Administration & Finance Committee
Regular MeetingNorthbrook, IL · November 19, 2013
Minutes
APPROVED
MINUTES OF A MEETING OF THE ADMINISTRATION & FINANCE COMMITTEE
VILLAGE OF NORTHBROOK
COOK COUNTY, ILLINOIS
November 19, 2013
Call to Order
Chairman Scolaro called the meeting to order in the Terrace Room of Village Hall, 1225 Cedar Lane, at
6:46 p.m. and asked the Village Clerk to call the roll. Committee members present were: Trustee
Karagianis, Trustee Ciesla and Chairman Scolaro. Others present: Trustees Buehler, Heller and Israel and
President Frum. Staff present: Village Manager Nahrstadt, Assistant Village Manager P. Kiraly, Director
of Finance J. Rowitz, Accounting Manager I. Petryszak, Director of Public Works K. Hamill, Assistant
Public Works Director M. Morrison, Analyst A. Letson, Village Engineer P. Kendzior, Fire Chief M. Nolan,
Deputy Chief T. Smeltzer, Analyst E. Trausch, Internal Services Administrator J. Batalden, Director of
Development and Planning Services T. Poupard, Assistant Director of Planning D. Schoon, and Village
Clerk Ford. A quorum was present.
Hear From the Audience
There were no comments from the audience.
DISCUSSION: 2013 Property Tax Levy
Director of Finance Jeff Rowitz stated that staff is seeking direction on preparation of the draft
levy ordinance to be considered by the Village Board at their regular meeting of December 10, 2013.
He explained that the Village is required by statute to annually conduct an actuarial evaluation of our
police and fire pension funds and to fund the required contributions. The calculations were based on our
4/30/13 financial statements and employee census information. Due primarily to required changes in
the mortality tables, the Village’s required contributions to our police and fire pension funds will
increase by a total of $339,701. He further explained that timing differences between the tax levy cycle
and the Village’s budget cycle cause the Village Board to make decisions on the property tax levy before
our budget cycle even begins. While the tax levy ordinance must be approved and filed in December,
abatements can be filed through March. This gives the Village Board the ability to reduce the levy during
the budget process, but not the ability to increase it.
Director Rowitz stated that in consideration of these circumstances, staff is recommending that
the Village Board adopt a tax levy that will provide you the most flexibility in making these decisions.
The proposed levy includes a $260,000 increase for the General Fund.
Trustee Karagianis noted the reserved surplus was targeted at 40%, but now it is at 42%. Based
on the increase we are seeing in permits we could generate a $900,000 surplus. Trustee Karagianis then
questioned why the Board would consider raising the levy, which will increase taxes, when the Village’s
Administration & Finance Committee Meeting September 24, 2013
Page 2
surplus is projected to do so well. Trustee Karagianis stated he did not know if he could support the
increase of the levy.
President Frum stated she has a problem with using surplus to pay for operating costs. She
stated she doesn’t want to use on expenses that are perpetual. Trustee Scolaro questioned what
President Frum is proposing to do with the surplus.
Trustee Scolaro and President Frum discussed their philosophies on how to deal with the
surplus. They agreed that a portion of the surplus should be used for planned capital expenses.
Trustee Scolaro explained that since we are not sure how the sales taxes will do this holiday
season, the proposed levy tax increase will give the Village Board flexibility during the budget process
.They are not actually raising taxes at this time, as abatements can be filed until March 31. He stated
that the Village Board should make it a goal to abate this increase during the budget deliberations.
Village Manager Nahrstadt noted the closing of Northbrook Court for several hours over
weekend due to a gas leak, and explained other uncertainties related to sales taxes.
Trustee Scolaro moved, seconded by Trustee Ciesla, to direct staff to prepare the recommended
tax levy for approval by the Village Board on December 10. On voice vote Trustees Scolaro and Ciesla
voted aye, Trustee Karagianis voted nay.
DISCUSSION: Capital Improvement Plan (CIP)
Village Manager Nahrstadt provided an overview of the Capital Improvement Plan. He stated there are
three notable items new to the CIP.
Central business district – parking, streetscape, and design.
Skokie Blvd Corridor Sanitary Sewer – He stated staff originally thought a lift station would be
needed, but upon further review staff has made an amendment.
Shermerville Commons - $12 M cost, recreational, includes moving the fleet maintenance
building.
Trustee Buehler entered at 7:08 PM
Staff then presented the planned projects for the Infrastructure Capital Projects Fund, Water
Fund, Sanitary Sewer Fund, and Storm Water Fund.
Director Hamill discussed the Skokie Blvd Sewer Main Replacement: 14,100 feet of 8, 10, and 12
inch gravity sanitary sewer pipe. He noted it was originally planned to replace the lift stations at 1000
and 1200 Skokie Blvd. Further study determined the ComEd lift station has sufficient capacity, but
recommended that 4,400 feet of sewer main be replaced and increased in size.
Administration & Finance Committee Meeting September 24, 2013
Page 3
Director Hamill noted that a 32% sanitary sewer rate increase is needed for the fiscal health of
the sanitary sewer fund and to fund the debt service on the Skokie Blvd sanitary sewer main
replacement. The rate will increase from $0.80/1,000 gallons to $1.05/1,000 gallons. It was explained
that 20% of the rate increase programmed for FY 2014/15 is to fund the operations, capital projects, and
debt service of the Sanitary Sewer Fund.
Director Hamill then discussed planned projects for the Water Fund –
Second Street, Center Ave and Hillside.
Water production facility improvement projects:
Include generator replacements in water plant west side reservoir and Lake front
pump station.
Water meter conversion programs
Vehicle replacements: step Van and pickup truck
Water distribution System:
Development of water model.
Director Hamill noted that a 20% rate increase will be needed for the Water Fund. The rate will
go from $4.08 to $4.90 per 1,000 gallons. The minimum bill will increase by $5.74 per quarter (based on
usage of 7,000 gallons of water per quarter). The Board members noted their concern with an increase.
Trustee Scolaro asked how the new rates would compare to neighboring communities. Director Rowitz
stated that Northbrook would still be at the low end of the range and reviewed a chart showing
combined water and sewer rates of communities in the area.
Director Rowitz discussed the current debt schedule. He reviewed the bonds for infrastructure,
debt service requirements, and the property tax levy.
Trustee Ciesla asked how the Village compares to other municipalities. Director Rowitz stated
that on a per capita basis, the Village was comparable to others in the area. He explained that total debt
was approximately 3% of the Equalized Assessed Valuation (EAV) and that the rating agencies look for
this ratio to be less than 6%.
The Committee then discussed the proposed capital projects and the proposed funding.
Trustee Karagianis stated he felt this is much more of a working document then it has ever been.
Trustee Scolaro concurred.
Adjournment
Administration & Finance Committee Meeting September 24, 2013
Page 4
There being no further business, Trustee Ciesla moved, seconded by Trustee Karagianis, to
adjourn the meeting. On a voice vote, the motion unanimously carried, and the meeting adjourned
at8:02 p.m.
Respectfully submitted,
Debbie Ford
Village Clerk
Agenda
ADMINISTRATION & FINANCE COMMITTEE
NORTHBROOK VILLAGE HALL, 1225 CEDAR LANE
NOVEMBER 19, 2013, 6:30 P.M., TERRACE ROOM
The Administration & Finance Committee of the Village of Northbrook Board of Trustees will hold a
meeting on Tuesday, November 19, 2013 at 6:30 p.m. in the Terrace Room of the Village Hall, 1225
Cedar Lane, Northbrook, Illinois. The following will be discussed.
MEETING AGENDA
1. CALL TO ORDER
2. HEAR FROM THE AUDIENCE
3. DISCUSSION: 2013 Property Tax Levy
4. DISCUSSION: Capital Improvement Plan
5. ADJOURN
Michael Scolaro, Chair
Administration/Finance Committee
Members: Trustee Karagianis
Trustee Ciesla
Village of Northbrook
Cook County, Illinois
November 15, 2013
The Village of Northbrook is subject to the requirements of the Americans with Disabilities Act of 1990.
Individuals with disabilities who plan to attend this meeting and who require certain accommodations in
order to allow them to observe and/or participate in this meeting, or who have questions regarding the
accessibility of this meeting or the facilities, are requested to contact Greg Van Dahm or Debbie Ford (664-
4014 or 4013respectively) promptly to allow the Village of Northbrook to make reasonable accommodations
for those persons. Hearing impaired individuals may call the TDD number, 564-8645, for more information.
MEMORANDUM
TO: Village President and Board of Trustees
FROM: Richard A. Nahrstadt, Village Manager
Jeffrey L. Rowitz, Director of Finance
DATE: November 13, 2013
RE: 2013 Property Tax Levy
At the December 10, 2013 meeting, the Village Board will review an ordinance to establish the 2013
property tax levy. At the November 19, 2013 meeting of the Administration & Finance Committee, staff
will be seeking direction for preparation of this ordinance.
The Illinois Truth in Taxation law requires that we calculate our estimated levy increase at least 20 days
prior to adoption (35 ILCS 200/18-60). If the calculated increase is expected to exceed 105% of the
previous year’s levy, we are required to publish specific notices and conduct a public hearing prior to
adoption of the levy Ordinance (35 ILCS 200/18-70). The proposed levy does not exceed 105% of last
year’s levy.
As you know, the Village is required by statute to annually conduct an actuarial evaluation of our police
and fire pension funds and to fund the required contributions. The calculations were based on our 4/30/13
financial statements and employee census information. Due primarily to required changes in the mortality
tables, the Village’s required contributions to our police and fire pension funds will increase by a total of
$339,701.
The timing differences between the tax levy cycle and the Village’s budget cycle cause the Village Board
to make decisions on the property tax levy before our budget cycle even begins. While the tax levy
ordinance must be approved and filed in December, abatements can be filed through March. This gives
the Village Board the ability to reduce the levy during the budget process, but not the ability to increase it.
In consideration of these circumstances, we recommend that the Village Board adopt a tax levy that will
provide you the most flexibility in making these decisions. Adopting the proposed levy in December will
provide the Board with more options to consider during the budget process. As many of you may recall in
both 2007 and 2010, the Board used this approach and then achieved the goal of reducing the levy
through the budget process.
VILLAGE OF NORTHBROOK
TRUTH IN TAXATION ANALYSIS
Proposed 2013 TAX LEVY
2012 2013
EXTENSION EXTENSION DOLLAR PERCENT
FUND (FY 12/13) (FY 13/14) CHANGE CHANGE
GENERAL CORPORATE 7,820,749 8,080,749 $ 260,000 3.32%
POLICE PENSION 1,256,351 1,397,406 141,055 11.23%
FIRE PENSION 1,220,753 1,419,399 198,646 16.27%
TOTAL VILLAGE (EX. DEBT SERVICE) 10,297,853 10,897,554 599,701 5.82%
LIBRARY GENERAL 5,845,000 6,046,000 * 201,000 3.44%
LIBRARY IMRF 380,000 410,000 * 30,000 7.89%
LIBRARY SOCIAL SECURITY 250,000 255,000 * 5,000 2.00%
TOTAL LIBRARY 6,475,000 6,711,000 236,000 3.64%
TOTAL FOR TRUTH IN
TAXATION CALCULATION 16,772,853 17,608,554 835,701 4.98%
DEBT SERVICE (AFTER ABATEMENTS)
VILLAGE 2,327,665 2,420,000 92,335 3.97%
LIBRARY 736,767 1,019,486 282,719 38.37%
3,064,432 3,439,486 375,054 12.24%
GRAND TOTAL 19,837,285 21,048,040 1,210,755 6.10%
TOTAL VILLAGE ONLY
(INCLUDING DEBT SERVICE) 12,625,518 13,317,554 692,036 5.48%
* Library levy figures represent the staff recommendation. The Library Board will discuss
the levy on November 14, 2013.
Village of
Northbrook
DRAFT - Five Year
Capital Improvement
Plan
2014-2019
Village of Northbrook Capital Improvement Plan Executive
Summary
INTRODUCTION
The Capital Improvement Plan (CIP) is a statement of the Village of Northbrook’s long range vision of
infrastructure improvements and capital purchases covering a variety of operational areas. This planning
document highlights five years of projects that, after Board and Staff collaboration as part of a public process,
will improve vital infrastructure necessary for safe conveyance of traffic, drinking water and stormwater runoff
and will help maintain the vitality of internal Village functions through improvements to operational systems
and equipment.
The CIP includes Fiscal Year 2014/15 project and cost projections as well as future projects for which financing
have not yet been determined. The “future years” of the CIP are therefore subject to change.
This CIP provides the Village Board, staff and the community with a roadmap toward achieving these
improvements and help to plan for the financial resources that will be necessary for accomplishing them.
The Village’s CIP is funded through five separate funds (explained in greater detail on the following pages):
Infrastructure Capital Projects Fund (Roadway surface improvement, sidewalks).
o These projects’ funding tables are delineated in BLACK.
Water Fund (Water production and distribution projects).
o These projects’ funding tables are delineated in BLUE.
Sanitary Sewer Fund (Sanitary sewer transmission projects).
o These projects’ funding tables are delineated in GREEN.
General Fund (Vehicle replacements, building improvements, technology replacements and
enhancements).
o These projects’ funding tables are delineated in GOLD.
Stormwater Management Funds (Stormwater infrastructure improvements and associated
equipment)
o These projects’ funding tables are delineated in RED.
Each section of the CIP provides the following:
Fiscal Year Summaries, highlighting single year projected expenditures by fund.
Fiscal Year Project Detail sheets, with photos (FY 2014/15 only), justifications and cost projections.
In addition, this Executive Summary offers additional information. Specifically, the tables on the following
pages outline:
Total 5-year expenditures, along with totals separated out by fund.
Total 5-year debt issuance (Bond Issues).
Water Fund Debt Summaries.
Stormwater Fund Debt Summaries
Cumulative Debt Service Summaries.
Fund descriptions, with information related to project type and proposed funding mechanisms, as well as year-
to-year cost projections are also included. Detail on surface improvement (including asphalt street resurfacing
and reconstruction and concrete street patching), water main improvement, stormwater remediation projects
(as approved by the Village’s Master Stormwater Management Plan) and sanitary sewer projects are
highlighted in subsequent sections.
Executive Summary – Page 2
Village of Northbrook Capital Improvement Plan Executive
Summary
Total 5-year expenditures; totals delineated by fund:
FY 15-FY 19
All Funds FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19
Total
Infrastructure Cap. Proj. Fund $ 3,442,919 $ 4,957,240 $ 7,848,444 $ 3,283,130 $ 4,865,014 $24,396,747
Water Fund $ 6,870,820 $ 7,085,640 $ 4,052,520 $ 1,772,070 $ 3,594,940 $23,375,990
Sanitary Sewer Fund $ 2,789,573 $ 388,440 $ 344,418 $ 525,694 $ 325,917 $ 4,374,042
General Fund $ 3,316,890 $ 2,914,480 $ 1,450,738 $ 2,018,197 $ 3,009,604 $12,709,909
Stormwater Fund $ 3,182,695 $ 2,006,845 $ 4,216,250 $ 4,820,180 $ 1,200,380 $15,426,350
Total Capital Expense $19,602,897 $17,352,645 $17,912,370 $12,419,271 $12,995,855 $80,283,038
Planned Financing
Bond Proceeds $13,898,936 $13,158,373 $13,269,747 $ 7,915,662 $11,248,032 $59,490,750
Designated Revenues $ 4,330,162 $ 2,550,846 $ 2,360,608 $ 2,452,438 $ 1,010,892 $12,704,946
Undesignated Revenues $ 1,373,799 $ 1,643,426 $ 2,282,015 $ 2,051,171 $ 736,931 $ 8,087,342
Total $19,602,897 $17,352,645 $17,912,370 $12,419,271 $12,995,855 $80,283,038
Infrastructure Cap. Proj. Fund FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Infrastructure Cap. Proj. Fund $ 3,442,919 $ 4,957,240 $ 7,848,444 $ 3,283,130 $ 4,865,014 $24,396,747
Planned Financing
Bond Proceeds $ 876,418 $ 4,335,188 $ 5,698,029 $ 1,561,908 $ 4,181,651 $16,653,194
Designated Revenues $ 2,237,592 $ 265,026 $ 682,178 $ 657,678 $ 566,412 $ 4,408,886
Undesignated Revenues $ 328,909 $ 357,026 $ 1,468,237 $ 1,063,544 $ 116,951 $ 3,334,667
Total $ 3,442,919 $ 4,957,240 $ 7,848,444 $ 3,283,130 $ 4,865,014 $24,396,747
Water Fund FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Water Fund $ 6,870,820 $ 7,085,640 $ 4,052,520 $ 1,772,070 $ 3,594,940 $23,375,990
Planned Financing
Bond Proceeds $ 5,228,250 $ 4,890,000 $ 2,411,300 $ - $ 3,150,460 $15,680,010
Designated Revenues $ 1,642,570 $ 2,195,640 $ 1,641,220 $ 1,772,070 $ 444,480 $ 7,695,980
Undesignated Revenues $ - $ - $ - $ - $ - $ -
Total $ 6,870,820 $ 7,085,640 $ 4,052,520 $ 1,772,070 $ 3,594,940 $23,375,990
Sanitary Sewer Fund FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Sanitary Sewer Fund $ 2,789,573 $ 388,440 $ 344,418 $ 525,694 $ 325,917 $ 4,374,042
Planned Financing
Bond Proceeds $ 2,339,573 $ 298,260 $ 307,208 $ 503,004 $ 325,917 $ 3,773,962
Designated Revenues $ 450,000 $ 90,180 $ 37,210 $ 22,690 $ - $ 600,080
Undesignated Revenues $ - $ - $ - $ - $ - $ -
Total $ 2,789,573 $ 388,440 $ 344,418 $ 525,694 $ 325,917 $ 4,374,042
General Fund FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
General Fund $ 3,316,890 $ 2,914,480 $ 1,450,738 $ 2,018,197 $ 3,009,604 $12,709,909
Planned Financing
Bond Proceeds $ 2,272,000 $ 1,628,080 $ 636,960 $ 1,030,570 $ 2,389,624 $ 7,957,234
Designated Revenues $ - $ - $ - $ - $ - $ -
Undesignated Revenues $ 1,044,890 $ 1,286,400 $ 813,778 $ 987,627 $ 619,980 $ 4,752,675
Total $ 3,316,890 $ 2,914,480 $ 1,450,738 $ 2,018,197 $ 3,009,604 $12,709,909
Stormwater Fund FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Stormwater Fund $ 3,182,695 $ 2,006,845 $ 4,216,250 $ 4,820,180 $ 1,200,380 $15,426,350
Planned Financing
Bond Proceeds $ 3,182,695 $ 2,006,845 $ 4,216,250 $ 4,820,180 $ 1,200,380 $15,426,350
Designated Revenues $ - $ - $ - $ - $ - $ -
Undesignated Revenues $ - $ - $ - $ - $ - $ -
Total $ 3,182,695 $ 2,006,845 $ 4,216,250 $ 4,820,180 $ 1,200,380 $15,426,350
Executive Summary – Page 3
Village of Northbrook Capital Improvement Plan Executive
Summary
Proposed 5-Year Debt Issuance:
All Funds Proposed Bond Issues FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 FY 15-FY 19 Total
Total Dollar Amount to be Issued $ 13,898,936 $ 13,158,373 $ 13,269,747 $ 7,915,662 $ 11,248,032 $ 59,490,750
New Annual Debt Service $ 917,153 $ 919,977 $ 929,190 $ 547,907 $ 862,756 $ 4,176,983
New Annual Cumulative Debt Service $ 917,153 $ 1,837,130 $ 2,766,320 $ 3,314,227 $ 4,176,983 $ 13,011,813
Current Annual Debt Service $ 6,095,471 $ 6,410,125 $ 6,416,723 $ 6,415,781 $ 6,421,372 $ 31,759,472
Total Cumulative Debt Service $ 6,718,468 $ 7,932,601 $ 9,176,445 $ 9,730,950 $ 10,592,764 $ 44,771,285
Water Fund Proposed Bond Issues FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 FY 15-FY 19 Total
Total Dollar Amount to be Issued $ 5,228,250 $ 4,890,000 $ 2,411,300 $ - $ 3,150,460 $ 15,680,010
New Annual Debt Service $ 326,061 $ 309,095 $ 153,634 $ - $ 206,722 $ 995,512
New Annual Cumulative Debt Service $ 326,061 $ 635,156 $ 788,790 $ 788,790 $ 995,512 $ 3,534,309
Current Annual Debt Service $ 1,304,029 $ 1,380,100 $ 1,382,308 $ 1,383,858 $ 1,374,456 $ 6,824,751
Total Cumulative Debt Service $ 1,630,090 $ 2,015,256 $ 2,171,098 $ 2,172,648 $ 2,369,968 $ 10,359,060
Stormwater Fund Proposed Bond Issues FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 FY 15-FY 19 Total
Total Dollar Amount to be Issued $ 3,182,695 $ 2,006,845 $ 4,216,250 $ 4,820,180 $ 1,200,380 $ 15,426,350
New Annual Debt Service $ 195,395 $ 126,855 $ 266,508 $ 313,561 $ 78,091 $ 980,410
New Annual Cumulative Debt Service $ 195,395 $ 322,250 $ 588,758 $ 902,319 $ 980,410 $ 2,989,132
Current Annual Debt Service $ 97,640 $ 127,215 $ 128,619 $ 127,732 $ 129,909 $ 611,115
Total Cumulative Debt Service $ 293,035 $ 449,465 $ 717,377 $ 1,030,051 $ 1,110,319 $ 3,600,247
Sanitary Sewer Fund Proposed Bond Issues FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 FY 15-FY 19 Total
Total Dollar Amount to be Issued $ 2,339,573 $ 298,260 $ 307,208 $ 503,004 $ 325,917 $ 3,773,962
New Annual Debt Service $ 143,631 $ 18,853 $ 19,419 $ 34,928 $ 21,202 $ 238,033
New Annual Cumulative Debt Service $ 143,631 $ 162,484 $ 181,903 $ 216,831 $ 238,033 $ 942,882
Current Annual Debt Service $ 22,558 $ 41,525 $ 41,599 $ 41,652 $ 41,688 $ 189,022
Total Cumulative Debt Service $ 143,631 $ 185,042 $ 223,428 $ 258,430 $ 279,685 $ 1,131,904
Infrastructure Capital Projects Fund Proposed
FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 FY 15-FY 19 Total
Bond Issues
Total Dollar Amount to be Issued $ 876,418 $ 4,335,188 $ 5,698,029 $ 1,561,908 $ 4,181,651 $ 16,653,194
New Annual Debt Service $ 38,457 $ 311,447 $ 418,120 $ 106,631 $ 312,712 $ 1,187,367
New Annual Cumulative Debt Service $ 38,457 $ 349,904 $ 768,024 $ 874,655 $ 1,187,367 $ 3,218,407
Current Annual Debt Service $ 2,251,273 $ 2,354,399 $ 2,359,211 $ 2,357,553 $ 2,359,177 $ 11,681,613
Total Cumulative Debt Service $ 2,289,730 $ 2,704,303 $ 3,127,235 $ 3,232,208 $ 3,546,544 $ 14,900,020
General Fund Proposed Bond Issues FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 FY 15-FY 19 Total
Total Dollar Amount to be Issued $ 2,272,000 $ 1,628,080 $ 636,960 $ 1,030,570 $ 2,389,624 $ 7,957,234
New Annual Debt Service $ 213,609 $ 153,727 $ 71,509 $ 92,787 $ 244,029 $ 775,661
New Annual Cumulative Debt Service $ 213,609 $ 367,336 $ 438,845 $ 531,632 $ 775,661 $ 2,327,083
Current Annual Debt Service $ 2,419,971 $ 2,506,886 $ 2,504,986 $ 2,504,986 $ 2,516,142 $ 12,452,971
Total Cumulative Debt Service $ 2,633,580 $ 2,874,222 $ 2,943,831 $ 3,036,618 $ 3,291,803 $ 14,780,054
Executive Summary – Page 4
Village of Northbrook Capital Improvement Plan Executive
Summary
INFRASTRUCTURE CAPITAL PROJECTS FUND
The Infrastructure Capital Projects Fund is used for the construction of roadway and other infrastructure
maintenance and improvement projects. This fund includes the annual concrete street patching program and
the bituminous street resurfacing program (through the Motor Fuel Tax (MFT) funds).
Financial Overview
The Infrastructure Capital Projects Fund is primarily funded by a portion of the Village’s home rule sales tax
and Motor Fuel Tax allotments received from the State of Illinois. Motor Fuel Tax funds are derived from a
State tax on the purchase of motor fuel. Receipts are collected by the State and distributed on a per capita
basis. The use of Motor Fuel Tax funds is restricted to road improvements. When it is advantageous, capital
projects which are accounted for in this fund may also be paid with proceeds from the issuance of general
obligation bonds.
Infrastructure Cap. Proj. Fund FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Infrastructure Cap. Proj. Fund $ 3,442,919 $ 4,957,240 $ 7,848,444 $ 3,283,130 $ 4,865,014 $24,396,747
Planned Financing
Bond Proceeds $ 876,418 $ 4,335,188 $ 5,698,029 $ 1,561,908 $ 4,181,651 $16,653,194
Designated Revenues $ 2,237,592 $ 265,026 $ 682,178 $ 657,678 $ 566,412 $ 4,408,886
Undesignated Revenues $ 328,909 $ 357,026 $ 1,468,237 $ 1,063,544 $ 116,951 $ 3,334,667
Total $ 3,442,919 $ 4,957,240 $ 7,848,444 $ 3,283,130 $ 4,865,014 $24,396,747
Scope of Infrastructure Fund Capital Improvement Projects
Projects that are supported by the Infrastructure Fund include:
Surface improvement projects
o Asphalt street reconstruction and rehabilitation
o Concrete street reconstruction and rehabilitation
o Sidewalk improvements
o Other
Bridge deck repairs
Street light and traffic signal improvements
Executive Summary – Page 5
Village of Northbrook Capital Improvement Plan Executive
Summary
Projects are categorized by type and projected capital expenditures for that category are identified by fiscal
year:
Infrastructure Capital Improvement FY 15-FY 19
FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19
Project Total
Asphalt Street Reconstruction and
Rehabilitation $ 2,237,592 $ 265,026 $ 682,178 $ 657,678 $ 566,412 $ 4,408,886
Concrete Street Reconstruction and
Rehabilitation $ 626,418 $ 1,735,188 $ 873,029 $ 1,136,908 $ 740,651 $ 5,112,194
Shermerville Commons $ - $ - $ 4,825,000 $ 425,000 $ 3,441,000 $ 8,691,000
Central Business District $ 250,000 $ 2,600,000 $ - $ - $ - $ 2,850,000
Sidewalk Improvements $ 103,909 $ 107,026 $ 110,237 $ 113,544 $ 116,951 $ 551,667
Traffic Signal Improvement $ 225,000 $ - $ - $ - $ - $ 225,000
Skokie Valley Bike Path $ - $ 250,000 $ 1,358,000 $ 950,000 $ - $ 2,558,000
Fiscal Year Total $ 3,442,919 $ 4,957,240 $ 7,848,444 $ 3,283,130 $ 4,865,014 $ 24,396,747
Surface Improvement
Northbrook’s street inventory contains over 130 centerline miles or roughly 2,075,373 square yards of
pavement. The Village’s inventory of pavement is primarily made up of asphalt streets, 75%, while the
remaining 25% of streets are concrete. The Village is responsible for maintaining these roadways. This
includes routine maintenance (e.g. pothole patching) and roadway restoration following water main breaks.
Northbrook also plans for and conducts roadway rehabilitation and reconstruction as roads reach the end of
their useful life.
The Village utilizes the revenue collected from our share of the State of Illinois Motor Fuel Tax (MFT) as the
primary funding mechanism for asphalt street reconstruction and rehabilitation. During the past decade,
asphalt prices have increased as the price of oil has risen, resulting in reduced buying power for the Village and
necessitating the extension of street resurfacing cycles. In recent years, economic conditions have forced fuel
consumption down, subsequently having a negative effect on MFT revenues. Also, a decrease in the Village’s
population (per the 2010 Census), decreased the MFT amount we will receive. Due to these factors, the
Village is forecasting to receive $780,000 annually in MFT revenues, down from $1,000,000 annually.
With that, the Village Board approved the issuance of bonds in FY 2013/14 to reduce the backlog of streets in
need of being resurfaced. In doing so, roughly169,649 square yards of pavement were resurfaced during 2013
with bond proceeds and MFT revenues representing approximately 11% of our total asphalt streets. The
second year of this bond program will be carried out in FY 2014/15 and address an additional 93,634 square
yards of pavement representing an additional 6% of our asphalt streets.
Concrete street repairs are funded by bond proceeds. There is no dedicated revenue source to abate the debt
service on the concrete street rehabilitation and reconstruction program bonds. During some fiscal years,
concrete street repairs have been deferred due to budgetary constraints or due to construction on other
infrastructure as was the case in FY10/11 when Revere Drive was reconstructed. Due to deferrals, roughly 11%
(62,558 square yards) of the Village’s concrete street surface is in need of repair at an estimated cost of $3.0
million.
Asphalt Street Reconstruction and Rehabilitation
Roadway rehabilitation is also known as resurfacing. The resurfacing process of asphalt streets includes
removing the surface layer of pavement and installing a new surface layer. Resurfacing roadways helps to
prevent degradation of pavement to the point where reconstruction of the roadway becomes necessary.
Roadway reconstruction is more extensive and includes removing pavement to the foundation of the road
Executive Summary – Page 6
Village of Northbrook Capital Improvement Plan Executive
Summary
before installing all new pavement. Rehabilitation and reconstruction of roadways are done by contract.
These contracts are prepared and overseen by the Engineering Division of Public Works.
In the 1990’s, the Village established a standard for asphalt road maintenance so that in any given year, 6 - 7%
of the asphalt streets receive some type of major maintenance. This standard was set based on the
determination that the average life of asphalt roadways is approximately 20 years. Due to reduced MFT
funding and increased cost of construction, the Village is struggling to meet this standard. Currently we are
conducting major maintenance on only approximately 3% of the Village’s asphalt roadways annually.
The Village of Northbrook proactively manages the Village’s asphalt roadways by assessing their condition on
an annual basis and planning for the reconstruction or rehabilitation of these streets. Roadways are assessed
on a 5 point rating scale with 1 being the worst and 5 the best. This system is designated as follows:
1. Poor – Road surface and sections of road base are failing.
2. Many Failures – Large potholes form. Beginning signs of base failures is evident.
3. Limited Failures – Cracking of pavement along curb line. Small potholes beginning to form.
4. Good - Road surface has small spider cracking at curb line, no significant or obvious deficiencies in the
roadway.
5. Like New - Road surface and base are in good condition. Road has been recently resurfaced or
pavement is not exhibiting signs of spider cracking.
Besides our own internal rating system, in 2011, the Village again contracted with an independent consulting
firm to perform a detailed pavement survey of Village streets using sensor technology. Village staff has also
performed a survey of the Village’s asphalt streets. Information from these sources combined with the
location, number of streets within the subdivision or neighborhood needing repair, age, and typical traffic
loads are used to develop a long-term plan for street rehabilitation or reconstruction.
Asphalt Streets by Rating - Existing Condition
4%
10%
28%
1: Poor
2: Many
Failures
3: Limited
Failurs
14% 44%
Executive Summary – Page 7
Village of Northbrook Capital Improvement Plan Executive
Summary
Approximately 14% of the Village’s asphalt streets currently have a condition rating of either a “1” (Poor) or
“2” (Many Failures). Historically, the Village has sought to have no more than 10% of its asphalt streets rated
as a “1” or “2”. This has significantly decreased over the last year with the use of bond proceeds that have
allowed a catch up on the backlog. One of the reasons we had not seen a decrease is attributable to increased
contractual costs, which we have attempted to control through partnering with other communities. Another
contributing factor to the Village’s inability to make a significant impact on asphalt street condition is related
to the timing that these streets were built and resurfaced; many of these streets were originally built and later
resurfaced at the same time, which has led to failure at the same time.
Asphalt Streets by Rating - After FY 14/15 Work
1%
8%
35%
1: Poor
2: Many Failures
3: Limited Failurs
4: Good
5: Like New
42%
14%
Five subdivisions were identified in the FY 2013 – 2018 CIP where roadway patching was no longer a viable
option and asphalt reconstruction and/or rehabilitation is necessary. These areas constituted 53% of the total
asphalt streets with a condition rating of a “1” or “2” at the time. While initially these five areas plus a smaller
area around the Central Business District were identified to be completed all during FY 2013/14, the project
was broken up over two years. By the end of FY 2014/15, the Village will be below the standard of 10% of
asphalt streets being rated as a “1” or “2” and at the end of the proposed five year capital improvement plan,
all of the asphalt streets with a current condition rating of a “1” or “2” will be rehabilitated. To make the best
use of MFT revenues, staff has reviewed and evaluated our patching program and has changed the program to
focus on streets currently rated as a “3” in an effort to extend their useful life.
Executive Summary – Page 8
Village of Northbrook Capital Improvement Plan Executive
Summary
Asphalt Streets by Rating - At Completion of 15-19 CIP
0%
5%
1: Poor
41%
2: Many Failures
40% 3: Limited Failurs
4: Good
5: Like New
14%
Concrete Street Reconstruction and Rehabilitation
The Village of Northbrook proactively manages concrete roadways in a similar manner to asphalt streets.
Public Works employees assess the condition of concrete streets on an annual basis. Specifically, the amount
of failed and deteriorated sections of pavement on each street is inventoried. These identified sections or
panels are then scheduled for replacement within our contractual concrete improvement program. This
program is based on performing work geographically and by subdivision and the amount of work completed is
dependent on available funding. Therefore, available funding combined with the location, number of other
streets within the subdivision or neighborhood needing repair, age, and typical traffic loads are used to
develop a long-term plan for concrete street rehabilitation or reconstruction.
Concrete street rehabilitation commonly includes large scale panel replacement. During this process, the
Village’s contractor removes concrete panels and replaces them. Concrete roadway reconstruction is similar
to that of asphalt roadway reconstruction in that the road surface is removed to the road base and new
roadway is constructed. Concrete rehabilitation and replacement work is done by contract, with contracts
prepared and overseen by the Engineering Division of Public Works.
A concrete street that is well designed and constructed of Portland cement concrete should have a 40-year life.
This street would typically require maintenance performed at the 20 year mark and again around year 30. On
average, 8.5% or approximately 45,570 square yards of the Village’s concrete roadways are in need of repair or
reconstruction annually. Due to reduced funding and increased cost of construction, the Village is currently
not meeting this standard. The Village repairs or replaces an average of 7,240 square yards of concrete
pavement on an annual basis.
The Village identifies roadways with significant degradation of the road surface, as well as roadways proximate
to a significant number of other streets within a subdivision or neighborhood needing repair, and considers
age, and typical traffic loads when selecting roadways for inclusion in the Village’s annual Concrete Street
Rehabilitation and Reconstruction Program.
Executive Summary – Page 9
Village of Northbrook Capital Improvement Plan Executive
Summary
Sidewalk Replacement Program
The Village of Northbrook is responsible for the maintenance and replacement of public sidewalks. The Village
systematically surveys public sidewalks to identify defective and deteriorated sections that create a potential
trip hazard. Sidewalk surveys are based on logical geographic areas to determine which portions are to be
replaced. Failed sections of sidewalk are replaced by the Village’s sidewalk concrete contractor.
Prior to 2009, the Village had a cost share program for sidewalk replacement where residents would pay a
portion of the cost to replace a section of sidewalk adjacent to their property. Even though we contracted out
the “construction” phase of this program, the approach was extremely labor intensive. Besides construction
supervision, there was also time spent sending out multiple letters to encourage participation, on-site
negotiation with the property owners on how much sidewalk needs replacement, revenue collection and the
data entry to insure we were only replacing sidewalk squares that the property owner had remitted payment
for their share, and then the follow-up maintenance to sidewalks where the property owner did not
participate in the cost-sharing program. For these reasons, the Village now fully funds the sidewalk
replacement program with General Fund revenues.
Executive Summary – Page 10
Village of Northbrook Capital Improvement Plan Executive
Summary
WATER FUND
Northbrook's water utility system has been constantly growing, evolving and improving since our inland
treatment facility first became operational in 1963. The Village delivers water to meet the demand generated
by the Village’s 12,000 residential, commercial and industrial consumers. The Village supplies drinking water
to residents within the corporate boundaries and sells water wholesale to the Mission Brook Sanitary District
and the Village of Riverwoods. The Village also has water mains in unincorporated Mission Hills Estates and
supplies water to residents in that area.
The system draws Lake Michigan water via two (2) intakes and pumps the untreated water through two (2)
raw water transmission mains to the Water Filtration Plant. The raw water supply system consists of a 30-inch
intake extending about 2,550 feet from shore and a 48-inch intake extending 6,400 feet from shore. Water
flows by gravity to a pump station at the shoreline in Glencoe. From there, the raw water is pumped through
almost three (3) miles of transmission mains to the Village’s water treatment plant located on Dundee Road.
Water treatment consists of chemical addition, mixing, sedimentation, filtration and disinfection. The Plant
has an EPA approved capacity of 20 million gallons per day (MGD). Treated water is pumped to the
distribution system, which consists of two (2) elevated water storage tanks, one (1) ground level reservoir and
pumping station, and over 170 miles of water mains.
Below is a five year summary of the Water Fund Capital Improvement Budget:
Water Fund FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Water Fund $ 6,870,820 $ 7,085,640 $ 4,052,520 $ 1,772,070 $ 3,594,940 $23,375,990
Planned Financing
Bond Proceeds $ 5,228,250 $ 4,890,000 $ 2,411,300 $ - $ 3,150,460 $15,680,010
Designated Revenues $ 1,642,570 $ 2,195,640 $ 1,641,220 $ 1,772,070 $ 444,480 $ 7,695,980
Undesignated Revenues $ - $ - $ - $ - $ - $ -
Total $ 6,870,820 $ 7,085,640 $ 4,052,520 $ 1,772,070 $ 3,594,940 $23,375,990
Scope of Water Fund Capital Improvement Projects
Projects that are supported by the Water Fund include:
Water main replacement
Water production facilities improvements
Water meter replacement
Vehicle and equipment replacement
Below is a five year summary of the planned projects for the Water Fund Capital Improvements Fund
Budget:
FY 15-FY 19
Water Fund Capital Project FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19
Total
Water Main Replacement $ 1,482,500 $ 2,000,000 $ 1,510,000 $ 1,640,000 $ 3,330,000 $ 9,962,500
Water Facilities Improvements $ 2,100,000 $ 1,890,000 $ 310,000 $ - $ - $ 4,300,000
Distribution System Improvements $ 3,000,000 $ 3,000,000 $ 2,000,000 $ - $ - $ 8,000,000
Water Meter Replacement $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 375,000
Vehicle and Equipment
Replacement $ 213,320 $ 120,640 $ 157,520 $ 57,070 $ 189,940 $ 738,490
Fiscal Year Total $ 6,870,820 $ 7,085,640 $ 4,052,520 $ 1,772,070 $ 3,594,940 $ 23,375,990
Financial Overview
Executive Summary – Page 11
Village of Northbrook Capital Improvement Plan Executive
Summary
Also known as an enterprise fund, the Water Fund is managed to be self-sustaining where the cost of
producing and distributing Northbrook’s drinking water to customers is financed through the sale of water.
Large capital projects are sometimes funded through the issuance of general obligation bonds, which serve as
loans to the fund that are paid back over a set period time.
In FY 2008/09, the Village hired a consultant to perform an analysis of its water rates. The study outlined the
current and planned revenues and expenditures of the fund. It was identified that future rate increases would
be needed to sustain the operations and maintenance of the water system and fund capital projects. As
recommended by the rate study, an increase in the water rate from $3.40 to $4.08 per 1,000 gallons of water
for FY 2011/12 was approved by the Village Board. This marked only the third rate increase since 1995, when
the rate was $3.00 per 1,000 gallons.
To maintain the fiscal health of this fund and provide the level of funding needed to support operations,
capital improvements, and debt service an increase of 20% is needed in FY 2014/15. A subsequent increase of
20% is also needed in FY 2017/18. Any recommended rate increase will require Village Board consideration
and approval. However, the combined factors of reduced water use by the community and necessary system
improvements including those to the Water Plant, West Side Reservoir, and Lake Front Pump Station which
include the conversion of the disinfection system and the installation of new emergency generators at these
facilities to ensure water is pumped, produced, and distributed to the residents and businesses of Northbrook.
Water Main Replacement Projects
The largest recurring capital cost to the Water Fund is the
replacement of water mains and system improvements. Miles of Water Main by Age and Material
When planning for the replacement of water main Material
segments, a multitude of factors are reviewed to
determine the priority in which water mains will be Age (Years) Cast Iron Ductile Iron
replaced. One of the most important factors is the
number of breaks that have occurred on a section of 0-20 0.00 17.79
main. Replacement of mains that chronically break helps 20-40 0.44 52.09
to prevent service disruptions to customers. Breaks can
be attributable to numerous factors including weather 40-60 68.41 9.66
(freeze/thaw cycles, extended dry periods and soil
movement), age of the infrastructure, pipe material, or 60 - 75 9.49 0.14
sudden changes in pressure. Once mains suffer breaks, 75+ 13.54 0.00
the integrity/strength of the pipe is compromised and
they become more susceptible to future breaks. Total (Miles) 91.88 79.69
Number of Water Main Breaks by Fiscal Year
FY 2009/10 FY 2010/11 FY 2011/12 FY 2012/13 FY2013/14
(YTD)
Number of Water Main Breaks 66 104 119 189 35
As mentioned, the cause of water main breaks can be attributed to a number of factors. In the Village’s
experience, water main material and installation methods used post World War II would be considered
inadequate by today’s standards. In line with this information, the median age of our water mains is 43 years;
however, the average age of mains that we have experienced a water main break on is 35 years. Today, the
Executive Summary – Page 12
Village of Northbrook Capital Improvement Plan Executive
Summary
standards by which water mains are constructed and installed are much stricter. For instance, water mains are
installed in trenches on stone back fill to help prevent some breaks from ground conditions and they are
wrapped with a protective material to prevent corrosive soils from prematurely degrading the mains.
The American Water Works Association recommends that water mains be replaced at least once every 75
years. 8% of our water mains are older than 75 years. Approximately 54% of our water mains are made of cast
iron; the remaining 46% are ductile iron. Ductile iron is much stronger and more durable than cast iron and is
currently the Village’s standard material when mains are replaced. A table identifying the miles of water main
by age and material is included on page 12.
As water mains age, the flow of water through the pipes can become limited due to mineral build up inside of
them. Additionally, the sizes of and standards by which water mains are installed have changed to
accommodate larger homes, and reflect new best practices. Larger water mains are also important so that
adequate water flows can be obtained for fire fighting. Increasing the size of a water main does not increase
the pressure on that main; however, it does allow for a greater amount of water to flow through the pipe,
reducing pressure loss. The above factors, in addition to break history, are considered when planning which
mains will be replaced and in what sequence.
The Village of Northbrook also works to eliminate sections of water main that do not interconnect or that are
only connected to the system at one location, creating a “dead end.” Interconnecting or “looping” water
mains can help enhance flow capacity and provide better water quality. Looped water mains can also be used
to provide water to customers who would otherwise be affected by a main break, minimizing the number of
customers impacted by water shut offs.
In addition, when planning for replacement of water mains, the Village of Northbrook comprehensively
programs capital infrastructure improvements such as sewer main replacements and road rehabilitation within
geographic areas to leverage economies of scale, avoid duplication of work, and minimize disruption to
residents.
Executive Summary – Page 13
Village of Northbrook Capital Improvement Plan Executive
Summary
SANITARY SEWER FUND
The Village is responsible for managing and maintaining 127 miles of public sanitary sewer and 13 lift stations.
The Village’s sewer lines act as collectors of sewage, conveying waste to interceptor lines operated by the
Metropolitan Water Reclamation District (MWRD). Sewage then flows to the MWRD treatment plant at
Howard Street and McCormick Boulevard in Skokie. Following treatment, treated water moves southward
through the branches of the Chicago and Illinois Rivers.
Financial Overview
The Sanitary Sewer Fund is managed in a way to be self-sustaining where the cost of transporting Northbrook’s
wastewater to MWRD interceptor lines is financed through user fees. Treatment of sanitary waste is done by
the MWRD. Certain large Village-operated capital projects may be funded through the issuance of general
obligation bonds, which serve as loans to the fund that are paid back over a set period time.
In FY 2008/09, the Village hired a consultant to perform an updated analysis of its sanitary sewer rates. The
study outlined the current and planned revenues and expenditures of the fund. It was identified that future
rate increases would be needed to sustain the operations and maintenance of the sanitary sewer system and
fund capital projects. The study recommended a rate increase of 12.5% in FY 2013/14 and 11% in FY 2016/17,
however the planned increase for 2013/14 was deferred one year to FY 2014/15.
To maintain the fiscal health of this fund and provide the level of funding needed to support operations,
capital improvements, and debt service a rate increase is needed in Fiscal Year 2014/15. Due to reduced water
usage by the community and the need to replace the Skokie Boulevard sewer main (FY 2014/2015, page 64), a
rate increase of 32% will be needed in FY 2014/15. The Skokie Boulevard sanitary sewer main accounts for 12%
of the total 32% increase.
Below is a five year summary of the Sanitary Sewer Fund Capital Improvement Budget:
Sanitary Sewer Fund FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Sanitary Sewer Fund $ 2,789,573 $ 388,440 $ 344,418 $ 525,694 $ 325,917 $ 4,374,042
Planned Financing
Bond Proceeds $ 2,339,573 $ 298,260 $ 307,208 $ 503,004 $ 325,917 $ 3,773,962
Designated Revenues $ 450,000 $ 90,180 $ 37,210 $ 22,690 $ - $ 600,080
Undesignated Revenues $ - $ - $ - $ - $ - $ -
Total $ 2,789,573 $ 388,440 $ 344,418 $ 525,694 $ 325,917 $ 4,374,042
Scope of Sanitary Sewer Fund Capital Improvement Projects
Projects that are supported by the sanitary sewer fund include:
Sanitary sewer line improvements
Sanitary sewer lining
Local sewer and collector line repair and replacement
Scheduled vehicle and equipment replacement
Executive Summary – Page 14
Village of Northbrook Capital Improvement Plan Executive
Summary
Below is a five year summary of the planned projects for the Sanitary Sewer Fund Capital Improvement
Budget
FY 15-FY 19
Sanitary Sewer Fund Capital Project FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19
Total
Sewer Lining Program $ 289,573 $ 298,260 $ 307,208 $ 316,424 $ 325,917 $ 1,537,382
Sewer Main Improvements $ 2,500,000 $ - $ - $ - $ - $ 2,500,000
Vehicle and Equipment
Replacement $ - $ 90,180 $ 37,210 $ 209,270 $ - $ 336,660
Fiscal Year Total $ 2,789,573 $ 388,440 $ 344,418 $ 525,694 $ 325,917 $ 4,374,042
Executive Summary – Page 15
Village of Northbrook Capital Improvement Plan Executive
Summary
STORMWATER FUND
In August 2011, the Village adopted the Master Stormwater Management Plan, which along with Addendum
#1 that was adopted in April 2012, lays out 28 stormwater management projects to reduce flooding issues
throughout the Village. The Stormwater Fund is utilized to account and provide for financial resources for the
construction of stormwater improvement projects. This fund also provides for operational costs to effectively
manage, maintain, operate, and repair the Village’s 123 miles of storm sewer system, ditches, detention
facilities, and lift stations.
Financial Overview
The Stormwater Fund is managed in a way to be self-sustaining where the cost of maintaining and improving
the existing stormwater system is financed through user fees. Large capital projects may be funded through
the issuance of general obligation bonds, which serve as loans to the fund that are paid back over a set period
time. Northbrook’s current stormwater utility fee is $1.00 per 1,000 gallons of water used.
Below is a five year summary of the Stormwater Fund Capital Improvement Budget:
Stormwater Fund FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Stormwater Fund $ 3,182,695 $ 2,006,845 $ 4,216,250 $ 4,820,180 $ 1,200,380 $15,426,350
Planned Financing
Bond Proceeds $ 3,182,695 $ 2,006,845 $ 4,216,250 $ 4,820,180 $ 1,200,380 $15,426,350
Designated Revenues $ - $ - $ - $ - $ - $ -
Undesignated Revenues $ - $ - $ - $ - $ - $ -
Total $ 3,182,695 $ 2,006,845 $ 4,216,250 $ 4,820,180 $ 1,200,380 $15,426,350
Scope of Sanitary Sewer Fund Capital Improvement Projects
Projects that are supported by the Stormwater Fund include:
Replacement of existing storm sewer lines
Installation of new storm sewer lines
Construction and enhancement of Stormwater detention facilities
Below is a five year summary of the planned projects for the Stormwater Fund Capital Improvement Budget:
FY 15-FY 19
Stormwater Fund Capital Project FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19
Total
Stormwater Management Projects $ 3,182,695 $ 2,006,845 $ 4,216,250 $ 4,820,180 $ 1,200,380 $ 15,426,350
Fiscal Year Total $ 3,182,695 $ 2,006,845 $ 4,216,250 $ 4,820,180 $ 1,200,380 $ 15,426,350
Executive Summary – Page 16
Village of Northbrook Capital Improvement Plan Executive
Summary
GENERAL FUND
The General Fund is the general operating fund of the Village. It accounts for all financial resources that
support the day-to-day operations and capital needs of the Village, except for those required to be accounted
for separately. The General Fund subsidizes the six (6) Village departments, and portions of their respective
capital purchases. These purchases include vehicle replacements, building maintenance, equipment and
technology needs.
Financial Overview
The General Fund is supported by three (3) major revenue sources in the Village of Northbrook – sales tax,
property taxes and state-shared income taxes. These revenues are the primary source of funding for capital
purchases in this fund. General obligation bond proceeds have been used to fund purchases of capital items
that will have an expected life equal to or greater than the term of the bonds. The Village maintains the
highest ratings by both Standard and Poor’s and Moody’s providing the Village the ability to borrow at a
relatively low cost.
Below is a five year summary of the General Fund Capital Improvement Budget:
General Fund FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
General Fund $ 3,316,890 $ 2,914,480 $ 1,450,738 $ 2,018,197 $ 3,009,604 $12,709,909
Planned Financing
Bond Proceeds $ 2,272,000 $ 1,628,080 $ 636,960 $ 1,030,570 $ 2,389,624 $ 7,957,234
Designated Revenues $ - $ - $ - $ - $ - $ -
Undesignated Revenues $ 1,044,890 $ 1,286,400 $ 813,778 $ 987,627 $ 619,980 $ 4,752,675
Total $ 3,316,890 $ 2,914,480 $ 1,450,738 $ 2,018,197 $ 3,009,604 $12,709,909
Scope of General Fund Capital Improvement Projects
Projects that are supported by the general fund include:
Fire apparatus replacements
Public Works equipment
Vehicle replacements
Information Technology system improvements
Operating equipment replacements
When purchasing a vehicle or piece of equipment, the Village plans for its full life cycle, identifying a useful life
and planned year of replacement. The Village has a proactive preventative maintenance program to help
extend the useful life of vehicles and equipment. As vehicles approach their replacement date, the
equipment’s engine hours, miles, maintenance history, and overall condition are taken into consideration to
determine if replacement is necessary. Additionally, vehicles and equipment are reviewed annually to
determine if they are still operationally necessary.
Similarly with Information Technology purchases, the Village will plan for an expected useful life of the
equipment, taking into account how the purchases impact day-to-day operations and long-term functionality
of computerized processes and operations.
The Village’s core information systems used to track and manage our daily processes, such as utility billing,
invoicing, licensing, permitting and coordination, do not allow for proper information cataloging, workflow
processing or adequate, timely reporting. An Enterprise Resource Planning program (ERP), helps to integrate
information across an entire organization. The purpose of an ERP is to allow for efficient flow of information
Executive Summary – Page 17
Village of Northbrook Capital Improvement Plan Executive
Summary
between all business functions. This is accomplished using programs, called “modules,” that manage a specific
business task while utilizing consistent resident/customer information throughout.
During Fiscal Year 2012/13, staff conducted a needs assessment and will be evaluating various software
packages before a formal recommendation is made to the Village Board during FY 2013/14. We anticipate this
project will take two fiscal years to complete due to the complexity of data transfer and implementation
timelines that allow for proper staff training and appropriate systems testing.
Below is a five year summary of the planned projects in the General Fund Capital Improvement Budget:
FY 15-FY 19
General Fund Capital Project FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19
Total
Vehicle and Equipment
Replacement $ 1,160,890 $ 855,060 $ 946,750 $ 1,638,990 $ 1,219,604 $ 5,821,294
Building Improvements $ 295,000 $ 1,240,500 $ 130,000 $ - $ 1,090,000 $ 2,755,500
Enterprise Resource Program $ 450,000 $ 350,000 $ - $ - $ - $ 800,000
Information Technology $ 130,000 $ 100,000 $ 100,000 $ 100,000 $ 600,000 $ 1,030,000
E-911 Equipment $ 1,281,000 $ 368,920 $ 273,988 $ 279,207 $ 100,000 $ 2,303,115
Fiscal Year Total $ 3,316,890 $ 2,914,480 $ 1,450,738 $ 2,018,197 $ 3,009,604 $ 12,709,909
Executive Summary – Page 18
Village of Northbrook Capital Improvement Plan Executive
Summary
FY 14-FY 19
Capital Improvement Projects FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19
Total
General Fund Capital Project
Ambulance Replacement (FD) $ 295,000 $ - $ 310,000 $ - $ 328,364 $ 933,364
Fire Squad Replacement (FD) $ 620,000 $ - $ - $ 738,430 $ - $ 1,358,430
Building Improvements (FD) $ 157,000 $ 350,500 $ 130,000 $ - $ - $ 637,500
Equipment (FD) $ 25,000 $ - $ - $ - $ - $ 25,000
Scheduled Vehicle Replacements (FD) $ 45,000 $ 76,490 $ 52,900 $ 76,510 $ 75,380 $ 326,280
Department Sub-Totals $ 1,142,000 $ 426,990 $ 492,900 $ 814,940 $ 403,744 $ 3,280,574
E-911 Equipment (PD/FD) $ 439,000 $ 268,920 $ 273,988 $ 279,207 $ 600,000 $ 1,861,115
Building Improvements (PD) $ 50,000 $ - $ - $ - $ 1,090,000 $ 1,140,000
Scheduled Vehicle Replacements (PD) $ 73,980 $ 168,130 $ 209,450 $ 229,530 $ 112,400 $ 793,490
Department Sub-Totals $ 562,980 $ 437,050 $ 483,438 $ 508,737 $ 1,802,400 $ 3,794,605
ERP Implementation (GG) $ 450,000 $ 350,000 $ - $ - $ - $ 800,000
IT Equipment Upgrades (GG) $ 130,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 530,000
Building Improvements (GG/DPS/Fin) $ 135,000 $ 735,000 $ - $ - $ - $ 870,000
Scheduled Vehicle Replacements (GG/DPS/Fin) $ 30,000 $ 27,510 $ 79,910 $ 29,190 $ - $ 166,610
Department Sub-Totals $ 745,000 $ 1,212,510 $ 179,910 $ 129,190 $ 100,000 $ 2,366,610
Building Improvements (PW) $ 500,000 $ 255,000 $ - $ - $ - $ 755,000
Scheduled Equipment Replacements (PW) $ 90,200 $ 210,090 $ 97,530 $ 119,870 $ 139,830 $ 657,520
Scheduled Vehicle Replacements (PW) $ 276,710 $ 372,840 $ 196,960 $ 445,460 $ 563,630 $ 1,855,600
Department Sub-Totals $ 866,910 $ 837,930 $ 294,490 $ 565,330 $ 703,460 $ 3,268,120
General Fund Fiscal Year Totals $ 3,316,890 $ 2,914,480 $ 1,450,738 $ 2,018,197 $ 3,009,604 $ 12,709,909
Infrastructure Capital Improvement Project
Asphalt Street Reconstruction and Rehabilitation $ 2,237,592 $ 265,026 $ 682,178 $ 657,678 $ 566,412 $ 4,408,886
Concrete Street Reconstruction and Rehabilitation $ 626,418 $ 1,735,188 $ 873,029 $ 1,136,908 $ 740,651 $ 5,112,194
Sidewalk Improvements $ 103,909 $ 107,026 $ 110,237 $ 113,544 $ 116,951 $ 551,667
Central Business District Improvements $ 250,000 $ 2,600,000 $ - $ - $ - $ 2,850,000
Shermerville Commons $ - $ - $ 4,825,000 $ 425,000 $ 3,441,000 $ 8,691,000
Traffic Signal Improvement $ 225,000 $ - $ - $ - $ - $ 225,000
Skokie Valley Bike Patch $ - $ 250,000 $ 1,358,000 $ 950,000 $ - $ 2,558,000
Infrastructure Fiscal Year Totals $ 3,442,919 $ 4,957,240 $ 7,848,444 $ 3,283,130 $ 4,865,014 $ 24,396,747
Water Fund Capital Project
Water Main Replacement $ 1,482,500 $ 2,000,000 $ 1,510,000 $ 1,640,000 $ 3,330,000 $ 9,962,500
Water Facilities Improvements $ 2,100,000 $ 1,890,000 $ 310,000 $ - $ - $ 4,300,000
Distribution System Improvements $ 3,000,000 $ 3,000,000 $ 2,000,000 $ - $ - $ 8,000,000
Water Meter Replacement $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 375,000
Vehicle and Equipment Replacement $ 213,320 $ 120,640 $ 157,520 $ 57,070 $ 189,940 $ 738,490
Water Fund Fiscal Year Totals $ 6,870,820 $ 7,085,640 $ 4,052,520 $ 1,772,070 $ 3,594,940 $ 23,375,990
Sanitary Sewer Fund Capital Project
Sewer Lining Program $ 289,573 $ 298,260 $ 307,208 $ 316,424 $ 325,917 $ 1,537,382
Skokie Boulevard Main Replacement $ 2,500,000 $ - $ - $ - $ - $ 2,500,000
Vehicle and Equipment Replacement $ - $ 90,180 $ 37,210 $ 209,270 $ - $ 336,660
Sanitary Sewer Fiscal Year Totals $ 2,789,573 $ 388,440 $ 344,418 $ 525,694 $ 325,917 $ 4,374,042
Stormwater Fund Capital Project
Stormwater Management Projects $ 3,182,695 $ 2,006,845 $ 4,216,250 $ 4,820,180 $ 1,200,380 $ 15,426,350
Stormwater Fund Fiscal Year Totals $ 3,182,695 $ 2,006,845 $ 4,216,250 $ 4,820,180 $ 1,200,380 $ 15,426,350
All Funds Fistal Year Totals $ 19,602,897 $ 17,352,645 $ 17,912,370 $ 12,419,271 $ 12,995,855 $ 80,283,038
Executive Summary – Page 19
Village of Northbrook Capital Improvement Plan Executive
Summary
Executive Summary – Page 20
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fiscal Year 2014/15 Summary
Capital Improvement Budget
FY 2014/15
By Fund
17% 19%
General Fund
Water Fund
16%
Sewer Fund
Stormwater Fund
34%
Infrastructure Capital Projects
14%
Fund
Total Capital Budget = $19,602,897
Infrastructure
Stormwater
General Fund Water Fund Sewer Fund Capital Total
Fund
Projects Fund
Capital Expense $ 3,316,890 $ 6,870,820 $ 2,789,573 $ 3,182,695 $ 3,442,919 $ 19,602,897
Planned Financing
Bond Proceeds $ 2,272,000 $ 5,228,250 $ 2,339,573 $ 3,182,695 $ 876,418 $ 13,898,936
Designated Revenues/User
$ - $ 1,642,570 $ 450,000 $ - $ 2,237,592 $ 4,330,162
Fees
Undesignated Revenues $ 1,044,890 $ - $ - $ - $ 328,909 $ 1,373,799
Total $ 3,316,890 $ 6,870,820 $ 2,789,573 $ 3,182,695 $ 3,442,919 $ 19,602,897
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
FY 2014/15 Projects - $19,602,897
Infrastructure Capital Projects Fund - $3,442,919
Asphalt Street Maintenance- $761,065: Page 5
Asphalt Street Maintenance- $1,476,527 (B): Page 12
Concrete Street Reconstruction and Rehabilitation- $626,418 (B)
o Sections of the Mideast and Midwest Areas of the Village: Page 18
Central Business District Infrastructure Improvements and Streetscape Expansion- $250,000 (B): Page 20
Traffic Signal Improvement- $75,000: Page 25
Traffic Signal and Control Device Improvement- $150,000: Page 26
Sidewalk Improvements- $103,909: Page 27
Stormwater Fund - $3,182,695 (B)
Wescott Park Underground Storage, Design- $577,500: Page 29
Shermer Road Overflow Sewer, Construction- $1,185,075: Page 31
Cherry Lane Underpass, Construction- $212,175: Page 33
Church Street (Near Chapel Court), Property/Easement Acquisition & Design/Final Engineering- $19,000:
Page 35
Dundee Road and Skokie Boulevard, Design/Final Engineering- $7,350: Page 37
Northbrook Manor, Design/Final Engineering & Construction- $462,480: Page 39
Shermer Road Underpass, Construction- $299,115: Page 41
Sunset Lane, Property/Easement Acquisition - $20,000: Page 44
Weller’s Subdivision, Property/Easement Acquisition - $400,000: Page 46
Water Fund - $6,870,820
Water Distribution System Improvement Projects-$3,000,000 (B): Page 48
Water Main Replacements
o Second Street- $350,000: Page 50
o Center Street- $475,000: Page 52
o Hillside Road- $657,500: Page 54
Water Production Facility Improvement Projects- $2,100,000 (B): Page 56
Water Meter Conversion Program- $75,000: Page 58
Step Van Replacement- $178,250 (B): Page 59
Vehicle Replacements- $35,070: Page 61
Sewer Fund - $2,789,573
Sanitary Sewer Improvements- $2,500,000 (B): Page 63
Sanitary Sewer Lining Program- $289,573(B): Page 64
General Fund - $3,316,890
Enterprise Resource Program- $450,000 (B): Page 66
Information Technology Equipment Replacement- $130,000: Page 69
E-911 Equipment Replacement- $175,000: Page 70
E-911 Portable Radio Replacements-$164,000: Page 71
E-911 Mobile Computer Equipment- $100,000: Page 72
Village Hall Window Replacements- $85,000: Page 73
FY 2014/2015 – Page 2
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
FY 2014/15 Projects - $19,602,897 (continued)
General Fund - $3,316,890 (continued)
Village Hall and Civic Building Automated Door Openers-$50,000: Page 75
Police Department Ramp Heater Replacement- $50,000: Page 76
Fire Department-Station 11 Drive Replacement- $107,000 (B): Page 77
Fire Department-Station 11 Building Improvements- $50,000 (B): Page 79
Public Works Center Office Build-Out- $150,000 (B): Page 81
Public Works Center Drive Repaving- $350,000 (B): Page 82
Ambulance Replacement- $295,000 (B): Page 83
Fire Engine Replacement - $620,000 (B): Page 85
Fire Department Vehicle Replacement- $45,000: Page 87
Light Tower Replacement- $25,000: Page 89
Dump Truck Replacement- $135,000 (B): Page 90
Aerial Lift Replacement- $115,000 (B): Page 92
Public Works Vehicle Replacement- $26,710: Page 94
Police Department Vehicle Replacement- $73,980: Pages 96-97
Administrative Vehicle Replacement- $30,000: Page 98
Public Works Equipment- $90,200: Page 99
(B) Proposed Bond Issue
FY 2014/2015 – Page 3
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
FY 2014/2015 – Page 4
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: Infrastructure Capital Improvement
Project Category: Asphalt Street Reconstruction & Rehabilitation
Location: Astor Place/Carter Court/Dauphine Avenue/Dauphine
Court/Division Alley/Division Street/Erin Lane/Happ Road/Killarney
Lane/Lee Road/Rosemary Lane/Summerfield Road/Sunset Ridge
Road/Willshire Lane
Cost: $761,065
The roadways selected for the 2014/15 asphalt reconstruction and rehabilitation program are rated as poor,
many failures, or limited failures.
Roadways rated as poor (1 on a scale of 5) have both a surface and a base that are failing and in need of
work. Typical examples of these failures include rutting of the pavement along the curbline or the edge
of the road cracking and breaking away from the rest of the road.
Roadways rated as having many failures (2 on a scale of 5) have large potholes form and signs of the
base beginning to fail will become evident. Typical examples of these failures include alligator cracking
or failure of the roadway surface.
Roadways rated as having limited failures (3 on a scale of 5) exhibit signs of the road surface cracking
and have small potholes beginning to form. Typical examples of these failures include horizontal and/or
longitudinal cracking in the street. Streets such as Erin Lane, which is rated as having “limited failures,”
are scheduled with other lower rated streets due to their close proximity.
The condition of these roads is such that patching is no longer an option and asphalt rehabilitation/
reconstruction is necessary. These repairs will be paid for with Motor Fuel Tax (MFT) revenues.
Address Range Approximate Square
Street Rating Last Resurfaced
(in hundred blocks) Yards of Pavement
Astor Place 200 Many Failures 1997 1,224
Carter Court 200 Many Failures 1997 2,824
Dauphine Avenue 3500 Many Failures - 1,224
Dauphine Court 600 Poor - 1,530
Division Alley 800 Many Failures 2005 645
Division Street 800 Limited Failures 2005 1,350
Erin Lane 200 Limited Failures 1997 730
Happ Road 1700 - 1800 Limited Failures 1994 7,547
Killarney Lane 1700 Many Failures 1997 2,693
Lee Road 400 - 700 Poor 1988 5,043
Rosemary Lane 1200 - 1300 Poor 1989 2,183
Summerfield Road 200 Limited Failures 1987 1,144
Sunset Ridge Road 800 Poor 1992 1,794
Willshire Lane 2700 Poor 1996 2,325
FY 2014/2015 – Page 5
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
FY 15-FY 19
Annual Program FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Astor Place - Happ Rd to East
End $ 17,289 $ - $ - $ - $ - $ 17,289
Carter Court - Happ Road to
East End $ 44,861 $ - $ - $ - $ - $ 44,861
Erin Lane - Happ Road to
North End $ 11,724 $ - $ - $ - $ - $ 11,724
Happ Road - Sunset Ridge
Road to Summerfield Drive $ 112,964 $ - $ - $ - $ - $ 112,964
Killarney Lane - Happ Road
to East End $ 44,967 $ - $ - $ - $ - $ 44,967
Lee Road - Dundee Road to
Morrison Road $ 156,377 $ - $ - $ - $ - $ 156,377
Rosemary Lane - Lee Road to
West End $ 42,234 $ - $ - $ - $ - $ 42,234
Summerfield Road - Happ
Road to West End $ 54,946 $ - $ - $ - $ - $ 54,946
Sunset Ridge Road - Skokie
Boulevard to DS@660N
Skokie Boulevard $ 43,415 $ - $ - $ - $ - $ 43,415
Sunset Ridge Road -
DS@660N Skokie Boulevard
to Skokie Boulevard $ 30,851 $ - $ - $ - $ - $ 30,851
Division Street - Dundee
Road to South End $ 22,724 $ - $ - $ - $ - $ 22,724
Division Alley - Division
Street to Bach Street $ 10,819 $ - $ - $ - $ - $ 10,819
Dauphine Avenue - East End
to Laburnum Drive $ 78,147 $ - $ - $ - $ - $ 78,147
Dauphine Court - Dauphine
Avenue to South End $ 20,220 $ - $ - $ - $ - $ 20,220
Dauphine Extension -
Dauphine Avenue to
SC@148S Dauphine Avenue $ 16,084 $ - $ - $ - $ - $ 16,084
Wilshire Extension -
Wilshire Lane to South End $ 9,526 $ - $ - $ - $ - $ 9,526
Wilshire Lane - Pfingsten
Road to East End $ 43,917 $ - $ - $ - $ - $ 43,917
Project Total $ 761,065 $ - $ - $ - $ - $ 761,065
Planned Financing
State Motor Fuel Tax
Receipts $ 761,065 $ - $ - $ - $ - $ 761,065
Fiscal Year Totals $ 761,065 $ - $ - $ - $ - $ 761,065
FY 2014/2015 – Page 6
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
FY 2014/2015 – Page 7
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
FY 2014/2015 – Page 8
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Astor Place Carter Court
Dauphine Avenue Dauphine Court
Division Alley Division Street
FY 2014/2015 – Page 9
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Erin Lane Happ Road
Killarney Court Killarney Lane
Lee Road Rosemary Lane
FY 2014/2015 – Page 10
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Summerfield Road Sunset Ridge Road
Willshire Lane
FY 2014/2015 – Page 11
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: Infrastructure Capital Improvement
Project Category: Bonded Asphalt Street Reconstruction &
Rehabilitation
Location: Summerhill/Wildebrook
Cost: $1,476,527
Approximately 14% of the Village’s asphalt streets have a condition rating of either a “1” (Poor) or “2” (Many
Failures). Generally, these streets are clustered together in subdivisions where the streets were originally built at
the same and/or resurfaced at the same time. Two areas have been identified where roadway patching is no
longer a viable option and asphalt reconstruction and/or rehabilitation is necessary:
Summerhill
Wildebrook
These areas constitute 5% of the total asphalt streets with a condition rating of a “1” or “2”. Many of these
streets have not been resurfaced since the mid-1990s. Waiting much longer on these areas may create a
situation where the streets degrade to the point of needing full reconstruction, thereby greatly increasing the
future cost. In short, rehabilitating or reconstructing the streets in these areas of town, which contain 2% of the
streets with a “poor” or “many failures” rating, in one year reduces the back log of failed/failing streets allowing
other similarly rated streets to be addressed in a timelier manner.
FY 14-FY 19
Bonded Asphalt Streets FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Summerhill $ 842,327 $ - $ - $ - $ - $ 842,327
Wildebrook $ 634,200 $ - $ - $ - $ - $ 634,200
Project Total $ 1,476,527 $ - $ - $ - $ - $ 1,476,527
Planned Financing
Designated
Revenue/Previous
Bond Proceeds $1,476,527 $ - $ - $ - $ - $ 1,476,527
Fiscal Year Totals $1,476,527 $ - $ - $ - $ - $ 1,476,527
FY 14-FY 18
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on
Previous Bonds $ 318,138 $ 318,793 $ 319,278 $ 319,278 $ 319,591 $ 1,595,078
Fiscal Year Totals $ 318,138 $ 318,793 $ 319,278 $ 319,278 $ 319,591 $ 1,595,078
The debt service on this bond will be paid for with MFT revenues. The annual debt service cost of this project
on bonds issued in FY 2013/14 averages to $319,016 (Term - 30 years, Rate - 4.0%).
FY 2014/2015 – Page 12
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
FY 2014/2015 – Page 13
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Summerhill
Cornflower Trail Lake Knoll Drive
Lavigne Lane Old Mill Road
Ridge Road Sleepy Hollow
FY 2014/2015 – Page 14
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Sunset Trail Valley Road
Whirlaway Drive White Oak Circle
White Oak Drive
FY 2014/2015 – Page 15
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Wildebrook
Bermuda Dunes Indian Wells Lane
Palm Canyon Drive Pebble Beach Road
Riviera Court Spyglass Lane
FY 2014/2015 – Page 16
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Torrey Pines Parkway
FY 2014/2015 – Page 17
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: Infrastructure Capital Improvement
Project Category: Concrete Street Reconstruction & Rehabilitation
Location: Mideast Area/Midwest Area
Cost: $626,418
The concrete streets of the Mideast and Midwest areas of town have been surveyed and an estimated number
of concrete panels have been identified for replacement. Deferring the replacement of the deteriorated panels
will result in more advanced degradation of roadways, including pavement failures, increased damage to
vehicles, and increased reconstruction and rehabilitation costs in the future.
Panels are approximately 5.89 cubic yards of concrete. In FY 2014/15, Village Staff anticipate replacing about
2,450 cubic yards of concrete, which equates to 287 cement trucks.
Concrete Street
Reconstruction and FY 15-FY 19
Rehabilitation FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Mideast & Midwest Areas $ 626,418 $ - $ - $ - $ 626,418
Project Total $ 626,418 $ - $ - $ - $ 626,418
Planned Financing
Bond Proceeds $ 626,418 $ - $ - $ - $ 626,418
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ 38,457 $ - $ - $ - $ - $ 38,457
Debt Service on Previous
Bonds $ - $ 38,457 $ 38,457 $ 38,457 $ 38,457 $ 153,828
Fiscal Year Totals $ 38,457 $ 38,457 $ 38,457 $ 38,457 $ 38,457 $ 192,285
At this time there is no identified funding source for the debt service for this project. The annual debt service
cost of this project on bonds issued in FY 2014/15 is $38,457 (Term - 30 years, Rate - 4.5%).
FY 2014/2015 – Page 18
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
FY 2014/2015 – Page 19
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: Infrastructure Capital Improvement
Project Category: Central Business District Infrastructure
Improvements and Streetscape Expansion
Location: Central Business District
Phase: Design/Final Engineering
Cost: $250,000
The Village of Northbrook underwent an extensive downtown planning effort that culminated in the Downtown
Area Plan in February 2012. Since that time, staff has been working on several components of that plan,
specifically the Shermerville Commons concept and the Central Business District Infrastructure Improvements
and Streetscape Expansion project.
The Central Business District Infrastructure Improvements and Streetscape Expansion project is made up of
several facets including expansion of the Village’s downtown streetscape, reconstructing and re-configuring the
downtown streets to incorporate more on-street parking, and replacement of the Shermer Road Bridge over the
West Fork of the North Branch of the Chicago River.
The goal is to maximize the amount of on-street parking while also rehabilitating asphalt streets in the Central
Business District that are currently rated as a “2” (Many Failures). These streets include Shermer Road, Meadow
Road, Cherry Lane, and Church Street. To accommodate parking as identified in the Downtown Area Plan, curb,
sidewalk, and Village utility connections would likely have to be moved; however, as many as 95 new public
parking spaces could be created.
Address Range Approximate Square
Street Rating Last Resurfaced
(in hundred blocks) Yards of Pavement
Cherry Lane 1900 Many Failures 1992 2,525
Church Street 1100 - 1300 Many Failures 2005 5,798
Meadow Road 1200 - 1300 Many Failures 2004 4,331
Shermer Road 1000 – 1200 Many Failures 1984 15,928
Movement of this infrastructure provides the Village an additional opportunity to refresh the existing
streetscape while also expanding to new areas. Streetscape will be expanded to new areas of Shermer Road
such as between Church Street and Waukegan Road to the north and between Walters Avenue and Illinois Road
to the south. The intent of this part of the project is to make the Central Business District more inviting for
shoppers, diners, residents, and visitors.
Lastly, as a component of this project, the Shermer Road Bridge will be replaced in its entirety. A bridge
assessment performed in 2012 identified that the superstructure of that bridge was in need of replacement in
the next five years. To minimize impacts on businesses in the downtown in the future, the bridge work will be
scheduled concurrently with the road rehabilitation work.
To complete this project, the Village will contract with an engineering firm for design of the roadways and bridge
during Fiscal Year 2014/15 with project construction scheduled for Fiscal Year 2015/16. This schedule allows
sufficient time for design and review by the Village Board and outreach to the businesses in the downtown prior
to work commencing.
Following the table on the next page are some renderings of the proposed street modifications.
FY 2014/2015 – Page 20
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
FY 15-FY 19
Central Business District FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Street and Parking
Reconfiguration
Engineering $ 150,000 $ - $ - $ - $ - $ 150,000
Shermer Road Bridge
Reconstruction
Engineering $ 100,000 $ - $ - $ - $ - $ 100,000
Street Reconstruction
(Church, Cherry, Meadow,
Shermer) $ - $1,500,000 $ - $ - $ - $ 1,500,000
Streetscape
Improvements/Extension $ - $ 150,000 $ - $ - $ - $ 150,000
Intersection
Improvements $ - $ 100,000 $ - $ - $ - $ 100,000
Shermer Road Bridge
Reconstruction $ - $ 850,000 $ - $ - $ - $ 850,000
Project Total $ 250,000 $2,600,000 $ - $ - $ - $ 2,850,000
Planned Financing
Bond Proceeds $ 250,000 $2,600,000 $ - $ - $ 2,850,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ - $ 201,766 $ - $ - $ - $ 201,766
Debt Service on Previous
Bonds $ - $ - $ 201,766 $ 201,766 $ 201,766 $ 605,298
Fiscal Year Totals $ - $ 201,766 $ 201,766 $ 201,766 $ 201,766 $ 807,064
At this time there is no identified funding source for the debt service for this project. The annual debt service
cost for the Street Reconstruction project on bonds issued in FY 2015/16 is $124,113 (Term – 20 years; Rate –
4.25%). The annual debt service cost for the Streetscape Improvements/Extension project on bonds issued in
FY 2015/16 is $11,283 (Term – 20 years; Rate – 4.25%). The annual debt service cost for the Intersection
Improvements project on bonds issued in FY 2015/16 is $6,321 (Term – 30 years; Rate – 4.75%). The annual
debt service cost for the Shermer Road Bridge Reconstruction project on bonds issued in FY 2015/16 is
$60,049 (Term – 30 years; Rate – 4.75%).
FY 2014/2015 – Page 21
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
FY 2014/2015 – Page 22
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
FY 2014/2015 – Page 23
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
FY 2014/2015 – Page 24
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: Infrastructure Capital Improvement
Project Category: Traffic Signal and Control Device Improvements
Location: Various Locations
Cost: $75,000
As changes in the Manual on Uniform Traffic Control Devices (MUTCD), State of Illinois law, and traffic patterns
occur, the Village installs additional and new types of signage and control devices to ensure roadways are safe
and that we are in compliance with applicable regulations. These improvements also help to minimize traffic
delays and conflicts between motorists and pedestrians. Additionally, as components of our traffic signals and
the controlling equipment age, they must be replaced and upgraded.
Recent examples of new traffic control devices include signage prohibiting handheld cell phone use in school
zones and in-street or LED pedestrian crossing signage. During FY 2014/15, the traffic signal heads on Pfingsten
Road will be upgraded to the new MUTCD standards.
Project Specifications:
o The Public Works Department will install new and additional traffic control devices as well as
upgrade existing traffic control devices that require it.
Project Benefits:
o New signage to comply with applicable regulations will be added as is necessary.
o Replace aging traffic signal heads and controller equipment.
o Minimize traffic delays and conflicts between motorists and pedestrians.
o Traffic signal heads on Pfingsten Road will be upgraded to the new MUTCD standards.
Traffic Signal/Street FY 15-FY 19
Light Improvements FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Intersection
Improvements at
Various Locations $ 75,000 $ - $ - $ - $ - $ 75,000
Project Total $ 75,000 $ - $ - $ - $ - $ 75,000
Planned Financing
Fund Reserves $ 75,000 $ - $ - $ - $ 75,000
FY 2014/2015 – Page 25
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: Infrastructure Capital Improvement
Project Category: Traffic Signal and Control Device Improvements
Location: Sanders Road and Lindenwood Lane
Cost: $150,000
Cook County will resurface Sanders Road from Techny Road to Lake Cook Road during Fiscal Year 2014/15. As
part of that work, they will replace the “temporary” wooden pole installations with permanent aluminum
fixtures. The traffic signal installation at Sanders Road and Lindenwood Lane occurred in 1999 as part of an
agreement with Cook County that requires if a permanent installation were to ever occur the Village would be
responsible for 50% of the construction cost. Replacement of the temporary poles with the permanent
installations will provide a more standardized look through this corridor and complete the project as part of the
overall construction process to minimize disruption to motorists and residents.
Project Specifications:
o The temporary traffic signals at Sanders Road and Lindenwood Lane will be replaced with a
permanent installation including new aluminum poles. The project will be completed by Cook
County as part of the
Project Benefits:
o New permanent installation for the traffic signals at Skokie Boulevard and Lindenwood Lane.
Traffic Signal/Street FY 15-FY 19
Light Improvements FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Intersection
Improvements at
Sanders Road and
Lindenwood Lane $ 150,000 $ - $ - $ - $ - $ 150,000
Project Total $ 150,000 $ - $ - $ - $ - $ 150,000
Planned Financing
Fund Reserves $ 150,000 $ - $ - $ - $ 150,000
FY 2014/2015 – Page 26
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: Infrastructure Capital Improvement
Project Category: Sidewalk Improvements
Location: Atlas Sections 6G, 6H, 6J, 6K, 7G, 7H, 7J, 7K
Cost: $103,909
The Village of Northbrook systematically surveys public sidewalks to identify defective and deteriorated sections
of sidewalk that create a potential hazard and a liability for the Village. Defective and deteriorated sections of
sidewalk are caused by a number of reasons including tree roots that push up sections of sidewalks and the
Midwest’s freeze/thaw cycle.
Replacement Process:
o Village staff survey sidewalks based on logical geographic areas (such as the one depicted in the
map below) to determine which portions are to be replaced.
o In addition to the replacement of failed sidewalk squares, the Village also installs ADA required
handicapped ramps at intersections and replaces select curbs adjacent to the sidewalks.
o In total, approximately 6% of Village sidewalks are replaced each year.
o All replacements are performed by the Village’s contractor.
Areas to be reviewed for replacement are detailed in the map on the following page.
FY 15-FY 19
Sidewalk Improvements FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Annual Program $ 103,909 $ 107,026 $ 110,237 $ 113,544 $ 116,951 $ 551,667
Fiscal Year Totals $ 103,909 $ 107,026 $ 110,237 $ 113,544 $ 116,951 $ 551,667
Planned Financing
Fund Reserves $ 103,909 $ 107,026 $ 110,237 $ 113,544 $ 116,951 $ 551,667
FY 2014/2015 – Page 27
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
FY 2014/2015 – Page 28
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: Stormwater
Project Category: Stormwater Mitigation Project
Location: Wescott Park Underground Storage
Project Phase: Design/Final Engineering
Cost: $577,500
Project Description: This project includes the construction of 20 acre-feet of underground storage at Wescott
Park and is intended to reduce flooding impacts for the Illinois Road watershed. Village staff continues to work
with their counterparts at the Park District to identify ways that an above ground facility can be constructed
which will reduce the cost of constructing this project.
Locations Impacted by the Project: Sunset Fields and Northbrook Park Subdivisions.
Properties Impacted: 91 properties will experience a reduction in flooding.
Structures Impacted: 12 of the 91 properties currently experience structure flooding. Staff anticipates that this
project will create a reduction in structure flooding for these properties.
Design: Design of the Wescott Park project is anticipated to take 2 years.
Construction: Construction of the Wescott Park Project is anticipated to take 2 years.
External Factors Affecting Design and Construction Timelines: Wescott Park is owned, operated, and is a highly
programmed facility for the Northbrook Park District. The Village has been working with the Northbrook Park
District and School District 30 to create a double use for this facility – a park on the surface with underground
stormwater detention (or some combination of the two). Preliminary cost estimates from the additional study of
this project indicates that the estimated cost of construction of roughly $8 million for this project is at the
median of the price range and can increase or decrease depending on the configuration of the construction and
amenities provided in the park. An intergovernmental agreement between the Village of Northbrook and the
Northbrook Park District will be needed for the project.
Photos of Flooding in the Project Area:
FY 2014/2015 – Page 29
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Wescott Park Project Map:
FY 15-FY 19
Wescott Park FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Design & Final Engineering $ 577,500 $ 577,500 $ - $ - $ - $ 1,155,000
Construction $ - $ - $3,674,250 $3,674,250 $ - $ 7,348,500
Project Total $ 577,500 $ 577,500 $3,674,250 $3,674,250 $ - $ 8,503,500
Planned Financing
Bond Proceeds $ 577,500 $ 577,500 $3,674,250 $3,674,250 $ - $ 8,503,500
Fiscal Year Totals $ 577,500 $ 577,500 $3,674,250 $3,674,250 $ - $ 8,503,500
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ 35,454 $ 36,504 $ 232,248 $ 239,016 $ - $ 543,222
Debt Service on Previous
Bonds $ - $ 35,454 $ 71,958 $ 304,206 $ 543,222 $ 954,840
Fiscal Year Totals $ 35,454 $ 71,958 $ 304,206 $ 543,222 $ 543,222 $ 1,498,062
The annual debt service cost of this project on bonds issued in FY 2014/15 is $35,454 (Term - 30 years, Rate -
4.5%). The annual debt service cost of this project on bonds issued in FY 2015/16 is $36,504 (Term - 30 years,
Rate - 4.75%). The annual debt service cost of this project on bonds issued in FY 2016/17 is $232,248 (Term -
30 years, Rate - 4.75%). The annual debt service cost of this project on bonds issued in FY 2017/18 is $239,016
(Term - 30 years, Rate – 5.0%).
FY 2014/2015 – Page 30
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: Stormwater
Project Category: Stormwater Mitigation Project
Location: Shermer Road Overflow Sewer
Project Phase: Construction
Cost: $1,185,075
Project Description: To help mitigate flooding in the Shermer Road/Woodlawn Road area, a 72-inch diameter
storm sewer will be constructed to convey water to the West Fork of the North Branch of the Chicago River and
replace the current overland drainage flow that extends through the opening at the Canadian Pacific Railroad
and Metra rail line embankment, which is known as the “Cattlepass.” The project is intended to mitigate
flooding impacts up to a 50-year storm.
Locations Impacted by the Project: Shermer Road Corridor and Northbrook Manor Subdivision.
Properties Impacted: 22 properties will experience a reduction in property flooding.
Structures Impacted: 17 of the 22 properties currently experience structure flooding. Staff anticipates that this
project will create a reduction in structure flooding for these properties.
Construction: Construction of the Shermer Road Overflow Sewer project is anticipated to take 1 year.
External Factors Affecting Design and Construction Timelines: The Shermer Road Overflow sewer will require
license agreements from the Canadian Pacific Railroad and Metra, and an easement from the Grainger property
for the construction of the proposed sewer.
Photos of Flooding in the Project Area:
FY 2014/2015 – Page 31
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Shermer Road Overflow Sewer Project Map:
Shermer Road Overflow FY 15-FY 19
Sewer FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Construction $1,185,075 $ - $ - $ - $ - $ 1,185,075
Project Total $1,185,075 $ - $ - $ - $ - $ 1,185,075
Planned Financing
Bond Proceeds $1,185,075 $ - $ - $ - $ - $ 1,185,075
Fiscal Year Totals $1,185,075 $ - $ - $ - $ - $ 1,185,075
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ 72,754 $ - $ - $ - $ - $ 72,754
Debt Service on Previous
Bonds $ - $ 72,754 $ 72,754 $ 72,754 $ 72,754 $ 291,016
Fiscal Year Totals $ 72,754 $ 72,754 $ 72,754 $ 72,754 $ 72,754 $ 363,770
The annual debt service cost of this project on bonds issued in FY 2014/15 is $72,754 (Term - 30 years, Rate -
4.5%).
FY 2014/2015 – Page 32
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: Stormwater
Project Category: Stormwater Mitigation Project
Location: Cherry Lane Underpass
Project Phase: Construction
Cost: $212,175
Project Description: The Cherry Lane underpass, a very important thoroughfare for the Village, floods during
high intensity rainfall events. The flooding is caused by a combination of the pumps not being able to discharge
the water fast enough away and the West Fork overtopping into the underpass. The proposed project includes
additional inlet capacity and a new conveyance storm sewer along Meadow Road.
Locations Impacted by the Project: Cherry Lane Underpass.
Properties Impacted: Ten (10) properties will experience a reduction in flooding.
Structures Impacted: One (1) of the 10 properties currently experiences structure flooding. Staff anticipates that
this project will create a reduction in structure flooding for this property.
Construction: Construction of the Cherry Lane Underpass project is anticipated to take 6 months.
External Factors Affecting Design and Construction Timelines: To construct this project, the Village must obtain
an easement from the condominiums at the northwest corner of Cherry Lane and Meadow Road.
Photos of Flooding in the Project Area:
FY 2014/2015 – Page 33
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Cherry Lane Underpass Project Map:
FY 15-FY 19
Cherry Lane Underpass FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Construction $ 212,175 $ - $ - $ - $ - $ 212,175
Project Total $ 212,175 $ - $ - $ - $ - $ 212,175
Planned Financing
Bond Proceeds $ 212,175 $ - $ - $ - $ - $ 212,175
Fiscal Year Totals $ 212,175 $ - $ - $ - $ - $ 212,175
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ 13,026 $ - $ - $ - $ - $ 13,026
Debt Service on Previous
Bonds $ - $ 13,026 $ 13,026 $ 13,026 $ 13,026 $ 52,104
Fiscal Year Totals $ 13,026 $ 13,026 $ 13,026 $ 13,026 $ 13,026 $ 65,130
The annual debt service cost of this project on bonds issued in FY 2014/15 is $13,026 (Term - 30 years, Rate -
4.5%).
FY 2014/2015 – Page 34
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: Stormwater
Project Category: Stormwater Mitigation Project
Location: Church Street (Near Chapel Court)
Project Phase: Property/Easement Acquisition & Design/Final
Engineering
Cost: $19,000
Project Description: To reduce roadway pavement flooding impacts on Church Street and lawn areas on the
adjacent properties near the Chapel Court intersection, a storm relief sewer and drainage structure
improvements are proposed.
Locations Impacted by the Project: 1200 and 1300 blocks of Church Street.
Properties Impacted: Five (5) properties will experience a reduction in flooding.
Structures Impacted: No properties are currently impacted by structure flooding.
Additional Study Needed: Additional study of this project is not needed.
Design: Design of the Church Street project is anticipated to take 1 year.
Construction: Construction of the Church Street project is anticipated to take 3 months.
External Factors Affecting Design and Construction Timelines: The Church Street project will require an
easement for the extension of a storm sewer to the West Fork of the North Branch of the Chicago River.
Photos of Flooding in the Project Area:
At this time, staff does not have photos documenting the flooding conditions in this location.
FY 2014/2015 – Page 35
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Church Street (near Chapel Court) Project Map:
FY 15-FY 19
Church Street FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Property & Easement
Acquisition $ 10,000 $ - $ - $ - $ - $ 10,000
Design/Final Engineering $ 9,000 $ - $ - $ - $ - $ 9,000
Construction $ - $ 63,135 $ - $ - $ - $ 63,135
Project Total $ 19,000 $ 63,135 $ - $ - $ - $ 82,135
Planned Financing
Bond Proceeds $ 19,000 $ 63,135 $ - $ - $ - $ 82,135
Fiscal Year Totals $ 19,000 $ 63,135 $ - $ - $ - $ 82,135
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ 1,167 $ 3,991 $ - $ - $ - $ 5,158
Debt Service on Previous
Bonds $ - $ 1,167 $ 5,158 $ 5,158 $ 5,158 $ 16,641
Fiscal Year Totals $ 1,167 $ 5,158 $ 5,158 $ 5,158 $ 5,158 $ 21,799
The annual debt service cost of this project on bonds issued in FY 2014/15 is $1,167 (Term - 30 years, Rate -
4.5%). The annual debt service cost of this project on bonds issued in FY 2015/16 is $3,991 (Term - 30 years,
Rate - 4.75%).
FY 2014/2015 – Page 36
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: Stormwater
Project Category: Stormwater Mitigation Project
Location: Dundee Road & Skokie Boulevard
Project Phase: Design/Final Engineering
Cost: $7,350
Project Description: This project includes the construction of additional inlets and/or replacing existing inlets
with those with a higher capacity. Sediment will be removed from the northerly drainage ditch to improve
conveyance and outlet conditions. Flood conveyance will also be improved by depressing the driveway
entrances on the north side of Dundee Road, east of Skokie Boulevard, in order to reinstate the easterly flood
overflow paths.
Locations Impacted by the Project: The intersection of Dundee Road and Skokie Boulevard.
Properties Impacted: Four (4) properties will experience a reduction in flooding.
Structures Impacted: No properties are currently impacted by structure flooding.
Additional Study Needed: Additional study of this project is not needed.
Design: Design of the Dundee Road and Skokie Boulevard project is anticipated to take 6 months.
Construction: Construction of the Dundee Road and Skokie Boulevard project is anticipated to take 3 months.
External Factors Affecting Design and Construction Timelines: The Dundee Road and Skokie Boulevard project
will require Village staff to coordinate and consult with the Illinois Department of Transportation regarding
drainage concerns and responsibilities along Dundee Road.
Photos of Flooding in the Project Area:
FY 2014/2015 – Page 37
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Dundee Road & Skokie Boulevard Project Map:
Dundee Road & Skokie FY 15-FY 19
Boulevard FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Design/Final Engineering $ 7,350 $ - $ - $ - $ - $ 7,350
Construction $ - $ 46,200 $ - $ - $ - $ 46,200
Project Total $ 7,350 $ 46,200 $ - $ - $ - $ 53,550
Planned Financing
Bond Proceeds $ 7,350 $ 46,200 $ - $ - $ - $ 53,550
Fiscal Year Totals $ 7,350 $ 46,200 $ - $ - $ - $ 53,550
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ 452 $ 2,921 $ - $ - $ - $ 3,373
Debt Service on Previous
Bonds $ - $ 452 $ 3,373 $ 3,373 $ 3,373 $ 10,571
Fiscal Year Totals $ 452 $ 3,373 $ 3,373 $ 3,373 $ 3,373 $ 13,944
The annual debt service cost of this project on bonds issued in FY 2014/15 is $452 (Term - 30 years, Rate -
4.5%). The annual debt service cost of this project on bonds issued in FY 2015/16 is $2,921 (Term - 30 years,
Rate - 4.75%).
FY 2014/2015 – Page 38
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: Stormwater
Project Category: Stormwater Mitigation Project
Location: Northbrook Manor
Project Phase: Design/Final Engineering & Construction
Cost: $462,480
Project Description: This project includes the construction of a 4-foot diameter relief sewer along Spruce Street
between Illinois Road and Maple Avenue. The new sewer will allow for the removal of the flap gates on the
existing 3-foot and 5-foot diameter storm trunk lines on Illinois Road. The flap gates do cause conveyance
concerns during storm events where the water levels in the West Fork are low.
Locations Impacted by the Project: 1800 Blocks of Oak Avenue, Illinois Road, Maple Avenue, 1900 Block of Oak,
and the 1480 and 1490 Blocks of Shermer Road.
Properties Impacted: 60 properties will experience a reduction in flooding.
Structures Impacted: No properties are currently impacted by structure flooding.
Additional Study Needed: Additional study of this project is not needed.
Design: Design of the Northbrook Manor project is anticipated to take 6 months.
Construction: Construction of the Northbrook Manor project is anticipated to take 6 months.
External Factors Affecting Design and Construction Timelines: There are no external factors affecting design
and construction of this project.
Photos of Flooding in the Project Area:
FY 2014/2015 – Page 39
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Northbrook Manor Project Map:
FY 15-FY 19
Northbrook Manor FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Design/Final Engineering $ 60,900 $ - $ - $ - $ - $ 60,900
Construction $ 401,580 $ - $ - $ - $ - $ 401,580
Project Total $ 462,480 $ - $ - $ - $ - $ 462,480
Planned Financing
Bond Proceeds $ 462,480 $ - $ - $ - $ - $ 462,480
Fiscal Year Totals $ 462,480 $ - $ - $ - $ - $ 462,480
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ 28,393 $ - $ - $ - $ - $ 28,393
Debt Service on Previous
Bonds $ - $ 28,393 $ 28,393 $ 28,393 $ 28,393 $ 113,572
Fiscal Year Totals $ 28,393 $ 28,393 $ 28,393 $ 28,393 $ 28,393 $ 141,965
The annual debt service cost of this project on bonds issued in FY 2014/15 is $28,393 (Term - 30 years, Rate -
4.5%).
FY 2014/2015 – Page 40
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: Stormwater
Project Category: Stormwater Mitigation Project
Location: Shermer Road Underpass
Project Phase: Construction
Cost: $299,115
Project Description: This project involves coordinating with the Illinois Department of Transportation (IDOT),
who maintains the roadway and drainage system that serves this location, to construct the necessary storm
sewer extension and drainage structure improvements. This will include a new 3-foot diameter storm sewer
that will extend from the underpass to the Willow Road storm sewer system. When the underpass is flooded,
direct access to the commercial and industrial properties on Shermer and Holste Roads is impacted. The only
alternative access to these properties is from the south through the Village of Glenview.
Locations Impacted by the Project: 2700 to 3000 Blocks of Shermer Road, 1800 and 1900 Blocks of Holste and
Old Willow.
Properties Impacted: One (1) property will experience a reduction in flooding.
Structures Impacted: No properties are currently impacted by structure flooding.
Construction: Construction of the Shermer Road Underpass project is anticipated to take 6 months.
External Factors Affecting Design and Construction Timelines: Due to the train derailment and subsequent
bridge collapse on July 4, 2012, a new Shermer Road underpass is currently being constructed with a timeline for
construction completion being November 2013. The Village will be working with Union Pacific, IDOT and the
Village of Glenview during this this entire process and with them, will determine the best schedule for this
project. IDOT owns and maintains the section of Shermer Road, south of Willow Road, and the drainage system
serving this area. Additionally, Northbrook will have to work with the Village of Glenview to complete its
permitting process as the storm sewer is extended to the Willow Road sewer.
FY 2014/2015 – Page 41
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Photos of Flooding in the Project Area:
Shermer Road Underpass Project Map:
FY 2014/2015 – Page 42
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
FY 15-FY 19
Shermer Rd. Underpass FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Construction $ 299,115 $ - $ - $ - $ - $ 299,115
Project Total $ 299,115 $ - $ - $ - $ - $ 299,115
Planned Financing
Bond Proceeds $ 299,115 $ - $ - $ - $ - $ 299,115
Fiscal Year Totals $ 299,115 $ - $ - $ - $ - $ 299,115
FY 14-FY 18
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ 18,364 $ - $ - $ - $ - $ 18,364
Debt Service on Previous
Bonds $ - $ 18,364 $ 18,364 $ 18,364 $ 18,364 $ 73,456
Fiscal Year Totals $ 18,364 $ 18,364 $ 18,364 $ 18,364 $ 18,364 $ 91,820
The annual debt service cost of this project on bonds issued in FY 2014/15 is $18,364 (Term - 30 years, Rate -
4.5%).
FY 2014/2015 – Page 43
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: Stormwater
Project Category: Stormwater Mitigation Project
Location: Sunset Lane
Project Phase: Property/Easement Acquisition
Cost: $20,000
Project Description: This project includes the construction of a 3-foot diameter storm sewer that will extend
between Sunset Lane to the existing detention basin on Commercial Avenue, which will be expanded by 2.5
acre-feet to mitigate the increased flow from the new sewer. The new sewer will reduce flooding conditions on
the roadway and front yards on Sunset Lane.
Locations Impacted by the Project: 3900 and 4000 Block of Sunset Lane.
Properties Impacted: 13 properties will experience a reduction in flooding.
Structures Impacted: No properties are currently impacted by structure flooding.
Additional Study Needed: Additional study of this project is not needed.
Design: Design of the Sunset Lane project is expected to take 6 months.
Construction: Construction of the Sunset Lane project is anticipated to take 3 months.
External Factors Affecting Design and Construction Timelines: Easements are needed from two (2) to three (3)
properties in order for the Sunset Lane project to be completed.
Photos of Flooding in the Project Area:
At this time, staff does not have photos documenting the flooding conditions in this location.
FY 2014/2015 – Page 44
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Sunset Lane Project Map:
FY 15-FY 19
Sunset Lane FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Property & Easement
Acquisition $ 20,000 $ - $ - $ - $ - $ 20,000
Design/Final Engineering $ - $ 56,700 $ - $ - $ - $ 56,700
Construction $ - $ 375,705 $ - $ - $ - $ 375,705
Project Total $ 20,000 $ 432,405 $ - $ - $ - $ 452,405
Planned Financing
Bond Proceeds $ 20,000 $ 432,405 $ - $ - $ - $ 452,405
Fiscal Year Totals $ 20,000 $ 432,405 $ - $ - $ - $ 452,405
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ 1,228 $ 27,333 $ - $ - $ - $ 28,561
Debt Service on Previous
Bonds $ - $ 1,228 $ 28,561 $ 28,561 $ 28,561 $ 86,911
Fiscal Year Totals $ 1,228 $ 28,561 $ 28,561 $ 28,561 $ 28,561 $ 115,472
The annual debt service cost of this project on bonds issued in FY 2014/15 is $1,228 (Term - 30 years, Rate -
4.5%). The annual debt service cost of this project on bonds issued in FY 2015/16 is $27,333 (Term - 30 years,
Rate - 4.75%).
FY 2014/2015 – Page 45
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: Stormwater
Project Category: Stormwater Mitigation Project
Location: Weller’s Subdivision (Weller, Hillcrest & Christina Lanes)
Project Phase: Property/Easement Acquisition
Cost: $400,000
Project Description: This project will address street and yard flooding on Weller Lane that is being caused by a
very poorly draining storm sewer outlet. It is proposed to construct a new conveyance storm sewer with inlet
improvements along with a 1.8 acre-foot detention facility for mitigation.
Locations Impacted by the Project: 2800 and 2900 blocks of Weller Lane, 1500 block of Christina Lane, and 2800
block of Keystone Road.
Properties Impacted: Seven (7) properties will experience a reduction in flooding.
Structures Impacted: No properties are currently impacted by structure flooding.
Additional Study Needed: Additional study of this project is not needed.
Design: Design of the Weller’s Subdivision project is expected to take 12 months.
Construction: Construction of the Weller’s Subdivision project is anticipated to take 6 months.
External Factors Affecting Design and Construction Timelines: The Village must acquire one (1) property for the
construction of the detention basin as part of this project.
Photos of Flooding in the Project Area:
FY 2014/2015 – Page 46
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Weller’s Subdivision Project Map:
FY 15-FY 19
Weller's Subdivision FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Property & Easement
Acquisition $ 400,000 $ - $ - $ - $ - $ 400,000
Design/Final Engineering $ - $ 43,050 $ - $ - $ - $ 43,050
Construction $ - $ 282,555 $ - $ - $ - $ 282,555
Project Total $ 400,000 $ 325,605 $ - $ - $ - $ 725,605
Planned Financing
Bond Proceeds $ 400,000 $ 325,605 $ - $ - $ - $ 725,605
Fiscal Year Totals $ 400,000 $ 325,605 $ - $ - $ - $ 725,605
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ 24,557 $ 20,582 $ - $ - $ - $ 45,139
Debt Service on Previous
Bonds $ - $ 24,557 $ 45,139 $ 45,139 $ 45,139 $ 159,974
Fiscal Year Totals $ 24,557 $ 45,139 $ 45,139 $ 45,139 $ 45,139 $ 205,113
The annual debt service cost of this project on bonds issued in FY 2014/15 is $24,557 (Term - 30 years, Rate -
4.5%). The annual debt service cost of this project on bonds issued in FY 2015/16 is $20,582 (Term - 30 years,
Rate - 4.75%).
FY 2014/2015 – Page 47
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: Water
Project Category: Water Distribution System Improvements
Cost: $3,000,000
One of the Village’s goals for the water distribution system has been to increase pressure in areas of the Village
with higher elevations and also provide for additional storage capacity with a new water tower. Both of these
goals were made possible by the construction of the new one million gallon tower at 201 Huehl Road. The new
water tower was slowly brought into service at the end of 2011. During this process the Village was using both
the Cedar Lane tower as well as the Huehl Road tower. Once the Huehl Road tower’s water elevation was
brought above the Cedar Lane tower’s high water elevation, the old tower was taken out of service.
The Village continued to gradually fill the Huehl Road tower and water pressure in the Village slowly started to
rise. While our water mains are rated for water pressure much higher than what our distribution system
operates at, we expected to experience breaks on water mains which were already challenged due to age,
corrosion and other factors impacting their reliability. Initially, the Village experienced a number of breaks which
were within reason for the time of year and the system condition. However, throughout the spring and summer
of 2012, the Village started to experience an inordinate number of water main breaks far exceeding what would
have reasonably been expected. To help buffer pressures in the system, the old water tower was brought back
online and pressures returned to their pre-water tower filling levels; the Village has since experienced a
normalized number of breaks.
In response to these operational challenges, the Public Works Department has been working with consulting
engineers to identify what solutions and improvements to the distribution system must be made to effectively
utilize the tower(s). The Village has completed a multitude of system improvement projects which were
required to bring the new tower into service and decommission the Cedar Lane tower. The only project which
was not completed was the recommendation to increase the size of portions of the Dundee Road water main.
The Dundee Road water main serves as a critical piece of the water distribution infrastructure that the Village
operates and provides water from the water plant to the western side of Northbrook and now, to the Huehl
tower. Based on the age, size, and critical nature of the main, staff is still concerned about future failures. The
Huehl tower was able to be put into service because the water plant pumps have sufficient pumping capacity to
overcome the constraints experienced while pumping water through smaller water mains on Dundee Road.
At this time, staff is working with our consulting engineer to complete the updated water model. This new water
distribution model should be completed in December 2013. This will give Village staff the ability to run scenarios
to help determine what improvements are still needed to the distribution system in order to meet the
previously stated goals while maintaining a normalized number of main breaks.
At a minimum, staff will be reviewing the following options:
Since the Cedar Lane tower is remaining under the current Shermerville Commons and Downtown Plan,
retain this tower as operational and operate in conjunction with the new tower.
If the Cedar Lane tower is to remain but not operational, improvements to the Dundee Water Main and
additional surge protection in central part of Village may be necessary.
Remove a number of smaller water mains interconnected to the Dundee water main thus making the
Dundee main more of a true transmission main similar to the cross-town water main which feeds the
West Side Reservoir.
FY 2014/2015 – Page 48
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Due to the critical nature of the Dundee water main and the need to consider replacement, does the
size of the main meet our water demands and operational needs now and into the future.
Other options as identified within the analysis.
At this time staff is unable to provide a recommendation as to what the exact system improvements will be;
therefore, for now, we will categorize these improvements as general water distribution improvements. After
review of the options, it is anticipated that additional direction will be identified prior to next fiscal year. Staff
will also be continuing to pursue options for addressing the replacement or repair of critical portions of the
Dundee Water Main. If prior to final budget approval more refined cost estimates are available, they will be
incorporated into that document. Likewise subsequent funding may need to be included within the CIP.
Currently staff is anticipating a cost of $3,000,000 for next year dependent on the direction taken.
FY 15-FY 19
Water Distribution FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Water Distribution System
Improvements $3,000,000 $3,000,000 $2,000,000 $ - $ - $8,000,000
Project Total $3,000,000 $3,000,000 $2,000,000 $ - $ - $8,000,000
Planned Financing
Bond Proceeds $3,000,000 $3,000,000 $2,000,000 $ - $ - $8,000,000
Total $3,000,000 $3,000,000 $2,000,000 $ - $ - $8,000,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ 184,175 $ 189,629 $ 126,419 $ - $ - $ 500,223
Debt Service on Previous
Bonds $ - $ 184,175 $ 373,804 $ 500,223 $ 500,223 $1,558,425
Fiscal Year Totals $ 184,175 $ 373,804 $ 500,223 $ 500,223 $ 500,223 $2,058,648
The annual debt service cost of this project on bonds issued in FY 2014/15 is $184,175 (Term - 30 years, Rate –
4.5%). The annual debt service cost of this project on bonds issued in FY 2015/16 is $189,629 (Term - 30 years,
Rate – 4.75%). The annual debt service cost of this project on bonds issued in FY 2016/17 is $126,419 (Term -
30 years, Rate – 4.75%).
FY 2014/2015 – Page 49
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: Water
Project Category: Water Main Replacement
Project Location: Second Street
Cost: $350,000
The replacement of the water main on Second Street was deferred from FY 2012/13 to FY 2014/15 to avoid
conflict with the Techny Road stormwater project and road reconstruction as well as to minimize disruptions
resulting from construction for residents on Second Street and those that use this road to get to Glenbrook
North High School. The water main on Second Street has experienced 22 breaks since it was installed in 1954.
While not the only feed to Glenbrook North High School (GBN), this is the larger of the two (2) and is considered
the primary feed. The existing 6-inch diameter main will be replaced with a main 8 inches or larger to
accommodate the increased volume needed by the community and to ensure sufficient water flow if needed by
the Fire Department in case of an emergency.
Replace Number of Estimated
Second Street Existing Size With Length Year Breaks to Date Cost
Techny Rd. to GBN 6" 8" 1400 1954 22 $ 350,000
Project Total $ 350,000
Planned Financing
User Fees $ 350,000
Total $ 350,000
FY 2014/2015 – Page 50
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
FY 2014/2015 – Page 51
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: Water
Project Category: Water Main Replacement
Project Location: Center Street
Cost: $475,000
The water main on Center Street has experienced 4 breaks since these two sections of main were installed in
1916 and 1927 respectively. The existing 4-inch and 6-inch diameter mains will be replaced with a main 8 inches
or larger to accommodate the increased volume needed by larger homes (particularly those with fire
suppression system) and to ensure sufficient water flow if needed by the Fire Department in case of an
emergency.
Replace Number of Estimated
Center Avenue Existing Size With Length Year Breaks to Date Cost
First St. to Greenbriar Ln. 4" 8" 1,150 1916 1 $ 320,000
Greenbriar Ln. to
Briarwood Ln. 6" 8" 850 1927 3 $ 155,000
Project Total $ 475,000
Planned Financing
User Fees $ 475,000
Total $ 475,000
FY 2014/2015 – Page 52
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
FY 2014/2015 – Page 53
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: Water
Project Category: Water Main Replacement
Project Location: Hillside Road
Cost: $657,500
This section of water main has had a significant number of breaks. The section provides a critical North/South
connection between Shermer Road and Walters Avenue and is essential for looping in this area. The existing 6-
inch diameter main will be replaced with an 8-inch main to accommodate the increased volume needed by the
community and to ensure sufficient water flow if needed by the Fire Department in case of an emergency.
Replace Number of Estimated
Hillside Road Existing Size With Length Year Breaks to Date Cost
Shermer Rd. to Walters Ave. 6" 8" 2800 1929 30 $ 657,500
Project Total $ 657,500
Planned Financing
User Fees $ 657,500
Total $ 657,500
FY 2014/2015 – Page 54
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
FY 2014/2015 – Page 55
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: Water
Project Category: Water Production Facilities Improvement
Cost: $2,100,000
Below is a table that outlines the water production facilities improvement projects over the 2014/15 Fiscal Year.
Details for each project follow this summary.
Water Production Facilities FY 15-FY 19
Improvements FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Pump Rebuild $ 50,000 $ - $ - $ - $ - $ 50,000
Mechanical Improvements,
Water Plant $1,100,000 $ - $ - $ - $ - $ 1,100,000
Mechanical Improvements, West
Side Reservoir $ 200,000 $ - $ - $ - $ - $ 200,000
Mechanical Improvements, Lake
Front Pumping Station $ 550,000 $ - $ - $ - $ - $ 550,000
Raw Water Transmission Main $ 200,000 $ - $ - $ - $ - $ 200,000
Project Total $2,100,000 $ - $ - $ - $ - $ 2,100,000
Planned Financing
User Charges $ 50,000 $ - $ - $ - $ - $ 50,000
Bond Proceeds $2,050,000 $ - $ - $ - $ - $ 2,050,000
Total $2,100,000 $ - $ - $ - $ - $ 2,100,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ 125,853 $ - $ - $ - $ - $ 125,853
Debt Service on Previous Bonds $ - $ 125,853 $ 125,853 $ 125,853 $ 125,853 $ 503,412
Fiscal Year Totals $ 125,853 $ 125,853 $ 125,853 $ 125,853 $ 125,853 $ 629,265
The annual debt service cost of this project on bonds issued in FY 2014/15 is $125,853 (Term - 30 years, Rate –
4.5%).
Pump Rebuild
To ensure the continued and reliable operation of the pumps that send water from the water plant to the
distribution system and also help to provide pressure to the distribution system, a proactive maintenance cycle
is necessary. On a regular basis, the Village will remove a pump from service and have a contractor inspect it,
replace worn parts, and reinstall the pump. Doing so helps to extend the useful life of the pumps and helps to
identify the state of the pumps allowing staff to plan for their replacement.
Mechanical Improvements, Water Plant
A study was completed in FY 2013/14 to determine the most appropriate size and type of generator to replace
the existing generator, which is over 25 years old. The generator will be replaced and installed in FY 2014/15.
This generator is responsible for keeping the plant operational during electrical outages. It is not possible for
FY 2014/2015 – Page 56
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
the plant to operate without a reliable electricity source, a lack of which will impact the Village’s ability to
deliver water to the community.
Mechanical Improvements, West Side Reservoir
During the summer of 2011, an electrical fire damaged the electrical control system and emergency generator at
this location. While these items have been repaired, they are antiquated and in need of replacement. With this
project, the emergency generator and automatic transfer switch will be replaced.
Mechanical Improvements, Lake Front Pumping Station
The generator and transfer switch at the Lake Front Pumping Station will be replaced in FY 2014/15 to ensure
that the Village can continue to draw water from Lake Michigan and produce clean drinking water even during a
power outage.
Raw Water Transmission Main
The Village’s 24” raw water main was constructed in 1963. Since that time, there have been significant changes
to the land over this main, including the construction of a fifty-foot tall hill, a lagoon, and an expanded Eden’s
expressway. To help protect the transmission line, cathodic protection will be added to the main. Cathodic
protection reduces the effect of electrolysis (electric current running through the ground) that can cause the
main to failure prematurely. A break or failure in this main could result in damage to the property along the
path that it travels, incurring significant costs for emergency repair, reducing the Village’s ability to deliver raw
water to the plant and limiting the Village’s ability to produce water for its customers.
FY 2014/2015 – Page 57
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: Water
Project Category: Water Meter Conversion Program
Cost: $75,000
As meters deteriorate or become defective or when a permit has been issued for new water meter service, the
Village will purchase new meters for installation in residential and commercial structures. This remote read
program has been in place for new construction since 1995. Residents are encouraged to have the Village install
remote read devices.
Conversion Process:
o The Village is committed to a multi-year program to replace water meters that are read from the
“inside only” with meters that can be read from outside, remote devices.
o The replacement of “inside only” meters ensures that readings are obtained more efficiently
and frequently.
o These costs also include the acquisition of electronic meter reading devices to download data
from the remote meters.
Water Meter Conversion FY 15-FY 19
Project FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Meter Purchases $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 375,000
Fiscal Year Totals $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 375,000
Planned Financing
User Charges/Fund Reserve $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 375,000
Total $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 375,000
FY 2014/2015 – Page 58
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: Water
Project Category: Vehicle Replacement
Unit #400: 2000 Freightliner MT45 Step Van
Cost: $178,250
Mileage: 47,208 2012 Miles: 2,684
2012 Repair Cost: $724 (Average: $946) 2012 Repair Hours: 47 hours (Average: 28.75 hours)
Unit #400 is a 2000 Freightliner MT45 Step Van. This van is used on a daily basis to transport employees,
materials (i.e. water main sleeves, sections of pipe, valves, etc.), tools (i.e. pumps, pipe saws, hydraulic
chainsaws, etc.), and equipment needed for among other things emergency water main and valve repairs. The
frame is beginning to separate due to rust which with the weight of materials and tools could result in failure of
frame if not replaced. Additionally, the van’s body has noticeable signs of rust and corrosion which is further
degrading the integrity of the vehicle. For these reasons, the Fleet Maintenance Supervisor recommends
replacement of this vehicle during FY 2014/15.
FY 15-FY 19
Vehicle Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Step Van $ 178,250 $ - $ - $ - $ - $ 178,250
Project Total $ 178,250 $ - $ - $ - $ - $ 178,250
Planned Financing
Bond Proceeds $ 178,250 $ - $ - $ - $ - $ 178,250
Total $ 178,250 $ - $ - $ - $ - $ 178,250
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ 16,033 $ - $ - $ - $ - $ 16,033
Debt Service on Previous
Bonds $ - $ 16,033 $ 16,033 $ 16,033 $ 16,033 $ 64,132
Fiscal Year Totals $ 16,033 $ 16,033 $ 16,033 $ 16,033 $ 16,033 $ 80,165
The annual debt service cost of this project on bonds issues in FY 2014/15 is $16,033 (Term - 15 years, Rate –
4.0%).
FY 2014/2015 – Page 59
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
FY 2014/2015 – Page 60
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: Water
Project Category: Vehicle Replacement
Unit #409: 2003 Chevrolet C1500 Pickup
Cost: $35,070
Mileage: 129,909 2012 Miles: 27,519
2012 Repair Cost: $1,175 (Average: $946) 2012 Repair Hours: 28 hours (Average: 28.75 hours)
Unit #409 is a 2003 Chevrolet C1500 Pickup. This pickup is used on a daily basis to transport employees,
materials, tools, and equipment for operations. The truck frame and body exhibit corrosion and at the time of
this vehicle’s replacement it will have approximately 155,000 miles. The 2012 repair cost for this unit was also
above average. For these reasons, the Fleet Maintenance Supervisor recommends replacement of this vehicle
during FY 2014/15.
FY 15-FY 19
Vehicle Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
#409, 2003 Chevrolet C1500
Pickup $ 35,070 $ - $ - $ - $ - $ 35,070
Project Total $ 35,070 $ - $ - $ - $ - $ 35,070
Planned Financing
User Charges $ 35,070 $ - $ - $ - $ - $ 35,070
Total $ 35,070 $ - $ - $ - $ - $ 35,070
FY 2014/2015 – Page 61
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
FY 2014/2015 – Page 62
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: Sanitary Sewer
Project Category: Sewer Main Replacement
Project Location: Skokie Boulevard
Cost: $2,500,000
The Village owns and maintains a sanitary sewer system along Skokie Boulevard, running from Lake Cook Road
to the southern corporate limit. This line services approximately 2 million square feet of commercial, office, and
light industrial buildings making up the “Skokie Corridor.” This system includes 14,100 feet of 8-inch, 10-inch,
and 12-inch gravity sanitary sewer pipe and lift stations at 100 and 1200 Skokie Boulevard. The lift station at
1200 Skokie Boulevard, commonly known as the ComEd Lift Station, pumps the effluent produced along the
Skokie Corridor and discharges it to the Metropolitan Water Reclamation District (MWRD) main on Sunset Ridge
Road.
To ensure that the sanitary sewers and lift stations serving the Skokie Corridor continue to meet the long term
needs of the existing properties, as well as having enough capacity for future redevelopment and development
of properties along the corridor, an engineering study of those sanitary sewers and specifically the ComEd lift
station was completed during FY 2013/14.
The results of that study showed that the ComEd Lift Station is sufficient to meet the needs of the corridor;
however, the sanitary sewer main serving the corridor is in need of replacement and the size must be increased
in several stretches. Replacement of these segments will eliminate flat or sagging sections of main while
increasing the size of other segments will ensure there is enough capacity in the pipe to serve all customers.
FY 15-FY 19
Sanitary Sewer Fund Projects FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Skokie Blvd. Main Replacement $ 2,500,000 $ - $ - $ - $ - $ 2,500,000
Project Total $ 2,500,000 $ - $ - $ - $ - $ 2,500,000
Planned Financing
Bond Proceeds $ 2,050,000 $ - $ - $ - $ - $ 2,050,000
Proceeds from Previous Bond Issuance $ 450,000 $ - $ - $ - $ - $ 450,000
Total $ 2,500,000 $ - $ - $ - $ - $ 2,500,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ 125,853 $ - $ - $ - $ - $ 125,853
Debt Service on Previous Bonds $ 31,190 $ 157,043 $ 157,043 $ 157,043 $ 157,043 $ 659,362
Fiscal Year Totals $ 157,043 $ 157,043 $ 157,043 $ 157,043 $ 157,043 $ 785,215
A sanitary sewer rate increase of 12% of which is attributable to this project will be needed in addition to the
20% increase identified in the Executive Summary (page 14). The annual debt service cost of this project from
bond issued in FY 2013/14 is $31,190. The annual debt service cost of this project on bonds issued in FY
2014/15 is $125,853 (Term - 30 years, Rate – 4.5%).
FY 2014/2015 – Page 63
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: Sanitary Sewer
Project Category: Sanitary Sewer Lining Program
Cost: $289,573
On a routine basis, the Village inspects its sanitary sewer lines with televising equipment to identify areas in
need of repair due to pipe failures, joint degradation, cracks in pipes, obstructions, and other age related
failures. To repair the deficiencies in sanitary sewer lines, one (1) of three (3) methods can be used: repair at the
point of failure, replacement of the failed segment, and lining of the section of sanitary sewer. Point repair and
line replacement require excavation, which, depending on the area of the repair, could require the need to
excavate in roads and disturb public and private property. Sewer lining requires no excavation, creates limited or
no interruptions to the sanitary sewer system, and rehabilitates the existing infrastructure, providing a
significant increase in the useful life of the system.
The Village of Northbrook first began lining sanitary sewers over 30 years ago. Since that time, approximately
14% (or 17 miles) of the Village’s 127 miles of sanitary sewer infrastructure has been lined. Installation of the
pipe liner is relatively unobtrusive. During the sewer lining process, a thin liner is inserted in sanitary sewer pipes
reinforcing the existing infrastructure. The lining process usually takes hours, minimizing disruption to a
resident’s or business’ use of waste water generating fixtures.
The Village is required to line its sanitary sewers by the Metropolitan Water Reclamation District to limit the
amount of storm and other water that infiltrates the sanitary sewer system. Limiting the amount of water that
infiltrates sanitary sewers can help reduce the volume of water in the sewer system during large rain storms
thereby helping to prevent back-ups of sewage into private property.
Priority is given to those lines showing signs of significant deterioration and/or those which would be difficult
to access to repair via standard excavation techniques. The identified locations are then included in the annual
lining program and detailed plans and specifications are created for publication.
FY 15-FY 19
Sanitary Sewer Fund Projects FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Sewer Lining Program $ 289,573 $ 298,260 $ 307,208 $ 316,424 $ 325,917 $ 1,537,382
Fiscal Year Totals $ 289,573 $ 298,260 $ 307,208 $ 316,424 $ 325,917 $ 1,537,382
Planned Financing
Bond Proceeds $ 289,573 $ 298,260 $ 307,208 $ 316,424 $ 325,917 $ 1,537,382
Total $ 289,573 $ 298,260 $ 307,208 $ 316,424 $ 325,917 $ 1,537,382
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ 17,778 $ 18,853 $ 19,419 $ 20,584 $ 21,202 $ 97,836
Debt Service on Previous
Bonds $ - $ 17,778 $ 36,631 $ 56,050 $ 76,634 $ 187,093
Fiscal Year Totals $ 17,778 $ 36,631 $ 56,050 $ 76,634 $ 97,836 $ 284,929
FY 2014/2015 – Page 64
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
The annual debt service cost of this project on bonds issues in FY 2014/15 is $17,778 (Term - 30 years, Rate –
4.5%). The annual debt service cost of this project on bonds issues in FY 2015/16 is $18,853 (Term - 30 years,
Rate – 4.75%). The annual debt service cost of this project on bonds issues in FY 2016/17 is $19,419 (Term - 30
years, Rate – 4.75%). The annual debt service cost of this project on bonds issues in FY 2017/18 is $20,584
(Term - 30 years, Rate – 5%). The annual debt service cost of this project on bonds issues in FY 2018/19 is
$21,202 (Term - 30 years, Rate – 5%).
FY 2014/2015 – Page 65
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: General
Project Category: Enterprise Resource Program
Project Phase: Software, Implementation, Project Management
Cost: $450,000
The Village’s core information systems used to track and manage our daily processes, such as utility billing,
invoicing, licensing, permitting and coordination, do not allow for proper information cataloging, workflow
processing or adequate, timely reporting.
An Enterprise Resource Planning program (ERP), helps to integrate information across an entire organization.
The purpose of an ERP is to allow for efficient flow of information between all business functions. This is
accomplished using programs, called “modules,” that manage a specific business task while utilizing consistent
resident/customer information throughout. An ERP consists of many integrated software modules that are
individually purchased, based on the specific needs and service requirements of the organization.
The following outlines the primary operational problems with the Village’s current systems:
1. The most significant shortcoming of Northbrook’s current system is the lack of integration between
modules. Currently, because of the separate nature of our systems, resident information must be
entered separately in as many as six different modules, including Permitting, Utility Billing, Business
Licensing, Alarm Billing, Ambulance Billing and Animal/Vehicle Licensing. If a resident pays a water bill,
gets a permit, or owns a car or a business, there is a separate entry for that individual’s information in
each module, and in many cases this information is stored in multiple formats. Because each module
stores a separate entry for each entity, performing business intelligence tasks, such as running reports
or cross referencing customer information from one module to another, is extremely complicated and
time consuming, and in some cases, impossible.
Also, since this data is not referenced from one central location, there is no standardization of data
entry. In some cases, abbreviations are used for streets or customer designations in one module, but
spelled out differently in another. This lack of standardization across systems can lead to data
inaccuracies from one department to another and does not allow for consolidated customer
information.
In addition, because systems do not share information between modules, it can be very difficult to
confirm customer information. For example, it is very difficult and time consuming for staff in the
Development and Planning Services Department to look up customer information regarding an unpaid
water bill before they process a permit. This is due to the way our systems were set up and designed
in-house decades ago.
Our current systems are generally custom built, stand-alone programs. This type of application has no
support from any software development company. The only clear understanding of the system and how
it was developed is in the hands of the developers of the current system whom are no longer employed
by the Village due to retirements. This fundamental lack of system knowledge has made issue
resolution extremely complicated. An example of this relates to the recently implemented Stormwater
Fee. Due to the design of the utility billing system, staff could not add the line item into the system and
therefore contacted various consultants who quoted costs of over $60,000 to integrate the new fee.
FY 2014/2015 – Page 66
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Luckily, staff was able to reach out to a retired employee familiar with the system who was able to
assist, fix the issue and resolve the concern. Had he been unavailable, the cost to do something
seemingly quite simple (but in reality very complex due to system limitations) would have been
substantial.
2. Water Billing, Permitting, Inventory, Scheduling are all separate from our Financial system. This causes
redundancy in data entry and processes for many standard operations.
3. The current system cannot be upgraded to keep pace with changing legal requirements. For example,
changes to the FOIA laws have dramatically increased both the number of requests and the amount of
information requested. Because modules are not integrated, instead of being able to run a report to get
the necessary data out of the system, several reports are required to be run and staff must manually
combine the data.
4. Our current system was developed to work with a Microsoft Operating System (O/S) that is no longer
supported. Due to the way our Oracle foundation was developed many years ago, new computers with
the necessary Microsoft O/S that support our Oracle foundation are no longer available for purchase,
indicating that the Village will not be able to replace aging computers until a new ERP is integrated.
A new ERP solution will provide the Village with the following benefits:
1. We will have a modern system, built on current technology with regular upgrades or enhancements by a
vendor. This vendor will be supported by significant research and development processes, informed by
a large municipal user base. The system’s modules will be integrated with reporting of information and
data tracking. This will centralize and standardize our customer data across all Village departments. No
longer will customer data be stored in multiple places and in multiple formats.
2. A new ERP will make our processes more customer-responsive and more efficient.. Workflow
management can help processes, like Permit and Plan Reviews, be tracked more efficiently and
managed through a central system, thus allowing staff to better adjust to changing priorities and further
improving our abilities to provide superior customer service.
3. A new ERP will allow the Village to provide residents and businesses the ability to interact with the
Village online, providing such improvements as an interactive portal to check permit status and utility
billing information and the ability to process payments for multiple services online. This will allow a fully
functioning portal to our community, providing more timely information on a 24/7 basis.. Reporting and
data tracking will be more meaningful and timely. Due to efficiencies brought upon by the new system,
reallocations of staff may also be possible.
During Fiscal Year 2012/13, staff conducted needs assessments. In Fiscal Year 2013/14, staff evaluated various
software packages. A formal recommendation of a vendor will be made to the Village Board in early 2014. After
vendor selection, we anticipate this project will take an additional two fiscal years to complete due to the
complexity of data transfer and implementation timelines that allow for proper staff training and appropriate
systems testing. A maintenance fee for the new software package will be included in the annual budget in FY
2016/17.
FY 2014/2015 – Page 67
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
FY 15-FY 19
Information Technology FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Enterprise Resource
Program Software/
Implementation/Project
Management $ 450,000 $ 350,000 $ - $ - $ - $ 800,000
Project Total $ 450,000 $ 350,000 $ - $ - $ - $ 800,000
Planned Financing
Bond Proceeds $ 450,000 $ 350,000 $ - $ - $ - $ 800,000
Total $ 450,000 $ 350,000 $ - $ - $ - $ 800,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ 54,109 $ 42,617 $ - $ - $ - $ 96,726
Debt Service on Previous
Bonds $ 46,855 $ 100,964 $ 143,581 $ 143,581 $ 143,581 $ 578,562
Fiscal Year Totals $ 100,964 $ 143,581 $ 143,581 $ 143,581 $ 143,581 $ 675,288
At this time there is no identified funding source for the debt service for this project. The annual debt service
for bonds issued in FY 2013/14 is $46,855. The annual debt service cost of this project on bonds issued in FY
2014/15 is $54,109 (Term - 10 years, Rate - 3.5%). The annual debt service cost of this project on bonds issued
in FY 2015/16 is $42,617 (Term - 10 years, Rate - 3.75%).
FY 2014/2015 – Page 68
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: General
Project Category: Information Technology (IT) Equipment
Replacement
Project: General Equipment
Cost: $130,000
Equipment replacements during this fiscal year will focus on replacing general equipment throughout the
organization— including copiers, printers, servers, networking devices, security system upgrades, and UPS
batteries— that operate a variety of systems or are components to systems. Several of the networking devices
are currently classified as “end of life.” “End of life” equipment cannot be supported by the vendors.
FY 15-FY 19
Information Technology FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
General Equipment
Replacement $ 130,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 530,000
Fiscal Year Totals $ 130,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 530,000
Planned Financing
General Fund Revenues $ 130,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 530,000
Fiscal Year Totals $ 130,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 530,000
FY 2014/2015 – Page 69
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: General
Project Category: E-911 Equipment Replacement
Project: Satellite Receiver Replacements
Cost: $175,000
The Village’s satellite receiver system is the backbone of the Police Department’s ability to have full operational
reception throughout the Village. This technology extends the range and distance for our police officers to
receive and transmit on our radio systems. Without these receivers, the Police Department runs the risk of
losing the ability to communicate with officers in the field. The seven (7) sites are located strategically
throughout the Village creating a grid that allows for continuous coverage throughout the municipal boundaries.
The Police Department will explore the option of phasing in new receivers rather than replacing all seven (7)
simultaneously.
E-911 Equipment F FY 15-FY 19
Replacement YFY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Satellite Receiver
Replacement (7 sites) $ 175,000 $ - $ - $ - $ - $ 175,000
Project Total $ 175,000 $ - $ - $ - $ - $ 175,000
Planned Financing
General Fund Revenues $ 175,000 $ - $ - $ - $ - $ 175,000
Fiscal Year Total $ 175,000 $ - $ - $ - $ - $ 175,000
FY 2014/2015 – Page 70
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: General
Project Category: E-911 Equipment Replacement
Project: Portable Radios
Cost: $164,000
The current generation of handheld UHF and VHF radios used by the Police and Fire Departments have a lifespan
of approximately 15 years and have reached the end of their useful lives. These radios are based on analog
technology which is being phased out as the Federal Communications Commission requires entities to switch to
narrow digital based radio bands. With the narrow digital based radio bands, new radios will have to be
purchased. Between the two departments there are approximately 166 handheld radios to be replaced. The
departments will work to jointly purchase the equipment to maximize the economies of scale and to work
towards interoperability. These will be replaced over the course of four (4) years.
E-911 Equipment F FY 15-FY 19
Replacement YFY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Portable Radio
Replacement $ 164,000 $ 168,920 $ 173,988 $ 179,207 $ - $ 686,115
Fiscal Year Totals $ 164,000 $ 168,920 $ 173,988 $ 179,207 $ - $ 686,115
Planned Financing
General Fund Revenues $ 164,000 $ 168,920 $ 173,988 $ 179,207 $ - $ 686,115
Fiscal Year Totals $ 164,000 $ 168,920 $ 173,988 $ 179,207 $ - $ 686,115
FY 2014/2015 – Page 71
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: General
Project Category: E-911 Equipment Replacement
Project: Mobile Computer Equipment
Cost: $100,000
A standard life expectancy for these pieces of equipment is three (3) years due to the nature of its usage. These
pieces of equipment (Panasonic ToughBook laptop computers) are significantly different than desktop
computers in that they are exposed to extremes in temperature due to them being mounted inside our Police
squads and Fire equipment; are often removed and replaced from squads as officers come on and off duty; are
subject to virtually around the clock usage; and, due to the nature of their use, both the physical components
(touch screens, rubberized keyboards) and operating components (hard drives) begin to fail once they reach
three (3) years old. In addition, the necessary mounting equipment also begins to fail, primarily the cables and
connections that allow the computers to communicate with the network. Approximately 1/3 of our mobile data
computers and all associated cables, antennas and docks will be replaced per year.
E-911 Equipment F FY 15-FY 19
Replacement YFY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Mobile Equipment
Replacement $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000
Fiscal Year Totals $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000
Planned Financing
General Fund Revenues $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000
Fiscal Year Totals $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000
FY 2014/2015 – Page 72
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: General
Project Category: Facilities Improvements
Facility: Village Hall – Window Replacements
Cost: $85,000
The windows that were installed as part of the Village Hall’s construction in 1990 have wood frames that are
labor intensive to maintain (requiring annual or bi-annual sanding and sealing) and have begun to deteriorate
with some frames displaying signs of rot. To mitigate this, the windows at the Village Hall will be replaced over a
three-year period with newer, more energy efficient windows that will help better balance the climate in the
building, and will have synthetic frames that require less maintenance. The third year of window replacements
will be included with Board Room annex renovations.
FY 15-FY 19
Facilities FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Exterior Improvements -
Village Hall $ 85,000 $ 85,000 $ - $ - $ - $ 170,000
Project Total $ 85,000 $ 85,000 $ - $ - $ - $ 170,000
Planned Financing
General Fund Revenues $ 85,000 $ 85,000 $ - $ - $ - $ 170,000
Fiscal Year Total $ 85,000 $ 85,000 $ - $ - $ - $ 170,000
FY 2014/2015 – Page 73
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
FY 2014/2015 – Page 74
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: General
Project Category: Facilities Improvements
Facility: Village Hall and Civic Building – Automated Door Openers
Cost: $50,000
As previously mentioned, the Village Hall serves as a meeting place for various groups and as a central location
where residents and businesses can interact with the Village of Northbrook. To make sure this facility is
accessible to all, doors compliant with the Americans with Disabilities Act (ADA) were installed at the rear
entrance of the Village Hall. In Fiscal Year 2014/15, ADA compliant door openers will be installed at the front
door of the Village Hall. In conjunction with this project, ADA compliant door openers will be installed at the
Civic Building which does not currently have any such accommodation.
FY 15-FY 19
Facilities FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Exterior Improvements -
Village Hall & Civic
Building $ 50,000 $ - $ - $ - $ - $ 50,000
Project Total $ 50,000 $ - $ - $ - $ - $ 50,000
Planned Financing
General Fund Revenues $ 50,000 $ - $ - $ - $ - $ 50,000
Fiscal Year Total $ 50,000 $ - $ - $ - $ - $ 50,000
FY 2014/2015 – Page 75
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: General
Project Category: Facilities Improvements
Facility: Police Department – Ramp Heater Replacement
Cost: $50,000
The ramp leading to the underground garage at the Police Station contains heating elements embedded in the
concrete to prevent ice and snow accumulation. This equipment prevents the pavement from becoming slippery
and vehicles sliding down into the overhead door, and allows vehicles to exit the garage. While the Public Works
Department does plow and salt this parking lot, salt trucks cannot effectively treat this area as they are not able
to back down the ramp. To make the necessary repairs, the concrete of the ramp must be removed;
underground piping that will carry a heated glycol solution installed, and a new concrete ramp constructed.
FY 15-FY 19
Facilities FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Exterior Improvements -
Police Department $ 50,000 $ - $ - $ - $ - $ 50,000
Project Total $ 50,000 $ - $ - $ - $ - $ 50,000
Planned Financing
General Fund Revenues $ 50,000 $ - $ - $ - $ - $ 50,000
Fiscal Year Total $ 50,000 $ - $ - $ - $ - $ 50,000
FY 2014/2015 – Page 76
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: General
Project Category: Facilities Improvements
Facility: Fire Department – Drive Replacement (Station 11)
Cost: $107,000
Fire Station 11 receives and responds to an average of 1,635 calls each year. With many of those calls, an
ambulance and fire engine are dispatched. These trips result in significant wear and tear on the pavement in
front of the bays where the equipment is stored. The asphalt pad between the bays and Dundee Road has
reached the end of its useful life and will be replaced with concrete to better withstand the weight of the heavy
equipment.
FY 15-FY 19
Facilities FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Exterior Improvements -
Station 11 $ 107,000 $ - $ - $ - $ - $ 107,000
Project Total $ 107,000 $ - $ - $ - $ - $ 107,000
Planned Financing
Bond Proceeds $ 107,000 $ - $ - $ - $ - $ 107,000
Fiscal Year Total $ 107,000 $ - $ - $ - $ - $ 107,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ 7,874 $ - $ - $ - $ - $ 7,874
Debt Service on Previous
Bond $ - $ 7,874 $ 7,874 $ 7,874 $ 7,874 $ 31,496
Fiscal Year Totals $ 7,874 $ 7,874 $ 7,874 $ 7,874 $ 7,874 $ 39,370
At this time there is no identified funding source for the debt service for this project. The annual debt service
cost of this project on bonds issued in FY 2014/15 is $7,874 (Term - 20 years, Rate – 4.0%).
FY 2014/2015 – Page 77
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
FY 2014/2015 – Page 78
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: General
Project Category: Facilities Improvements
Facility: Fire Department – Window Replacements (Station 11)
Cost: $50,000
Fire Station 11 serves as an active fire station, the headquarters for the Fire Department, and houses the
Village’s Emergency Operations Center. The frames around 1/5 of the station’s windows leak and the windows
themselves have reached the end of their useful lives. The windows will be replaced with new more energy
efficient materials. In conjunction with this work, painting of the walls and replacement of carpet in offices
where windows are being replaced will be scheduled. In addition, with their 2014/15 budget request, the Fire
Department will be including funds for a facility operations plan in order to determine what additional
improvements are necessary.
FY 15-FY 19
Facilities FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Exterior Improvements -
Station 11 $ 50,000 $ - $ - $ - $ - $ 50,000
Project Total $ 50,000 $ - $ - $ - $ - $ 50,000
Planned Financing
Bond Proceeds $ 50,000 $ - $ - $ - $ - $ 50,000
Fiscal Year Total $ 50,000 $ - $ - $ - $ - $ 50,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ 3,680 $ - $ - $ - $ - $ 3,680
Debt Service on Previous
Bond $ - $ 3,680 $ 3,680 $ 3,680 $ 3,680 $ 14,720
Fiscal Year Totals $ 3,680 $ 3,680 $ 3,680 $ 3,680 $ 3,680 $ 18,400
At this time there is no identified funding source for the debt service for this project. The annual debt service
cost of this project on bonds issued in FY 2014/15 is $3,680 (Term - 20 years, Rate – 4.0%).
FY 2014/2015 – Page 79
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
FY 2014/2015 – Page 80
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: General
Project Category: Facilities Improvements
Facility: Public Works Center – Office Build-Out
Cost: $150,000
Since 2010, the Public Works Department has again assumed responsibility for all private property tree
inspections and engineering reviews for single family and commercial developments. With the addition of these
functions, and the staff that has relocated from other departments to Public Works, sufficient office space is not
currently available in the building. With the proposed office build-outs it is likely that the utilities that are
currently embedded in the concrete floors of the building’s wings will have to be accessed resulting in
restoration costs. The Public Works Department will be working with an architect on plans for this work and will
make every attempt to minimize that work and therefore the cost of this project.
FY 15-FY 19
Facilities FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Interior Improvements -
Public Works Center $ 150,000 $ - $ - $ - $ - $ 150,000
Project $ 150,000 $ - $ - $ - $ - $ 150,000
Planned Financing
Bond Proceeds $ 150,000 $ - $ - $ - $ - $ 150,000
Fiscal Year Totals $ 150,000 $ - $ - $ - $ - $ 150,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ 11,038 $ - $ - $ - $ - $ 11,038
Debt Service on Previous
Bonds $ - $ 11,038 $ 11,038 $ 11,038 $ 11,038 $ 44,152
Fiscal Year Totals $ 11,038 $ 11,038 $ 11,038 $ 11,038 $ 11,038 $ 55,190
At this time there is no identified funding source for the debt service for this project. The annual debt service
cost of this project on bonds issued in FY 2014/15 is $11,038 (Term - 20 years, Rate – 4.0%).
FY 2014/2015 – Page 81
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: General
Project Category: Facilities Improvements
Facility: Public Works Center – East Wing Access & Storage Yard
Repaving
Cost: $350,000
The Storage Yard is used by the Public Works Department for material and equipment storage including salt,
wood chips, excavation spoils, and tree debris. This was last repaved in 1996. The continuous use of the
department trucks and pieces of heavy equipment in this yard combined with the bulk storage of materials has
caused the pavement to deteriorate. Failing to repave this area will further damage the base of the pavement,
potentially adding significant replacement costs in the future.
FY 15-FY 19
Facilities FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Exterior Improvements -
Public Works Center $ 350,000 $ - $ - $ - $ - $ 350,000
Project Total $ 350,000 $ - $ - $ - $ - $ 350,000
Planned Financing
Bond Proceeds $ 350,000 $ - $ - $ - $ - $ 350,000
Fiscal Year Totals $ 350,000 $ - $ - $ - $ - $ 350,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ 25,754 $ - $ - $ - $ - $ 25,754
Debt Service on Previous
Bonds $ - $ 25,754 $ 25,754 $ 25,754 $ 25,754 $ 103,016
Fiscal Year Totals $ 25,754 $ 25,754 $ 25,754 $ 25,754 $ 25,754 $ 128,770
At this time there is no identified funding source for the debt service for this project. The annual debt service
cost of this project on bonds issued in FY 2014/15 is $25,754 (Term - 20 years, Rate – 4.0%).
FY 2014/2015 – Page 82
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: General
Project Category: Vehicle Replacement - Fire Department
Unit #068: 2005 International Ambulance/Pierce Body
Cost: $295,000
Mileage: 81,344 2012 Miles: 2,594
2012 Repair Cost: $4,580.00 (Average $2,739) 2012 Repair Hours: 74.5 (Average: 118.5)
Based upon the Village Board approved schedule for replacing fire apparatus, Ambulance #068 is scheduled for
replacement in FY 2014/15.
Ambulance Replacement Schedule:
o The current schedule for medium duty ambulances calls for a six year front-line status and a four
year reserve status.
o Typically, ambulances are replaced every ten years or 100,000 miles.
o This replacement is consistent with department history and a recommendation from the
Village’s fleet maintenance supervisor.
o This 2005 International Ambulance with a Road Rescue body has an anticipated replacement
cost of $295,000, which includes the chassis, body, and all necessary equipment.
o Staff will make a final determination of replacement need before final recommendation to the
Village Board.
FY 15-FY 19
Ambulance Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
#068, 2005 International
Ambulance $ 295,000 $ - $ - $ - $ - $ 295,000
Project Total $ 295,000 $ - $ - $ - $ - $ 295,000
Planned Financing
Bond Proceeds $ 295,000 $ - $ - $ - $ - $ 295,000
Fiscal Year Total $ 295,000 $ - $ - $ - $ - $ 295,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ 35,472 $ - $ - $ - $ - $ 35,472
Debt Service on Previous
Bonds $ - $ 35,472 $ 35,472 $ 35,472 $ 35,472 $ 141,888
Fiscal Year Totals $ 35,472 $ 35,472 $ 35,472 $ 35,472 $ 35,472 $ 177,360
At this time there is no identified funding source for the debt service for this project. The annual debt service
cost of this project on bonds issued in FY 2014/15 is $35,472 (Term - 10 years, Rate - 3.5%).
FY 2014/2015 – Page 83
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
FY 2014/2015 – Page 84
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: General
Project Category: Vehicle Replacement - Fire Department
Unit #E10R-060: 1996 Pierce Saber Engine
Cost: $620,000
Mileage: 101,206 2012 Miles: 1,002
2012 Repair Cost: $2,581 (Average: $1,838) 2012 Repair Hours: 97 hours (Average: 97.8 hours)
Engine Replacement Schedule:
o Engines are on a 20 year/100,000 mile replacement schedule.
o The Fire Department uses an engine for eight years front-line service, an additional four years
front-line service for Paid-On-Call response, and eight years in reserve service.
o Two identical engines were purchased in 1996 coinciding with the opening of two new fire
stations. Staff recommends separating their replacement scheduling allowing for one
replacement engine in FY 2014/15 and the second engine in FY 2017/18.
Reasons and Warrants for Early Replacement:
o Frame of truck chassis and sub frame for pumper are both covered in rust and severely
corroded, which will lead to failure of the connecting points between the body and the chassis.
o Above average repair costs.
o While this apparatus will not be 20 years old, it currently has over 100,000 miles on it.
o New unit would comply with 2010 emissions regulations resulting in a 90% reduction in
hydrocarbon, 86% reduction in nitrogen oxide and a 90% reduction of particulate matter when
compared to the 1996 unit.
FY 15-FY 19
Engine Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
#060, 1996 Pierce Saber
Engine $ 620,000 $ - $ - $ - $ - $ 620,000
Project Total $ 620,000 $ - $ - $ - $ - $ 620,000
Planned Financing
Bond Proceeds $ 620,000 $ - $ - $ - $ - $ 620,000
Fiscal Year Total $ 620,000 $ - $ - $ - $ - $ 620,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ 45,621 $ - $ - $ - $ - $ 45,621
Debt Service on Previous
Bonds $ - $ 45,621 $ 45,621 $ 45,621 $ 45,621 $ 182,484
Fiscal Year Totals $ 45,621 $ 45,621 $ 45,621 $ 45,621 $ 45,621 $ 45,621
At this time there is no identified funding source for the debt service for this purchase. The annual debt
service cost of this project on bonds issued in FY 2014/15 is $45,621 (Term - 20 years, Rate - 4.0%).
FY 2014/2015 – Page 85
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
FY 2014/2015 – Page 86
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: General
Project Category: Vehicle Replacement - Fire Department/Public Works Department
Unit #203: 2003 GMC Sierra Pickup
Cost: $45,000
Mileage: 88,501 2012 Miles: 4,489
2012 Repair Cost: $295 (Average: $946) 2012 Repair Hours: 19.5 hours (Average: 28.75 hours)
Unit #203 is a 2003 GMC Sierra Pickup. This truck is used on a daily basis for the Public Improvements Inspector
to conduct private development inspections. Rust is evident on the body of the truck. While the repair costs are
below average, the truck frame and suspension components have advanced stages of corrosion causing the
structural integrity of the frame to be weakened. For these reasons, the Fleet Maintenance Supervisor
recommends replacement of this vehicle during FY 2014/15. Vehicle #203 will be replaced with the current unit
#076 a 2001 Chevy Tahoe 4X4, which has reached the end of its useful life as a frontline emergency response
vehicle but can be used by other operational departments.
Vehicle #076 has an anticipated replacement cost of $45,000 which includes all necessary emergency response
equipment. Staff will make a final determination of replacement need before final recommendation to the
Village Board. This unit is to be removed from service as a Fire Department vehicle and will be used by the Public
Works Department as Unit #203.
FY 15-FY 19
Vehicle Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
#076, 2001 Chevy Tahoe
4x4 $ 45,000 $ - $ - $ - $ - $ 45,000
Project Total $ 45,000 $ - $ - $ - $ - $ 45,000
Planned Financing
General Fund Revenues $ 45,000 $ - $ - $ - $ - $ 45,000
Fiscal Year Total $ 45,000 $ - $ - $ - $ - $ 45,000
FY 2014/2015 – Page 87
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Unit #203
Unit #203
FY 2014/2015 – Page 88
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: General
Project Category: Vehicle Replacement - Fire Department
Unit #080: 1989 GMC One Ton Aerial
Cost: $25,000
Fire and Fleet Maintenance staff have determined the most appropriate equipment to replace Unit #080 is a
portable Light Trailer with a 20 KW generator that can be pulled to the scene by a pickup truck with a hitch by
Fire, Police or Public works. This is a scheduled equipment replacement resulting in a reduction of one vehicle in
the fleet. Unlike the truck, the trailer would not need to be staffed at the scene.
Unit #080, a 1989 GMC one-ton bucket truck that served the Public Works Department as a tree and streetlight
maintenance truck for seventeen years. In 2004 the Fire Department, funded through the Foreign Fire Tax
Board, converted it into a platform for large stadium lights to be used in night operations. Unit #080 has proven
to be a valuable asset enhancing night time operations for the Fire, Police, and Public Works departments.
Ongoing maintenance issues to the Unit have caused staff to seek the best alternative to provide this key piece
of equipment.
FY 15-FY 19
Vehicle Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Portable Light
Tower/Generator
(Replacement for Unit #80) $ 25,000 $ - $ - $ - $ - $ 25,000
Project Total $ 25,000 $ - $ - $ - $ - $ 25,000
Planned Financing
General Fund Revenues $ 25,000 $ - $ - $ - $ - $ 25,000
Fiscal Year Total $ 25,000 $ - $ - $ - $ - $ 25,000
Proposed #080
Current #080 FY 2014/2015 – Page 89
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: General
Project Category: Vehicle Replacement – Public Works
Unit #229: 2000 International 4900 4x2 Dump Truck
Cost: $135,000
Mileage: 46,947 2012 Miles: 1,822
2012 Repair Cost: $600 (Average: $2,040) 2012 Repair Hours: 80 hours (Average: 82.6 hours)
Included in the Village’s fleet is Unit #229, a 2000 International 5-ton Dump Truck. This dump truck is a front-
line vehicle used for: snow plowing operations, street maintenance operations, water main break and
maintenance operations, and tree removal operations. This vehicle has a fifteen year projected lifespan. The
metal making up the frame of this vehicle has begun to separate due to rust resulting in a loss of structural
integrity of the frame. With the loads this vehicle carries the result could be significant damage to the frame
resulting in vehicle failures and repairs beyond the value of the truck.
FY 15-FY 19
Vehicle Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
#229, 2000 International
Dump Truck $ 135,000 $ - $ - $ - $ - $ 135,000
Project Total $ 135,000 $ - $ - $ - $ - $ 135,000
Planned Financing
Bond Proceeds $ 135,000 $ - $ - $ - $ - $ 135,000
Fiscal Year Total $ 135,000 $ - $ - $ - $ - $ 135,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ 16,233 $ - $ - $ - $ - $ 16,233
Debt Service on Previous
Bonds $ 16,233 $ 16,233 $ 16,233 $ 16,233 $ 64,932
Fiscal Year Totals $ 16,233 $ 16,233 $ 16,233 $ 16,233 $ 16,233 $ 81,165
At this time there is no identified funding source for the debt service for this purchase. The annual debt
service cost of this project on bonds issued in FY 2014/15 is $16,233 (Term - 10 years, Rate - 3.5%).
FY 2014/2015 – Page 90
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
FY 2014/2015 – Page 91
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: General
Project Category: Vehicle Replacement – Public Works
Unit #235: 2001 Ford 4x2 Chassis Aerial Lift
Cost: $115,000
Mileage: 109,172 2012 Miles: 4,488
2012 Repair Cost: $1,100 (Average: $1,647.50) 2012 Repair Hours: 40 hours (Average: 28.5 hours)
Included in the Village’s fleet is Unit #235, a 2001 Ford 4 x 2 Chassis Aerial Lift. This unit is used for fixing street
lights as well as hanging the street banners. Staff recommends replacing the current aerial lift with a maximum
height of 37 feet with a vehicle that has a boom of 47 feet so that it can also be utilized for forestry work as well.
The unit has above average miles and is heavily corroded underneath. The aerial components are in need of
refurbishing or replacement. The lift also requires annual repairs in order to pass its State of Illinois mandated
safety inspection and certification. Due to the age of the unit, maintenance problems, and the elevated level of
corrosion, the Fleet Maintenance Supervisor recommends replacement of this vehicle during FY 2014/15.
FY 15-FY 19
Vehicle Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
#235, 2001 Ford 4 x 2
Chassis Aerial Lift $ 115,000 $ - $ - $ - $ - $ 115,000
Project Total $ 115,000 $ - $ - $ - $ - $ 115,000
Planned Financing
Bond Proceeds $ 115,000 $ - $ - $ - $ - $ 115,000
Fiscal Year Total $ 115,000 $ - $ - $ - $ - $ 115,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ 13,828 $ - $ - $ - $ - $ 13,828
Debt Service on Previous
Bonds $ - $ 13,828 $ 13,828 $ 13,828 $ 13,828 $ 55,312
Fiscal Year Totals $ 13,828 $ 13,828 $ 13,828 $ 13,828 $ 13,828 $ 69,140
At this time there is no identified funding source for the debt service for this purchase. The annual debt
service cost of this project on bonds issued in FY 2014/15 is $13,828 (Term - 10 years, Rate - 3.5%).
FY 2014/2015 – Page 92
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
FY 2014/2015 – Page 93
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: General
Project Category: Vehicle Replacement – Public Works
Unit #429: 1998 Dodge Caravan
Cost: $26,710
Mileage: 97,502 2012 Miles: 13,568
2012 Repair Cost: $200 (Average: $1,402) 2012 Repair Hours: 7 hours (Average: 33.4 hours)
Unit #429 is a 1998 Dodge Caravan. This unit is used on a daily basis for utility locates. Advanced stages of
corrosion are evident on the vehicle’s body and frame including rust that has completely eaten through the rear
passenger door exposing the interior of the vehicle’s panels to rain and snow. Over the last several years, this
unit has required repairs to the transmission including replacing the transmission pan, and transmission cooler.
Repairs to the body and additional mechanical repairs to this vehicle would likely exceed the value of this
vehicle. For these reasons, the Fleet Maintenance Supervisor recommends replacement of this vehicle during FY
2014/15.
FY 15-FY 19
Vehicle Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
#429, 1998 Dodge Caravan $ 26,710 $ - $ - $ - $ - $ 26,710
Project Total $ 26,710 $ - $ - $ - $ - $ 26,710
Planned Financing
General Fund Revenues $ 26,710 $ - $ - $ - $ - $ 26,710
Fiscal Year Total $ 26,710 $ - $ - $ - $ - $ 26,710
FY 2014/2015 – Page 94
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
FY 2014/2015 – Page 95
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: General
Project Category: Vehicle Replacement – Police Department
Unit #030: 2011 Ford Crown Victoria Police Interceptor
Cost: $34,480
Mileage: 104,247 2012 Miles: 37,538
2012 Repair Cost: $1,455 (Average: $1,016) 2012 Repair Hours: 55.5 hours (Average: 60.75 hours)
Unit #030 is a front-line Police Department squad that is to be replaced due to the fact that the vehicle’s mileage
meets the necessary criteria for replacement as determined by the Village’s Fleet Maintenance Supervisor. This
vehicle has also had a myriad of repair issues that have kept it out of service including electrical issues that
routinely require bulbs and outlets in the vehicle to be replaced as well as components of the air bag system. At
the time of this vehicle’s replacement it will have over 150,000 miles on it.
FY 15-FY 19
Vehicle Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
#030, 2011 Ford Crown
Victoria Police
Interceptor $ 34,480 $ - $ - $ - $ - $ 34,480
Project Total $ 34,480 $ - $ - $ - $ - $ 34,480
Planned Financing
General Fund Revenues $ 34,480 $ - $ - $ - $ - $ 34,480
Fiscal Year Total $ 34,480 $ - $ - $ - $ - $ 34,480
FY 2014/2015 – Page 96
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: General
Project Category: Vehicle Replacement – Police Department
Unit #042: 2008 Chevrolet Tahoe
Cost: $39,500
Mileage: 103,755 2012 Miles: 16,956
2012 Repair Cost: $1,385 (Average: $1,016) 2012 Repair Hours: 40 hours (Average: 60.75 hours)
Unit #042 is a front-line Police Department pursuit vehicle. This unit is to be replaced due to the fact that the
vehicle’s mileage and age meets the necessary criteria for replacement as determined by the Village’s Fleet
Maintenance Supervisor. At the time of this vehicle’s replacement it will have over 120,000 miles and since it
has reached 100,000 miles staff has noticed an increase in oil consumption and engine knock.
FY 15-FY 19
Vehicle Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
#042, 2008 Chevrolet
Tahoe Police Pursuit
Vehicle $ 39,500 $ - $ - $ - $ - $ 39,500
Project Total $ 39,500 $ - $ - $ - $ - $ 39,500
Planned Financing
General Fund Revenues $ 39,500 $ - $ - $ - $ - $ 39,500
Fiscal Year Total $ 39,500 $ - $ - $ - $ - $ 39,500
FY 2014/2015 – Page 97
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: General
Project Category: Vehicle Replacement – General Government
Unit #A01: 2008 Toyota Highlander 4WD Hybrid
Cost: $30,000
Mileage: 70,356 2012 Miles: 14,047
2012 Repair Cost: $385 (Average: $695) 2012 Repair Hours: 11.5 hours (Average: 26.5 hours)
Unit #A01 is a 2008 Toyota Highlander 4WD Hybrid used as an administrative vehicle in the General Government
Department. This vehicle will be transferred to the Public Works Department to replace Unit #436 (a 2001
Chevrolet Trailblazer), an administrative vehicle. Unit #436 is currently in need of a new suspension (shocks and
struts) that is greater than what the value of this vehicle would be at auction. This transfer will extend the useful
life of the #A01. A new vehicle will be purchased to replace Unit #A01.
FY 15-FY 19
Vehicle Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
#A01, 2008 Toyota
Highlander Hybrid $ 30,000 $ - $ - $ - $ - $ 30,000
Project Total $ 30,000 $ - $ - $ - $ - $ 30,000
Planned Financing
General Fund Revenues $ 30,000 $ - $ - $ - $ - $ 30,000
Fiscal Year Total $ 30,000 $ - $ - $ - $ - $ 30,000
FY 2014/2015 – Page 98
Village of Northbrook Capital Improvement Plan Fiscal Year
2014/2015
Fund: General
Project Category: Equipment Replacement – Public Works
Unit #s 279, S06, S09 & S09: 2002 Jacobson Turfcat 26HP Mower &
Three (3) 1999 Flink Hopper Spreaders
Cost: $90,200
The Public Works Department will be replacing Unit #279, a 2002 Jacobson Turfcat 26 HP Mower along with
three (3) 1999 Flink Hopper salt spreaders. The Public Works Department mows the equivalent of almost 30
acres of land, inclusive of Village-owned properties and the rights of way along various roadways, to help
beautify the community. The salt spreaders are fit into the beds of dump trucks and used during snow and ice
control events. Because the spreaders are exposed to salt and calcium chloride (a liquid applied to salt to help it
work in colder temperatures) they corrode and need to be replaced.
FY 15-FY 19
Vehicle Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Unit #279, 2002 Jacobson
Turfcat 26HP Mower $ 17,000 $ - $ - $ - $ - $ 17,000
Unit # S06, S08, S09, 1999
Flink V-Hopper Spreader $ 73,200 $ - $ - $ - $ - $ 73,200
Project Total $ 90,200 $ - $ - $ - $ - $ 90,200
Planned Financing
General Fund Revenues $ 90,200 $ - $ - $ - $ - $ 90,200
Fiscal Year Total $ 90,200 $ - $ - $ - $ - $ 90,200
FY 2014/2015 – Page 99
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fiscal Year 2015/16 Summary
Capital Improvement Budget
FY 2015/16
By Fund
15%
29%
General Fund
Water Fund
Sewer Fund
Stormwater Fund
Infrastructure Capital Projects Fund
12% 42%
2%
Total Capital Budget = $17,352,645
Infrastructure
General Stormwater
Water Fund Sewer Fund Capital Total
Fund Fund
Projects Fund
Capital Expense $ 2,914,480 $ 7,085,640 $ 388,440 $ 2,006,845 $ 4,957,240 $ 17,352,645
Planned Financing
Bond Proceeds $ 1,628,080 $ 4,890,000 $ 298,260 $ 2,006,845 $ 4,335,188 $ 13,158,373
Designated
$ - $ 2,195,640 $ 90,180 $ - $ 265,026 $ 2,550,846
Revenues/User Fees
Undesignated Revenues $ 1,286,400 $ - $ - $ - $ 357,026 $ 1,643,426
Total $ 2,914,480 $ 7,085,640 $ 388,440 $ 2,006,845 $ 4,957,240 $ 17,352,645
FY 2015/2016 – Page 1
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
FY 2015/16 Projects – $17,352,645
Infrastructure Capital Projects Fund – $4,957,240
Asphalt Street Maintenance- $265,026 (MFT): Page 5
Central Business District- $2,600,000 (B): Page 7
Concrete Street Reconstruction and Rehabilitation- $1,735,188 (B)
o Sections of Heathercrest East, Heathercrest West, Arrowhead Subdivision and Western Avenue:
Page 9
Sidewalk Improvements- $107,026: Page 12
Skokie Valley Trail Bike Path- $250,000: Page 14
Stormwater Fund - $2,006,845 (B)
Keystone Road/Chartres Drive, Property/Easement Acquisition & Design/Final Engineering- $62,000:
Page 16
Western Avenue/Oak Avenue, Property/Easement Acquisition- $500,000: Page 18
Wescott Park Underground Storage, Design/Final Engineering- $577,500: Page 20
Church Street (Near Chapel Court), Construction- $63,135: Page 22
Dundee Road and Skokie Boulevard, Construction- $46,200: Page 24
Sunset Lane, Design/Final Engineering and Construction - $432,405: Page 26
Weller’s Subdivision, Design/Final Engineering and Construction - $325,605: Page 28
Water Fund - $7,085,640
Water Distribution System Improvement Project- $3,000,000 (B): Page 30
Water Main Replacements
o Western Avenue- $600,000: Page 9
o Crabtree Lane- $950,000: Page 31
o Woodlawn Road – Phase One- $450,000: Page 33
Water Production Facility Improvement Projects- $1,890,000 (B): Page 35
Water Meter Conversion Program- $75,000: Page 37
Vehicle Replacements- $120,640: Page 38
Sewer Fund - $388,440
Sanitary Sewer Lining Program- $298,260 (B): Page 39
Step Van Replacement- $90,180: Page 41
General Fund – $2,914,480
Enterprise Resource Program- $350,000 (B): Page 43
Information Technology Equipment Replacement- $100,000: Page 44
E-911 Portable Radio Replacement- $168,920: Page 45
E-911 Mobile Equipment Replacement- $100,000: Page 46
E-911 Security Improvements- $100,000: Page 47
Village Hall Generator Replacement- $250,000 (B): Page 48
Village Hall Window Replacement- $85,000: Page 49
Village Hall Board Room Improvements - $300,000 (B): Page 50
Public Works Center Drive Replacement- $125,000 (B): Page 51
Public Works Center Fuel Island Improvements- $130,000 (B): Page 52
FY 2015/2016 – Page 2
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
FY 2015/16 Projects – $17,352,645 (continued)
General Fund – $2,914,480 (continued)
Fire Stations 10 and 12 Improvements- $70,000: Page 53
Fire Station 11 Electrical Improvements- $100,000 (B): Page 54
Fire Station 12 Drive Replacement- $180,500 (B): Page 55
Snow Blower Replacement- $120,940 (B): Page 56
Public Works Tractor Replacement- $71,640 (B): Page 57
Vehicle Replacements- $662,480: Page 58
(B) Proposed Bond Issue
FY 2015/2016 – Page 3
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
FY 2015/2016 – Page 4
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: Infrastructure Capital Improvement
Project Category: Asphalt Street Reconstruction & Rehabilitation
Location: Era Drive/Woodhead Drive
Cost: $265,026
The roadways selected for the 2015/16 asphalt reconstruction and rehabilitation program are rated as limited
failures.
Roadways rated as having limited failures (3 on a scale of 5) exhibit signs of the road surface cracking
and have small potholes beginning to form. Typical examples of these failures include horizontal and/or
longitudinal cracking in the street.
The condition of these roads is such that patching is no longer an option and asphalt rehabilitation/
reconstruction is necessary. These repairs will be paid for with Motor Fuel Tax (MFT) revenues.
Address Range Approximate Square
Street Rating Last Resurfaced
(in hundred blocks) Yards of Pavement
Era Drive 300 Limited Failures 2004 1,945
Woodhead Drive 3400-3600 Limited Failures 2004 2,300
FY 15-FY 19
Annual Program FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Era Drive - SC@92N
Commercial Avenue to
Woodhead Drive $ - $ 48,741 $ - $ - $ - $ 48,741
Woodhead Drive - Era Drive
to Huehl Road $ - $ 216,285 $ - $ - $ - $ 216,285
Project Total $ - $ 265,026 $ - $ - $ - $ 265,026
Planned Financing
State Motor Fuel Tax
Receipts $ - $ 265,026 $ - $ - $ - $ 265,026
Fiscal Year Totals $ - $ 265,026 $ - $ - $ - $ 265,026
Era Drive Woodhead Drive
FY 2015/2016 – Page 5
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
FY 2015/2016 – Page 6
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: Infrastructure Capital Improvement
Project Category: Central Business District Infrastructure Capital
Improvement and Streetscape Expansion
Location: Central Business District
Cost: $2,600,000
For additional information on this capital expenditure, please refer to pages 20-24 of Fiscal Year 2014/15.
FY 15-FY 19
Central Business District FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Street and Parking
Reconfiguration Engineering $ 150,000 $ - $ - $ - $ - $ 150,000
Shermer Road Bridge
Reconstruction Engineering $ 100,000 $ - $ - $ - $ - $ 100,000
Street Reconstruction
(Church, Cherry, Meadow,
Shermer) $ - $ 1,500,000 $ - $ - $ - $ 1,500,000
Streetscape
Improvements/Extension $ - $ 150,000 $ - $ - $ - $ 150,000
Intersection Improvements $ - $ 100,000 $ - $ - $ - $ 100,000
Shermer Road Bridge
Reconstruction $ - $ 850,000 $ - $ - $ - $ 850,000
Project Total $ 250,000 $ 2,600,000 $ - $ - $ - $ 2,850,000
Planned Financing
Bond Proceeds $ 250,000 $ 2,600,000 $ - $ - $ 2,850,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ - $ 201,766 $ - $ - $ - $ 201,766
Debt Service on Previous
Bonds $ - $ - $ 201,766 $ 201,766 $ 201,766 $ 605,298
Fiscal Year Totals $ - $ 201,766 $ 201,766 $ 201,766 $ 201,766 $ 807,064
At this time there is no identified funding source for the debt service for this project. The annual debt service
cost for the Street Reconstruction project on bonds issued in FY 2015/16 is $124,113 (Term – 20 years; Rate –
4.25%). The annual debt service cost for the Streetscape Improvements/Extension project on bonds issued in
FY 2015/16 is $11,283 (Term – 20 years; Rate – 4.25%). The annual debt service cost for the Intersection
Improvements project on bonds issued in FY 2015/16 is $6,321 (Term – 30 years; Rate – 4.75%). The annual
FY 2015/2016 – Page 7
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
debt service cost for the Shermer Road Bridge Reconstruction project on bonds issued in FY 2015/16 is
$60,049 (Term – 30 years; Rate – 4.75%).
Cherry Lane Church Street
Meadow Road Shermer Road
FY 2015/2016 – Page 8
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: Infrastructure Capital Improvement
Project Category: Concrete Street Reconstruction & Rehabilitation
Location: Heathercrest East/Heathercrest West/Arrowhead
Subdivision/Western Avenue
Cost: $1,735,188
Fund: Water
Project Category: Water Main Replacement
Project Location: Western Avenue
Cost: $600,000
The concrete streets of the Heathercrest East and West areas of town, as well as in Arrowhead Subdivision, have
been surveyed and an estimated number of concrete panels have been identified for replacement. Deferring
the replacement of the deteriorated panels will result in more advanced degradation of roadway, including
pavement failures, increased damage to vehicles, and increased reconstruction and rehabilitation costs in the
future.
Panels are approximately 5.89 cubic yards of concrete. In FY 2015/16, Village Staff anticipate replacing about
2,060 cubic yards of concrete, which equates to 243 cement trucks.
The final street, Western Avenue, is in very poor condition and must be reconstructed. Replacement of the
existing 8-inch water main on Western Avenue has been programmed to be replaced when the road is
reconstructed. The water main on Western Avenue between Oak Avenue and Techny Road has experienced 21
breaks, 11 of which have occurred over the last decade. Replacement of the water main with equal sized pipes
when the road is reconstructed will provide a cost savings in pavement restoration costs after the main
installation is complete and will reduce the likelihood that a future main break will require the roadway to be
reopened and restored.
FY 2015/2016 – Page 9
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Concrete Street
Reconstruction and FY 15-FY 19
Rehabilitation FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Heathercrest
East/Heathercrest
West/Arrowhead
Subdivision $ - $ 535,188 $ - $ - $ - $ 535,188
Western Avenue $ - $1,200,000 $ - $ - $ - $ 1,200,000
Project Total $ - $1,735,188 $ - $ - $ - $ 1,735,188
Planned Financing
Bond Proceeds $ - $1,735,188 $ - $ - $ 1,735,188
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ - $ 109,681 $ - $ - $ - $ 109,681
Debt Service on
Previous Bonds $ - $ - $ 109,681 $ 109,681 $ 109,681 $ 329,043
Fiscal Year Totals $ - $ 109,681 $ 109,681 $ 109,681 $ 109,681 $ 438,724
At this time there is no identified funding source for the debt service for this project. The annual debt service
cost of this project on bonds issued in FY 2015/16 is $109,681 (Term - 30 years, Rate - 4.75%).
Replace Number of Estimated
Western Avenue Existing Size With Length Year Breaks to Date Cost
Oak Ave. to Techny Rd. 8" 8" 3,200 1953 21 $ 600,000
Project Total $ 600,000
Planned Financing
User Fees $ 600,000
Total $ 600,000
FY 2015/2016 – Page 10
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
FY 2015/2016 – Page 11
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: Infrastructure Capital Improvement
Project Category: Sidewalk Improvements
Location: Atlas Sections 4E, 4F, 4G, 4H, 5H, 5J, 5K
Cost: $107,026
For additional information on this capital purchase, please refer to pages 27 of Fiscal Year 2014/15.
Areas to be reviewed for replacement are detailed in the map below.
FY 15-FY 19
Sidewalk Improvements FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Annual Program $ 103,909 $ 107,026 $ 110,237 $ 113,544 $ 116,961 $ 551,677
Fiscal Year Totals $ 103,909 $ 107,026 $ 110,237 $ 113,544 $ 116,961 $ 551,677
Planned Financing
Fund Reserves $ 103,909 $ 107,026 $ 110,237 $ 113,544 $ 116,961 $ 551,677
FY 2015/2016 – Page 12
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
FY 2015/2016 – Page 13
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: Infrastructure Capital Improvement
Project Category: Bike Path Construction – Skokie Valley Trail
Project Phase: Property/Easement Acquisition
Cost: $250,000
The Skokie Valley Trail is a planned 28-mile multi-use trail identified in the Northwest Municipal Conference’s
Bicycle Plan as a tier one prioritized trail project. The purpose of the Trail is to connect the City of Chicago north
into Lake County and will span 13 municipalities.
Project Specifications:
o The Village’s additional portion of the Skokie Valley Trail is approximately 2.6 miles in length.
This adds to current trails already located in the Village so the total Trail length in Northbrook
would be be seven miles long.
o This additional portion is located within a corridor running parallel to the west of the Edens
Expressway.
o The Village has applied for Illinois Transportation Enhancement Program funding for this project,
in concert with other neighboring communities. Depending on the award of this grant, the
project timeline may be accelerated.
o Nearly all of the project’s costs (80%) will be reimbursed by the grant; however, the Village will
have to budget the entire sum.
Skokie Valley Trail Bike FY 15-FY 19
Path FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Property & Easement
Acquisition $ - $ 250,000 $ - $ - $ - $ 250,000
Design/Final Engineering $ - $ - $1,358,000 $ - $ - $ 1,358,000
Construction $ - $ - $ - $ 950,000 $ - $ 950,000
Project Total $ - $ 250,000 $1,358,000 $ 950,000 $ - $ 950,000
Planned Financing
Undesignated Revenues $ - $ 250,000 $1,358,000 $ 950,000 $ - $ 2,558,000
Fiscal Year Totals $ - $ 250,000 $1,358,000 $ 950,000 $ - $ 2,558,000
FY 2015/2016 – Page 14
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
FY 2015/2016 – Page 15
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: Stormwater
Project Category: Stormwater Mitigation Project
Location: Keystone Road/Chartres Drive
Project Phase: Property/Easement Acquisition and Design/Final
Engineering
Cost: $62,000
Project Description: This project includes the construction of an approximate 24-inch storm relief sewer
extending from the Keystone Road/Chartres Drive intersection to West Park, where an approximate 6 acre-foot
expansion of the existing detention basin is required for mitigation.
Locations Impacted by the Project: 3000 Block of Keystone, 500 Block of Chartres Drive, and 3000 Block of
Rennes Court.
Properties Impacted: 17 properties will experience a reduction in flooding.
Structures Impacted: Five (5) of the 17 properties currently experience structure flooding. Staff anticipates that
this project will create a reduction in structure flooding for these properties.
Additional Study Needed: Additional study of this project is not needed.
Design: Design of the Keystone Road/Chartres Drive project is anticipated to take 18 months.
Construction: Construction of the Keystone Road/Chartres Drive project is anticipated to take 1 year.
External Factors Affecting Design and Construction Timelines: This project will require the Village to obtain
easements from up to four (4) properties. The project necessitates that the Village obtain a license agreement
with the Northbrook Park District for expansion of detention at West Park.
Photos of Flooding in the Project Area:
FY 2015/2016 – Page 16
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Keystone Road/Chartres Drive Project Map:
Keystone Road/Chartres FY 15-FY 19
Drive FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Property & Easement
Acquisition $ - $ 20,000 $ - $ - $ - $ 20,000
Design/Final Engineering $ - $ 42,000 $ 42,000 $ - $ - $ 84,000
Construction $ - $ - $ - $ 561,750 $ - $ 561,750
Project Total $ - $ 62,000 $ 42,000 $ 561,750 $ - $ 665,750
Planned Financing
Bond Proceeds $ - $ 62,000 $ 42,000 $ 561,750 $ - $ 665,750
Fiscal Year Totals $ - $ 62,000 $ 42,000 $ 561,750 $ - $ 665,750
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ - $ 3,919 $ 2,655 $ 36,543 $ - $ 43,117
Debt Service on Previous
Bonds $ - $ - $ 3,919 $ 6,574 $ 43,117 $ 53,610
Fiscal Year Totals $ - $ 3,919 $ 6,574 $ 43,117 $ 43,117 $ 96,727
The annual debt service cost of this project on bonds issued in FY 2015/16 is $3,919 (Term - 30 years, Rate -
4.75%). The annual debt service cost of this project on bonds issued in FY 2016/17 is $2,655 (Term - 30 years,
Rate - 4.75%). The annual debt service cost of this project on bonds issued in FY 2017/18 is $36,543 (Term - 30
years, Rate – 5%).
FY 2015/2016 – Page 17
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: Stormwater
Project Category: Stormwater Mitigation Project
Location: Western Avenue/Oak Avenue (Wescott Road to Shermer
Road)
Project Phase: Property/Easement Acquisition
Cost: $500,000
Project Description: This project includes the construction of long segments of 4-foot diameter storm sewer
pipe with inlet improvements in strategic locations (roadway sags) along Oak Avenue between Royal Drive and
Cedar Lane. With the construction of this sewer the Village will also need to construct roughly 6 acre feet of
stormwater detention. These extremely long segments of pipe will provide additional storage of surface runoff
during high intensity storms.
Locations Impacted by the Project: 2100, 2200, 2400 and 2500 blocks of Maple Avenue, 2100, 2200, 2300,
2400, 2500, and 2600 Blocks of Oak Avenue, 1400 block of Wescott Road, and 1400 block of Cedar Lane.
Properties Impacted: 106 properties will experience a reduction in flooding.
Structures Impacted: No properties are currently impacted by structure flooding.
Additional Study Needed: Additional study of this project is not needed.
Design: Design of the Western Avenue/Oak Avenue project is expected to take 6 months.
Construction: Construction of the Western Avenue/Oak Avenue project is anticipated to take 12 months.
External Factors Affecting Design and Construction Timelines: As part of the engineering design of this project
that was undertaken in Fiscal Year 2013/14, it was determined that the anticipated benefit for this project could
not be reached with the project configured as envisioned in the Master Stormwater Management Plan.
Detention equaling roughly six acre feet must be constructed. This will require the acquisition of property before
design can be concluded.
Photos of Flooding in the Project Area:
FY 2015/2016 – Page 18
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Western Avenue/Oak Avenue Project Map:
Western Avenue & Oak FY 15-FY 19
Avenue FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Property & Easement
Acquisition $ - $ 500,000 $ 500,000 $ - $ - $ 1,000,000
Construction $ - $ - $ - $ 567,180 $ - $ 567,180
Project Total $ - $ 500,000 $ 500,000 $ 567,180 $ - $ 1,567,180
Planned Financing
Bond Proceeds $ - $ 500,000 $ 500,000 $ 567,180 $ - $ 1,567,180
Fiscal Year Totals $ - $ 500,000 $ 500,000 $ 567,180 $ - $ 1,567,180
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ - $ 31,605 $ 31,605 $ 36,896 $ - $ 100,106
Debt Service on Previous
Bonds $ - $ - $ 31,605 $ 63,210 $ 100,106 $ 194,921
Fiscal Year Totals $ - $ 31,605 $ 63,210 $ 100,106 $ 100,106 $ 295,027
The annual debt service cost of this project on bonds issued in FY 2015/16 is $31,605 (Term - 30 years, Rate -
4.75%). The annual debt service cost of this project on bonds issued in FY 2016/17 is $31,605 (Term - 30 years,
Rate - 4.75%). The annual debt service cost of this project on bonds issued in FY 2017/18 is $36,896 (Term - 30
years, Rate - 5%).
FY 2015/2016 – Page 19
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: Stormwater
Project Category: Stormwater Mitigation Project
Location: Wescott Park Underground Storage
Project Phase: Design/Final Engineering
Cost: $577,500
Project Phases Completed: Design and Final Engineering will begin in FY 2014/15.
For additional information on this stormwater mitigation project, please refer to pages 29-30 of Fiscal Year
2014/15.
Photos of Flooding in the Project Area:
Wescott Park Project Map:
FY 2015/2016 – Page 20
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
FY 15-FY 19
Wescott Park FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Design/Final Engineering $ 577,500 $ 577,500 $ - $ - $ - $ 1,155,000
Construction $ - $ - $3,674,250 $3,674,250 $ - $ 7,348,500
Project Total $ 577,500 $ 577,500 $3,674,250 $3,674,250 $ - $ 8,503,500
Planned Financing
Bond Proceeds $ 577,500 $ 577,500 $3,674,250 $3,674,250 $ - $ 8,503,500
Fiscal Year Totals $ 577,500 $ 577,500 $3,674,250 $3,674,250 $ - $ 8,503,500
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ 35,454 $ 36,504 $ 232,248 $ 239,016 $ - $ 543,222
Debt Service on Previous
Bonds $ - $ 35,454 $ 71,958 $ 304,206 $ 543,222 $ 954,840
Fiscal Year Totals $ 35,454 $ 71,958 $ 304,206 $ 543,222 $ 543,222 $ 1,498,062
The annual debt service cost of this project on bonds issued in FY 2014/15 is $35,454 (Term - 30 years, Rate -
4.5%). The annual debt service cost of this project on bonds issued in FY 2015/16 is $36,504 (Term - 30 years,
Rate - 4.75%). The annual debt service cost of this project on bonds issued in FY 2016/17 is $232,248 (Term -
30 years, Rate - 4.75%). The annual debt service cost of this project on bonds issued in FY 2017/18 is $239,016
(Term - 30 years, Rate - 5%).
FY 2015/2016 – Page 21
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: Stormwater
Project Category: Stormwater Mitigation Project
Location: Church Street (Near Chapel Court)
Project Phase: Construction
Cost: $63,135
Project Phases Completed: The necessary easements will be acquired and design will be completed during Fiscal
Year 2014/15.
For additional information on this stormwater mitigation project, please refer to pages 35-36 of Fiscal Year
2014/15.
Photos of Flooding in the Project Area:
At this time, staff does not have photos documenting the flooding conditions in this location.
Church Street (near Chapel Court) Project Map:
FY 2015/2016 – Page 22
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
FY 15-FY 19
Church Street FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Property & Easement
Acquisition $ 10,000 $ - $ - $ - $ - $ 10,000
Design/Final Engineering $ 9,000 $ - $ - $ - $ - $ 9,000
Construction $ - $ 63,135 $ - $ - $ - $ 63,135
Project Total $ 19,000 $ 63,135 $ - $ - $ - $ 82,135
Planned Financing
Bond Proceeds $ 19,000 $ 63,135 $ - $ - $ - $ 82,135
Fiscal Year Totals $ 19,000 $ 63,135 $ - $ - $ - $ 82,135
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ 1,167 $ 3,991 $ - $ - $ - $ 5,158
Debt Service on Previous
Bonds $ - $ 1,167 $ 5,158 $ 5,158 $ 5,158 $ 16,641
Fiscal Year Totals $ 1,167 $ 5,158 $ 5,158 $ 5,158 $ 5,158 $ 21,799
The annual debt service cost of this project on bonds issued in FY 2014/15 is $1,167 (Term - 30 years, Rate -
4.5%). The annual debt service cost of this project on bonds issued in FY 2015/16 is $3,991 (Term - 30 years,
Rate - 4.75%).
FY 2015/2016 – Page 23
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: Stormwater
Project Category: Stormwater Mitigation Project
Location: Dundee Road & Skokie Boulevard
Project Phase: Construction
Cost: $46,200
Project Phases Completed: Design and final engineering for this project will be completed during Fiscal Year
2014/15.
For additional information on this stormwater mitigation project, please refer to pages 37-38 of Fiscal Year
2014/15.
Photos of Flooding in the Project Area:
FY 2015/2016 – Page 24
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Dundee Road & Skokie Boulevard Project Map:
Dundee Road & Skokie FY 15-FY 19
Boulevard FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Design/Final Engineering $ 7,350 $ - $ - $ - $ - $ 7,350
Construction $ - $ 46,200 $ - $ - $ - $ 46,200
Project Total $ 7,350 $ 46,200 $ - $ - $ - $ 53,550
Planned Financing
Bond Proceeds $ 7,350 $ 46,200 $ - $ - $ - $ 53,550
Fiscal Year Totals $ 7,350 $ 46,200 $ - $ - $ - $ 53,550
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ 452 $ 2,921 $ - $ - $ - $ 3,373
Debt Service on Previous
Bonds $ - $ 452 $ 3,373 $ 3,373 $ 3,373 $ 10,571
Fiscal Year Totals $ 452 $ 3,373 $ 3,373 $ 3,373 $ 3,373 $ 13,944
The annual debt service cost of this project on bonds issued in FY 2014/15 is $452 (Term - 30 years, Rate -
4.5%). The annual debt service cost of this project on bonds issued in FY 2015/16 is $2,921 (Term - 30 years,
Rate - 4.75%).
FY 2015/2016 – Page 25
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: Stormwater
Project Category: Stormwater Mitigation Project
Location: Sunset Lane
Project Phase: Design/Final Engineering and Construction
Cost: $432,405
Project Phases Completed: Property and easement acquisition for this project will be completed during Fiscal
Year 2014/15.
For additional information on this stormwater mitigation project, please refer to pages 44-45 of Fiscal Year
2014/15.
Photos of Flooding in the Project Area:
At this time, staff does not have photos documenting the flooding conditions in this location.
Sunset Lane Project Map:
FY 2015/2016 – Page 26
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
FY 15-FY 19
Sunset Lane FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Property & Easement
Acquisition $ 20,000 $ - $ - $ - $ - $ 20,000
Design/Final Engineering $ - $ 56,700 $ - $ - $ - $ 56,700
Construction $ - $ 375,705 $ - $ - $ - $ 375,705
Project Total $ 20,000 $ 432,405 $ - $ - $ - $ 452,405
Planned Financing
Bond Proceeds $ 20,000 $ 432,405 $ - $ - $ - $ 452,405
Fiscal Year Totals $ 20,000 $ 432,405 $ - $ - $ - $ 452,405
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ 1,228 $ 27,333 $ - $ - $ - $ 28,561
Debt Service on Previous
Bonds $ - $ 1,228 $ 28,561 $ 28,561 $ 28,561 $ 86,911
Fiscal Year Totals $ 1,228 $ 28,561 $ 28,561 $ 28,561 $ 28,561 $ 115,472
The annual debt service cost of this project on bonds issued in FY 2014/15 is $1,228 (Term - 30 years, Rate -
4.5%). The annual debt service cost of this project on bonds issued in FY 2015/16 is $27,333 (Term - 30 years,
Rate - 4.75%).
FY 2015/2016 – Page 27
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: Stormwater
Project Category: Stormwater Mitigation Project
Location: Weller’s Subdivision (Weller, Hillcrest, and Christina
Lanes)
Project Phase: Design/Final Engineering and Construction
Cost: $325,605
Project Phases Completed: Property and easement acquisition for this project will be completed during Fiscal
Year 2014/15.
For additional information on this stormwater mitigation project, please refer to pages 46-47 of Fiscal Year
2014/15.
Photos of Flooding in the Project Area:
FY 2015/2016 – Page 28
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Weller’s Subdivision Project Map:
FY 15-FY 19
Weller's Subdivision FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Property & Easement
Acquisition $ 400,000 $ - $ - $ - $ - $ 400,000
Design/Final Engineering $ - $ 43,050 $ - $ - $ - $ 43,050
Construction $ - $ 282,555 $ - $ - $ - $ 282,555
Fiscal Year Totals $ 400,000 $ 325,605 $ - $ - $ - $ 725,605
Planned Financing
Bond Proceeds $ 400,000 $ 325,605 $ - $ - $ - $ 725,605
Fiscal Year Totals $ 400,000 $ 325,605 $ - $ - $ - $ 725,605
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ 24,557 $ 20,582 $ - $ - $ - $ 45,139
Debt Service on Previous
Bonds $ - $ 24,557 $ 45,139 $ 45,139 $ 45,139 $ 159,974
Fiscal Year Totals $ 24,557 $ 45,139 $ 45,139 $ 45,139 $ 45,139 $ 205,113
The annual debt service cost of this project on bonds issued in FY 2014/15 is $24,557 (Term - 30 years, Rate -
4.5%). The annual debt service cost of this project on bonds issued in FY 2015/16 is $20,582 (Term - 30 years,
Rate - 4.75%).
FY 2015/2016 – Page 29
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: Water
Project Category: Water Distribution System Improvements
Cost: $3,000,000
For additional information on this capital purchase, please refer to pages 48-49 of Fiscal Year 2014/15.
FY 15-FY 19
Water Distribution FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Water Distribution System
Improvements $ 3,000,000 $ 3,000,000 $ 2,000,000 $ - $ - $ 8,000,000
Project Total $ 3,000,000 $ 3,000,000 $ 2,000,000 $ - $ - $ 8,000,000
Planned Financing
Bond Proceeds $ 3,000,000 $ 3,000,000 $ 2,000,000 $ - $ - $ 8,000,000
Total $ 3,000,000 $ 3,000,000 $ 2,000,000 $ - $ - $ 8,000,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ 184,175 $ 189,629 $ 126,419 $ - $ - $ 500,223
Debt Service on Previous Bonds $ - $ 184,175 $ 373,804 $ 500,223 $ 500,223 $ 1,558,425
Fiscal Year Totals $ 184,175 $ 373,804 $ 500,223 $ 500,223 $ 500,223 $ 2,058,648
The annual debt service cost of this project on bonds issued in FY 2014/15 is $184,175 (Term - 30 years, Rate –
4.5%). The annual debt service cost of this project on bonds issued in FY 2015/16 is $189,629 (Term - 30 years,
Rate – 4.75%). The annual debt service cost of this project on bonds issued in FY 2016/17 is $126,419 (Term -
30 years, Rate – 4.75%).
FY 2015/2016 – Page 30
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: Water
Project Category: Water Main Replacement
Project Location: Crabtree Lane
Cost: $950,000
The water main on Crabtree Lane has experienced two (2) water main breaks in 2009 and 2010 and 25 since its
installation in 1963. It provides a critical East/West connection between Western Avenue and Pfingsten Road
and is essential for looping in this area. The existing 6-inch diameter main will be replaced with an 8-inch main
to accommodate the increased volume needed by the area and to ensure sufficient water flow if needed by the
Fire Department in case of an emergency.
Replace Number of Estimated
Crabtree Lane Existing Size With Length Year Breaks to Date Cost
Western Ave. to Pfingsten Rd. 6" 8" 3000 1963 25 $ 950,000
Project Total $ 950,000
Planned Financing
User Fees $ 950,000
Total $ 950,000
FY 2015/2016 – Page 31
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
FY 2015/2016 – Page 32
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: Water
Project Category: Water Main Replacement
Project Location: Woodlawn Road – Phase One
Cost: $450,000
The water main on Woodlawn between Shermer Road and Western Avenue has experienced 35 main breaks
since its installation in 1948. The existing 6-inch diameter main will be replaced with an 8-inch main to
accommodate the increased volume needed by the area and to ensure sufficient water flow if needed by the
Fire Department in case of an emergency.
Replace Number of Estimated
Woodlawn Road Existing Size With Length Year Breaks to Date Cost
Shermer Rd. to Western Ave. 6" 8" 2500 1948 35 $ 450,000
Project Total $ 450,000
Planned Financing
User Fees $ 450,000
Total $ 450,000
FY 2015/2016 – Page 33
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
FY 2015/2016 – Page 34
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: Water
Project Category: Water Production Facilities Improvement
Cost: $1,890,000
Below is a table that outlines the water production facilities improvement projects over the 2015/16 Fiscal Year.
Water Production Facilities FY 15-FY 19
Improvements FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Roof Work/Replacement $ - $ 355,000 $ - $ - $ - $ 355,000
Sodium Hypochlorite Conversion $ - $ 750,000 $ - $ - $ - $ 750,000
Mechanical Improvements,
Water Plant $ 155,000 $ - $ - $ - $ 155,000
Mechanical Improvements, Lake
Front Pumping Station $ - $ 30,000 $ - $ - $ - $ 30,000
Exterior Improvements, Cedar
Lane Water Tower $ - $ 400,000 $ - $ - $ - $ 400,000
Raw Water Transmission Main $ - $ 200,000 $ - $ - $ - $ 200,000
Project Total $ - $ 1,890,000 $ - $ - $ - $ 1,890,000
Planned Financing
Bond Proceeds $ - $ 1,890,000 $ - $ - $ - $ 1,890,000
Total $ - $ 1,890,000 $ - $ - $ - $ 1,890,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ - $ 119,466 $ - $ - $ - $ 119,466
Debt Service on Previous Bonds $ - $ - $ 119,466 $ 119,466 $ 119,466 $ 358,398
Fiscal Year Totals $ - $ 119,466 $ 119,466 $ 119,466 $ 119,466 $ 477,864
The annual debt service cost of this project on bonds issued in FY 2015/16 is $119,466 (Term - 30 years, Rate –
4.75%).
Roof Replacements
The roof of the Water Plant is nearing the end of its useful life and will be replaced over the course of two (2)
fiscal years due to the large scope of work. Replacement of the roof will ensure the continued structural
integrity of the facility and eliminate the risk of a leaking roof contaminating the water production process. An
assessment of the roof will be completed in early Fiscal Year 2014/15 to more clearly define the scope of work
and materials, similar to the process used for the Public Works Center.
Sodium Hypochlorite Conversion
The Village uses chlorine gas to disinfect the water pumped from Lake Michigan at the Lake Front Pump Station
and at the Village’s Water Plant. Chlorine gas is a volatile chemical and storage of chlorine gas requires
significant precautions to be taken to prevent a leak that would pose a significant health risk. Currently, the
Village is meeting the requirements for the storage of chlorine gas; however, the EPA will be instituting new
rules on the storage of chlorine gas. These rules would require the Village to expend significant resources to
FY 2015/2016 – Page 35
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
come into compliance. A safer and more cost effective solution is to transition to a sodium hypochlorite
disinfection system. Staff recommends making these improvements to the facility.
Mechanical Improvements, Water Plant
The HVAC unit at the Water Plant has reached the end of its useful life. The unit currently utilizes a refrigerant
that is being phased out in the industry and has only one of two compressors working. The failed components
cannot be replaced at this time due to the unit’s operation on the refrigerant. Installation of a new unit will not
only utilize current industry refrigerants, but also be more energy efficient.
Additionally, as the Village’s water production operations have become more automated, servers and computer
equipment serving those processes have been added. For this equipment to properly function and not overheat,
an air conditioning system similar to the one included in the server room at the Village Hall (albeit on a smaller
scale) is needed.
Mechanical Improvements, Lake Front Pumping Station
At the beginning of the Village’s water production process, water is treated with sodium hypochlorite as it
enters the intakes in Lake Michigan. The sodium hypochlorite begins the disinfection process and helps to
prevent Zebra mussels from building colonies on our intakes. The chemical is stored in a steel tank at the Lake
Front Pump Station which was installed in 1993. The tank has a rubber liner to prevent the chemical from
corroding the walls of the tank and spilling out. The rubber liner is degrading and needs to be replaced before
the steel tank is compromised. This work was deferred from FY 2013/14 to FY 2015/16 to coincide with the
sodium hypochlorite work at the Water Plant.
Cedar Lane Water Tower
The Cedar Lane water tower requires interior and exterior sandblasting and repainting.
Raw Water Main Rehabilitation
For additional information on this capital purchase, please refer to page 56-57 of Fiscal Year 2014/15.
FY 2015/2016 – Page 36
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: Water
Project Category: Water Meter Conversion Program
Cost: $75,000
For additional information on this capital purchase, please refer to page 58 of Fiscal Year 2014/15.
Water Meter Conversion FY 15-FY 19
Project FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Meter Purchases $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 375,000
Fiscal Year Totals $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 375,000
Planned Financing
User Charges/Fund Reserve $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 375,000
Total $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 375,000
FY 2015/2016 – Page 37
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: Water
Project Category: Scheduled Equipment & Vehicle Replacements
Cost: $120,640
Vehicles will be assessed prior to formal recommendation for replacement.
FY 15-FY 19
Vehicle Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Pickup(s) $ - $ 120,640 $ 37,210 $ - $ 39,480 $ 197,330
Excavator (2002) $ - $ - $ - $ 57,070 $ - $ 57,070
Backhoe (1996) $ - $ - $ 101,300 $ - $ - $ 101,300
Hydraulic Breaker (1997) $ - $ - $ 19,010 $ - $ - $ 19,010
Dump Truck (2004) $ - $ - $ - $ - $ 150,460 $ 150,460
Project Total $ - $ 120,640 $ 157,520 $ 57,070 $ 189,940 $ 525,170
Planned Financing
User Charges $ - $ 120,640 $ 56,220 $ 57,070 $ 39,480 $ 273,410
Bond Proceeds $ - $ - $ 101,300 $ - $ 150,460 $ 251,760
Total $ - $ 120,640 $ 157,520 $ 57,070 $ 189,940 $ 525,170
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ - $ - $ 7,620 $ - $ 11,567 $ 19,187
Debt Service on Previous
Bonds $ - $ - $ - $ 7,620 $ 7,620 $ 15,240
Fiscal Year Totals $ - $ - $ 7,620 $ 7,620 $ 19,187 $ 34,427
The annual debt service cost of this project on bonds issues in FY 2016/17 is $7,620 (Term - 20 years, Rate –
4.25%). The annual debt service cost of this project on bonds issues in FY 2018/19 is $11,567 (Term - 20 years,
Rate – 4.5%).
FY 2015/2016 – Page 38
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: Sanitary Sewer
Project Category: Sanitary Sewer Lining Program
Cost: $298,260
For additional information on this capital purchase, please refer to pages 64-65 of Fiscal Year 2014/15.
FY 15-FY 19
Sanitary Sewer Fund Projects FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Sewer Lining Program $ 289,573 $ 298,260 $ 307,208 $ 316,424 $ 325,917 $ 1,537,382
Fiscal Year Totals $ 289,573 $ 298,260 $ 307,208 $ 316,424 $ 325,917 $ 1,537,382
Planned Financing
Bond Proceeds $ 289,573 $ 298,260 $ 307,208 $ 316,424 $ 325,917 $ 1,537,382
Total $ 289,573 $ 298,260 $ 307,208 $ 316,424 $ 325,917 $ 1,537,382
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ 17,778 $ 18,853 $ 19,419 $ 20,584 $ 21,202 $ 97,836
Debt Service on Previous
Bonds $ - $ 17,778 $ 36,631 $ 56,050 $ 76,634 $ 187,093
Fiscal Year Totals $ 17,778 $ 36,631 $ 56,050 $ 76,634 $ 97,836 $ 284,929
The annual debt service cost of this project on bonds issues in FY 2014/15 is $17,778 (Term - 30 years, Rate –
4.5%). The annual debt service cost of this project on bonds issues in FY 2015/16 is $18,853 (Term - 30 years,
Rate – 4.75%). The annual debt service cost of this project on bonds issues in FY 2016/17 is $19,419 (Term - 30
years, Rate – 4.75%). The annual debt service cost of this project on bonds issues in FY 2017/18 is $20,584
(Term - 30 years, Rate – 5%). The annual debt service cost of this project on bonds issues in FY 2018/19 is
$21,202 (Term - 30 years, Rate – 5%).
FY 2015/2016 – Page 39
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
FY 2015/2016 – Page 40
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: Sanitary Sewer
Project Category: Vehicle Replacement
Unit #404: 1999 Workhorse Commercial Union City Step Van
Cost: $90,180
Mileage: 92,633 2012 Miles: 3,551
2012 Repair Cost: $320 (Average: $946) 2012 Repair Hours: 9.5 hours (Average: 28.75 hours)
Unit #404 is a 1999 Workhorse Commercial Union City Step Van. This van is used on a daily basis to transport
employees, materials, tools, and equipment for operations. Rust is evident on the frame and structure of the
van. Rear frame extensions are separating due to rust jacking. While the repair costs are below average, the
frame and under structure components have advanced stages of corrosion. For these reasons, the Fleet
Maintenance Supervisor recommends replacement of this vehicle during FY 2015/16.
FY 15-FY 19
Vehicle Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
#404, Step Van
Replacement $ - $ 90,180 $ - $ - $ - $ 90,180
Fiscal Year Totals $ - $ 90,180 $ - $ - $ - $ 90,180
Planned Financing
User Charges $ - $ 90,180 $ - $ - $ - $ 90,180
Total $ - $ 90,180 $ - $ - $ - $ 90,180
FY 2015/2016 – Page 41
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
FY 2015/2016 – Page 42
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: General
Project Category: Enterprise Resource Program
Project Phase: Software, Implementation, Project Management
Cost: $350,000
For additional information on this capital purchase, please refer to pages 66-68 of Fiscal Year 2014/15.
FY 15-FY 19
Information Technology FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Enterprise Resource
Program Software/
Implementation/Project
Management $ 450,000 $ 350,000 $ - $ - $ - $ 800,000
Project Total $ 450,000 $ 350,000 $ - $ - $ - $ 800,000
Planned Financing
Bond Proceeds $ 450,000 $ 350,000 $ - $ - $ - $ 800,000
Fiscal Year Totals $ 450,000 $ 350,000 $ - $ - $ - $ 800,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ 54,109 $ 42,617 $ - $ - $ - $ 96,726
Debt Service on Previous
Bonds $ 46,855 $ 100,964 $ 143,581 $ 143,581 $ 143,581 $ 578,562
Fiscal Year Totals $ 100,964 $ 143,581 $ 143,581 $ 143,581 $ 143,581 $ 675,288
At this time there is no identified funding source for the debt service for this project. The annual debt service
for bonds issued in FY 2013/14 is $46,855. The annual debt service cost of this project on bonds issued in FY
2014/15 is $54,109 (Term - 10 years, Rate - 3.5%). The annual debt service cost of this project on bonds issued
in FY 2015/16 is $42,617 (Term - 10 years, Rate - 3.75%).
FY 2015/2016 – Page 43
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: General
Project Category: Information Technology (IT) Equipment
Replacement
Project: General Equipment
Cost: $100,000
For additional information on this capital purchase, please refer to page 69 of Fiscal Year 2014/15.
FY 15-FY 19
Information Technology FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
General Equipment
Replacement $ 130,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 530,000
Fiscal Year Totals $ 130,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 530,000
Planned Financing
General Fund Revenues $ 130,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 530,000
Fiscal Year Totals $ 130,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 530,000
FY 2015/2016 – Page 44
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: General
Project Category: E-911 Equipment Replacement
Project: Portable Radios
Cost: $168,920
For additional information on this capital purchase, please refer to page 71 of Fiscal Year 2014/15.
E-911 Equipment FY 15-FY 19
Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Portable Radio
Replacement $ 164,000 $ 168,920 $ 173,988 $ 179,207 $ - $ 686,115
Fiscal Year Totals $ 164,000 $ 168,920 $ 173,988 $ 179,207 $ - $ 686,115
Planned Financing
General Fund Revenues $ 164,000 $ 168,920 $ 173,988 $ 179,207 $ - $ 686,115
Fiscal Year Totals $ 164,000 $ 168,920 $ 173,988 $ 179,207 $ - $ 686,115
FY 2015/2016 – Page 45
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: General
Project Category: E-911 Equipment Replacement
Project: Mobile Computer Equipment
Cost: $100,000
For additional information on this capital purchase, please refer to page 72 of Fiscal Year 2014/15.
E-911 Equipment FY 15-FY 19
Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Mobile Equipment
Replacement $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000
Fiscal Year Totals $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000
Planned Financing
General Fund Revenues $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000
Fiscal Year Totals $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000
FY 2015/2016 – Page 46
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: General
Project Category: E-911 Equipment Replacement
Project: Village Hall and Public Works Center - Security System
Upgrades
Cost: $100,000
The Village Hall serves as a meeting space for the elected and appointed boards and commissions of
Northbrook, a venue for various resident groups to hold their meetings, and a workplace where the Village’s
Finance, Development and Planning Services, and General Government Departments are located. To balance the
openness and accessibility of this facility and its many uses with security concerns, it is recommended that
security cameras be installed on the interior and exterior of the building. These cameras will be tied into the
Police Department and monitored so that an emergency response can be coordinated if necessary. As a
component of this project, several cameras at the Public Works Department will be replaced. The feed from the
cameras at Public Works will also be monitored by the Police Department.
E-911 Security
Upgrades FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 FY 15-FY 19 Total
Security System
Upgrades $ 100,000 $ - $ - $ - $ - $ 100,000
Project Total $ 100,000 $ - $ - $ - $ - $ 100,000
Planned Financing
General Fund
Revenues $ 100,000 $ - $ - $ - $ - $ 100,000
Fiscal Year Total $ 100,000 $ - $ - $ - $ - $ 100,000
FY 2015/2016 – Page 47
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: General
Project Category: Facilities Improvements
Facility: Village Hall – Emergency Generator Replacement
Cost: $250,000
An emergency generator powers the Village Hall in times when the electricity is out. This was installed at the
time the building was constructed (1990). The generator powers some of the Village Hall’s systems including
lighting, door access systems, the computer server room, and select outlets. The generator does not power the
entire building including key components such as the heating, ventilation, and air conditioning (HVAC) system.
With the generator reaching 25 years of age, finding parts has become challenging and makes timely repairs
difficult. The generator will be replaced with one large enough to serve the entire Village Hall, which will be
especially important should the building need to be utilized for emergency operations or other functions during
power outages.
FY 15-FY 19
Facilities FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Emergency Generator
Replacement - Village Hall $ - $ 250,000 $ - $ - $ - $ 250,000
Project Total $ - $ 250,000 $ - $ - $ - $ 250,000
Planned Financing
Bond Proceeds $ - $ 250,000 $ - $ - $ - $ 250,000
Fiscal Year Totals $ - $ 250,000 $ - $ - $ - $ 250,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ - $ 30,441 $ - $ - $ - $ 30,441
Debt Service on Previous
Bonds $ - $ - $ 30,441 $ 30,441 $ 30,441 $ 91,323
Fiscal Year Totals $ - $ 30,441 $ 30,441 $ 30,441 $ 30,441 $ 121,764
At this time there is no identified funding source for the debt service for this project. The annual debt service
cost of this project on bonds issued in FY 2015/16 is $30,441 (Term - 10 years, Rate - 3.75%).
FY 2015/2016 – Page 48
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: General
Project Category: Facilities Improvements
Facility: Village Hall – Window Replacements
Cost: $85,000
For additional information on this project, please refer to pages 74-75 of Fiscal Year 2014/15.
FY 15-FY 19
Facilities FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Exterior Improvements -
Village Hall $ 85,000 $ 85,000 $ - $ - $ - $ 170,000
Project Total $ 85,000 $ 85,000 $ - $ - $ - $ 170,000
Planned Financing
General Fund Revenues $ 85,000 $ 85,000 $ - $ - $ - $ 170,000
Fiscal Year Totals $ 85,000 $ 85,000 $ - $ - $ - $ 170,000
FY 2015/2016 – Page 49
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: General
Project Category: Facilities Improvements
Facility: Village Hall – Board Room Annex Improvements
Cost: $300,000
Construction of the Village Hall was completed in 1990 along with the Board Room Annex which houses the
Board Room, Tower Room, and Shermer Study. The Board Room has not been updated since its construction
and the drapery, carpeting, furniture, and lighting have reached the end of their useful life and are in need of
replacement. With these improvements, the windows in the Board Room Annex of the Village Hall will also be
replaced with new more energy efficient materials that require less maintenance, thus completing replacement
of all windows at the Village Hall.
FY 15-FY 19
Facilities FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Interior Improvements -
Village Hall $ - $ 300,000 $ - $ - $ - $ 300,000
Project Total $ - $ 300,000 $ - $ - $ - $ 300,000
Planned Financing
Bond Proceeds $ - $ 300,000 $ - $ - $ - $ 300,000
Fiscal Year Totals $ - $ 300,000 $ - $ - $ - $ 300,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ - $ 22,566 $ - $ - $ 22,566
Debt Service on Previous
Bonds $ - $ - $ 22,566 $ 22,566 $ 22,566 $ 67,698
Fiscal Year Totals $ - $ 22,566 $ 22,566 $ 22,566 $ 22,566 $ 22,566
At this time there is no identified funding source for the debt service for this project. The annual debt service
cost of this project on bonds issued in FY 2015/16 is $22,566 (Term - 20 years, Rate – 4.25%).
FY 2015/2016 – Page 50
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: General
Project Category: Facilities Improvements
Facility: Public Works Center – Driveway Replacement
Cost: $125,000
The west driveway that provides access to the Public Works Center’s west wing was last resurfaced in 2000. The
driveway sees heavy use as many of the Village’s heavy equipment such as dump trucks, front end loaders, and
fire trucks travel over the pavement regularly to get fuel. Failure to replace this driveway at this time may result
in additional paving or reconstruction costs in the future.
FY 15-FY 19
Facilities FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Exterior Improvements -
Public Works Center $ - $ 125,000 $ - $ - $ - $ 125,000
Project Total $ - $ 125,000 $ - $ - $ - $ 125,000
Planned Financing
Bond Proceeds $ - $ 125,000 $ - $ - $ - $ 125,000
Fiscal Year Totals $ - $ 125,000 $ - $ - $ - $ 125,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ - $ 9,403 $ - $ - $ - $ 9,403
Debt Service on Previous
Bonds $ - $ - $ 9,403 $ 9,403 $ 9,403 $ 28,209
Fiscal Year Totals $ - $ 9,403 $ 9,403 $ 9,403 $ 9,403 $ 37,612
At this time there is no identified funding source for the debt service for this project. The annual debt service
cost of this project on bonds issued in FY 2015/16 is $9,403 (Term - 20 years, Rate – 4.25%).
FY 2015/2016 – Page 51
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: General
Project Category: Facilities Improvements
Facility: Public Works Center – Fuel Island System Improvements
Cost: $130,000
The Village operates a fueling island at the Public Works Center for its fleet of gasoline and diesel vehicles. The
current fuel system and software were installed in 1999. Since that time, the fuel system has become antiquated
and harder to maintain. Newer systems offer more functionality and provide more accountability while
removing the human element of data entry with the download of vehicle information (mileage, vehicle ID,
engine hours, etc.) by radio signal. This information would be used to help build better preventative
maintenance schedules and better track fuel usage. The exact configuration of the system will be evaluated
prior to purchase.
FY 15-FY 19
Facilities FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Mechanical Improvements -
Public Works Center $ - $ 130,000 $ - $ - $ - $ 130,000
Project Total $ - $ 130,000 $ - $ - $ - $ 130,000
Planned Financing
Bond Proceeds $ - $ 130,000 $ - $ - $ - $ 130,000
Fiscal Year Totals $ - $ 130,000 $ - $ - $ - $ 130,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ - $ 9,779 $ - $ - $ - $ 9,779
Debt Service on Previous
Bonds $ - $ - $ 9,779 $ 9,779 $ 9,779 $ 29,337
Fiscal Year Totals $ - $ 9,779 $ 9,779 $ 9,779 $ 9,779 $ 39,116
At this time there is no identified funding source for the debt service for this project. The annual debt service
cost of this project on bonds issued in FY 2015/16 is $9,779 (Term - 20 years, Rate – 4.25%).
FY 2015/2016 – Page 52
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: General
Project Category: Facilities Improvements
Facility: Fire Department – Infrared Heaters (Stations 10 & 12)
Cost: $70,000
The apparatus bays of Fire Stations 10 and 12 are heated with natural gas infrared heaters. The configuration of
the bays and the height of the vehicles stored in those bays required that the heating elements be installed
closer to the ceiling than they would normally to avoid causing damage to the Fire Department’s vehicles. The
result of the installation of the heaters being installed too close to the ceiling is the drywall continually dries out,
cracks, and breaks apart. To avoid making on-going repairs, the heaters will be replaced with a more effective
method of heating the apparatus bays of Fire Stations 10 and 12.
FY 15-FY 19
Facilities FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Mechanical
Improvements - Fire
Stations 10 & 12 $ - $ 70,000 $ - $ - $ - $ 70,000
Project Total $ - $ 70,000 $ - $ - $ - $ 70,000
Planned Financing
General Fund Revenues $ - $ 70,000 $ - $ - $ - $ 70,000
Fiscal Year Total $ - $ 70,000 $ - $ - $ - $ 70,000
FY 2015/2016 – Page 53
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: General
Project Category: Facilities Improvements
Facility: Fire Department – Electrical Upgrades (Station 11)
Cost: $100,000
Fire Department vehicles are outfitted with a myriad of electronics including laptops, radios,
coolers/refrigerators for medications, and other lifesaving equipment that must be charged and operational
whenever a vehicle is dispatched. To power this equipment and prevent the vehicles’ battery from being
drained, the vehicles are plugged into the station’s power supply when they are not in use. The electrical panels
at Station 11 do not have sufficient capacity to supply the power for the higher draws of the newer vehicles. This
project will improve the capacity of the electrical system at Station 11 to accommodate the increased demand
of all fire apparatus.
FY 15-FY 19
Facilities FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Mechanical Improvements-
Fire Station 11 $ - $ 100,000 $ - $ - $ - $ 100,000
Project Total $ - $ 100,000 $ - $ - $ - $ 100,000
Planned Financing
Bond Proceeds $ - $ 100,000 $ - $ - $ - $ 100,000
Fiscal Year Totals $ - $ 100,000 $ - $ - $ - $ 100,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ - $ 7,522 $ - $ - $ - $ 7,522
Debt Service on Previous
Bonds $ - $ - $ 7,522 $ 7,522 $ 7,522 $ 22,566
Fiscal Year Totals $ - $ 7,522 $ 7,522 $ 7,522 $ 7,522 $ 30,088
At this time there is no identified funding source for the debt service for this project. The annual debt service
cost of this project on bonds issued in FY 2015/16 is $7,522 (Term - 20 years, Rate – 4.25%).
FY 2015/2016 – Page 54
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: General
Project Category: Facilities Improvements
Facility: Fire Department – Driveway Replacement (Station 12)
Cost: $180,500
Fire Station 12 receives and responds to an average of 1,805 calls each year. With many of those calls, an
ambulance and fire engine or tower truck are dispatched. These trips result in significant wear and tear on the
pavement in front of the bays where the equipment is stored. The concrete pad between the bays and Shermer
Road is degrading and has reached the end of its useful life. The drive will be replaced with concrete to better
withstand the weight of the heavy equipment.
FY 15-FY 19
Facilities FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Exterior Improvements -
Fire Station 12 $ - $ 180,500 $ - $ - $ - $ 180,500
Project Total $ - $ 180,500 $ - $ - $ - $ 180,500
Planned Financing
Bond Proceeds $ - $ 180,500 $ - $ - $ - $ 180,500
Fiscal Year Totals $ - $ 180,500 $ - $ - $ - $ 180,500
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ - $ 13,578 $ - $ - $ - $ 13,578
Debt Service on Previous
Bonds $ - $ - $ 13,578 $ 13,578 $ 13,578 $ 40,734
Fiscal Year Totals $ - $ 13,578 $ 13,578 $ 13,578 $ 13,578 $ 54,312
At this time there is no identified funding source for the debt service for this project. The annual debt service
cost of this project on bonds issued in FY 2015/16 is $13,578 (Term - 20 years, Rate – 4.25%).
FY 2015/2016 – Page 55
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: General
Project Category: Vehicle Replacement – Public Works
Unit #261: 1979 Klauer 100” Snow Blower
Cost: $120,940
Included in the Village’s fleet is Unit #261, a 1979 Klauer 100” Snow Blower. Staff will continue to assess this
equipment, but based upon current service issues, it will likely require replacement by FY 2015/16.
FY 15-FY 19
Vehicle Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
#261, 1979 Klauer 100"
Snow Blower $ - $ 120,940 $ - $ - $ - $ 120,940
Project Total $ - $ 120,940 $ - $ - $ - $ 120,940
Planned Financing
Bond Proceeds $ - $ 120,940 $ - $ - $ - $ 120,940
Fiscal Year Total $ - $ 120,940 $ - $ - $ - $ 120,940
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 Total
Debt Service on New
Bonds $ - $ 9,098 $ - $ - $ - $ 9,098
Debt Service on Previous
Bonds $ - $ - $ 9,098 $ 9,098 $ 9,098 $ 27,294
Fiscal Year Totals $ - $ 9,098 $ 9,098 $ 9,098 $ 9,098 $ 36,392
At this time there is no identified funding source for the debt service for this project. The annual debt service
cost of this project on bonds issued in FY 2015/16 is $9,098 (Term - 20 years, Rate – 4.25%).
FY 2015/2016 – Page 56
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: General
Project Category: Vehicle Replacement – Public Works
Unit #245: 1991 John Deere 2755 Tractor
Cost: $71,640
Included in the Village’s fleet is Unit #245, a 1991 John Deere 2755 Tractor. Staff will continue to assess this
equipment, but based upon current service issues, it will likely require replacement by FY 2015/16.
FY 15-FY 19
Vehicle Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
#245, 1991 John Deere
2755 Tractor $ - $ 71,640 $ - $ - $ - $ 71,640
Project Total $ - $ 71,640 $ - $ - $ - $ 71,640
Planned Financing
Bond Proceeds $ - $ 71,640 $ - $ - $ - $ 71,640
Fiscal Year Total $ - $ 71,640 $ - $ - $ - $ 71,640
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 Total
Debt Service on New
Bonds $ - $ 8,723 $ - $ - $ - $ 8,723
Debt Service on Previous
Bonds $ - $ - $ 8,723 $ 8,723 $ 8,723 $ 26,169
Fiscal Year Totals $ - $ 8,723 $ 8,723 $ 8,723 $ 8,723 $ 34,892
At this time there is no identified funding source for the debt service for this project. The annual debt service
cost of this project on bonds issued in FY 2015/16 is $8,723 (Term - 10 years, Rate – 3.75%).
FY 2015/2016 – Page 57
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2015/2016
Fund: General
Project Category: Vehicle Replacements
Cost: $662,480
These vehicles and equipment will be assessed before recommendations for replacement are finalized.
FY 15-FY 19
Vehicle Replacements FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Administrative Vehicle (DPS) $ - $ 27,510 $ - $ - $ - $ 27,510
Administrative Vehicles (FD) $ - $ 76,490 $ - $ - $ - $ 76,490
Police Squad/Administrative
Vehicles (5) $ - $ 168,130 $ - $ - $ - $ 168,130
Public Works Vehicles (10) $ - $ 372,840 $ - $ - $ - $ 372,840
Commercial Mower $ - $ 17,510 $ - $ - $ - $ 17,510
Project Total $ - $ 662,480 $ - $ - $ - $ 662,480
Planned Financing
General Fund Revenues $ - $ 662,480 $ - $ - $ - $ 662,480
Fiscal Year Total $ - $ 662,480 $ - $ - $ - $ 662,480
FY 2015/2016 – Page 58
FY 2014/2015 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
Fiscal Year 2016/17 Summary
Capital Improvement Budget
FY 2016/17
By Fund
10%
43% 22% General Fund
Water Fund
Sewer Fund
Stormwater Fund
2% Infrastructure Capital Projects Fund
23%
Total Capital Budget = $17,912,370
Infrastructure
General Sewer Stormwater
Water Fund Capital Projects Total
Fund Fund Fund
Fund
Capital Expense $ 1,450,738 $ 4,052,520 $ 344,418 $ 4,216,250 $ 7,848,444 $ 17,912,370
Planned Financing
Bond Proceeds $ 636,960 $ 2,411,300 $ 307,208 $ 4,216,250 $ 5,698,029 $ 13,269,747
Designated Revenues $ - $ 1,641,220 $ 37,210 $ - $ 682,178 $ 2,360,608
Undesignated Revenues $ 813,778 $ - $ - $ - $ 1,468,237 $ 2,282,015
Total $ 1,450,738 $ 4,052,520 $ 344,418 $ 4,216,250 $ 7,848,444 $ 17,912,370
FY 2016/2017 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
FY 2016/17 Projects – $17,912,370
Infrastructure Capital Projects Fund – $7,848,444
Asphalt Street Maintenance- $682,178 (MFT): Page 4
Concrete Street Reconstruction and Rehabilitation- $873,029 (B)
o Sections of Lone Tree Subdivision, Sunset Fields Area, Southbridge Commons, Prestwick Area:
Page 9
Sidewalk Improvements- $110,237: Page 11
Shermerville Commons- Land Acquisition, Design and Engineering- $4,825,000 (B): Page 13
Skokie Valley Trail Bike Path- $1,358,000: Page 16
Stormwater Fund - $4,216,250 (B)
Wescott Park Underground Storage, Construction- $3,674,250: Page 17
Keystone Road/Chartres Drive, Design/Final Engineering- $42,000: Page 19
Western Avenue/Oak Avenue, Property/Easement Acquisition- $500,000: Page 21
Water Fund - $4,052,520
Water Distribution System Improvements- $2,000,000 (B): Page 23
Water Main Replacements
o Elm Street- $137,500: Page 24
o Farnsworth Lane- $540,000: Page 26
o Mulberry Lane- $237,500: Page 28
o Sunnyside Lane- $412,500: Page 30
o Woodlawn Road – Phase Two- $182,500: Page 32
Water Production Facility Improvement Projects- $310,000: Page 34
Water Meter Conversion Program- $75,000: Page 35
Vehicle Replacements- $157,520 (B): Page 36
Sewer Fund - $344,418
Sanitary Sewer Lining Program- $307,208 (B): Page 37
Vehicle Replacements- $37,210: Page 39
General Fund – $1,450,738
Information Technology Equipment Replacement- $100,000: Page 40
E-911 Portable Equipment Replacement- $173,988: Page 41
E-911 Equipment Replacement- $100,000: Page 42
Fire Station Facilities Improvements - $130,000 (B): Page 43
Ambulance Replacement- $310,000 (B): Page 44
Dump Truck Replacement- $196,960 (B): Page 46
Vehicle Replacements- $439,790: Page 47
(B) Proposed Bond Issue
FY 2016/2017 – Page 2
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
FY 2016/2017 – Page 3
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
Fund: Infrastructure Capital Improvement
Project Category: Asphalt Street Reconstruction & Rehabilitation
Location: Illinois Road/Kingsport Court/Maple Avenue/Oak
Avenue/Picardy Circle/Picardy Drive/Royal Drive
Cost: $682,178
The roadways selected for the 2016/17 asphalt reconstruction and rehabilitation program are rated many
failures, or limited failures.
Roadways rated as having many failures (2 on a scale of 5) have large potholes form and signs of the
base beginning to fail will become evident. Typical examples of these failures include alligator cracking
or failure of the roadway surface.
Roadways rated as having limited failures (3 on a scale of 5)exhibit signs of the road surface cracking
and have small potholes beginning to form. Typical examples of these failures include horizontal and/or
longitudinal cracking in the street. Streets such as Maple Avenue, which is rated as having “limited
failures,” are scheduled with worse streets because of their close proximity.
The condition of these roads is such that patching is no longer an option and asphalt rehabilitation/
reconstruction is necessary. These repairs will be paid for with Motor Fuel Tax (MFT) revenues.
Address Range Approximate Square
Street Rating Last Resurfaced
(in hundred blocks) Yards of Pavement
Illinois Road 2500-2700 Many Failures 1999 2,949
Kingsport Court 1400 Many Failures - 1,760
Maple Avenue 2500-2700 Limited Failures - 1,929
Oak Avenue 2500-2700 Many Failures 1999 2,904
Picardy Circle 600-700 Many Failures - 3,954
Picardy Drive 4100 Many Failures - 5,269
Royal Drive 2700 Many Failures - 1,338
FY 2016/2017 – Page 4
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
FY 15-FY 19
Annual Program FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Illinois Road - Royal Drive to
SC@663E Birch Road $ - $ - $ 58,327 $ - $ - $ 58,327
Kingsport Court - Walters
Avenue to South End $ - $ - $ 28,632 $ - $ - $ 28,632
Maple Avenue - Oak Avenue
to DS@660E Oak Avenue $ - $ - $ 57,077 $ - $ - $ 57,077
Maple Avenue - DS@660E
Oak Avenue to East End $ - $ - $ 31,931 $ - $ - $ 31,931
Oak Avenue - DS@660W
Cedar Lane to Royal Drive $ - $ - $ 173,215 $ - $ - $ 173,215
Picardy Circle - Picardy Circle
to Picardy Drive $ - $ - $ 262,899 $ - $ - $ 262,899
Picardy Drive - Sanders Road
to Picardy Circle $ - $ - $ 13,979 $ - $ - $ 13,979
Picardy Drive Extension -
Picardy Circle $ - $ - $ 18,420 $ - $ - $ 18,420
Royal Drive - Oak Avenue to
Illinois Road $ - $ - $ 26,895 $ - $ - $ 26,895
Royal Drive - Royal Drive to
Pfingsten Road $ - $ - $ 10,803 $ - $ - $ 10,803
Project Total $ - $ - $ 682,178 $ - $ - $ 682,178
Planned Financing
State Motor Fuel Tax
Receipts $ - $ - $ 682,178 $ - $ - $ 682,178
Fiscal Year Totals $ - $ - $ 682,178 $ - $ - $ 682,178
Illinois Road Kingsport Court
FY 2016/2017 – Page 5
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
Maple Avenue Oak Avenue
Picardy Circle Picardy Drive
Royal Drive
FY 2016/2017 – Page 6
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
FY 2016/2017 – Page 7
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
FY 2016/2017 – Page 8
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
Fund: Infrastructure Capital Improvement
Project Category: Concrete Street Reconstruction & Rehabilitation
Location: Lone Tree Subdivision/Sunset Fields Area/Southbridge
Commons/Prestwick Area
Cost: $873,029
The concrete streets of the Lone Tree Subdivision, Sunset Fields, Southbridge Commons and the Prestwick areas
of town have been surveyed and an estimated number of concrete panels have been identified for replacement.
Deferring the replacement of the deteriorated panels will result in more advanced degradation of roadway,
including pavement failures, increased damage to vehicles, and increased reconstruction and rehabilitation costs
in the future.
Panels are approximately 5.89 cubic yards of concrete. In FY 2016/17, Village Staff anticipate replacing about
3,200 cubic yards of concrete, which equates to 376 cement trucks.
Concrete Street
Reconstruction and FY 15-FY 19
Rehabilitation FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Lone Tree
Subdivision/Sunset
Fields Area/Southbridge
Commons/Prestwick
Area $ - $ - $ 873,029 $ - $ - $ 873,029
Project Total $ - $ - $ 873,029 $ - $ - $ 873,029
Planned Financing
Bond Proceeds $ - $ - $ 873,029 $ - $ - $ 873,029
Fiscal Year Totals $ - $ - $ 873,029 $ - $ - $ 873,029
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ - $ - $ 55,184 $ - $ - $ 55,184
Debt Service on
Previous Bonds $ - $ - $ - $ 55,184 $ 55,184 $ 110,368
At this time there is no identified funding source for the debt service for this project. The annual debt service
cost of this project on bonds issued in FY 2016/17 is $55,184 (Term - 30 years, Rate - 4.75%).
FY 2016/2017 – Page 9
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
FY 2016/2017 – Page 10
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
Fund: Infrastructure Capital Improvement
Project Category: Sidewalk Improvements
Location: Atlas Sections 2E, 2F, 2G, 2H, 2J, 2K, 3E, 3F, 3G, 3H
Cost: $110,237
For additional information on this capital purchase, please refer to page 27 of Fiscal Year 2014/15.
Areas to be reviewed for replacement are detailed in the map below.
FY 15-FY 19
Sidewalk Improvements FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Annual Program $ 103,909 $ 107,026 $ 110,237 $ 113,544 $ 116,951 $ 551,667
Fiscal Year Totals $ 103,909 $ 107,026 $ 110,237 $ 113,544 $ 116,951 $ 551,667
Planned Financing
Fund Reserves $ 103,909 $ 107,026 $ 110,237 $ 113,544 $ 116,951 $ 551,667
FY 2016/2017 – Page 11
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
FY 2016/2017 – Page 12
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
Fund: Infrastructure Capital Improvement
Project Category: Shermerville Commons – Fleet Maintenance
Garage
Project Phase: Land Acquisition and Design/Engineering
Cost: $4,825,000
The Downtown Area Plan was presented to and reviewed by the Village Board in February 2012. A central
component that grew out of that plan was the creation of a park to help better unify the campuses of the Village
Hall and Library, which would also provide an additional draw for residents, shoppers, and diners to the
downtown. The park concept, which would be named Shermerville Commons, called for enhancing the
stormwater facility located behind the Village Hall and Library with additional recreational features to better
take advantage of the space and the natural amenity provided by the branch of the Chicago River flowing
through the downtown. In total, the project contains three distinct components: relocation of the Village’s Fleet
Maintenance Garage, enlarging the stormwater facility, and construction of a park facility.
The table below breaks down the three distinct components of Shermerville Commons.
Component FY 2016/17 FY 2017/18 FY 2018/19 FY 2019/20 FY 2020/21 Total
Fleet Maintenance $4,825,000 $325,000 $3,241,000 $50,000 - $8,441,000
Stormwater Facility - $100,000 $200,000 $2,675,000 - $2,975,000
Park Facility - - - $150,000 $1,130,000 1,280,000
FY Total $4,825,000 $425,000 $3,441,000 $2,875,000 $1,130,000 $12,696,000
The park envisioned for this location contains a variety of uses including a walking path around what will be a
pond, fishing, a pedestrian bridge over the river connecting the walking path to Cherry Lane, a children’s play
fountain, and a reading area that can be programmed by the Library or Park District during the summer months.
To provide these recreational components, the stormwater facility must be enlarged and the fleet maintenance
facility must be relocated.
The Shermerville Commons project would transform the currently dry bottom basin to a ponded or wet bottom
stormwater facility which will increase the stormwater storage capacity by 10.5 acre feet (a volume equal to
seven of the Cedar Lane water towers). It is anticipated that the pond will be approximately four (4) feet deep
which will be sufficient to provide a habitat for fish; however due to safety concerns, ice skating would no longer
be available at this site. Additionally, staff will be working with the Metropolitan Water Reclamation District
(MWRD) to determine if this increased storage can be used to provide commercial properties in the downtown
with stormwater detention credits to minimize the amount of onsite detention that a new development would
have to provide.
To obtain the space necessary for the stormwater facility and recreational components, the Village’s Fleet
Maintenance Garage must be relocated. A new fleet maintenance building will necessitate property being
purchased and a new building constructed. It is anticipated that approximately 25,600 square feet of building
space is needed for fleet maintenance activities, and current construction costs for fleet facilities are $110 per
square foot (inclusive of equipment such as lifts and cranes). To construct this building, a minimum of 3.6 acres
of land will be needed. This building is sized to allow for the Village to partner with other organizations on the
maintenance of vehicles and equipment. The Village’s Cedar Lane water tower will remain in place and not need
to be relocated.
FY 2016/2017 – Page 13
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
It is anticipated that the project will take approximately three (3) to four (4) years to complete. The progression
of the project would begin with relocation of the Garage, construction of the enlarged stormwater facility, and
finally, completion of the Shermerville Commons park targeted for Fiscal Year 2020/21.
Following the table below is a Shermerville Commons concept rendering that was included in the Downtown
Plan.
Shermerville Commons FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 FY 15-FY 19 Total
Fleet Maintenance
Garage $ - $ - $4,825,000 $ 325,000 $3,241,000 $ 8,391,000
Stormwater Facility $ - $ - $ - $ 100,000 $ 200,000 $ 300,000
Park Facility $ - $ - $ - $ - $ - $ -
Project Total $ - $ - $4,825,000 $ 425,000 $3,441,000 $ 8,691,000
Planned Financing
Bond Proceeds $ - $ - $4,825,000 $ 425,000 $3,441,000 $ 8,691,000
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 FY 15-FY 19 Total
Debt Service on New
Bonds $ - $ - $ 362,936 $ 32,673 $ 264,531 $ 660,140
Debt Service on Previous
Bonds $ - $ - $ - $ 362,936 $ 395,609 $ 758,545
Fiscal Year Totals $ - $ - $ 362,936 $ 395,609 $ 660,140 $ 1,418,685
At this time there is no identified funding source for the debt service for this project. The annual debt service
cost of this project on bonds issued in FY 2016/17 is $362,936 (Term - 20 years, Rate - 4.25%). The annual debt
service cost of this project on bonds issued in FY 2017/18 is $32,673 (Term - 20 years, Rate - 4.5%). The annual
debt service cost of this project on bonds issued in FY 2018/19 is $264,531 (Term - 20 years, Rate - 4.5%).
FY 2016/2017 – Page 14
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
FY 2016/2017 – Page 15
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
Fund: Infrastructure Capital Improvement
Project Category: Bike Path Construction – Skokie Valley Trail
Project Phase: Design/Final Engineering
Cost: $1,358,000
For additional information on this capital purchase, please refer to pages 14-15 of Fiscal Year 2015/16.
Skokie Valley Trail Bike FY 15-FY 19
Path FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Property & Easement
Acquisition $ - $ 250,000 $ - $ - $ - $ 250,000
Design/Final
Engineering $ - $ - $1,358,000 $ - $ - $ 1,358,000
Construction $ - $ - $ - $ 950,000 $ - $ 950,000
Project Total $ - $ 250,000 $1,358,000 $ 950,000 $ 950,000
Planned Financing
Undesignated Revenues $ - $ 250,000 $1,358,000 $ 950,000 $ - $ 2,558,000
Fiscal Year Totals $ - $ 250,000 $1,358,000 $ 950,000 $ - $ 2,558,000
FY 2016/2017 – Page 16
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
Fund: Stormwater
Project Category: Stormwater Mitigation Project
Location: Wescott Park Underground Storage
Project Phase: Construction (Start)
Cost: $3,674,250
Project Phases Completed: Design and Final Engineering will begin in FY 2014/15 and be completed in FY
2015/16.
For additional information on this stormwater mitigation project, please refer to pages 29-30 of Fiscal Year
2014/15.
Photos of Flooding in the Project Area:
Wescott Park Project Map:
FY 2016/2017 – Page 17
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
FY 15-FY 19
Wescott Park FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Design/Final Engineering $ 577,500 $ 577,500 $ - $ - $ - $ 1,155,000
Construction $ - $ - $3,674,250 $3,674,250 $ - $ 7,348,500
Project Total $ 577,500 $ 577,500 $3,674,250 $3,674,250 $ - $ 8,503,500
Planned Financing
Bond Proceeds $ 577,500 $ 577,500 $3,674,250 $3,674,250 $ - $ 8,503,500
Fiscal Year Totals $ 577,500 $ 577,500 $3,674,250 $3,674,250 $ - $ 8,503,500
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ 35,454 $ 36,504 $ 232,248 $ 239,016 $ - $ 543,222
Debt Service on Previous
Bonds $ - $ 35,454 $ 71,958 $ 304,206 $ 543,222 $ 954,840
Fiscal Year Totals $ 35,454 $ 71,958 $ 304,206 $ 543,222 $ 543,222 $ 1,498,062
The annual debt service cost of this project on bonds issued in FY 2014/15 is $35,454 (Term - 30 years, Rate -
4.5%). The annual debt service cost of this project on bonds issued in FY 2015/16 is $36,504 (Term - 30 years,
Rate - 4.75%). The annual debt service cost of this project on bonds issued in FY 2016/17 is $232,248 (Term -
30 years, Rate - 4.75%). The annual debt service cost of this project on bonds issued in FY 2017/18 is $239,016
(Term - 30 years, Rate - 5%).
FY 2016/2017 – Page 18
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
Fund: Stormwater
Project Category: Stormwater Mitigation Project
Location: Keystone Road/Chartres Drive
Project Phase: Design/Final Engineering
Cost: $42,000
Project Phases Completed: Easement acquisition will be completed, and design and final engineering will begin,
during FY 2015/16.
For additional information on this stormwater mitigation project, please refer to pages 16-17 of Fiscal Year
2015/16.
Photos of Flooding in the Project Area:
Keystone Road/Chartres Drive Project Map:
FY 2016/2017 – Page 19
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
Keystone Road/Chartres FY 15-FY 19
Drive FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Property & Easement
Acquisition $ - $ 20,000 $ - $ - $ - $ 20,000
Design/Final Engineering $ - $ 42,000 $ 42,000 $ - $ - $ 84,000
Construction $ - $ - $ - $ 561,750 $ - $ 561,750
Project Total $ - $ 62,000 $ 42,000 $ 561,750 $ - $ 665,750
Planned Financing
Bond Proceeds $ - $ 62,000 $ 42,000 $ 561,750 $ - $ 665,750
Fiscal Year Totals $ - $ 62,000 $ 42,000 $ 561,750 $ - $ 665,750
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ - $ 3,919 $ 2,655 $ 36,543 $ - $ 43,117
Debt Service on Previous
Bonds $ - $ - $ 3,919 $ 6,574 $ 43,117 $ 53,610
Fiscal Year Totals $ - $ 3,919 $ 6,574 $ 43,117 $ 43,117 $ 96,727
The annual debt service cost of this project on bonds issued in FY 2015/16 is $3,919 (Term - 30 years, Rate -
4.75%). The annual debt service cost of this project on bonds issued in FY 2016/17 is $2,655 (Term - 30 years,
Rate - 4.75%). The annual debt service cost of this project on bonds issued in FY 2017/18 is $36,543 (Term - 30
years, Rate – 5%).
FY 2016/2017 – Page 20
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
Fund: Stormwater
Project Category: Stormwater Mitigation Project
Location: Western Avenue/Oak Avenue (Wescott Road to Shermer
Road)
Project Phase: Property/Easement Acquisition
Cost: $500,000
Project Phases Completed: Property and easement acquisition will begin in FY 2015/16 and be completed
during FY 2016/17.
For additional information on this stormwater mitigation project, please refer to pages 18-19 of Fiscal Year
2015/16.
Photos of Flooding in the Project Area:
FY 2016/2017 – Page 21
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
Western Avenue/Oak Avenue Project Map:
Western Avenue & Oak FY 15-FY 19
Avenue FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Property & Easement
Acquisition $ - $ 500,000 $ 500,000 $ - $ - $ 1,000,000
Construction $ - $ - $ - $ 567,180 $ - $ 567,180
Project Total $ - $ 500,000 $ 500,000 $ 567,180 $ - $ 1,567,180
Planned Financing
Bond Proceeds $ - $ 500,000 $ 500,000 $ 567,180 $ - $ 1,567,180
Fiscal Year Totals $ - $ 500,000 $ 500,000 $ 567,180 $ - $ 1,567,180
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ - $ 31,605 $ 31,605 $ 36,896 $ - $ 100,106
Debt Service on Previous
Bonds $ - $ - $ 31,605 $ 63,210 $ 100,106 $ 194,921
Fiscal Year Totals $ - $ 31,605 $ 63,210 $ 100,106 $ 100,106 $ 295,027
The annual debt service cost of this project on bonds issued in FY 2015/16 is $31,605 (Term - 30 years, Rate -
4.75%). The annual debt service cost of this project on bonds issued in FY 2016/17 is $31,605 (Term - 30 years,
Rate - 4.75%). The annual debt service cost of this project on bonds issued in FY 2017/18 is $36,896 (Term - 30
years, Rate - 5%).
FY 2016/2017 – Page 22
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
Fund: Water
Project Category: Water Distribution System Improvements
Cost: $2,000,000
For additional information on this capital purchase, please refer to pages 48-49 of Fiscal Year 2014/15.
FY 15-FY 19
Water Distribution FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Water Distribution System
Improvements $ 3,000,000 $ 3,000,000 $ 2,000,000 $ - $ - $ 8,000,000
Project Total $ 3,000,000 $ 3,000,000 $ 2,000,000 $ - $ - $ 8,000,000
Planned Financing
Bond Proceeds $ 3,000,000 $ 3,000,000 $ 2,000,000 $ - $ - $ 8,000,000
Total $ 3,000,000 $ 3,000,000 $ 2,000,000 $ - $ - $ 8,000,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ 184,175 $ 189,629 $ 126,419 $ - $ - $ 500,223
Debt Service on Previous Bonds $ - $ 184,175 $ 373,804 $ 500,223 $ 500,223 $ 1,558,425
Fiscal Year Totals $ 184,175 $ 373,804 $ 500,223 $ 500,223 $ 500,223 $ 2,058,648
The annual debt service cost of this project on bonds issued in FY 2014/15 is $184,175 (Term - 30 years, Rate –
4.5%). The annual debt service cost of this project on bonds issued in FY 2015/16 is $189,629 (Term - 30 years,
Rate – 4.75%). The annual debt service cost of this project on bonds issued in FY 2016/17 is $126,419 (Term -
30 years, Rate – 4.75%).
FY 2016/2017 – Page 23
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
Fund: Water
Project Category: Water Main Replacement
Project Location: Elm Street
Cost: $137,500
Due to the age of the main and a section of the main located under the river, a planned replacement is
warranted. Staff has concerns that a break, especially one on the segment under the river, would be a very
difficult emergency repair that would seriously impact the community. In addition, this water main replacement
will significantly improve water flow in this area. The existing 6-inch diameter main will be replaced with an 8-
inch main to accommodate the increased volume needed by the area and to ensure sufficient water flow if
needed by the Fire Department in case of an emergency.
Replace Number of Estimated
Elm Avenue Existing Size With Length Year Breaks to Date Cost
Church St. to 1731 Elm Ave. 6" 8" 500 1926 30 $ 137,500
Project Total $ 137,500
Planned Financing
User Fees $ 137,500
Total $ 137,500
FY 2016/2017 – Page 24
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
FY 2016/2017 – Page 25
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
Fund: Water
Project Category: Water Main Replacement
Project Location: Farnsworth Lane
Cost: $540,000
The water main on Farnsworth between Birch Road and Western Avenue has experienced 34 water main breaks
since its installation in 1966. The existing 6-inch diameter main will be replaced with an 8-inch main to
accommodate the increased volume needed by the area and to ensure sufficient water flows if needed by the
Fire Department in case of an emergency. Additionally this work will be done to coincide with the storm sewer
installation along Farnsworth Lane scheduled as part of the Wescott Park stormwater project.
Replace Number of Estimated
Farnsworth Lane Existing Size With Length Year Breaks to Date Cost
Birch Rd. to Western Ave. 6" 8" 2200 1966 34 $ 540,000
Project Total $ 540,000
Planned Financing
User Fees $ 540,000
Total $ 540,000
FY 2016/2017 – Page 26
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
FY 2016/2017 – Page 27
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
Fund: Water
Project Category: Water Main Replacement
Project Location: Mulberry Lane
Cost: $237,500
The water main on Mulberry Lane between Fieldwood Drive and Birch Road has experienced one (1) main break
in the past four (4) years and 13 since its installation in 1950. The existing 6-inch diameter main will be replaced
with an 8-inch main to accommodate the increased volume needed by the area and to ensure sufficient water
flow if needed by the Fire Department in case of an emergency.
Replace Number of Estimated
Mulberry Lane Existing Size With Length Year Breaks to Date Cost
Fieldwood Dr. to Birch Rd. 6" 8" 1000 1964 13 $ 237,500
Project Total $ 237,500
Planned Financing
User Fees $ 237,500
Total $ 237,500
FY 2016/2017 – Page 28
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
FY 2016/2017 – Page 29
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
Fund: Water
Project Category: Water Main Replacement
Project Location: Sunnyside Lane
Cost: $412,500
The water main on Sunnyside Lane between Larkdale Road and Farnsworth Lane has 35 water main breaks since
its installation in 1965. The existing 6-inch diameter main will be replaced with an 8-inch main to accommodate
the increased volume needed by the area and to ensure sufficient water flow if needed by the Fire Department
in case of an emergency. Additionally, this work is scheduled due to its proximity to the Farnsworth Lane water
main replacement and storm sewer installation on that street as part of the Wescott Park stormwater project.
Replace Number of Estimated
Sunnyside Circle Existing Size With Length Year Breaks to Date Cost
Larkdale Rd. to Farnsworth Ln. 6" 8" 1100 1964 30 $ 412,500
Project Total $ 412,500
Planned Financing
User Fees $ 412,500
Total $ 412,500
FY 2016/2017 – Page 30
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
FY 2016/2017 – Page 31
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
Fund: Water
Project Category: Water Main Replacement
Project Location: Woodlawn Road – Phase Two
Cost: $182,500
For additional information on this capital purchase, please refer to pages 33-34 of Fiscal Year 2015/16.
Replace Number of Estimated
Woodlawn Road Phase 2 Existing Size With Length Year Breaks to Date Cost
Shermer Rd. to Western Ave. 6" 8" 2500 1948 35 $ 182,500
Project Total $ 182,500
Planned Financing
User Fees $ 182,500
Total $ 182,500
FY 2016/2017 – Page 32
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
FY 2016/2017 – Page 33
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
Fund: Water
Project Category: Water Production Facilities Improvement
Cost: $310,000
Below is a table that outlines the water production facilities improvement projects over the 2016/17 Fiscal Year.
Details for each project follow this summary.
Water Production Facilities FY 15-FY 19
Improvements FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Roof Work/Replacement $ - $ - $ 310,000 $ - $ - $ 310,000
Project Total $ - $ - $ 310,000 $ - $ - $ 310,000
Planned Financing
Bond Proceeds $ - $ - $ 310,000 $ - $ - $ 310,000
Total $ - $ - $ 310,000 $ - $ - $ 310,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ - $ - $ 19,595 $ - $ - $ 19,595
Debt Service on Previous Bonds $ - $ - $ - $ 19,595 $ 19,595 $ 39,190
Fiscal Year Totals $ - $ - $ 19,595 $ 19,595 $ 19,595 $ 58,785
The annual debt service cost of this project on bonds issued in FY 2016/17 is $19,595 (Term - 30 years, Rate –
4.75%).
Roof Replacement
For additional information on this capital purchase, please refer to page35 of Fiscal Year 2015/16.
FY 2016/2017 – Page 34
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
Fund: Water
Project Category: Water Meter Conversion Program
Cost: $75,000
For additional information on this capital purchase, please refer to pages 58 of Fiscal Year 2014/15.
Water Meter Conversion FY 15-FY 19
Project FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Meter Purchases $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 375,000
Fiscal Year Totals $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 375,000
Planned Financing
User Charges/Fund Reserve $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 375,000
Total $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 375,000
FY 2016/2017 – Page 35
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
Fund: Water
Project Category: Scheduled Equipment & Vehicle Replacements
Cost: $157,520
Vehicles will be assessed prior to formal recommendation for replacement.
FY 15-FY 19
Vehicle Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Pickup(s) $ - $ 120,640 $ 37,210 $ - $ 39,480 $ 197,330
Excavator (2002) $ - $ - $ - $ 57,070 $ - $ 57,070
Backhoe (1996) $ - $ - $ 101,300 $ - $ - $ 101,300
Hydraulic Breaker (1997) $ - $ - $ 19,010 $ - $ - $ 19,010
Dump Truck (2004) $ - $ - $ - $ - $ 150,460 $ 150,460
Project Total $ - $ 120,640 $ 157,520 $ 57,070 $ 189,940 $ 525,170
Planned Financing
User Charges $ - $ 120,640 $ 56,220 $ 57,070 $ 39,480 $ 273,410
Bond Proceeds $ - $ - $ 101,300 $ - $ 150,460 $ 251,760
Total $ - $ 120,640 $ 157,520 $ 57,070 $ 189,940 $ 525,170
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ - $ - $ 7,620 $ - $ 11,567 $ 19,187
Debt Service on Previous
Bonds $ - $ - $ - $ 7,620 $ 7,620 $ 15,240
Fiscal Year Totals $ - $ - $ 7,620 $ 7,620 $ 19,187 $ 34,427
The annual debt service cost of this project on bonds issued in FY 2016/17 is $7,620 (Term - 20 years, Rate –
4.25%). The annual debt service cost of this project on bonds issued in FY 2018/19 is $11,567 (Term - 20 years,
Rate – 4.5%).
FY 2016/2017 – Page 36
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
Fund: Sanitary Sewer
Project Category: Sanitary Sewer Lining Program
Cost: $307,208
For additional information on this capital purchase, please refer to page 64-65 of Fiscal Year 2014/15.
FY 15-FY 19
Sanitary Sewer Fund Projects FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Sewer Lining Program $ 289,573 $ 298,260 $ 307,208 $ 316,424 $ 325,917 $ 1,537,382
Fiscal Year Totals $ 289,573 $ 298,260 $ 307,208 $ 316,424 $ 325,917 $ 1,537,382
Planned Financing
Bond Proceeds $ 289,573 $ 298,260 $ 307,208 $ 316,424 $ 325,917 $ 1,537,382
Total $ 289,573 $ 298,260 $ 307,208 $ 316,424 $ 325,917 $ 1,537,382
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ 17,778 $ 18,853 $ 19,419 $ 20,584 $ 21,202 $ 97,836
Debt Service on Previous
Bonds $ - $ 17,778 $ 36,631 $ 56,050 $ 76,634 $ 187,093
Fiscal Year Totals $ 17,778 $ 36,631 $ 56,050 $ 76,634 $ 97,836 $ 284,929
The annual debt service cost of this project on bonds issues in FY 2014/15 is $17,778 (Term - 30 years, Rate –
4.5%). The annual debt service cost of this project on bonds issues in FY 2015/16 is $18,853 (Term - 30 years,
Rate – 4.75%). The annual debt service cost of this project on bonds issues in FY 2016/17 is $19,419 (Term - 30
years, Rate – 4.75%). The annual debt service cost of this project on bonds issues in FY 2017/18 is $20,584
(Term - 30 years, Rate – 5%). The annual debt service cost of this project on bonds issues in FY 2018/19 is
$21,202 (Term - 30 years, Rate – 5%).
FY 2016/2017 – Page 37
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
FY 2016/2017 – Page 38
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
Fund: Sanitary Sewer
Project Category: Scheduled Equipment & Vehicle Replacements
Cost: $37,210
Vehicles will be assessed prior to formal recommendation for replacement.
FY 14-FY 18
Vehicle Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Pickup (2004) $ - $ - $ 37,210 $ - $ - $ 37,210
Project Total $ - $ - $ 37,210 $ - $ - $ 37,210
Planned Financing
User Charges $ - $ - $ 37,210 $ - $ - $ 37,210
Bond Proceeds $ - $ - $ - $ - $ - $ -
Total $ - $ - $ 37,210 $ - $ - $ 37,210
FY 2016/2017 – Page 39
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
Fund: General
Project Category: Information Technology (IT) Equipment
Replacement
Project: General Equipment
Cost: $100,000
For additional information on this capital purchase, please refer to page 69 of Fiscal Year 2014/15.
FY 15-FY 19
Information Technology FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
General Equipment
Replacement $ 130,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 530,000
Fiscal Year Totals $ 130,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 530,000
Planned Financing
General Fund Revenues $ 130,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 530,000
Fiscal Year Totals $ 130,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 530,000
FY 2016/2017 – Page 40
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
Fund: General
Project Category: E-911 Equipment Replacement
Project: Portable Radios
Cost: $173,988
For additional information on this capital purchase, please refer to page 71 of Fiscal Year 2014/15.
E-911 Equipment FY 15-FY 19
Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Portable Radio
Replacement $ 164,000 $ 168,920 $ 173,988 $ 179,207 $ - $ 686,115
Fiscal Year Totals $ 164,000 $ 168,920 $ 173,988 $ 179,207 $ - $ 686,115
Planned Financing
General Fund Revenues $ 164,000 $ 168,920 $ 173,988 $ 179,207 $ - $ 686,115
Fiscal Year Totals $ 164,000 $ 168,920 $ 173,988 $ 179,207 $ - $ 686,115
FY 2016/2017 – Page 41
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
Fund: General
Project Category: E-911 Equipment Replacement
Project: Mobile Computer Equipment
Cost: $100,000
For additional information on this capital purchase, please refer to page 72 of Fiscal Year 2014/15.
E-911 Equipment FY 15-FY 19
Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Mobile Equipment
Replacement $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000
Fiscal Year Totals $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000
Planned Financing
General Fund Revenues $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000
Fiscal Year Totals $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000
FY 2016/2017 – Page 42
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
Fund: General
Project Category: Facilities Improvements
Facility: Fire Department – Window & Carpeting Replacement
(Stations 10 & 12)
Cost: $130,000
Construction of Fire Stations 10 and 12 was completed in 1996. The windows have reached the end of their
useful lives and are in need of replacement. The new windows will be constructed of more energy efficient
materials that also require less maintenance similar to those planned for the Village Hall and Fire Station 11.
With the scheduling of window replacements, painting and carpet replacement will be performed concurrently.
FY 15-FY 19
Facilities FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Exterior Improvements - Fire
Stations 10 & 12 $ - $ - $ 100,000 $ - $ - $ 100,000
Interior Improvements - Fire
Stations 10 & 12 $ - $ - $ 30,000 $ - $ - $ 30,000
Project Total $ - $ - $ 130,000 $ - $ - $ 130,000
Planned Financing
Bond Proceeds $ - $ - $ 130,000 $ - $ - $ 130,000
Fiscal Year Totals $ - $ - $ 130,000 $ - $ - $ 130,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ - $ - $ 9,779 $ - $ - $ 9,779
Debt Service on Previous
Bonds $ - $ - $ - $ 9,779 $ 9,779 $ 19,558
Fiscal Year Totals $ - $ - $ 9,779 $ 9,779 $ 9,779 $ 9,779
At this time there is no identified funding source for the debt service for this project. The annual debt service
cost of this project on bonds issued in FY 2016/17 is $9,779 (Term - 20 years, Rate – 4.25%).
FY 2016/2017 – Page 43
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
Fund: General
Project Category: Vehicle Replacement - Fire Department
Unit #065: 2007 International Ambulance/MedTek Body
Cost: $310,000
Based upon the Village Board approved schedule for replacing fire apparatus, Ambulance #065 is scheduled for
replacement in FY 2016/17.
Ambulance Replacement Schedule:
o The current schedule for medium duty ambulances calls for a six year front-line status and a four
year reserve status.
o Typically, ambulances are replaced every ten years or 100,000 miles.
o This replacement is consistent with department history and a recommendation from the
Village’s Fleet Maintenance Supervisor.
o This 2007 International Ambulance with a MedTek body has an anticipated replacement cost of
$310,000, which includes the chassis, body, and all necessary equipment.
o Staff will make a final determination of replacement need before final recommendation to the
Village Board.
FY 15-FY 19
Ambulance Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
#065, 2008 International
Ambulance $ - $ - $ 310,000 $ - $ - $ 310,000
Fiscal Year Total $ - $ - $ 310,000 $ - $ - $ 310,000
Planned Financing
Bond Proceeds $ - $ - $ 310,000 $ - $ - $ 310,000
Fiscal Year Total $ - $ - $ 310,000 $ - $ - $ 310,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ - $ - $ 37,746 $ - $ - $ 37,746
Debt Service on Previous
Bonds $ - $ - $ - $ 37,746 $ 37,746 $ 75,492
Fiscal Year Totals $ - $ - $ 37,746 $ 37,746 $ 37,746 $ 37,746
At this time there is no identified funding source for the debt service for this project. The annual debt service
cost of this project on bonds issued in FY 2016/17 is $37,746(Term – 10 years, Rate - 3.75%).
FY 2016/2017 – Page 44
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
FY 2016/2017 – Page 45
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
Fund: General
Project Category: Vehicle Replacement – Public Works
Unit #417: 2002 International 6x4 Dump Truck
Cost: $196,960
Included in the Village’s fleet is Unit #417 a 2002 International 5-ton Dump Truck. This dump truck is a front-line
vehicle used for snow plowing operations, street maintenance operations, water main break and maintenance
operations, and tree removal operations. This vehicle has a fifteen-year projected lifespan.
Choosing to defer the replacement of this vehicle will likely incur costs for sandblasting and repainting of the
body and frame, which are already showing signs of wear, as well as replacement of various other components
that have deteriorated.
FY 15-FY 19
Vehicle Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
#417, 2002 International
6x4 Dump Truck $ - $ - $ 196,960 $ - $ - $ 196,960
Project Total $ - $ - $ 196,960 $ - $ - $ 196,960
Planned Financing
Bond Proceeds $ - $ - $ 196,960 $ - $ - $ 196,960
Fiscal Year Totals $ - $ - $ 196,960 $ - $ - $ 196,960
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ - $ - $ 23,983 $ - $ - $ 23,983
Debt Service on Previous
Bonds $ - $ - $ - $ 23,983 $ 23,983 $ 47,966
Fiscal Year Totals $ - $ - $ 23,983 $ 23,983 $ 23,983 $ 71,949
At this time there is no identified funding source for the debt service for this project. The annual debt service
cost of this project on bonds issued in FY 2016/17 is $23,983 (Term - 10 years, Rate - 3.75%).
FY 2016/2017 – Page 46
Village of Northbrook Capital Improvement Plan Fiscal Year
2016/2017
Fund: General
Project Category: Vehicle Replacements
Cost: $439,790
These vehicles and will be assessed before recommendations for replacement are finalized.
FY 15-FY 19
Vehicle Replacements FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Police Squad/Administrative
Vehicles (6) $ - $ - $ 209,450 $ - $ - $ 209,450
Administrative Vehicle (GG) $ - $ - $ 39,390 $ - $ - $ 39,390
Administrative Vehicle (Fin) $ - $ - $ 40,520 $ - $ - $ 40,520
Administrative Vehicles (Fire) $ - $ - $ 52,900 $ - $ - $ 52,900
Spreader $ - $ - $ 25,890 $ - $ - $ 25,890
Tractor $ - $ - $ 71,640 $ - $ - $ 71,640
Project Total $ - $ - $ 439,790 $ - $ - $ 439,790
Planned Financing
General Fund Revenues $ - $ - $ 439,790 $ - $ - $ 439,790
Fiscal Year Totals $ - $ - $ 439,790 $ - $ - $ 439,790
FY 2016/2017 – Page 47
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
Fiscal Year 2017/18 Summary
Capital Improvement Budget
FY 2017/18
By Fund
13%
20%
General Fund
Water Fund
Sewer Fund
Stormwater Fund
35%
29% Infrastructure Capital Projects Fund
3%
Total Capital Budget = $12,419,271
Infrastructure
General Water Sewer Stormwater
Capital Projects Total
Fund Fund Fund Fund
Fund
Capital Expense $ 2,018,197 $1,772,070 $ 525,694 $ 4,820,180 $ 3,283,130 $ 12,419,271
Planned Financing
Bond Proceeds $ 1,030,570 $ - $ 503,004 $ 4,820,180 $ 1,561,908 $ 7,915,662
Designated
$ - $1,772,070 $ 22,690 $ - $ 657,678 $ 2,452,438
Revenues/User Fees
Undesignated Revenues $ 987,627 $ - $ - $ - $ 1,063,544 $ 2,051,171
Total $ 2,018,197 $1,772,070 $ 525,694 $ 4,820,180 $ 3,283,130 $ 12,419,271
FY 2017/2018 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
FY 2017/18 Projects – $12,419,271
Infrastructure Capital Projects Fund – $3,283,130
Asphalt Street Maintenance- $657,678 (MFT): Page 4
Concrete Street Reconstruction and Rehabilitation- $1,136,908 (B)
o Sky Harbor Industrial Park: Page 8
Sidewalk Improvements- $113,544: Page 10
Shermerville Commons, Construction and Demolition- $425,00 (B): Page 12
Skokie Valley Trail Bike Path- $950,000: Page 13
Stormwater Fund - $4,820,180 (B)
Dehne Road/Glendale Avenue Intersection, Design/Final Engineering- $17,000: Page 14
Wescott Park Underground Storage, Construction- $3,674,250: Page 16
Keystone Road/Chartres Drive, Construction- $561,750: Page 18
Western Avenue/Oak Avenue, Construction- $567,180: Page 20
Water Fund - $1,772,070
Water Main Replacements
o Pfingsten Road- $700,000: Page 22
o Lee Road- $540,000: Page 24
o Skokie Boulevard- $400,000: Page 26
Water Meter Conversion Program- $75,000: Page 28
Vehicle Replacements- $57,070: Page 29
Sewer Fund - $525,694
Sanitary Sewer Lining Program- $316,424: Page 30
Vehicle Replacements - $209,270 (B): Page 32
General Fund - $2,018,197
Information Technology Equipment Replacement- $100,000: Page 33
E-911 Portable Radio Replacement- $179,207: Page 34
E-911 Mobile Equipment Replacement- $100,000: Page 35
Fire Engine Replacement- $738,430 (B): Page 36
Dump Truck(2) Replacements- $292,140 (B): Page 38
Vehicle Replacements- $608,420: Page 39
(B) Proposed Bond Issue
FY 2017/2018 – Page 2
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
FY 2017/2018 – Page 3
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
Fund: Infrastructure Capital Improvement
Project Category: Asphalt Street Reconstruction & Rehabilitation
Location: Daniel Court/Juli-Lyn Court/Juli-Lyn Lane/Lori-Lyn
Lane/Ridgeland Lane/Terri-Lyn Lane/Walters Avenue
Cost: $657,678
The roadways selected for the 2017/18 asphalt reconstruction and rehabilitation program are rated as many
failures, or limited failures.
Roadways rated as having many failures (2 on a scale of 5) have large potholes form and signs of the
base beginning to fail will become evident. Typical examples of these failures include alligator cracking
or failure of the roadway surface.
Roadways rated as having limited failures exhibit signs of the road surface cracking and have small
potholes beginning to form. Typical examples of these failures include horizontal and/or longitudinal
cracking in the street.
The condition of these roads is such that patching is no longer an option and asphalt rehabilitation/
reconstruction is necessary. These repairs will be paid for with Motor Fuel Tax (MFT) revenues.
Address Range Approximate Square Yards
Street Rating Last Resurfaced
(in hundred blocks) of Pavement
Daniel Court 1400 Limited Failures - 1,470
Juli-Lyn Court 1400 Many Failures 1997 837
Juli-Lyn Lane 1400 Many Failures 1997 1,970
Lori-Lyn Lane 1400 - 1500 Many Failures 1997 3,370
Ridgeland Lane 4000 – 4200 Many Failures 2003/1997 2,839
Terri-Lyn Lane 4100 - 4300 Limited Failures 1997 7,973
Walters Avenue 4100 - 4300 Many Failures 1997 1,274
FY 2017/2018 – Page 4
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
FY 15-FY 19
Annual Program FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Daniel Court - Walters
Avenue to South End $ - $ - $ - $ 23,685 $ - $ 23,685
Juli-Lyn Court - Juli-Lyn Lane
to East End $ - $ - $ - $ 17,006 $ - $ 17,006
Juli-Lyn Lane - Lori-Lyn Lane
to Walters Avenue $ - $ - $ - $ 63,997 $ - $ 63,997
Lori-Lyn Lane - Walters
Avenue to Terri-Lyn Lane $ - $ - $ - $ 110,988 $ - $ 110,988
Ridgeland Lane - Sanders
Road to Start C/G $ - $ - $ - $ 18,683 $ - $ 18,683
Ridgeland Lane - Start C/G to
Lori-Lyn Lane $ - $ - $ - $ 41,751 $ - $ 41,751
Terri-Lyn Extension - Terri-
Lyn Lane $ - $ - $ - $ 22,019 $ - $ 22,019
Terri-Lyn Lane - Walters
Avenue to Sanders Road $ - $ - $ - $ 241,758 $ - $ 241,758
Walters Avenue - West End
to Terri-Lyn Lane $ - $ - $ - $ 7,340 $ - $ 7,340
Walters Avenue - Terri-Lyn
Lane to Daniel Court $ - $ - $ - $ 110,451 $ - $ 110,451
Project Total $ - $ - $ - $ 657,678 $ - $ 657,678
Planned Financing
State Motor Fuel Tax
Receipts $ - $ - $ - $ 657,678 $ - $ 657,678
Fiscal Year Totals $ - $ - $ - $ 657,678 $ - $ 657,678
Daniel Court Juli-Lyn Court
FY 2017/2018 – Page 5
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
Juli-Lyn Lane Lori-Lyn Lane
Ridgeland Lane Teri-Lyn Lane
Walters Avenue
FY 2017/2018 – Page 6
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
FY 2017/2018 – Page 7
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
Fund: Infrastructure Capital Improvement
Project Category: Concrete Street Reconstruction & Rehabilitation
Location: Sky Harbor Industrial Park
Cost: $1,136,908
The concrete streets of Sky Harbor Industrial Park have been surveyed and an estimated number of concrete
panels have been identified for replacement. Deferring the replacement of the deteriorated panels will result in
more advanced degradation of roadway, including pavement failures, increased damage to vehicles, and
increased reconstruction and rehabilitation costs in the future.
Panels are approximately 5.89 cubic yards of concrete. In FY 2017/18, Village Staff anticipate replacing about
4,260 cubic yards of concrete, which equates to 501 cement trucks.
Concrete Street
Reconstruction and FY 15-FY 19
Rehabilitation FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Sky Harbor Industrial
Park $ - $ - $ - $1,136,908 $ - $ 1,136,908
Project Total $ - $ - $ - $1,136,908 $ - $ 1,136,908
Planned Financing
Bond Proceeds $ - $ - $ - $1,136,908 $ - $ 1,136,908
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ - $ - $ - $ 73,958 $ - $ 73,958
Debt Service on
Previous Bonds $ - $ - $ - $ - $ 73,958 $ 73,958
Fiscal Year Totals $ - $ - $ - $ 73,958 $ 73,958 $ 147,916
At this time there is no identified funding source for the debt service for this project. The annual debt service
cost of this project on bonds issued in FY 2017/18 is $73,958 (Term - 30 years, Rate - 5%).
FY 2017/2018 – Page 8
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
FY 2017/2018 – Page 9
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
Fund: Infrastructure Capital Improvement
Project Category: Sidewalk Improvements
Location: Atlas Sections 1B, 1C, 1D, 1E, 1F, 1G, 1H, 1I, 1K
Cost: $113,544
For additional information on this capital purchase, please refer to pages 27-28 of Fiscal Year 2014/15.
Areas to be reviewed for replacement are detailed in the map below.
FY 15-FY 19
Sidewalk Improvements FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Annual Program $ 103,909 $ 107,026 $ 110,237 $ 113,544 $ 116,951 $ 551,667
Fiscal Year Totals $ 103,909 $ 107,026 $ 110,237 $ 113,544 $ 116,951 $ 551,667
Planned Financing
Fund Reserves $ 103,909 $ 107,026 $ 110,237 $ 113,544 $ 116,951 $ 551,667
FY 2017/2018 – Page 10
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
FY 2017/2018 – Page 11
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
Fund: Infrastructure Capital Improvement
Project Category: Shermerville Commons – Fleet Maintenance
Garage/Stormwater Facility
Project Phase: Construction Management Services and
Demolition/Remediation and Design/Final Engineering
Cost: $425,000
For additional information on this capital purchase, please refer to pages 13-15 of Fiscal Year 2016/17.
FY 15-FY 19
Shermerville Commons FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Fleet Maintenance
Garage $ - $ - $4,825,000 $ 325,000 $3,241,000 $ 8,391,000
Stormwater Facility $ - $ - $ - $ 100,000 $ 200,000 $ 300,000
Park Facility $ - $ - $ - $ - $ - $ -
Project Total $ - $ - $4,825,000 $ 425,000 $3,441,000 $ 8,691,000
Planned Financing
Bond Proceeds $ - $ - $4,825,000 $ 425,000 $ - $ 5,250,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ - $ - $ 362,936 $ 32,673 $ 264,531 $ 660,140
Debt Service on Previous
Bonds $ - $ - $ - $ 362,936 $ 395,609 $ 758,545
Fiscal Year Totals $ - $ - $ 362,936 $ 395,609 $ 660,140 $ 1,418,685
At this time there is no identified funding source for the debt service for this project. The annual debt service
cost of this project on bonds issued in FY 2016/17 is $362,936 (Term - 20 years, Rate - 4.25%). The annual debt
service cost of this project on bonds issued in FY 2017/18 is $32,673 (Term - 20 years, Rate - 4.5%). The annual
debt service cost of this project on bonds issued in FY 2018/19 is $264,531 (Term - 20 years, Rate - 4.5%).
FY 2017/2018 – Page 12
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
Fund: Infrastructure Capital Improvement
Project Category: Bike Path Construction – Skokie Valley Trail
Project Phase: Construction
Cost: $950,000
For additional information on this capital purchase, please refer to pages 14-15 of Fiscal Year 2015/16.
Skokie Valley Trail Bike FY 15-FY 19
Path FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Property & Easement
Acquisition $ - $ 250,000 $ - $ - $ - $ 250,000
Design/Final
Engineering $ - $ - $1,358,000 $ - $ - $ 1,358,000
Construction $ - $ - $ - $ 950,000 $ - $ 950,000
Project Total $ - $ 250,000 $1,358,000 $ 950,000 $ - $ 950,000
Planned Financing
Undesignated Revenues $ - $ 250,000 $1,358,000 $ 950,000 $ - $ 2,558,000
Fiscal Year Totals $ - $ 250,000 $1,358,000 $ 950,000 $ - $ 2,558,000
FY 2017/2018 – Page 13
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
Fund: Stormwater
Project Category: Stormwater Mitigation Project
Location: Dehne Road/Glendale Avenue Intersection
Project Phase: Design/Final Engineering
Cost: $17,000
Project Description: This project involves increasing the swale capacity between the road and the property. This
would be accomplished by either deepening the swale and/or re-grading the street, parkway, and the private
property front/side yard area to increase the berm height (including private entrance modifications).This project
also involves removing and replacing 350 feet of old 8-inch corrugated storm sewer pipe and inlets located on
the east side of Glendale Road and constructing a 330 foot, 18-inch storm sewer along Glendale Avenue
between Bellevue Place and Techny Road. Currently, this intersection experiences flooding of the roadway and
parkway.
Locations Impacted by the Project: The intersection of Dehne Road and Glendale Avenue.
Properties Impacted: One (1) property currently experiences property flooding. Staff anticipates that this
project will create a reduction in flooding for this property.
Structures Impacted: One (1) property currently experiences structure flooding. Staff anticipates that this
project will create a reduction in structure flooding for this property.
Additional Study Needed: Additional study of this project is not needed.
Design: Design of the Dehne Road/Glendale Avenue Intersection project is anticipated to take 12 months.
Construction: Construction of the Dehne Road/Glendale Avenue Intersection project is anticipated to take 6
months.
External Factors Affecting Design and Construction Timelines: The construction of the new 330 foot, 18 inch
storm sewer is contingent upon the Techny Road project being completed and in place.
Photos of Flooding in the Project Area:
At this time, staff does not have photos documenting the flooding conditions in this location.
FY 2017/2018 – Page 14
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
Dehne Road/Glendale Avenue Intersection
Dehne Road & Glendale FY 15-FY 19
Avenue FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Design/Final Engineering $ - $ - $ - $ 17,000 $ - $ 17,000
Construction $ - $ - $ - $ - $ 118,650 $ 118,650
Project Total $ - $ - $ - $ 17,000 $ 118,650 $ 135,650
Planned Financing
Bond Proceeds $ - $ - $ - $ 17,000 $ 118,650 $ 135,650
Fiscal Year Totals $ - $ - $ - $ 17,000 $ 118,650 $ 135,650
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ - $ - $ - $ 1,106 $ 7,719 $ 8,825
Debt Service on Previous
Bonds $ - $ - $ - $ - $ 1,106 $ 1,106
Fiscal Year Totals $ - $ - $ - $ 1,106 $ 8,825 $ 9,931
The annual debt service cost of this project on bonds issued in FY 2017/18 is $1,106 (Term - 30 years, Rate -
5%). The annual debt service cost of this project on bonds issued in FY 2018/19 is $7,719 (Term - 30 years,
Rate - 5%).
FY 2017/2018 – Page 15
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
Fund: Stormwater
Project Category: Stormwater Mitigation Project
Location: Wescott Park Underground Storage
Project Phase: Construction
Cost: $3,674,250
Project Phases Completed: Design and Final Engineering will begin in FY 2014/15 and be completed in FY
2015/16. Construction will begin in FY 2016/17.
For additional information on this stormwater mitigation project, please refer to pages 29-30 of Fiscal Year
2014/15.
Photos of Flooding in the Project Area:
Wescott Park Project Map:
FY 2017/2018 – Page 16
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
FY 15-FY 19
Wescott Park FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Design/Final Engineering $ 577,500 $ 577,500 $ - $ - $ - $ 1,155,000
Construction $ - $ - $3,674,250 $3,674,250 $ - $ 7,348,500
Project Total $ 577,500 $ 577,500 $3,674,250 $3,674,250 $ - $ 8,503,500
Planned Financing
Bond Proceeds $ 577,500 $ 577,500 $3,674,250 $3,674,250 $ - $ 8,553,500
Fiscal Year Totals $ 577,500 $ 577,500 $3,674,250 $3,674,250 $ - $ 8,553,500
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ 35,454 $ 36,504 $ 232,248 $ 239,016 $ - $ 543,222
Debt Service on Previous
Bonds $ 35,454 $ 71,958 $ 304,206 $ 543,222 $ 954,840
Fiscal Year Totals $ 35,454 $ 71,958 $ 304,206 $ 543,222 $ 543,222 $ 1,498,062
The annual debt service cost of this project on bonds issued in FY 2014/15 is $35,454 (Term - 30 years, Rate -
4.5%). The annual debt service cost of this project on bonds issued in FY 2015/16 is $36,504 (Term - 30 years,
Rate - 4.75%). The annual debt service cost of this project on bonds issued in FY 2016/17 is $232,248 (Term -
30 years, Rate - 4.75%). The annual debt service cost of this project on bonds issued in FY 2017/18 is $239,016
(Term - 30 years, Rate - 5%).
FY 2017/2018 – Page 17
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
Fund: Stormwater
Project Category: Stormwater Mitigation Project
Location: Keystone Road/Chartres Drive
Project Phase: Construction
Cost: $561,750
Project Phases Completed: Easement acquisition will be completed in Fiscal Year 2015/16. Design and final
engineering will begin during FY 2015/16 and be completed during FY 2016/17.
For additional information on this stormwater mitigation project, please refer to pages 16-17 of Fiscal Year
2015/16.
Photos of Flooding in the Project Area:
Keystone Road/Chartres Drive Project Map:
FY 2017/2018 – Page 18
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
Keystone Road/Chartres FY 15-FY 19
Drive FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Property & Easement
Acquisition $ - $ 20,000 $ - $ - $ - $ 20,000
Design/Final Engineering $ - $ 42,000 $ 42,000 $ - $ - $ 84,000
Construction $ - $ - $ - $ 561,750 $ - $ 561,750
Project Total $ - $ 62,000 $ 42,000 $ 561,750 $ - $ 665,750
Planned Financing
Bond Proceeds $ - $ 62,000 $ 42,000 $ 561,750 $ - $ 665,750
Fiscal Year Totals $ - $ 62,000 $ 42,000 $ 561,750 $ - $ 665,750
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ - $ 3,919 $ 2,655 $ 36,543 $ - $ 43,117
Debt Service on Previous
Bonds $ - $ - $ 3,919 $ 6,574 $ 43,117 $ 53,610
Fiscal Year Totals $ - $ 3,919 $ 6,574 $ 43,117 $ 43,117 $ 96,727
The annual debt service cost of this project on bonds issued in FY 2015/16 is $3,919 (Term - 30 years, Rate -
4.75%). The annual debt service cost of this project on bonds issued in FY 2016/17 is $2,655 (Term - 30 years,
Rate - 4.75%). The annual debt service cost of this project on bonds issued in FY 2017/18 is $36,543 (Term - 30
years, Rate – 5%).
FY 2017/2018 – Page 19
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
Fund: Stormwater
Project Category: Stormwater Mitigation Project
Location: Western Avenue/Oak Avenue (Wescott Road to Shermer
Road)
Project Phase: Construction
Cost: $567,180
Project Phases Completed: Property and easement acquisition will begin in FY 2015/16 and be completed
during FY 2016/17.
For additional information on this stormwater mitigation project, please refer to pages 18-19 of Fiscal Year
2015/16.
Photos of Flooding in the Project Area:
FY 2017/2018 – Page 20
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
Western Avenue/Oak Avenue Project Map:
Western Avenue & Oak FY 15-FY 19
Avenue FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Property & Easement
Acquisition $ - $ 500,000 $ 500,000 $ - $ - $ 1,000,000
Construction $ - $ - $ - $ 567,180 $ - $ 567,180
Project Total $ - $ 500,000 $ 500,000 $ 567,180 $ - $ 1,567,180
Planned Financing
Bond Proceeds $ - $ 500,000 $ 500,000 $ 567,180 $ - $ 1,567,180
Fiscal Year Totals $ - $ 500,000 $ 500,000 $ 567,180 $ - $ 1,567,180
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ - $ 31,605 $ 31,605 $ 36,896 $ - $ 100,106
Debt Service on Previous
Bonds $ - $ - $ 31,605 $ 63,210 $ 100,106 $ 194,921
Fiscal Year Totals $ - $ 31,605 $ 63,210 $ 100,106 $ 100,106 $ 295,027
The annual debt service cost of this project on bonds issued in FY 2015/16 is $31,605 (Term - 30 years, Rate -
4.75%). The annual debt service cost of this project on bonds issued in FY 2016/17 is $31,605 (Term - 30 years,
Rate - 4.75%). The annual debt service cost of this project on bonds issued in FY 2017/18 is $36,896 (Term - 30
years, Rate - 5%).
FY 2017/2018 – Page 21
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
Fund: Water
Project Category: Water Main Replacement
Project Location: Pfingsten Road
Cost: $700,000
The water main on Pfingsten Road between Longmeadow Road and Willow Road has experienced six (6)
substantial main breaks since its installation in 1964. The existing main will be replaced with a 12-inch main to
accommodate the increased volume needed by the area and to ensure sufficient water flow if needed by the
Fire Department in case of an emergency. The design and scope of this project may be altered with the outcome
of the completed water model.
Replace Number of Estimated
Pfingsten Road Existing Size With Length Year Breaks to Date Cost
Longmeadow Rd. to Willow Rd. 10" 12" 2000 1964 6 $ 700,000
Project Total $ 700,000
Planned Financing
User Fees $ 700,000
Total $ 700,000
FY 2017/2018 – Page 22
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
FY 2017/2018 – Page 23
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
Fund: Water
Project Category: Water Main Replacement
Project Location: Lee Road
Cost: $540,000
The water main on Lee Road between Lake-Cook Road and the Edens has experienced two (2) substantial main
breaks since its installation in 1973. The existing main will be replaced with a 12-inch main to accommodate the
increased volume needed by the area and to ensure sufficient water flow if needed by the Fire Department in
case of an emergency.
Replace Number of Estimated
Lee Road Existing Size With Length Year Breaks to Date Cost
Lake-Cook Rd. to Edens 12" 12" 2,500 1973 2 $ 540,000
Project Total $ 540,000
Planned Financing
User Fees $ 540,000
Total $ 540,000
FY 2017/2018 – Page 24
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
FY 2017/2018 – Page 25
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
Fund: Water
Project Category: Water Main Replacement
Project Location: Skokie Boulevard
Cost: $400,000
The water main on Skokie Road between the 200 and 300 blocks has experienced several main breaks in the
past four (4) years and 28 in its history. The existing 6-inch to 12-inch diameter main will be replaced with a 12-
inch main to accommodate the increased volume needed by the area and to ensure sufficient water flow if
needed by the Fire Department in case of an emergency.
Replace Number of Estimated
Skokie Boulevard Existing Size With Length Year Breaks to Date Cost
200 Block to 300 Block 6" - 12" 12" 1100 1945-1983 28 $ 400,000
Project Total $ 400,000
Planned Financing
User Fees $ 400,000
Total $ 400,000
FY 2017/2018 – Page 26
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
FY 2017/2018 – Page 27
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
Fund: Water
Project Category: Water Meter Conversion Program
Cost: $75,000
For additional information on this capital purchase, please refer to pages 58 of Fiscal Year 2014/15.
Water Meter Conversion FY 15-FY 19
Project FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Meter Purchases $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 375,000
Fiscal Year Totals $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 375,000
Planned Financing
User Charges/Fund Reserve $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 375,000
Total $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 375,000
FY 2017/2018 – Page 28
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
Fund: Water
Project Category: Scheduled Equipment & Vehicle Replacements
Cost: $57,070
Vehicles will be assessed prior to formal recommendation for replacement.
FY 15-FY 19
Vehicle Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Pickup(s) $ - $ 120,640 $ 37,210 $ - $ 39,480 $ 197,330
Excavator (2002) $ - $ - $ - $ 57,070 $ - $ 57,070
Backhoe (1996) $ - $ - $ 101,300 $ - $ - $ 101,300
Hydraulic Breaker (1997) $ - $ - $ 19,010 $ - $ - $ 19,010
Dump Truck (2004) $ - $ - $ - $ - $ 150,460 $ 150,460
Project Total $ - $ 120,640 $ 157,520 $ 57,070 $ 189,940 $ 525,170
Planned Financing
User Charges $ - $ 120,640 $ 56,220 $ 57,070 $ 39,480 $ 273,410
Bond Proceeds $ - $ - $ 101,300 $ - $ 150,460 $ 251,760
Total $ - $ 120,640 $ 157,520 $ 57,070 $ 189,940 $ 525,170
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ - $ - $ 7,620 $ - $ 11,567 $ 19,187
Debt Service on Previous
Bonds $ - $ - $ - $ 7,620 $ 7,620 $ 15,240
Fiscal Year Totals $ - $ - $ 7,620 $ 7,620 $ 19,187 $ 34,427
The annual debt service cost of this project on bonds issues in FY 2016/17 is $7,620 (Term - 20 years, Rate –
4.25%). The annual debt service cost of this project on bonds issues in FY 2018/19 is $11,567 (Term - 20 years,
Rate – 4.5%).
FY 2017/2018 – Page 29
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
Fund: Sanitary Sewer
Project Category: Sanitary Sewer Lining Program
Cost: $316,424
For additional information on this capital purchase, please refer to page 64-65 of Fiscal Year 2014/15.
FY 15-FY 19
Sanitary Sewer Fund Projects FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Sewer Lining Program $ 289,573 $ 298,260 $ 307,208 $ 316,424 $ 325,917 $ 1,537,382
Fiscal Year Totals $ 289,573 $ 298,260 $ 307,208 $ 316,424 $ 325,917 $ 1,537,382
Planned Financing
Bond Proceeds $ 289,573 $ 298,260 $ 307,208 $ 316,424 $ 325,917 $ 1,537,382
Total $ 289,573 $ 298,260 $ 307,208 $ 316,424 $ 325,917 $ 1,537,382
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ 17,778 $ 18,853 $ 19,419 $ 20,584 $ 21,202 $ 97,836
Debt Service on Previous
Bonds $ - $ 17,778 $ 36,631 $ 56,050 $ 76,634 $ 187,093
Fiscal Year Totals $ 17,778 $ 36,631 $ 56,050 $ 76,634 $ 97,836 $ 284,929
The annual debt service cost of this project on bonds issues in FY 2014/15 is $17,778 (Term - 30 years, Rate –
4.5%). The annual debt service cost of this project on bonds issues in FY 2015/16 is $18,853 (Term - 30 years,
Rate – 4.75%). The annual debt service cost of this project on bonds issues in FY 2016/17 is $19,419 (Term - 30
years, Rate – 4.75%). The annual debt service cost of this project on bonds issues in FY 2017/18 is $20,584
(Term - 30 years, Rate – 5%). The annual debt service cost of this project on bonds issues in FY 2018/19 is
$21,202 (Term - 30 years, Rate – 5%).
FY 2017/2018 – Page 30
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
FY 2017/2018 – Page 31
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
Fund: Sanitary Sewer
Project Category: Scheduled Equipment & Vehicle Replacements
Cost: $209,270
Vehicles will be assessed prior to formal recommendation for replacement.
FY 14-FY 18
Vehicle Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Sewer Flusher (2003) $ - $ - $ - $ 186,580 $ - $ 186,580
Trash Pump (1987) $ - $ - $ - $ 22,690 $ - $ 22,690
Project Total $ - $ - $ - $ 209,270 $ - $ 209,270
Planned Financing
User Charges $ - $ - $ - $ 22,690 $ - $ 22,690
Bond Proceeds $ - $ - $ - $ 186,580 $ - $ 186,580
Total $ - $ - $ - $ 209,270 $ - $ 209,270
FY 14-FY 18
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on Bonds $ - $ - $ - $ 14,344 $ - $ 14,344
Debt Service on Previous
Bonds $ 14,344 $ 14,344
Fiscal Year Totals $ - $ - $ - $ 14,344 $ 14,344 $ 28,688
The annual debt service cost of this project on bonds issued in FY 2017/18 is $14,344 (Term - 20 years, Rate -
4.5%)
FY 2017/2018 – Page 32
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
Fund: General
Project Category: Information Technology (IT) Equipment
Replacement
Project: General Equipment
Cost: $100,000
For additional information on this capital purchase, please refer to page 69 of Fiscal Year 2014/15.
FY 15-FY 19
Information Technology FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
General Equipment
Replacement $ 130,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 530,000
Fiscal Year Totals $ 130,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 530,000
Planned Financing
General Fund Revenues $ 130,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 530,000
Fiscal Year Totals $ 130,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 530,000
FY 2017/2018 – Page 33
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
Fund: General
Project Category: E-911 Equipment Replacement
Project: Portable Radios
Cost: $179,207
For additional information on this capital purchase, please refer to page 71 of Fiscal Year 2014/15.
E-911 Equipment F FY 15-FY 19
Replacement YFY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Portable Radio
Replacement $ 164,000 $ 168,920 $ 173,988 $ 179,207 $ - $ 686,115
Fiscal Year Totals $ 164,000 $ 168,920 $ 173,988 $ 179,207 $ - $ 686,115
Planned Financing
General Fund Revenues $ 164,000 $ 168,920 $ 173,988 $ 179,207 $ - $ 686,115
Fiscal Year Totals $ 164,000 $ 168,920 $ 173,988 $ 179,207 $ - $ 686,115
FY 2017/2018 – Page 34
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
Fund: General
Project Category: E-911 Equipment Replacement
Project: Mobile Computer Equipment
Cost: $100,000
For additional information on this capital purchase, please refer to page 72 of Fiscal Year 2014/15.
E-911 Equipment F FY 15-FY 19
Replacement YFY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Mobile Equipment
Replacement $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000
Fiscal Year Totals $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000
Planned Financing
General Fund Revenues $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000
Fiscal Year Totals $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000
FY 2017/2018 – Page 35
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
Fund: General
Project Category: Vehicle Replacement - Fire Department
Unit #057: 1996 Pierce Pumper
Cost: $738,430
Based upon the Board approved schedule for replacing fire apparatus, Engine #057 is scheduled for replacement
in FY 2017/18.
Engine Replacement Schedule:
o Engines are on a 20 year/100,000 mile replacement schedule.
o The Fire Department uses an engine for eight years front-line service, an additional four years
front-line service for Paid-On-Call response, and eight years in reserve service.
o Two identical engines were purchased in 1996 coinciding with the opening of two new fire
stations. Staff recommends separating their replacement scheduling allowing for one
replacement engine in FY 2013/14 and the second engine in FY 2017/18.
Staff will make a final determination of replacement need before final recommendation to the Village Board.
FY 15-FY 19
Engine Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
#057, 1997 Pierce Pumper $ - $ - $ - $ 738,430 $ - $ 738,430
Project Total $ - $ - $ - $ 738,430 $ - $ 738,430
Planned Financing
Bond Proceeds $ - $ - $ - $ 738,430 $ - $ 738,430
Fiscal Year Totals $ - $ - $ - $ 738,430 $ - $ 738,430
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ - $ - $ - $ 56,768 $ - $ 56,768
Debt Service on Previous
Bonds $ - $ - $ - $ - $ 56,768 $ 56,768
Fiscal Year Totals $ - $ - $ - $ 56,768 $ 56,768 $ 113,536
At this time there is no identified funding source for the debt service for this project. The annual debt service
cost of this project on bonds issued in FY 2017/18 is $56,768 (Term - 20 years, Rate - 4.5%).
FY 2017/2018 – Page 36
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
FY 2017/2018 – Page 37
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
Fund: General
Project Category: Vehicle Replacement – Public Works
Units #226 & 227: Two (2) 2003 International 7400 SBA 4x2 Dump
Trucks
Cost: $292,140
Included in the Village’s fleet are Units #226 and #227, 2003 International 7400 SBA 4x2 Dump Trucks. These
dump trucks are front-line vehicles used for snow plowing operations, street maintenance operations, water
main break and maintenance operations, and tree removal operations. These vehicles have a fifteen year
projected lifespan.
FY 15-FY 19
Vehicle Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
#226 & #227, 2003 4 x 2 Dump
Trucks $ - $ - $ - $ 292,140 $ - $ 292,140
Project Total $ - $ - $ - $ 292,140 $ - $ 292,140
Planned Financing
Bond Proceeds $ - $ - $ - $ 292,140 $ - $ 292,140
Fiscal Year Totals $ - $ - $ - $ 292,140 $ - $ 292,140
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ - $ - $ - $ 36,019 $ - $ 36,019
Debt Service on Previous Bonds $ - $ - $ - $ - $ 36,019 $ 36,019
Fiscal Year Totals $ - $ - $ - $ 36,019 $ 36,019 $ 72,038
At this time there is no identified funding source for the debt service for this project. The annual debt service
cost of this project on bonds issued in FY 2017/18 is $36,019 (Term - 10 years, Rate – 4%).
FY 2017/2018 – Page 38
Village of Northbrook Capital Improvement Plan Fiscal Year
2017/2018
Fund: General
Project Category: Vehicle Replacements
Cost: $608,420
These vehicles and will be assessed before recommendations for replacement are finalized.
FY 15-FY 19
Vehicle Replacements FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Police
Squad/Administrative
Vehicles (7) $ - $ - $ - $ 229,530 $ - $ 229,530
Administrative Vehicle
(GG) $ - $ - $ - $ 29,190 $ - $ 29,190
Administrative Vehicles
(Fire) $ - $ - $ - $ 76,510 $ - $ 76,510
Public Works Pickups (4) $ - $ - $ - $ 153,320 $ - $ 153,320
Chipper (2007) $ - $ - $ - $ 60,280 $ - $ 60,280
Message Trailers (2) $ - $ - $ - $ 43,360 $ - $ 43,360
Anti Icing System (2003) $ - $ - $ - $ 16,230 $ - $ 16,230
Project Total $ - $ - $ - $ 608,420 $ - $ 608,420
Planned Financing
General Fund Revenues $ - $ - $ - $ 608,420 $ - $ 608,420
Fiscal Year Totals $ - $ - $ - $ 608,420 $ - $ 608,420
FY 2017/2018 – Page 39
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Fiscal Year 2018/19 Summary
Capital Improvement Budget
FY 2018/19
By Fund
21%
27%
General Fund
Water Fund
Sewer Fund
Stormwater Fund
8%
Infrastructure Capital Projects Fund
2%
42%
Total Capital Budget = $12,995,855
Infrastructure
General Sewer Stormwater
Water Fund Capital Total
Fund Fund Fund
Projects Fund
Capital Expense $ 3,009,604 $ 3,594,940 $ 325,917 $ 1,200,380 $ 4,865,014 $ 12,995,855
Planned Financing
Bond Proceeds $ 2,389,624 $ 3,150,460 $ 325,917 $ 1,200,380 $ 4,181,651 $ 11,248,032
Designated
$ - $ 444,480 $ - $ - $ 566,412 $ 1,010,892
Revenues/User Fees
Undesignated Revenues $ 619,980 $ - $ - $ - $ 116,951 $ 736,931
Total $ 3,009,604 $ 3,594,940 $ 325,917 $ 1,200,380 $ 4,865,014 $ 12,995,855
FY 2018/2019 – Page 1
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
FY 2018/19 Projects – $12,995,855
Infrastructure Capital Projects Fund – $4,865,014
Asphalt Street Maintenance- $566,412 (MFT): Page 4
Concrete Street Reconstruction and Rehabilitation- $740,651 (B)
o Sections of White Plains North, Saint Stephens Green, Portions of Cherry Lane and Shermer
Road: Page 9
Sidewalk Improvements- $116,951: Page 11
Shermerville Commons, Construction, Design and Engineering- $3,441,000 (B): Page 13
Stormwater Fund - $1,200,380 (B)
Blackthorn Lane, Property and Easement Acquisition- $34,000: Page 14
Brittany Road, Design/Final Engineering- $18,630: Page 16
Dehne Subdivision, Design/Final Engineering- $113,750: Page 18
Longvalley Drive, Design/Final Engineering- $12,000: Page 20
Surrey Lane, Property and Easement Acquisition- $20,000: Page 22
Williamsburg Drive/Old Post Road, Property and Easement Acquisition, Design/Final Engineering,
Construction- $267,500: Page 24
Woodlawn Road, Property and Easement Acquisition, Design/Final Engineering, Construction- $265,850:
Page 26
Dehne Road/Glendale Avenue Intersection, Construction- $118,650: Page 28
Elm Ridge and Second Street Culvert Replacement- $350,000: Page 30
Water Fund - $3,594,940
Water Main Replacements
o Big Lane Oak - $330,000: Page 31
o Waukegan Road - $3,000,000 (B): Page 33
Water Meter Conversion Program- $75,000: Page 35
Vehicle Replacements- $189,940 (B): Page 36
Sewer Fund - $325,917
Sanitary Sewer Lining Program- $325,917: Page 37
General Fund - $3,009,604
Police Department CAD Replacement- $500,000 (B): Page 39
Information Technology Equipment Replacement- $100,000: Page 40
E-911 Mobile Replacement- $100,000: Page 41
Police Department Building Improvements- $1,090,000 (B): Page 42
Ambulance Replacement- $328,364 (B): Page 43
Dump Truck(2) Replacements- $292,140 (B): Page 45
Public Work Aerial Lift Truck- $179,120 (B): Page 46
Vehicle Replacements- $419,980: Page 47
(B) Proposed Bond Issue
FY 2018/2019 – Page 2
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
FY 2018/2019 – Page 3
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Fund: Infrastructure Capital Improvement
Project Category: Asphalt Street Reconstruction & Rehabilitation
Location: Coral Parkway/Lakeside Avenue/Phillips Avenue/Prince
Street/Sherman Drive
Cost: $566,412
The roadways selected for the 2018/19 asphalt reconstruction and rehabilitation program are rated as many
failures or limited failures.
Roadways rated as having many failures (2 on a scale of 5) have large potholes form and signs of the
base beginning to fail will become evident. Typical examples of these failures include alligator cracking
or failure of the roadway surface.
Roadways rated as having limited failures (3 on a scale of 5) exhibit signs of the road surface cracking
and have small potholes beginning to form. Typical examples of these failures include horizontal and/or
longitudinal cracking in the street. Coral Parkway, which is rated as having “limited failures,” is
scheduled with other lower rated streets due to their close proximity.
The condition of these roads is such that patching is no longer an option and asphalt rehabilitation/
reconstruction is necessary. These repairs will be paid for with Motor Fuel Tax (MFT) revenues.
Address Range Approximate Square
Street Rating Last Resurfaced
(in hundred blocks) Yards of Pavement
Coral Parkway 1400 Limited Failures N/A 1830
Lakeside Avenue 1800 - 1900 Many Failures 1990 1,428
Phillips Avenue 3200 - 3300 Many Failures 1990 1,981
Prince Street 2400 - 2700 Many Failures 2005 4,208
Sherman Drive 2000 - 2400 Many Failures 1997 8,114
FY 2018/2019 – Page 4
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
FY 15-FY 19
Annual Program FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Coral Parkway - Walters
Avenue to South End $ - $ - $ - $ - $ 37,227 $ 37,227
Lakeside Avenue - Landwehr
Road to Phillips Avenue $ - $ - $ - $ - $ 44,087 $ 44,087
Phillips Avenue - Lakeside
Avenue to Techny Road $ - $ - $ - $ - $ 31,756 $ 31,756
Prince Street - The Strand to
Pfingsten Road $ - $ - $ - $ - $ 90,758 $ 90,758
Sherman Drive- Shermer
Road to Greenview Road $ - $ - $ - $ - $ 362,584 $ 362,584
Project Total $ - $ - $ - $ - $ 566,412 $ 566,412
Planned Financing
State Motor Fuel Tax
Receipts $ - $ - $ - $ - $ 566,412 $ 566,412
Fiscal Year Totals $ - $ - $ - $ - $ 566,412 $ 566,412
Coral Parkway Lakeside Avenue
FY 2018/2019 – Page 5
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Phillips Avenue Prince Street
Sherman Drive
FY 2018/2019 – Page 6
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
FY 2018/2019 – Page 7
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
FY 2018/2019 – Page 8
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Fund: Infrastructure Capital Improvement
Project Category: Concrete Street Reconstruction & Rehabilitation
Location: White Plains North/ Saint Stephens Green/ Portions of
Cherry Lane & Shermer Road
Cost: $740,651
The concrete streets of the White Plains North, Saint Stephens Green, Cherry Lane and Shermer Road areas of
town have been surveyed and an estimated number of concrete panels have been identified for replacement.
Deferring the replacement of the deteriorated panels will result in more advanced degradation of roadway,
including pavement failures, increased damage to vehicles, and increased reconstruction and rehabilitation costs
in the future.
Panels are approximately 5.89 cubic yards of concrete. In FY 2018/19, Village Staff anticipate replacing about
2,560 cubic yards of concrete, which equates to 301 cement trucks.
Concrete Street
Reconstruction and FY 15-FY 19
Rehabilitation FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
White Plains North/
Saint Stephens Green
Area/ Shagbark
Lane/Portions of Cherry
Lane & Shermer Road $ - $ - $ - $ - $ 740,651 $ 740,651
Project Total $ - $ - $ - $ - $ 740,651 $ 740,651
Planned Financing
Bond Proceeds $ - $ - $ - $ - $ 740,651 $ 740,651
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ - $ - $ - $ - $ 48,181 $ 48,181
Fiscal Year Totals $ - $ - $ - $ - $ 48,181 $ 48,181
At this time there is no identified funding source for the debt service for this project. The annual debt service
cost of this project on bonds issued in FY 2018/19 is $48,181 (Term - 30 years, Rate - 5%).
FY 2018/2019 – Page 9
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
FY 2018/2019 – Page 10
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Fund: Infrastructure Capital Improvement
Project Category: Sidewalk Improvements
Location: Atlas Sections 2C, 2D, 3C, 3D, 4C, 4D
Cost: $116,951
For additional information on this capital purchase, please refer to pages 27 of Fiscal Year 2014/15.
Areas to be reviewed for replacement are detailed in the map below.
FY 15-FY 19
Sidewalk Improvements FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Annual Program $ 103,909 $ 107,026 $ 110,237 $ 113,544 $ 116,951 $ 551,667
Fiscal Year Totals $ 103,909 $ 107,026 $ 110,237 $ 113,544 $ 116,951 $ 551,667
Planned Financing
Fund Reserves $ 103,909 $ 107,026 $ 110,237 $ 113,544 $ 116,951 $ 551,667
FY 2018/2019 – Page 11
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
FY 2018/2019 – Page 12
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Fund: Infrastructure Capital Improvement
Project Category: Shermerville Commons – Fleet Maintenance
Garage/Stormwater Facility
Project Phase: Construction Management Services,
Demolition/Remediation and Construction and Design/Final
Engineering
Cost: $3,441,000
For additional information on this capital purchase, please refer to pages 13-15 of Fiscal Year 2016/17.
FY 15-FY 19
Shermerville Commons FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Fleet Maintenance
Garage $ - $ - $4,825,000 $ 325,000 $3,241,000 $ 8,391,000
Stormwater Facility $ - $ - $ - $ 100,000 $ 200,000 $ 300,000
Park Facility $ - $ - $ - $ - $ - $ -
Project Total $ - $ - $4,825,000 $ 425,000 $3,441,000 $ 8,691,000
Planned Financing
Bond Proceeds $ - $ - $4,825,000 $ 425,000 $3,441,000 $ 8,691,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ - $ - $ 362,936 $ 32,673 $ 264,531 $ 660,140
Debt Service on Previous
Bonds $ - $ - $ - $ 362,936 $ 395,609 $ 758,545
Fiscal Year Totals $ - $ - $ 362,936 $ 395,609 $ 660,140 $ 1,418,685
At this time there is no identified funding source for the debt service for this project. The annual debt service
cost of this project on bonds issued in FY 2016/17 is $362,936 (Term - 20 years, Rate - 4.25%). The annual debt
service cost of this project on bonds issued in FY 2017/18 is $32,673 (Term - 20 years, Rate - 4.5%). The annual
debt service cost of this project on bonds issued in FY 2018/19 is $264,531 (Term - 20 years, Rate - 4.5%).
FY 2018/2019 – Page 13
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Fund: Stormwater
Project Category: Stormwater Mitigation Project
Location: Blackthorn Lane
Project Phase: Property/Easement Acquisition and Design/Final
Engineering
Cost: $34,000
Project Description: This project involves improving the street drainage collection system by increasing inlet
capacity both along the street and within the low street area. The current corrugated metal pipe system on
Blackthorn Lane will also be replaced with a new 18” diameter storm sewer and include a stormwater control
structure. Currently, this area experiences street, front yard, back yard and structure flooding. Increased
flooding depths have been reported..
Locations Impacted by the Project: 1100 block of Blackthorn Lane.
Properties Impacted: 12 properties will experience a reduction in property flooding.
Structures Impacted: Two (2) properties currently experience structure flooding. Staff anticipates that this
project will create a reduction in structure flooding for these properties.
Additional Study Needed: Additional study of this project is not needed.
Design: Design of the Blackthorn Lane project is anticipated to take 6 months.
Construction: Construction of the Blackthorn Lane project is anticipated to take 1 year.
External Factors Affecting Design and Construction Timelines: To construct this project, the Village must obtain
easements between two properties fronting on Blackthorn Lane to facilitate the construction of the new storm
sewer to Briarwood Lane.
Photos of Flooding in the Project Area:
FY 2018/2019 – Page 14
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Blackthorn Lane Project Map:
FY 15-FY 19
Blackthorn Lane FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Property & Easement
Acquisition $ - $ - $ - $ - $ 20,000 $ 20,000
Design/Final Engineering
$ - $ - $ - $ - $ 14,000 $ 14,000
Project Total $ - $ - $ - $ - $ 34,000 $ 34,000
Planned Financing
Bond Proceeds $ - $ - $ - $ - $ 34,000 $ 34,000
Fiscal Year Totals $ - $ - $ - $ - $ 34,000 $ 34,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ - $ - $ - $ - $ 2,212 $ 2,212
Fiscal Year Totals $ - $ - $ - $ - $ 2,212 $ 2,212
The annual debt service cost of this project on bonds issued in FY 2018/19 is $2,212 (Term - 30 years, Rate –
5%).
FY 2018/2019 – Page 15
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Fund: Stormwater
Project Category: Stormwater Mitigation Project
Location: Brittany Road
Project Phase: Design/Final Engineering
Cost: $18,630
Project Description: This project involves supplementing the existing 42” storm sewer by constructing
approximately 375’ of 48” storm sewer to drain the low area on Brittany Road to the 48” storm sewer outlet on
Bordeaux Road. The lower inlets within the flood prone area will be disconnected from the existing storm sewer
and reconnected to the 48” storm sewer. The inflow capacity will be increased by adding inlets. A downstream
control structure will be constructed. Currently, this area experiences street, front yard, and reported structure
flooding.
Locations Impacted by the Project: Bourdeaux Drive to Dauphine Avenue.
Properties Impacted: Six (6) properties will experience a reduction in property flooding.
Structures Impacted: One (1) property currently experience structure flooding. Staff anticipates that this project
will create a reduction in structure flooding for this property.
Additional Study Needed: Additional study of this project is not needed.
Design: Design of the Brittany Road project is anticipated to take 6 months.
Construction: Construction of the Brittany Road project is anticipated to take 1 year.
External Factors Affecting Design and Construction Timelines: There are no external factors affecting design
and construction of this project.
Photos of Flooding in the Project Area:
FY 2018/2019 – Page 16
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Brittany Road Project Map:
FY 15-FY 19
Brittany Road FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Design/Final Engineering
$ - $ - $ - $ - $ 18,630 $ 18,630
Project Total $ - $ - $ - $ - $ 18,630 $ 18,630
Planned Financing
Bond Proceeds $ - $ - $ - $ - $ 18,630 $ 18,630
Fiscal Year Totals $ - $ - $ - $ - $ 18,630 $ 18,630
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ - $ - $ - $ - $ 1,212 $ 1,212
Fiscal Year Totals $ - $ - $ - $ - $ 1,212 $ 1,212
The annual debt service cost of this project on bonds issued in FY 2018/19 is $1,212 (Term - 30 years, Rate –
5%).
FY 2018/2019 – Page 17
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Fund: Stormwater
Project Category: Stormwater Mitigation Project
Location: Dehne Subdivision
Project Phase: Design/Final Engineering and Construction
Cost: $113,750
Project Description: This project involves improving conveyance by replacing damaged culverts and regrading
the ditches along Dehne and Brentwood Roads. The project will also improve collection capacity through the
installation of inlets along Brentwood Road. Currently, this area experiences front yard, rear yard and street
flooding with water flowing across Dehne Road.
Locations Impacted by the Project: Dehne Road and Brentwood Road.
Properties Impacted: Eight (8) properties will experience a reduction in property flooding.
Structures Impacted: No properties are currently impacted by structure flooding.
Additional Study Needed: Additional study of this project is not needed.
Design: Design of the Dehne Subdivision project is anticipated to take 6 months.
Construction: Construction of the the Dehne Subdivision project is anticipated to take 6 months.
External Factors Affecting Design and Construction Timelines: The Dehne Subdivision project is contingent
upon the Northbrook Manor, Shermer Road Outlet, Shermer Road Overflow and Wescott Park projects being
completed.
Photos of Flooding in the Project Area:
FY 2018/2019 – Page 18
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Dehne Subdivision Project Map:
FY 15-FY 19
Dehne Subdivision FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Design/Final Engineering $ - $ - $ - $ - $ 14,000 $ 14,000
Construction $ - $ - $ - $ - $ 99,750 $ 99,750
Project Total $ - $ - $ - $ - $ 113,750 $ 113,750
Planned Financing
Bond Proceeds $ - $ - $ - $ - $ 113,750 $ 113,750
Fiscal Year Totals $ - $ - $ - $ - $ 113,750 $ 113,750
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ - $ - $ - $ - $ 7,400 $ 7,400
Fiscal Year Totals $ - $ - $ - $ - $ 7,400 $ 7,400
The annual debt service cost of this project on bonds issued in FY 2018/19 is $7,400 (Term - 30 years, Rate –
5%).
FY 2018/2019 – Page 19
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Fund: Stormwater
Project Category: Stormwater Mitigation Project
Location: Longvalley Drive
Project Phase: Design/Final Engineering
Cost: $12,000
Project Description: This project involves improving the intersection drainage collection system by increasing
inlet capacity and related lateral storm sewer capacities. The project includes replacing 300” of the existing 15”
storm sewer with 18” storm sewer. A control structure will also be constructed at the beginning of the 18” storm
sewer. Currently, this area experiences street, front yard and structure flooding.
Locations Impacted by the Project: Longvalley Drive and Longvalley Court intersection.
Properties Impacted: Eight (8) properties will experience a reduction in property flooding.
Structures Impacted: One (1) property currently experience structure flooding. Staff anticipates that this project
will create a reduction in structure flooding for this property.
Additional Study Needed: Additional study of this project is not needed.
Design: Design of the Longvalley Drive project is anticipated to take 6 months.
Construction: Construction of the Longvalley Drive project is anticipated to take 1 year.
External Factors Affecting Design and Construction Timelines: There are no external factors affecting design
and construction of this project.
Photos of Flooding in the Project Area:
At this time, staff does not have photos documenting the flooding conditions in this location.
FY 2018/2019 – Page 20
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Longvalley Drive Project Map:
FY 15-FY 19
Longvalley Drive FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Design/Final Engineering
$ - $ - $ - $ - $ 12,000 $ 12,000
Project Total $ - $ - $ - $ - $ 12,000 $ 12,000
Planned Financing
Bond Proceeds $ - $ - $ - $ - $ 12,000 $ 12,000
Fiscal Year Totals $ - $ - $ - $ - $ 12,000 $ 12,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ - $ - $ - $ - $ 781 $ 781
Fiscal Year Totals $ - $ - $ - $ - $ 781 $ 781
The annual debt service cost of this project on bonds issued in FY 2018/19 is $781 (Term - 30 years, Rate –
5%).
FY 2018/2019 – Page 21
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Fund: Stormwater
Project Category: Stormwater Mitigation Project
Location: Surrey Lane
Project Phase: Property/Easement Acquisition
Cost: $20,000
Project Description: This project involves constructing a conveyance storm sewer from the cul-de-sac at Lee
Road as well as a low/flood overflow structure at the east side of the cul-de-sac with a restrictor plate. Also, a
relief swale will be constructed within the drainage easement. Two (2) inlets will be added within the cul-de-sac
area to improve drainage. A short segment of the Lee Road storm sewer system will be modified to
accommodate the new storm sewer and flood overflow path. Currently, this area experiences cul-de-sac, front
yard and rear yard flooding.
Locations Impacted by the Project: Surrey Lane cul-de-sac.
Properties Impacted: Seven (7) properties will experience a reduction in property flooding.
Structures Impacted: No properties are currently impacted by structure flooding.
Additional Study Needed: Additional study of this project is not needed.
Design: Design of the Surrey Lane project is anticipated to take 6 months.
Construction: Construction of the Surrey Lane project is anticipated to take 1 year.
External Factors Affecting Design and Construction Timelines: To construct this project, the Village must obtain
a 15’ wide drainage easement between the Surrey Lane cul-de-sac and Lee Road.
Photos of Flooding in the Project Area:
FY 2018/2019 – Page 22
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Surrey Lane Project Map:
FY 15-FY 19
Surrey Lane FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Property & Easement
Acquisition $ - $ - $ - $ - $ 20,000 $ 20,000
Project Total $ - $ - $ - $ - $ 20,000 $ 20,000
Planned Financing
Bond Proceeds $ - $ - $ - $ - $ 20,000 $ 20,000
Fiscal Year Totals $ - $ - $ - $ - $ 20,000 $ 20,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ - $ - $ - $ - $ 1,302 $ 1,302
Fiscal Year Totals $ - $ - $ - $ - $ 1,302 $ 1,302
The annual debt service cost of this project on bonds issued in FY 2018/19 is $1,302 (Term - 30 years, Rate –
5%).
FY 2018/2019 – Page 23
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Fund: Stormwater
Project Category: Stormwater Mitigation Project
Location: Williamsburg Drive/Old Post Road
Project Phase: Property/Easement Acquisition, Design/Final
Engineering and Construction
Cost: $267,500
Project Description: This project involves the construction of a 2-foot and 3-foot diameter storm sewer line
extending from the Williamsburg Drive/Old Post Road intersection to the adjacent Revere Drive retention pond,
which will also be expanded by 1 acre-foot. Currently, this intersection experiences flooding of the roadway and
parkway.
Locations Impacted by the Project: 1000 block of Williamsburg Drive and 200 block of Old Post Road.
Properties Impacted: 18 properties will experience a reduction in flooding.
Structures Impacted: Two (2) of the 18 properties currently experience structure flooding. Staff anticipates that
this project will create a reduction in structure flooding for these properties.
Additional Study Needed: Additional study of this project is not needed.
Design: Design of the Williamsburg Drive/Old Post Road project is expected to take 24 months.
Construction: Construction of the Williamsburg Drive/Old Post Road project is anticipated to take 6 months.
External Factors Affecting Design and Construction Timelines: The Village must acquire two (2) easements and
either an additional easement or license agreement with the Revere Drive Business Association for the
construction of a storm sewer and expansion of a retention pond for the Williamsburg Drive/Old Post Road
project.
Photos of Flooding in the Project Area:
FY 2018/2019 – Page 24
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Williamsburg Drive/Old Post Road Project Map:
Williamsburg Drive/Old FY 15-FY 19
Post Road FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Property & Easement
Acquisition $ - $ - $ - $ - $ 5,000 $ 5,000
Design/Final Engineering
$ - $ - $ - $ - $ 34,650 $ 34,650
Construction $ - $ - $ - $ - $ 227,850 $ 227,850
Project Total $ - $ - $ - $ - $ 267,500 $ 267,500
Planned Financing
Bond Proceeds $ - $ - $ - $ - $ 267,500 $ 267,500
Fiscal Year Totals $ - $ - $ - $ - $ 267,500 $ 267,500
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ - $ - $ - $ - $ 17,402 $ 17,402
Fiscal Year Totals $ - $ - $ - $ - $ 17,402 $ 17,402
The annual debt service cost of this project on bonds issued in FY 2018/19 is $17,402 (Term - 30 years, Rate –
5%).
FY 2018/2019 – Page 25
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Fund: Stormwater
Project Category: Stormwater Mitigation Project
Location: Woodlawn Road
Project Phase: Property/Easement Acquisition, Design/Final
Engineering and Construction
Cost: $265,850
Project Description: This project involves the addition of inlet structures as well as regarding of ditches and
replacement of damaged, crushed and nonstandard driveway culverts. Currently, this area experiences street,
front yard and back yard flooding.
Locations Impacted by the Project: 2000 and 2100 blocks of Woodlawn Road.
Properties Impacted: 15 properties will experience a reduction in flooding.
Structures Impacted: No properties are currently impacted by structure flooding.
Additional Study Needed: Additional study of this project is not needed.
Design: Design of the Woodlawn Road project is expected to take 6 months.
Construction: Construction of the Woodlawn Road project is anticipated to take 6 months.
External Factors Affecting Design and Construction Timelines: Construction of the Woodlawn Road project is
dependent on the Northbrook Manor, Shermer Road Outlet, Shermer Road Overflow and Wescott Park projects
being completed.
Photo of Flooding in the Project Area:
FY 2018/2019 – Page 26
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Woodlawn Road Project Map:
FY 15-FY 19
Woodlawn Road FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Property & Easement
Acquisition $ - $ - $ - $ - $ 5,000 $ 5,000
Design/Final Engineering
$ - $ - $ - $ - $ 33,000 $ 33,000
Construction $ - $ - $ - $ - $ 227,850 $ 227,850
Project Total $ - $ - $ - $ - $ 265,850 $ 265,850
Planned Financing
Bond Proceeds $ - $ - $ - $ - $ 265,850 $ 265,850
Fiscal Year Totals $ - $ - $ - $ - $ 265,850 $ 265,850
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ - $ - $ - $ - $ 17,294 $ 17,294
Debt Service on Previous
Bonds $ - $ - $ - $ - $ - $ -
Fiscal Year Totals $ - $ - $ - $ - $ 17,294 $ 17,294
The annual debt service cost of this project on bonds issued in FY 2018/19 is $17,294 (Term - 30 years, Rate –
5%).
FY 2018/2019 – Page 27
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Fund: Stormwater
Project Category: Stormwater Mitigation Project
Location: Dehne Road/Glendale Avenue Intersection
Project Phase: Construction
Cost: $118,650
Project Phases Completed: Design and Final Engineering of this project will be completed during Fiscal Year
2017/18.
For additional information on this stormwater mitigation project, please refer to pages 14-15 of Fiscal Year
2017/18.
Photos of Flooding in the Project Area:
At this time, staff does not have photos documenting the flooding conditions in this location.
Dehne Road/Glendale Avenue Intersection
FY 2018/2019 – Page 28
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Dehne Road & Glendale FY 15-FY 19
Avenue FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Design/Final Engineering
$ - $ - $ - $ 17,000 $ - $ 17,000
Construction $ - $ - $ - $ - $ 118,650 $ 118,650
Project Total $ - $ - $ - $ 17,000 $ 118,650 $ 135,650
Planned Financing
Bond Proceeds $ - $ - $ - $ 17,000 $ 118,650 $ 135,650
Fiscal Year Totals $ - $ - $ - $ 17,000 $ 118,650 $ 135,650
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ - $ - $ - $ 1,106 $ 7,719 $ 8,825
Debt Service on Previous
Bonds $ - $ - $ - $ - $ 1,106 $ 1,106
Fiscal Year Totals $ - $ - $ - $ 1,106 $ 8,825 $ 9,931
The annual debt service cost of this project on bonds issued in FY 2017/18 is $1,106 (Term - 30 years, Rate -
5%). The annual debt service cost of this project on bonds issued in FY 2018/19 is $7,719 (Term - 30 years,
Rate - 5%).
FY 2018/2019 – Page 29
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Fund: Stormwater
Project Category: Culvert Replacement
Location: Elm Ridge and Second Street
Project Phase: Construction
Cost: $350,000
The culverts under Elm Ridge Drive and Second Street are concrete structures that allow stormwater to flow
from the Techny Drain underneath these roadways. The culverts have begun to show signs of degradation and
are in need of replacement.
FY 15-FY 19
Culvert Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Construction $ - $ - $ - $ - $ 350,000 $ 350,000
Project Total $ - $ - $ - $ - $ 350,000 $ 350,000
Planned Financing
Bond Proceeds $ - $ - $ - $ - $ 350,000 $ 350,000
Fiscal Year Totals $ - $ - $ - $ - $ 350,000 $ 350,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ - $ - $ - $ - $ 22,769 $ 22,769
Fiscal Year Totals $ - $ - $ - $ - $ 22,769 $ 22,769
The annual debt service cost of this project on bonds issued in FY 2018/19 is $22,769 (Term - 30 years, Rate -
5%).
FY 2018/2019 – Page 30
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Fund: Water
Project Category: Water Main Replacement
Project Location: Big Oak Lane
Cost: $330,000
The water main on Big Oak Lane between Meadow Road and Laurel Road has experienced three (3) main breaks
in the past three (3) years and 22 since its installation in 1955. The existing 6-inch diameter main will be replaced
with an 8-inch main to accommodate the increased volume needed by the area and to ensure sufficient water
flow if needed by the Fire Department in case of an emergency.
Replace Number of Estimated
Big Oak Lane Existing Size With Length Year Breaks to Date Cost
Meadow Rd. to East End 6" 8" 1200 1955 22 $ 330,000
Project Total $ 330,000
Planned Financing
User Fees $ 330,000
Total $ 330,000
FY 2018/2019 – Page 31
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
FY 2018/2019 – Page 32
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Fund: Water
Project Category: Water Main Replacement
Project Location: Waukegan Road
Cost: $3,000,000
The water main on Waukegan Road has experienced 25 breaks, including 5 breaks over the last couple years.
Approximately 95 customers are impacted by outages on this main. Waukegan Road is a main thoroughfare for
the Village and breaks on the line often generate the need for lane closures, leading to traffic back-ups that also
affect other routes through town. Continual breaks on the line will lead to increased damage to the road and a
possible requirement from the Illinois Department of Transportation (IDOT) for the Village to repair. The existing
4-8 inch diameter main will be replaced with a main 10 inches or larger to accommodate the increased volume
needed by the community and to ensure sufficient water flow if needed by the Fire Department in case of an
emergency.
This project, which was originally slated for FY 2013/14, has been deferred to FY 2018/19 due to construction
restrictions that IDOT has placed on the project. While the design is evaluated, staff continues to work with IDOT
on the constructability of this project. Should a change in the requirements occur that will allow the project to
be constructed in an earlier fiscal year, this project will be accelerated. Additionally, depending on the outcome
of the water model the scope of this project may change.
Replace Number of Estimated
Waukegan Road Existing Size With Length Year Breaks to Date Cost
Walters Ave. to Shermer Rd. 4" - 8" 10" 2,400 1922 - 1965 25 $ 3,000,000
Project Total $ 3,000,000
Planned Financing
Bond Proceeds $ 3,000,000
Total $ 3,000,000
FY 14-FY 18
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on Bonds $ - $ - $ - $ - $ 195,155 $ 195,155
Fiscal Year Totals $ - $ - $ - $ - $ 195,155 $ 195,155
The annual debt service cost of this project on bonds issued in FY 2018/19 is $195,155 (Term – 30 years, Rate –
5.0%).
FY 2018/2019 – Page 33
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
FY 2018/2019 – Page 34
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Fund: Water
Project Category: Water Meter Conversion Program
Cost: $75,000
For additional information on this capital purchase, please refer to pages 58 of Fiscal Year 2014/15.
Water Meter Conversion FY 15-FY 19
Project FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Meter Purchases $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 375,000
Fiscal Year Totals $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 375,000
Planned Financing
User Charges/Fund Reserve $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 375,000
Total $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 375,000
FY 2018/2019 – Page 35
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Fund: Water
Project Category: Scheduled Equipment & Vehicle Replacements
Cost: $189,940
Vehicles will be assessed prior to formal recommendation for replacement.
FY 15-FY 19
Vehicle Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Pickup(s) $ - $ 120,640 $ 37,210 $ - $ 39,480 $ 197,330
Excavator (2002) $ - $ - $ - $ 57,070 $ - $ 57,070
Backhoe (1996) $ - $ - $ 101,300 $ - $ - $ 101,300
Hydraulic Breaker (1997) $ - $ - $ 19,010 $ - $ - $ 19,010
Dump Truck (2004) $ - $ - $ - $ - $ 150,460 $ 150,460
Project Total $ - $ 120,640 $ 157,520 $ 57,070 $ 189,940 $ 525,170
Planned Financing
User Charges $ - $ 120,640 $ 56,220 $ 57,070 $ 39,480 $ 273,410
Bond Proceeds $ - $ - $ 101,300 $ - $ 150,460 $ 251,760
Total $ - $ 120,640 $ 157,520 $ 57,070 $ 189,940 $ 525,170
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ - $ - $ 7,620 $ - $ 11,567 $ 19,187
Debt Service on Previous
Bonds $ - $ - $ - $ 7,620 $ 7,620 $ 15,240
Fiscal Year Totals $ - $ - $ 7,620 $ 7,620 $ 19,187 $ 34,427
The annual debt service cost of this project on bonds issues in FY 2016/17 is $7,620 (Term - 20 years, Rate –
4.25%). The annual debt service cost of this project on bonds issues in FY 2018/19 is $11,567 (Term - 20 years,
Rate – 4. 5%).
FY 2018/2019 – Page 36
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Fund: Sanitary Sewer
Project Category: Sanitary Sewer Lining Program
Cost: $325,917
For additional information on this capital purchase, please refer to page 63 of Fiscal Year 2014/15.
FY 15-FY 19
Sanitary Sewer Fund Projects FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Sewer Lining Program $ 289,573 $ 298,260 $ 307,208 $ 316,424 $ 325,917 $ 1,537,382
Fiscal Year Totals $ 289,573 $ 298,260 $ 307,208 $ 316,424 $ 325,917 $ 1,537,382
Planned Financing
Bond Proceeds $ 289,573 $ 298,260 $ 307,208 $ 316,424 $ 325,917 $ 1,537,382
Total $ 289,573 $ 298,260 $ 307,208 $ 316,424 $ 325,917 $ 1,537,382
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ 17,778 $ 18,853 $ 19,419 $ 20,584 $ 21,202 $ 97,836
Debt Service on Previous
Bonds $ - $ 17,778 $ 36,631 $ 56,050 $ 76,634 $ 187,093
Fiscal Year Totals $ 17,778 $ 36,631 $ 56,050 $ 76,634 $ 97,836 $ 284,929
The annual debt service cost of this project on bonds issues in FY 2014/15 is $17,778 (Term - 30 years, Rate –
4.5%). The annual debt service cost of this project on bonds issues in FY 2015/16 is $18,853 (Term - 30 years,
Rate – 4.75%). The annual debt service cost of this project on bonds issues in FY 2016/17 is $19,419 (Term - 30
years, Rate – 4.75%). The annual debt service cost of this project on bonds issues in FY 2017/18 is $20,584
(Term - 30 years, Rate – 5%). The annual debt service cost of this project on bonds issues in FY 2018/19 is
$21,202 (Term - 30 years, Rate – 5%).
FY 2018/2019 – Page 37
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
FY 2018/2019 – Page 38
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Fund: General
Project Category: Information Technology (IT) Equipment
Replacement
Project: Computer Aided Dispatch (CAD) and Records Management
System (RMS) Replacement
Cost: $500,000
Our Computer Aided Dispatch (CAD) and Records Management System (RMS), currently provided by Spillman
Technologies, is a comprehensive incident management, records management and resource allocation solution
specifically designed for a law enforcement environment. This CAD and RMS system streamlines the call taking,
dispatch, and records management processes by allowing for rapid data entry, setting call priorities, making
resource recommendations, searching of records and databases, and writing incident reports. The system is
composed of multiple modules, each providing specific functionality such as mapping, automatic vehicle location,
records management, equipment, personnel, and sex offender tracking. The modular system has allowed the
department to customize the systems to our needs as well as provide the ability to easily add state-of-the-art
modules as they are developed.
By FY 2019, the CAD system will be 12 years old. At this time, it is appropriate for the police department to plan
for an assessment of the functionality and service provided by the CAD and RMS system. Moreover, as the
Village seeks to replace its organization-wide Enterprise Resource Program, ancillary systems must be evaluated
as well. Should the need arise to replace the current software with a more appropriate solution, or switch to a
vendor that would provide increased information sharing opportunities among neighboring municipalities, we
are planning for this potential expense.
FY 15-FY 19
Information Technology FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
CAD Replacement $ - $ - $ - $ - $ 500,000 $ 500,000
Project Total $ - $ - $ - $ - $ 500,000 $ 500,000
Planned Financing
Bond Proceeds $ - $ - $ - $ - $ 500,000 $ 500,000
Fiscal Year Totals $ - $ - $ - $ - $ 500,000 $ 500,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ - $ - $ - $ - $ 61,646 $ 61,646
Fiscal Year Totals $ - $ - $ - $ - $ 61,646 $ 61,646
At this time there is no identified funding source for the debt service for this project. The annual debt service cost
of this project on bonds issued in FY 2018/19 is $61,646 (Term - 10 years, Rate – 4.0%)
FY 2018/2019 – Page 39
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Fund: General
Project Category: Information Technology (IT) Equipment
Replacement
Project: General Equipment
Cost: $100,000
For additional information on this capital purchase, please refer to page 69 of Fiscal Year 2014/15.
FY 15-FY 19
Information Technology FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
General Equipment
Replacement $ 130,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 530,000
Fiscal Year Total $ 130,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 530,000
Planned Financing
General Fund Revenues $ 130,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 530,000
Fiscal Year Totals $ 130,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 530,000
FY 2018/2019 – Page 40
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Fund: General
Project Category: E-911 Equipment Replacement
Project: Mobile Computer Equipment
Cost: $100,000
For additional information on this capital purchase, please refer to page 72 of Fiscal Year 2014/15.
E-911 Equipment F FY 15-FY 19
Replacement YFY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Mobile Equipment
Replacement $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000
Fiscal Year Total $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000
Planned Financing
General Fund Revenues $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000
Fiscal Year Totals $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000
FY 2018/2019 – Page 41
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Fund: General
Project Category: Facilities Improvements
Facility: Police Department – Roof Replacement, Window
Replacement and HVAC Replacement
Cost: $1,090,000
The Public Safety Building at 1401 Landwehr Road originally housed both the Police and Fire Departments until
the construction of Fire Station 11. The roof has reached the end of its useful life and will be replaced and the
HVAC system will be reconfigured to be more energy efficient. Windows throughout the building will also be
replaced. In preparation for this project, and to better identify what improvements can be made to improve the
interior of the building, the Police Department will be including with their 2014/15 budget request funds for a
facility operations plan.
FY 15-FY 19
Facilities FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Exterior Improvements $ - $ - $ - $ - $ 440,000 $ 440,000
Interior Improvements $ - $ - $ - $ - $ - $ -
Structural Improvements $ - $ - $ - $ - $ - $ -
Mechanical
Improvements $ - $ - $ - $ - $ 650,000 $ 650,000
Project Total $ - $ - $ - $ - $1,090,000 $ 1,090,000
Planned Financing
Bond Proceeds $ - $ - $ - $ - $1,090,000 $ 1,090,000
Fiscal Year Totals $ - $ - $ - $ - $1,090,000 $ 1,090,000
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New
Bonds $ - $ - $ - $ - $ 83,795 $ 83,795
Fiscal Year Totals $ - $ - $ - $ - $ 83,795 $ 83,795
At this time there is no identified funding source for the debt service for this project. The annual debt service
cost of this project on bonds issued in FY 2018/19 is $83,795 (Term – 20 years, Rate – 4.5%).
FY 2018/2019 – Page 42
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Fund: General
Project Category: Vehicle Replacement - Fire Department
Unit #067: 2008 International Ambulance/Road Rescue
Cost: $328,364
Based upon the Village Board approved schedule for replacing fire apparatus, Ambulance #067 is scheduled for
replacement in FY 2018/19.
Ambulance Replacement Schedule:
o The current schedule for medium duty ambulances calls for a six year front-line status and a four
year reserve status.
o Typically, ambulances are replaced every ten years or 100,000 miles.
o This replacement is consistent with department history and a recommendation from the
Village’s fleet maintenance supervisor.
o This 2008 International Ambulance with a MedTek body has an anticipated replacement cost of
$328,364, which includes the chassis, body, and all necessary equipment.
o Staff will make a final determination of replacement need before final recommendation to the
Village Board.
FY 15-FY 19
Ambulance Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
#067, 2008 International
Medtec Ambulance $ - $ - $ - $ - $ 328,364 $ 328,364
Project Total $ - $ - $ - $ - $ 328,364 $ 328,364
Planned Financing
Bond Proceeds $ - $ - $ - $ - $ 328,364 $ 328,364
Fiscal Year Totals $ - $ - $ - $ - $ 328,364 $ 328,364
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on New Bonds $ - $ - $ - $ - $ 40,485 $ 40,485
Fiscal Year Totals $ - $ - $ - $ - $ 40,485 $ 40,485
At this time there is no identified funding source for the debt service for this project. The annual debt service
cost of this project on bonds issued in FY 2018/19 is $40,485 (Term – 10 years, Rate - 4%).
FY 2018/2019 – Page 43
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
FY 2018/2019 – Page 44
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Fund: General
Project Category: Vehicle Replacements – Public Works
Units #208 & 210: Two (2) 2007 GMC 5500 Dump Trucks
Cost: $292,140
Included in the Village’s fleet are Units #208 and #210, 2007 GMC 5500 Dump Trucks. These dump trucks are
front-line vehicles used for snow plowing operations, street maintenance operations, water main break and
maintenance operations, and tree removal operations.
Choosing to defer the replacement of this vehicle will likely incur costs for sandblasting and repainting of the
body and frame, which are already showing signs of wear, as well as replacement of various other components
that have deteriorated.
FY 15-FY 19
Vehicle Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
#208 & #210, 2007 GMC 5500
Dump Trucks $ - $ - $ - $ - $ 292,140 $ 292,140
Project Total $ - $ - $ - $ - $ 292,140 $ 292,140
Planned Financing
Bond Proceeds $ - $ - $ - $ - $ 292,140 $ 292,140
Fiscal Year Totals $ - $ - $ - $ - $ 292,140 $ 292,140
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on Bonds $ - $ - $ - $ - $ 36,019 $ 36,019
Fiscal Year Totals $ - $ - $ - $ - $ 36,019 $ 36,019
At this time there is no identified funding source for the debt service for this project. The annual debt service
cost of this project on bonds issued in FY 2018/19 is $36,019 (Term – 10 years, Rate - 4%).
FY 2018/2019 – Page 45
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Fund: General
Project Category: Vehicle Replacements – Public Works
Unit #236: 2004 International Snorkel
Cost: $179,120
Included in the Village’s fleet is Unit #236, a 2004 International Snorkel. This piece of equipment includes a 60-
foot aerial lift as well as a dump bed with a box that allows the wood chipper to deposit chips into the back of
the truck, minimizing the number of vehicles that need to be brought to a job site. Choosing to defer the
replacement of this vehicle will likely incur costs for sandblasting and repainting of the body and frame, which
are already showing signs of wear, as well as replacement of various other components that have deteriorated.
FY 15-FY 19
Vehicle Replacement FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
#236, 2004 International Snorkel $ - $ - $ - $ - $ 179,120 $ 179,120
Project Total $ - $ - $ - $ - $ 179,120 $ 179,120
Planned Financing
Bond Proceeds $ - $ - $ - $ - $ 179,120 $ 179,120
Fiscal Year Totals $ - $ - $ - $ - $ 179,120 $ 179,120
FY 15-FY 19
Annual Funding FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Debt Service on Bonds $ - $ - $ - $ - $ 22,084 $ 22,084
Fiscal Year Totals $ - $ - $ - $ - $ 22,084 $ 22,084
At this time there is no identified funding source for the debt service for this project. The annual debt service
cost of this project on bonds issued in FY 2018/19 is $22,084 (Term – 10 years, Rate - 4%).
FY 2018/2019 – Page 46
Village of Northbrook Capital Improvement Plan Fiscal Year
2018/2019
Fund: General
Project Category: Vehicle Replacements
Cost: $419,980
These vehicles and will be assessed before recommendations for replacement are finalized.
FY 15-FY 19
Vehicle Replacements FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total
Police
Squad/Administrative
Vehicles (3) $ - $ - $ - $ - $ 112,400 $ 112,400
Administrative Vehicles
(Fire) $ - $ - $ - $ - $ 75,380 $ 75,380
Public Works Pickups (2) $ - $ - $ - $ - $ 92,370 $ 92,370
Roller (1998) $ - $ - $ - $ - $ 48,960 $ 48,960
Forklift (2007) $ - $ - $ - $ - $ 32,240 $ 32,240
Scissor Lift (2006) $ - $ - $ - $ - $ 12,780 $ 12,780
Trailers (2) $ - $ - $ - $ - $ 12,420 $ 12,420
Mower (2006) $ - $ - $ - $ - $ 5,970 $ 5,970
Spreader (2003) $ - $ - $ - $ - $ 27,460 $ 27,460
Project Total $ - $ - $ - $ - $ 419,980 $ 419,980
Planned Financing
General Fund Revenues $ - $ - $ - $ - $ 419,980 $ 419,980
Fiscal Year Totals $ - $ - $ - $ - $ 419,980 $ 419,980
FY 2018/2019 – Page 47