated herein and
can also be viewed online at www.hoffmanestates.org and/or in person in the Village Clerk's office. The Village of
Hoffman Estates complies with the Americans with Disabilities Act (ADA). For accessibility assistance, call the
ADA Coordinator at 847/882-9100.
Page 1
Page 1 of 22
AGENDA ITEM REPORT
Public Health & Safety Committee
June 8, 2026
ITEM 3A
REQUEST: Review and Acceptance of the Construction Manager’s
Recommendation of the Qualified Low Bidders and Guaranteed
Maximum Price Proposal for the construction of Fire Station #22.
FROM: Dan O'Malley, Deputy Village Manager
Alan Wax, Fire Chief
ITEM TYPE: Action Item - Committee
REQUEST SUMMARY
The construction of new fire station #22 is included in the 2026-2030 Capital
Improvement Program. The Village Board approved the construction of the new station,
the financing plan, the issuance of bonds to fund the project and the contracts for both
the architectural design and construction manager services. Design is complete and the
bid opening for all construction trades was conducted on May 29, 2026. Pursuant to the
Construction Manager agreement, Camosy has provided the Village with a
recommendation of the qualified low bidders for all trades and submitted the
guaranteed maximum price proposal which identifies the cost of construction. Attached
for your review is the recommendation from Camosy for the acceptance of each trade
subcontract for the construction of new fire station #22. There are sixteen (16) trade
bids recommended ranging in work from earthwork/site utilities to landscaping to
complete the new station. All bids submitted are listed in the bid tabulation along with
Camosy’s recommendation of each trade bid for Village acceptance.
Additionally, Camosy has provided the guaranteed maximum price which is the current
estimate of the total construction cost based on the bid results including contingency
and the construction manager fees. Execution of the guaranteed maximum price is a
requirement of the Construction Manager agreement and provides the basis for the
budget framework of the project.
Based on the results of the bid, the architect’s (FGM) review and staff review, it is
recommended that the Village accept the Construction Manager’s recommendation of
the qualified low bid selections and the guaranteed maximum price proposal. Should
Committee concur, this will allow for the construction of the new station to proceed once
all required permitting is secured.
FINANCIAL IMPACT
The 2026-2030 CIP includes the new Fire Station #22 construction project which will be
funded by the proceeds of the bond issue. Based on the bid results, the estimated
Page 1 of 2
Page 2 of 22
construction totals $15,528,287.00. This includes demolition the office buildings,
preparation of the site and construction of the new station. It does not include design,
furniture/furnishings and other owner responsible expenses.
RECOMMENDATION
Acceptance of the Construction Manager’s recommendation of the qualified low bidders
and the guaranteed maximum price proposal for the construction of new fire station
#22.
ATTACHMENTS
1. Hoffman Estates Fire Station No 22_PRE-GMP_6.3.26
2. Hoffman Estates Fire Station 22_Bid Tabs
3. HEFS22_GMP Summary 6.4.26
Page 2 of 2
Page 3 of 22
VILLAGE OF HOFFMAN ESTATES
FIRE STATION 22 RECAP
PRELIMINARY GMP
0187-24 BID SET DATED 5/1/2026 25,180 SF 3-Jun-26
ITEM DESCRIPTION GMP BUDGET
1.00 GENERAL CONDITIONS $13.07 $328,987
1.10 MISCELLANEOUS CONDITIONS $9.14 $230,263
2.10 BUILDING DEMOLITION $7.33 $184,500
2.20 EARTHWORK & SITE UTILITIES $33.56 $845,000
2.74 ASPHALT PAVING $3.77 $95,000
2.82 FENCING & GATES $8.43 $212,365
2.90 LANDSCAPING $4.09 $102,900
4.00 MASONRY WORK $43.61 $1,098,000
5.00 STRUCTURAL STEEL $44.98 $1,132,517
6.00 GENERAL TRADES $135.03 $3,400,000
7.50 EPDM ROOFING & SHEET METAL $34.87 $878,000
8.40 ALUMINUM STOREFRONT/ GLASS & GLAZING $17.34 $436,500
9.26 METAL STUDS & DRYWALL $29.70 $747,800
9.67 SEALED CONCRETE / RESINOUS FLOORING $2.76 $69,447
9.90 PAINTING & WALL COVERING $4.24 $106,690
15.30 FIRE PROTECTION $3.43 $86,406
15.40 PLUMBING $27.54 $693,500
15.80 HVAC $45.01 $1,133,333
16.00 ELECTRICAL $54.88 $1,382,000
18.00 TESTING ALLOWANCE $1.79 $45,000
19.00 COOK COUNTY PERMIT FEE $1.59 $40,000
22.00 WINTER PROTECTION $9.93 $250,000
24.00 PROJECT CONTINGENCY $19.86 $500,000
25.00 DESIGN CONTINGENCY $0.00 $0
27.00 INSURANCE $3.44 $86,674
28.00 SUPERVISION $25.53 $642,918
29.00 CONSTRUCTION FEE $18.20 $458,334
30.00 BOND PREMIUM $3.64 $91,667
SUBTOTAL CONSTRUCTION COSTS $606.74 $15,277,800
ALTERNATE COSTS
ALTERNATES DESCRIPTION COST/SF TOTAL Y/N
1.00 CONCRETE PAVING DRIVE LANE IN LIEU OF ASPHALT $1.04 $26,087 Y $26,087
2.00 EPDM ROOFING IN LIEU OF PVC ($1.53) ($38,219) N $0
3.00 MODIFIED BITUMEN ROOFING IN LIEU OF PVC NO BIDS N $0
4.00 REDUNDANT DATA CABLING AND PORTS $0.74 $18,567 Y $18,567
5.00 EPOXY IN LIEU OF SEALED CONCRETE - APP BAY $3.72 $93,655 Y $93,655
6.00 SNOW MELT @ NORTH APRON $2.41 $60,807 Y $60,807
7.00 SNOW MELT @ SOUTH APRON $2.04 $51,371 Y $51,371
TOTAL ALTERNATE COSTS $250,487
TOTAL CONSTRUCTION COSTS $15,528,287
_ ______________________________________________________________________________________________________________
Hoffman Estates Fire Station No 22_PRE-GMP BID DAY.xls Page 1 of 1 Page
PREGMP 4 of 22
RECAP
BID DATE: 5/29/26
VILLAGE OF HOFFMAN ESTATES FIRE STATION #22
Bid Package - #2.20 - EXCAVATION & SITE UTILITIES
Bid Tabulation
Addendums Noted Clarifications Noted Alt #1 - Alt #3 - Alt #5 - ERF in
Bid Bond
Alt #2 - EPDM Alt #4 - Alt #6 - Snow Alt #7 - Snow Alt #8 -
Concrete Modified Bit lieu of Sealed
Company Name Bid Package Base Bid Paving in lieu
Roofing in Lieu
Roofing in lieu
Additional
Concrete in
Melt at North Melt at South Alternate
Y/N Y/N
of PVC Data Ports Apron Apron Fencing
of Asphalt of PVC Apparatus Bay
ALESSIO & SONS COMPANY 2.20 $845,000.00 Y Y Y
J. PEASE EXCAVATING 2.20 $938,000.00 Y Y Y
DOETSCH CONTRACTORS 2.20 $998,040.00 Y Y Y $4,000
BERGER CONTRACTORS 2.20 $1,037,000.00 Y Y Y
KANE COUNTY EXCAVATING 2.20 $1,169,853.00 Y Y Y $6,000
2.20
2.20
2.20
2.20
2.20
2.20
2.20
2.20
2.20
2.20
2.20
2.20
2.20
2.20
2.20
Page 5 of 22
BID DATE: 5/29/26
VILLAGE OF HOFFMAN ESTATES FIRE STATION #22
Bid Package - #2.74 - ASPHALT PAVING
Bid Tabulation
Addendums Noted Clarifications Noted
Alt #5 - ERF in
Alt #1 - Alt #3 -
Bid Bond
Alt #2 - EPDM Alt #4 - lieu of Sealed Alt #6 - Snow Alt #7 - Snow Alt #8 -
Concrete Modified Bit
Company Name Bid Package Base Bid Paving in lieu
Roofing in
Roofing in
Additional Concrete in Melt at North Melt at South Alternate
Y/N Y/N
Lieu of PVC Data Ports Apparatus Apron Apron Fencing
of Asphalt lieu of PVC
Bay
CHICAGOLAND PAVING 2.74 $95,000.00 Y Y Y -$15,000
SUPERIOR PAVING, INC. 2.74 $97,300.00 Y Y Y -$17,500
ABBEY CONSTRUCTION CO. 2.74 $111,500.00 Y Y Y -$16,850
2.74
2.74
2.74
2.74
2.74
2.74
2.74
2.74
2.74
2.74
2.74
2.74
2.74
2.74
2.74
2.74
Page 6 of 22
BID DATE: 5/29/26
VILLAGE OF HOFFMAN ESTATES FIRE STATION #22
Bid Package - #2.82 FENCING & GATES
Bid Tabulation
Addendums Noted Clarifications Noted
Alt #5 - ERF in
Alt #1 - Alt #3 - Alt #7 -
Bid Bond
Alt #2 - EPDM Alt #4 - lieu of Sealed Alt #6 - Snow Alt #8 -
Concrete Modified Bit Snow Melt
Company Name Bid Package Base Bid Paving in lieu
Roofing in
Roofing in
Additional Concrete in Melt at North
at South
Alternate
Y/N Y/N
Lieu of PVC Data Ports Apparatus Apron Fencing
of Asphalt lieu of PVC Apron
Bay
ACTION FENCE CONTRACTORS 2.82 $212,365.00 Y Y Y
2.82
2.82
2.82
2.82
2.82
2.82
2.82
2.82
2.82
2.82
2.82
2.82
2.82
2.82
2.82
2.82
2.82
2.82
Page 7 of 22
BID DATE: 5/29/26
VILLAGE OF HOFFMAN ESTATES FIRE STATION #22
Bid Package - #2.90 - LANDSCAPING
Bid Tabulation
Addendums Noted Clarifications Noted Alt #3 - Alt #5 - ERF in
Bid Bond
Alt #1 - Concrete Alt #2 - EPDM Alt #4 - Alt #6 - Snow Alt #7 - Snow Alt #8 -
Modified Bit lieu of Sealed
Company Name Bid Package Base Bid Paving in lieu of Roofing in Lieu of
Roofing in
Additional Data
Concrete in
Melt at North Melt at South Alternate
Y/N Y/N
Asphalt PVC Ports Apron Apron Fencing
lieu of PVC Apparatus Bay
BREEZY HILL LANDSCAPING 2.90 $102,900.00 Y Y Y
ALLIED LANDSCAPING 2.90 $134,905.00 Y Y Y
2.90
2.90
2.90
2.90
2.90
2.90
2.90
2.90
2.90
2.90
2.90
2.90
2.90
Page 8 of 22
BID DATE: 5/29/26
VILLAGE OF HOFFMAN ESTATES FIRE STATION #22
Bid Package - #4.00 - MASONRY WORK
Bid Tabulation
Addendums Noted Clarifications Noted Alt #5 - ERF in
Bid Bond
Alt #1 - Concrete Alt #2 - EPDM Alt #3 -Modified Alt #6 - Snow Alt #7 - Snow
Alt #4 -Additional lieu of Sealed Alt #8 - Alternate
Company Name Bid Package Base Bid Paving in lieu of Roofing in Lieu of Bit Roofing in
Data Ports Concrete in
Melt at North Melt at South
Fencing
Y/N Y/N
Asphalt PVC lieu of PVC Apron Apron
Apparatus Bay
JOE'S MASONRY 4.00 $1,098,000.00 Y Y Y
GC MASONRY, INC 4.00 $1,155,000.00 Y Y Y
EBBEN MASONRY, INC 4.00 $1,192,000.00 Y Y Y
JAC MASONRY 4.00 $1,248,000.00 Y Y Y
JIMMY'Z MASONRY 4.00 $1,259,400.00 Y Y Y
IWANSKI MASONRY INC 4.00 $1,264,000.00 Y Y Y
RASCO MASON CONTRACTORS 4.00 $1,265,000.00 Y Y Y
A-ONE GROUP 4.00 $1,287,800.00 Y Y Y
ABLE MASONRY 4.00 $1,321,912.00 Y Y Y
MIDWEST MASONRY, INC 4.00 $1,382,000.00 Y Y Y
KR TECH GROUP LLC 4.00 $1,498,000.00 Y Y Y
MIKE CACHEY CONTRACTING 4.00 $1,626,000.00 Y Y Y
4.00
4.00
Page 9 of 22
BID DATE: 5/29/26
VILLAGE OF HOFFMAN ESTATES FIRE STATION #22
Bid Package - #5.00 - STRUCTURAL STEEL
Bid Tabulation
Addendums Clarifications
Alt #1 - Alt #3 - Alt #5 - ERF in
Bid Bond
Alt #2 - EPDM Alt #4 - Alt #6 - Snow Alt #7 - Snow Alt #8 -
Concrete Modified Bit lieu of Sealed
Company Name Bid Package Base Bid Paving in lieu
Roofing in
Roofing in lieu
Additional
Concrete in
Melt at North Melt at South Alternate
Noted Y/N Noted Y/N
Lieu of PVC Data Ports Apron Apron Fencing
of Asphalt of PVC Apparatus Bay
MCKINNEY STEEL AND SALES 5.00 $ 1,132,517.00 Y Y Y
AFFORDABLE WELDING 5.00 $ 1,139,600.00 Y Y Y
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
Page 10 of 22
BID DATE: 5/29/26
VILLAGE OF HOFFMAN ESTATES FIRE STATION #22
Bid Package - #6.01 GENERAL TRADES
Bid Tabulation
Addendums Noted Clarifications Noted
Bid Bond
Alt #1 - Concrete Alt #2 - EPDM Alt #3 -Modified Bit Alt #5 - ERF in lieu
Alt #4 -Additional Alt #6 - Snow Melt Alt #7 - Snow Melt Alt #8 - Alternate
Company Name Bid Package Base Bid Paving in lieu of Roofing in Lieu of Roofing in lieu of
Data Ports
of Sealed Concrete
at North Apron at South Apron Fencing
Y/N Y/N
Asphalt PVC PVC in Apparatus Bay
DBM SERVICES 6.01 $3,400,000.00 Y Y Y $40,000 $4,000 $4,000
CAMOSY CONSTRUCTION 6.01 $3,627,900.00 Y Y Y $31,150 $10,300 $10,300
OSMAN CONSTRUCTION CORP. 6.01 $3,777,000.00 Y Y Y $41,000 $3,600 $3,600
STAALSEN CONSTRUCTION CO. 6.01 $3,839,589.00 Y Y Y $41,655 $1,110 $890
6.01
6.01
6.01
6.01
6.01
6.01
6.01
6.01
6.01
6.01
6.01
6.01
6.01
6.01
Page 11 of 22
BID DATE: 5/29/26
VILLAGE OF HOFFMAN ESTATES FIRE STATION #22
Bid Package - #7.50 SHINGLE ROOFING & ARCHITECTURAL SHEET METAL
Bid Tabulation
Addendums Noted Clarifications Noted
Bid Bond
Alt #1 - Concrete Alt #5 - ERF in lieu of
Alt #2 - EPDM Alt #3 -Modified Bit Alt #4 -Additional Alt #6 - Snow Melt at Alt #7 - Snow Melt at Alt #8 - Alternate
Company Name Bid Package Base Bid Paving in lieu of
Roofing in Lieu of PVC Roofing in lieu of PVC Data Ports
Sealed Concrete in
North Apron South Apron Fencing
Y/N Y/N
Asphalt Apparatus Bay
WEATHERGUARD ROOFING 7.50 $878,000.00 Y Y Y -$38,000
7.50
7.50
7.50
7.50
7.50
7.50
7.50
7.50
7.50
7.50
7.50
7.50
7.50
7.50
7.50
7.50
Page 12 of 22
BID DATE: 5/29/26
VILLAGE OF HOFFMAN ESTATES FIRE STATION #22
Bid Package - #8.40 - ALUMINUM FRAMING, GLASS & GLAZING
Bid Tabulation
Addendums Noted Clarifications Noted
Bid Bond
Alt #1 - Concrete Alt #2 - EPDM Alt #3 -Modified Bit Alt #5 - ERF in lieu of
Alt #4 -Additional Alt #6 - Snow Melt at Alt #7 - Snow Melt at Alt #8 - Alternate
Company Name Bid Package Base Bid Paving in lieu of Roofing in Lieu of Roofing in lieu of
Data Ports
Sealed Concrete in
North Apron South Apron Fencing
Y/N Y/N
Asphalt PVC PVC Apparatus Bay
RELIANT CONTRACT GLASS 8.40 $436,500.00 Y Y Y
3F CORPORATION 8.40 $455,000.00 Y Y Y
LS GLASS CO 8.40 $511,000.00 Y Y Y
8.40
8.40
8.40
8.40
8.40
8.40
8.40
8.40
8.40
8.40
8.40
8.40
8.40
Page 13 of 22
BID DATE: 5/29/26
VILLAGE OF HOFFMAN ESTATES FIRE STATION #22
Bid Package - #9.26 - METAL FRAMING, DRYWALL, & INSULATION
Bid Tabulation
Addendums Noted Clarifications Noted Alt #5 - ERF in
Bid Bond
Alt #1 - Concrete Alt #2 - EPDM Alt #3 -Modified Alt #4 - Alt #6 - Snow Alt #7 - Snow
lieu of Sealed Alt #8 - Alternate
Company Name Bid Package Base Bid Paving in lieu of Roofing in Lieu Bit Roofing in Additional Data
Concrete in
Melt at North Melt at South
Fencing
Y/N Y/N
Asphalt of PVC lieu of PVC Ports Apron Apron
Apparatus Bay
THE ROCKWELL GROUP 9.26 $747,800.00 Y Y Y
CHAMPION DRYWALL INC. 9.26 $748,520.00 Y Y Y
OPC CONSTRUCTION GROUP 9.26 $786,840.00 Y Y Y
DBM SERVICES, INC. 9.26 $808,000.00 Y Y Y
DENK & ROCHE BUILDERS 9.26 $855,647.00 Y Y Y
HEITKOTTER, INC. 9.26 $861,150.00 Y Y Y
DOHERTY CONSTRUCTION 9.26 $919,838.00 Y Y Y
LJ MORSE CONSTRUCTION CO 9.26 $998,000.00 Y Y Y
9.26
9.26
9.26
9.26
9.26
9.26
9.26
Page 14 of 22
BID DATE: 5/29/26
VILLAGE OF HOFFMAN ESTATES FIRE STATION #22
Bid Package - #9.67 EPOXY FLOORING SYSTEM
Bid Tabulation
Addendums Noted Clarifications Noted
Alt #3 - Alt #5 - ERF in
Alt #1 - Alt #6 - Alt #7 -
Bid Bond
Alt #2 - EPDM Modified Alt #4 - lieu of Sealed Alt #8 -
Concrete Snow Melt Snow Melt
Company Name Bid Package Base Bid Paving in lieu
Roofing in Bit Roofing Additional Concrete in
at North at South
Alternate
Y/N Y/N
Lieu of PVC in lieu of Data Ports Apparatus Fencing
of Asphalt Apron Apron
PVC Bay
ARTLOW SYSTEMS 9.67 $69,447.00 Y Y Y $89,332
CCI FLOORING INC. 9.67 $92,500.00 Y Y Y $74,200
MENCONI TERRAZZO LLC 9.67 $98,500.00 Y Y Y $131,500
PREMIER TILE & STONE 9.67 $158,000.00 Y Y Y $75,000
9.67
9.67
9.67
9.67
9.67
9.67
9.67
9.67
9.30
9.30
9.30
9.30
Page 15 of 22
BID DATE: 5/29/26
VILLAGE OF HOFFMAN ESTATES FIRE STATION #22
Bid Package - #9.90 - PAINTING AND WALL COVERINGS
Bid Tabulation
Addendums Noted Clarifications Noted Alt #5 - ERF in
Bid Bond
Alt #1 - Concrete Alt #2 - EPDM Alt #3 -Modified Alt #6 - Snow Alt #7 - Snow
Alt #4 -Additional lieu of Sealed Alt #8 - Alternate
Company Name Bid Package Base Bid Paving in lieu of Roofing in Lieu of Bit Roofing in
Data Ports Concrete in
Melt at North Melt at South
Fencing
Y/N Y/N
Asphalt PVC lieu of PVC Apron Apron
Apparatus Bay
OOSTERBAAN & SONS 9.90 $106,690.00 Y Y Y
GP MAINTENANCE SERVICES 9.90 $109,400.00 Y Y Y
MIDWEST DECORATING 9.90 $123,260.00 Y Y Y
NEDROW PAINTING 9.90 $136,000.00 Y Y Y
9.90
9.90
9.90
9.90
9.90
9.90
9.90
9.90
9.90
9.90
9.90
9.90
9.90
9.90
9.90
Page 16 of 22
BID DATE: 5/29/26
VILLAGE OF HOFFMAN ESTATES FIRE STATION #22
Bid Package - #15.30 - FIRE PROTECTION
Bid Tabulation
Addendums Noted Clarifications Noted Alt #5 - ERF in
Bid Bond
Alt #1 - Concrete Alt #2 - EPDM Alt #3 -Modified Alt #4 - Alt #7 - Snow Alt #8 -
lieu of Sealed Alt #6 - Snow Melt at
Company Name Bid Package Base Bid Paving in lieu of Roofing in Lieu Bit Roofing in Additional Data
Concrete in North Apron
Melt at South Alternate
Y/N Y/N
Asphalt of PVC lieu of PVC Ports Apron Fencing
Apparatus Bay
NELSON FIRE PROTECTION 15.30 $86,406.00 Y Y Y
AUTOMATIC FIRE SYSTEMS, INC 15.30 $130,359.00 Y Y Y
ABSOLUTE FIRE PROTECTION 15.30 $138,250.00 Y Y Y
UNITED STATES ALLIANCE FIRE PROTECTION 15.30 $173,605.00 Y Y Y
15.30
15.30
15.30
15.30
15.30
15.30
15.30
15.30
15.30
15.30
15.30
15.30
15.30
Page 17 of 22
BID DATE: 5/29/26
VILLAGE OF HOFFMAN ESTATES FIRE STATION #22
Bid Package - #15.40 - PLUMBING
Bid Tabulation
Addendums Noted Clarifications Noted
Bid Bond
Alt #1 - Concrete Alt #2 - EPDM Alt #3 -Modified Bit Alt #5 - ERF in lieu of
Alt #4 -Additional Alt #6 - Snow Melt at Alt #7 - Snow Melt at Alt #8 - Alternate
Company Name Bid Package Base Bid Paving in lieu of Roofing in Lieu of Roofing in lieu of
Data Ports
Sealed Concrete in
North Apron South Apron Fencing
Y/N Y/N
Asphalt PVC PVC Apparatus Bay
HARTWIG MECHANICAL 15.40 $693,500.00 Y Y Y
CW BURNS COMPANY 15.40 $747,000.00 Y Y Y
DEFRANCO PLUMBING 15.40 $789,976.00 Y Y Y
A&H PLUMBING 15.40 $799,800.00 Y Y Y
ERNIE PETERSON PLUMBING 15.40 $839,500.00 Y Y Y
MARTIN PETERESEN COMPANY 15.40 $933,835.00 Y Y Y
15.40
15.40
15.40
15.40
15.40
15.40
15.40
15.40
15.40
15.40
15.40
Page 18 of 22
BID DATE: 5/29/26
VILLAGE OF HOFFMAN ESTATES FIRE STATION #22
Bid Package - #15.80 - HVAC
Bid Tabulation
Addendums Noted Clarifications Noted
Bid Bond
Alt #1 - Concrete Alt #2 - EPDM Alt #3 -Modified Alt #5 - ERF in lieu Alt #8 -
Alt #4 -Additional Alt #6 - Snow Melt Alt #7 - Snow Melt at
Company Name Bid Package Base Bid Paving in lieu of Roofing in Lieu of Bit Roofing in lieu
Data Ports
of Sealed Concrete
at North Apron South Apron
Alternate
Y/N Y/N
Asphalt PVC of PVC in Apparatus Bay Fencing
FLO-TECH MECHANICAL SYSTEMS 15.80 $1,133,333.00 Y Y Y $53,000 $44,000
JENSEN'S PLUMBING & HEATING 15.80 $1,149,800.00 Y Y Y $45,000 $39,000
AIR SUPPLY AC & HEATING 15.80 $1,165,000.00 Y Y Y $68,625 $64,225
MCDONOUGH MECHANICAL 15.80 $1,178,000.00 Y Y Y $36,630 $36,630
DEKALB MECHANICAL 15.80 $1,204,000.00 Y Y Y $31,000 $22,500
MG MECHANICAL 15.80 $1,342,000.00 Y Y Y $39,000 $39,000
AMBER MECHANICAL 15.80 $1,343,000.00 Y Y Y $50,000 $41,000
GREAT LAKES PLUMBING & HEATING 15.80 $1,389,000.00 Y Y Y $47,500 $47,500
HARTWIG MECHANICAL 15.80 $1,416,300.00 Y Y Y $78,100 $78,100
15.80
15.80
15.80
15.80
15.80
15.80
15.80
15.80
15.80
15.80
15.80
Page 19 of 22
BID DATE: BID
11/14/2023
DATE: 5/29/26
VILLAGE OF HOFFMAN ESTATES FIRE STATION #22
Bid Package - #16.00 - Electrical
Bid Tabulation
Addendums Noted Clarifications Noted Alt #5 - ERF in
Bid Bond
Alt #1 - Concrete Alt #2 - EPDM Alt #3 -Modified Alt #4 -
lieu of Sealed Alt #6 - Snow Melt at Alt #7 - Snow Melt at Alt #8 - Alternate
Company Name Bid Package Base Bid Paving in lieu of Roofing in Lieu Bit Roofing in Additional Data
Concrete in North Apron South Apron Fencing
Y/N Y/N
Asphalt of PVC lieu of PVC Ports
Apparatus Bay
PETERS ELECTRIC AND TECHNOLOGY 16.00 $1,382,000.00 Y Y Y $17,710 $1,000 $1,000
BERNARDONI ELECTRIC INC 16.00 $1,581,350.00 Y Y Y $28,380
ASSOCIATED ELECTRIC 16.00 $1,610,000.00 Y Y Y $21,600
KELLENBERGER ELECTRIC 16.00 $1,623,609.00 Y Y Y $22,491
CAREY ELECTRIC CONTRACTING 16.00 $1,694,942.00 Y Y Y $17,564
16.00
16.00
16.00
16.00
16.00
16.00
16.00
16.00
16.00
16.00
16.00
16.00
16.00
16.00
16.00
16.00
16.00
Page 20 of 22
June 4, 2026
RE: Hoffman Estates Fire Station No. 22
Hoffman Estates, IL
GMP Summary
This Bid Release 2 bid opening was held on May 29, 2026, at 10:00AM. The bid was broken into (16)
Bid Packages in which we received a total of (73) bids. Bid Release 1, which was for the demolition
of the existing buildings on property, was held September 26, 2025 at 11:00 AM and we received (9)
bids for the demo.
All subcontracts will be held between the subcontractor and Camosy Incorporated.
The following contractors are being recommended for award as the lowest responsible bidder in
each package:
Bid Release 1
BP – 2.10 – Building Demolition – Donegal Services - $184,500.00
Bid Release 2
BP – 2.20 – Excavation & Site Utilities – Alessio & Sons Company - $845,000.00
BP – 2.74 – Asphalt Paving – Chicagoland Paving - $80,000.00
BP – 2.82 – Fencing & Gates – Action Fence Contractors - $212,365.00
BP – 2.90 – Landscaping – Breezy Hill Landscaping - $102,900.00
BP – 4.00 – Masonry Work – Joe’s Masonry, Inc. - $1,098,000.00
BP – 5.00 – Structural Steel – McKinney Steel and Sales, Inc - $1,132,517.00
BP – 6.01 – General Trades – DBM Services - $3,448,000.00
BP – 7.50 – Membrane Roofing & Architectural Sheet Metal – Weatherguard Roofing - $878,000.00
BP – 8.40 – Aluminum Framing, Glass, and Glazing – Reliant Contract Glass – $436,500.00
BP – 9.26 – Metal Framing, Drywall, & Insulation – The Rockwell Group, Inc. - $747,800.00
BP – 9.67 – Epoxy Flooring System – Artlow Systems, Inc. - $158,779.00
BP – 9.90 – Painting & Wall Coverings – Oosterbaan & Sons - $106,690.00
BP – 15.30 – Fire Protection – Nelson Fire Protection - $86,406.00
BP – 15.40 – Plumbing – Hartwig Mechanical - $693,500.00
BP – 15.80 – HVAC –Flo-Tech Mechanical Systems - $1,230,333.00
BP – 16.00 – Electrical – Peters Electric and Technology - $1,401,710.00
(Highlighted bids include alternate pricing)
Building Trust Since 1910
Construction Managers 12795 120th Avenue 43451 N. US Hwy 41 Delivery Address:
Design/Builders Kenosha, WI Zion, IL 43451 N. US Hwy. 41
General Contractors 53142-7326 60099-9455 Zion, IL 60099-9455
262-552-9440 847-395-6800
www.camosy.com FAX 262-552-0480 FAX 847-395-6891
Page 21 of 22
Included within the Bid Packages is the following alternate scope and pricing:
Alternate No. 1: Site Pavement drive lane heavy duty concrete in lieu of asphalt = ADD $26,087
Alternate No 4: Additional Data Ports & Cabling : Provide cost for (1) additional Cat6a data cable
at each Data System outlet & Wall telephone outlet = ADD $18,567
Alternate No 5: Epoxy Flooring system at Apparatus Bay in lieu of sealed concrete = ADD
$93,655
Alternate No 6: Radiant Slab Heat - North Bay Apron = ADD $60,807
Alternate No 7: Radiant Slab Heat - South Bay Apron = ADD $51,371
The next step in the process will be to execute the GMP Attachment Document (AIA-A133
Exhibit A), which is the sister document to the Contract that has already been executed
between the Village of Hoffman Estates and Camosy Incorporated for Construction
Management Services. The Guaranteed Maximum Price of $15,528,287.00 is for all of
Construction costs associated with this project; including the Bid Packages listed above,
Construction Management Services, Project Supervision, Insurance, and Bonds.
Not included in the GMP are the soft costs for Architectural / Engineering Fees, Furniture, and
Equipment.
I will be attending the Board Meeting to answer any questions that you may have on the Bid
Process or GMP Attachment as it is presented.
Sincerely,
CAMOSY INCORPORATED
Thank you,
Todd Peyron
Vice President of Estimating and Pre-Construction Services
Page 22 of 22