Tuesday, October 9, 2018 9:00 AM Room 330 City Hall & Court House
9:00 a.m. Hearings
Remove/Repair Orders
1 RLH RR 18-38 Ordering the rehabilitation or razing and removal of the structures at 610
SAINT ALBANS STREET NORTH within fifteen (15) days after the
September 26, 2018 City Council public hearing. (Public hearing held
September 26; laid over from October 10) (Amend to remove within 15
days)
Sponsors: Thao
No one appeared.
Ms. Mai Vang: Ms. Askar emailed me at 7:25 this morning; she's now in Brainerd &
running late
Ms. Moermond: my concern is the financing on this; every time we ask the question,
different financing comes up; it started out that she didn't really have financing to do
the rehab; then, she showed approval of a loan but it wasn't actually closed; then, she
said that her brother had a couple of personal accounts that could be used to fund the
rehab; he was not present & had no information to share; after that, I was contacted by
her banker, David Harvey, BNC National Bank; he indicated that Ms. Askar & her
brother were approved for a loan to rehabilitate both 677 Thomas single family house &
610 St. Albans duplex both on this parcel; that loan was to have been closed last
week; for that reason, I asked Council for a Lay Over; at first she had wanted to rehab;
then, she told us that she wanted to demo it; then, at the last meeting, she wanted to
fix it again; she shared her brother's account information again; the last construction
loan would only cover the fixing of 610 St. Albans & not both of them; I haven't heard
from the bank as to whether they closed the construction loan
Ms. Vang: as of yesterday, BNC National Bank is no longer in the pictures; the new
bank is Mid Country; they have submitted new information to the file; it's printed &
stapled together; Ryan Sayer
Supervisor Steve Magner: an email was sent by Reid Soley on Fri, Oct 5, 2018, "Dear
Marcia: Received a call today from a banker who intends to lend money for the repairs
required at the property at 610 St. Albans St N & 677 Thomas Ave. He informed me
that Ayan Askar, Hooyo Huno Housing LLC, owns this property & intends to sell the
City of Saint Paul Page 1
Legislative Hearings Minutes - Final October 9, 2018
property to her brother. Bank loan would be issued in her brother's name. I told him
that our Legislative Code prohibits the transfer of title of a residential Cat 3 VB
property. The banker intends to contact the LH Officer; his name is Ryan (I did not
write down his last name but his phone number is 602/434-9200."
-so, I'm having some concerns, as probably you are, as to --- we were led to believe
last LH two weeks ago that this was a done deal; that we had a loan & all we simply
had to do was go to this hearing; get a recommendation of time from the LH Officer &
then move forward to closing; now, I don't think that's happening
-another question: conflicts with the construction plans; McLemore Construction
submitted a multi-page plan for 610 St. Albans
Ms. Moermond: that was a perfectly good sworn construction statement but it didn't
have a schedule on it; after a few conversations, the owner of McLemore Construction
did provide a rudimentary schedule
Mr. Magner; I have some of that documentation; my concern is that the estimated
numbers for the electrical don't match up
-I'd like to see McLemore give us the plans for both bldgs & their subs' estimates
Ms. Moermond: I asked for those in an email on Oct 1, 2018; plans & bids for one
property / plans & bids for both properties
Mr. Magner: OK; so all that was talked about at the last LH, articulated in Mai's letters
& reiterated in your email of Oct 1, 2018
-Ms. Askar is in arears with Ramsey County
Ms. Moermond: that time period has run out; there was a 12-month time period the
county gave on its Contract for Deed it had issued to the Jansen/Wenzel ownership
last summer; Jansen/Wenzel got that Contract for Deed on the condition that they sell
the property within 90 days to someone capable of executing the rehab; that Contract
was sold to Hooyo Huno Housing LLC, who assumed the necessity to have it rehabbed
by this summer; so, they had 9 months in which to execute a rehab for 677 Thomas &
610 St. Albans; they did not meet that requirement & in fact, are several months
behind their terms & they haven't pulled a permit on either one of the properties; so,
Ms. Kujala indicated that the county was initiating Cancellation of Contract proceedings
on that Contract for Deed; if they initiate this rehab & have an agressive timeline, the
county would be willing to work with them but we don't have a real plan or financing
Mr. Magner: we dont' have a complete or thorough rehab plan & we are lacking a
finance requirement
Ms. Vang: McLemore submitted an estimate yesterday; the total amount is different
now = $72,000
Ms. Moermond: Mid Country says that the loan approval (not closed) is dated Aug 20,
2018; last time, she showed us loan approval from BNC as evidence of financing; it's
not clear from whom they are getting their loan for this rehab; the bank said that
money would be dispersed as a construction loan thru a 3rd party
-Ms. Askar did provide info on her brother's personal loan; she submitted an affidavit
but doesn't state the amount
-this is front of Council tomorrow
-even if Ms. Askar's brother, co-owner, spent all of the money that he has in his
accounts that are shown with a total of $67,000, it still does not equal the cost of the
revised Work Plan for the 1 property, let alone the 2 properties
City of Saint Paul Page 2
Legislative Hearings Minutes - Final October 9, 2018
-I'm going to reject that as a financing source & Mid Country will be responsible for
getting back to me with what they have for plans & based on their questions for
continuance,..... I don't have any concrete info for when there's a closing scheduled,
etc, all is unknown to me; they're not here & she is not here today
____
Remove the building within 15 days with no option for repair, unless Appellant can
provide approved financing documentation to support her case.
Referred to the City Council due back on 10/10/2018
2 RLH RR 18-45 Ordering the rehabilitation or razing and removal of the structures at 1232
SEVENTH STREET EAST within fifteen (15) days after the November 7,
2018 City Council public hearing.
Sponsors: Prince
Melissa Porter, Shapiro & Zielke, LLP, appeared representing Harrington Mortgage
Services & Mers
Steve Magner, Code Enforcement Manager:
-The building is a two-story wood frame triplex on a lot of 6,970 square Feet.
According to our files, it has been a vacant building since November 3, 2016
-The current property owner is Mai Vue per AMANDA and Ramsey County Property
records.
-On May 23, 2018, an inspection on the building was conducted, a list of deficiencies
which constitute a nuisance condition was developed and photographs were taken. An
ORDER TO ABATE A NUISANCE BUILDING was posed on June 11, 2018 with a
compliance date of July 11, 2018. As of this date, the property remains in a condition
which comprises a nuisance as defined by the legislative code.
-Taxation has placed an estimated market value of $115,600 on the land and $123,000
on the building.
-Real estate taxes for the first half of 2018 have been paid
-The Vacant Building registration fees were paid by assessment on December 4, 2017.
-A Team Inspection was done on April 18, 2017 and has since expired.
-As of October 8, 2018, the $5000 performance deposit has not been posted.
-There have been nine (9) SUMMARY ABATEMENT NOTICES since 2016.
-There have been fourteen (14) WORK ORDERS issued for:
-garbage/rubbish
-boarding/securing
-snow/ice
-vehicles
-Code Enforcement Officers estimate the cost to repair this structure exceeds
$50,000. The estimated cost to demolish exceeds $15,000.
-this was referred to the VB Program by Fire Prevention Staff; they Revoked the
Certificate of Occupancy; there was a water shut-off & a gas/electricity shut-off
-WO for garbage in Sep; WO for emergency boarding in Aug; a bunch of WO's for
boarding in May-Jun; on-going issues
Ms. Moermond: we have returned mail from Mai Vue; was she the previous owner?
Ms. Porter: we haven't yet concluded our foreclosure process; we have a sheriff's sale
scheduled for Nov 27, 2018; so, my clients do not yet own the property; Mai Vue is the
current owner
City of Saint Paul Page 3
Legislative Hearings Minutes - Final October 9, 2018
-my clients are in the process of setting up the code compliance inspection; I don't
have a date certain; I just received the file within the last couple of days; once my
clients have the inspection report, they will make their determination
Ms. Moermond: they need to make application for the code compliance inspection
Ms. Porter: the Brokers Price Opinion is $179,000; the mortgage is around $143,000;
it's likely my client will repair but until they get the inspection report & have some
estimates for the repairs.....
-they have not yet applied for the shortened redemption period; that is often done after
the sheriff's sale
-asked for shut-off dates
Mr. Magner: the water was shut-off on May 30, 2017; the electric was shut-off on Jun
5, 2017; the gas was shut-off on Jun 20, 2017
-the bldg was Revoked in Nov 2016
-there were other complaints in Apr 2016: mold in the bathroom; no vent in bathroom;
bathroom light fixture doesn't work; kitchen sink leaking, entire floor is warped
-we started our action in Apr 2016 & ultimately Revoked the C of O & referred it to VB
in Nov 2016
Ms. Moermond: a team inspection took place in Apr 2017; it looks as though the
previous owner, Mai Vue , ordered it but your client could start looking at that now; we
will email it to you
-I would be happy to work with you on time
-you will need to clean it out before the trades inspectors will go in to inspect
Mr. Magner: you will need to contact Reid Soley, 651/266-9120 to see if it can remain
a triplex because it's been vacant for more than one year; it's existing use is listed as
residential multi-family
Ms. Moermond: there is no current Fire Certificate of Occupancy information
Mai Vang gave Ms. Porter a VB Registration form & 2 applications for a Code
Compliance Inspection (one duplex & one triplex)
Ms. Moermond: this will go to City Council on Nov 7, 2018
-get the junk out done within 2 weeks - by Oct 23, 2018; then, you can file your
application for the correct code compliance inspection; & have your VB form filled out
-get the $5000 performance deposit posted by Fri Nov 2, 2018
-I would like to also see a shortened redemption application to the Courts; I'd like to
see paperwork by Nov 2, 2018
____
The following conditions must be met in order to receive a grant of time:
1) interior clean-out by October 23;
2) shorten redemption application to Court by November 2;
3) post the $5,000 performance deposit by November 2.
If the conditions are met, on November 7 at the Public Hearing, the matter will be
continued to Legislative Hearing on November 27 to discuss work plans, bids &
financial plans.
Referred to the City Council due back on 11/7/2018
City of Saint Paul Page 4
Legislative Hearings Minutes - Final October 9, 2018
3 RLH RR 18-46 Ordering the razing and removal of the structures at 1213 THIRD
STREET EAST within fifteen (15) days after the November 7, 2018 City
Council public hearing.
Sponsors: Prince
Douglas Twait, Esq., DST & Associates appeared o/b/o Sally Foster, owner.
Steve Magner, Code Enforcement Manager:
-The building is a one story split-level wood frame single family dwelling with an
attached one-stall garage on a lot of 4,792 sq.ft. According to our files, it has been a
vacant building since January 18, 2018 due to a fire.
-The current property owner is Sally Foster per Amanda and Ramsey County Property
records.
-On May 16, 2018, an inspection of the building was conducted, a list of deficiencies
which constitute a nuisance condition was developed and photographs were taken. An
Order to Abate a Nuisance Building was posted on June 13, 2018 with a compliance
date of July 18, 2018. As of this date, the property remains in a condition which
comprises a nuisance as defined by the legislative code.
-Taxation has placed an estimated market value of $14,400 on the land and $77,700
on the building.
-Real estate taxes for the first half of 2018 have been paid.
-The Vacant Building registration fees were paid by check on March 8, 2018.
-As of October 8, 2018, a Code Compliance Inspection has not been done.
-As of October 8, 2018, the $5,000 performance deposit has not been posted.
-There have been five (5) Summary Abatement Notices since 2018.
-There have been six (6) Work Orders issued for:
-garbage/rubbish
-boarding/securing
-snow/ice
-Code Enforcement Officers estimate the cost to repair this structure exceeds
$50,000. The estimated cost to demolish exceeds $15,000.
-the fire may have originated in the attached garage & merged into the residence
-we have had no interaction with the owner at this time
Ms. Moermond: skimming the Fire Report; will email it to Mr. Twait
-the report notes that the estimated cost of damage to the building was $57,400; they
don't describe any damage to content or vehicles; they also note that it was a vacant
building at the time of the fire; there is heavy smoke damage throughout the house
-as Mr. Magner indicated, the fire investigator said, "After examination of the fire scene
and fire patterns of movement and the intensity observed, my conclusion is that the
fire started in the lower level along the west wall, approximately 1 foot to the south of
the interior garage service door. Ignition source was probably an open flame..... the
action that brought these items together was due to an intentional human act."
-someone started a fire in an empty house but they aren't listing it as being under
investigation but it may well be; the other possibility is that it may have been squatters
going in & starting a fire to keep warm
Mr. Magner: that is possible
Ms. Moermond: if Ms. Foster did live there, she did not live there at the time of the
fire; the county lists her address as 2000 White Bear Ave N; there was an attempt at
personal service telling her about these hearings today but she wasn't found by the
server, who gave us an affidavit saying that; evidently, she did get the Notice; is there
City of Saint Paul Page 5
Legislative Hearings Minutes - Final October 9, 2018
a mortgage?
-maybe you could tell me what Ms. Foster is up to & what's going on with the
insurance, if there is some
Mr. Twait: I haven't been given any information about insurance but I've been told that
as of last week, they have requested 3 demolition bids; I'm still waiting to hear what
they are; their intention is to demolish the property; I've also been told that they are
mowing the grass & trimming trees
Ms. Moermond: do you have a VB registration form, Mr. Magner?
Mr. Magner: No; suggested they call Joe Yannarelly, 651/266-1920 for a list of
licensed demo contractors in the City of Saint Paul
Ms. Moermond: this will be on the Council's agenda on Nov 7, 2018
Mr. Magner: in my opinion, there's enough time to be able to approve a bid before Nov
7, 2018
Ms. Moermond: on Nov 7, I will recommend removing the building within 15 days; that
would give your client 15 days to get this thing rolling
Mr. Magner: that means that we need to have a signed contract with a St. Paul
licensed demolition contractor within those 15 days; that's about 45 days from today to
obtain a signed contract that states the work will be done within 30 days; he went on to
further explain the process & list some examples
Ms. Moermond:
Remove the building within 15 days with no option for repair.
Referred to the City Council due back on 11/7/2018
10:00 a.m. Hearings
4 RLH RR 18-16 Making finding on the appealed nuisance abatement ordered for 1536
VAN BUREN AVENUE in Council File RLH RR 18-2.
Sponsors: Jalali Nelson
No Show; LO to 10/23/2018
Laid Over to the Legislative Hearings due back on 10/23/2018
11:00 a.m. Hearings
Correction Orders
5 RLH CO 18-37 Appeal of Michelle Camilo to a Correction Notice at 679 COOK
AVENUE EAST.
Sponsors: Bostrom
City of Saint Paul Page 6
Legislative Hearings Minutes - Final October 9, 2018
Rescheduled to October 16; owner wasn't able to make Oct 9 hearing.
Ms. Moermond: tell her to bring her bids along next week.
Laid Over to the Legislative Hearings due back on 10/16/2018
6 RLH CO 18-39 Appeal of David Simons to a Correction Notice at 1033 DESOTO
STREET.
Sponsors: Brendmoen
Ms. Moermond: he indicates that he has money issues; the gas & electric are off;
does that continue to be the case?
Supervisor Lisa Martin: I'll call Xcel & ask for an updated status on 1033 DeSoto
A Recess was taken while Ms. Martin placed her call to Xcel.
Ms. Martin: Xcel states that the gas/electric are still off & there's no notes in the
system that county assistance is kicking in or that there are any other agreements at
this time; compliance date was Oct 3, 2018
Ms. Moermond: the next course of action would be to issue a Condemnation/Order to
Vacate
-I will recommend to deny the appeal at City Council next Wed, Oct 17, 2018
-give a Vacate date after next Wed but send the letter now
____
No show. Deny the appeal.
Referred to the City Council due back on 10/17/2018
11:30 a.m. Hearings
Orders To Vacate, Condemnations and Revocations
7 RLH VO 18-52 Appeal of Attorney Jon Paulson on behalf of Irma Sonia Ortega to a
Revocation of Fire Certificate of Occupancy and Order to Vacate at 990
PAYNE AVENUE.
Sponsors: Bostrom
Jon Paulson, Attorney; Irma Sonia Ortega, 990 Payne Avenue LLC, owner; and her
wife, Isis Delusia, appeared.
Fire Supervisor A.J. Neis: Revocation of Certificate of Occupancy/Order to Vacate is
due to long term non-compliance of a building; C of O process started in Oct 6, 2017;
there are multiple code violations; the Inspector continuously finds new code violations,
not because they were missed but because of the continuous changes that have been
going on without getting the proper permits; the bldg is also supposed to have a partial
sprinkler system installed, which to my understanding, is still not done; there's been
some dispute as to why the contractor won't turn it on (could be anything from the
contractor hasn't been paid to the city not turning it on because of an outstanding
water bill?); the sprinkler system has been required for over one year; so, we have the
City of Saint Paul Page 7
Legislative Hearings Minutes - Final October 9, 2018
appearance of having a fire life-safety system within a bldg with restaurants, etc, & the
system isn't turned on; this bldg has a history of challenges with our office including
allowing illegal occupancies of assemblies for receptions, etc; I understand that is not
happening any longer
-our office has been unable to get voluntary compliance
-Ms. Ortega has had a fire in another one of her properties on Dale Street
-Inspector has not had very good luck getting communication with Ms. Ortega
Ms. Moermond: how many sets of Orders were there during this past year?
Mr. Neis: appointment letter sent in Oct 2017; Orders issued Nov 2017; appointment
letters sent in Jan & May, 2018; Correction Notices in Apr, May, Jun, Aug in 2018; &
finally a Revocation in Sep 2018, the 6th set of Orders in this cycle; typically, we go 90
days
-the cycle before that started in Jul 2015 & it was not approved with Corrections until
Jul 2016 (over 12 Correction Notices before we finally got minimum compliance)
-we've really been trying to work with this property owner & it's been very challenging
Mr. Paulson: after the Sep list came thru, they went thru & did the things that they
were asked to do within the past 15 days; they still need to work on the sprinkler
system; up until this point, the sprinkler system hasn't been required for the 1st floor;
it's required if there are people living on the 2nd floor; the hoods are done, etc.
-the reason for the appeal is, obviously, with 30 days to vacate 6 tenants, it's a
hardship for the tenants, as well
Ms. Moermond: why has it taken 12 months?
Ms. Ortega: we have different tenants; in each space, the tenant is responsible for
taking care of their area; I don't go inside their business; I had a different business & I
wasn't inside this bldg much but we closed the other business; so now, I'm here & I'm
making sure that everything is taken care of it
-this is my wife; she is the one who was on the inspection; she is taking care of a lot of
things
-when we got the Vacate Notice, I went thru the list & I had a meeting with all of the
tenants & I told them the problems
Ms. Moermond: how do you communicate with your tenants normally about these
Orders?
Ms. Ortega: usually, we try to take care of everything
Ms. Delusia: when we have an inspection, I usually tell them what needs to be fixed
inside their own place; they know what they need to do
Ms. Moermond: do you give them the Orders?
Ms. Delusia: no; I tell them what needs to be fixed
Mr. Neis: again, these are not issues that were made in the appeal but we received as
a complaint in Sep; read some of the complaint comments sent to the office; not
made by the Fire Insp: "multiple electrical boxes not active; main electrical room is
blocked with furniture - narrow hallway upon entering room; fire suppression system
does not appear to be in service; hazards in basement including remove concrete;
exposed asbestos insulation where boiler was removed; false stairwell leading to
City of Saint Paul Page 8
Legislative Hearings Minutes - Final October 9, 2018
upstairs has flooring placed over it; occupancy in rear upper floors unable to access
bldg; curtains hung over windows & doors leading to maintenance sheds smell like dog
feces; multiple items stacked in front of doors leading to electrical room in front of
sprinkler room & alarm panel;"
-this has been a continual problem since the 2015-16 Orders; took over a year & over
a dozen Correction Orders
-we are prohibited from divulging the complainant by state law
Ms. Moermond: when will the sprinklers be addressed?
Ms. Ortega: we have had a financial hardship so we haven't been able to finish the
last phase because the sprinkler company put in wet heads in the garage area & I
needed to get them to switch them to fryer heads so they won't freeze in the winter;
otherwise, I'd have to heat the garage & I'm not in a position to heat the garage; we
haven't had the money to finish paying for that; originally, I wanted to make the 2nd
floor compliant & they told me that in order for me to do that, I needed to sprinkler the
entire 1st floor; so that's why we started to install the sprinkler system in the 1st floor
but it wasn't for the first floor; it was for the 2nd floor
Mr. Neis: the fire code is clear that you cannot have a life-safety system that gives the
appearance/illusion that they have protection but they do not & it has to work properly;
the system has to be up & running; typically, if we'd find this in any other bldg, we'd
require the owner to provide a 24/7 fire watch while the bldg is occupied until the fire
system has been restored; otherwise, we wouldn't allow occupancy at all
Ms. Moermond: any programs for sprinkler systems?
Mr. Neis: on the east side--- if there were, we would have given those resources
Ms. Ortega: I think there is some program; I'll look into it
Ms. Moermond: is there a change in the requirement?
Mr. Neis: my understanding is there were some conditions where, if they wanted to do
certain things with the bldg, this partial sprinkler system would be required; so, that
may be correct; but if it's there, it has to be working
-the only parts that were required to be sprinklered were the parts that needed to be;
we weren't adding....
Ms. Moermond: I'm confused; what parts are those?
Mr. Neis: the 1st floor
Ms. Moermond: OK; and you guys were saying something else; I want to be clear
Ms. Ortega: the only part that needed to be sprinklered was the storage area between
the brewery & the restaurant on the first floor; but in planning for the future & using the
2nd floor; we were told by the fire dept. that we'd needed to sprinkler the whole 1st
floor; so, we thought we'd just get it done; but we fell into financial hardship when my
business burnt; so we're having some tough times
-we've addressed all the items on the list except for the sprinklers
-she entered documentation for the hoods with photos that go along with the fixes &
number on the deficiency list (scanned); she described what was on the photos
-we put a tag by the hood & there was one by the door but someone removed it; there's
City of Saint Paul Page 9
Legislative Hearings Minutes - Final October 9, 2018
a line that goes from the hood to the exit; both hoods have been certified
-the 2nd floor is vacant
-we removed all the ext cords & plug adaptors
-we cleaned the hoods
-we fixed the screens
-we replaced the light by the dumpster, etc.
-we will be sending photos that were missed (hamburger shop)
-I will look into what loans may be available from the city
Ms. Moermond: go to the Real Estate section to see what we have for loans for
commercial bldgs; talk to PED Deputy Director, Kristen Guild, 266-6671; try East Side
Community Dev Corp, John Vaughn; & Northeast Nbhd Dev Corp, Chuck Repke
-we need to figure out a deadline for the sprinkler system ($12,000 business loan to
keep on working on it but $100,000 would finish the work completely)
Mr. Neis: I'll have Insp Imbertson go out for a re-inspection Oct 22 to get the list
checked off
Ms. Moermond: we will talk again here on Nov 6 about financing for the sprinkler
system & come up with a plan; we're allowing continued occupancy while this happens
____
Layover to November 6 to discuss remaining items. (Inspection on October 22 to
check off compliant items on list.)
Laid Over to the Legislative Hearings due back on 11/6/2018
1:30 p.m. Hearings
Fire Certificates of Occupancy
8 RLH FCO Appeal of James F. Cannon, Jr. to a Re-Inspection Fire Certificate of
18-171 Occupancy With Deficiencies at 752 CARROLL AVENUE.
Sponsors: Thao
James F. Cannon, Jr, owner, appeared.
Fire Supervisor Leanna Shaff: 2-unit bldg; the last inspection cycle finished in Aug
2014; the next cycle started in Jul 2017 by Insp Elvestad, who is no longer with the
city; at first they went to the wrong party; the insp was picked up by Insp Huseby; there
are 5 large items on the list; one includes adding another unit to a duplex
-I got involved with this in May; Mr. Cannon came to DSI wondering what he needed to
do & I explained that he needed to get a Work Plan submitted to get all of these items
taken care of
-the work that happened was not done under permit
Ms. Mai Vang: this is a legal duplex
Ms. Shaff: back in May, I asked for a plan for deconversion; in the meantime, there
have been a lot of emails back & forth; I'm not sure that Mr. Cannon quite understands
the depth of what has to happen (photos)
Mr. Cannon: there's not 3 units & that's part of my contention; when I purchased the
City of Saint Paul Page 10
Legislative Hearings Minutes - Final October 9, 2018
property about 3 years ago in 2015, the seller had already put a bathroom in the
basement - some work had already been done but I didn't know that no permits had
been pulled at that time; instead of making it habitable space, I left it alone; my
biggest concern is to make the property safe; I do understand to a certain degree,
what Ms. Shaff & Ms. Huseby have asked me to do; the biggest problem I've had is
finding someone who's trustworthy to do the work; I've made some progress; I removed
all the sheet rock in the basement but the person I hired to do that work didn't follow
thru & ended up taking money for work that wasn't done
-I'm just asking for more time to bring it up to code; my intent is not to turn it into a
triplex; I just want to get it safe; just want to know what to do
Ms. Moermond: the Order says to discontinue unapproved use or convert to a legal
use
Mr. Cannon: there's a bathroom in the basement; no kitchen; it was divided into
rooms but unfinished; they had started to turn it into a triplex; a lot of the work was
poorly done, so I didn't move forward on it & because I thought that because it wasn't
going to be used for living or sleeping & that I had made that clear -- I thought that was
enough but apparently, it's not; I just want to make it clear that I didn't want to turn it
into a triplex & that it's not being used as habitable space & because of that, I thought
that I was still in compliance; I guess I'm just new to all of this
Ms. Shaff: we were very clear in our communication with Mr. Cannon; on May 18, Ms.
Huseby writes, "Thank you for coming to the office & talking with Leanna & I; ... this
morning, the City's requiring a Work Plan to be submitted to me re the correction of
the electrical, the removal of sheet rock, correction of the electrical by name of your
electrician under permit either as abandonment of improperly installed for potential
triplex conversion; it goes on... does not mention venting
Ms. Moermond: electrical in walls without permit is a concern
Ms. Shaff: and the venting
-on Jun 4, I got an email from Mr. Cannon: "I wanted to let you know I recently hired a
contractor & an electrician to make sure that everything in the basement is up to code;
so I'll be pulling permits & begin the process of remodeling the basement."
Ms. Moermond: I see that an egress window was installed; so, there was an intention
for there to be a sleeping space down there & a separate entrance into that also
(photos)
-utilities are in the basement so other tenants would need access
-I see a refrigerator down there
-do we have any other plumbing going on besides the bathroom?
Ms. Shaff: I'm not sure
Ms. Moermond: originally, this hearing was scheduled for Sep 25, 2018
Mr. Cannon: that was at my request; I wasn't able to get that time off work
-I had an electrician in 2 weeks ago; he hasn't given me the bid yet; I submitted a
Work Plan
Ms. Shaff: it was not a Work Plan; just a sketch
Mr. Cannon: this is the only property I own; I live here; I did have a couple of bids but I
City of Saint Paul Page 11
Legislative Hearings Minutes - Final October 9, 2018
didn't feel comfortable moving forward with them
Ms. Moermond: the Order has been out there for more than a year
Mr. Cannon: the biggest reason that it's been so long is because I didn't hear anything
from Mr. Elvestad or from the last time he came until almost .....
Ms. Moermond: did he write you an Order telling you that you needed to deconvert this
& that electrical was a part of it?
Mr. Cannon: he did and....
Ms. Moermond: so, the Order has been out there for more than a year
Mr. Cannon: what I'm saying is, the Order was made & I had done everything on there
& I felt that I had complied with what the Order had said & I didn't hear anything from
St. Paul Fire until almost a year later; what I was told was that if I'm living in my
property & I do some electric work on my own property, that I'm still in compliance so I
thought from what I had heard from other people that had been in similar situations,,,,,
I thought I was in compliance; I hadn't heard anything back
-I knew that there was work that needed to be done in May
Ms. Shaff: we have Orders from Aug 24, 2017; Sep 26, 2017; Jun 15, 2018; Aug 23,
2018
-Insp Huseby has notes in here:
-Mar 21, 2018 - working off a C of O
-Mar 29, 2018 - property owner requests more time
-he came in on May 18, 2018; I gave him unit Jun 15 to give me a plan
-I'm forwarding you all the emails
-I'm pretty sure that I told Mr. Cannon that the electrical code requires that if it is a
non-owner occupied unit, that you cannot do the work; if it's a duplex, you can do the
work within your unit; you are still required to have a permit, which is inspected &
signed-off on; on any other part of the property, you are required to have a licensed
electrician working under permit
Ms. Moermond: what's your plan?
Mr. Cannon: I would like to have someone from inspections to come & look at it &
see that all the sheet rock has been removed & tell me what I need to do so that it's
safe & up to code; not a triplex;
Ms. Moermond: I think that you want them to tell you exactly what needs to be done &
their expectation is that you would hire an electrical contractor with the statement:
Remove the illegal wiring that was installed in this basement; the electrical contractor
being a licensed & bonded contractor would know exactly what the electrical code
requires & be able to pull those wires that shouldn't be there & make sure that the
connections are sound & legal; that is their purview & once they pull their permit, one
of the city's electrical inspectors would be able to go in & confirm that what the
contractor has proposed is what the code requires & be able to specify corrections to
the electrical contractor
Mr. Cannon: I'm more clear now than I was before; I thought that I was being told to
convert my duplex into a triplex; that's how I read the Order
City of Saint Paul Page 12
Legislative Hearings Minutes - Final October 9, 2018
Ms. Moermond: you read it wrong
Mr. Cannon: OK
Ms. Moermond: pulling off sheet rock is not a permitted thing but go backwards & pull
a plumbing permit for the bathroom & remove it; if you want to keep the bathroom,
you'll need to have permits pulled on another person's work (plumbing, electrical &
venting)
-Ms. Shaff, you're looking for walls & studs to be gone; illegal wiring removed; illegal
plumbing pulled
Ms. Shaff: yes
Mr. Cannon: I prefer to cap it the plumbing in the bathroom
Ms. Moermond: have it all done by Nov 9, 2018; skip the Work Plan; go straight to the
permits
-if financing is a concern, try Neighborworks
Ms. Shaff: he was given info on other resources; i.e., Rental Rehab Program on city
website
Ms. Moermond:
Grant to November 9, 2018 to remove basement walls, studs, venting, plumbing and
electrical which were installed without permits, or bring into compliance by getting this
work permitted and approved.
Referred to the City Council due back on 11/7/2018
9 RLH FCO Appeal of Mike Bertrand to a Re-Inspection Fire Certificate of Occupancy
18-176 With Deficiencies at 935 FOREST STREET.
Sponsors: Bostrom
Michael J Bertrand, owner, appeared.
Fire Inspector Leanna Shaff: 4 unit bldg; re-inspection of Fire C of O by Insp George
Niemeyer
-31 deficiencies; Mr. Bertrand lives here; started with appointment ltr being sent out
Apr 9, 2018; no show on Apr 24 - no answer at main door; rec'd email from property
owner late in after asking for re-schedule; Insp Niemeyer writes on Jun 11: rec'd call
from PO; he was confused; Jun 25 Insp Niemeyer cancelled; he inspected: Jul 24,
Aug 31, Oct 1, 2018
Ms. Moermond:
-are all the units occupied? (Mr. Bertrand: no)
-has the list diminished at all over time?
-so, what's going on?
Ms. Shaff: on the first Order there were 36 Orders
Mr. Bertrand: I'm basically unemployed; this was the perfect storm, financially; I've
had 3 evictions this year; I own 3 properties on which I live; I fix them with the money
that comes in, too; my self-employment is bathtub refinisher & the business has just
City of Saint Paul Page 13
Legislative Hearings Minutes - Final October 9, 2018
about dried up; so, I took a job with Metro Transit to get health insurance & other
benefits; things were going OK for a while but with the recent attacks on bus drivers
on Mpls - I was almost assaulted; so, I decided to get out of that &then, I went to no
income; I started Uber but that wasn't profitable; I lost income; because of lost
income, I'm down $20,675 for the year; my divorce decree states that at the end of
2018, I have to get my ex-wife off of 2 mortgages; so, the property that I'm selling & I
had a Purchase Agreement on 609-611 Reaney ($97,000); after I paid off Reaney & the
4-plex in which I live, I would have had $32,000 approximately; last Thu, I found out
that, the original PA that I had signed, they assigned the contract - that person backed
out of the PA; so it didn't sell; they offered me the $1000 but I said that I didn't want
the $1000, I wanted the property gone; so then, they came back to me and said that
because of the re-assignment, they wanted the upstairs tenant gone & they thought
that I could do that quickly; I told them that was not proper service; proper service is
giving 30 days and in Oct, it's Dec 1; it's not 30 days from today, it's for Dec 1; and
then, there's no guarantee that the person will be out Dec 1; so, then, I didn't keep my
end of the agreement - the tenant's not out - the deal goes up in smoke
-I live in apartment #1; and someone lives in Apartment #2 on the first floor; #3 & #4
are vacant; the Orders are basically from #3; it has a leaking roof, which I've been
trying to fix all summer but couldn't do it - I couldn't find the source; so, when Insp
Niemeyer came out, he told me about the Rental Rehab Program; I took his advice &
looked it over & it seemed like it was based on credit worthiness & I don't have good
credit; so, I dismissed it;
-I had a bid to do the roof for $20,000 & I had the sale of a property done which would
cover the roof - it's a flat roof; when Insp Niemeyer came back out; he told me that I
could appeal it; I've been a landlord for 20 years & never appealed anything; I thought
that if you appealed something, you got on the city's black list; to me, that was never
an option & Insp Niemeyer convinced me that it's only an option
-George told me to contact Rental Rehab because it's based on keeping the property
maintained, not necessarily on credit worthiness; OK, I applied; they told me that I
needed to submit it thru a contractor, who'd pull the permit & oversee everything
-I'm looking for additional time because I have a commercial driver's license & I'm
going to go on the road for 30 days & make some money - outstate; I won't be home at
night
-the sale of the property is going to happen because it has to happen
Ms. Moermond: you've got Reaney, up/down duplex; Sims & Thomas, nonconforming
use- single family & a duplex; Thomas/Griggs is paid for - the legal address is Forest;
Sims will be paid off with the sale of Reaney; the rest will be used to fix the property; I
do my own work & this is general building maintenance; George never saw water
dripping from the ceiling
Ms. Shaff: #27 - debris falling out of furnaces
Mr. Bertrand: I pulled a permit & replaced 2 water heaters; permit is finaled; I met the
Sr. Mechanical Insp there; they re-plumbed that & a lot of debris (sand, gravel) from
inside the pipe ended coming out the pipe; Insp fired up the furnace #4 to make sure
there was proper draft
Ms. Moermond: #27; Insp is asking to have all 4 furnaces tested
Mr. Bertrand: at $200 a piece; that's $800; that can be done immediately
Ms. Moermond: any other life-safety issues that affect Units #1 & #2?
City of Saint Paul Page 14
Legislative Hearings Minutes - Final October 9, 2018
Mr. Bertrand: I fixed the door & installed a door jam; 2 permits were pulled & finaled
for the water heaters
Ms. Moermond: #30- " water heaters' permit; contact the licensed contractor to
repair/replace water heater; 2 water heaters were installed; there's only 1 permit for one
of them; obtain a 2nd permit for the 2nd water heater & have both permits inspected &
approved"
Mr. Bertrand: that's finaled off; its' been done; I met the gentleman that came out
there; I know that he inspected 2 water heaters
Ms. Shaff: I see a permit on Jul 13, 2018; it's finaled; I see different permit numbers
but I'm confused - I've never seen it written this way in AMANDA; it's not very explicit
Ms. Moermond: so, we really need to get more info from Paul Zellmer
Mr. Bertrand: I'm trying to sell Reaney ($97,000); it's supposed to close on Dec 1,
2018
-tomorrow at 2:30 pm, a roofing guy is coming out to repair the roof; the ceiling is open
in #3; I know where it's leaking, exactly
Ms. Moermond: 1) conditioning an extension on doing the furnaces right away; 2)
wondering about certifying Units #1 & #2 and taking #3 & #4 off
Mr. Bertrand: blue cupboards are in #4 - just needs a drawer front on that one; needs
carpet & paint; appliances are there; mechanicals are there; & leave #3 until the
repairs are done
-going on the road next week Tue
Ms. Moermond: #4 is in pretty rough shape; if you can get half the bldg certified &
work towards getting Units #3 & #4 certified, that keeps you in there & give you some
time
-furnaces done this week; water heater permits finaled - Super Shaff can talk with Insp
Zellmer; notes aren't clear; get the furnace receipt to Insp Niemeyer; if corrections are
required, we'll have to have another conversation
-Insp will send an appointment ltr for the week of Nov 18, 2018
____
Grant the following deadlines:
-Grant to close of business on October 15, 2018 for Items 27 & 30
-Grant to November 16, 2018 for Items 1, 2, 3, 23, 24 & 26
-Grant to January 18, 2019 for the balance of the orders
-Units 3 & 4 cannot be occupied until repairs are completed and the apartments
certified for occupancy.
Referred to the City Council due back on 11/7/2018
2:30 p.m. Hearings
Vacant Building Registrations
10 RLH VBR 18-78 Appeal of Shirzad Raimi to a Vacant Building Registration Requirement
Fee Warning Letter at 1055 FREMONT AVENUE.
City of Saint Paul Page 15
Legislative Hearings Minutes - Final October 9, 2018
Sponsors: Prince
No one appeared.
Ms. Moermond: this is a Vacant Building Registration; I emailed back & forth with
Supervisor Matt Dornfeld; owner Shirzad Raimi is asking for a 60-day extension; I'll
round that up to a 90-day extension to be on the safe side
-I'll recommend that Council grant a 90-day extension
____
Waive the vacant building fee for 90 days.
Referred to the City Council due back on 11/7/2018
City of Saint Paul Page 16
Agenda
15 West Kellogg Blvd.
City of Saint Paul Saint Paul, MN 55102
Meeting Agenda - Final-revised
Legislative Hearings
Marcia Moermond, Legislative Hearing Officer
Mai Vang, Hearing Coordinator
Jean Birkholz, Hearing Secretary
legislativehearings@ci.stpaul.mn.us
651-266-8585
Tuesday, October 9, 2018 9:00 AM Room 330 City Hall & Court House
9:00 a.m. Hearings
Remove/Repair Orders
1 RLH RR Ordering the rehabilitation or razing and removal of the structures at 610
18-38 SAINT ALBANS STREET NORTH within fifteen (15) days after the
September 26, 2018 City Council public hearing. (Public hearing held
September 26)
Sponsors: Thao
2 RLH RR Ordering the rehabilitation or razing and removal of the structures at 1232
18-45 SEVENTH STREET EAST within fifteen (15) days after the November 7,
2018, City Council Public Hearing.
Sponsors: Prince
3 RLH RR Ordering the rehabilitation or razing and removal of the structures at 1213
18-46 THIRD STREET EAST within fifteen (15) days after the November 7, 2018,
City Council Public Hearing.
Sponsors: Prince
10:00 a.m. Hearings
4 RLH RR Making finding on the appealed nuisance abatement ordered for 1536
18-16 VAN BUREN AVENUE in Council File RLH RR 18-2.
Sponsors: Jalali Nelson
11:00 a.m. Hearings
Correction Orders
5 RLH CO Appeal of Michelle Camilo to a Correction Notice at 679 COOK AVENUE
18-37 EAST.
Sponsors: Bostrom
City of Saint Paul Page 1 Printed on 10/8/2018
Legislative Hearings Meeting Agenda - Final-revised October 9, 2018
6 RLH CO Appeal of David Simons to a Correction Notice at 1033 DESOTO
18-39 STREET.
Sponsors: Brendmoen
11:30 a.m. Hearings
Orders To Vacate, Condemnations and Revocations
7 RLH VO Appeal of Attorney Jon Paulson on behalf of Irma Sonia Ortega to a
18-52 Revocation of Fire Certificate of Occupancy and Order to Vacate at 990
PAYNE AVENUE.
Sponsors: Bostrom
1:30 p.m. Hearings
Fire Certificates of Occupancy
8 RLH FCO Appeal of James F. Cannon, Jr. to a Re-Inspection Fire Certificate of
18-171 Occupancy With Deficiencies at 752 CARROLL AVENUE.
Sponsors: Thao
9 RLH FCO Appeal of Mike Bertrand to a Re-Inspection Fire Certificate of Occupancy
18-176 With Deficiencies at 935 FOREST STREET.
Sponsors: Bostrom
2:30 p.m. Hearings
Vacant Building Registrations
10 RLH VBR Appeal of Shirzad Raimi to a Vacant Building Registration Requirement
18-78 Fee Warning Letter at 1055 FREMONT AVENUE.
Sponsors: Prince
City of Saint Paul Page 2 Printed on 10/8/2018