Zoning Commission
Regular MeetingNorwalk, CT · June 3, 2021
Minutes
CITY OF NORWALK
ZONING COMMISSION
June 3, 2021
PRESENT: Louis Schulman, Chair; Rod Johnson; Galen Wells; Nick Kantor; Mike
Witherspoon and Josh Goldstein (arrived at 6:24 pm)
STAFF: Steve Kleppin (arrived after the meeting had begun); Bryan Baker; Michelle
Andrzejewski
OTHERS: Matthew Edvardsen; Colin Grotheer; Mike Galanty; Vincent Hynes; Eric Raines;
Atty Adam Blank; Mark Hopper; Ricardo Ceballos; Leonard D’Andrea; Matt
Popp
I. CALL TO ORDER
Mr. Schulman called the meeting to order at 6:03 p.m. It should be noted that this
meeting was held on Zoom.com with all participants calling in, separately.
II. ROLL CALL
Mr. Baker called the roll. Mr. Schulman asked the commissioners to vote on the
minutes at the beginning of the meeting but after realizing that there were not enough
commissioners to vote on the minutes, he said they would vote on them as usual, at the end of
the meeting. Mr. Schulman then discussed the rules for the public hearings.
III. PUBLIC HEARINGS
a. #2021-09 SP – Spinnaker Real Estate Partners LLC/Coastal Lofts LLC – 8, 10
and 18 Monroe St; 2 and 4 Chestnut St; 75 and 77 South Main St – Proposed multi-
building, mixed-use project to include commercial office, retail, restaurant, residential
(150 units) and off-street parking uses
Mr. Schulman opened the public hearing. He said that it would be continued into the
next meeting as there were team members missing at this meeting.
Matthew Edvardsen began the presentation with a description of the ownership of the
property. He also described previous projects that the applicant had completed in Norwalk. The
abutting neighbors had been notified and the certified, return receipt cards had been delivered
to the Zoning Department. He gave a brief description of the parcels that are a part of the
project. Two of the buildings have been determined to be historically significant. Included in the
project would be affordable housing units. He noted that there had been challenges on the
design. He then introduced the project team.
Zoning Commission
June 3, 2021
Page 1 of 6
Colin Grotheer, the architect on the project, continued the presentation by orienting the
commissioners as to the location of the property on an aerial map. He showed them pictures of
the current structures on the properties. He described the public space which would be across
from Police headquarters. He noted that the landscaping plan had been changed and would be
described in detail by Mr. Raines. He also described the lighting plan as well as the traffic plan
in which there were ongoing talks. He showed them the floor plans for each individual floor,
including parking levels and residential units. There would be a pool and bar amenity. Some
units would have terraces. He also showed them the elevations for the buildings. He described
the work to be done on the historical buildings. He described the shade structures which would
be built out and used by the tenants. He then discussed the windows on the units. He also
described the materials being used on the buildings as well as some ideas for signage. He then
showed the location of the workforce housing units.
There was a discussion about the number of workforce housing units. Mr. Edvardsen
described how they would help the residents currently in these buildings when demolition
begins. There was also a discussion about outreach to the current commercial and residential
tenants. There was then a discussion about reaching out to local councilpersons. It did not
appear that the applicant had a plan to do so. They were asked to have a plan ready at the
next Zoning Commission meeting in June. There was also a discussion about the addition of
green infrastructure.
Mike Galanty, the traffic engineer, continued the presentation by describing how the
study was done. The levels of service would remain the same. They would work with the city
on street parking. He discussed Chestnut Street potentially becoming a one way street.
Vincent Hynes, the engineer on the project, continued the presentation by explaining
which sign-offs the applicant has received from the city. He described the proposed
streetscape. He also described meetings with local utilities. He then discussed storm water
management as well as the green infrastructure proposed. There are some incentives for
green infrastructure from some utility companies.
Eric Raines, the landscape architect, continued the presentation by showing them the
proposed landscape plan, especially the entrance to the building. He noted that there would be
some furniture for seating options. He described the use of ballards. There was a discussion
about the maintenance of the area in the winter as well as whether the pavers were permeable,
which would not be. Turf would be used because the applicant expected a lot of wear and tear.
There was a discussion about street trees on Chestnut and Main Street.
There were no comments in support or against the application.
Mr. Kleppin spoke about the next steps for this application. The 3rd party consultant
would have his report completed within the next few weeks so the public hearing would remain
open until the next Zoning Commission meeting on June 23.
Zoning Commission
June 3, 2021
Page 2 of 6
Mr. Edvardsen thanked the commissioners and would put together a plan for meeting
with the neighbors. They would be open to suggestions from Zoning Department staff.
Mr. Schulman noted that the public hearing would remain open and hoped to conclude
at the next Zoning Commission meeting.
IV. REVIEW AND ACTION ON PENDING APPLICATIONS
a. Action on item III. a.
Since the commissioners had not heard from all parties at the public hearing, it
remained open and no action was taken.
V. REVIEW AND ACTION ON NEW APPLICATIONS
a. #2021-16 R/SP – 132 Flax Hill, LLC – 132 Flax Hill Road – Proposed
Building Zone Regulation text amendment to reduce the minimum lot size requirement
for historic incentive developments in conjunction with a five (5) unit historic incentive
development – Preliminary review
Atty Adam Blank, the attorney for the applicant, began the presentation by orienting the
commissioners as to the location of the property on an aerial map. He showed them a picture
of the current property as well as the proposed structure. The property is on the historical
inventory. He also noted that there is a text amendment as a part of the application. He showed
them pictures of comparable structures in Norwalk. He described the driveway which would be
shared with a neighboring property. They would create some additional green space. He
discussed the waivers they were requesting. He described the parking spaces and that they
would like 1 less space. He noted that they had received most of their sign-offs from CEAC.
Mark Hopper, the architect on the project, continued the presentation by showing the
commissioners the proposed floor plans. The number of units has increased. There would be
more sprinklers in order to eliminate fire escapes. He described the style of the building. He
showed them the elevations and the materials to be used. The color palette would be a historial
one.
Ricardo Ceballos, the engineer on the property, showed the commissioners photos of
the current property. He explained the greenspace and proposed shared driveways. He
explained the storm water management system.
There was a discussion about the reduction in the number of parking spaces required.
There were also concerns about whether regulations were being waterdowned with this
application and whether the city was giving too much consideration. Atty Blank and Kevney
Moses addressed some of these concerns. Atty Blank noted that this was a smaller
Zoning Commission
June 3, 2021
Page 3 of 6
development than other recent historical projects in the city. There was also a concern that
there was a loss of a 3 bedroom unit. Mr. Moses noted that 3 bedroom units in his portfolio are
less likely to be leased. Mr. Kleppin described staff’s comments on this application.
** MR. JOHNSON MOVED: THEREFORE BE IT RESOLVED by the Norwalk Zoning
Commission that application #2021-16 R/SP – 132 Flax Hill, LLC – 132 Flax Hill Road –
Proposed Building Zone Regulation text amendment to reduce the minimum lot size
requirement for historic incentive developments in conjunction with a five (5) unit historic
incentive development should be referred to the Planning Commission and the Historical
Commission be APPROVED.
Ms. Wells seconded.
Rod Johnson; Galen Wells; Nick Kantor; Mike Witherspoon and Josh Goldstein
approved.
Louis Schulman opposed.
No one abstained.
b. #2021-17 SP – FRAP, LLC – 40 Fullin Road – Proposed 40-unit elderly
housing development – Preliminary review
Atty Blank began the presentation by orienting the commissioners as to the location of
the property on an aerial map. He explained the proposed project and introduced the project
team. He then showed them the proposed renderings and noted that they were a similar senior
housing project at 125 Richards Avenue. They are also waiting for the Conservation
Commission’s approval.
Leonard D’Andrea, the engineer on the project, continued the presentation by
discussing the driveway. He noted that the site is fairly level. He discussed the storm water
management as well as driveway slopes. There was a discussion about solar panels on the
roofs.
Matt Popp, the landscape architect, continued the presentation by showing the
commissioners the landscape plan. He noted the habitats on the site, including the wetlands
area. He described the proposed plantings.
There was a discussion about the trees that would be cut down. Atty Blank noted that
as of right, the applicant could bulldoze the trees if this was a subdivision application. There
was also a discussion about outreach to neighbors. Zoning Department staff made comments
as to the application. There was a discussion about next steps for the application.
c. #2021-20 R/M – Zoning Commission – Building Zone Regulation Text
Amendment to create the East Norwalk Village TOD Zone (EVTZ) and to allow dwelling
units and artist live/work spaces within the Industrial #1 Zone within designated areas
Zoning Commission
June 3, 2021
Page 4 of 6
on the map entitled “Designated I1 Properties for Residential Units in East Norwalk” by
special permit in conjunction with a Building Zone Map Amendment to create the EVTZ –
Preliminary review
Mr. Kleppin began the presentation by noting that they had begun discussing this topic
at previous meetings. He shared a map of the proposed zoning for the East Norwalk TOD area
and discussed the geography of the area. It was to show them where changes would be made.
He also discussed the bulk and height standards. He then discussed the special permit
process as well as the design guidelines. He also noted the site plan approval process by
being less restrictive. There was a discussion about the first floor for commercial tenants. He
described street-activating uses and a point system for amenities.
There was a discussion about the amenity system point system. Mr. Kleppin did not
think that other towns had it. There was also a discussion about adding one of the amenities to
the regulations which would require one of them. There was a discussion about the problems
of the area. It was also discussed as to adding it to the zoning regulations re-write. Mr. Kleppin
said that this item would be on the next Zoning Commission agenda. If the commissioners had
questions, they could send them to him.
VI. DISCUSSION OF OTHER ITEMS
a. Status report on the Industrial zones study, zoning regulations rewrite and
South Norwalk TOD study
With regards to the status of the industrial zones study, Mr. Kleppin said that his staff
were editing the draft which would then be sent back to the consultant. It would probably be
sent back to the committee to review in July. He also noted that the Planning Committee of the
Common Council had allocated funds for an additional study of the waterfront. Ms. Wells would
also sit on this committee with Mr. Roina.
For the Zoning regulations re-write, Mr. Kleppin noted that most of the commissioners
had scheduled a time to meet with the consultants. All department heads who interact with the
Planning and Zoning staff would meet with the consultants. The public meetings would be in
September. They were not sure if these meetings would be in person or on Zoom. Mr. Kleppin
would send confirmations to the commissioners for their scheduled time.
For the South Norwalk TOD study, Mr. Kleppin said there was a draft that was shared
with the committee. There would be further public engagement on the following Monday.
Zoning Commission
June 3, 2021
Page 5 of 6
b. Discussion of Housing Bills and combining the Planning & Zoning
Commissions
The bill on the state level had been signed. Mr. Kleppin noted that there could be
problems with the parking standards under the new regulations. The city might be able to opt
out of some of these provisions. Mr. Baker discussed provisions for the accessory apartments
and that there would be revisions to the city’s regulations. He would send a memo to the
Zoning commissioners about it.
The ordinance committee had met about combining the Planning and Zoning
Commissions. There was a concern about the workload. Mr. Schulman and Mr. Kleppin met
with Tom Livingston to discuss the Capital Budget process.
VII. APPROVAL OF MINUTES: May 19, 2021
** MS. WELLS MOVED to approve the May 19, 2021 meeting minutes.
Mr. Johnson seconded.
Louis Schulman; Rod Johnson; Galen Wells; and Josh Goldstein approved.
No one opposed.
Nick Kantor and Mike Witherspoon abstained.
VIII. COMMENTS OF DIRECTOR
Mr. Kleppin had no other comments.
IX. COMMENTS OF COMMISSIONERS
Mr. Schulman reminded the commissioners that they should be aware of what they say
during the comments portion of the meeting, especially with regards to a proposed application.
It could later become problematic especially if an applicant decides to take the city to court.
X. ADJOURNMENT
Mr. Goldstein made a Motion to Adjourn.
Mr. Witherspoon seconded.
Louis Schulman; Rod Johnson; Galen Wells; Nick Kantor; Mike Witherspoon and
Josh Goldstein approved.
No one opposed.
No one abstained.
The meeting was adjourned at 9:31 p.m.
Respectfully submitted,
Diana Palmentiero
Zoning Commission
June 3, 2021
Page 6 of 6
Agenda
REGULAR MEETING AGENDA
ZONING COMMISSION
THURSDAY, JUNE 3, 2021 – 6:00 P.M.
* VIRTUAL MEETING TO BE HELD ONLINE *
Public Participation instructions below!
CITY OF NORWALK, CT
*The Chairman reserves the right to change the order of the agenda*
I. CALL TO ORDER
II. ROLL CALL
III. PUBLIC HEARINGS
a. #2021-09 SP – Spinnaker Real Estate Partners LLC/Coastal Lofts LLC – 8, 10
and 18 Monroe St; 2 and 4 Chestnut St; 75 and 77 South Main St – Proposed
multi-building, mixed-use project to include commercial office, retail, restaurant,
residential (150 units) and off-street parking uses
IV. REVIEW AND ACTION ON PENDING APPLICATIONS
a. Action on item III. a.
V. REVIEW AND ACTION ON NEW APPLICATIONS
a. #2021-16 R/SP – 132 Flax Hill, LLC – 132 Flax Hill Road – Proposed Building
Zone Regulation text amendment to reduce the minimum lot size requirement for
historic incentive developments in conjunction with a five (5) unit historic
incentive development – Preliminary review
b. #2021-17 SP – FRAP, LLC – 40 Fullin Road – Proposed 40-unit elderly housing
development – Preliminary review
c. #2021-20 R/M – Zoning Commission – Building Zone Regulation Text
Amendment to create the East Norwalk Village TOD Zone (EVTZ) and to allow
dwelling units and artist live/work spaces within the Industrial #1 Zone within
designated areas on the map entitled “Designated I1 Properties for Residential
Units in East Norwalk” by special permit in conjunction with a Building Zone
Map Amendment to create the EVTZ – Preliminary review
VI. DISCUSSION OF OTHER ITEMS
a. Status report on the Industrial zones study, zoning regulations rewrite and South
Norwalk TOD study
b. Discussion of Housing Bills and combining the Planning & Zoning Commissions
VII. APPROVAL OF MINUTES: May 19, 2021
VIII. COMMENTS OF DIRECTOR
IX. COMMENTS OF COMMISSIONERS
X. ADJOURNMENT
Links to application documents for new or pending applications can be found below:
- 10 Monroe Street: https://www.norwalkct.org/2525/10-Monroe-Street
- 132 Flax Hill Rd: https://www.norwalkct.org/2610/132-Flax-Hill-Road
- 40 Fullin Rd: https://www.norwalkct.org/2615/40-Fullin-Road
- East Norwalk Village TOD Zone: https://www.norwalkct.org/2670/East-Norwalk-
Village-TOD-Zone
To allow Public Access, anyone may access this meeting by telephone, Zoom, and/or the
City of Norwalk YouTube Channel. Specific instructions and links can be found at:
https://www.norwalkct.org/1913/Meeting-Notices
Telephone access (Listening only)
● Dial: (646) 558-8656
● Enter webinar ID: 833 7463 5766
The Public may watch this meeting at: https://us02web.zoom.us/j/83374635766
For those that wish to view, but are not participating, the Live Stream can be seen on the City of
Norwalk YouTube channel. PLEASE NOTE THAT DUE TO SCHEDULING CONFLICTS
IT IS NOT GUARANTEED THAT A LIVE YOUTUBE STREAM WILL BE
AVAILABLE FOR THIS MEETING, PLEASE USE THE ZOOM LINK ABOVE TO
WATCH THE MEETING IF NO YOUTUBE STREAM IS AVAILABLE:
norwalkct.org/youtube
This meeting will also be recorded and a copy of the audio recording will be posted on the City’s
website within seven (7) days after the meeting.
Members of the public who wish to provide public comment are encouraged to submit
those via email in advance of the meeting to skleppin@norwalkct.org. For these
comments to be read into the record, they should be submitted at least three hours in
advance of the meeting start time