Legislative Hearings
Regular MeetingSt. Paul, MN · February 27, 2018
Minutes
15 West Kellogg Blvd.
City of Saint Paul Saint Paul, MN 55102
Minutes - Final
Legislative Hearings
Marcia Moermond, Legislative Hearing Officer
Mai Vang, Hearing Coordinator
Jean Birkholz, Hearing Secretary
legislativehearings@ci.stpaul.mn.us
651-266-8585
Tuesday, February 27, 2018 9:00 AM Room 330 City Hall & Court House
9:00 a.m. Hearings
Remove/Repair Orders
1 RLH RR 18-11 Ordering the rehabilitation or razing and removal of the structures at
521-523 DESNOYER AVENUE within fifteen (15) days after the March
14, 2018 City Council public hearing. (To continue public hearing to
March 28 with Legislative Hearing on March 27)
Sponsors: Stark
Jeff Chermak, proposed buyer, appeared.
Neighbors Joyce Perrin & Richard Howey also appeared.
Steve Magner, Code Enforcement Manager: Update --
-a letter was sent to Jay Olson, owner (attached) on Feb 20, 2018, to confirm that on
Feb 13, the hearing officer recommended that on Feb 27 the following conditions must
be met: 1) apply for code compliance insp & lockbox combination needs to be
provided; 2) $5000 perf dep posted; 3) delinquent taxes paid; 4) detailed work
plan/sworn construction statement including timelines & bids; 5) documentation of
financing sufficient to execute the work plan; 6) affidavit, if needed; 7) agreement
between owner & a purchaser who's rehabbing; & 8) maintain the property
Ms. Moermond: an application for code compl insp was made last Wed; there was
some question about the zoning situation & whether or not it required the
re-establishment of it's legal nonconforming status; and DSI & PED came to the
conclusion that since the building was constructed as a duplex, even though it's been
vacant for more than 10 years, since it's not had any substantial change to it, it would
be allowed to be rehabilitated as a duplex, which was communicated to the owner &
Mr. Chermak last week
-I notice that a lot of the conditions haven't been met; we only have the code compl
insp applied for
-what's going on & why is Mr. Olson not here?
Mr. Chermak: I'm not sure why Mr. Olson is not here; it sounded like he had a
previous engagement & could not make it but I am here to communicate that we have
been working in good faith to try to work thru the steps outlined in the letter; it is a time
consuming & labor intensive process; the zoning threw us off & set us back 4-5 days
& we haven't received any inspection report back yet so we can't come up with a
City of Saint Paul Page 1
Legislative Hearings Minutes - Final February 27, 2018
detailed work plan; the application was made on Fri, 3 days after the hearing; Reid
Soley was not in that day & we were consulting with the people at the city desk; they
advised us at that point not to post the $5000 perf dep until after we had a chance to
meet with Reid Soley; they also alerted us to the zoning issue so, we immediately went
over to the PED office & spoke with Paul DuBruiel; I apologize but we are not trying to
drag our feet
Ms. Moermond: an Order to Abate a Nuisance Building went out months earlier telling
Mr. Olson that a code compl insp was necessary; are you ready to post the $5000 perf
dep? Is there anything going on at all?
Mr. Chermak: absolutely; working with attorneys, which takes time, I have a draft
contract in front of me (not signed) that will allow us to do the work on Mr. Olson's
property, to rehab it while he still owns it; it was a complicated process (entered for
review); once that is in place, we can begin spending more money; I can't put the
money in without having some kind of contractual security; this was the first step; once
this is signed, we can post the perf dep; then we can get the construction plan &
amend it per the insp report, etc
Mr. Magner: reviewing the contract along with Ms. Moermond
-my initial thought is that I think it would suffice; my concern is that the lender, in this
case, believes that they have some type of equity position that they can move forward
with actually lending the funds; this is a large sum of money; & I want to assure that if
the city moves forward with this, approves the agreement & issues a time period for the
rehab, that this just isn't going to stall out & go away because the lender becomes
concerned after we say, "Yea; it's OK to do it," & then they decide to walk away (we've
had a number of situations similar to this where we go thru this whole process & then
we find out 2-3 months into it that nothing's been done-no permits pulled; no work
being done because someone is concerned that the agreement is failing)
Mr. Chermak: we're doing the leg work right now; the properties are in the Trust; we're
working on getting the Trust straightened out & getting the contract put together, etc.
there's a lot of hurdles we're trying to get thru so that once this contract is signed, it's
legitimate & can progress forward
Ms. Moermond: let's hear from the neighbors
Joyce Perrin, 518 Otis, neighbor: I've lived at 518 Otis since 2000, it's right next to
another vacant duplex, 522-524 Otis that's condemned; I finally built a fence to block
out this property, 521-523 Desnoyer; it backs up to our property; we complained a lot
about the garages, they were in tatters, so, he finally painted them; I've made
numerous calls; I talked to his father when his father was living there & he was very
defensive right away; the city eventually demolished the garage; Mr. Olson does just
enough to get you off his back; the bottom line is Jay Olson's character; he is not here
& he has not been available to manage his properties, actively; I'm speaking to his
credibility - whether or not he's actually going to come thru with this deal with Mr.
Chermak; I have no reason to believe that; his record isn't good
Richard Howey, 518 Otis, neighbor: Joyce & I are married; this house has been
vacant all the time that I've lived at 518 Otis; I know what the house next to me is like -
the roof is in absolutely terrible condition & has been; it had a blue tarp on part of it for
years so, there's potential water damage, which is not actually discovered until you tear
out walls; if the same thing is true about 521-523 Desnoyer, then there's a good
likelihood that the house couldn't even be renovated; I would like to see the code
City of Saint Paul Page 2
Legislative Hearings Minutes - Final February 27, 2018
compliance insp report once it's finished
Ms. Moermond: the contract that we just saw, there's an estimate of up to $100,000 to
repair the house
-we have a report that the land is worth $145,900; the building $153,500 (probably not
current given the conditions)
-I'm pretty much where I was at before: show me the money; we want our attorneys to
look at this (scanning); I wasn't clear in my first glance at which point the property
would transfer from Mr. Olson to you, Mr. Chermak; I need you to post the $5000 perf
dep; property taxes need to be paid; I need to know where the $100,000 is coming
from - documentation
-I had asked the inspection staff yesterday to expedite this; I'd be willing to ask for a
short Layover if these financial matters are taken care of as a sign of good faith; our
attorneys will review this agreement over the next couple of days
Mr. Magner: I haven't had a chance to read the agreement; I have a question: what is
your surety that Mr. Olson's going to pay this back - what is your equity position?
Mr. Chermak: his attorney's advice: we're basically lending $100,000 & attaching it to
Exhibit B, which will be another property, perhaps the property immediately adjacent as
the mortgage on that property that's also owned free & clear; so, we're filing a lien
against it - that's our surety
Mr. Magner: why aren't you just buying one of his other properties, give him the money,
then contracting back with him just to do the rehabilitation for him (?)
Mr. Chermak: that's a good question; maybe we have the cart before the horse; we
haven't thought about what you're proposing
Ms. Moermond: right now, there is no Exhibit B
Mr. Chermak: I apologize
Mr. Magner: if we get to the 180-day mark & this goes awry, the city will be knocking
down this property
Ms. Moermond: get all the financials cleared up; we can meet in 2 weeks; the
following day we'll be at City Council Public Hearing; all the financials need to be
cleared up by then; work plan with deadlines; property taxes paid; forward the financials
to my office
____
Legislative Hearing on March 13 to meet the following conditions:
1) post the $5,000 performance deposit;
2) pay the outstanding delinquent property taxes;
3) documentation of financing sufficient to execute the work plan (line of credit,
construction loan or personal bank account);
4) an affidavit stating the necessary funds will be set aside for the project;
5) a detailed work plan or sworn construction statement, including timelines and bids,
for completing the work, in accordance with the code compliance inspection, including
contractor bids; and
6) a revised signed loan and construction agreement, including 1) the exhibits; 2)
noting, the language correction necessary in the second Whereas; and 3) addressing
City of Saint Paul Page 3
Legislative Hearings Minutes - Final February 27, 2018
concerns raised by the legislative hearing officer, which are listed below:
(list is forthcoming)
Public hearing is March 14.
Referred to the City Council due back on 3/14/2018 (Legislative Hearing on
3/13)
2 RLH RR 18-12 Ordering the rehabilitation or razing and removal of the structures at 96
MANITOBA AVENUE within fifteen (15) days after the March 14, 2018
City Council public hearing. (Amend to grant 90 days)
Sponsors: Thao
Arafat El Bakri, owner, appeared.
Ms. Moermond: in your case, I made a call to Steve Ubl, the city's building official,
asking your inspection to be expedited
Steve Magner, Code Enforcement Manager: Update
-read letter sent to Mr. El Bakri on Feb 15, 2018 (attached) listing the following
conditions be met by Feb 27, 2018: apply for & receive a new code compliance
inspection; post $5000 perf dep; submit detailed work plan or sworn construction
statement with timelines, bids; financing documentation sufficient to execute the
above work plan; affidavit, if necessary; maintain property
-on Feb 21, 2018, a code compliance inspection fee & $5000 perf dep were submitted
Ms. Moermond: at the last hearing, you talked a lot about your frustration that you
have to go thru this process at all
Mr. El Bakri: what I see is the goal & process clashing; I don't see a consistency; we
need to get this done as soon as possible & this is upsetting my schedule for all my
work; it's not this property alone; I wanted to be finished by the end of Feb 2018; then,
somebody said that I didn't call.... it's not making any sense for me & you have to
excuse me for being confused about going backward to speed up the process of
finishing it; even the first day I came here, I had a deadline by the end of Mar - this
property would be passing all inspection & rented; yet,,,,,
Ms. Moermond: we talked about how the code compliance inspection itself was very
dated; it was 3 years old & your permits were --- either not pulled or they were closed
for inactivity for a number of years; and so...
Mr. El Bakri: but there was a reason....
Ms. Moermond: I'm not saying there wasn't a reason
Mr. El Bakri: I was not ignoring my responsibility; I thought there would be some
understanding; I was in a hard position; you might look at this as.......... regardless of
my personal issues, which is non of the business of the city but also, having to wade
thru all the process of investigation regarding the massive.... it's a huge number,
$45,000 damages in the property after I did all this work.... it's not a little bit of money;
and then, having to wait for insurance to determine whether they would pay me or not..
City of Saint Paul Page 4
Legislative Hearings Minutes - Final February 27, 2018
and they don't... to put myself together, I came to finish at the end of Feb and Matt
told me to call Joe Yannarelly & he claims that I didn't call him, which is also not true;
I called him & left him a message; he said that he would not be back until Jan 16,
2018 from his vacation; later on, he denied that I called him; I was waiting badly to
show somebody the progress - the house is almost finished; I have invoices, bills,
plumbing, electrician; I changed all the windows & after they were destroyed, I changed
them again; I had roughing inspection on bldg; plumbing inspector came & found the
bldg closed & called the contractor, who told him that the city had cancelled his
permit; he said, "Nobody told me;" I just needed a couple of weeks to finish; then, I
found out that I had to go back on all of it; & it really hurt me financially; I need to
finish this badly; I have another bldg scheduled & .....
Ms. Moermond: I want to get you thru this process as quickly as possible; I don't
think that missing the connection with Mr. Yannarelly makes a difference for you
sitting here today
Mr. El Bakri: I thought he was supposed to come & see before Mr......
Ms. Moermond: he scheduled the appointment for an inspection to happen to make a
determination about whether or not the bldg constitutes a nuisance & about how long
it's been in the VB Program; connecting with him would not change the outcome of
that
Mr. El Bakri: he sends me a letter about snow shoveling while I shovel the snow there
for me & both my neighbors before I do my house; I have no idea why he would send
me a letter for snow; later on, I called & told him that I had pictures of what I did; he
says, "I'm sorry; it was a mistake;"
Ms. Moermond: these letters go out automatically
Mr. El Bakri: another code compliance inspection was required of me; I don't see the
purpose of that
Mr. Magner: no one has been out there to inspect yet
Ms. Moermond: I will ask again for them to get out there quickly
Mr. El Bakri: can I show you?
Ms. Moermond: we can scan those but we need to have our inspectors look at it &
make sure that what was done was done under permit
Mr. Magner: I would recommend to you, as a consumer, when you enter into a contract
with a contractor, make sure that you specify in the contract that the contractor pulls
the permit before he begins work & that you don't make final payment with that
contractor until you see that the permit has been signed-off
Mr. El Bakri: I do that but I also know from my humble experience that every
contractor, before they reach the city, they start the work with a couple of workers at 7
am or 8 am, they drop off materials & workers, they do the work, then they pull the
permit & I've never seen an issue with that
Ms. Moermond: in this situation, we're seeing cases where a permit wasn't pulled or
where an inspector wasn't called to inspect or final the permit
City of Saint Paul Page 5
Legislative Hearings Minutes - Final February 27, 2018
Mr. El Bakri: my bldg permit was cancelled; my electrician talked to the electric
inspector himself
-I left the lock box combination with the code compliance application
-I have approximately $70,000 in that account, excluding the money that was paid for
the plumber, electrician, my costs for other work
Ms. Moermond: if we can get you the code compliance insp report quickly, can you
get the work plan or sworn construction statement done in 2 weeks?
Mr. El Bakri: there's nothing left except painting & flooring after they close the walls
Ms. Moermond: we'll get to the other side; I'll see if I can get those inspectors out
there really quickly
-I will look at all of this in 2 weeks; hopefully, everything will be together at that time &
you'll have the plan in place for finishing
-City Council votes Mar 14, 2018; you can pull permits Mar 15
_____
Owner needs to meet the conditions below:
1. A detailed work plan or sworn construction statement, including timelines and bids,
for completing the work required in the forthcoming code compliance inspection report
will need to be provided, including subcontractor bids;
2. an affidavit that states the necessary funds from TCF Bank account will be set
aside for the project; and
3. the property must be maintained.
Referred to the City Council due back on 3/14/2018
3 RLH RR 18-2 Ordering the rehabilitation or razing and removal of the structures at 1536
VAN BUREN AVENUE within fifteen (15) days after the February 14,
2018, City Council public hearing. (Amend to remove within 15 days with
no option for rehabilitation)
Sponsors: Henningson
Patricia Hanratty, HomeLiberty; Inna Tobak, Neighborhood Assistance for
Homeowners; and Greta Bjerkness, Attorney, appeared.
Ms. Moermond: as of Feb 13, 2018, there was nothing in place to indicate that Mr.
Henneman was going to do any kind of rehabilitation on the property; although he had
paid for the code compliance inspection report, there was no lock box provided; there
was testimony that a lock box was stolen, which is unusual; I don't know if one is there
now; we also had testimony that the house still had material in it that would prevent or
slow the inspection of the property; as a result, nothing was done prepatory to the
Wed, Feb 14, City Council Public Hearing; 1 hour & 20 minutes before the public
hearing, I received a phone call from Ms. Tobak, who indicated that her business,
Neighborhood Assistance for Homeowners, had an investor(s), who were willing to do
the rehabilitation on this property & wanted time to be able to explore that possibility
-my recommendation to the City Council on Feb 14 was to refer the matter back into
Legislative Hearing if Ms. Tobak & her investor posted the $5000 Performance Deposit
within one week
-Ms. Tobak had indicated on the phone that within 14 days the whole thing could be
put together; I expressed my concern that it wouldn't be possible without having that
code compl insp report in hand because that is the basis upon a work plan would be
City of Saint Paul Page 6
Legislative Hearings Minutes - Final February 27, 2018
put together
Steve Magner, Code Enforcement Manager: the last time code was out there was Sep
17, 2018
-the $5000 Perf Dep was posted on Feb 21, 2018
-the existing mortgage is up-to-date
Ms. Hanratty: we do not have an inspection report yet; when I spoke with Mr. Seeger,
he said to make sure that all of the materials in the house were moved into the middle
of the rooms
-we have a timeline that we can discuss; we've already had a general contractor &
project manager go into the house; we are on a fast track to begin construction in Apr,
depending upon city timelines; we've already been working with attorneys to come up
with contracts; the general contractor/project manager will be monitoring everything &
has to approve before any money will go out; you will also have a preliminary
commitment letter from HomeLiberty, we would be the lender
Ms. Moermond: what was strange about that letter was that it said that they would be
buying the property & doing the fix & leasing it back to Mr. Henneman, which is
something that was really common back in 2008-09 & was considered to be kind of an
unscrupulous business practice because there would be balloon payments on these
things & the properties would be taken; so, I look at that & I see: 1) you're buying the
property against what city code would allow; and 2) I'm not Mr. Henneman's babysitter
but. ..... ... it does speak to... what you guys are up to
Ms. Hanratty: not at all
Ms. Moermond: why not at all?
Ms. Hanratty: because we have been doing this for a number of years.... we'd be
happy to give you names of customers we've had, city officials in other places that
we've worked with; when we had spoken, I was not aware of the city regulation about
"no transfer of property" so without contemplating that, obviously, the transfer of
property was not going to HomeLiberty; it was going to Neighborhood Assistance,
which is a nonprofit
Ms. Moermond: I'm not clear why their status as a nonprofit is relevant (?)
Ms. Hanratty: because it's a foreclosure counseling agency approved by Neighbor
Works & has been working with hundreds of St. Paul & Mpls....
Ms. Moermond: so, the money would go to them?
Ms. Tobak: we are kind of protecting the homeowners; it's only for homeowners who
want to stay in the home
Ms. Hanratty: it's very strictly governed & up front; governed by a contract with the
homeowner; they normally refinance within 3 years; this one is different so, we would
be providing all the contract information & the contract, itself; & since we can't finance
thru Neighborhood Assistance because of the restriction on the transfer of property,
we are working on a construction mortgage that we would do with Mr. Henneman on the
property in order to complete the work
Ms. Moermond: what was Mr. Seeger's response about piling the construction
City of Saint Paul Page 7
Legislative Hearings Minutes - Final February 27, 2018
materials in the middle of the rooms? a lockbox?
Mr. Hanratty: that's what he asked us to do
Ms. Tobak: Jim Seeger said he was coming to check the property on the Jan 30,
2018; & when he left, Mr. Henneman came; the windows were broken from the porch &
the lockbox was gone, so Mr. Seeger said that by Mon he should be over for the
inspection; the snow has all been shoveled
Ms. Bjerkness: I don't have anything to add; as long as my client's mortgage remains
in tack.....
Ms. Moermond: does the city have the lock box combination now?
Mr. Hanratty: we spoke with Mr. Seeger; he told us what needed to be done & we were
in the process of doing (a week ago); & there's been on-going work to get the property
in the condition in terms of bldg materials that Mr. Seeger wants
-our proposal would be that anytime from Mon on would be the inspection; when we get
the report, we'd go for bids; review the bids when they come in to develop a project
plan & present it to you for approval; produce & sign construction contract so we can
begin renovation on it by Apr 17
-our attorneys are working on a draft agreement; we're meeting this afternoon to go
over the details
-estimate: in the high $70s to do the repairs
Mr. Magner: let's walk thru this again on exactly how this would work, who are the
entities & how will their roles play out
Ms. Tobak: Neighborhood Assistance for Homeowners is a nonprofit organization; I'm
Executive Director & I would be their communication manager
Ms. Hanratty: I fund HomeLiberty & would actually have a contract with Mr.
Henneman; those monies would be dedicated only to that project & could only be
released after the work has been done & approved by a certified project manager; the
major work is for the new systems: plumbing, electric, HVAC & others, we would hire
a project manager because I want someone there inspecting & making sure that
everything is getting done; it's work that a licensed 3rd party will be doing; those funds
would be placed in escrow at the attorney's office & there would be a signature required
from the inspector as well as from me before any funds could be released; the funds
would be strictly controlled
Ms. Moermond: what is the legal situation between you guys?
Ms. Hanratty: none
Ms. Moermond: Why would the money be going between your two organizations if you
don't have a contract between you; what's your operational set-up?
Ms. Hanratty: we're totally separate companies; I would not be funding Neighborhood
Assistance because of the restriction on transfer of title
Ms. Moermond: if he's not paying, do you get money?
Mr. Magner: the property owner is not here; he actually has control of the property & he
City of Saint Paul Page 8
Legislative Hearings Minutes - Final February 27, 2018
has conditions that he has to meet because he's contractually obligated to pay his
mortgage company; at some point, he reached out to Neighborhood Assistance and
asked for help with this; I could see that a nonprofit might be stepping in to help him
do that but our experience with nonprofit agencies doing those kinds of things is that
they generally take over the role as project management but you're saying that they're
just acting as a go-between between Mr. Henneman & HomeLiberty, who will be
funding this & hiring their own separate project manager who will be doing the
re-development; is that correct?
Ms. Hanratty: that is correct; the difference in this particular case.... our original plan
was that we would fund Neighborhood Assistance because they would buy into the
property to fund the construction & that is the normal way that I would do it
Mr. Magner: you are focusing on a previous model that you are used to using but in
this specific case, you can't do that; so, let me narrow the scope a little bit
1) at this point, HomeLiberty is going to enter into a contractual agreement with Mr.
Henneman to give him money & to provide services for rehabilitation; at the end of that
contract, when the property is rehabilitated & it's no longer a nuisance building, & it
can be sold, what happens then? Does the title transfer to HomeLiberty?
Ms. Hanratty: at that point, Neighborhood Assistance would become a partial owner of
the property & there would be a mortgage on the property that would be paid by Mr.
Henneman
Mr. Magner: how is he going to pay back this mortgage & his first mortgage?
Ms. Hanratty: he will have the income to pay the amount that's required in order for
him to get the property into a situation where he can lease out the 2nd unit
Mr. Magner: have you pre-qualified him for that?
Ms. Hanratty: yes, I have
Mr. Magner: what happens if this all falls through?
Ms. Hanratty: it's a fairly clean transaction; I'm going to provide a loan to Mr.
Henneman; as a part of my loan covenance, I'm requiring that there be a licensed &
bonded project manager in place, whether he's a 3rd party or a general contractor
remains to be seen; at the beginning of that period, I have a 2nd mortgage & if during
that period, performance is unable to be completed for whatever reason, I would be in
a position where I would have to foreclose, which is not something that I want to do
Mr. Magner: in this particular "hybrid" of your normal situations, Neighborhood
Assistance is simply just holding Mr. Henneman's hand & reminding him of his
obligations; where does Neighborhood Assistance's money coming from?
Ms. Hanratty: they work with attorneys; they've got independent clients; they're a
foreclosure ___ agency
Mr. Magner: in this scenario, Neighborhood Assistance isn't going to obtain any
ownership of this property; you're just basically there as a 3rd party....
Ms. Hanratty: they would after the Certificate of Compliance was issued
City of Saint Paul Page 9
Legislative Hearings Minutes - Final February 27, 2018
Mr. Magner: wait a minute; let's back-up; you're saying that after the project's
completed, you are going to obtain ownership?
Ms. Tobak: a partial ownership; that's in the contract
Mr. Magner: how does Mr. Henneman sell a partial ownership interest when he has a
mortgage? Generally, when you have a mortgage, you have a mortgage with a lender &
it says, "You do this, you get this money; you get to buy a house; if you have a
problem, we will come after you;" you, during that period of time, don't have the right,
under that mortgage, to sell any interest in that property...
Ms. Hanratty: .. without the permission of the lender
Mr. Magner: Mr. Bjerkness, would your lender be open to selling a percentage of this
property?
Ms. Bjerkness: I can't answer that for certain without knowing more details; once a
Certificate of Occupancy is obtained, there's nothing prohibiting Mr. Henneman from
deeding half of his interest to homeownership thru a nonprofit; there's nothing
prohibiting that as long as the mortgage is paid & is satisfied upon the sale; whoever
has a fee title interest is really irrelevant to my client at this time
Ms. Hanratty: and all of this is contingent upon the continued payment of the first
mortgage; normally, I do not do 2nd mortgages; the reason that I'm doing this 2nd
mortgage is because Mr. Henneman cannot get financing because of the current
situation of the house; he also has financial issues that he needs financial counseling
on, which is what Neighborhood Assistance does, which is totally separate from me
Ms. Bjerkness: what does Neighborhood Assistance having an ownership in Mr.
Henneman's property mean going forward?
Ms. Hanratty: frankly, we have to work that one out; when Neighborhood Assistance
couldn't buy in, which we just confirmed last week, that changed the plan; our
attorneys came up with a construction contract idea; what we need to do right now, is
to settle what the situation is going to be until we get code compliance & an
occupancy permit
Mr. Tobak: our program is primarily here to protect the homeowner
Ms. Moermond: I asked Ms. Vang to check the computer system & there still is no
lock box code in there
-I'm assuming that you're looking for 180 days
-I need to see a detailed Scope of Work with timelines
-we need evidence of HomeLiberty's ability to finance this
-need to see what that 2nd mortgage agreement would look like on this property
-like to see legal arrangement between HomeLiberty & Neighborhood Assistance for
Homeowners
-we need contractor's stuff
-get the contracts in for our attorneys to review
-need evidence of financing $100,000
-I would like to review this 2 weeks from now on Mar 13 at LH
Need the following conditions met:
City of Saint Paul Page 10
Legislative Hearings Minutes - Final February 27, 2018
1. Evidence of financing to be used for the project (Estimate of repairs at $100,000);
2. provide a draft agreement between Doug Henneman and financier as to conditions
of mortgage and rehab of property. Note, this draft agreement needs to be received
and approved by the City. Subsequently, a signed version must be submitted;
3. ensure premise is ready for code compliance inspection by Monday, March 5; and
4. the property must be maintained.
If these conditions are met, will do a layover to provide a detailed work plan or sworn
construction, including timelines and bids for the project.
Laid Over to the Legislative Hearings due back on 3/13/2018
10:00 a.m. Hearings
4 RLH RR 18-9 Making finding on the appealed nuisance abatement ordered for 106
KING STREET EAST in Council File RLH RR 17-21.
Sponsors: Noecker
Nuisance has been abated.
Referred to the City Council due back on 3/7/2018
11:00 a.m. Hearings
Summary Abatement Orders
5 RLH SAO 18-13 Appeal of Sherita Mosley, MCO Holdings; and Jay Mitchell, Northern
Holdings; to a Summary Abatement Order at 1839 SAINT ANTHONY
AVENUE.
Sponsors: Stark
Jay Mitchell, Northern Holdings LLC, MCO Holdings Ltd, appeared.
Supervisor Lisa Martin: we mailed a Summary Abatement Order Feb 1, 2018 to
Northern Holdings LLC in Minnetonka & the Occupant; it was for repairing a defective
sewer; compliance was Feb 7, 2018; the Sewer Utility Division had sent a Notice Oct
19, 2017 to have this sewer line taken care of; nothing was done & there was no
response; Nov 20, 2017, they sent a 2nd Notice to have it done; still no response; so,
we sent out a Notice on Feb 1, 2018 with a compliance date of Feb 7, 2018
-I spoke with Sherita at Northern Holdings about the situation; I also talked with Jay
Mitchell a couple of times; on Feb 6, Mr. Mitchell said that he was looking at
contractors; I explained to him that he needed to have a signed contract by Fri, Feb 9
or the city would send a contractor to take care of it; he said that he had that in play -
the contract would be signed & sent over to us by Fri morning; after that, the appeal
was signed
-I have no contract at this time
Ms. Moermond: asked Ms. Martin to describe the conditions that led to the Order
Ms. Martin: 4 violations were noted: 1) settlement of the surface of the
street/blvd/sidewalk that can pose a hazard to traveling public; 2) the pathway for
City of Saint Paul Page 11
Legislative Hearings Minutes - Final February 27, 2018
sewage to enter the ground; 3) the pathway for rain, ground water, or dirt to enter the
public sewer system; & 4) rats
-they had sent out copies of maps where exactly the rat holes were; where the break in
the sewer line was, etc. to the owner of the property & I have discussed this with Jay;
I'm just waiting on a contract
-maps/drawings (entered & scanned)
Ms. Moermond: what are your plans?
Mr. Mitchell: as far as I know, we have a signed contract with Triple E Water & Sewer
LLC; we sent that over; we weren't sure that we were going to get it done, so Sherita
filed an appeal
Ms. Moermond: this has been going on for months
Mr. Mitchell: originally, the Notices were going straight to Northern, the mail wasn't
being forwarded to MCO; I don't know how that happened
Ms. Moermond: I would correct that with Ramsey County Taxation
-do you have the contract with Triple E with you?
Mr. Mitchell: No, but I can look it up on my email, if you don't mind
Ms. Martin: so, is the work done?
-there's no permit on file to do any work at this time
Ms. Moermond: my background with this is that sewer repair work goes on regardless
of time of year; regardless of frozen ground
Mr. Mitchell: I found it on my phone & is emailing it to LH office; I had sent it over to a
Natalie
Ms. Martin: is calling Mr. Ekobena, Sewer Division, PW
Ms. Moermond: is reading the contract from Feb 9 to repair the sewer from house to
the main; quote is $9000; we have your signature on it on Feb 9; so, they didn't give
you a day when they would begin or finish their work;
Mr. Mitchell: he said that once the frost was removed.....
Ms. Moermond: we're not going with that
Mr. Mitchell: I'm hearing you; I'm just telling you what I was told; he said that he had
talked to someone over in Sewers & they had an understanding; this is just what I
know
Ms. Moermond: I just read that the $9000 is good right now & the only reason that
would change is the arrival or departure of frost; sounds like your square whether
there's frost or not
Mr. Mitchell: I thought that I had done all the right steps
Ms. Moermond: we just need to make sure that there's a permit filed now or in the very
near future; then, we need to put a deadline on this for getting the repairs actually done
City of Saint Paul Page 12
Legislative Hearings Minutes - Final February 27, 2018
Mr. Mitchell: I do know that this goes under our front stairs & he said that if he did do
the work, he may/may not destroy/disturb the front stairs; hence, pouring concrete
would be even harder in the winter
Ms. Moermond: you'd have to construct a stairway out of wood then, temporarily, so
there'd be access for your tenants & others going in & out of that entrance
*Pause taken for Inspector Martin to return
Ms. Martin: I spoke with Bruce Elder, Manager, Sewer Utilities Division, who got me in
touch with Richard Ekobena, who verified that there is no permit or signed contract in
their possession; as far as they're concerned, no action has been taken & this does
need to be resolved
Ms. Moermond: you have a signed contract with Triple E & they need to get a permit &
share that contract with the Sewer folks; you have had that bid since Feb 9; is Triple E
ready to execute now?
Mr. Mitchell: I would assume so; it was my understanding that I get the contract in;
they make further communications with whomever on the city side & they arrange this
Ms. Moermond: we have a sewer break & a rat problem; I don't know how this went on
this long without showing up here as an issue with an Abatement Order
-I will recommend that City Council grant until close of business next Fri, Mar 9, 2018
for the work to be completed; it should be plenty of time for them to undertake the
work; if they're not done with it, the city will initiate the work & the cost will become an
assessment onto the taxes; so, it's probably cheaper to have your folks do it now than
have the city take it over
Mr. Mitchell: I can't control Triple E
Ms. Moermond: the city will take the low bidder on a project like this; if Triple E can't
get it done; they you need to find somebody who can get it done or the city will
-if permits aren't closed on Mar 9, Ms. Martin will begin to hire a contractor on Mon 12,
2018
-I will put this on the City Council's agenda for Mar 7, 2018 & if you disagree with this,
you can talk with the City Council about a different deadline at that time
Mr. Mitchell: if it's done in a month from now..... when there is no frost ... how does
that adversely affect anything during that 30-day time?
Ms. Moermond: well, we have rats, sewer seepage causing the sidewalk to sink; we
have contamination of soils - all of these things have been happening; I am stunned
that it's been happening since Oct, 2017 & the fact that you guys didn't take action
back in Oct, which would have preceded frost setting in, is on you; & realistically, frost
won't leave the soil until at least mid-Apr;
-in the interest of public health, this situation has to come to an end sooner rather than
later; & if you don't do it, the city will
___
Grant to close of business on March 9, 2018 to comply with the sewer line.
Referred to the City Council due back on 3/7/2018
City of Saint Paul Page 13
Legislative Hearings Minutes - Final February 27, 2018
11:30 a.m. Hearings
Orders To Vacate, Condemnations and Revocations
6 RLH VO 18-7 Appeal of Kelly Skie to a Fire Certificate of Occupancy Revocation and
Order to Vacate at 919 LAWSON AVENUE EAST.
Sponsors: Bostrom
Kelly Skie, (Wilke), owner, appeared.
Fire Inspector A.J. Neis: Revocation of the Fire Certificate of Occupancy / Order to
Vacate issued by Inspector Jonathan Gaulke for long term noncompliance; Mr. Gaulke
certified the building back in Apr 2017 & issued an Approval with Corrections with only
3 violations: 1) attend landlord class (class was cancelled); 2) dryer vent repaired
under permit; permit was pulled; however, the mechanical inspector noted that the
repairs still needed to be done; and 3) ceiling tile issues in the basement
-we have received multiple complaints on this property in the last couple of years; we
had to provide city trash containers; love seat in front yard; junk in the alley; leak in the
upstairs bathroom toilet; overflowing trash; garage full of garbage; mattress, toilet,
shingles; chair left out for 3 weeks; mice; sink, toilet issues; holes in porch ceiling;
this property just isn't being managed
-after the approval we pulled an early C of O after all of the complaints & was told by
the occupant that the owner was just going to sell the property & be done with it; they
haven't sold it & they put a new tenant in there
Ms. Moermond: after the approval with conditions, when did the inspector come back
to check on the items that were left?
Mr. Neis: was approved in Apr 2017; inspector came back on May 30, 2017; the work
was still not done, so he pushed the extension to Jun 29, 2017; a complaint came in
so the inspector went back in Jul; another complaint in Oct 2017 about mice, sink
leaks, toilet issues; in Nov 2017, the landlord signed up for Landlord 101 Class for Apr
2018; then, another complaint came in on Nov 22, 2017 that the heat was not working
properly; so, based on those circumstances, we pulled an early C of O inspection
-current tenant planned on moving out; owner planned on selling; months later another
referral came in & at that time, there were new tenants
-multiple code issues & long term noncompliance
-it's a Class D now that it's been revoked
Ms. Moermond: provided Ms. Skie with a Fire C of O form to update her contact info
Ms. Skie: I had to evict my previous tenants because of the garbage issue & them
not taking care of the property; I got new tenants in Jan 2017 & all of the violations
were taken care of except for the dryer vent; the Landlord class was cancelled; I
applied for the dryer permit & I had it repaired; I did not hear from the fire inspector
from Apr 2017 to Oct 2017; he was not at my property; he did not do a re-inspection
because there were no issues; in Oct, I had an issue with my tenants & I gave them a
30-day Notice to vacate because of city fines for garbage ($488 in Jul); I told them that
they needed to pay that, which is their reponsibility per the lease & they got upset &
called the fire inspector in retaliation; so he came & gave me 15 violations, which I
took care of immediately; the tenant tried to escrow her rent; everything was repaired,
City of Saint Paul Page 14
Legislative Hearings Minutes - Final February 27, 2018
so I wasn't worried about it; we went to court in Nov; I talked to the inspector about the
dryer permit; he told me that the permit has not been closed out; I didn't even know
what that was; I called down & said that I needed to close this out, could somebody
come look at it & inspect it; they said, "Not a problem;" that was in Nov 2017; he said
that there was 1 issue with it; he was going to notify the fire inspector & get back to
me; I never heard from the fire inspector & he said that he couldn't tell me whatever the
issue was so, I just waited to hear from the fire inspector
-there have been multiple notices of violations going to a bad address with the wrong
name; I did supply a form to the Fire & Safety Inspections with my current name &
address & I haven't gotten anything since Oct, 2017 so, I worked off the last report I
had from Oct 2, 2017; everything was complete; we went to court with Judge Frisch on
Nov 13; the tenant said that everything in that house was taken care of that was her
responsibility, which is not showing on the current violations (washer, dryer, clock on
the stove, mice) so the property manager went to the property Jan 4, 2018 to double
check - it was not done; he gave her an additional week to complete it; she said that
she had an appointment with HomeSmart to come look at the appliances; we went to
the property Jan 20; she denied access to the house & changed the locks; we evicted
her the next Mon & she is set to be out on Mar 30, 2018
-the property has sold; the new closing on the house is Apr 6, 2018
-I did include a lease as well as her eviction notice; you'll see that all the violations are
the tenant's responsibility; there's nothing I can do but enforce the lease & get her out
of there to get the repairs done
-I didn't think that Revocation was the necessary step considering that these are
appliances, not life-threatening issues & they are still allowing her to stay on the
property & when I was at DSI, they said that nobody could live there; so, if that's the
case, we need to stick with that
Mr. Neis: I understand that these are the tenants' violations but ultimately the
Revocation falls upon the owner because the owner is ultimately responsible for what
happens inside of the bldg; the Revocation in this case was warranted by multiple
complaints & multiple violations
-did you screen your 2nd set of tenants?
Ms. Skie: yes; and I'm not going to be a landlord any more because of my horrible
tenants
-we're removing the dryer vent; capping it; taking the dryer out
Mr. Neis: in that case, you need to get the stuff done before you can sell
Ms. Moermond: right now, your re-check is scheduled for Apr 2, 2018 & I think that
you're going to want to sell this property with the Fire C of O; so, you're going to want to
have an inspection that week to make sure that everything's been taken care of
-the vacate date right now is Apr 2, according to the city; that's when they'll re-check to
find out if somebody is still there; her vacate date is Mar 30 & your closing date is Apr
6
Mr. Neis: if the broken glass is fixed; the dryer vent is capped; get the fuel safety test
done
Ms. Skie: the house will be owner-occupied
-if the tenants don't fix the appliances, we're getting rid of them
Mr. Neis: I'm confident, she should be able to get her C of O back
-TISH dated Feb 21, 2018
City of Saint Paul Page 15
Legislative Hearings Minutes - Final February 27, 2018
Ms. Moermond: if you're sure that they're going to be owner-occupants, you won't need
to get a C of O; you need it if you're going to have this be a rental property; either way,
you can get your C of O if you have the inspection the first week of Apr or you can let
the C of O go; it's not going to go into the Vacant Building Program if somebody
moves right into it; if the new owners are actually going to rent it, they are going to
need to establish a Certificate of Occupancy to do that
Mr. Neis: the only possible concern that I would have on the Appellant's behalf is if
they don't have a C of O, if at the title closing, there were to do a screen & found that it
has a Revocation, could that effect the closing? We don't want that to happen; we're in
a quandry because it's a C of O bldg & tenants are in there right now but if the tenants
move out, then, it's technically, a Vacant Building & if the closing happens, it would
need a C of O in case the title company said, "It's a VB" or "It's Revoked" they may
not allow the closing to happen
-so, we could get the C of O & once it closes, they can confirm with us & then we
could close it out & make it not a C of O bldg
-once it's Revoked, the computer system will show it as Revoked unless the C of O is
approved
Ms. Moermond: but, if it's under appeal, enforcement is stayed
Mr. Neis: we can't change the computer system designation based on the stay of
enforcement
Ms. Moermond: I'm going to grant the appeal on the Revocation of the C of O, so the
Certificate is not Revoked; we'll keep the current deadline of Apr 2, 2018 for a
re-inspection; if things are taken care of by Apr 2, then, the Certificate will be issued;
that doesn't mean that they couldn't take additional enforcement action at that time but
it gets you through (you wouldn't have a Revocation on the record right now)
Mr. Neis: we can make that work
Ms. Moermond:
Grant the appeal on the revocation and order to vacate but items in the order remain in
place and will be inspected on April 2, 2018 for sign-off.
Referred to the City Council due back on 3/14/2018
1:30 p.m. Hearings
Fire Certificates of Occupancy
7 RLH FCO Appeal of Heidi Schwarze, Unilev Management Corp o/b/o Bureau of
18-26 Alcohol, Tobacco and Firearms, to a Fire Inspection Correction Notice at
30 SEVENTH STREET EAST.
Sponsors: Noecker
Heidi Schwarze, Unilev Management Corp, appeared o/b/o Bureau of Alcohol, Tobacco
& Firearms, appeared.
Fire Supervisor Leanna Shaff: Fire Certificate of Occupancy inspection conducted on
City of Saint Paul Page 16
Legislative Hearings Minutes - Final February 27, 2018
Jan 22, 2018 by Inspector Mitch Imbertson
-only #5 is being appealed: Remove unapproved locks from the exit doors. The door
must be openable from the inside without the use of keys or special knowledge or
effort.
Commercial Fire Inspection Supervisor Jim Perucca: the ATF's interview room has
locking devices that aren't consistent with the occupancy type of the Wells Fargo
Towers; Wells Fargo Place is a 37 story bldg
-the interview room is adjacent to a work room & both require at least 1 approved exit
back up to the suite that does not require a key/card access; current arrangements
require the key/card to get into the room & must be swiped again to get back out; this
also does not appear to be tied into the fire alarm system or have any other kind of
emergency override on the locking system
-MN State Fire Code, Chap 10 - Means of Egress, Section 1008.1.9.3 Locks &
Latches - indicates that locks & latches shall be permitted to prevent operation of
doors where any of the following 9 conditions exist; the condition that most closely
resembles this condition is the 9th: "In rooms other than cells where occupants are
being restrained for safety or security reasons, special detention arrangements that
comply with the requirements of Section 1008.1.11 are permitted"
-special detention arrangements in 1008.1.11 - "special detention arrangements meet
the requirements of this Section 1008.1.11 - 1008.1.11.4 are permitted for the rooms
other than cells where the occupants are being restrained for safety or security
reasons, the use of this section may be revoked by the Fire Chief or Fire Code Official
for due cause;" but it goes on to say in the next section "Locking hardware and
locking devices shall release upon any of the following conditions: 1) activation of the
sprinkler system; 2) activation of the fire detection system; 3) activation of fire alarm
system; 4) loss of power to the locking device or the fire alarm system; 5) activation of
the ____ to the fire alarm system; and 6) operation of a manual switch located in an
approved condition"
-in all of the locking devices they shall be designed to fail in the open position and
also, to re-lock them, it has to be done by manual means; with that, there are 3 other
conditions that we would ask that this suite would comply with: Section 1008.1.11.2 -
Fire Extinguishing Systems - When special locking arrangements are used, a room or
area being secured must be protected with quick response sprinklers; standard
response sprinklers activate between 155-165 degrees F; quick response activate at a
lower degree, around 140 degrees F; it might require replacement of 1 or 2 heads; I
don't know how many are in that room; the 2nd is Fire Detection System - When
special locking arrangements are used, the room or area between the room & areas on
the outside exits shall be protected with automatic smoke detection connecting to the
building's fire alarm system & if the walls of the room or area do not extend to the
ceiling, automatic smoke detection can be provided in an adjacent room or area
provided that there's no substantial obstruction to the delay activation; & finally, the
door swing must be in direction of travel
-on Insp Imbertson's inspection, he did not have the info that the fire alarm system
was tied to this locking device; at the time, either it was or he couldn't provide any
documentation; if we could achieve that with documentation that it will release should
the fire alarm system activate, the alarm system activates .......
Ms. Moermond: we have a secure room; this is an interview room; the ATF have
people being interviewed in there, some of whom need to be restrained for public
safety purposes; right now, access in & out of the room requires a key card; the room
is sprinklered but it may not be equipped with highly sensitive sprinklers; with respect
to tying the access egress to the fire alarm system - tell me more about that
City of Saint Paul Page 17
Legislative Hearings Minutes - Final February 27, 2018
Mr. Perucca: the bottom line is that the lock should open should the fire alarm system
go off or if the sprinklers go off in that area; they should automatically release; the
lock should release should you lose power to that room; the other condition was there
is a manual override at some designated location
Ms. Shaff: this is an I-Occupancy & the code is more stringent on how things happen
because their access is highly controlled; in this particular instance since it's a
B-Occupancy, 4 things need to happen: 1) doors unlocking upon alarm; 2) sprinkler
activation - sprinkler's quick response; 3) smoke detection is tied to the alarm; and 4)
the door swings in the direction of exit travel
-this has been discussed with bldg management, according to Insp Imbertson
Ms. Schwarze: I was actually there with Mitch; there wasn't real discussion around
alternative arrangements; we did know that it's not tied into the fire alarm system,
which I am working with our vendor now to get it tied in;
I can add to their scope the quick response sprinkler heads; the manual override -
we're happy to comply with
Ms. Moermond:
Grant the appeal if the 3 conditions listed below pertaining to the interview room are in
compliance by April 9:
1) quick response sprinklers;
2) automatic door lock release in the event of alarm condition;
3) automatic smoke detectors within room tied to alarm system.
Referred to the City Council due back on 3/28/2018
2:30 p.m. Hearings
Vacant Building Registrations
8 RLH VBR 18-8 Appeal of Troy Olson to a Vacant Building Registration Fee Warning
Letter at 164 STEVENS STREET WEST.
Sponsors: Noecker
Troy Olson, Superior Development Inc, appeared.
Supervisor Matt Dornfeld, Vacant Buildings: I was called to this property after a
referral received from the St. Paul Fire Dept on Jan 11, 2017; in their Fire Report, they
documented severe damage to the interior/exterior of the home; the garage is a
complete loss; there was also at least on e severely damaged vehicle in the fire; I
opened a Category 1 Vacant Building file; we held the VB fee for the first 90 days;
then, permits had been pulled; rehab had started; & we gave an additional 180 days for
the work to be completed in 2017; the property has not been a nuisance; it's been
maintained; major rehab has been done
-the 2017 VB fee went to assessment in Dec 2017
-we're here today to discuss the 2018 VB fee that is past due & has also gone to
assessment on Feb 1, 2018
-went past there yesterday; the rehab is impressive from the exterior
Mr. Olson: 3-4 weeks until we finish
City of Saint Paul Page 18
Legislative Hearings Minutes - Final February 27, 2018
Ms. Moermond: today, we're discussing the 2018 VB fee; you didn't appeal it earlier;
you're going to be done in a few weeks; fantastic! DSI has already referred it to
assessment because it hadn't been paid; it is scheduled for the assessment roll on
Apr 3 LH; Council on May 16
-I can deal with it as an assessment; your assessment Legislative Hearing is
scheduled for Apr 3, 2018; we can look at your record on May 1 & if you're done, I'll
recommend deletion; if not, we'll need to talk on May 1 LH & I can prorate it; you'll get
a letter telling you about the Apr 3 hearing
Mr. Dornfeld: when you get those permits finaled, call me the day of; then, I'll get you
closed out of the system
Ms. Moermond:
____
Deny the appeal, noting the vacant building fee has gone to assessment. (Scheduled
for LH on 4/3 with public hearing on 5/16.)
Referred to the City Council due back on 3/28/2018
City of Saint Paul Page 19
Agenda
15 West Kellogg Blvd.
City of Saint Paul Saint Paul, MN 55102
Meeting Agenda
Legislative Hearings
Marcia Moermond, Legislative Hearing Officer
Mai Vang, Hearing Coordinator
Jean Birkholz, Hearing Secretary
legislativehearings@ci.stpaul.mn.us
651-266-8585
Tuesday, February 27, 2018 9:00 AM Room 330 City Hall & Court House
9:00 a.m. Hearings
Remove/Repair Orders
1 RLH RR Ordering the rehabilitation or razing and removal of the structures at
18-11 521-523 DESNOYER AVENUE within fifteen (15) days after the March 14,
2018, City Council Public Hearing.
Sponsors: Stark
2 RLH RR Ordering the rehabilitation or razing and removal of the structures at 96
18-12 MANITOBA AVENUE within fifteen (15) days after the March 14, 2018,
City Council Public Hearing.
Sponsors: Thao
3 RLH RR 18-2 Ordering the rehabilitation or razing and removal of the structures at 1536
VAN BUREN AVENUE within fifteen (15) days after the February 14,
2018, City Council public hearing. (Amend to remove within 15 days with
no option for rehabilitation)
Sponsors: Stark
10:00 a.m. Hearings
4 RLH RR 18-9 Making finding on the appealed nuisance abatement ordered for 106 KING
STREET EAST in Council File RLH RR 17-21.
Sponsors: Noecker
11:00 a.m. Hearings
Summary Abatement Orders
5 RLH SAO Appeal of Sherita Mosley, MCO Holdings; and Jay Mitchell, Northern
18-13 Holdings; to a Summary Abatement Order at 1839 SAINT ANTHONY
AVENUE.
Sponsors: Stark
City of Saint Paul Page 1 Printed on 2/26/2018
Legislative Hearings Meeting Agenda February 27, 2018
11:30 a.m. Hearings
Orders To Vacate, Condemnations and Revocations
6 RLH VO 18-7 Appeal of Kelly Skie to a Fire Certificate of Occupancy Revocation and
Order to Vacate at 919 LAWSON AVENUE EAST.
Sponsors: Bostrom
1:30 p.m. Hearings
Fire Certificates of Occupancy
7 RLH FCO Appeal of Heidi Schwarze, Unilev Management Corp o/b/o Bureau of
18-26 Alcohol, Tobacco and Firearms, to a Fire Inspection Correction Notice at
30 SEVENTH STREET EAST.
Sponsors: Noecker
2:30 p.m. Hearings
Vacant Building Registrations
8 RLH VBR Appeal of Troy Olson to a Vacant Building Registration Fee Warning Letter
18-8 at 164 STEVENS STREET WEST.
Sponsors: Noecker
City of Saint Paul Page 2 Printed on 2/26/2018