Legislative Hearings
Regular MeetingSt. Paul, MN · February 23, 2016
Minutes
15 West Kellogg Blvd.
City of Saint Paul Saint Paul, MN 55102
Minutes - Final
Legislative Hearings
Marcia Moermond, Legislative Hearing Officer
Mai Vang, Hearing Coordinator
Jean Birkholz, Hearing Secretary
legislativehearings@ci.stpaul.mn.us
651-266-8585
Tuesday, February 23, 2016 9:00 AM Room 330 City Hall & Court House
9:00 a.m. Hearings
Remove/Repair Orders
1 RLH RR 15-13 Ordering the razing and removal of the structures at 870 FULLER
AVENUE within fifteen (15) days after the June 3, 2015, City Council
Public Hearing. (To be referred back to Legislative Hearing on
January 26)
Sponsors: Thao
Laura Krenz, Lindquist & Vennum LLP, appeared representing E. Diane Smith,
owner.
Greg Finzell, Rondo Community Land Trust, appeared hear the end.
Inspector Steve Magner, Vacant Buildings:
-update
-read letter sent to Ms. Krenz on Jan 27, 2015 (attached) by Mai Vang
-since then, he had a conversation with Greg Finzell, Rondo, who's been involved
with these hearings over the last couple of months; he was asking about the
possibility of Summer Smith, Ms. E. Dianne Smith's son, might be the position to act
as an agent for his mother for doing some of the rehabilitation and what would this
body be looking for
-he told Mr. Finzell that our standard package of: 1) Performance Deposit; 2) Code
Compliance (done); 3) contractor bids based off code compliance; 4) work plan with
timelines; 5) misc. issues like probate, taxes, etc; Mr. Finzell was in contact with Ms.
Krenz regarding those issues; Ms. Krenz also sent an email to Mai Vang
-subsequently, he had a conversation with Ms. Moermond
-thinks that we need to be clear that DSI is willing to provide Ms./Mr. Smith with
permits for rehabilitation as long as the main issues can be addressed as to the
ability, the funding, the timing and the resources
Ms. Krenz:
-she did speak with Greg Finzell and does understand what needs to happen
-they did receive Power of Attorney from James Oliver; it will be filed and sent to Ms.
Smith to sign (will send a copy)
-expects that probate will be done in less than 6 months
-currently, Summer Smith is interested in doing the rehabilitation work; he will hire
Maliq Davis, who is a general contractor; she will have Mr. Davis prepare the bids,
etc.
City of Saint Paul Page 1
Legislative Hearings Minutes - Final February 23, 2016
-finance the cost of rehab: Mr. Smith is willing to obtain financing but he doesn't have
any interest in the home and as she understands it, you can't transfer ownership until
that work is done; are there any exceptions? Could we at least get Mr. Smith a
partial ownership in the home so that he could obtain financing?
Mr. Magner:
-Chap 33 of the code outlines the prohibition of transfer of ownership for Category 3
buildings; we have in this forum reviewed documents in regards to a contract that
identifies the title will transfer after the nuisance condition is rectified; he doesn't
know, because he's not the lender, if that would qualify for stated ownership to obtain
that goal; you'd have to work with the lender about that
-we've recognized that there's contractual agreements that identify the 3rd party is
going to be in the process of doing the rehabilitation and sometimes in lieu of the title
but the actual physical title transfer doesn't occur until after the issuance of the Code
Compliance Certificate, which identifies that the nuisance condition has been abated
Ms. Krenz:
-her sense is that Mr. Smith had talked to a number of lenders and they are unwilling
to finance unless is has some ownership interest
Mr. Magner:
-what he's saying is that the actual transfer of title can't occur until the nuisance
condition is abated but if there's a contractual ownership agreement and the bank
accepts that, then, that's their decision
-we can't make a recommendation on that specific transfer of title to occur prior to
that and send it to the City Council because it's in direct violation of an Ordinance that
has been identified and passed by the City Council
-there can be a contractual agreement but there can't be a physical transfer of title
-if there were a partial ownership interest that was passed on and was put into Mr.
Smith's name and the county agreed with that, then, it wouldn't be an issue; you'd
have to go the county and find out how that would work; currently, the property is in 2
parties' names and if the deceased party's interest was transferred to Summer, in this
case, then, we would clearly meet that threshold that he's assuming the lender would
accept
Ms. Krenz:
-thinks what the plan would be that Dianne's Smith's interest (owns half of the
property now & the other half is owned by her mother, who's deceased), but if Ms.
Smith is willing to currently transfer her half interest and once the probate process
was completed, the entire interest could be transferred
Mr. Magner:
-no sure that he can speak to that
-since we are still waiting for probate to be worked out, we should take this under
advisement
-recommends that we lay this matter over for a couple hearing dates; in that time, he
can take that question back to the City Attorney, who would review it and give us a
better feel for it
Ms. Vang:
-will Lay this Over to Mar 22, 2016 LH to gather input from CA
Mr. Finzell arrived. Security downstairs decided to open up his briefcase and go
throught it thoroughly.
Ms. Vang:
Layover to give attorney a chance to work with Dianne Smith on the probate plan.
City of Saint Paul Page 2
Legislative Hearings Minutes - Final February 23, 2016
Laid Over to the Legislative Hearings due back on 3/22/2016
2 RLH RR 16-6 Denying request for a stay of enforcement of Council File RLH RR
15-37 ordering the rehabilitation or razing and the demolition of the
structures at 2227 BEECH STREET within 30 days after the October
7, 2015 City Council Public Hearing.
Sponsors: Prince
Melanie Smith, Real Estate Broker, The Ewing Group LLC, representing new owners,
Shellpoint Mortgage, appeared.
This was previous owned by Ocwen.
Inspector Steve Magner, Vacant Buildings:
-at previous hearings, this property was represented by a different law firm; they
came to the table with a proposal for rehabilitation; then, at the last hearing, they
came and indicated that Ocwen had transferred their ownership to a different
mortgage company and that were no longer under retainer to do this work; so, the
original construct that was put together by the hearing officer does not exist
-the property was then put back to City Council and we were informed that this party
has come forward and wants to do the rehabilitation; we had received some
documentation in regards to that; the foremost issue today is that the commitment
letter for the availability of funds for the rehabilitation was not clarified; in her words,
Ms. Moermond wrote, "This letter is insufficient; it has a qualifying comment." That
letter submitted by the Ewing Group (attached) states: This letter is to serve as a
commitment to rehabilitate the property referenced above in accordance to the bids
provided and per city code. Final commitment approval is subject to investor review.
It's his understanding that the hearing officer did not believe that the last sentence
provided enough documentation or caused concern for that documentation; that
issue needs to be resolved before we can move forward any type of recommendation
-the other documents that were provided probably meet that threshold but we need to
have a commitment from the ownership that they have dedicated the specific funds
for rehabilitation and not that they're going to make that decision after the fact; the
City Council needs to make that final decision and issue a grant of time; then, the
mortgage company can have their servicer hire the contractors and do the
rehabilitation
Ms. Smith:
-that makes sense; unfortunately, the attorney representing Ocwen did not provide
the letter or identify where things were at; so the Feb 10 deadline was almost
impossible to meet
-the bids that are inside the packets that she sent over to Mai
-she has not seen the other rehab plans from Ocwen; so, she doesn't know if the
investor is the same or not
-her job is, essentially to market and sell the property whether it ends up being razed
or ...
-she has not heard back as of this morning if they have the go ahead
-in her correspondence with Mai, she has identified the process of when she
completed her broker price opinion, which included what she thought the property
would sell for (just the lot) and also what the property would sell for if it were demoed;
this property was a little bit newer housing stock for the immediate area and it was
her recommendation, based on current costs, it would make sense to rehab it vs.
demo it; that was the asset manager's opinion also
-their goal is to rehab the property but we're not the decision maker; the investor is
and whether the investor changed hands or not, she doesn't know; so, it's possible
that the investor is the same
City of Saint Paul Page 3
Legislative Hearings Minutes - Final February 23, 2016
Mr. Magner:
-believes that it would be most prudent to Lay this Over to the end of Mar and in the
mean time, if your client can get a guaranteed commitment of funds, then City
Council can make a decision on it
Ms. Smith:
-as soon as I have the go ahead, I'll reach out to Mai to re-schedule this or have a
Council meeting to wrap this up
Mr. Magner:
-thinks there's some confusion in regards to the $5000 Performance Deposit; the
original law firm representing Ocwen posted a Performance Deposit on Jan 5, 2016;
we just need to know if that deposit will stay in place or are we, for some reason,
going to give that $5000 back and they you post a new deposit - that needs to be
aired out
Ms. Smith:
-she is working on that, too; she will ask if the $5000 is part of the transfer or will the
other law firm contact the city to ask for their $5000 back
Ms. Vang:
-she will Lay this Over to Mar 22, 2016 LH
Ms. Smith, representing ShellPoint, is waiting to hear from the investor on plans for
the property. Ms. Smith is to send any communications by March 16. Legislative
Hearing Officer is asking for a revision commitment of financial letter and post a
$5,000 performance deposit.
Laid Over to the Legislative Hearings due back on 3/22/2016
3 SR 16-7 Reviewing request of owner to have Council reconsider its Order to
Remove or Repair the Structures at 805 HUDSON ROAD.
Sponsors: Prince
Patrick Nseumen, owner, appeared.
Inspector Steve Magner, Vacant Buildings:
-The building is a one-story wood frame commercial building on a lot of 3,920 square
feet. According to our files, it has been a vacant building since July 6, 2012.
-The current property owner is Patrick Nseumen per AMANDA and Ramsey County
Property records.
-On September 17, 2015 an inspection of the building was conducted, a list of
deficiencies which constitute a nuisance condition was developed and photographs
were taken. An ORDER TO ABATE A NUISANCE BUILDING was posted on
September 30, 2015 with a compliance date of October 30, 2015. As of this date, the
property remains in a condition which comprises a nuisance as defined by the
legislative code.
-Taxation has placed an estimated market value of $28,300 on the land and $700 on
the building.
-Real estate taxes are current.
-The Vacant Building registration fee was paid by assessment on July 31, 2015.
-A Team Inspection was done on October 17, 2014, which would have to be re-done
at this time; it's more than 1 year old
-As of December 7, 2015, the $5,000 performance deposit has not been posted. (Has
been posted since this was written)
City of Saint Paul Page 4
Legislative Hearings Minutes - Final February 23, 2016
-There have been eleven (11) SUMMARY ABATEMENT NOTICES since 2012.
-There have been six (6) WORK ORDERS issued for:
- Garbage/rubbish
- Grass/weeds
- Snow/ice
-A letter from the Department of Parks and Recreation, Forestry Division, was issued
on December 7, 2015 to remove a dangerous tree on private property with a
compliance date of December 21, 2015.
Code Enforcement Officers estimate the cost to repair this structure exceeds
$40,000. The estimated cost to demolish exceeds $12,000.
-should also be noted that this commercial building is located in a residential zoning
district and it's lost its legal nonconforming status
-the owner filed an application to rezone the property from RT-1 family residential to a
T-2 transitional neighborhood; the Zoning Committee of the Planning Commission
met Nov 24, 2015 and recommended denying the application to rezone the property
and the full Planning Commission was scheduled to take up the matter on Dec 4,
2015.
-subsequent to that, City Council denied that request to rezone
-so it defaulted back to the original RT-1, so it would have to be some type of
residential use
-that hearing on Dec 8, 2015, no one was present; then, it went to City Council Jan 6,
2016 when the Appellant did appear; since then, a letter was mailed Jan 27, 2016 to
Mr. Nseumen (attached) from Mai Vang, Legislative Hearing Coordinator
Amy Spong, Heritage Preservation Commission (HPC):
-has nothing additional to report
-the HPC did adopt a resolution on Nov 19, which has been in the record all along; for
the record, the HPC concluded that "The proposed demolition will have no adverse
effect on the program for preservatioarchitectural control on the Dayton's Bluff
Heritage Preservation District for the findings that were established in the
resolution..." (Attached)
-it was built during a period of significance for the district but it's been altered; you
can't recognize it's original use (it had been a gas station)
Mr. Nseumen:
-the application from RT-1 to RT-2 was denied
-he wrote out a $5,000 for the Performance Deposit
-if that structure was meant for residential use, he would have no problem in keeping
it as residential
-another critical point is that the building is in good shape, regardless of any
inspection; there are no structural bones; it's brick with no issues; the roof is missing
a couple shingles only
-it was a running business a couple years ago; really all that happened was that it
was boarded up
-it seems to wasteful to demolish a building that is fit for use - fit to contribute to the
community
-as I've noted in previous meetings, he has made good faith attempts prior to it falling
into a Category 3 status; he opened up permits to complete the code compliance
repairs; he was stopped - the permit was denied because of it's gray zoning status;
there's been a true attempt on his part to bring this building back; the quagmire that
it's in because of it's zoning status has made it completely difficult
-he is committed to show proof of funds and going through whatever process he
needs to; he wrote the check for the performance deposit
-his goal is to re-apply for rezoning or conditional use; the previous owner had a
conditional use for business but once she left, it reverted back to it's original use;
almost forced into a terrible situation because of it's status; even from a financing
City of Saint Paul Page 5
Legislative Hearings Minutes - Final February 23, 2016
perspective, it puts him at a disadvantage
-the next step in this process was this hearing; the outcome of this hearing, he
believes will be taken into context
-rezoning is dependent on this but his process.....that's what he doesn't understand;
he's committed to bringing the property back
-what does he need to do next
-he's more than happy to go through a team inspection; just basic things to do to get
it out of the city's angry list; instead of tying him to a specific zoning request, can he
just bring the building up to it's basic standards; the list was very small; not big items
- is committed to fixing the items on the list; doesn’t think that’s tied to what use it’s
going to be
Ms. Vang:
-as of today, if you were to bring the property into compliance, it would have to be in
compliance with the RT-1 zoning definition but if you’re proposing to make it an RT-2
zone, we’d have to wait until the zoning piece is resolved
Mr. Magner:
-unfortunately, today the only thing I see you able to move forward with is you could
apply for a code compliance inspection to meet the RT-1 zoning (single family
residential) based on the size of the property; they would send a team of inspectors
out there and they would give you a definitive list; from there, you could come back to
this forum with a work plan, including timeline, and a financing plan and meeting the
criteria; however, that doesn’t sound like that’s what you want to do; you want to
change the actual zoning, not get a conditional use; if you want to do that, you have
to go through a rezoning process
-maybe we should Lay this Over for 3-4 weeks to see what you find out about what
you ultimately want to do with the property; you could get the code compliance
inspection done; get your contractors to put in bids; put some estimates and financing
behind that in a work plan, etc; if you decide to get the property re-zoned, you'd need
to make application for that
-you'd have to meet the requirements for a single family residential structure; he
doesn't know whether this property meets that; you need ample space; you'd have to
have a bathroom, a bedroom, egress from the bedroom; obviously, there'd be
structural changes you'd have to make to the property to accommodate that use
Ms. Spong:
-has a couple thoughts; this building was never built as a residence; it's not a
situation created by the owner; when all of these commercial corners were built, they
were not zoned residential; they got zoned residential later on
-thinking of another situation - we had a lot of meetings on a property where the
zoning was not yet resolved and they were going to go get some additional permits....
they weren't going to put in a kitchen, bathroom and bedroom; there was some
discussion and we did have a plan to move forward with the building official at that
time; the zoning was underway but we just didn't have a final decision of that zoning
decision; this is a little different because we've had a denial already of a rezoning
decision
-asked Mr. Nseumen if he's met with zoning staff since the last denial?
Mr. Nseumen:
-he had, just to get a sense of what direction, what options he had; with no
guarantee, he did get some indication that it would get looked at if he did propose
something; initially, he is looking at opening a small cafe with no drive thru window;
he's committed to re-apply for T-1 with great hope that it gets approved and he's
willing to go thru the re-application process
City of Saint Paul Page 6
Legislative Hearings Minutes - Final February 23, 2016
Mr. Magner:
-he does not have a recommendation for Mr. Nseumen one way or another
-thinks it's prudent for him to check your recourse to finding out how to get the zoning
changed so that you could rehabilitate the structure for the specific use that you want
-recommends a Layover to the end of Mar to get more information on the rezoning
Mr. Nseumen:
-he will go through the rezoning process then
Ms. Vang:
-will Lay Over to Mar 22, 2016 LH to give Mr. Nseumen time to explore the rezoning
Owner wants to re-apply for rezoning. Recommendation is forthcoming.
Laid Over to the Legislative Hearings due back on 3/22/2016
4 RLH RR 16-7 Ordering the razing and removal of the structures at 82 GEORGE
STREET WEST within fifteen (15) days after the March 16, 2016, City
Council Public Hearing.
Sponsors: Noecker
Remove the building within 15 days with no option for repair. No one appeared.
Inspector Steve Magner, Vacant Buildings:
-The building is a one and one-half story wood frame single-family dwelling on a lot of
3,920 square feet. According to our files, it has been a vacant building since
December 3, 2013.
-The current property owner is Robert D. Sherry per AMANDA and Ramsey County
Property records.
-On December 10, 2015 an inspection of the building was conducted, a list of
deficiencies which constitute a nuisance condition was developed and photographs
were taken. An ORDER TO ABATE A NUISANCE BUILDING was posted on
December 18, 2015 with a compliance date of January 17, 2016. As of this date, the
property remains in a condition which comprises a nuisance as defined by the
legislative code.
-Taxation has placed an estimated market value of $11,900 on the land and $81,100
on the building.
-Real estate taxes are delinquent for the following: $2,437.15 for 2012; $2,111.88 for
2013; $2,129.92 for 2014; and $6,569.22 for 2015. Total amount owing to date is
$13,248.17. The property is scheduled for tax forfeiture July 2016.
-The Vacant Building registration fees were paid by assessment on January 6, 2016.
-As of February 19, 2016, a Code Compliance Inspection has not been done.
-As of February 19, 2016, the $5,000 performance deposit has not been posted.
-There have been sixteen (16) SUMMARY ABATEMENT NOTICES since 2013.
-There have been fifteen (15) WORK ORDERS issued for:
- Garbage/rubbish
- Boarding/securing
- Grass/weeds
- Snow/ice
- Remove/repair wood fence
-Code Enforcement Officers estimate the cost to repair this structure exceeds
$50,000. The estimated cost to demolish exceeds $15,000.
-DSI, Division of Code Enforcement Resolution submitted for consideration orders
the property owner to repair or remove this structure within fifteen (15) days; if not the
resolution authorizes the Division of Code Enforcement to demolish and assess the
costs to the property.
City of Saint Paul Page 7
Legislative Hearings Minutes - Final February 23, 2016
Amy Spong, Heritage Preservation Commission (HPC):
-built in 1900; a small classical revival style cottage
-original owner was Joseph Brechner; builder was L.M. Baumeister
-it is setback from the sidewalk by quite a bit
-originally, there were 4 detached family dwellings on one large lot; 2 auto garages
were added up to 1946; at some point, the parcels were all divided into individual
single family lots
-originally had a full width 1-story open front porch, which has been enclosed
-original clapboard siding has been wrapped in aluminum
-original 1 1/12 story featured a rectangular layout on a concrete block foundation
-has an intersecting gable roof features gable return around the 2nd floor windows;
the windsymmetricalmetrical
-last time West Side was surveyed to identify historic resources was 1980, which is
considered out of date; we can't use a lot of that survey information from that time; do
not have an updated historic survey information
-given the unusual setback, this property does not have potential for local designation
or national register
-SHPO said it is not eligible for national register
-demolition will not have an adverse affect
Ms. Nhia Vang:
-will recommend removal within 15 days with no option for rehabilitation
Referred to the City Council due back on 3/16/2016
5 RLH RR 16-8 Ordering the rehabilitation or razing and removal of the structures at
595 JESSAMINE AVENUE EAST within fifteen (15) days after the
March 16, 2016, City Council Public Hearing. (To be referred to March
22 Legislative Hearing)
Sponsors: Bostrom
No one appeared.
Inspector Steve Magner, Vacant Buildings:
-The building is a two-story wood frame single-family dwelling with a detached
two-stall garage on a lot of 3,920 square feet. According to our files, it has been a
vacant building since February 11, 2015 due to a fire in which there was a fatality.
-The current property owner is Mao Vang and Dao P. Yang per AMANDA and
Ramsey County Property records.
-On December 2, 2015 an inspection of the building was conducted, a list of
deficiencies which constitute a nuisance condition was developed and photographs
were taken. An ORDER TO ABATE A NUISANCE BUILDING was posted on
December 16, 2015 with a compliance date of January 15, 2015. As of this date, the
property remains in a condition which comprises a nuisance as defined by the
legislative code.
-Taxation has placed an estimated market value of $8,800 on the land and $100,700
on the building.
-Real estate taxes for 2015 are delinquent in the amount of $916.73.
-The Vacant Building registration fees were paid by assessment on June 30, 2015.
-A Code Compliance Inspection was done on June 29, 2015.
-As of February 19, 2016, the $5,000 performance deposit has not been posted.
-There has been one (1) SUMMARY ABATEMENT NOTICE issued since 2015 which
has resulted in no WORK ORDERS being issued.
-Code Enforcement Officers estimate the cost to repair this structure is $60,000 to
$75,000. The estimated cost to demolish is $12,000 to $15,000.
City of Saint Paul Page 8
Legislative Hearings Minutes - Final February 23, 2016
-it is his understanding in this case, the Appellant had contacted us seeking to have
this matter laid over; they could not appear today; staff has no issues with having this
matter laid over
Mai Vang:
-they are asking for a pretty long Lay Over due to a death in the family; Ms.
Moermond denied that; she laid it over to Mar 22, 2016
Mr. Magner:
-seems as though Mar 22 is reasonable due to the recent death
Amy Spong, Heritage Preservation Commission (HPC):
-built in 1887; a 2-story Greek revival cottage
-frame; limestone foundation; rectangular layout with a forward facing gabled roof
-side gables are support by projecting _
-porch has been enclosed over time
-some windows appear to be vinyl replacement sash
-original 4-inch clapboard underneath vinyl
-area was within the last survey in 2011, which is considered up to date; it was not
identified as a potential historic resource on a local level nor was it identified as
having eligibility for the national register
-did not see a fire report; Ms. Vang handed her one to review
-SHPO - not eligible for national register
-demolition will have no adverse affect
Ms. Vang:
-asked if they need to do another code compliance inspection report
Mr. Magner:
-he assumes that at this point in the process, we won't need another code
compliance inspection report; if it keeps getting laid over until the end of the year, we
might
-there were 2 fires at this property
Ms. Vang:
To refer back to Legislative Hearing on March 22 and to continue the public hearing
to April 6.
Referred to the City Council due back on 3/16/2016
6 RLH RR 16-9 Ordering the rehabilitation or razing and removal of the structures at
839 THOMAS AVENUE within fifteen (15) days after the March 16,
2016, City Council Public Hearing. (To be referred back to Legislative
Hearing on March 22; Council public hearing to be continued to April
6)
Sponsors: Thao
Jared Goerlitz, PFB Law, appeared on behalf of JN Homes LLC.
John McKusick, McKusick Business Services, owner, also appeared.
Inspector Steve Magner, Vacant Buildings:
-The building is a two-story, wood frame, single-family dwelling with a detached
two-stall garage on a lot of 4,792 square feet. According to our files, it has been a
vacant building since May 8, 2013.
City of Saint Paul Page 9
Legislative Hearings Minutes - Final February 23, 2016
-The current property owner is Mckusick Building Services LLC per AMANDA and
Ramsey County Property records.
-On December 2, 2015 an inspection of the building was conducted, a list of
deficiencies which constitute a nuisance condition was developed and photographs
were taken. An ORDER TO ABATE A NUISANCE BUILDING was posted on
December 10, 2015 with a compliance date of January 9, 2016. As of this date, the
property remains in a condition which comprises a nuisance as defined by the
legislative code.
-Taxation has placed an estimated market value of $11,200 on the land and $74,200
on the building.
-Real estate taxes for 2014 are delinquent in the amount of $1,106.76, which includes
penalty and interest. Real estate taxes for 2015 are delinquent in the amount of
$1,650.42, which includes penalty and interest. Property is scheduled for tax
forfeiture July 2016.
-The Vacant Building registration fees were paid by assessment on June 3, 2015.
-A Code Compliance Inspection was done on May 5, 2015.
-As of February 19, 2016, the $5,000 performance deposit has not been posted.
-There have been eight (8) SUMMARY ABATEMENT NOTICES since 2013.
-There have been five (5) WORK ORDERS issued for: Garbage/rubbish;
Grass/weeds; Snow/ice
-Code Enforcement Officers estimate the cost to repair this structure exceeds
$30,000. The estimated cost to demolish is $12,000 to $15,000.
-DSI, Division of Code Enforcement Resolution submitted for consideration orders
the property owner to repair or remove this structure within fifteen (15) days; if not the
resolution authorizes the Division of Code Enforcement to demolish and assess the
costs to the property.
Amy Spong, Heritage Preservation Commission (HPC):
-1 1/2 story classical revival style built in 1915
-original owner Matt Raas; builder was Alvin Derr; originally built as a single family
dwelling and has maintained that status
-these 2 block faces were built during a very similar period of homes - they have
continuity; similar building styles, mapping, most have original full front open porches;
this porch was enclosed early on
-windows were changed to vinyl, vinyl siding over wood
-was part of the boundary area surveyed in 2001; was identified as a potential historic
resource but it did not go into the next step of getting a more extensive survey done
on it; was recommended for further study
-with that, demolition would not have an adverse effect from an historic preservation
perspective
-noted that SPPO looked at this from a national register status and it does not meet
the criteria for national register eligibility
Mr. Goerlitz:
-he contacted Ms. Moermond and everyone by email about a month ago
-his client was the lender on this property; has now foreclosed its mortgage on the
property by a sheriff's sale which took place Jan 7, 2016; that sale was confirmed by
Order of Ramsey County Court on Feb 9, 2016; on that same day, we had had a
hearing to reduce the redemption period down to 5 weeks at which Mr. McKusick was
in attendance and indicated that the property was abandoned and vacated and that
he was planning to take possession of the property and rehabilitate it to resolve the
abatement issues; the redemption period is now Aug 9, 2016; so, we don't have title
to this property for the ability to abate the nuisance until they obtain title; we originally
asked for a continuance to this hearing but at this point, we would defer to Mr.
McKusick's plans to rehabilitate the property satisfying the code compliance
inspection report; to the extend that he does not do that, we'd like the opportunity to
City of Saint Paul Page 10
Legislative Hearings Minutes - Final February 23, 2016
pick up where he had left off so that we can rehabilitate the property; from an
economic standpoint, this is not a property that should be demoed; it can easily be
rehabilitated
Mr. McKusick:
-he wants to rehab this property; he and the lender have a long history; it's
complicated; I've done work for the lender but I wasn't able to work on this property;
the lender said that he's willing to stand back and let McKusick to the remodel to
more forward to getting the house on the market; pay off the taxes; pay off the lender;
etc.
-the code compliance inspection report on the surface looks like there's a lot of
repairs to be done; I'm a general contractor; he has the permits in place to do
everything except for the mechanical, electrical & plumbing
-he thinks that he can have this property up and running in 60-90 days
-he has enough money to pay for the electrical, mechanical & plumbing; has credit
with Home Depot and Menards
-when he purchased the property, a $5000 performance deposit wasn't needed
Mr. Magner:
-this is a Category 3 Vacant Building and as such requires a $5000 performance
deposit posted before the city will issue any permits
-it switched to a Cat 3 on Dec 10, 2015 when the Order to Abate was posted
Mr. McKusick:
-that would wipe out my resources to rehab the house; is there an alternative?
-he knows that he has enough money to do what he needs to do; the $5000 is extra
and he knows that he doesn't have enough for that, too
Mr. Magner:
-in a case like this, the expectation that would be presented to Council by the Hearing
Officer would be that a $5,000 Performance Deposit be posted and it could be in the
form of a bond, as well; if you don't have the money, you'd have to seek that bond
somewhere (there's a cost for the bond but it's not the same as the deposit);
-you'd need a Work Plan identifying whose going to do the repairs and when
(timeline)
-you need bids for the plumbing, electrical and mechanical
-you need proof of financing
-taxes need to be paid prior to the CIty Council Public Hearing
-assumes that the hearing officer will lay this over for a couple of hearing sessions
with the necessary items
-at the that time, the hearing officer can grant up to 180 days for rehabilitation
(standard path)
Ms. Vang:
-will Lay this Over to Mar 22, 2016 in order for you to pull everything together
To refer back to Legislative Hearing on March 22: The following conditions must be
met in order to receive a grant of time if owner intends to rehab the building:
1) the $5,000 performance deposit must be posted;
2) the property must be maintained;
3) the property taxes must be paid or make an arrangement with Ramsey County to
have payment plans made;
4) a work plan or sworn construction statement, with timelines, for the completion of
the rehab of the building;
5) provide financial documentation indicating the funds for the rehab (City's estimate
exceeds $30,000) (line of credit, construction loan, personal bank account);
City of Saint Paul Page 11
Legislative Hearings Minutes - Final February 23, 2016
6) provide subcontractor bids; and
6) must provide an affidavit indicating the amount of funds to be used for the project.
City Council Public Hearing to continue to April 6, 2016.
Referred to the City Council due back on 3/16/2016
7 RLH OA 16-2 Making no recommendation to Ramsey County on the application of
Elizabeth A. Schwantes for repurchase of tax forfeited property at 560
CHARLES AVENUE.
Sponsors: Thao
Inspector Steve Magner, Vacant Buildings:
-Repurchase Application to Ramsey County for the property of 560 Charles Avenue
-he reviewed the application
-it appears that we had to issue some abatement Orders; no police activity
-doesn't think that staff would be making a recommendation one way or the other
Ms. Vang:
-will go forward without making a recommendation
Making no recommendation to the County Board.
Referred to the City Council due back on 3/16/2016
11:00 a.m. Hearings
Summary Abatement Orders
Correction Orders
8 RLH CO 16-3 Appeal of Robert Arnold, Ashland Property, LLC to a Correction Order
at 443 ASHLAND AVENUE.
Sponsors: Thao
Rescheduled per owner's request.
Laid Over to the Legislative Hearings due back on 4/5/2016
11:30 a.m. Hearings
Orders To Vacate, Condemnations and Revocations
9 RLH VO 16-13 Appeal of Lonn Anderson to a Fire Certificate of Occupancy
Revocation and Order to Vacate at 251 MARIA AVENUE.
Sponsors: Prince
Lonn Anderson, Maria Associates LLC, owner, appeared.
Fire Inspector Leanna Shaff:
City of Saint Paul Page 12
Legislative Hearings Minutes - Final February 23, 2016
-Fire Certificate of Occupancy Revocation/Order to Vacate issued by Inspector
George Niemeyer
-9 items on the list
-first inspection Jun 15, 2015
-on 4-2, inspector rec'd an email requesting a date change
-on 5-21, he also rec'd an email for a date change
-7-27 -inspector writes: re-inspection on 7-22, responsible party wasn't present;
tenant said they are not given Notice; responsible party said he wasn't given a Notice
of the inspection from the management company
-insp writes on 8-25-15: I wrote Correction Orders
-1-28 he rec'd a call from Lonn; told me it was in the process of being sold by the loan
holder; had 2 offers on the building but the loan holder has not made any decisions;
he let me know that not all the repairs were completed; asked for an extension;
denied
-2-9-16, met Lonn on site; bedroom in #2 was the only thing done; he also gave me
smoke detector affidavit; none of the other repairs had been completed; he let Lonn
know that he was going to take action against the C of O
-quite an on-going inspection
-there are still 11 items on the list of Orders; 6 are interior; 5 are exterior
-Insp Niemeyer has asked for a comprehensive and detailed work plan on all the
exterior repairs to include approximate timeline; we have not rec'd anything
Christine Boulware, Heritage Preservation Commission (HPC):
-added that #3 was an exterior repair, as well - a window cord
Ms. Shaff:
-as of this morning, there has not been an HPC application submitted either
-we understand that exterior things can, necessarily be completed during winter but
we're looking for good faith from the property owner, meaning that all the interior
repairs are done; it appears that we haven't received that
Christine Boulware, Heritage Preservation Commission (HPC):
-this property is located in the Dayton's Bluff Heritage Preservation District; all
exterior work is subject to review & approval by HPC staff, depending upon scope of
work
-this building is historically known as the Arm Brewster Double House, constructed in
1892
-on Feb 17, 2015, Mr. Anderson came to speak to me at the counter of PED; she
provided him with an HPC application, design review check list, information about the
guidelines; and we'd need a photos, a scope of work because there are a few exterior
items, prominently, the front stoop, that would require a little more review
-the deficiently list of Feb 9, 2016, she sees #3, the window - repair of the cord and
it's considered maintenance and she doesn't need that in an application; it's fine to do
now
-a chimney needs repair; she needs a scope of work of what's happening; masonry
specs; looks like the mortar joints are missing mortar and some brick is crumbling,
so, mortar specs and details would be required; and it's suggested that a mason do
this work rather than someone putting on a concrete mixture that would be damaging
to the property
-it's noted that the front cement steps need work; looks like it needs a footing under
there; the guidelines say that concrete steps should not replace wood; in this case
the wood is not there and the concrete steps, depending on condition, if they can be
lifted and a footing be put underneath, it's fine for them to remain; if they can't be
lifted or if the handrails need to be replaced, more information will be necessary and
she will provide the general guidelines
-there's a note about the soffit above the front door; specific photos from the applicant
City of Saint Paul Page 13
Legislative Hearings Minutes - Final February 23, 2016
will be required that show the areas where work is necessary along with what the
proposed scope of work will be; a copy of that will also go to the fire inspector; and
whatever is necessary to go along with the building permit to DSI - Plan Review
-looks like there's been concrete patching to the stucco in the back of the property;
given that this property was designated in 1992 by the City Council, in the address
file, she has no building permits or record of any work every being conducted at the
property on the exterior; it hasn't been reviewed and approved by HPC staff and we
can look into Amanda to see if there have been any plaster permits pulled for stucco
work; thinks that will also require review
-those are the items she sees for the exterior that she will coordinate with Mr.
Anderson
Mr. Anderson:
-his main objective is to be granted an extension; hoping for 90 days to get even all
the exterior work done
-interior items completed: 1,2,3,6 - could be re-inspected Mar 2 for confirmation
-background on why it's taken so much time to get items done: they've owned it
since 2004; one of the members of the partnership is a very astute real estate
developer and investor; and the decision was made about 3 years ago to stop paying
the mortgage and the taxes to try to get it at a discount from whomever the note
holder was; the mortgage, originally was with Washington Mutual; then, it transferred
to J.P. Morgan Chase; and through the financial crisis, we didn't even know who
owned it; -no Notices were ever sent; we sent certified letters to the address on file
for the recorder's office and never got any response; this went on for 3 years; then,
over the summer after the first letter was received regarding the inspection and while
he was in the process of completing the repairs, the taxes were coming due and we
were at risk of tax forfeiture; so, we entered into a payment plan with the county,
which must have triggered something as far as the recorder's office; all of a sudden
everyone in the partnership got served papers from Callthin County Financial, based
out of CA; they started a process of foreclosing on the building; negotiations took
place; they do not want to take title to the building, so we still have title; essentially,
we are doing a short sale but we need Callthin's approval; he thought this was going
to be done back in Sep-Oct, 2015 and the new buyer would be responsible for the
code compliance issues; it's taken much, much longer than any of them expected
-he is somewhat glad that they are now in this position because he thinks it's kind of
forcing the issue with the lender to either approve it or do something with it - that's the
history of why it's taken so long
-we are at a position where we don't want to have any issues with this moving
forward; so, if nothing comes of this, we will go ahead and do the repairs
-there's be 2 full price offers submitted: 1) one by Bill Curry; and 2) the other by
George __?__, who owns the building next door
-regardless, we want to bring the building up to compliance but we do need extra time
for the exterior items
-originally, there were some pieces of stucco on the back that were falling off; and he
was ignorant of the fact that they needed a permit for the patch; agrees that it's
subpar work; thinks it may have to be torn off and re-done
-he has lived at the house for over a year now
Ms. Boulware:
-Orders sent Jun 22, 2015, item #15 for exterior repairs says, "Permit may be
required for exterior repairs; contact HPC for approval on all exterior repairs,
including the stucco on the back of the building
-the HPC application needs to be submitted as soon as a full scope of work and
photos can be put together; bring it to DSI office; she will look it over to make sure it's
complete; once the application is complete, their review time begins
City of Saint Paul Page 14
Legislative Hearings Minutes - Final February 23, 2016
Mr. Anderson:
-the work had already been done at that point
Ms. Vang:
-going forward, you will need to pull the necessary permits to get all of these
deficiencies corrected
-a complete HPC application needs to be submitted
Ms. Shaff:
-it doesn't look like anything in the interior needs permits
-asked Mr. Anderson about items #4 & #5
Mr. Anderson:
-we were doing some plumbing work in Unit 2 when the inspector came and the
plumbing permit wasn't closed; now, it is closed; but Unit 9 is beneath Unit 2; so in
order to complete the work in Unit 2, we had to get into Unit 9 (unoccupied) and do a
little bit of plumbing work, which involved taking out some of the walls and ceilings;
the permit was opened in Aug 2015 and finally closed just last week (2-19-16); now,
we do that ceiling/wall work
-work in Unit 9 should not take very long, probably a 2-day job; provided he can get
his guys out there, it should be done in 2 weeks
Ms. Boulware:
-added that typically you would not be doing any re-pointing or any stuccoing until
night time temperatures don't fall below 50 degrees
Ms. Vang:
-will grant until Mar 2, 2016 for the interior work to be completed; re-inspection Mar 2,
at 1 pm
-will grant until 4:30 pm Mar 4, 2016 to submit the initial HPC application
-will grant until Jul 1, 2016 for the exterior work to be completed
Owner has until March 2, 2016 to get the interior items done. (This is also the
reinspection date indicated in the February 9 Revocation letter); grant until July 1,
2016 for the exterior items provided owner submits an application to HPC for review
by March 4.
Referred to the City Council due back on 3/16/2016
1:30 p.m. Hearings
Fire Certificates of Occupancy
10 RLH VO 16-12 Appeal of Paul L. Belmonte to a Fire Certificate of Occupancy and
Order to Vacate at 632 & 634 LEXINGTON PARKWAY NORTH.
Sponsors: Thao
Paul L. Belmonte, owner, appeared.
Fire Inspector A.J. Neis:
-Revocation of Fire Certificate of Occupancy issued by Fire Inspector Justin Elvestad
-was Revoked due to long term noncompliance - going on since as early as Apr 2014
when they initially tried to do the inspection and the property owner had called and
said he was putting on a new roof and installing new windows and there were active
City of Saint Paul Page 15
Legislative Hearings Minutes - Final February 23, 2016
building permits (at that time, it was Fire Inspector Lisa Martin); a lot of work was
being done; receipts were provided; so, we delayed the C of O inspection until Oct
2015, and Mr. Elvestad took over the file and conducted the C of O inspection; found
numerous code violations
-issue we're dealing with is basically a fire separation from the basement; there's a
tuck under garage area - side by side duplex with 2 tuck under garages
-photos in file
-the fire separation from the rehab/remodel work in the basement is not intact and
there's a vehicle that's parked in the garage area; the primary issue we have is the
fire separation between the garage and the house
-there's a lot of exterior work that inspector advised the property owner that needed
to be done before winter (get exterior sealed up) on front of house
-our police is 90 days before we Revoke; we are well over that; in addition, this
started back in Mar 2014
-at this point, he doesn't know if the work will ever get done
-his recommendation to the inspector when he forwarded the file was to Revoke the
C of O and Order the building vacated in hopes to get the property owner to comply
sooner rather than later
-currently, one unit is vacant; the other unit is occupied
-with the fire separation not intact at this point, the home is not safely habitable with
the vehicles, etc.
-there are active building permits
-all he needs to do is to get the work done and have the permits finaled and
approved; the, the Fire C of O can be issued
Mr. Belmonte:
-one unit is occupied into which he'll be moving into; the other side is vacant
-2013 - put on new roof; 2014 - he installed a new furnace, central air and some
windows
-2015 - he had eye surgery in Feb; prostrate issues in Jul; he took 2015 off and he
had told the inspector about this
-2016 - he started to work on the basement; he got the 2 x 4s up, the fire doors were
ordered and he's installing them
-inspector coming Mar 1 and by that time, he should have installed the fire proof
sheet rock installed (unit 634)
-by Mar 31, 2016, he should have both units with fire doors and fire proof sheet rock
installed in garages (has permit)
-if the weather cooperates, he will have the front entry done by Apr 15, 2016
-put egress window where there had been a broken window
Mr. Neis:
-if the fire separation is intact by Mar 31, 2016, they would be willing to extend the
vacate with the condition that the permit was finaled and approved (Mr. Elvestad will
go into the computer to check if the building inspector has been out to inspect and
believes that the fire separation is intact and in good repair); the vehicle cannot be
stored in the garage until the fire separation is finaled and approved; then, he'd go
along with an extension to Apr 15, 2016
Mr. Belmonte:
-the car cannot be moved out; there's no motor in it; it's a storage car
Mr. Neis:
-a vehicle, whether operable or inoperable has to have the fire separation; if you need
to flatbed it out of there until you get the fire separation done, then that's what you
need to do
City of Saint Paul Page 16
Legislative Hearings Minutes - Final February 23, 2016
Mr. Belmonte:
-by Mar 1, that one side should be all done fire proofing
-tenant lives in 634; 634 needs to be fire proofed; the 632 side is separate; there's a
wall right in the middle
-the inspector OK'd everything in 2012
Mr. Neis:
-both sides of those walls need to be fully intact in order to have a fire separation
-the fire code has remained the same about fire separations for a very long time
Ms. Vang:
-Mr. Neis' recommendation is sound; suggests he tows the car
Mr. Belmonte:
-I'll have to appeal that because the vehicle cannot come out
-he can have all this done by Mar 31 - both sides will be fire proofed but the car has
to stay; I will appeal that
-he's trying to have one side done by Mar 1, 2016
Ms. Vang:
-you can definitely appeal it before the City Council on Mar 16, 2016
Mr. Neis:
-the car is what's causing the violation
-we could reschedule the re-inspection
-if the car is on the 632 side (vacant) and he has the separation intact from the 634
side by Mar 1, 2016 like he is suggesting and no one is occupying the 632 side where
the car is, then, he's amenable to granting time to Mar 31
Ms. Vang:
Inspector to keep the March 1 reinspection date so he can inspect the 634 Lexington
side for fire separation compliance between the garage and house. Once in
compliance, owner must remove vehicle from 632 side to 634 side in order to extend
time to March 31 for the rest of the repairs.
Referred to the City Council due back on 3/16/2016
2:30 p.m. Hearings
Vacant Building Registrations
11 RLH VBR 16-12 Appeal of Heather Otto, Osaka Properties LLC, to a Vacant Building
Registration Fee at 323 LAWSON AVENUE EAST.
Sponsors: Brendmoen
Appeal withdrawn. Inspector and appellant worked out an agreement.
Withdrawn
City of Saint Paul Page 17
Agenda
15 West Kellogg Blvd.
City of Saint Paul Saint Paul, MN 55102
Meeting Agenda - Final
Legislative Hearings
Marcia Moermond, Legislative Hearing Officer
Mai Vang, Hearing Coordinator
Jean Birkholz, Hearing Secretary
legislativehearings@ci.stpaul.mn.us
651-266-8585
Tuesday, February 23, 2016 9:00 AM Room 330 City Hall & Court House
9:00 a.m. Hearings
Remove/Repair Orders
1 RLH RR Ordering the razing and removal of the structures at 870 FULLER
15-13 AVENUE within fifteen (15) days after the June 3, 2015, City Council
Public Hearing. (To be referred back to Legislative Hearing on January
26)
Sponsors: Thao
City of Saint Paul Page 1 Printed on 2/23/2016
Legislative Hearings Meeting Agenda - Final February 23, 2016
Attachments: 870 Fuller Ave.OTA 3-6-15
870 Fuller Ave.PH 4-10-15
870 Fuller Ave.Photo.6-20-14
870 Fuller Ave.Photo Doc 1.3-6-15
870 Fuller Ave.Photo Doc 2.3-5-15
870 Fuller Ave.Photo Doc 3.3-5-15
870 Fuller Ave.SHPO Form 4-16-15
870 Fuller Ave.Email.4-20-15
870 Fuller Ave.email updating PO contact info
870 Fuller Ave.Historic Sites Survey
870 Fuller Ave.Smith Ltr.5-14-15
870 Fuller Ave.Chain Emails.5-29-15
870 Fuller Ave.Barnett Email.6-10-15
870 Fuller Ave.Vang-Barnett Email.6-11-15
870 Fuller Ave.Barnett-Vang Chain Email.6-11-15
870 Fuller.Code Compliance Inspection Report.6-22-15
870 Fuller Ave.Photos.6-20-14
870 Fuller Ave.Smith Ltr.6-24-15
870 Fuller Ave.Title Report.7-14-15
870 Fuller.Barnett-Finzell Email Chain.7-10-15
870 Fuller Ave.Barnett Ltr.7-15-15
870 Fuller Ave.Satisfaction of Mortgage.Western Bank
870 Fuller Ave.Smith Ltr.7-29-15
870 Fuller Ave.Smith Ltr.9-24-15
870 Fuller Ave.Chain emails.10-2-15
870 Fuller Ave.Barnett R-R Ltr.10-28-15
870 Fuller Ave.Barnett Email.11-9-15
870 Fuller Ave.Barnett R-R Ltr.11-12-15
870 Fuller Ave.Barnett R-R Ltr.12-10-15
870 Fuller Ave.Lindquist Ltr & Work Plan.12-18-15
870 Fuller Ave.Krenz Update.1-22-16
870 Fuller Ave.Summer Smith Email Chain.1-22-16
870 Fuller Ave.Krenz Ltr.1-27-16
2 RLH RR Denying request for a stay of enforcement of Council File RLH RR 15-37
16-6 ordering the rehabilitation or razing and the demolition of the structures
at 2227 BEECH STREET within 30 days after the October 7, 2015 City
Council Public Hearing.
Sponsors: Prince
City of Saint Paul Page 2 Printed on 2/23/2016
Legislative Hearings Meeting Agenda - Final February 23, 2016
Attachments: 2227 Beech St.FTA RR Ltr.9-10-15
2227 Beech St.Kemper Ltr.12-9-15
2227 Beech St.Bond Posted.
2227 Beech St.Kemper Ltr.1-27-16
2227 Beech St.Mel Email.2-10-16
2227 Beech St.St Paul MN Rehab Estimate PDF
2227 Beech St.St Paul Rehab Estimate
2227 Beech St.St Paul MN Demo Estimate
2227 Beech St.Supreme Estimate St Paul Demo Estimate
2227 Beech St.Minutes
2227 Beech St.Mel Email.2-17-16
2227 Beech St.Minutes.RR 15-37
2227 Beech St.Authorized Signatory Dec Appointments
2227 Beech St.Commitment Letter.2-17-16
3 SR 16-7 Reviewing request of owner to have Council reconsider its Order to
Remove or Repair the Structures at 805 HUDSON ROAD.
Sponsors: Prince
Attachments: 805 Hudson Rd.OTA 9-30-15
805 Hudson Rd.PH 11-6-15
805 Hudson Rd.SHPO 10-13-15
805 Hudson.Photos.8-14-15
805 Hudson.Photo.10-5-15
805 Hudson.Team-Code Compliance Insp.10-17-14
805 Hudson Rd.HPC resolution.11-19-15
805 Hudson Rd.FTA R-R Ltr.12-9-15
805 Hudson Rd.Affidavit of Service.11-9-15
805 Hudson Rd.Nseumen Ltr.1-26-16
4 RLH RR Ordering the rehabilitation or razing and removal of the structures at 82
16-7 GEORGE STREET WEST within fifteen (15) days after the March 16,
2016, City Council Public Hearing.
Sponsors: Noecker
Attachments: 82 George St W.OTA 12-18-15
82 George St W.PH 1-22-16
82 George St W.Photos 12-3-13
82 George St W.Photos 3-27-15
82 George St W.Photos 11-5-15
82 George St W.Photos 12-11-15
82 George St W.SHPO Form 12-31-15
City of Saint Paul Page 3 Printed on 2/23/2016
Legislative Hearings Meeting Agenda - Final February 23, 2016
5 RLH RR Ordering the rehabilitation or razing and removal of the structures at 595
16-8 JESSAMINE AVENUE EAST within fifteen (15) days after the March 16,
2016, City Council Public Hearing.
Sponsors: Bostrom
Attachments: 595 Jessamine Ave E.OTA 12-16-15
595 Jessamine Ave E.PH 1-22-16
595 Jessamine Ave E.Code Compliance Report 6-29-15
595 Jessamine Ave E.SHPO Form 12-22-15
595 Jessamine Ave E.Photos #1.12-3-15
595 Jessamine Ave E.Photos #2.12-3-15
595 Jessamine Ave E.Photos.2-11-16
595 Jessamine Ave E.Fire Report.2-8-15
6 RLH RR Ordering the rehabilitation or razing and removal of the structures at 839
16-9 THOMAS AVENUE within fifteen (15) days after the March 16, 2016,
City Council Public Hearing.
Sponsors: Thao
Attachments: 839 Thomas Ave.OTA 12-10-15
839 Thomas Ave.PH 1-22-16
839 Thomas Ave.Code Compliance Report 5-5-15
839 Thomas Ave.SHPO 12-22-15
839 Thomas Ave.Photos #1.12-3-15
839 Thomas Ave.Photos #2.12-3-15
839 Thomas Ave.Photos #3.12-3-15
839 Thomas Ave.Georlitz email to staff.1-20-16
839 Thomas Ave.Sheriff's Report of Sale
839 Thomas Ave.OTSC signed
839 Thomas Ave.Order
7 RLH OA Making recommendation to Ramsey County on the application of
16-2 Elizabeth A. Schwantes for repurchase of tax forfeited property at 560
CHARLES AVENUE.
Sponsors: Thao
Attachments: 560 Charles Ave.appeal.2-5-16
560 Charles Ave.STAMP ao 2-11-16
560 Charles Ave.Police Log.5 yrs
11:00 a.m. Hearings
Summary Abatement Orders
Correction Orders
City of Saint Paul Page 4 Printed on 2/23/2016
Legislative Hearings Meeting Agenda - Final February 23, 2016
8 RLH CO Appeal of Robert Arnold, Ashland Property, LLC to a Correction Order
16-3 at 443 ASHLAND AVENUE.
Sponsors: Thao
Attachments: 443 Ashland Ave.appeal.1-20-16
443 Ashland Ave.Aerial Map
443 Ashland Ave.Arnold Ltr.1-28-16
11:30 a.m. Hearings
Orders To Vacate, Condemnations and Revocations
9 RLH VO Appeal of Lonn Anderson to a Fire Certificate of Occupancy Revocation
16-13 and Order to Vacate at 251 MARIA AVENUE.
Sponsors: Prince
Attachments: 251 Maria Ave.appeal.2-23-16
251 Maria Ave.Photos.2-22-16
1:30 p.m. Hearings
Fire Certificates of Occupancy
10 RLH VO Appeal of Paul L. Belmonte to a Fire Certificate of Occupancy and Order
16-12 to Vacate at 632 & 634 LEXINGTON PARKWAY NORTH.
Sponsors: Thao
Attachments: 632-34 Lexington Pkwy.appeal.2-1-16
632-634 Lexington Pkwy N.Photo Doc 1.1-6-16
632-634 Lexington Pkwy N.Photo Doc 2.1-6-16
632-634 Lexington Pkwy N.Photo Doc 3.1-6-16
632-634 Lexington Pkwy N.Photo Doc 1.10-29-15
632-634 Lexington Pkwy N.Photo Doc 2.10-29-15
632-634 Lexington Pkwy N.Photo Doc 3.10-29-15
2:30 p.m. Hearings
Vacant Building Registrations
11 RLH VBR Appeal of Heather Otto, Osaka Properties LLC, to a Vacant Building
16-12 Registration Fee at 323 LAWSON AVENUE EAST.
Sponsors: Brendmoen
Attachments: 323 Lawson Ave E.appeal.2-16-16
323 Lawson Ave E.Photos.1-8-16
City of Saint Paul Page 5 Printed on 2/23/2016