Budget Review Committee
Regular MeetingNashua, NH · April 3, 2014
Minutes
BUDGET REVIEW COMMITTEE
APRIL 3, 2014
A meeting of the Budget Review Committee was held Thursday, April 3, 2014 at 7:10 p.m. in the
Aldermanic Chamber.
Alderman-at-Large David W. Deane, Chair, presided.
Members of Committee present: Alderman-at-Large Lori Wilshire, Vice Chair
Alderman Richard A. Dowd
Alderwoman Pamela T. Brown
Alderman Ken Siegel
Alderman David Schoneman
Alderman Michael Soucy
Also in Attendance: Alderman-at-Large Brian S. McCarthy
Stephen M. Bennett, Esq., Corporation Counsel
John Griffin, CFO/Comptroller
Chief John Seusing, Nashua Police Department
PUBLIC COMMENT – None
COMMUNICATIONS
From: Traffic Safety Group
Re: Manchester Street and Shady Lane – School Zone Flashers with Speed Feedback Sign
(O-14-013)
MOTION BY ALDERMAN SIEGEL TO ACCEPT AND PLACE ON FILE
ON THE QUESTION
Chairman Deane
We’re going to make some subsequent alterations to the legislation as we move on.
MOTION CARRIED
UNFINISHED BUSINESS – None
NEW BUSINESS – RESOLUTIONS
R-14-009
Endorsers: Alderman-at-Large Lori Wilshire
Alderman Michael Soucy
Alderwoman Pamela T. Brown
Alderman-at-Large Jim Donchess
Alderman Richard A. Dowd
Alderman-at-Large David W. Deane
APPROVING THE COST ITEMS OF A COLLECTIVE BARGAINING AGREEMENT
BETWEEN THE NASHUA POLICE COMMISSION AND THE NASHUA POLICE SUPERVISORS
ASSOCIATION FROM JULY 1, 2011 THROUGH JUNE 30, 2015 AND AUTHORIZING RELATED
TRANSFERS
MOTION BY ALDERMAN WILSHIRE TO RECOMMEND FINAL PASSAGE OF R-14-009
Budget Review – 04/03/14 Page 2
ON THE QUESTION
Chairman Deane
We were given a handout. We should probably suspend the rules accept and place on file two
communications from Stephen Bennett. Both of them are related to the Nashua Police Supervisors
Collective Bargaining Agreement.
MOTION BY ALDERMAN DEANE THAT THE RULES BE SO FAR SUSPENDED AS TO ACCEPT TWO
COMMUNCIATIONS FROM ATTORNEY STEPHEN BENNETT REGARDING THE TWO NASHUA
POLICE SUPERVISORS COLLECTIVE BARGAINNING AGREEMENT
MOTION CARRIED
Chairman Deane
Attorney Bennett, do you want to walk us through these two communications you gave us this evening?
Thank you.
Attorney Bennett
The two copies of Article 14 attached. One is the final draft and the other one is the red lined. What
had happened was some language which had been previously negotiated, this is the third go around on
this Collective Bargaining Agreement and some previously negotiated language that stayed in and it
shouldn’t have. During the last negotiations, that language was deleted. I didn’t delete it when I did the
draft of the legislation. The deletions that occurred all relate to the named carriers. The legislation
before you now, the named carriers are still in the Article 14. Previously, they had been removed - R-13-
145 which was vetoed last November or December. The language I deleted had been contained in that
prior proposal.
Chairman Deane
You have given us two copies. The first copy should be the amendment made to the resolution that we
currently have and the second copy is what is currently in the resolution?
Attorney Bennett
No, there are two copies. There both the same. One is the red line and one is the non-red line version.
Chairman Deane
So the resolution that we have in front of us, does it have to be amended to reflect this?
Attorney Bennett
These pages have to be substituted in for the Article 14 that’s in the Collective Bargaining Agreement
attached to the original legislation.
Chairman Deane
So both pages have to go in there?
Budget Review – 04/03/14 Page 3
Attorney Bennett
Yes, and they are both the same except that one is for the red line version and one is for the clean copy.
Chairman Deane
Does everyone understand what Attorney Bennett said? I think we should move to amend R-14-009
which would be Article 14 would be amended with the handout that we were given this evening.
MOTION BY ALDERMAN DEANE TO AMEND BY REPLACING ARTICLE 14 WITH THE COPIES
ATTACHED TO ATTORNEY BENNETT’S MEMO ACCEPTED EARLIER THIS EVENING
MOTION CARRIED
Chairman Deane
The other item that Attorney Bennett gave us is a summary, would you please go over that with us?
Attorney Bennett
The one difference in this summary before we start is that you’ll see that this has been red lined also and
the language that has been red lined deleted is language that was in the prior proposal which was R-13-
145. There is some additional language added. This is just to show the difference between these two
resolutions. The first article is Article 10 – Vacation, again this was contained in the prior Collective
Bargaining Agreement which was not approved. There would be 25 vacation days after 15 years of
service as opposed to the existing contract which provides 25 vacation days after 16 years. So they are
getting an extra day of vacation one year earlier. The biggest change from this proposed contract and
the last one is in Article 14 – Insurances. There are two major changes there. While this proposal
adopts the increased premium for employees going from 80% to 70% for point of service and 90% to
80% for HMO’s and the increased deductibles. What it doesn’t include this time is the removal of the
named carriers. The named carriers are back in this proposal. The other major change had to do with
how the retro premium for healthcare was going to be paid back by the officers. Previously, they had the
option to pay off using accrued sick leave. In this one, they will be paying off back to October 1, 2011,
through payroll deductions.
Chairman Deane
It will be spread out through the duration of the contract.
Attorney Bennett
Yes, and it goes through until June 30, 2015. So they will be paying back what they owe for a little over
a year.
Alderman Siegel
I assume that our guests have seen the changes and everyone agrees. As a point of order, we have
substituted Article 14 but in fact, there is Article 10, 16, 19, 28, and 33 that I believe are part of this, is
that correct? Based on what you are saying, you just described a change to Article 10 – Vacation, is
that in the same ordinance we have already?
Budget Review – 04/03/14 Page 4
Attorney Bennett
The only reason you received those replacement pages for Article 14 is because there was some
language included in Article 14 shouldn’t have been.
Alderman Siegel
Only Article 14?
Attorney Bennett
Yes, only Article 14.
Chairman Deane
So now you are on Article 16.
Attorney Bennett
Article 16 – Educational Benefits. These changes were contained in the prior Collective Bargaining
Agreement presented last November. There are $250.00 increases to degrees held by the officers. It
went from an Associate’s Degree which there was an annual bonus of $250.00 and it’s now $500.00. A
Bachelor’s Degree has been at $750.00 and it’s now up to $1,000.00. A Master’s Degree was at
$1,000.00 and is now at $1,250.00. Article 19 – Bereavement Leave. Again, that was part of the
previous proposed contract and that increases the number of consecutive days for bereavement for the
death of a close family member, a parent, spouse, or child. It goes from 3 to 4 days. Article 28 –
Wages. These wages that are proposed are the same as the prior contract. FY12 – Lieutenants 2%,
Sergeant’s 1%, FY13, Lieutenants and Sergeants both receive 1% wage increases. FY14 Lieutenants
and Sergeants receive 2.2% wage increases and FY15, there is an across the board of 2.5% wage
increase.
Chairman Deane
So when we look at the financial analysis given my Mr. Griffin did he take the difference between the 2%
for the Lieutenants and the 1% for Sergeants and come up with a 1.3% increase overall?
Mr. Griffin
Yes, that’s what I did.
Attorney Bennett
The final article is Article 33 – Term of Agreement and that would be from July 1, 2011, through June 30,
2015.
Chairman Deane
The contract analysis can be found with the resolution. It’s the third page in. Mr. Griffin, would you
please provide us with an overview of that.
Budget Review – 04/03/14 Page 5
Mr. Griffin
This analysis has been provided most recently in November as Attorney Bennett indicated. This
analysis captures the head count of the officers in the Supervisor’s Union, it captures the differences in
pay raise between the Lieutenants and the Sergeants. It calculates the base pay rate increase for each
year of the contract. It provides the other salary related costs such as overtime, longevity, holiday pay,
etc. That’s the pay side, the payroll side of the equation. This analysis is very consistent with prior
analyses in that it captures the retirement costs associated with this contract to include the city portion
pension paid to the (NHRS) New Hampshire Retirement System. Finally, as well as to the extent
applicable, FICA and Medicare. The bottom of the equation is the insurance benefit cost to include
health insurance, dental insurance, life insurance, and the changes associated with those in the years
FY12 through FY15, projected. It captures a total cost by year, in the case of the increase or decrease
in the prior year and then divides the result by the number of officers to get an average compensation
rate and it carries the average compensation rate increase from year to year. It’s not a cumulative look.
It could be done, I think individuals have indicated that in the past, that could be done but these
percentage increases are for the annual increase from the prior years.
Chairman Deane
Does that number include the payback?
Mr. Griffin
That’s a good question. Let me call your attention to line 47 - Employee Contributions. The amounts
paid by the subscribing officers, this is the retro payments estimated as of October 1, 2011. This
captures their contributions although the contributions, as Attorney Bennett indicated, would be paid
back once the contract gets in place and the payroll and benefits department – this attempts to show the
retroactive payments each year.
Chairman Deane
So what is coming back to the city is the $143,727, the $119,528, and the $64,262?
Mr. Griffin
One way of looking at this is if we look at the base share which was FY11, the officers collectively
contributed $64,262 and in FY12 it’s a nine month increase for the 10% increase that Attorney Bennett
indicated so the $119,528 is a full year at 10% and nine months at the additional 10%. FY13, FY14, and
FY15, it’s essentially 20% of the cost of the healthcare insurance as shown on the previous line 46. In
summary, this shows the contributions by the officers as it would have occurred had this contract been in
place beginning FY12 and that’s important because the increase in compensation is going to be
retroactive to that date. The other point to mention is that from time to time we talk about the NHRS,
that employer rate increases every other year. That’s why you see pretty large increases in the odd
years and then the year that they don’t increase the rate, we increase the pay so there’s a percentage
increase just because of the pay increases.
Chairman Deane
I was looking at the fluctuation of those numbers there. Does anyone have any questions for Mr.
Griffin? Does the police department have any comments they would like to make?
Budget Review – 04/03/14 Page 6
Chief Seusing
The only comment that I would make is that this contract that is before you contains what the board had
asked for the last time it was down here which pertained to paying back the healthcare retroactively with
real dollars versus the sick leave. This proposal contains that. I think as most of the board members
know that that union is going on almost three years without a contract and I can tell you that the
members of that union have worked as hard as they would have if they had a contract in place. Their
dedication has not faltered one bit. I have noticed it, I know that the commissioner has noticed it as well
as the deputy’s and that means quite a bit to me. I am certainly concerned that we are pushing three
years without a contract now and I’m hoping that with this proposal in front of you, with them paying back
the healthcare retroactively, which was asked by nearly the entire board last time around, I am hoping
this time around it gets through.
Chairman Deane
It was asked for after it was vetoed. Let’s be clear about that.
Chief Seusing
Yes.
Alderman Schoneman
Typically, if someone is hired and goes to the academy and gets trained starting out from scratch, how
long will it be before they become a sergeant? How many years of service does an officer have to
become a sergeant and to become a lieutenant?
Chief Seusing
It varies but I would say a fair average number to become a sergeant would be at least 10 years and
then once you become a sergeant, you would probably be a sergeant for 4 or 5 years before you
become a lieutenant. Those numbers change but I think that’s a fair number. For example, I was on the
job for a total of 12 or 12 ½ years before I made sergeant and 17 years before I made lieutenant.
Alderman Schoneman
The average annual total compensation package, how do these figures compare to other cities in the
state and if you have a sense of how other cities might apportion compensation among all of this
categories to arrive at a similar or different number?
Chief Seusing
We had done a comparison probably a year and a half ago in regards to the supervisor’s contract and
with these pay increase that are in this proposal, it keeps our sergeants and lieutenants competitive with
New Hampshire State Police and the Manchester Police Department, which are really the two agencies
that are similar in size. Specific to Manchester, my recollection in comparing our wages with their
wages, the benefit that we saw with the Manchester contract was that the more time that you had on, the
more senior you were in a supervisor’s rank. At the lower end, our younger supervisors were slightly
ahead of their supervisors with the same time level but as you went on and became more senior they
would bypass us to some degree. With this proposal, we are competitive and in line.
Budget Review – 04/03/14 Page 7
Alderman Siegel
I am very much in favor of this and I would hope that this would be unanimous. I’d like for anyone in
doubt, maybe here or in the T.V. audience, I’d like to point out the cost of losing people because it’s
easy for people to focus on the percentage of increase and say that’s big, we shouldn’t be paying any
money. You are talking about sergeants, captains, people that have had probably $100,000 worth of
training invested in them over the years.
Chief Seusing
At least.
Alderman Siegel
To even lose one or two people to attrition, separate from the obvious value of the experience level, is
incredibly expensive and I want people to take a look at the much broader picture and look beyond the
1/2 or 1 %. Take a look at the absolute value that the officers are being considered here and the cost
of losing them. I would urge everyone to vote for this and I think it’s very fair.
Alderwoman Brown
I would like to thank your officers for their patience for being without a contract for so many years
acknowledge that we appreciate their work for us. They risk their lives every day and I also hope that we
approve this unanimously.
Chief Seusing
Thank you very much.
MOTION CARRIED
Chairman Deane
I talked to Ms. Lovering and we have to meet our 30-day criteria so this will be on our next full board
th
agenda on April 8 .
R-14-011
Endorsers: Mayor Donnalee Lozeau
Alderman-at-Large Daniel T. Moriarty
Alderman Sean M. McGuinness
RELATIVE TO THE TRANSFER OF $200,000 FROM DEPARTMENT 194, ACCOUNTING
CLASSIFICATION 70 – CONTINGENCY INTO EXPENDABLE TRUST FUND #7038 “DPW
SNOW REMOVAL FUND”
MOTION BY ALDERMAN DEANE THAT THE RULES BE SO FAR SUSPENDED AS TO ALLOW FOR
THE INTRODUCTION OF A COMMUNICATION RECEIVED AFTER THE AGENDA WAS PREPARED
MOTION CARRIED
Budget Review – 04/03/14 Page 8
Chairman Deane
I spoke with the Mayor today about this and I told her that I thought it would be prudent for her to issue a
memo on her position on the transfer of contingency money into the snow account. I said that it seemed to
me that we are pretty much done with winter and there was no need to buff this account up. Normally,
what we have done is through the escrow process is where we have unexpended appropriations from a lot
of different areas. We look at replenishing the trust account at that point in time and right now since there
is still funds available to the tune of $34,231.00 and with April now upon us she felt comfortable to take this
resolution as she has stated in here and indefinitely postpone it. That’s the gist of the memo that was sent.
MOTION CARRIED
Alderman Siegel
If we indefinitely postpone, does that mean that the legislation is still pending and the funds are frozen?
Chairman Deane
It’s pending until the board takes final action at our next full board meeting. As soon as that happens, and
the seven day timeframe after that then the funds are freed up at that point in time.
Alderman Siegel
So if it were a case that we indefinitely postponed and it remains in committee and then that $200,00
remains in limbo?
Chairman Deane
Right but we are going to move to recommend indefinite postponement to the full board and it’s going to
be pushed onto our next agenda.
Alderman Siegel
So the money would be freed up?
Chairman Deane
Absolutely.
MOTION BY ALDERMAN SIEGEL TO ACCEPT AND PLACE ON FILE
MOTION CARRIED
MOTION BY ALDERMAN DOWD TO RECOMMEND INDEFINITE POSTPONEMENT
MOTION CARRIED
Budget Review – 04/03/14 Page 9
R-14-014
Endorsers: Alderman-at-Large Brian S. McCarthy
Alderman Richard A. Dowd
Alderman-at-Large Lori Wilshire
Alderwoman Mary Ann Melizzi-Golja
Alderman-at-Large Diane Sheehan
AUTHORIZING THE MAYOR AND CITY TREASURER TO ISSUE BONDS NOT TO EXCEED
THE AMOUNT OF EIGHT MILLION SEVEN HUNDRED AND NINETY THOUSAND TWO
HUNDRED AND FIFTY DOLLARS ($8,790,250) FOR BROAD STREET ELEMENTARY SCHOOL
HVAC IMPROVEMENTS AND BUILDING RENOVATIONS
MOTION BY ALDERMAN DOWD TO RECOMMEND FINAL PASSAGE
ON THE QUESTION
Alderman Dowd
We have done a great deal of preliminary costing on this and we have the analysis on this which includes
the additions. The number is not something that is cast in concrete for a two reasons, one is that they are
still doing some of the pricing but it won’t exceed this, and the other thing I’d like to point out is that on the
last three projects when we have finished, we have scrutinized the funding and the spending of it to have
monies left over. The last project we had almost $2 million left over to put towards this project and this
project will get the same kind of scrutiny on spending.
Alderman Wilshire
I just want to know on this project what happens during the construction period like with the gymnasium
and that kind of thing. Is that going to be cut up into classrooms like we did prior?
Alderman McCarthy
Yes.
Alderman Wilshire
So their Phys. Ed. Program won’t be offered during that construction phase?
Alderman McCarthy
They’ll do whatever they can but the gymnasium will have classrooms built in temporarily. The last thing
we do is refinish the gym after the classrooms are torn down.
Alderman Siegel
I’d like to thank my colleague Alderman Dowd for providing me with some information that I needed to
better evaluate this. I’d also like to thank my colleagues Alderman’s Dowd, McCarthy, and Deane. I
managed to go back and read an entire years’ worth of minutes of the Building Committee and the Joints
Special Committee to get a feel for the types of discussions that were held and the analysis that was done.
I can confirm what Alderman Dowd has said, there was definitely a lot of scrutiny and a lot of good thought.
I went into this not understanding anything about what it was that we were getting a bond for and it was
helpful to read those discussions.
Budget Review – 04/03/14 Page 10
Alderman McCarthy
I just wanted to point out that there is an option – I had deliberately structured the resolution so that the
Budget Committee whether we wanted to do the addition or not. I think the addition is a very useful thing to
do. It addresses some security concerns but I was concerned that it is about 10% of the hard construction
cost so I would point out that it’s actually a little more expensive than what is in here. The good news is
the overall project cost went down by $46,000, the bad news is the alternate went up by $23,000 so the
total project cost only dropped by about $23,000 which is something that we will true up at the end.
Chairman Deane
I know that in some of the meetings we have had and some of the meetings which I attended where you
were a major part of the discussion on the change in the entryway and the little bit of heartburn that went
on with what the cost was but there are two things that I think you should explain. One is the citizens up
there were concerned about the fire access road around the building, the buffer and things of that nature
should be spoken to somewhat. The other thing I look at is that we just made a significant investment in
school security throughout the city and this current situation, and I’m not saying that it puts the children in
peril and danger but it isn’t the most prudent way to get students in and out of a building the way it’s being
done now. I would rather look at the safety end of it where the school is going to be in disarray and the
contractors going to be on-site. Everything is going to be mobilized and it’s kind of a tough pill to swallow
financially but I think from a safety standpoint, now is the time to do it and be done with it. It should have
been done – the whole design of that building is rather odd to begin with. Can you explain what’s been
done about the fire access road?
Alderman McCarthy
There are a couple of things that I’d like to point out about the construction. We had a meeting with the
abutters a while ago and they were concerned, particularly the one who is at 11 Upstone which is the
corner house because the fire marshal had asked us to put a road around the entire school which is what
we’ve done virtually with all of the ones we’ve rebuilt so we can patrol or get emergency vehicles around
them. That one required significant grading and cutting into the buffer area that existed. After one of the
discussions, I had asked the architect and the construction manager to go back and look at what it would
take to do a turn-around rather than continue the road back to the grade. The school has wings that stick
out and it is possible to back a truck in between two of the wings and turn around. The Planning Board
made that a stipulation – to not continue the road back down to Upstone but rather to just end it there and
do a turn-around. The fire marshal’s office said they would be okay with that as long as the turn-around
was large enough to accommodate the largest truck which turned out to be a little bigger than I expected
and would have liked and as a result we don’t save much by not finishing the road. It turns out the cuts
and fills to do the grading are about the same. I drove by the site earlier this week just to take a look at the
affect it would have and the construction is up on a plateau and it does not bring it down into the area
where it would cut directly across the abutter’s buffer to the front of the school. I was pretty happy with the
way that came out and the neighbors were reasonably happy with that. I think the addition to the front at
the entrance is in fact a really good idea, I was just concerned that it is costly. In the interest of full
disclosure, my wife does work at that school and gets to watch the process of loading and unloading kids
everyday which is not the most organized thing in the world. There is an intent to straighten out some of
the waiting area for cars because right now there is a lot of conflict between parents arriving for drop-off,
meetings at the school, staff trying to park, and buses arriving and I think that’s all fixed. There will be
significant enhancements to the mechanical systems – we will be putting penthouses for the equipment at
the end of each of the wings so that they are easier to maintain and will be closer to the classrooms. The
building will also be converted displacement like we have done in some of the others which has had great
advantage at Fairgrounds and at Amherst and Charlotte, Ledge, and Fairgrounds Elementary. Overall, I
Budget Review – 04/03/14 Page 11
am very happy with what we are going to get out of the project. The roof sections that are not new will get
replaced so that we won’t have to do roof repairs five years out like we’ve done with other schools. I’ve
tried with all the schools we have done that they are in good shape for a long time to come and we use
surfaces that are long lasting. It’s the last six schools that we have come in substantially under budget.
Chairman Deane
The preferred contractor agreement, I was led to understand that the electrical went out to bid and an
employee of the school district informed the construction manager that their preferred contractor for the
technology wiring and phone system is to be this company so you let the electricians know that are bidding
on this job that this is who they are using regardless of the price. It’s also my understanding that their price
was $9,000 more than the next guy for the same product. I’m a little bit concerned about that. Number
one I am concerned that a school district employee would be giving dictation to contractors who are bidding
that they must use somebody. This is cabling, a lot of people do it.
Alderman McCarthy
Are you talking about Broad Street?
Chairman Deane
Yes.
Alderman McCarthy
We haven’t let contracts on any of those things yet.
Chairman Deane
Well, the contracts haven’t been let but that’s what is going on. I will get you all of the information you
want. I cannot see that as being a process that is about board.
Alderman McCarthy
Yes, please do. Those are typically competitively bid and the only times we don’t take the low bidder is if
we think the bid is non-responsive or the reputation of the contractor suggests we should do otherwise.
Alderman Dowd
All of those contracts will come through us for scrutiny.
Chairman Deane
I understand that but if you don’t know what’s going on behind the scenes, it is hard to scrutinize it.
Alderman McCarthy
One possible explanation for that is that we did select contractors for the security systems and it’s possible
that what they were told was make sure that the people bidding on the electrical contract for the work on
the school know that they will be working with the security contractor who was already selected.
Budget Review – 04/03/14 Page 12
Chairman Deane
Who was that?
Alderman McCarthy
I don’t know.
Chairman Deane
Does the security include the phone system?
Alderman McCarthy
It may, I don’t know. The parts of the phone system were redone as part of the normal school district
maintenance not as part of the reconstruction project. I’ll make sure we follow-up on that.
Alderman Dowd
The only thing I can think of is if that pieces of the project are already paid for. If part of the project is
putting in this wiring but it’s already been paid for. The security systems were paid for the whole school
district. Some of it wasn’t put it at Broad Street because of the construction.
Chairman Deane
It’s not the security, it’s the phones. The electricians were dictated to when they were bidding on the
project that they would use this contractor in your bid.
Alderman McCarthy
Well I will check on that but like I said, that may be because we had already awarded that bid through the
process of the security project.
Chairman Deane
This is for the work that’s being done, the work that we are asking to fund this evening.
Alderman McCarthy
I’m not sure that it is. We’ll look into it. Some of the security work that is in the scope of the security
project was pushed out for the schools that we know we’ll be renovating at the same time.
Alderman Siegel
In reading the minutes, it appears that the entranceway was also coupled with an increased view of
students’ security so that it isn’t just that we want to get vehicles in and out. It seemed that there was a lot
of attention how to make sure the building is secure and that access points are secure. Given that is the
case as I read it, I see that as mandatory in this day of age.
Budget Review – 04/03/14 Page 13
Alderman McCarthy
We have procedures to secure the building. The building had the door locks and cameras put in place last
year but the door is on the first floor and the office is on the second so one of the secretaries has to either
go down and let somebody in or buzzes them in with just seeing them on the camera. The kids are
brought in through a door that is behind the gym and there is an adult at that door when that door is open
so there is a procedure there to do the security. It’s a lot easier if you have the new walkway in the front
and in fact, it makes the building a lot more attractive. It puts a covered walkway. One of the things that
we were going to do if we didn’t do that alternative is to put a covered walkway behind the gym to that other
entrance. Right now the kids are walking from the outdoor environment right onto the surface of the
hallways so they track a lot of dirt and mud in and that increases cost and wear and tear on the place.
There is security and operational advantages to having that entryway there, it just does have a price tag
associated with that.
Alderman Dowd
The parking lot is also going to be a structured so that we can put all of the cars that are waiting for
students inside the school parking lot as opposed to being out on the streets which has caused problems
with traffic in the neighborhood. As part of the Planning Board’s findings, we are enlarging the visibility
openings of the access to Broad Street so that it’s not as dangerous getting in and out of there. There will
be better site lines, wider entrance, and the bus loop will be made easier for the buses to be able to turn.
Alderman Siegel
Obviously there’s interest in principal payments that show up and there’s, and I assume a bonding fee.
Does that show up in the school budget or in the general city budget.
Alderman McCarthy
The city budget.
Alderman Schoneman
I understand that it’s not part of the spending cap, is that correct.
Alderman McCarthy
Yes and no. It’s not an annual expenditure. What is part of the spending cap unless we exclude it under
the provisions of Section 54 in the charter is the yearly principal and interest payments on the bond.
Alderman Schoneman
That is included or is not included?
Alderman McCarthy
That is included.
Alderman Schoneman
So, the principal and interest are subject to the spending cap?
Budget Review – 04/03/14 Page 14
Alderman McCarthy
Yes, the budget includes in one of the departments the bonded debt service which is principal and interest
payments. That is considered part of the spending cap.
Alderman Schoneman
I was told that it was not.
Alderman McCarthy
We have the option to exclude it by a vote of ten aldermen if we want to do that and we have done that on
some occasions but typically not. I would point out that with respect to the bonded debt service, if you look
at where the number has been historically, it was very low compared to other municipalities for many years
and we had a back-up of capital projects and once we got the high school projects in place, they have a
very large principal and interest payments that started out around $14 million a year and have come down
by $700,000 to $1 million a year so in essence, if you look at what happens to the debt service base strictly
on this bond, it probably won’t change because we will erase a $700,000 on the old bonds and at the same
time, if we let $7 million bond, for example, the first years payment would be about $700,000. It was
actually a very good time for us to do that and make sure we keep that debt service level but keep up with
the infrastructure investments.
Alderman Schoneman
I wasn’t aware that there was a $2 million surplus from previous projects? Was this an $11 million project
or are we bonding $8.7 and we are going to use $2 million out of….
Alderman McCarthy
The current balance is $1,048,000 and the construction left to do is $9.838 million so the bond then is
therefore for the difference which is about $8,790,000.
Alderman Schoneman
So the $8,790,000 that’s net of?
Alderman McCarthy
That’s $9.838 minus $1,048,000.
Alderman Schoneman
Was the surplus on previous projects typical and would we hope for something similar in this case.
Alderman McCarthy
We typically end up not spending the contingency at all. We are very careful about modifying the contract
to require a vote to expend the contingency money in other places that contract allows the construction
manager to make that decision. We have been very frugal with contingency money. Net of having to do
an additional $2 million in hazardous materials abatement, we still came in at about $6 million under. We
carried that over and we had over $1 million left after we had done the three previous elementary schools.
Budget Review – 04/03/14 Page 15
It was a little more than that and some of it has been carried on what’s called the pre-construction services
which is the payments to the architect and the construction manager during the design phase. That
doesn’t actually show up in the budget which is the construction budget and that came out of the surplus
that was a little more than $1 million. Now we are down to $1 million left.
Alderman Schoneman
What do we envision the lifespan of these renovations to be.
Alderman McCarthy
We would like to see 30 years. The bonds are for 20 so we have to ensure that the life is 20. Some of
things will vary. The roofs require a guarantee of 20, the surfaces should last 20 – 30, and the construction
is masonry and not sheetrock so that should last indefinitely. The electrical systems have typically lasted
20 – 30 years.
Alderman Soucy
So it’s going to be 20 years at 4%?
Alderman McCarthy
It’s 5% of the principal so about $400,000 for that plus 4% interest in the first year which would be
another $300,000.
Alderman Siegel
That’s a little high. This is a not to exceed amount on the bond and the 4% is very conservative. At 4%
for 20 years, we have $639,206.28 a year. If we get a bond rate of 3% for 20 years we are down to
$585,006.24 a year. That’s an amortization over 20 years.
Alderman McCarthy
We don’t do it that way. We do constant principal payment which means it…we pay 5% of the principal
plus interest on the remaining portion on a yearly basis.
Alderman Siegel
So it would be less then?
Alderman McCarthy
The first year would be higher.
Alderwoman Brown
I would like to thank Aldermen Dowd, McCarthy, and Siegel for all of your hard work on this.
MOTION CARRIED
Budget Review – 04/03/14 Page 16
R-14-015
Endorser: Alderman-at-Large Brian S. McCarthy
APPROVING A $100,000 PAYMENT TO COTTON MILL SQUARE, LLC FOR WORK ON THE
RIGHT ABUTMENT OF THE JACKSON MILLS DAM
Chairman Deane
I had a conversation with Mr. Stabile this afternoon. I asked him to put together a timeline on what
exactly went on with this project and get it either to the administration or to me so everybody can have a
full understanding of how this whole thing played out and why. There seems to be some questions
about it, so I figured it would be better to have the facts put down on a sheet of paper for everyone to
review prior to taking it up. He was okay with that.
Alderman Dowd
Based on the view out the back windows at BAE over the last few days, it’s a good thing we had that
dam and it’s a good thing we fixed that side piece because the water flowing through there is pretty high.
Alderman Siegel
The idea being to table this in committee?
Chairman Deane
We can table it, and I’ll get the information for everyone so everybody can review it and take it up at our
next budget meeting.
Alderwoman Brown
I just want to mention there is a website, cottonmillsnh.com, if you want to look at the project for further
information.
MOTION BY ALDERMAN SCHONEMAN TO TABLE R-14-015
MOTION CARRIED
NEW BUSINESS – ORDINANCES
O-14-013
Endorsers: Alderman Ken Siegel
Alderman David Schoneman
Alderman-at-Large David W. Deane
Alderman-at-Large Diane Sheehan
Alderman-at-Large Jim Donchess
Alderman-at-Large Daniel T. Moriarty
Alderwoman Mary Ann Melizzi-Golja
Alderwoman Pamela T. Brown
Alderman Richard A. Dowd
AUTHORIZING THREE SCHOOL ZONE FLASHING SPEED LIMIT SIGNS AND
TRANSFERRING $30,000 TO FUND THEIR PURCHASE AND INSTALLATION
Also assigned to the Committee on Infrastructure; Favorable Recommendation Issued 3/12/14
Budget Review – 04/03/14 Page 17
MOTION BY ALDERMAN SIEGEL TO RECOMMEND FINAL PASSAGE OF O-14-013
ON THE QUESTION
Chairman Deane
Everyone got a copy of the memo from the traffic department. What I wanted to do was go to that. When
we had originally prepared the legislation what we did was we just kind of picked out random spots that
were in the general vicinity. “The engineering department proposes to install each of the school signal
flashers with speed feedback signs as shown on the attached engineering drawing as follows…” I don’t
know what happened to the drawings. I never got one of those. Oh, that’s with the other agenda. Okay.
I’m sorry. I talked to the Director of Public Works and asked that the engineers go out and take a look.
Alderman Siegel
The legislation is not very specific about the site; it’s an approximation. It’s my opinion that we don’t have
to make a change to the legislation to accommodate the recommendations for the exact locations that are
specified in the memorandum.
Chairman Deane
Their attached plans are appropriate. You would be right on the money with that assumption that no
changes need to be made which is a good thing. We don’t have to sit here and explain it to Alderman
Chasse and beat him to the punch. We did something right the first time. We’re only kidding.
Alderman Siegel
There was also a recommendation in one of the memorandums to change some of the wording to
eliminate solar and radar. I would object to that change only because I don’t think it’s necessary in the
legislation. I don’t believe that we’re going to get anything more energy efficient than solar. If radar
changes to something better in the far distant future, I’m sure that we can accommodate it if need be. The
specific signs that were recommended were ones that were recommended by Jeanne Walker in the traffic
department. They were the ones picked out by her. I want to avoid anything that would get in the way of
rapidly and efficiently implementing this legislation. It’s had a bumpy history, and I’d just assume not
change anything at this point. I don’t see the value at changing at this point.
Chairman Deane
We’re going to take Alderman McCarthy up on his school zone flashing speed limit sign signal locations
throughout the city and take a good hard look at other areas that have deficiencies and bring in some
additional legislation to take care of that. I think we should take care of everything all at once and not leave
anything hanging out there. That’s something we’ll have to work on.
Alderman Siegel
That would be separate legislation?
Chairman Deane
Yes, that would be separate legislation. I have an e-mail from the director of public works that gave me the
locations so we can look at the other school zones. I know Charlotte Avenue they’ve got their safe route
Budget Review – 04/03/14 Page 18
grant and the signals are all included so we don’t have to go up there. But we should look around. Broad
Street does have them. I think those got put in at the elementary school prior to the high school being built.
Alderman McCarthy
They have the flashers. They don’t have the radar units.
Chairman Deane
Right. I always thought those signs up there were kind of unorthodox. They are way, way, way up in the
air. When you’re driving and the sight distance, you’ve got to look up to see the thing. If we did go to
replace them, one of the things we looked at was not having a recurring cost of the PSNH bill with a
separate meter per signal and the piping and then the failure. Alderman Siegel is the one that did all the
research on it. When he looked at it, the solar seemed to be the way to go. Then when we showed it to
Jeanne Walker and the areas where we wanted to put them, there wasn’t any large trees blocking them or
things of that nature.
Alderman McCarthy
Speaking of that road and recurring costs, we also put the signals out there for a crosswalk in front of the
Red Barn when it was built as a convenient store. It’s not any use that attracts a lot of pedestrian traffic at
this point. I’m not sure it makes sense to leave the signalized crosswalk there that we put in a couple of
years back. I’ll mention that to Alderman McGuiness.
Chairman Deane
That is something we should maybe take a look at because that facility has changed.
Alderman Soucy
Cleveland Street, correct me if I’m wrong, I don’t think it has anything and the beauty is you would cover
two schools. You have the elementary and the junior high right there.
Alderman McCarthy
I wouldn’t bother with these at schools that are not on fairly high traffic roads that are tend to have
speeding problems. Cleveland Streets is one of the ones where I’m not sure we’ve had much of a speed
problem in front of there. Main Dunstable I don’t think needs them.
Alderman Soucy
I agree with Main Dunstable.
Alderman McCarthy
Sunset I think is fine. Dr. Crisp is probably okay. The ones I had in mind, the biggest one was basically
Amherst.
Budget Review – 04/03/14 Page 19
Alderman Soucy
I would agree with all of the schools with the exception of Cleveland Street having worked as a SRO. I do
have a lot of teenagers coming out of Forge Drive, Kingston Drive and they come flying through there. The
front of the school is good.
Alderman McCarthy
Alright.
Chairman Deane
I was just thinking about Amherst Street while we were there. How hard would it be to amend this just to
add it? The locations are already there. The poles are already there. We’d just be replacing the signals.
Alderman Siegel
It’s the funding source.
Chairman Deane
The funding source is already there too for that. Does anybody have any heartburn about adding Amherst
Street Elementary School to this? Those signals are already out there.
Alderman Dowd
Do they have any crossing guards during the comings and goings of students?
Chairman Deane
Yes they do, but that road is brutal.
Alderman Schoneman
Are you speaking about Sargents Ave.?
Chairman Deane
No, out on Amherst itself.
Alderman Schoneman
Sargents Ave. is kind of tough too just because it’s really easy to get going quickly down there. I agree that
Amherst Street is a bigger concern but Sargents there maybe some issues there too. Although we haven’t
heard any complaints about it, I just know from looking at it it’s fast.
Chairman Deane
It’s the widest street in the City of Nashua.
Alderman Siegel
Budget Review – 04/03/14 Page 20
While I’m empathetic to your suggestion because we could just keep adding until we fill the bucket, I am
concerned. I think Alderman McCarthy was going to take the lead on taking a look at some of the other
schools. We could probably put the other one in that.
Chairman Deane
I know where you’re going with this. We’ll let it be. I don’t want to make Alderman Chasse happy.
MOTION CARRIED
GENERAL DISCUSSION
Chairman Deane
I’m in the process of putting the budget review session dates together. I don’t plan on piggy-backing any
other committee meetings. I’m not going to do that. We’re not going to do this after finance or human
affairs. I’m just not going to do it. Sue got me some copies of that so pretty soon we’ll have that out for
everyone to look at.
PUBLIC COMMENT – None
REMARKS BY THE ALDERMEN
Alderman Schoneman
We’re having a Ward 3 meeting on Monday, the 7th, at 7 PM at the Amherst Street School in the media
room. It’s just general information, a chance to hear constituent concerns and update them on what’s
happening here at the Board of Aldermen. That’s this coming Monday.
Alderman Wilshire
I know we had talked about doing some work in this Chamber. One of the things that I find hard to deal
with is the lighting in here. When you are here for two, three, four hours for a budget meeting. The
lighting especially right here. That desk not so bad but when I sat over there, the same thing. The
lighting is so bad.
Chairman Deane
Are those fluorescent lights in those? I wonder if they put LEDs in them if that would make a difference.
Alderman Wilshire
Anything would make a difference, I think. I think the lighting is so poor in here that after two or three
hours of sitting here looking at a budget book…
Chairman Deane
I’ll pick some bulbs up and bring my ladder in and change them.
Budget Review – 04/03/14 Page 21
Alderman Wilshire
Perfect. Good job. Thank you. All I had to do was ask, right?
Chairman Deane
That’s right.
Alderman Wilshire
Perfect.
Chairman Deane
That will take care of it.
Alderman Dowd
The fixtures used to be candles when this first opened.
Alderman Wilshire
They still are.
POSSIBLE NON-PUBLIC SESSION
ADJOURNMENT
MOTION BY ALDERMAN WILSHIRE TO ADJOURN
MOTION CARRIED
The meeting was declared closed at 8:20 p.m.
Alderman Ken Siegel
Committee Clerk
Agenda
BUDGET REVIEW COMMITTEE
APRIL 3, 2014
Immediately Follows
Special Board of Aldermen Aldermanic Chamber
ROLL CALL
PUBLIC COMMENT
COMMUNICATIONS
From: Traffic Safety Group
Re: Manchester Street and Shady Lane – School Zone Flashers with Speed Feedback Sign (O-14-013)
UNFINISHED BUSINESS – None
NEW BUSINESS – RESOLUTIONS
R-14-009
Endorsers: Alderman-at-Large Lori Wilshire
Alderman Michael Soucy
Alderwoman Pamela T. Brown
Alderman-at-Large Jim Donchess
Alderman Richard A. Dowd
Alderman-at-Large David W. Deane
APPROVING THE COST ITEMS OF A COLLECTIVE BARGAINING AGREEMENT BETWEEN
THE NASHUA POLICE COMMISSION AND THE NASHUA POLICE SUPERVISORS ASSOCIATION
FROM JULY 1, 2011 THROUGH JUNE 30, 2015 AND AUTHORIZING RELATED TRANSFERS
R-14-011
Endorsers: Mayor Donnalee Lozeau
Alderman-at-Large Daniel T. Moriarty
Alderman Sean M. McGuinness
RELATIVE TO THE TRANSFER OF $200,000 FROM DEPARTMENT 194, ACCOUNTING
CLASSIFICATION 70 – CONTINGENCY INTO EXPENDABLE TRUST FUND #7038 “DPW
SNOW REMOVAL FUND”
R-14-014
Endorsers: Alderman-at-Large Brian S. McCarthy
Alderman Richard A. Dowd
Alderman-at-Large Lori Wilshire
Alderwoman Mary Ann Melizzi-Golja
Alderman-at-Large Diane Sheehan
AUTHORIZING THE MAYOR AND CITY TREASURER TO ISSUE BONDS NOT TO EXCEED
THE AMOUNT OF EIGHT MILLION SEVEN HUNDRED AND NINETY THOUSAND TWO
HUNDRED AND FIFTY DOLLARS ($8,790,250) FOR BROAD STREET ELEMENTARY SCHOOL
HVAC IMPROVEMENTS AND BUILDING RENOVATIONS
R-14-015
Endorser: Alderman-at-Large Brian S. McCarthy
APPROVING A $100,000 PAYMENT TO COTTON MILL SQUARE, LLC FOR WORK ON THE
RIGHT ABUTMENT OF THE JACKSON MILLS DAM
NEW BUSINESS – ORDINANCES
O-14-013
Endorsers: Alderman Ken Siegel
Alderman David Schoneman
Alderman-at-Large David W. Deane
Alderman-at-Large Diane Sheehan
Alderman-at-Large Jim Donchess
Alderman-at-Large Daniel T. Moriarty
Alderwoman Mary Ann Melizzi-Golja
Alderwoman Pamela T. Brown
Alderman Richard A. Dowd
AUTHORIZING THREE SCHOOL ZONE FLASHING SPEED LIMIT SIGNS AND
TRANSFERRING $30,000 TO FUND THEIR PURCHASE AND INSTALLATION
Also assigned to the Committee on Infrastructure; Favorable Recommendation Issued 3/12/14
GENERAL DISCUSSION
PUBLIC COMMENT
REMARKS BY THE ALDERMEN
POSSIBLE NON-PUBLIC SESSION
ADJOURNMENT
City of Nashua
Public Works Division Engineering Department
9 Riverside Street 9 Riverside Street
Nashua, NH 03062 Fax (603) 589-3169
MEMO
Date: March 18, 2014
To: Lisa Fauteux, Director of Public Works
From: Traffic Safety Group
CC: Steve Dookran, P.E., City Engineer
Traffic Safety Group Members:
Bryan Marshall, Police Department
Steve Galipeau, Fire Department
Roger Houston, Planning Department
Jeanne Walker, Engineering Department
Wayne Husband, Engineering Department
Andy Patrician, Public Works Operations Manager
Subject: Manchester Street and Shady Lane – School Zone flashers with Speed feedback sign (O-14-013)
The Traffic Safety Group met to discuss the proposed school zone flashers (with speed feedback signs) at select
locations along Manchester Street and Shady Lane. The Engineering Department surveyed the existing conditions
in the field and prepared drawings for each location. Each location was then reviewed to determine the following:
Existing and/or most recent sign locations
Limits of each of the School zone areas
Projected effectiveness in alerting motorists to reduce their speed.
Location of Solar panels to optimize functionality
The Engineering Department proposes to install each of the School Zone flashers with speed feedback signs as
shown on the attached Engineered Drawings as follows;
Shady Lane – North of New Searles School Entrance:
Install a solar school flashing sign with a 20mph speed limit when flashing on the west side of Shady Lane
200 feet north of the entrance to New Searles School. This will include a speed feedback sign. Also install
an advanced advisory speed limit sign of 20 mph 600 feet north of the school entrance.
Administration Street City Parks-Recreation Solid Waste Wastewater
Business Office Department Engineer Department Department Treatment Plant
(603) 589-3140 (603) 589-4750 (603) 589-3120 (603) 589-3370 (603) 589-3410 (603) 589-3560
City of Nashua
Public Works Division Engineering Department
9 Riverside Street 9 Riverside Street
Nashua, NH 03062 Fax (603) 589-3169
Manchester Street near its intersection with Gordon Street:
Install a solar school flashing sign with a 20 mph speed limit when flashing and a speed feedback sign on
the west side of Manchester Street near its intersection with Gordon Street.
Manchester Street near its intersection with Hopkins Street:
Install a solar school flashing sign with a 20mph speed limit when flashing and a speed feedback sign on
the west side of Manchester Street near its intersection with Hopkins Street.
The Traffic Safety Group is supportive of installing these devices at the locations proposed.
Administration Street City Parks-Recreation Solid Waste Wastewater
Business Office Department Engineer Department Department Treatment Plant
(603) 589-3140 (603) 589-4750 (603) 589-3120 (603) 589-3370 (603) 589-3410 (603) 589-3560
City of Nashua
Public Works Division Engineering Department
9 Riverside Street 9 Riverside Street
Nashua, NH 03062 Fax (603) 589-3169
MEMO
Date: March 18, 2014
To: Lisa Fauteux, Director of Public Works
From: Stephen Dookran, P.E., City Engineer
Subject: School Zone Flashers with Speed Feedback – Manchester St and Shady Ln
Attachments: 1. Plans of Locations 2. Drawing of Flasher Unit
Engineering staff has reviewed the locations along Manchester St and Shady Ln for the proper placement of school
zone flashers combined with speed feedback signs proposed by O-14-013 and determined that the following
locations shown on the attached plans are appropriate:
Manchester Street on the west side just south of Gordon St
Manchester Street on the west side near its intersection with Hopkins St
Shady Lane on the west side 200 feet north of the New Searles School driveway.
These locations coincide with the established school zones and the signs will be effective in advising drivers on the
reduced speed limit as well as their current traveling speeds. Further, as shown on the plan, Engineering suggests
the addition of an advanced speed limit reduction sign 600 feet ahead of the New Searles School driveway to give
drivers the opportunity to attain the lower speed upon reaching the school zone boundary which is only 200 feet
from the driveway. The school zone boundaries on Manchester St are considerably farther from the entrances to
the schools and such advanced signs may not be necessary.
The units being considered are supplied by Marlin Controls. Marlin will provide a solar-powered school zone
assembly consisting of the flasher (MAR 1020S) and a speed radar feedback sign (TC 500S) estimated at about
$9,700 installed. Attached is a drawing of a similar Marlin flasher. We will continue to research the availability of
such equipment from other vendors to ensure that the City purchases devices with the best proven performance
given the budget.
An additional point to note is that we recommend that O-14-013 be amended by removing the terms “solar
powered” and “radar” such that the City will be able to replace the equipment when it becomes necessary with a
more reliable or energy efficient power supply and better feedback technology.
Administration Street City Parks-Recreation Solid Waste Wastewater
Business Office Department Engineer Department Department Treatment Plant
(603) 589-3140 (603) 589-4750 (603) 589-3120 (603) 589-3370 (603) 589-3410 (603) 589-3560
MAR-1000 ● SCHOOL ZONE WARNING SIGNAL
____________________________________________________________________________________________________________________________
980 QUAKER HIGHWAY ( 146A ) ■ UXBRIDGE, MA 01569
(ph) 508-278-0446 ■ (fx) 508-278-0447
WWW.MARLIN-CONTROLS.COM
MAR-1000 ● SCHOOL ZONE WARNING SIGNAL
_________________________________________________________________________________________________________________________
Single Circuit Time Switch
AP21 Series
• Three models to choose from.
• 16-character, alpha-numeric Liquid Crystal Display (LCD).
• Daylight Savings Time change entered from the keyboard.
• 48 hour capacitive back up, no batteries.
• Auto-Prompt for user friendly programming.
• 16 Powerful Program steps.
• 10 Skip Plans, for one day or multiple day holidays.
• 15 amp SPDT relay output.
• Program transfer from unit to unit (AP21T & AP21TR).
• Power any AP21 Series Time Switch from 120 VAC supply.
• Optional DC version draws power from any 12 Volt DC supply.
• Smallest Time Switch ever built for traffic applications,
only 2" x 2.5" x 4" (AP21TR).
• Program the AP21T & AP21TR from a laptop computer.
For ordering and information call
(P) 508-278-0446 ● (F) 508-278-0447