Muyni
← Back to Nashua

Board of Public Works

Regular Meeting

Nashua, NH · October 22, 2015

AgendaMinutes

Minutes

Minutes of Board of Public Works Meeting of October 22, 2015 A regular meeting of the Board of Public Works was held on Thursday, October 22, 2015 at 5:30 p.m. at the Division of Public Works, Administration & Engineering offices, 9 Riverside Street, Nashua, NH 03062. Members Present Mayor Donnalee Lozeau, Chair Lisa Fauteux, Director of Public Works Commissioner Kevin S. Moriarty, Vice Chair David Simmons, Superintendent of Wastewater Commissioner Paul G. Bergeron Nick Caggiano, Superintendent of Parks & Recreation Commissioner Tracy Pappas Steve Dookran, City Engineer Commissioner Joel Ackerman Ken Siegel, Aldermanic Liaison Mayor Lozeau called the meeting to order at 5:30 p.m. and called the roll. Commissioner Moriarty: Present Commissioner Bergeron: Present Commissioner Pappas: Present Commissioner Ackerman: Present Mayor Lozeau: Present I. MOTION: Commissioner Pappas to approve the Agenda as presented. SECONDED: Commissioner Moriarty MOTION CARRIED: Carried Unanimously II. MOTION: Commissioner Pappas to approve the Minutes of the Board of Public Works Meeting of September 17, 2015. SECONDED: Commissioner Moriarty MOTION CARRIED: Carried Unanimously III. Aldermanic Referrals A. R-15-175 FIRST AMENDMENT TO THE SITE LEASE AGREEMENT WITH SPRINT SPECTRUM REALTY COMPANY, L.P. (SUCCESSOR-IN-INTEREST TO SPRINT SPECTRUM, L.P.) TO RELOCATE THE LESSEE’S COMMUNICATION EQUIPMENT LOCATED AT WHIPPLE STREET, MINES FALL PARK TO THE NEW REPLACEMENT TOWER MOTION: Commissioner Pappas moves for a positive recommendation for Aldermanic Referral: R-15-175. SECONDED: Commissioner Moriarty MOTION CARRIED: Unanimously DISCUSSION: Minutes of Board of Public Works Meeting of October 22, 2015 Page 1 IV. Broad Street Parkway A. Motion: Commissioner Pappas to approve and place on file the Informational Update of overall status on the Broad Street Parkway. SECONDED: Commissioner Moriarty MOTION CARRIED: Unanimously DISCUSSION: John Vancor provided an update on the status of the Broad Street Parkway Project. Attached is the updated report on the project. B. Motion: Commissioner Pappas to approve the amendment to the contract for Environmental Services with Sanborn Head Associates in the amount of $35,500. Funding will be through Department 160 Admin/Engineering; Fund: Bond; Activity: Broad Street Parkway. SECONDED: Commissioner Moriarty MOTION CARRIES: Unanimously DISCUSSION: The original contract awarded in July 2012 for $267,300 with Sanborn Head was primarily for evaluating underground hazardous materials and groundwater within the parkway footprint, as well as designing the measures to mitigate project impacts. Amendments 1, 2 and 3, totaling $166,441, were for added environmental services related to construction. These services included but were not limited to testing and monitoring of the removal and disposal of large amounts of buried asbestos on Parkway North, dealing with a buried contaminated tank found at 44 Broad St. and addressing contaminated drilled shaft spoils related to the foundation of the Nashua River Bridge. Amendments 4, 5, 6 and 7, totaling $109,000 incrementally provided additional budget so that if unanticipated underground hazardous material were encountered, Sanborn Head could react quickly and in so doing, avoid or minimize potential construction delays. As additional buried asbestos continued to be encountered, Amendments 8 and 9 provided budget for Sanborn Head to further increase the efforts to monitor ongoing excavation within the Millyard. Sanborn Head provided staff whenever excavation occurred in the Millyard. This effort enhanced awareness, reduced the timeline needed to sample suspect excavated material and reduced reaction time as additional pockets of asbestos were encountered. Amendment 10 provides further budget for this oversight. More asbestos has been encountered. In some cases the nature of the material encountered has required different disposal procedures. The effort to address asbestos continues to take greater time by the Contractor than anticipated requiring more oversight. V. Wastewater Department: A. Motion: Commissioner Pappas to approve the User Warrants as presented. SECONDED: Commissioner Moriarty Minutes of Board of Public Works Meeting of October 22, 2015 Page 2 MOTION CARRIES: Unanimously DISCUSSION: B. Motion: Commissioner Pappas to approve the contract in an amount not to exceed of $45,000 over a 3 year period with Chemserve Environmental Analyst of Milford, NH for water quality sampling of the Nashua and Merrimack Rivers in conjunction with the CSO Post Construction Monitoring Plan. Funding will be through Department: 169 Wastewater; Fund: Wastewater; Account Classification: 53 Professional & Technical Services. SECONDED: Commissioner Moriarty MOTION CARRIES: Unanimously DISCUSSION: The EPA Consent Decree mandated CSO improvements are now complete. The Consent Decree requires a post construction monitoring plan including sampling of the Nashua and Merrimack Rivers at 4 locations for dry and wet weather conditions four times a year. The purpose of this request is to hire a sampling and water quality analysis company for a 3-years contract to collect and analyze the required samples. This project will benefit the City by ensuring that CSO discharges meet the design storm they are supposed to discharge in order to keep the Nashua and Merrimack Rivers as clean as possible during storm conditions. Since the EPA mandated Consent Decree CSO improvements are complete a water quality sampling and analysis program is required to assess the effectiveness of the 7 CSO structures with outfall discharges. In addition to the water quality benefits of the sampling and analysis, this program will keep the City in good standing with the EPA which could implements fines should the City fail to have in place a water quality monitoring plan. Six environmental consultants were given proposals, two provided bids, as follows: Consultant Costs for 3 Years Annual Costs Chemserve Environmental $45,000 $15,000 Normandeau Associates $74,767.28 $24,922.43 The consultant’s bid the project over a 3 year period, but in Addendum-1 it specifies the maximum number of samples to be taken per year. Each year the same maximum number of samples will be collected so the total samples and costs are divided by 3 to come up with the annual (not to exceed) costs. The Wastewater Plant currently uses Chemserve to perform laboratory analyses of certain constituents in the plant and industrial wastewater that the lab does not have the capability to analyze. They have provided well for the laboratory for many years and we recommend that they be approved for these services. C. Motion: Commissioner Pappas to accept and place on file that John Adie, Plant Operations Supervisor, is the recipient of the 2015 Water Environment Federation William D. Hatfield Award. Minutes of Board of Public Works Meeting of October 22, 2015 Page 3 SECONDED: Commissioner Moriarty MOTION CARRIES: Unanimously DISCUSSION: Commissioner Pappas acknowledged John Adie for his hard work. Superintendent Dave Simmons explained that the award is for the outstanding commitment to operations in the field of wastewater and is a great honor to receive. Commissioner Moriarty requested that the Board send a letter to Mr. Adie congratulating him on receiving the award. D. Informational: EPA Permit Status MOTION: Commissioner Pappas to approve the EPA Permit Status update. SECONDED: Commissioner Moriarty MOTION CARRIES: Unanimously DISCUSSION: A packet was handed out to the commissioners and is attached. Director Fauteux acknowledged Mayor Lozeau for her part in this process which has been very beneficial. Commissioner Bergeron recalled a time not too long ago when the City’s rivers were very unhealthy and commended the City’s efforts to improve the quality of them. E. Motion: Commissioner Pappas to approve the contract with Highland Power of Brockton, MA in the amount of $11,500 for Waukesha Generator repairs. Funding will be through Department: 169 Wastewater; Fund: Wastewater; Account Classification: 54 Property Services. SECONDED: Commissioner Moriarty MOTION CARRIES: Unanimously DISCUSSION: Highland Power was been the sole provider of repairs to the Waukesha generator since 2008. This has been documented by previous sole source letters. The Waukesha generator produces electricity for the plant or power grid by burning methane produced through the digestion process. The generator is in need of a resealed oil plan. After the repair, Highland will test run the unit and check for leaks. For these reasons, I recommend that we hire Highland Power to perform the necessary repairs. F. Informational: Hazen and Sawyer EPA Appeal Invoice MOTION: Commissioner Pappas to approve the EPA Appeal Invoice update. SECONDED: Commissioner Moriarty MOTION CARRIES: Unanimously DISCUSSION: Minutes of Board of Public Works Meeting of October 22, 2015 Page 4 Mayor Lozeau summarized the update, stating that there was a misunderstanding as to who Hazen and Sawyer would invoice for their services. Hazen Sawyer invoiced the City instead of Rath, Young, Pignatelli which was the City Staff’s original assumption, so the City has brought the invoice before the Board as an informational piece. The cost of the service came in under the original estimate. VI. Parks Department: A. Motion: Commissioner Pappas to approve the selection of Mr. Shawn Dyer of Merrimack, NH to the position of Groundskeeper / Maintenance at the Parks and Recreation Department. Starting salary for this position will be $24.81 per hour for a yearly salary of $51,188.8. Funding is through Department: 171 Parks and Recreation; Fund: General; Account Classification: 51-Salary & Wages. SECONDED: Commissioner Moriarty MOTION CARRIES: Unanimously DISCUSSION: This position was posted per the AFSCME CBA and there were three internal applicants from the department. The interview team of Nick Caggiano, Parks and Recreation Superintendent, Eric Ryder Streets Superintendent and Jeff Lafleur Solid Waste Superintendent developed interview questions related to the job and scored and rated the applicant. The candidates were then administered a general knowledge written test based on the requirements of the position as well as a field test. After review of the interview and test scores, the applicant that met minimum qualifications and with the most department seniority was selected. Mr Dyer met the guidelines and is recommended for the position. Mr. Dyer has been employed by the city for the past 20 years. He started out as summer help then became a Groundsman I and then was promoted to Truck Driver. Mr Dyer currently holds a Commercial Driver’s License, and has performed his duties well. Parks and Recreation Superintendent Nick Caggiano joined the discussion. Commissioner Pappas wanted to confirm that Mr. Dyer can plow. Superintendent Caggiano confirmed that he can and that he is one of the department’s better drivers. Commissioner Moriarty noted that driving requirements were not listed on the application. Superintendent Caggiano responded that it is a current system limitation that internal candidates are not asked to list their driving credentials. He will follow up with Human Resources again about making that change. B. Motion: Commissioner Pappas to approve the elimination of the Truck Driver positon at the Parks and Recreation Department, and the creation of a Groundsman I position. SECONDED: Commissioner Moriarty MOTION CARRIES: Unanimously DISCUSSION: Minutes of Board of Public Works Meeting of October 22, 2015 Page 5 This proposal will eliminate the vacant Driver position and create a Groundsman I position. This change will save the department $2,849 per year and will help with the 2017 budget. This change will eliminate the only driver position in the department which will streamline the process of assigning work in the morning. This will provide a more versatile work group for both the winter and summer seasons. This position will also provide an individual to work on grass crews, mowing, trimming, weeding, and setting up ball fields and rectangular fields. With the removal of the one Park and Recreation Truck Driver classification we will be able to assign work without going through the time consuming process of calling this out on days when needed. There will be a positive annual financial impact of $2,849 by downgrading this position from a rate of $21.70 per hour to a rate of $20.33 per hour. It is the Superintendents recommendation that this change be made. C. Informational: Commissioner Pappas to accept and place on file the 2015 Summer Camp Revenue summary report. SECONDED: Commissioner Moriarty MOTION CARRIES: Unanimously DISCUSSION: Superintendent Caggiano reviewed the 2015 Summer Camp Revenue summary report. He also discussed two new camps for next year – yoga camp and fitness camp. Commissioner Pappas mentioned that she has received requests to restripe the parking lot at Main Dunstable Soccer Field. Superintendent Caggiano said he would look into it and agreed that it probably hasn’t been painted in years. Commissioner Pappas also suggested that soccer coaches be asked that if snacks or drinks were given to kids they or their parents please take the trash home with them. Superintendent Caggiano said that the City currently empties 220 trash cans there every Monday and Friday. Commissioner Bergeron noted how fantastic it is that these camps are profitable. He also noted the wonderful variety of camps offered. VII. Engineering Department: A. Motion: Commissioner Bergeron to approve the Residential and Commercial Wastewater Service Permits and Fees as submitted. SECONDED: Commissioner Moriarty MOTION CARRIES: Unanimously DISCUSSION: Minutes of Board of Public Works Meeting of October 22, 2015 Page 6 Residential and Commercial Wastewater Service Permits September 1 through September 30, 2015 Connection 10% Discount Betterment Date Permit Appl Location Address Name Comments Fees # # Entrance 278 Daniel Webster 9/01/2015 23589 13420 Mike Silva Increase Use $295.00 X Hwy Holly Original 9/16/2015 23590 13421 52 Legacy Dr $295.00 X McCarty Application Holly Original 9/16/2015 23591 13422 53 Legacy Dr $295.00 X McCarty Application 5 Pine St Ext-N, Stephen 9/16/2015 23592 13423 Increase Use $0.00 X Unit 1D Bonnette 17 Courtney Ln, Original 9/22/2017 23593 13424 Robert Dion $295.00 X Unit 7 Application 354 Amherst St, 9/30/2015 23594 13425 Ed Campbell Increase Use $0.00 X Unit 5 TOTAL $1,180.00 B. Motion Removed From Agenda Mayor Lozeau removed the motion from the agenda. She provided an update on the status of the completion of the two crosswalks on Main Street. The Finance Committee did not approve the crosswalks on the 10/21 meeting. The bid from Hutter was at least twice as much as it would cost for the City to complete the work. She hopes to be able to find a compromise to still get the crosswalks completed before winter – possibly by having the City do some of the work and contracting less work from Hutter. Commissioner Bergeron expressed his support for getting the crosswalks completed this year. He also feels that the businesses on Main Street and the residents of Nashua would be in support. The Main Street infrastructure project has lasted four construction seasons which is the equivalent of 27 months – completing it this year would be ideal. C. Motion: Commissioner Pappas to accept and place on file the Paving Program Update. SECONDED: Commissioner Moriarty MOTION CARRIES: Unanimously DISCUSSION: Minutes of Board of Public Works Meeting of October 22, 2015 Page 7 Attached is an update of the status of the streets included in the 2014/2015 Paving Program. Engineering is working with utilities, contractors and the Wastewater and Street Departments to prepare streets for paving. Coordination of paving with other city projects is ongoing. Manchester St paving was completed on Saturday, October 10, 2015. East Hobart St, Oak St, and Whitney St are scheduled for the week of October 19. This will conclude paving for the year. Paving of Mulberry St., Tolles St (Whitney to Canal), and Canal St. will be delayed until the required sewer repairs are completed. D. Motion: Commissioner Pappas moves to accept and place on file the Consent Decree (Civil Action No. 05-376-PB, dated December 26, 2005) on Combined Sewer Overflows – July 1 to September 30, 2015 Quarterly Report on Compliance. SECONDED: NONE MOTION CARRIES: Unanimously DISCUSSION: VIII. Street Department: A. Motion: Commissioner Pappas to approve the purchase of four Swenson EV100 1056SS Stainless Steel V-Box Spreaders from H.P. Fairfield, Pembroke, NH for the price of $10,500 each for a total purchase of $42,000. Funding will be through Department: 161 Streets; Fund: Prior Year Escrows; Account Classification: 71 Equipment. SECONDED: Commissioner Moriarty MOTION CARRIES: Unanimously DISCUSSION: The Street Department went out to bid April 25, 2014 to up-fit four, six-wheel dump trucks purchased in March 2014. This bid included the purchase of Stainless Steel V- Box Spreaders. H. P. Fairfield has offered to hold the pricing of the sanders to the price quoted per the bid. The current tailgate spreaders are showing signs of excess wear and corrosion. The stainless steel drop in sanders with ground speed controls will more effectively control the amount of material being applied, and they are preferable as the stainless sanders have a 20 year life expectancy plus the ability to mount the sander onto a different truck should there be a need. Commissioner Ackerman asked if we were getting government pricing. Superintendent Caggiano said that we have purchased from H.P. Fairfield in the past and the Purchasing Department allows us to not have to go out to bid again if a vendor holds their price Minutes of Board of Public Works Meeting of October 22, 2015 Page 8 within a certain period of time. H.P. Fairfield held their price so we didn’t have to go out to bid. B. Motion: Commissioner Pappas approve the award of the FY16 Pavement Markings contract to Hi-Way Safety Systems, Inc. of Rockland, MA in the amount of $155,525. Funding for this contract is through Department 161: Streets; Fund: General; Account Classification: 54 – Property Services. SECONDED: Commissioner Moriarty MOTION CARRIES: Unanimously DISCUSSION: City of Nashua annual Pavement Marking Program was put out to bid in July 2014. Three bids were received on July 17, 2014 as follows, HI-Way Safety Systems, Inc. $155,525 Markings Inc. $160,125 L&D Safety Marking $257,250 Highway Safety Systems, Inc. was awarded the contract for FY 2015, and their performance has been satisfactory for the past several years. Highway Safety has agreed to hold their unit prices for the same quantities from their FY 2015 bid during FY 2016. It is the recommendation of the Superintendent of Streets to extend their contract into FY 2016 given the contractor has agreed to hold their last years pricing. Commissioner Bergeron asked if we were happy with the service provided by Hi-Way Safety Systems since we’ve had a number of issues with paint and striping and new techniques. Mayor Lozeau responded that our issues with Thermoplastic in the past has been related to putting it down when it is too cold or when the pavement isn’t fresh enough. The City has been happy overall with this company’s work. Commissioner Bergeron asked about the status of the striping on Manchester and Concord Street. Director Fauteux said it should be completed in about three weeks. IX. Administration A. Informational: i. Motion: Commissioner Pappas to accept and place on file the Main Street Sidewalk Update. SECONDED: Commissioner Moriarty MOTION CARRIES: Unanimously ii. Director’s Report A series of slides showing various current Public Works projects and activities were shown. X. Commissioner’s Comments Minutes of Board of Public Works Meeting of October 22, 2015 Page 9 None. Meeting adjourned at 6:51 pm Minutes of Board of Public Works Meeting of October 22, 2015 Page 10 Broad Street Parkway Construction Contract Status Update Prepared October 15, 2015 Parkway North/Baldwin Street Bridge As Reported Update September 9, 2015 Contract Amount $10,884,025 $10,884,025 Progress Report:  Work on this contract is substantially complete.  Only punchlist tasks remain.

Agenda

City of Nashua Public Works Division 9 Riverside Street Phone (603) 589-3140 Nashua, NH 03062 Fax (603) 589-3169 Board of Public Works Meeting of October 22, 2015 Agenda A meeting of the Board of Public Works is scheduled for Thursday, October 22, 2015 at 5:30 p.m. at the Division of Public Works, Administration & Engineering offices, 9 Riverside Street, Nashua, NH 03062. I. Motion: To approve the Agenda as presented. II. Motion: To approve the Minutes of the Board of Public Works Meeting of September 17, 2015. III. Public Comment IV. Aldermanic Referrals A. R-15-175 - APPROVING A FIRST AMENDMENT TO THE SITE LEASE AGREEMENT WITH SPRINT SPECTRUM REALTY COMPANY, L.P. (SUCCESSOR-IN-INTEREST TO SPRINT SPECTRUM, L.P.) TO RELOCATE THE LESSEE’S COMMUNICATION EQUIPMENT LOCATED AT WHIPPLE STREET, MINES FALL PARK TO THE NEW REPLACEMENT TOWER V. Broad Street Parkway A. Informational: Overall Status of the Broad Street Parkway. B. Motion: To approve Amendment to contract for Environmental Services with Sanborn Head Associates in the amount of $35,500. Funding will be through Department 160 Admin/Engineering; Fund: Bond; Activity: Broad Street Parkway. VI. Wastewater Department: A. Motion: To approve the User Warrants as presented. B. Motion: To approve the contract in an amount not to exceed of $45,000 over a 3 year period with Chemserve Environmental Analyst of Milford, NH for water quality sampling of the Nashua and Merrimack Rivers in conjunction with the CSO Post Construction Monitoring Plan. Funding will be through Department: 169 Wastewater; Fund: Wastewater; Account Classification: 53 Professional & Technical Services. C. Informational: To acknowledge that John Adie, Plant Operations Supervisor, is the recipient of the 2015 Water Environment Federation William D. Hatfield Award. D. Informational: EPA Permit Status Administration Street City Parks-Recreation Solid Waste Wastewater Business Office Department Engineer Department Department Treatment Plant (603) 589-3140 (603) 589-4750 (603) 589-3120 (603) 589-3370 (603) 589-3410 (603) 589-3560 Board of Public Works Meeting of October 22, 2015 Agenda Page | 2 E. Motion: To approve the contract with Highland Power of Brockton, MA in the amount of $11,500 for Waukesha Generator repairs. Funding will be through Department: 169 Wastewater; Fund: Wastewater; Account Classification: 54 Property Services. F. Informational: Hazen and Sawyer EPA Appeal Invoice VII. Engineering Department: A. Motion: To approve the Residential and Commercial Wastewater Service Permits and Fees as submitted. B. Motion: To approve the construction contract for the Main Street Mid-Block Crosswalks to Hutter Construction, Inc. of New Ipswich, NH in an amount not to exceed $184,000. Funding will be through: Department: 161 - Street; Fund: General; Activity Description: Main Street. C. Informational: Paving Program Update D. Informational: Consent Decree (Civil Action No. 05-376-PB, dated December 26, 2005) on Combined Sewer Overflows – July 1 to September 30, 2015 Quarterly Report on Compliance. VIII. Parks Department: A. Motion: To approve the selection of Mr. Shawn Dyer of Merrimack, NH to the position of Groundskeeper / Maintenance at the Parks and Recreation Department. Starting salary for this position will be $24.81 per hour for a yearly salary of $51,188.8. Funding is through Department: 171 Parks and Recreation; Fund: General; Account Classification: 51-Salary & Wages. B. Motion: To approve the elimination of the Truck Driver positon at the Parks and Recreation Department, and the creation of a Groundsman I position. C. Informational: To accept and place on file the 2015 Summer Camp Revenue summary report. IX. Street Department: A. Motion: To approve the purchase of four Swenson EV100 1056SS Stainless Steel V-Box Spreaders from H.P. Fairfield, Pembroke, NH for the price of $10,500 each for a total purchase of $42,000. Funding will be through Department: 161 Streets; Fund: Prior Year Escrows; Account Classification: 71 Equipment. B. Motion: To approve the award of the FY16 Pavement Markings contract to Hi-Way Safety Systems, Inc. of Rockland, MA in the amount of $155,525. Funding for this contract is through Department 161: Streets; Fund: General; Account Classification: 54 – Property Services. X. Administration A. Informational: i. Main Street Sidewalk Update ii. Director’s Report C. Commissioner’s Comments D. Possible Non-Public Session 2 Broad Street Parkway Project Budget v Projections As of 10-16-2015 This report provides updates based on the $68,107,000 budget to complete the project as estimated in July, 2008. At that time, total project cost, including costs already Revenue Federal 1 Bond Total Revenue incurred before the City took over management, was $ 30,507,000 $ 37,600,000 $ 68,107,000 projected to be $82,453,000 Expenses Budget Budget Projection Projection Committed Costs to Date July, 2008 January, 2011 9/10/2015 10/16/2015 Federal Bond Balance Overall Project $ 68,107,000 Construction $ 39,790,000 $ 32,004,470 $ 32,077,864 $ 19,142,373 $ 12,935,491 $ 0 Construction Administration $ 4,270,000 $ 3,916,521 $ 3,916,521 $ 195,000 $ 3,706,727 $ 14,794 Design $ 2,880,000 $ 2,898,015 $ 2,898,015 $ 2,075,093 $ 757,922 $ 65,000 Project Admin/Prof. Services * $ 3,426,586 $ 3,426,586 $ 379,113 $ 2,704,482 $ 342,991 Utility Relocation $ 1,510,000 $ 743,718 $ 743,718 $ - $ 623,216 $ 120,502 Right-of-Way $ 7,550,000 $ 8,346,300 $ 8,346,300 $ 7,945,500 $ 400,800 $ - Hazardous Mitigation $ 3,470,000 $ 2,498,921 $ 2,498,921 $ - $ 2,498,921 $ - Environmental Mitigation $ 640,000 $ 815,485 $ 815,485 $ 27,876 $ 767,609 $ 20,000 Other Costs - Allowances $ 7,220,000 $ 4,400,000 $ 4,494,000 $ 1,073,450 $ 3,063,441 $ 357,109 2 Total $ 68,107,000 $ 67,330,000 $ 59,050,016 $ 59,217,410 $ 30,838,405 $ 27,458,609 $ 920,396 * Included under "Other Costs - Allowances" 1 Current Projections reflect updated escalation factor Note: the total Federal Funds listed is the total as of July, 2008 when the maximun bond Bond Sales: amount was established. The City has secured additional Federal funding since this time. This $2,205,000 8/10 additional funding will serve to reduce the amount of City Bond which will be required. $2,500,000 10/11 $1,662,000 4/13 Federal Grant received for sidewalks on River Bridge = $487,000 $17,000,000 6/14 Funding through Federal Railroad Crossing Program = $304,274 $8,000,000 4/15 $31,367,000 2 $6,233,000 Remaining Bond balance Note: The proceeds of the sale of surplus property to date ($420,847) have been added to the budget for other costs and allowances City of Nashua Public Works Division Wastewater Department 9 Riverside Street (603) 589-3560 Nashua, NH 03062 Fax (603) 594-3474 Board of Public Works Meeting of October 22, 2015 Wastewater Department Agenda A. Motion: To approve the User Warrants as presented. B. Motion: To approve the contract in an amount not to exceed of $45,000 over a 3 year period with Chemserve Environmental Analyst of Milford, NH for water quality sampling of the Nashua and Merrimack Rivers in conjunction with the CSO Post Construction Monitoring Plan. Funding will be through Department: 169 Wastewater; Fund: Wastewater; Account Classification: 53 Professional & Technical Services. C. Informational: To acknowledge that John Adie, Plant Operations Supervisor, is the recipient of the 2015 Water Environment Federation William D. Hatfield Award. D. Informational: EPA Permit Status E. Motion: To approve the contract with Highland Power of Brockton, MA in the amount of $11,500 for Waukesha Generator repairs. Funding will be through Department: 169 Wastewater; Fund: Wastewater; Account Classification: 54 Property Services. F. Informational: Hazen and Sawyer EPA Appeal Invoice Administration Street City Parks-Recreation Solid Waste Wastewater Business Office Department Engineer Department Department Treatment Plant (603) 589-3140 (603) 589-4750 (603) 589-3120 (603) 589-3370 (603) 589-3410 (603) 589-3560 City of Nashua, Public Works Division To: Board of Public Works Meeting Date: October 22, 2015 From: David A. Simmons, Superintendent Wastewater Department Re: EPA Permit Status D. Informational: EPA Permit Status Attachment: Memorandum City of Nashua, Public Works Division To: Board of Public Works Meeting Date: October 22, 2015 From: David A. Simmons, Superintendent Wastewater Department Re: Waukesha Generator Repairs Attachment: Quote E. Motion: To approve the contract with Highland Power of Brockton, MA in the amount of $11,500 for Waukesha Generator repairs. Funding will be through Department: 169 Wastewater; Fund: Wastewater; Account Classification: 54 Property Services. Discussion: Highland Power was been the sole provider of repairs to the Waukesha generator since 2008. This has been documented by previous sole source letters. The Waukesha generator produces electricity for the plant or power grid by burning methane produced through the digestion process. The generator is in need of a resealed oil plan. After the repair, Highland will test run the unit and check for leaks. For these reasons, I recommend that we hire Highland Power to perform the necessary repairs. City of Nashua Public Works Division Wastewater Department 9 Riverside Street Sawmill Rd, Nashua, NH 03060 Nashua, NH 03062 Fax (603) 594-3474 Memorandum Date: October 15, 2015 To: Lisa Fauteux, Director of Board of Public Works From: David A. Simmons, Wastewater Superintendent Re: Hazen and Sawyer Invoices for EPA Appeal Process __________________________________________________________________________________________________ The legal firm of Rath, Young, Pignatelli, P.C. was hired by the City of Nashua to provide legal representation in the appeal process with the EPA in reference to the new NPDES Permit that was issued in March 2015. Rath, Young, Pignatelli, P.C. retained the services of Hazen and Sawyer to provide the technical data required to proceed with the permit appeal. Rath, Young, Pignatelli asked Hazen and Sawyer to provide a scope of services and an estimate. They estimated a cost of $67,514 to complete the work. The scope and estimate was accepted and Rath, Young, Pignatelli began their work with Hazen and Sawyer. It was the City’s understanding that Hazen and Sawyer would invoice the City through Rath, Young, Pignatelli which didn’t happen. As a result, the City will now need to create a purchase order for the agreed upon services and pay Hazen Sawyer directly. The invoice total is $9,532.85 below the original budget estimate of $67,514. Administration Street/Traffic City Parks-Recreation Solid Waste Wastewater Business Office Department Engineer Department Department Treatment Plant (603) 589-3140 (603) 589-4750 (603) 589-3120 (603) 589-3370 (603) 589-3410 (603) 589-3560 City of Nashua, Public Works Division To: Board of Public Works Meeting Date: October 22, 2015 From: Stephen Dookran, P.E., City Engineer Engineering Department Re: Main Street Mid-Block Crosswalks – Construction Contract B. Motion: To approve the construction contract for the Main Street Mid-Block Crosswalks to Hutter Construction, Inc. of New Ipswich, NH in an amount not to exceed $184,000. Funding will be through: Department: 161 - Street; Fund: General; Activity Description: Main Street. Discussion: The Main Street Mid-Block Crosswalks project includes improvements to two crosswalks, one located near the intersection of High Street and the other near the intersection of Eldridge Street. These crosswalks will be similar to the two existing mid-block crosswalks located at the Main Street Bridge and near 100 Main Street. In anticipation of this work, the City is purchasing the granite and brick materials needed for this project. Recently, Hutter Construction, Inc. was approached for a quote to perform the installation of these crosswalks to keep the Main Street project on schedule for completion this year. Attached is a proposal from Hutter to complete both crosswalk improvements for a total cost of $164,060 by the end of this year. In order to ensure completion of the project by the end of the year, a twelve percent (12%) contingency has been added to the proposal cost to allow for any unknown conditions during construction. The price submitted by Hutter is reasonable. Hutter is constructing crosswalks for the City on Manchester St and Concord St with satisfactory results. Further, Hutter has recently successfully completed similar sidewalk and crosswalk improvements for Rivier University. October 22, 2015 Paving Program Status Update as of 10/19/15 Streets to be paved Status Name From To Dow St Summer St Lock St Completed Haines St Arlington St Gillis St Completed Rogers St Concord St Webster St Completed Stanley Ln Entire length Completed Cross St Lock St Summer St Completed Freemont St (Including Dublin St Dublin Ave Woodland Dr Completed intersection) Ritter St Kinsley St Ross St Completed Mulberry St Chestnut St Walnut St Delayed due to required sewer work. Holbrook Dr Yarmouth Dr Nutmeg Dr Completed Boulder Cir Entire length Completed Faxon St Entire length Completed Tolles St Courtland St Whitney St Completed Kinsley St Hanover St Main St Delayed due to required sewer work. Canal St Howard Ct Jackson Ave Delayed due to required sewer work. Manchester St Concord St Ferry Rd Completed Ledge St 165 Ledge St Seventh St Completed Major utility work is planned. Milling and patching distressed Main St Allds St Orchard Ave areas for the winter will be completed by others. East Hobart St Entire length Completed Sewer Project Streets Belmont St Entire length Completed Grove St Whitney St to Lock St Completed Robinson Ct Entire length Completed Eldridge St Entire length Reclaimed & base paved. Final paving October* Oak St Entire length Reclaimed & base paved. Final paving October* Whitney St 61 Whitney St Tolles St Reclaimed & base paved. Final paving October* Cross St Holman St Lock St Completed. *Final schedule to be determined. Schedule dependent upon progress with preparation work. Paving schedule is also weather dependent. City of Nashua, Public Works Division To: Board of Public Works Meeting Date: October 22, 2015 From: Eric Ryder, Superintendent Street Department Re: Purchase of four Swenson EV100 1056SS Stainless Steel V-Box Spreaders. A. Motion: To approve the purchase of four Swenson EV100 1056SS Stainless Steel V-Box Spreaders from H.P. Fairfield, Pembroke, NH for the price of $10,500 each for a total purchase of $42,000. Funding will be through Department: 161 Streets; Fund: Prior Year Escrows; Account Classification: 71 Equipment. Attachments: Quote sheet and Dealer letter Discussion: The Street Department went out to bid April 25, 2014 to up-fit four, six-wheel dump trucks purchased in March 2014. This bid included the purchase of Stainless Steel V-Box Spreaders. H. P. Fairfield has offered to hold the pricing of the sanders to the price quoted per the bid. The current tailgate spreaders are showing signs of excess wear and corrosion. The stainless steel drop in sanders with ground speed controls will more effectively control the amount of material being applied, and they are preferable as the stainless sanders have a 20 year life expectancy plus the ability to mount the sander onto a different truck should there be a need. Board of Public Works Meeting of October 22, 2015 Department Report Street Department  Main Street Sidewalks. Work on Block 3 continues with the installation of underground drainage. The brick ribbons continue to be installed along with the brick work in front of Nashua Bank. The framing and pouring of the remaining concrete pads on Block 3 will continue the week of 10/12. The electricians along with the traffic technicians have been working to get the street light on Blocks 4 & 5 working.  Sidewalks. Crews have installed new concrete sidewalks along Lake Street from Lewis Street to Monroe Street.  Potholes. Crews have filled over 35 potholes this month along with patching manhole and catch basin excavations.  Manhole Repairs. Crews continue to repair manhole and catch basin frames that had become compromised this past winter. Some of the repair work was minor with just new pavement while others required new frames and covers or a completely new structure.  Street Sweeping. The sweepers continue to clean the residential areas. The downtown sweeper has been working keeping the inner city clean.  Signs and Pavement Markings. Over the past month more than 25 signs have been replaced or repaired including Stop signs, several street name signs and several parking regulations. We have also been recoating thermoplastic markings along major routes at night. Crosswalk painting continues on every suitable weather day. The Crew has been painting the overnight parking spots.  Fleet Department. Preventative Maintenance is scheduled and performed daily on all DPW department vehicles. Backline plow trucks are being readied for winter operations. State inspections on the fleet currently at 99 % completed with the remaining backline trucks in the repair process.  Weld Shop. The Welders are repairing body rot and corrosion on the beds, bodies and tailgates on various trucks. Plows are being repaired for winter.  Traffic Signals. The traffic signal technicians investigated and/or fixed calls for 20 traffic signals. There were 4 after hour call in’s for signals not working properly. We also assisted other departments by installing variable message boards at several locations for different projects. We installed the street light poles on Block 4 & 5. The crew has installed the new solar crosswalk at Hills Ferry Rd. @ Manchester St. Parks & Recreation Department  2015 Trips. Our next trip will be to New York City in December. Followed by a trip to see Cirque Du Soleil and then to a Bruins Game. Please look at the website for details.  Holman Stadium. The stadium is in maintenance mode. There will be facility and field work to do for the remainder of the season.  Stellos Stadium. The fall season is in full production. The stadium has a very busy schedule for the fall. Playoff schedules will be posted as they become available. 1  Fall Ball. The fall baseball programs are wrapping up for the year. This instructional step up program helps develop player skills.  Ball field Maintenance. Work has been completed at the Haines Street complex as well as Murray Field and Ledge Street. The next complexes scheduled for work are Shady Lane and Lyons Field.  Centennial Pool. Work has started on the renovations at the pool. A set of stairs, new coping and a liner are scheduled for installation this fall.  Pools. The pools are being winterized for the season. Meetings were held with the pool coordinators to develop maintenance list for 2016.  Gate City Fall Festival. The Fall Festival was held on Saturday October 17th. A parade was held going up Main Street which ended at Holman Stadium. At the Stadium there were crafts, games, performances and a costume contest.  Biddy Basketball. The 2015 / 2016 season is underway. Tryouts have occurred and the draft was held. Practices start up in November.  Fright Night. Fright Night is scheduled for Friday October 30th at Greeley Park. The nun will start at 6:30. Please join us for a haunted hay ride and try to get through the garden maze of terror.  Columbus Day Soccer Tournament. The holiday weather provided a wonderful weekend for over 150 teams to travel to Nashua. Games were held at the Main Dunstable Fields, Mine Falls Park Fields and Stellos Stadium.  Roadside Mowing. Road side mowing of the levies, trails and intersections is ongoing and should continue through mid-November.  Main Street. Trees, plants and irrigation work are being done as the sidewalks are completed. Plant and tree maintenance continues to be done along all of the existing beds along Main Street.  Broad Street Parkway Tree Planting. The planting of 330 trees started on October 12th. This project is scheduled to be completed by the end of the month.  Bicentennial Park. The park rehabilitation work is underway. Demolition and the moving of the monument were complete over October 8th – October 11th. The project is scheduled for completion this fall.  Mine Falls Park Red Trail. All of the City approvals have been secured. There are still some environmental permits that are coming in. Mobilization will begin as soon as these permits are received.  Summerfun. Our 2016 fund raising campaign will be beginning soon. A recap of the 2015 season will be presented in November.  Senior Outing. The 2015 Outing is scheduled to be held on Sunday November 8th at the Crowne Plaza Hotel. The event is sold out. Engineering Department  CSO# 005 and CSO # 006 Screening and Disinfection Facility. Certificate of Occupancy has been issued and a follow up training session was held on October 6th.  Burke Street Sewer Phase 2. Two construction crews and two lining crews are working to install/remediate lateral service connections for sewer and drainage.  2015 Sewer Replacement Project. Pennichuck is continuing their work on the water line in Temple St. Defelice has completed the sewer surface patches from East Hollis St to Amory St. 2 The sewer replacement effort between Franklin St and Auburn St is complete with the section to be lined scheduled for this month.  2014 Sewer Replacement Project. Sidewalks restoration and final pavement on Belmont St were completed.  Main Street Sidewalk Improvements. Engineering is overseeing construction while coordinating material purchases and construction contracts with outside vendors. Construction on Block 3 is nearing completion with just brick, planting, irrigation and electrical work remaining. The two remaining mid-block crosswalks are in the process of being contracted out for installation this year.  CDBG Manchester/Concord St Crosswalk Improvements. Hutter Construction has completed two of the crosswalks in front of the Mt. Pleasant St School and is continuing with the Concord St and Orange St location. Paving in the vicinity of these three locations is complete as part of 2015 Paving Program.  Concord Street Crosswalks. Initial work on the Concord St crosswalks is being staged. Some drainage adjustments are required to meet the intent of the work effort.  East Hollis Railroad Crossing. Scheduling and other logistical elements have held up progress on the project. Engineering continues to work with DOT toward moving the project forward.  2014/2015 Street Paving Program. Manchester St paving is complete. East Hobart St, Oak St, and Whitney St are scheduled for the week of October 19. This will conclude paving for the year.  Amherst Street Improvements - Charron Ave to Diesel Road. Work continues on easement documents and utility relocation. Project to be rebid for spring construction.  Merrimack River Levee. The annual inspection with the USACE took place on September 16. Staff from the NHDES Dam Bureau were also in attendance.  Legacy Park-Cleveland Street. No bids were received on Sept 17 with construction scheduled for this fall. It was determined that due to the lead time required for the playground equipment; construction of the park would be better served if it is in spring 2016. The project was re advertised with a bid opening on October 30th.  Yudicky Park -Access Road. The project was advertised on August 24. Three bids were received on Sept. 9. The City selected J Parker & Daughters, the qualified low bidder, and construction is scheduled to start early-mid October.  Site Development Review. Engineering has reviewed the following Site Development and Subdivision plans: 323 Daniel Webster Highway, 621 & 625 Amherst St, 104 Canal St, and 19 Conant Rd.  Street Acceptance. Engineering is working on the street acceptance of a portion of Cherrywood Dr, Moonstone Ct, Tamora Ct and Annabelle Ct. Three abutters have contacted us and we are working with the developer to resolve those issues.  Construction Bond Guarantee. Bonds were reviewed and reduced for 260 East Dunstable Road and new bonds were reviewed for 242 Main St (CVS).  Construction Inspection. The inspectors have provided inspection for the following projects: 2014 Paving Program, 2014 Sewer Rehabilitation, 2015 Sewer Rehabilitation, Burke St Sewer Rehabilitation, Monis Farms Phase 2, 270 Amherst St, Rivier Crosswalk, 565 Amherst St, Lovell and Ash Senior Housing project, Gagnon Farms and inspections for sewer service repairs throughout the city.  Engineering Survey. Ongoing survey projects include: Southwest Park trail layout, Bicentennial Park layout, ROW for Hartwell Brook, Dawn St, Crown Hill Pool and Fowell Ave, 3 Research of Mechanic St, raised crosswalk survey at Reservoir and Ledge Sts, Warner St survey, Whitney St grading issue and Eldridge St survey.  Street Opening Permits. Engineering issued 87 Street Opening Permits and 10 Permits to Encumber in September.  Sewer Permits. Six sewer permits were issued and $1,180.00 in fees was collected from September 1 to September 30, 2015. Solid Waste Department  Landfill Gas Expansion Project. Work started on October 8th on the Landfill Gas Expansion project one week ahead of schedule. The project includes the installation of 8 new vertical wells and 8 horizontal collectors. Completion of this work is expected by the second week of November.  Recyclables Shipped in September 2015. 373 tons of single stream recycled materials 22 tons of electronic waste 14 tons textiles and Books 1047 fluorescent bulbs and ballasts 500 gallons of waste oil 3 boxes rechargeable batteries  Recycling Bins & Carts. 92 recycling carts were sold in August. 30 recycling bins were given to 16 residents, including 2 new units 28 Trash carts distributed  Permits Sold 13532 Residential 621 Commercial  Collected Curbside MSW 5299 tons Soft Yard Waste 500 tons 4

Get email alerts for Nashua

A daily email when new agendas and minutes are posted.

Report an issue with this meeting