Aldermen, Board of
Regular MeetingNashua, NH · May 24, 2016
Minutes
A regular meeting of the Board of Aldermen was held Tuesday, May 24, 2016, at 7:30 p.m. in the
Aldermanic Chamber.
President Brian S. McCarthy presided; City Clerk Patricia D. Piecuch recorded.
Prayer was offered by City Clerk Patricia D. Piecuch; Alderwoman Mary Ann Melizzi-Golja led in the
Pledge to the Flag.
President McCarthy
Before I ask the Clerk to take the roll, Alderman Dowd is participating by telephone and under the
terms of the state law that allows him to do that, he needs to explain why he can’t attend, if he
can hear us, and who he is with, if anyone.
Alderman Dowd stated the reason he could not attend, confirmed that he could hear the proceedings
and stated who was present with him.
President McCarthy
Acknowledged that those present could hear Alderman Dowd as well.
The roll call was taken with 14 members of the Board of Aldermen present; Alderman Richard Dowd
was not in attendance but participated in the meeting via telecommunication; Alderman Deane was
recorded absent.
Mayor James W. Donchess and Corporation Counsel Steven A. Bolton were also present.
President McCarthy
Before we begin I am going to recognize Alderman Wilshire to make a motion so we can accept
procedural motions without the roll call vote.
MOTION BY ALDERMAN WILSHIRE THAT THE RULES BE SO FAR SUSPENDED AS TO
ALLOW FOR THE ACCEPTANCE OF PROCEDURAL ACTIONS WITHOUT OBJECTION
A Viva Voce Roll Call was taken, which resulted as follows:
Yea: Alderman Wilshire, Alderman Clemons, Alderman Dowd, 13
Alderman Caron, Alderman Siegel, Alderman Schoneman,
Alderwoman Melizzi-Golja, Alderman McGuinness, Alderman LeBrun,
Alderman Moriarty, Alderman O’Brien, Alderman Lopez,
Alderman McCarthy
Nay: 0
MOTION CARRIED
REMARKS BY THE MAYOR
Mayor Donchess
We have two contracts on the agenda that have been recommended by the Finance Committee. The
first is the contract for the LED Street Light Conversion Project with Siemens in the amount of $1.5
million. This project, which will replace all of the existing lights with LED lights, will enable the city to
Board of Aldermen Page 2
May 24, 2016
save about 40% of the electric bill devoted to street lighting. That bill is $830,000 so it will help the city
realize a savings of over $300,000 a year. At one point there was a proposal that we do a sole source
project at a cost of $2.1 million and as a result of the decision to go out to bid with this we reduced the
price by $600,000 so that’s good news.
The other contracts that are on the agenda are the contracts for the administration of our medical
benefits. These have not come to the Finance Committee or the Board of Aldermen before just through
custom but technically since they are larger contracts they should come before us. As you know we
have a self-insured system of medical payments except for catastrophic claims but the individual claims,
the medical claims that are made by employees are administered by these three carriers. What is before
us is the contracts to approve the administrative services rendered by Anthem, Harvard and the Hartford.
The Finance Committee is recommending that you approve those contracts.
A few good things have happened. On Sunday there was the dedication of the Child Victim Statute at
the Holocaust Memorial, it was a wonderful ceremony. Mr. Fred Teeboom was responsible for the entire
memorial as well as this sculpture. The Holocaust Memorial is a great addition to Nashua and the only
one of its kind in the State of New Hampshire.
Mary Zhu, one of our Nashua students, won a second award at the Intel Science and Engineering Fair
which is a big award. She did a project in behavioral science. In addition, the Granite State Challenge
Team from Nashua South won the State of New Hampshire and that was the first time that has
happened. The students on that team are Dody Eyd who came here before to be honored for another
accomplishment that he had; Nisha Davacia, Sam McIntyre and Noah Telerski were the team members
and the coaches were Neil Claffey, Katherine Poulin and Greg Montine. They did a really good job
representing the city.
Finally, Mr. President, coming up of course we have the Memorial Day parade on Monday and hopefully
as many of the Board members can join us to march in the parade as possible. One week from Friday
the Silver Knights open on the 3rd.
RESPONSE TO REMARKS OF THE MAYOR – None
RECOGNITION PERIOD – None
READING MINUTES OF PREVIOUS MEETINGS
There being no objection, President McCarthy declared the minutes of the Board of Aldermen
meetings of May 5, and May 10, 2016, accepted, placed on file and the readings suspended.
COMMUNICATIONS
There being no objection, President McCarthy declared that all communications be read by title
only.
From: Mayor Jim Donchess
Re: LED Street Light Conversion Project
MOTION BY ALDERMAN COOKSON TO ACCEPT, PLACE ON FILE AND AWARD THE CONTRACT
TO SIEMENS INDUSTRY, INC., IN THE AMOUNT OF $1,455,694
Board of Aldermen Page 3
May 24, 2016
A Viva Voce Roll Call was taken, which resulted as follows:
Yea: Alderman Wilshire, Alderman Clemons, Alderman Cookson, 14
Alderman Dowd, Alderman Caron, Alderman Siegel,
Alderman Schoneman, Alderwoman Melizzi-Golja, Alderman McGuinness,
Alderman LeBrun, Alderman Moriarty, Alderman O’Brien,
Alderman Lopez, Alderman McCarthy
Nay: 0
MOTION CARRIED
From: Mayor Jim Donchess
Re: Approval of Contracts for Administrative Services to Anthem BlueCross and
Blue Shield, Harvard Pilgrim Healthcare and The Hartford
MOTION BY ALDERMAN O’BRIEN TO ACCEPT, PLACE ON FILE AND AWARD THE CONTRACTS TO
ANTHEM BLUE CROSS BLUE SHIELD IN AN AMOUNT NOT TO EXCEED $1,140,000; HARVARD
PILGRIM HEALTHCARE IN AN AMOUNT NOT-TO-EXCEED $225,000; AND THE HARTFORD IN AN
AMOUNT NOT-TO-EXCEED $0.15 PER $1,000 OF AD&D INSURANCE PER MONTH
A Viva Voce Roll Call was taken, which resulted as follows:
Yea: Alderman Wilshire, Alderman Clemons, Alderman Cookson, 14
Alderman Dowd, Alderman Caron, Alderman Siegel,
Alderman Schoneman, Alderwoman Melizzi-Golja, Alderman McGuinness,
Alderman LeBrun, Alderman Moriarty, Alderman O’Brien,
Alderman Lopez, Alderman McCarthy
Nay: 0
MOTION CARRIED
There being no objection, President McCarthy suspended the rules to allow for the introduction
of a communication received after the agenda was prepared
From: Stephen Dookran, P.E., City Engineer
Sonia Shahnaj, P.E., Senior Staff Engineer
Re: R-16-038, Authorizing the Mayor to Enter into an Amendment to the Railroad Agreement
With the State of New Hampshire and Pan Am Railways for the Purpose of Replacing a
Railway Highway Crossing on East Hollis Street
– Request for the First and Second Reading at the May 24, 2016, Meeting
There being no objection, President McCarthy declared that the communication accepted and
placed on file
Board of Aldermen Page 4
May 24, 2016
PERIOD FOR PUBLIC COMMENT RELATIVE TO ITEMS EXPECTED TO BE ACTED
UPON THIS EVENING
Mr. Fred Teeboom, 24 Cheyene Drive
Mayor Donchess, thank you very much for your kind comments. I’m not sure any of you attended the
commemoration last Sunday but I invite you all to go to the memorial and take a look at the latest
sculpture, it’s very impressive.
O-016-011 – Reducing the Taxation for Certain Chartered Public Schools. One of the truly most
incorrect and inappropriate statements that I ever heard made before the Board of Aldermen was made
on May 10th and I refer to the minutes on page 12, referring to the charter schools Alderman Clemons
said “I think that they syphon money off of the district for the benefit of the few and then the rest of the
population is left behind.” The Academy for Science and Design is a top scoring school on NECAP in
New Hampshire and it is rated the 50th best school in the entire United States by Newsweek Magazine.
Let’s look at the figures. The average cost for students in the public schools K-12 in Nashua is $13,000
per student. The cost per teacher is almost $89,000 per teacher. There are 1,005 teachers in Nashua
for 11,500 students in K-12 and that’s from the Board of Education data. This means that there is a load
of $11,500 divided by 1,005 teachers or 11.4 students per teacher. There are 257 Nashua students in
the Academy of Science and Design. The entire enrollment is 525. That saves 257 divided by 11.4 is
22.5 teachers that you don’t have to hire because they are at the Academy of Science and Design;
otherwise they would have to be educators in the Nashua system. 22.5 teachers at a rate of $89,000 per
teacher is $2 million. You add to that the 45% overhead it doubles the teachers cost. The savings just
for the Academy of Science and Design is $2.9 million that the taxpayers don’t have to pay. If you look
at the 464 Nashua students at all of the regional schools; Manchester, Derry; there are about 10 or so, all
of it is in the Board of Education data, that would save $3.6 million and if you multiply that by the 45%
overhead that amounts to $5.2 million that Nashua taxpayers do not have to pay because those students
do not go to public schools. Let’s look at it another way, the state pays Nashua $40.1 million in
education aid and that computes to $3,400 per student in education aid and if you multiply that times the
275 students who are at the Academy of Science and Design, that’s a savings of $2.62 million. Look at
all of the charter schools, there are 464 students and multiply that by $13,000 and the state aid of $3,400
you end up with $4.4 million. No matter how you look at it the savings are enormous. In O-016-011 we
are talking about a tax reduction of $80,000 for the Academy of Science and Design and $145,000 for all
the other charter schools; that compares with up to a $5 million savings? This is a no brainer. You can
see that the Nashua taxpayers are going to get tax relief, you get better schools and you should fully
support O-016-011.
The other thing that I wanted to talk about is R-16-015; the expendable trust fund for pensions but there
is no such thing as an “expendable” trust fund. Now this came before at a cost $2.3 million and now it is
$350,000. It wasn’t needed at $2.3 million and it isn’t needed in the form of $350,000. Here are the
facts. The fiscal ’17 budget covers the additional $350,000. Look at account 52150 on page 21. A
question was asked by Alderman Schoneman of CFO Griffin on May 18th and CFO Griffin said “yes, we
funded it.” Why do you need to override the spending cap in 2016 when it’s already funded in 2017, it
makes no sense, unless you have an ulterior motive. (inaudible) This account 52150 is funded at
$21.67 million, its $350,000 above last years’ funding as I mentioned earlier. Then there is account 5175
just for the schools alone, they got an additional $800,000. Then there is account 89725, that’s another
$500,000 in transfers and it’s attached to the city retirement fund. Then there is 7025, trust funds, the
city retirement trust fund which was set up in the year 2000, then there is a trust fund 7076 which is the
school retirement trust fund. I think I still have $300,000 in it, I think it was $700,000 a month ago. There
is funding for pensions all over this budget. Many mentioned the savings set aside in the fund balance,
there is no such thing as savings set aside in the fund balance but there is a term called designated fund
balance. The designated fund balance is recommended in the CAFR report. They recommend that the
CFO set aside some delegated money but that set aside has no legal authority because it doesn’t have
Board of Aldermen Page 5
May 24, 2016
the legal authority from the Board of Aldermen; it’s just an artificial designation by the CFO. If you are
going to set aside savings then take the end of year surplus and escrow that money into one of these
expendable trust funds; 7025 or 7076. Now, talking about surplus, there has been a consistent $1
million surplus in the pension fund; in the 52150 fund; it’s been consistently underfunded by $1 million.
Look at the profile in 2017 if you look at 5150, it looks like it’s about $1 million ahead this year. It was
just like last year. This was recognized by the very champion of the current plan B, Alderman Siegel,
who two years as a freshmen Alderman said he did this fantastic analysis and he came up with a
$400,000 savings and guess what? Those are $400,000 savings in the very same pension but not the
regular budget for. This entire Board voted unanimously to cut $400,000. You surely do not need to
override the spending cap with 10 votes required. Six votes I hope hold out. I think Mayor Donchess did
an outstanding job and held to his pledge of sticking with the cap. Alderman Siegel and some others
want to override the cap. They say why is there a cap? There is a cap because citizens want you to cap
and prioritize your budget not override it even when it’s not necessary to override it. There is no
emergency here. CFO Griffin admitted that the $350,000 is funded and the whole discussion degraded
into well, we have to override the cap so we have another $350,000. The fact that it overrides the
spending cap in 2016 to spend the money in 2017, 2018 or 2019 is craziness. Plan B, just like plan A
makes no sense, Alderman Siegel.
I should also mention that Alderman O’Brien is beneficial of this legislation because he gets a very
generous pension. His pension is about the same as the highest salary he ever made.
Alderman Siegel
Point of order, that’s out of line, it has nothing to do with any legislation.
Alderman McCarthy
Please don’t refer to any personnel, Mr. Teeboom.
Mr. Teeboom
It’s got to do with the pension.
Alderman McCarthy
He does not receive any additional pension benefit whether or not this legislation passes. What he will
receive is set by law.
Mr. Teeboom
That’s correct, I certainly don’t deny that but there are funds for that. There are accounts all around
starting with the state law. The Trust Fund Board is inundated with union representatives.
On a persona note, on April 26th, Alderman Siegel named himself Prometheus who is a God and a
Greek…
Alderman Siegel
What are you talking about?
Board of Aldermen Page 6
May 24, 2016
Mr. Teeboom
I suggest you take a look at the April 26th Board of Aldermen meeting discussing this pension funding.
It’s appropriate that I respond to that. It says “I look at myself as Prometheus, and Prometheus by the
way is a protector of mankind and creator of mankind. He said he worried that…
Alderman Siegel
What does this have to do with the legislation?
Mr. Teeboom
We are discussing O-016-015, you brought it up.
Alderman Siegel
I discussed it in the context of being Prometheus feeling like his liver was being pecked out on a cliff
which I feel like I should revisited that analogy, Mr. Teeboom.
Mr. Teeboom
He said “like an eagle I would swoop down and peck out his liver.” Alderman Siegel, I wouldn’t mind
pecking out your liver if you offered me a glass of Chianti.
Alderman Siegel
I wasn’t talking about you, Mr. Teeboom.
Mr. Teeboom
You mentioned my name.
PETITIONS – None
NOMINATIONS, APPOINTMENTS AND ELECTIONS – None
REPORTS OF COMMITTEE
Budget Review Committee .................................................................. 05/16/16
There being no objection, President McCarthy declared the report of the May 16, 2016
Budget Review Committee accepted and placed on file.
Budget Review Committee .................................................................. 05/18/16
There being no objection, President McCarthy declared the report of the May 18, 2016
Budget Review Committee accepted and placed on file.
Finance Committee .............................................................................. 05/18/16
There being no objection, President McCarthy declared the report of the May 18, 2016
Finance Committee accepted and placed on file.
Board of Aldermen Page 7
May 24, 2016
Human Affairs Committee .................................................................... 05/09/16
There being no objection, President McCarthy declared the report of the May 9, 2016
Human Affairs Committee accepted and placed on file.
Planning & Economic Development Committee ................................... 05/03/16
There being no objection, President McCarthy declared the report of the May 3, 2016
Planning & Economic Development Committee accepted and placed on file.
WRITTEN REPORTS FROM LIAISONS - None
CONFIRMATION OF MAYOR'S APPOINTMENTS
Conservation Commission
William S. Parker (New Appointment) For a Term to Expire: December 31, 2018
1 Rockland Street
Nashua, NH 03064
Tabled until 6/14/16
UNFINISHED BUSINESS – RESOLUTIONS
R-16-015
Endorsers: Mayor Jim Donchess
Alderman Ken Siegel
Alderman-at-Large Brian S. McCarthy
Alderman-at-Large Lori Wilshire
Alderman Richard A. Dowd
Alderman June M. Caron
Alderman-at-Large Michael B. O’Brien, Sr.
ESTABLISHING AN EXPENDABLE TRUST FUND FOR STATE EMPLOYER PENSION COSTS
AND APPROPRIATING $2,230,000 FROM FUND BALANCE ASSIGNED FOR THIS PURPOSE
INTO THE EXPENDABLE TRUST FUND
Given its fourth reading;
MOTION BY ALDERMAN SIEGEL TO AMEND R-16-015 IN ITS ENTIRETY BY REPLACING IT
WITH THE GOLDEN ROD COPY PROVIDED WITH THE AGENDA
ON THE QUESTION
Alderman Siegel
I want to go over the changes in the “plan B.” The major objection that I heard from several of my colleagues
on the Board was the feeling that an expansion of the spending cap limits was an unfortunate by-product in
that transferring the entire $2.23 million in one lump and divvying it up amongst three different years while
potentially a desirable outcome for dealing with the pension issue had the undesirable side effect of
expanding the spending cap. I thought about it and came up with an alternate plan which was to recognize
that we have a known additional pension obligation of $350,000 and for this year we have the fund balance
that was designated for that purpose and that it would make sense to transfer that over and leave years two
and three unfunded in anticipation of the new numbers. The plan modifies the title of the legislation to have it
change to $350,000 and it modifies the amount and the year so we transfer just that amount this year and
years two and three will be at the discretion of the Board in future years as we address the pension overhang
that we will have to address. After this discussion if this amendment passes we can discuss the greater
Board of Aldermen Page 8
May 24, 2016
problems.
A Viva Voce Roll Call was taken, which resulted as follows:
Yea: Alderman Wilshire, Alderman Clemons, Alderman Cookson, 13
Alderman Dowd, Alderman Caron, Alderman Siegel,
Alderman Schoneman, Alderwoman Melizzi-Golja, Alderman McGuinness,
Alderman LeBrun, Alderman O’Brien, Alderman Lopez,
Alderman McCarthy
Nay: Alderman Moriarty 1
MOTION CARRIED
MOTION BY ALDERMAN SIEGEL FOR FINAL PASSAGE OF R-16-015 AS AMENDED BY ROLL
CALL
ON THE QUESTION
Alderman Siegel
Let me deal with some of the issues that were raised both in the Budget Review Committee and just
recently in public comment. This idea that this money is something that is already accounted for; on its
surface one could say yes, we have a budget in front of us but you have to look and see what happened
in order to make that happen. I would particularly like to focus on the Capital Equipment Reserve Fund
which has been hacked down by $700,000. So, yes, we made a budget but what we are doing is playing
a dangerous game of kick the can. We can play that game, for that matter why not just have no Capital
Equipment Reserve Fund amount. At a certain point there is a threshold by which we are cutting our
own throat. You can bleed out from a little razor cuts just as well as you can bleed out from just slicing
your aorta. I believe that this is a fairly significant problem so with the money I am going to propose
eventually that we help to restore our Capital Equipment Reserve Fund because we cannot allow the
maintenance work in this city that our reserve funds to go down to the point where we are not replacing
our equipment. It is a fallacy that this has been accounted for or that there is some ulterior motive, in
fact, I am specifically going out of my way to demonstrate that this has absolutely nothing to do with the
desire to expand the spending cap. If the amount was $100,000 or $1 million then that would be the
amount. It is the exact amount specified by CFO Griffin and in fact, we have an estimate for years two
and three that we are going to have a $2 million additional pension problem. Clearly, we aren’t going to
solve that with any existing money in the fund; we can solve it partially but not completely so there will be
other changes and again, when the time comes which is in Budget not before this committee, I will try to
make some suggestions which hopefully can constructively address that problem. This is not about
playing some weird fiscal game. Frankly, I think it’s a flaw in the spending cap legislation the way it was
crafted that we have this expansion, for example, you can’t level fund a budget and say I’m going to take
from this account and move it here and have the same amount of money but now you need 10 votes to
do that. I was never quoted as having any desire to override the spending cap and my reference to
Prometheus has to do with the agony involved in trying to get a budget through and the feeling that we
have revisited this before. While Mr. Teeboom would like to classify himself as the eagle that pecks out
my liver, I would not discredit the eagle with that analogy because that is not what I had in mind,
unfortunately I don’t believe that there is any other bird that I can think of and be in polite company but
he is not who I was referring to. I certainly didn’t refer to myself as Prometheus, the giver of fire to the
humans which is what he really was; sorry to correct you on that. Nonetheless, getting back to the
legislation, I believe this is important to pass because this is a real problem. Again, we have this issue in
the budget; it’s a very clear hole. I’m not looking to put this into random areas, for example, beautifying
the city, additional salaries; I was very explicit in this legislation. It was there to plug the pension hole.
Board of Aldermen Page 9
May 24, 2016
Now, because of the timing of how this legislation was debated, a budget had to be put forward before
this legislation had its final determination. Nonetheless, that hole exists in the Capital Equipment
Reserve Fund and I believe if this were here that hole would not be the same size but we would still have
to do something. I strongly urge my colleagues to adopt this recognizing that this is a solution to a real
problem and that problem is going to manifest itself on us not doing proper replacement of our capital
equipment.
Alderman Schoneman
I appreciate all the work that Alderman Siegel did in concert with CFO Griffin to work this out and I think
there are clearly serious issues and I don’t take them personally. When we had the last full Board of
Aldermen meeting we talked about an amount that could be suitable that would be less than $2.2 million
and I said I would consider it and I have. The $350,000 sounded attractive for a couple of reasons but in
the end I have to maintain my opposition to it for a couple of reasons. One, it is a spending cap override
of fiscal ’16; I cannot count on that spending cap override. The fiscal ’17 problem for pensions has been
solved. I totally recognize the Capital Equipment Reserve Fund that has been created but I don’t share
the same view that we cannot do anything about CERF in this budget. I think there could be 10 votes to
increase the Capital Equipment Reserve Fund as necessary if there were 8 votes to reduce a line
somewhere else. It is about prioritization. In an effort to keep all city spending within the spending cap
for fiscal ’16, ’17 and on I am going to continue to oppose this legislation and when fiscal ’18 and fiscal
’19 rolls around we will address those issues when the time comes.
Alderman Siegel
I appreciate the views of my colleague. I would point out that we have a $2 million overhang in the
following two budget years as estimated by CFO Griffin. That could get worse but that is the current
estimate from the state. In looking at the current budget, you can’t just say well where can I find that
$350,000 and plug it in here and call it a day. You have to think where can I find this in the next two
years because it isn’t going away. It’s all well and good to just say we will do an across the board cut but
anyone who has actually done a real budget knows that is impossible. The second that you start
defining those areas where there are fixed costs that are non-negotiable, then you are back making
decisions and trade-offs. You just don’t get to make a blanket statement about cutting it across the
board; that’s a very naïve way to do budgets. This is looking forward and seeing what the rolling effect is
is. It’s easy to focus on the Capital Equipment Reserve Fund because that problem is going to multiply
itself. We’ve already seen what happens when we neglect our maintenance. If I take that $500,000 and
put it towards the pension well guess what, that’s a spending cap override but are we going to sit in
dogmatic debate and say oh my God, I can’t override the cap or what is the threshold over which we say
alright, now it’s so bad that I am willing to do something, I am going to override this religious conviction
because my arm is hanging off and I guess I better apply a tourniquet; is it a $3 million pension
overhang, a $5 million, a $7 million overhang? At a certain point these kinds of arguments fall by the
wayside and they become silly. You have to view the world as it is and not how you wish it to be. What
we are proposing does not affect the dollars out of the taxpayer’s pocket and that is ultimately what we
are talking about. Are we taking more money from taxpayer’s to do this, if we were I would not have put
this legislation in place. That is the point; to cap the amount of money that flows out of the taxpayer’s
pockets. I would serious urge everyone to be very careful in consideration of that and consider that as a
key point in all of this.
Alderman Schoneman
It’s clear that moving money from inside of the budget to outside in an expendable trust fund does not
affect taxes. If the cash is already there you spend it from account A or B but it doesn’t affect the tax rate
but what is does do is that if we were to take that gap of $350,000 and apply it to the Capital Equipment
Reserve Fund in the fiscal ’17 budget then that would increase the budget and it would ultimately result
Board of Aldermen Page 10
May 24, 2016
in an expense to taxpayers. I don’t think it’s a religious conviction but it’s a promise to taxpayers for us to
hold the line. As time goes on we will have discussions around this horseshoe and set priorities and
come to conclusions.
A Viva Voce Roll Call was taken, which resulted as follows:
Yea: Alderman Wilshire, Alderman Clemons, Alderman Dowd, 9
Alderman Caron, Alderman Siegel, Alderwoman Melizzi-Golja,
Alderman O’Brien, Alderman Lopez, Alderman McCarthy
Nay: Alderman Cookson, Alderman Schoneman, Alderman McGuinness, 5
Alderman LeBrun, Alderman Moriarty
MOTION FAILS
MOTION BY ALDERMAN SIEGEL FOR INDEFINITE POSTPONEMENT OF R-16-015
ON THE QUESTION
Alderman Clemons
I’m disappointed with the way the last vote went. I kind of look at this situation as the miser who has
millions of dollars and lives in a mansion that has a leaky roof and mold growing everywhere and doesn’t
pay his taxes. The idea is the miser sets his budget and says I am not going to spend more than
$30,000 this year, even though he lives in a house that leaks every time it rains and he sleeps in a room
that has mold and that affects his health. But he wants to continue to be a millionaire so he keeps that
money in his account rather than spending a little bit of it to fix his house and have a better quality of life
and to pay his taxes. I look at this situation as something that’s similar. We have an obligation from the
State of New Hampshire that says we have to pay for these pension costs. There is no way around it.
We have millions of dollars set aside to pay for these pension costs and yet a minority of this board is
holding hostage that money against the will of the majority so that we can take it from a need that is
going to make the quality of life for our citizens in this city better. I really have a problem with that. Like
Alderman Siegel said, at what point do we take that ideology and look at the reality and say this is
something we just have to do? We have the resources, we have the funds. Let us not forget that all that
money that is sitting aside, we have already taxed people on. Our citizens have already paid taxes for
this purpose. Essentially what we are telling them is even though we’ve already taxed you and put your
money aside, we’re going to tax you again for what the state is telling us what we have to pay. I don’t
think that’s right. You folks can hide behind the Spending Cap and say I made a pledge to this, but in
reality what you’re doing is you’re double-taxing people. You can use the Spending Cap as a way of
saying I pledged I wouldn’t override the Spending Cap but in this situation you are double taxing people.
Alderman Siegel
One, I don’t believe Nashua is a leaky house. We’re not a miser millionaire. In fact the taxpayers of
Nashua deserve us to be very careful with their money so I respect that. I respect my colleagues on the
board that voted both for and against it. I believe they did in good conscience; I appreciate that. I want
to make that very, very clear. This is done. We argued it. We went through and it’s not a minority of the
Board holding the majority. It’s exactly the way the rules work. It takes 2/3; we didn’t have it. We’re
done. That’s the way it goes.
Alderman Schoneman
Board of Aldermen Page 11
May 24, 2016
I just wanted to add a comment to Alderman Siegel’s excellent answer. There is no double-taxation. I
just want to be very clear on that too. Monies that were raised are still available to be spent. They are
spent within the budget as opposed to on the outside of the budget. If anything is done to make room in
the budget for more spending then that does become an additional tax. I fully agree that the taxpayers of
Nashua are a miser millionaire. That money is not floating around out there. It’s a very tight budget.
Alderman Clemons
We have millions of dollars set aside. We have a need, and we’re not spending the money.
Alderman Schoneman
We are spending the money. We are meeting the obligation. It’s coming from the funds that have been
earmarked previously.
Alderman O’Brien
I would like to thank Alderman Siegel for his comments. I do agree with you that we did kick the can.
Unfortunately this problem is not going to go away. With the state, it’s a new biennium that’s coming up.
After people get elected in November, I really don’t see them putting any type of money at this particular
time back to alleviate this problem. By our inaction today, it’s going to prove out in the future, whether
we help the taxpayer or hurt the taxpayer. The end result if we are liable for $2 million next year, where
we could have made that $1.6 million if we voted to alieve the taxpayers a little bit of burden, we missed
that opportunity and we’re going to have to live with that. I thank Alderman Siegel for putting this. It was
well thought. It was an attempt to try to soften the blow of eventually what’s going to happen. We’re
going to be held liable for this debt. Thank you, sir, for having the foresight to come forward and try and
help to alleviate the pain that may come with this. Thank you.
Alderman Schoneman
Again, this legislation does not alleviate any sense of the responsibility that exists, whether it’s $2 million
next year from one fund, Fund A or Fund B; it’s still $2 million of taxpayer money. This would not have
shrunk that obligation in any way whatsoever and we cannot have that implication.
A Viva Voce Roll Call was taken, which resulted as follows:
Yea: Alderman Cookson, Alderman Caron, Alderman Siegel, 11
Alderman Schoneman, Alderwoman Melizzi-Golja,
Alderman McGuinness, Alderman LeBrun, Alderman Moriarty,
Alderman O’Brien, Alderman Lopez, Alderman McCarthy
Nay: Alderman Wilshire, Alderman Clemons, Alderman Dowd 3
MOTION CARRIED
Resolution R-16-015 declared duly indefinitely postponed.
Board of Aldermen Page 12
May 24, 2016
R-16-027
Endorsers: Mayor Jim Donchess
Alderman-at-Large Lori Wilshire
Alderwoman Mary Ann Melizzi-Golja
Alderman June M. Caron
Alderman Richard A. Dowd
RELATIVE TO THE ACCEPTANCE AND APPROPRIATION OF $11,822 FROM THE UNITED
STATES DEPARTMENT OF HOMELAND SECURITY AND THE STATE OF NEW HAMPSHIRE
DEPARTMENT OF SAFETY INTO EMERGENCY MANAGEMENT GRANT ACTIVITY “2016
EMERGENCY MANAGEMENT PERFORMANCE GRANT (EMPG)”
Given its second reading;
MOTION BY ALDERMAN WILSHIRE FOR FINAL PASSAGE OF R-16-027
ON THE QUESTION
Alderman Moriarty
Does this go into the department that Director Kates is involved with?
Alderman Wilshire
Yes.
Alderman Moriarty
I just want to give credit where credit is due. Back in 2011, some of us might remember the storm in
October. That’s when I was first running for alderman. My Facebook was lit up with people wishing there
was some sort of centralized department of emergency management, some sort of director who could do
things. I’ve sort of kept my eye on that department and Director Kates. He’s just done an absolutely great
job.
A Viva Voce Roll Call was taken, which resulted as follows:
Yea: Alderman Wilshire, Alderman Clemons, Alderman Cookson, 14
Alderman Dowd, Alderman Caron, Alderman Siegel,
Alderman Schoneman, Alderwoman Melizzi-Golja, Alderman McGuinness,
Alderman LeBrun, Alderman Moriarty, Alderman O’Brien,
Alderman Lopez, Alderman McCarthy
Nay: 0
MOTION CARRIED
Resolution R-16-027 declared duly adopted.
Board of Aldermen Page 13
May 24, 2016
UNFINISHED BUSINESS – ORDINANCES
O-16-011
Endorsers: Alderman Don LeBrun
Alderman Ken Siegel
Alderman David Schoneman
Alderman Tom Lopez
ADOPTING PROVISIONS FOR REDUCED TAXATION FOR CERTAIN CHARTERED
PUBLIC SCHOOL FACILITIES
Tabled at Full Board Level – 5/10/16
NEW BUSINESS – RESOLUTIONS
R-16-035
Endorsers: Mayor Jim Donchess
Alderman Ken Siegel
Alderman-at-Large Daniel T. Moriarty
RELATIVE TO THE RESCINDING OF AUTHORIZED UNISSUED DEBT
Given its first reading; assigned to the Budget Review Committee by President McCarthy
R-16-036
Endorser: Mayor Jim Donchess
Alderman-at-Large Lori Wilshire
Alderman June M. Caron
Alderman-at-Large Mark S. Cookson
Alderman Tom Lopez
Alderman-at-Large Michael B. O’Brien, Sr.
Alderwoman Mary Ann Melizzi-Golja
UPDATING THE FINANCIAL STANDARDS FOR THE CITY’S WELFARE GUIDELINES
Given its first reading; assigned to the Personnel/Administrative Affairs Committee by President McCarthy
R-16-037
Endorsers: Alderman Richard A. Dowd
Alderman-at-Large Lori Wilshire
Alderman June M. Caron
Alderman Ken Siegel
Alderwoman Mary Ann Melizzi-Golja
Alderman-at-Large Michael B. O’Brien, Sr.
Alderman Tom Lopez
Alderman-at-Large Brian S. McCarthy
AUTHORIZING THE TRANSFER OF UP TO $1,146,336 FROM THE SCHOOL CAPITAL
RESERVE FUND INTO CAPITAL PROJECT ACTIVITY “SCHOOL HVAC IMPROVEMENTS”
FOR THE PURPOSE OF IMPROVING HVAC SYSTEMS AT VARIOUS SCHOOLS
Given its first reading; assigned to the Budget Review Committee by President McCarthy
Board of Aldermen Page 14
May 24, 2016
R-16-038
Endorsers: Mayor Jim Donchess
Alderman June M. Caron
Alderman-at-Large Michael B. O’Brien
Alderman-at-Large Lori Wilshire
Alderman Richard A. Dowd
AUTHORIZING THE MAYOR TO ENTER INTO AN AMENDMENT TO THE RAILROAD
AGREEMENT WITH THE STATE OF NEW HAMPSHIRE AND PAN AM RAILWAYS FOR
THE PURPOSE OF REPLACING A RAILWAY HIGHWAY CROSSING ON EAST HOLLIS
STREET
Given its first reading;
MOTION BY ALDERMAN WILSHIRE THAT THE RULES BE SO FAR SUSPENDED AS
TO ALLOW FOR THE SECOND READING OF R-16-038
A Viva Voce Roll Call was taken, which resulted as follows:
Yea: Alderman Wilshire, Alderman Clemons, Alderman Dowd, 12
Alderman Caron, Alderman Siegel, Alderman Schoneman,
Alderwoman Melizzi-Golja, Alderman McGuinness, Alderman LeBrun,
Alderman O’Brien, Alderman Lopez, Alderman McCarthy
Nay: Alderman Cookson, Alderman Moriarty 2
MOTION CARRIED
Resolution R-16-038 given its second reading;
MOTION BY ALDERMAN WILSHIRE FOR FINAL PASSAGE OF R-16-038
A Viva Voce Roll Call was taken, which resulted as follows:
Yea: Alderman Wilshire, Alderman Clemons, Alderman Dowd, 13
Alderman Caron, Alderman Siegel, Alderman Schoneman,
Alderwoman Melizzi-Golja, Alderman McGuinness, Alderman LeBrun,
Alderman Moriarty, Alderman O’Brien, Alderman Lopez,
Alderman McCarthy
Nay: Alderman Cookson 1
MOTION CARRIED
Resolution R-16-038 declared duly adopted.
NEW BUSINESS – ORDINANCES – None
PERIOD FOR GENERAL PUBLIC COMMENT
Mr. Jim Cutter, 86 Palm Street
Article 9, Administration, Section 36, plat. It was passed November 23, 1949, as a means to prevent land
theft and states all applications for building permits shall be accompanied by a plan showing the actual
dimensions of each lot. On May 13, 1971, the building permit was approved for 88 Palm Street by the
building inspector for 53.57 feet. It was not the actual dimensions and took a 2.57 foot wide strip away
Board of Aldermen Page 15
May 24, 2016
from our driveway and curtilage. I have told the Gilbertson’s they are trespassing by taking a strip of our
driveway. It is evident they never read the 1949 plat ordinance. They only listened to the building
inspector instructions. Since I do not have the authority, they do not believe me. The city needs to send a
letter to the Gilbertsons explaining their 1971 building permit should have had the actual dimensions of 51
feet. Anything more than that is trespassing. Thus the fence, etc., should be removed soon.
Sir George Peter Knight
I represent chendie bracelets. I’m here to talk you about a few key points on what I feel we should be
spending our government funds on in this town. First our sidewalks is about safety. Our sidewalks should
be fenced in. I was at Hampton Beach and I saw a gentleman crossing on the crosswalk and get struck by
a car. The gentleman was going about 35 mph. Hampton Beach is a party area. He wasn’t looking and
the guy got a concussion. In our town in Nashua, which I did just legally move here about two months, we
should invest in sidewalks that have fenced in areas. We should make it as though the fence was as high
as the tallest person, which would make sense. We should also invest in crossing guards to assist people
with crossing. The lighting in this town, I feel like in the night, obviously my name is “Knight”, when our
citizens and patrons are walking and conducting their normal activity they are walking in the town. IN the
nighttime people can get mugged, robbed. They could use track of their personal belongings and not find
them because of the night. I did hear about the LED lights and how you spent money on that and that is
great. I want to mention solar. We all know solar is free, the sun is free. We can use it; it’s our habitat.
We can use the water, we can use the sun. We can use anything that gets naturally replenished. This is
what I feel is our biggest asset, using things that are natural and can revitalizing our community. Solar
lights, solar panels, I was in New York three months ago. Time Square is huge. It was lit up. I was
walking in Time Square and said I have to mention this at the next meeting. If I’m walking in this town and
I can see at 3 o’clock in the morning in New York, this is something that is good. The solar panels will light
up the whole community. They are inexpensive. When you are parking and driving your car on the side of
the road. On the actual Main Street, the side of the road has a curb that stands up flat. I’m popping my
tire, I’m scuffing my tire. Why are we doing this? We’re scuffing the tire because we designed a curb
vertical. Our curbs should be diagonal, to the ground up. That’s the biggest thing. The main thing is we
should have a way of safeguarding our kids. Our kids are going to school and they are reading their
books. A bullet travels at 2000 yards. We should be able to have a way of safeguarding the kids. Our
schools should have bulletproof glass. Thank you so much.
REMARKS BY THE MEMBERS OF THE BOARD OF ALDERMEN
Alderman Lopez
For Mr. Teeboom’s awareness, I didn’t receive an invitation to the Holocaust upgrade, but I was actually
in the park a couple days ago looking at the lights. It’s definitely an improvement. I would encourage
any member of the public who has the chance; it’s across from Shaw’s, next to Rotary Common. It’s a
really nice space; it’s really well designed. If definitely an area that’s worth reflecting on. I also wanted to
complement Alderman Siegel on his focus tonight. He was trying to, in my mind, address a very
important need. He was trying to do it while balancing a lot of other opinions. I think he did a great job. I
think he did it with a lot of dignity, and I appreciated the effort.
Alderman O’Brien
I’ll second what my friend, Alderman Lopez, said about Alderman Siegel. I said it earlier, but again a
very tough issue. We’re going to face it again. It will be interesting to watch the $2 million. I appreciate
your attempt to try to make it less painless for the taxpayers at this time.
Board of Aldermen Page 16
May 24, 2016
Alderman Moriarty
This issue has been easy to see coming, the issue of the pension downshifting. It’s been in the books,
it’s been planned, it’s been calculated. Every time a salary contract crosses our desk, it’s on page two.
It’s listed in there. We have the out years, the percentage increases. It’s all been in black and white for
four years, and I’ve been saying this for four years that this is going to happen. The fact that we’re
between a rock and a hard place is our own doing except I voted consistently no for four years now.
Today, after four years of being on the losing end of 14 – 1 votes, for once I’m actually going to enjoy this
victory.
Alderman Siegel
First of all I’d like to thank my colleagues for their kind words and also for the ability for me to have my
liver regrow and not get pecked out. Being the CO of a liquor company, I guess I can find a more
enjoyable way to destroy my own liver. With regard to whether or not this was coming or not, this
legislation and all of my efforts have everything to do with the overhang from the state. That isn’t
something we could have anticipated unfortunately. I suppose years ago when we decided not to fund it
at the state level, we could have anticipated we might run into problems, but this is a burden that we’ve
been handed that we have no control over. So I won’t agree that it was something that we could see
coming per se, so we part company on that. Thank you.
Alderman Caron
On a lighter note, May is “Older American’s” month. The senior center has put out a contest to see if
they can get 300 new members by the end of December. I kindly, if you look in your mailboxes, you will
all find a membership form. For those of you who are under 50, which is a lot of you, I’m sure you know
someone who might be interested in going to the Senior Center. As the staff keeps telling me, it’s not
about bingos and playing cards. It’s about kickboxing and yoga and bodybuilding and a lot of other
wonderful things that they do at the Senior Center. But I agree with my colleagues, Alderman Siegel
went above and beyond trying to get this resolved and next year is another year. Thank you.
Alderman Dowd
I just wanted to thank Alderman Wilshire for running the budget meetings while I was on the mend. I
watched the meeting last night. I thought it went extremely well, and I want to congratulate her for a
great meeting. Hopefully by Thursday I will be back on my feet and able to resume all of my activities.
Thank you.
Alderman Clemons
I just want to take a moment to say thank you to all the veterans who gave the ultimate sacrifice for our
freedom. Hopefully we all take a moment to remember on Monday those folks and the families that they
left behind. Thank you.
Alderman Wilshire
I would like to send my condolences to the family of Stephanie Eason-Poisson, who passed away earlier
this week at a young age, I might say. Also on June 13, Chief Justice Broderick has asked to come in to
talk to the Human Affairs Committee and the Board about an initiative called “Change Direction New
Hampshire.” The purpose is to kind of change the culture and the way people think about mental illness
and wellness and mental health issues. I hope you all join us on June 13.
Committee announcements:
Board of Aldermen Page 17
May 24, 2016
Alderman Siegel
Substandard Living Condition Committee is going to be meeting this Thursday in the Chambers at 7:00
p.m.
Alderwoman Melizzi-Golja
On Tuesday, June 7, PEDC will be meeting. We will be discussing the feasibility study for the performing
arts center.
President McCarthy
This Thursday evening is Construction Projects and Joint Special also at Nashua North. The
planetarium rededication at Nashua South is tomorrow afternoon at 2:30 p.m.
Alderman Clemons
Monday, June 6, at 7 PM is the Personnel/Administrative Affairs Committee.
Alderman Dowd
If you could just remind them of the change times for the construction projects and joint special.
President McCarthy
We have Constructions Projects at 7:00 p.m. and Joint Special at 7:15 p.m.
Alderwoman Melizzi-Golja
For people who are going to be staying local this weekend the sculptors from the Sculpture Symposium
will be down in the Nimco building on 1 Pine Street Extension. They are there from 8:30 a.m. to 5:30
p.m. They will be there and it’s not like you have to have some special pass to get in. The Sculpture
Symposium will be ending June 4. The closing ceremony will be here behind city hall at 1:00 p.m.
Alderman Wilshire
I wanted to mention the Taste of Downtown on June 1st. I believe tickets are still available at Great
American Downtown and at some of the downtown merchants. It’s always a good event.
Board of Aldermen Page 18
May 24, 2016
ADJOURNMENT
MOTION BY ALDERMAN WILSHIRE THAT THE MAY 24, 2016, MEETING OF THE BOARD OF
ALDERMEN BE ADJOURNED
A Viva Voce Roll Call was taken, which resulted as follows:
Yea: Alderman Wilshire, Alderman Clemons, Alderman Cookson, 14
Alderman Dowd, Alderman Caron, Alderman Siegel,
Alderman Schoneman, Alderwoman Melizzi-Golja, Alderman McGuinness,
Alderman LeBrun, Alderman Moriarty, Alderman O’Brien,
Alderman Lopez, Alderman McCarthy
Nay: 0
MOTION CARRIED
The meeting was declared adjourned at 8:45 p.m.
Attest: Patricia D. Piecuch, City Clerk
City ©ff Washua
Public Works Division Engineering Department
9 Riverside Street 9 Riverside Street
Nashua, NH 03062 Fax (603) 589-3169
MEMO
Date: May 23, 2016
To: Brian S. McCarthy, President of Board of Aldermen
From: Stephen Dookran, P.E., City Engineer
Sonia Shahnaj, P.E., Senior Staff Engineer
Cc: Mayor Jim Donchess
Lisa Fauteux, Director of Public Works
Re: (R-16-038) Authorizing the Mayor to enter into an Amendment to the Railroad Agreement with
the State of New Hampshire and Pan Am Railways for the purpose of replacing a railway
highway crossing on East Hollis Street
Request for the first and second reading at the May 24, 2016 meeting
The original three-way Agreement was executed in August 2015, but the work did not proceed essentially due to
financial hurdles involving the Railroad as they were unable to allocate funding to purchase materials needed for the
project. Since NHDOT does not have a policy of paying upfront, the Railroad and the NHDOT requested the City to
bear the upfront cost of the materials approximately in the amount of $130,000.00. The City will be fully reimbursed
by NHDOT for this cost after the project is complete. The timing is critical for the following reasons:
1. According to the NHDOT, who is administering the Federal funds, if the project is not completed in the 2016
Federal funding year which ends in September 2016, the funding will no longer be available for this project. In
order to complete this project by September 2016, the construction must begin no later than middle of July
2016.
2. The project is about 95% funded by FHWA and the remaining 5% is City's share. Should the resolution be
referred to committees for recommendations, the current schedule for aldermanic meetings will put final
approval too late for the project and the City will be in jeopardy of losing Federal funding in the amount of
$606,299.87.
3. The City must make payment to the Railroad without delay for the Railroad to order the materials with long-
lead time to start construction by the July 2016 deadline.
The crossing on East Hollis Street has been in a deteriorated condition for many years and interim repairs have not
held up. This project will not only include the needed repairs but also upgrading the crossing to meet Federal railroad
safety standards. In addition to the improvements associated with railroad crossing, the project includes improvements
to curbing, sidewalk, new pavement and striping at the intersection.
Administration Street/Traffic City Parks-Recreation Solid Waste Wastewater
Business Office Department Engineer Department Department Treatment Plant
(603)589-3140 (603)589-4750 (603) 589-3120 (603)589-3370 (603)589-3410 (603)589-3560
Agenda
AGENDA MEETING OF THE BOARD OF ALDERMEN MAY 24. 2016
1. PRESIDENT BRIAN S. MCCARTHY CALLS ASSEMBLY TO ORDER
2. PRAYER OFFERED BY CITY CLERK PATRICIA PIECUCH
3. PLEDGE TO THE FLAG LED BY ALDERWOMAN MARY ANN MELIZZI-GOLJA
4. ROLL CALL
5. REMARKS BY THE MAYOR
6. RESPONSE TO REMARKS OF THE MAYOR
7. RECOGNITIONS
8. READING OF MINUTES OF PREVIOUS MEETINGS AND PUBLIC HEARING
Special Board of Aldermen Meeting with Nashua Delegation 05/05/16
Board of Aldermen 05/10/16
9. COMMUNICATIONS
From: Mayor Jim Donchess
Re: LED Street Light Conversion Project
From: Mayor Jim Donchess
Re: Approval of Contracts for Administrative Services to Anthem BlueCross and
Blue Shield, Harvard Pilgrim Healthcare and The Hartford
PERIOD FOR PUBLIC COMMENT RELATIVE TO ITEMS EXPECTED TO BE ACTED
UPON THIS EVENING
10. PETITIONS
11. NOMINATIONS, APPOINTMENTS AND ELECTIONS
12. REPORTS OF COMMITTEE
Budget Review Committee 05/16/16
Budget Review Committee 05/18/16
Finance Committee 05/18/16
Human Affairs Committee 05/09/16
05/03/16
Planning & Economic Development Committee
13. WRITTEN REPORTS FROM LIAISONS
14. CONFIRMATION OF MAYOR'S APPOINTMENTS
Conservation Commission
William S. Parker (New Appointment) For a Term to Expire: December 31, 2018
1 Rockland Street
Nashua, NH 03064
• Tabled until 6/14/16
UNFINISHED BUSINESS - RESOLUTIONS
R-16-015
Endorsers: Mayor Jim Donchess
Alderman Ken Siegel
Alderman-at-Large Brian S. McCarthy
Alderman-at-Large Lori Wilshire
Alderman Richard A. Dowd
Alderman June M. Caron
Alderman-at-Large Michael B. O'Brien, Sr.
ESTABLISHING AN EXPENDABLE TRUST FUND FOR STATE EMPLOYER PENSION COSTS
AND APPROPRIATING $2,230,000 FROM FUND BALANCE ASSIGNED FOR THIS PURPOSE
INTO THE EXPENDABLE TRUST FUND
• Re-referred to Committee - 4/26/16; Budget Review Committee Recommends: Final Passage
as Amended
R-16-027
Endorsers: Mayor Jim Donchess
Alderman-at-Large Lori Wilshire
Alderwoman Mary Ann Melizzi-Golja
Alderman June M. Caron
Alderman Richard A. Dowd
RELATIVE TO THE ACCEPTANCE AND APPROPRIATION OF $11,822 FROM THE UNITED
STATES DEPARTMENT OF HOMELAND SECURITY AND THE STATE OF NEW HAMPSHIRE
DEPARTMENT OF SAFETY INTO EMERGENCY MANAGEMENT GRANT ACTIVITY "2016
EMERGENCY MANAGEMENT PERFORMANCE GRANT (EMPG)"
• Human Affairs Committee Recommends: Final Passage
UNFINISHED BUSINESS - ORDINANCES
0-16-011
Endorsers: Alderman Don LeBrun
Alderman Ken Siegel
Alderman David Schoneman
Alderman Tom Lopez
ADOPTING PROVISIONS FOR REDUCED TAXATION FOR CERTAIN CHARTERED
PUBLIC SCHOOL FACILITIES
• Tabled at Full Board Level - 5/10/16
NEW BUSINESS - RESOLUTIONS
R-16-035
Endorser: Mayor Jim Donchess
RELATIVE TO THE RESCINDING OF AUTHORIZED UNISSUED DEBT
R-16-036
Endorser: Mayor Jim Donchess
UPDATING THE FINANCIAL STANDARDS FOR THE CITY'S WELFARE GUIDELINES
R-16-037
Endorser: Alderman Richard A. Dowd
AUTHORIZING THE TRANSFER OF UP TO $1,146,336 FROM THE SCHOOL CAPITAL
RESERVE FUND INTO CAPITAL PROJECT ACTIVITY "SCHOOL HVAC IMPROVEMENTS"
FOR THE PURPOSE OF IMPROVING HVAC SYSTEMS AT VARIOUS SCHOOLS
R-16-038
Endorser: Mayor Jim Donchess
AUTHORIZING THE MAYOR TO ENTER INTO AN AMENDMENT TO THE RAILROAD
AGREEMENT WITH THE STATE OF NEW HAMPSHIRE AND PAN AM RAILWAYS FOR
THE PURPOSE OF REPLACING A RAILWAY HIGHWAY CROSSING ON EAST HOLLIS
STREET
NEW BUSINESS - ORDINANCES
PERIOD FOR GENERAL PUBLIC COMMENT
REMARKS BY THE MEMBERS OF THE BOARD OF ALDERMEN
Committee announcements:
ADJOURNMENT
AMENDED
R-16-015
RESOLUTION
ESTABLISHING AN EXPENDABLE TRUST FUND FOR STATE EMPLOYER
PENSION COSTS AND APPROPRIATING $350,000 FROM FUND BALANCE
ASSIGNED FOR THIS PURPOSE INTO THE EXPENDABLE TRUST FUND
CITY OF NASHUA
In the Year Two Thousand and Sixteen
RESOLVED by the Board of Aldermen of the City of Nashua that pursuant to NH RSA
31:19-a, the City of Nashua hereby establishes an expendable trust fund for the purpose of
funding the city's employer contributions to the New Hampshire Retirement System. This is
established to fund pension costs in excess of yearly budgeted pension costs appropriations.
Funds may be expended or transferred from this fund for this purpose by the Financial Services
Division. Any balance remaining in this expendable trust fund at each fiscal year end will not
lapse or be closed out to the General Fund, but will remain in this expendable trust fund. This
expendable trust fund will be discontinued on June 30, 2019. At the time the fund is
discontinued, any remaining balance shall be transferred into the General Fund.
FURTHERMORE, BE IT RESOLVED by the Board of Aldermen of the City of Nashua
that $350,000 is appropriated from fund balance assigned for this purpose into this expendable
trust fund.
As this is a resolution which supplements the FY2016 Adopted Budget, the following
information is provided pursuant to NRO § 5-145, E:
Currently, the accumulated sum of all appropriations of the FY2016 combined annual municipal
budget is $260,536,617. The FY2016 dollar amount under the limit established by City Charter
Section 56-c is $40,276
If this resolution passes, the accumulated sum of all appropriations of the FY2016 combined
annual municipal budget will be $260,886,617. The FY2016 dollar amount over the limit
established by City Charter Section 56-c would be $309,724.
THEREFORE, BE IT RESOLVED by the Board of Aldermen of the City of Nashua that
under the authority of the City of Nashua Charter Section 56-d, the amount of $350,000
representing certain principal and interest on municipal bonds included in the FY2016 Adopted
Budget is exempt from the budget limitation imposed by City Charter Section 56-c, resulting in
the FY2016 dollar amount under the limit of $40,276.
Jim Donchess
Mayor • City of Nashua
To: Board of Aldermen
From: Jim Donchess
Date: 5/19/16
Re: LED Street Light Conversion Project
Pursuant to NRO § 5-90 (E) which states that approval by the Finance Committee of a contract award in
excess of $1,000,000 shall be submitted to the full Board of Aldermen at its next regularly scheduled
meeting for final approval prior to award of the contract, please consider the following. The Finance
Committee approved the purchase of the below referenced contract at their May 18, 2016 meeting. I
request the Board of Aldermen's concurrence and approval for this purchase.
LED Street Light Conversion Project - Attached please find Purchasing Manager's Memo # 16-136 regarding
this contract.
229 Main Street * PO Box 2019 • Nashua, New Hampshire 03061-2019
603.589.3260 • fax 603.594.3450 • NashuaMayor@NashuaNH.gov
www.NashuaNH.gov
THE CITY OF NASHUA The Gate City
Financial Services
Purchasing Department
April 28, 2016
Memo #16-136
TO: MAYOR DONCHESS
FINANCE COMMITTEE
SUBJECT: LED STREET LIGHT CONVERSION PROJECT (VALUE: $1,455,694)
DEPARTMENT: 161 STREET; FUND: BOND
ACTIVITY: LED LIGHTING
Please see the attached communication from Stephen Dookran, P.E., City Engineer for the information
related to this purchase.
Pursuant to § 5-78 Major purchases (greater than $10,000) A. All supplies and contractual services,
except as otherwise provided herein, when the estimated cost thereof shall exceed $10,000 shall be
purchased by formal, written contract from the lowest responsible bidder, after due notice inviting bids.
The City Engineer and the Purchasing Department recommend the award of this contract in an amount of
$1,455,694 to Siemens Industry, Inc. of Austin, TX. This award is contingent upon BPW approval at
their next meeting scheduled for 5/5/16.
Respectfully,
Dan Kooken
Purchasing Manager
Ce: S Dookran L Fauteux
2 2 9 Main Street • Nashua, New Hampshire 0 3 0 6 1 • Phone ( 6 0 3 ) 5 8 9 - 3 3 3 0 « Fax ( 6 0 3 ) 5 8 9 - 3 3 4 4
Jim Donchess
Mayor • City of Nashua
To: Board of Aldermen
From: Jim Donchess
Date: 5/19/16
Re: To Approve Contracts for Admin Services to Anthem BlueCross and Blue Shield, Harvard Pilgrim
Healthcare and The Hartford.
Pursuant to NRO § 5-90 (E) which states that approval by the Finance Committee of a contract award in
excess of $1,000,000 shall be submitted to the full Board of Aldermen at its next regularly scheduled
meeting for final approval prior to award of the contract, please consider the following. The Finance
Committee approved the award of the below referenced contracts at their May 18, 2016 meeting. I request
the Board of Aldermen's concurrence and approval for this purchase.
To Approve Contracts for Admin Services to Anthem BlueCross and Blue Shield, Harvard Pilgrim Healthcare
and The Hartford. - Attached please find Purchasing Manager's Memo # 16-140 regarding these contracts.
229 Main Street • PO Box 2019 • Nashua, New Hampshire 03061-2019
603.589.3260 • fax 603.594.3450 • NashuaMayor@NashuaNH.gov
www.NashuaNH.gov
THE CITY OF NASHUA TheCateCitf
financial Services
Purchasing Department
May 12, 2016
Memo #16-140
TO: MAYOR DONCHESS
FINANCE COMMITTEE
SUBJECT: TO APPROVE CONTRACTS FOR ADMIN SERVICES TO ANTHEM BLUECROSS AND
BLUE SHIELD, HARVARD PLIGRIM HEALTHCARE AND THE HARTFORD (VALUE:
NOT TO EXCEED $1,395,000)
DEPARTMENT: HUMAN RESOURCES; FUND: BENEFITS SELF INSURANCE FUND
Please see attached communication from Larry Budreau, Human Resources Director dated May 10, 2016
for the information related to these contract awards.
The Human Resources Director the CEO and the Purchasing Department recommend awarding these
contracts to Anthem BlueCross Blue Shield in an amount not to exceed $1,140,000, Harvard Pilgrim
HealthCare in an amount not to exceed $255,000 and The Hartford in an amount not to exceed $0.15 per
$1,000 of AD&D insurance per month.
Respectfully,
Dan Kooken
Purchasing Manager
Cc: L Budreau J Griffin