Board of Public Works
Regular MeetingNashua, NH · March 19, 2013
Minutes
Minutes of the Board of Public Works Budget Workshop of March 19, 2013
The Board of Public Works held a Budget Workshop on Tuesday, March 19, 2013 at 12:00
p.m. at the Division of Public Works, Administration and Engineering offices, 9 Riverside
Street, Nashua, NH 03062.
Members Present
Mayor Lozeau, Chairman Lisa Fauteux, Director
Tim Lavoie, Vice Chairman Steve Dookran, P.E., City Engineer
Dan Gagnon, Commissioner Mario Leclerc, Superintendent, WWTF
Kevin Moriarty, Commissioner Nick Caggiano, Superintendent, Parks & Recreation
Roy Sorenson, Superintendent, Streets
Jeff Lafleur, Superintendent, Solid Waste
Carolyn O’Connor, Finance & Admin. Mgr.
Via Phone-Conference
Tracy Pappas, Commissioner
The Commissioners were provided draft FY14 budget documents which included the current
FY13 original budget and actual expenditures through the end of February.
Director Fauteux advised the Commissioners each Superintendent would provide the overview
of their departmental budget.
Superintendent Leclerc reviewed the Wastewater Department budget noting the areas of
significant changes. There was a discussion on the increase in revenue for Sewer User
Charges. Carolyn O’Connor Finance & Administration Manager informed the Commissioners
it is anticipated that there will be a 15 percent rate increase for residential and commercial
sewer user fees and this is reflected in the draft budget request. The CFO is completing a
review of the Wastewater Rate Study which should be presented to the Commissioners at their
April meeting.
Commissioner Moriarty inquired as to how many temporary seasonal employees are hired as
part of Wastewater operations. Superintendent Leclerc detailed the seven temporary positions
which include lab assistant, two laborers for the facility, two laborers for the collection system
and two engineer interns. Electricity draft budget is higher due to the anticipated rebuild to be
done on the co-gen generator. The rebuild could require the generator to be down for up to six
weeks. Superintendent Leclerc discussed the need to increase the chemical budget to allow for
chemical needed to address the foaming issue. The Wastewater Department draft FY14 budget
request represents a 2.78% reduction from FY13.
The next department to present a review of its FY14 draft budget request was the Street
Department. Superintendent Sorenson discussed there are few changes to the budget. Within
salaries and wages the increase in full-time wages is directly related to the contractual
obligations. There is a $100,000 increase to overtime as part of the work to be done on the
sidewalk project. Superintendent Sorenson highlighted the increase to the Signing & Striping
budget which is required to complete the crosswalks with thermoplastic. The asphalt line has
1
been reduced so as to not negatively impact the budget, however this will mean reduction in the
mill and fill program. Mayor Lozeau would like to revisit this reduction as the program has
been quite successful in repairing pothole issues throughout the city.
Engineer Dookran presented the Admin/Engineering draft FY14 budget which too included
increases in salary due to contractual obligations. Additional adjustment to the
Admin/Engineering full-time wages was 80% of the Operations Managers salary will now be
included in the Department’s budget. The 80% had previously been allocated to Park &
Recreation 40% and Street 40%. The remaining 20% is broken out evenly between the two
enterprise funds as it was originally done.
Mileage reimbursements has been increased and fixed rate mileage decreased. This is a result
of the change to the Union contracts for the inspectors which now provided mileage
reimbursement rather than a stipend. The net result is a reduction of $1,862.
Superintendent Caggiano presented the Park & Recreation Department FY14 draft budget
request. He also highlighted the changes to Salaries and Wages that are the result of
contractual obligations and the elimination of the departmental Operations Manager.
Commissioner Pappas inquired why under Professional and Technical Services nothing had
been spent to date yet he is once again requesting a $7,000 budget. Superintendent Caggiano
explained that these funds are needed for the stadium inspections which are not completed until
the spring. It is anticipated the $7,000 will be fully expended. Superintendent Caggiano stated
that he has included a $500 increase for the Senior Outing in the hopes of having it held at a
hotel complex again this year. The seniors were very happy with last year’s event with the
change in venue.
The draft FY14 general fund operating budget for the Division represents a 1.3% increase from
FY13.
Superintendent Lafleur presented the draft FY14 Budget request for the Solid Waste
Department. There were no major changes to the operating budget. The department had made
an adjustment to diesel fuel for FY13 cutting the budget in half due to the new CNG vehicles.
Superintendent Lafleur discussed that the diesel fuel budget is required due to the various diesel
fuel equipment at the landfill. The capital outlay budget includes $150,000 for continued
construction of the soil wall and $100,000 for the required gas collection. The draft FY14
Solid Waste Department budget request represents a 0.85% increase from FY13.
The Board agreed to review the draft budget and advise the Director if they felt an additional
budget workshop was warranted prior to approval at their regularly scheduled April meeting.
Mayor Lozeau also informed the Board that she did not anticipate making changes however,
additional changes to the budget may be required.