Muyni
← Back to Charleston

Board of Architectural Review

Regular Meeting

Charleston, SC · December 29, 2014

Agenda

Agenda

BAR-DRB Approval Report --- Friday, January 2, 2015 at 05:14 PM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2014-12-29 2014-12-29 Single- and Two-family Renovation 141229-55CannonSt-1 Repaint exterior to match existing. No repairs. no changes. BAR Staff Final risse Approval 2014-12-29 2014-12-29 Multi-family Renovations 141229-39MontaguSt-1 Repaint exterior to match existing. No rot repair. No changes. BAR Staff Final risse Approval 2014-12-29 2014-12-29 Sign Project 141229-82ChurchSt-1 3.36sqft right angle sign BAR Staff Final risse Approval 2014-12-29 2014-12-29 Commercial Renovation 141229-189Saint exploratory demo to find source of water intrusion. Repairs to be permited later. BAR Staff Final risse PhilipSt-1 Approval 2014-12-29 2014-12-29 Uninhabitable Structures 141229-584KingSt-1 Freestanding canopy installed in 2013 without permit. BAR Staff Final risse Approval 2014-12-30 2014-12-30 Single- and Two-family Renovation 141230-51SmithSt-1 Repaint exterior with no changes. BAR Staff Final risse Approval 2014-12-30 2014-12-30 Single- and Two-family Renovation 141230-8TrumboSt-1 Repainting- siding color change to sullivans dune BAR Staff Final stubble Approval 2014-12-30 2014-12-30 Single- and Two-family Renovation 141230-4 1/2KrackeSt-1 Changes to window patters, siding materials, and fascia on side of house. change BAR Staff Final risse of stairs to brick. Approval 2014-12-30 2014-12-30 Multi-family Renovations 141230-7DoughtySt-1 Replacement of 3tab shingle with new arch shingle BAR Staff Final stubble Approval 2014-12-30 2014-12-30 Single- and Two-family Renovation 141230-66WarrenSt-1 HVAC changeout- same location BAR Staff Final hopkins Approval 2014-12-30 2014-12-30 Commercial Renovation 141230-138LoganSt-1 Exterior renovation / repair of siding, trim, windows, doors, porch rails, and shutters BAR Staff Final risse according to detailed scope. No changes Approval 2014-12-30 2014-12-30 Sign Project 141230-441MeetingSt-2 changeout of existing lighted sign for Midtown Elan (becoming Midtown Grand) BAR Staff Final hopkins Approval 2014-12-30 2014-12-30 Commercial Renovation 141230-34Saint wall extension at existing wall for security purposes BAR Staff Final risse PhilipSt-1 Approval 2014-12-30 2014-12-30 Multi-family Renovations 141230-21AmherstSt-1 renovations of existing building for triplex use BAR Staff Final hopkins Approval BAR-DRB Approval Report --- Friday, January 2, 2015 at 05:14 PM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2014-12-30 2014-12-30 BAR 141230-21AmherstSt-2 construction of a free-standing fourth unit in rear of existing house BAR Staff Final hopkins Approval 2014-12-31 2014-12-31 Single- and Two-family Renovation 141231-50HasellSt-1 repairs and painting to match existing BAR Staff Final hopkins Approval 2014-12-31 2014-12-31 Sign Project 141231-103SpringSt-1 19sqft facade sign pin mounted aluminum BAR Staff Final risse Approval 2013-07-02 2015-01-02 Demolition - Complete 130702-91StuartSt-1 removal of CWS water storage tank BAR/DRB DEMO stubble Commercial/Mult.Fam. Approval 2015-01-02 2015-01-02 Sign Project 150102-441KingSt-1 Replace existing facade sign as per approved design. BAR Staff Final keane Approval Total Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19

Get email alerts for Charleston

A daily email when new agendas and minutes are posted.

Report an issue with this meeting