Bicycle and Pedestrian Advisory Board
Regular MeetingWichita, KS · September 24, 2013
Minutes
City of Wichita Bicycle and Pedestrian Advisory Board
Tuesday, September 24, 2013 /5:30 – 7:00 P.M.
777 E. Waterman, Building 200
Wichita Transit Van Maintenance Facility
Conference Room
Meeting Notes
Attendance
Board Maxine Bostic, Jack Brown, Barry Carroll, Ryan Hollingshead,
Members Jerry Jones Thomas Lasater, Anna Mosher, Alex Umberger
City Staff: Mike Lemke, Scott Wadle
Other: Tom Liss, Charla Liss
Description
Call to Order
Jack Brown,welcomed everyone to the meeting.
The Board members introduced themselves.
Approval of August Meeting Notes
The meeting notes of August 6, 2103 were approved by consensus.
Project Tracking Reports
Redbud Trail: Julianne Kallman, the project manager, reports that
the project will be out for bid before the end of the year; and the
artwork designs are available for public review.
WSU to Schweiter: this was one of the corridors that the City Council
recently authorized design funding for.
1st & 2nd Street Bikeways: this is also one of the project that the City
Council authorized design funding for.
4) Sycamore Shared Lane Markings: no update
5) Delano Path & Proposed oil drilling: the Wichita‐Sedgwick County
Metropolitan Area Planning Commission reviewed the project on
September 12th. There are conflicting reports about whether the
drilling project will proceed or not. [project cancelled]
New members were given the ‘Project Tracking List’ to review and
current members also.
1
Delano Bicycle Parking – Phase II
Mike Lemke, Planning Department, provided a PowerPoint
presentation that described an overview of: the City Council
endorsed Delano West Douglas Avenue Bicycle Parking Plan;
implementation of Phase I; funding for Phase II; and recommended
updates to the Plan prior to the implementation of Phase II. The
recommendations for updates to the Plan are from a project
Steering Committee made up of representatives from the Delano
Neighborhood Association and Historic Delano.
On August 20th the Delano Neighborhood Association reviewed and
indicated their support for the recommended updaetes.
Barry Carroll made a motion to approve the recommended updates
to the Delano West Douglas Avenue Bicycle Master Plan. The motion
was seconded by Anna Mosher and was unanimously approved.
Barry Carroll made another motion that the Design Council keep the
existing artwork for the Delano bike racks, based upon the
neighbors’ preference. The motion was seconded by Thomas Lasater
and approved unanimouslyThe Wichita City Councilwill consider the
recommended updates to the Delano West Douglas Avenue Bicycle
Parking Plan at a future meeting.
Bicycle Facility Maintenance Overview (no action required)
Scott Wadle, Planning Department, provided information on both
the Park Department, and the Public Works and Utilities
Departments and their respective maintenance roles and
responsibilities
Citizens can access the City’s website and make an inquiry about a
maintenance issue.
Citizens can also call a ‘one stop’ phone number to report problems
at: 942‐4482
Staff from the Park Department , and the Public Works and Utilities
Department will be invited to future meetings.
Below are highlights from comments by individual Board Members.
o Maintenance is critical – quality can be more important than
quantity of facilities.
o Maybe corporate sponsorship can be useful for funding
maintenance.
The general consensus of the Board is that the pavement conditions
and sweeping are the priority maintenance activities that the Board
would like to learn more about.
Wayfinding System Plan (no action required)
Scott Wadle, Planning Department, reported on a potential Kansas
2
Health Foundation grant for $25,000
If funded, grant funds would be used to develop a wayfinding system
plan for the City.
Grant awards will be announced in early 2014
Routine Accommodation Policy (no action required)
Scott Wadle reported that the Health & Wellness Coalition has
funded this proposed initiative $30,000 for the routine
accommodation policy and $183,336 for development of street
design standards.
A Request for Proposal [RFP] will be announced in
October/November.
The selected contractor will develop, internal, City policies
andprocedures.
Pedestrian Master Plan Update (no action required)
Scott Wadle provided an overview and reported on the Pedestrian
Master Plan Open House held on September 12th
In addition, the City offered a pedestrian facility design training for
engineers and other stakeholders. On online e‐survey regarding the
Pedestrian Master Plan will be forwarded to board members for
distribution.
This Pedestrian Master Plan initiative is slated to end around July
2014
Closing Thoughts
Jack Brown asked for closing thoughts from board members
There were no comments
Public Comments
Tom & Charla Liss, 7024 Plaza Drive, Haysville, KS addressed the
board
They suggested that increased public education is needed for both
cyclists and motorists
Tom suggested that the new ‘Three‐Foot Passing Law’ needs to be
publicized
The board members thanked Tom & Charla Liss for their comments
For the record I believe we indicated that we would ask for a
representative of the Police Dept to attend a future meeting to
disucss issues realting to bike safety.
Next Meeting: Monday, October 14, 2014 /@5:30 pm
3
There being no further business, the meeting was officially adjourned at 7:10 pm.
Barry L. Carroll
Recorder
4
Agenda
City of Wichita Bicycle and Pedestrian Advisory Board
Tuesday, September 24, 5:30 – 7:00 P.M.
777 E. Waterman, Building 200
Wichita Transit Van Maintenance Facility
Conference Room
Agenda
Time Description
5:30 pm Call to Order
Jack Brown, Interim Bicycle and Pedestrian Advisory Board Chair
5:31 pm Approval of August Meeting Notes
Jack Brown, Interim Bicycle and Pedestrian Advisory Board Chair
5:35 pm Project Tracking Reports
Jack Brown, Interim Bicycle and Pedestrian Advisory Board Chair
5:50 pm Delano Bicycle Parking – Phase II
Mike Lemke, Planning Department
6:00 pm Bicycle Facility Maintenance Overview (no action)
Scott Wadle, Planning Department
6:30 pm Wayfinding System Plan (no action)
Scott Wadle, Planning Department
6:35 pm Routine Accommodation Policy (no action)
Scott Wadle, Planning Department
6:45 pm Pedestrian Master Plan Update (no action)
Scott Wadle, Planning Department
6:50 pm Closing Thoughts
Jack Brown, Bicycle and Pedestrian Advisory Board Interim Chair
6:55 pm Public Comments
Jack Brown, Bicycle and Pedestrian Advisory Board Interim Chair
Notice – City Council Members may attend this meeting.
City of Wichita
Bicycle and Pedestrian Advisory Board Meeting
August 6, 2013
SUBJECT: Public Bicycle Parking Request Process
INITIATED BY: Metropolitan Area Planning Department
Recommendation: Recommend that the City Council endorse the proposed updates to the Delano West
Douglas Avenue Bicycle Parking Plan (Plan).
Background: On April 5, 2011, the Wichita City Council endorsed the Plan as the official City of
Wichita guide for the provision of public bicycle parking within the Plan boundaries. The Plan was
developed by a Steering Committee of business owners and residents, with assistance from City staff,
have worked for approximately eight (8) months to create the Delano West Douglas Avenue Bicycle
Parking Plan (Plan). The plan boundaries are the former railroad corridor to the north, McLean Boulevard
to the east, Seneca Street to the west, and a half block south of Douglas Avenue to the south.
1
The Plan includes recommendations for the following actions.
• The City should install 120 on-street bike racks along the West Douglas Avenue corridor, and 15
off-street bike racks at Lawrence-Dumont Stadium. The total estimated cost to purchase and
install the 135 bike racks is $72,000. The Plan recommends that the City fund 100 percent of the
costs, while the Delano Community Development Corporation and other stakeholders seek non-
City contributions to expedite the purchase and installation of the bike racks. The Plan
recommends that the installation be divided into nine (9) phases in order to phase funding, allow
for review of usage, and adjustments to future improvements if necessary. The Plan also includes
the following recommendations.
• It is recommended that an artist consultation occur after the installation of the phase I bike racks,
the Plan recommends that an artist be consulted to identify options for installing vehicle charging
stations and/or artistic bike racks prior to the implementation of phase II and subsequent phases.
The vehicle charging stations/artistic bike racks should be substituted for the Delano Bollard bike
racks in key locations, to be determined.
• The City should include bicycle parking as part of the proposed new Central Branch Library
facility designs.
In 2011, the City of Wichita utilized Energy Efficiency Community Block Grant funds from the
American Recovery and Renewal Act (ARRA) to purchase and install the Phase I bicycle racks.
On June 11, 2013, the Wichita Area Metropolitan Planning Organization (WAMPO) awarded $11,924 of
federal Transportation Enhancement funds as a match for the $8,346 of City Capital Improvement
Program (CIP) Bicycle Enhancement line item funds to install the Phase II bicycle racks.
Since the award of the funds, representatives from Historic Delano and the Delano Neighborhood
Association have met with City staff members to review the Plan and to identify any necessary updates.
Below is a listing of the proposed updates.
• Rack location and prioritization
o Between Elizabeth and Martinson – add two of the racks on the north side of the street to
Phase 2
o Between Seneca and Walnut - make two of the racks on the north side of the street part of
Phase 2 and make two of the racks on the south side of the street part of Phase 4
o Between Osage and Oak - make two of the racks on the south side of the street part of
Phase 6
o Between Sycamore and McLean – make four of the bicycle racks on the north side part of
Phase 2 and make four of the bicycle racks on the south side part of Phase 4
• The Plan should recommend the artist consultation between phases 2 and 3.
The proposed updates were presented to the Delano Neighborhood Association at their August meeting.
After reviewing the proposed changes, the neighborhood association indicated full support for the
representatives from Historic Delano and the Neighborhood Association.
Analysis: The updates to the Plan will help to ensure that the installation of the Phase II bicycle racks
meet the current and near future needs of the Plan area stakeholders.
2
Financial Considerations: The City of Wichita has identified $8,346 from the City CIP Bicycle
Enhancement line item to provide a local match for the $11,924 of WAMPO TE funding for the purchase
and installation of the Phase II bicycle parking.
Legal Considerations: None.
Recommendation/Actions: It is recommended that the Wichita Bicycle and Pedestrian Advisory Board
recommend that the City Council endorse the proposed updates to the Delano West Douglas Avenue
Bicycle Parking Plan (Plan).
Attachments: None.
3
Wichita Bicycle Facilities Maintenance
Plan – DRAFT
September 19, 2013
Background
On February 5, 2013, the Wichita City Council endorsed the Wichita Bicycle Master Plan. The Plan is a
guide for how the City can make it easier, safer, and more convenient to get around the City on a
bicycle. The plan guides the provision of bicycle related infrastructure, policies, and plans by the City.
Included within the Plan is a recommendation to ensure that the City “prioritize and fund bicycle facility
maintenance” (Strategy 7). In order to implement the strategy, the Plan recommends the following
actions.
1. Establish prioritization criteria and frequency for annual maintenance of existing facilities.
2. Annual maintenance: Create prioritized plan for maintaining and funding on- and off-road
facilities (e.g. sweeping bike lanes; fixing pot holes, etc.).
In order to implement the two actions listed above and Strategy 7 in the Wichita Bicycle Master Plan, it
is recommended that the City of Wichita fund this project to develop a Wichita Bicycle Facilities
Maintenance Plan and an annual maintenance work plan.
It is recommended that the Wichita Bicycle Maintenance Plan include, but not be limited to, the
following elements.
• Overview with general return of investment analysis explanation of the importance of proper
maintenance of bicycle facilities
• Identification of current maintenance activities
• Identification of maintenance responsibilities by organization (e.g. adjacent property owner,
City, Wichita Transit, utilities, etc.)
• Review of best practices for maintenance
• Categorization of maintenance activities (i.e. routine or major)
• Prioritization criteria for frequency of maintenance
• Cost estimates for maintenance activities
• Checklist for maintenance field staff with instructions and frequency
• Checklist for new construction maintenance estimates
• Recommended policies and procedures for receiving, administering, tracking, and recording
maintenance requests
• Performance measures to evaluate performance
• Recommendations for future funding sources and related policies
• Recommended elements of an annual maintenance work plan
• Detour protocols for bicycle facilities that are closed for maintenance or other work
• Recommendations for changes to construction standards and design process to reduce
maintenance costs
• Identification of current citizen reporting processes (i.e. how citizens report a City issue)
Page 1 of 2
• Identification of current City issue logging, routing, and tracking
• Recommendations for improvements related to citizen issue reporting processes, logging,
routing, and tracking.
The annual bicycle facilities maintenance work plan will be designed so that it can be replicated every
year and can include the following elements.
• Identification of maintenance activities, if different than Wichita Bicycle Maintenance Plan
• Prioritization of bicycle facilities for maintenance activities
• Funding requests for maintenance activities
• Identification of maintenance projects for improvements to bicycle facilities
• Coordination activities for maintenance as part of other maintenance programs
Analysis
During the creation of the Wichita Bicycle Master Plan, maintenance was identified as a high priority by
the planning process participants. The creation of the Wichita Bicycle Facilities Maintenance Plan and an
annual maintenance work plan will help to ensure that maintenance is addressed in a systematic and
cost-effective manner that reduces long-term costs and enhances safety.
Addressing the maintenance of the City’s existing bicycle facilities is important due to the substantial
investments in the many off- and on-street bicycle facilities that have been made in the past 40 years.
Now is also a critical time to address maintenance because the City is poised to invest in another 149
miles of bicycle facilities over the next 10 years.
Costs
It is estimated that the cost to undertake this project will be approximately $60,000. The costs to
undertake this project are not eligible for inclusion in the Wichita Capital Improvement Program but are
an eligible use of funds from the City operating budget. Per the email received on April 23, 2013, KDOT
and WAMPO staff have determined that the development of a Wichita Bicycle Facilities Maintenance
Plan is an eligible use of federal Surface Transportation Program (STP) funding.
In addition to the financial costs, the planning process will require staff time and commitment from a
variety of departments, including but not limited to, those listed below.
• Public Works and Utilities
o Maintenance
o Engineering
o Stormwater
• Planning
• Park and Recreation
• Metropolitan Area Building and Construction (graffiti)
• Information Technology
Page 2 of 2
Wichita Bicycle Route and Wayfinding
System Plan; and Demonstration Project
– DRAFT
September 19, 2013
Contents
Background ................................................................................................................................................... 1
Analysis ......................................................................................................................................................... 2
Costs .............................................................................................................................................................. 2
Background
On February 5, 2013, the Wichita City Council endorsed the Wichita Bicycle Master Plan. The Plan is a
guide for how the City can make it easier, safer, and more convenient to get around the City on a
bicycle. The plan guides the provision of bicycle related infrastructure, policies, and programs by the
City. Included within the Plan is the recommendation to install a signed bicycle route wayfinding system
(Strategy 2). The wayfinding system will visually connect the bicycle network, allowing bicyclists to reach
their destination with minimal or no use of a map. The signage will help increase safety by directing
bicyclists to preferred facilities and by increasing the awareness of bicycle facilities that may not be
readily visible from a major roadway.
In order to implement the strategy, the Plan recommends the following actions.
1. Adopt a wayfinding protocol (developed as part of the Wichita Bicycle Master Plan)
2. Create a signed bicycle route system plan
3. Prioritize segments and spot locations within the bicycle network where wayfinding signage is to
be installed.
This project will implement the Wichita Bicycle Master Plan by creating a Wichita Bicycle Route and
Wayfinding System Plan; developing designs for a bicycle route and wayfinding demonstration project
on a six mile segment of the existing K-96 Path; and construct the demonstration project. This project
will result in the following deliverables:
• A bicycle route system plan
• Final designs for bicycle route and wayfinding (signage and markings) on the K-96 Path from Dr.
Dey Park (Grove Park) to Central Ave.
• Construction of the bicycle route and wayfinding (signage and markings) on the K-96 Path from
Dr. Dey Park (Grove Park) to Central Ave.
Page 1 of 3
The Bicycle Route and Wayfinding System Plan will include the following tasks listed below.
• Work with a steering committee, who will guide the development of the plan
• Work with a technical advisory committee consisting of City staff, who will provide input and
information related to the project.
• Conduct public outreach and provide opportunities for public input related to the project
• Review and assess best practices for bicycle route and wayfinding systems, including but not
limited to the following:
o Route identification (both pavement markings and signage)
o Destination identification (which ones, what proximity, etc.)
o Installation and maintenance
• Creation of the Wichita Bicycle Route and Wayfinding System Plan
• Creation of a capital budget to serve as the basis for a budget for implementing the routes and
wayfinding over a three (3) year period
• Creation of a planning level costs calculator for installation and maintenance costs
The Wichita Bicycle Route and Wayfinding System Plan should include, but not be limited to the
following elements listed below.
• Principals for developing the plan
• Map(s) of the bicycle route and wayfinding system locations
• Identification of the bicycle route and wayfinding corridors by priority
• Prioritization criteria for prioritization
• Criteria for destination signage
• Identification of destinations for signage
• Signage and pavement marking designs
• Design guidance for bicycle routes
• Recommended funding amounts and sources (maintenance and installation)
Analysis
The creation of bicycle routes and wayfinding within the City of Wichita could help to expand bicycle
access to destinations throughout the City, greatly expanding the geographic coverage of the bicycle
network by utilizing local streets where appropriate. The creation of the bicycle routes and wayfinding is
significantly less than the costs of developing bikeways (bike lanes, bicycle boulevards, paths, etc.) and
can be accomplished in a much shorter time frame.
Costs
It is estimated that the cost to undertake this project will be approximately $
• $25,000 for the development of the Wichita Bicycle Route and Wayfinding System Plan
• $8,400 for the design of the demonstration project (20% of construction costs)
• $53,421 for construction of the bicycle route and wayfinding demonstration project ($7,00 per
mile, contingency, and City admin and overhead project fees )
Page 2 of 3
Funding
The Kansas Department of Transportation has awarded the City of Wichita $28,618 of Transportation
Enhancement funding for the construction of the bicycle route and wayfinding demonstration project
along the 6-mile segment of the K-96 Path from Dr. Dey Park to Central Avenue. As part of the TE
application and award, the City of Wichita has committed to providing $9,593 to construct the project.
The City of Wichita has also identified $8,400 to fund the design of the design of the demonstration
bicycle route and wayfinding project.
The unfunded portions of the project are $25,000 for the Wichita Bicycle Route and Wayfinding System
Plan and $15,263 for construction of the bicycle route and wayfinding demonstration project.
Staffing
In addition to the financial costs, the planning process will require staff time and commitment from a
variety of departments, including but not limited to, those listed below.
• Public Works and Utilities
o Maintenance
o Engineering
• Planning
• Park and Recreation
Page 3 of 3
2013 - 2014
City of Wichita Bicycle and Pedestrian
Advisory Board
Future Meeting Topics
September 19, 2013
Meeting Dates and Time: Meetings are held on the **** unless otherwise noted. Meetings begin at
5:30p.m. and are held in the **** at the Wichita City Hall, located at 455 N. Main St.
August
• Purpose of Board and brief overview
• Delano Bicycle Parking – Phase II
• Delano oil drilling and future path corridor impacts
• Bikeways Design Projects
• Pedestrian Master Plan
September
• Delano Bicycle Parking – Phase II
• Bicycle Facility Maintenance (no action)
o Who is responsible for what
o How to report maintenance issues
o Plan recommendations
Funding options
• Routine accommodation policy and design standards (no action)
o What will the project accomplish
o What is the funding source
o How will it be managed
o What is the schedule
• Wayfinding System Plan (no action)
o What will the project accomplish
o How can we fund the project
• Pedestrian Master Plan (update)
October
• Vote for Chairperson
• Bicycle signage and markings detail sheet (endorse)
o What markings should be utilized
o What signage should be utilized
• Bicycle Facility Designs
• CIP Submissions
o Park Department
o Engineering Division
• WAMPO TAC Representative
o October 28th next meeting
• Pedestrian Master Plan Steering Committee Appointments
November
• Retreat
o Bylaws subcommittee
December 2013
• Review draft annual report
• Review 2014 work plan (including meeting schedule)
January 2014
• Redbud Path
• Kellogg & I-235 Project
• Enforcement (Police Department)
o Roadways
Actions that lead to crashes
Highest crash intersections
Grant funding
o Paths
Patrols
Statistics – how much crime is associated with paths?
****
Parking Lot
• Library and Delano Path
• West Bank development and Delano Path
• T-intersections and crosswalks
• Pedestrian signals and flashing school zone lights
• Kellogg and Greenwich
• Northwest Bypass
• KDOT Practice to not award TA funds in MPO locations